Sales & Distribution - Available to Promise (ATP) 2009
1 Posted by: Sudipta Sanyal on Aug 2009 @sdn.sap.som
Table of Contents
Available to Promise (ATP)................................................................................................ 2
Dates:- ............................................................................................................................. 2
Order Date .................................................................................................................. 2
Material Availability Date .......................................................................................... 2
Transportation Planning Date ..................................................................................... 2
Loading Date ............................................................................................................... 2
Goods Issue Date ........................................................................................................ 2
Delivery Date .............................................................................................................. 2
Times:- ............................................................................................................................ 3
Pick/Pack Time ........................................................................................................... 3
Transportation Lead Time ........................................................................................... 3
Loading Time .............................................................................................................. 3
Transit Time ................................................................................................................ 3
How do we View Availability Situation? ....................................................................... 3
When is Availability Check Triggered? ......................................................................... 4
How we arrive at a Confirmed Delivery Date? .............................................................. 5
Below is the logic the system uses to check availability: ........................................... 5
Backwards Scheduling ................................................................................................ 6
Control of Availability Check ..................................................................................... 7
Forward Scheduling .................................................................................................... 8
Result of Availability Check: Some Sample Scenarios .............................................. 9
One-time delivery ..................................................................................................... 10
Complete dlv. ............................................................................................................ 10
Delivery proposal ...................................................................................................... 10
Continue .................................................................................................................... 10
Case: Confirmation on Requested Delivery Date ..................................................... 11
Case: Confirmation after Requested Delivery Date (Complete Delivery) ...... 12
Case: Confirmation after Requested Delivery Date (Partial Delivery) .................... 13
See the screens below corresponding to this situation. ................................................. 14
Case: Confirmation after Requested Delivery Date (Replenishment Lead Time) ... 16
What Configuration & Data do we need? ..................................................................... 21
Controlling Elements:- .............................................................................................. 21
Material Master Data:- .............................................................................................. 22
Scheduling Data:-...................................................................................................... 22
Sales & Distribution - Available to Promise (ATP) 2009
2 Posted by: Sudipta Sanyal on Aug 2009 @sdn.sap.som
Available to Promise (ATP)
Dates:-
Order Date
Date on which the sales order is entered. System proposes the current date by default.
Material Availability Date
The date on which the material must be available. On the material availability date, the
vendor must start the activities relevant for delivery, such as picking and packing the
goods. The material availability date must be sufficiently early enough so that the goods
are prepared by the loading date.
Transportation Planning Date
We must arrange transportation by this date, so that the delivery can be sent to the
customer. The date from which the organization of goods transport must begin. The
transportation planning date must be selected early enough so that the transport is
available on the loading date to load the goods.
Loading Date
Picking and packing must be completed by this date so that the goods are ready for
loading.
Goods Issue Date
Goods must physically leave the shipping point by this date. The date on which the
goods must leave the company to arrive at the customer location in time.
Delivery Date
Customer should receive delivery of the goods by this date. The date on which goods are
to arrive at the customer's premises. Example: The delivery date can be the delivery date
requested by the customer (desired delivery date) or the date confirmed in the vendor's
order acknowledgment or shipping confirmation (confirmed or acknowledged delivery
date).
Sales & Distribution - Available to Promise (ATP) 2009
3 Posted by: Sudipta Sanyal on Aug 2009 @sdn.sap.som
Times:-
Pick/Pack Time
Difference between the material availability date and loading date.
Transportation Lead Time
Number of days required for organizing a shipment for an item to be delivered.
Loading Time
Difference between loading date and goods issue date.
Transit Time
Number of days required for delivering an item from your company to the customer via a
certain route.
How do we View Availability Situation?
Run Transaction: CO09
Enter Plant & Checking Rule, against which the Availability is to be checked. For Sales Order
Checking Rule = A, Delivery = B, Back Order = BO
Sales & Distribution - Available to Promise (ATP) 2009
4 Posted by: Sudipta Sanyal on Aug 2009 @sdn.sap.som
In this screen, we can see:
• Availability Checking Group (Avail Check): 02
• Check Rule : A
• End Lead Time Refers to the end of Replenishment Lead Time. If that is not included in
the Configuration, then this field is not visible.
• Totals Display:** Receipts = Sum of all +ve Quantities in Rec./Reqd qty Column
(Leave out the last row, MRP Element 001, since it is a total)
These are all the Planned Incoming Movements
• Issues = Sum of all -ve Quantities in Rec./Reqd qty Column
These are all the Planned Outgoing Movements
• Confirmed issues = Sum of all (+ve) Quantities in Confirmed Column
These are the confirmations against ATP.
When is Availability Check Triggered?
While creating a Sales Order, Production Order, Delivery, etc. Below is a screen from Sales
Order. At the bottom is a button for Check Material Availability. Also while creating the order, if
the Availability situation cannot meet the requested delivery date, the system goes to Availability
screen automatically. (Discussed later)
Run Transaction: VA01
Sales & Distribution - Available to Promise (ATP) 2009
5 Posted by: Sudipta Sanyal on Aug 2009 @sdn.sap.som
How we arrive at a Confirmed Delivery Date?
Below is the logic the system uses to check availability:
• Using the Scheduling data from Delivery & Transportation Scheduling, the system does
the backward calculation from the Requested Delivery Date. This is used to arrive at Material
Availability Date.
• On the Material Availability Date, system checks the Available Qty, as seen in CO09 in
column Cum. ATP Qty. If the Available Qty is > than Required Qty, Requested Delivery Date is
confirmed. Otherwise,
• System moves into the future till it finds the required Available Qty. The new date is then
the new Material Availability Date.
• On getting the confirmed Material Availability Date, system does the Forward Scheduling
to arrive at a Confirmed Delivery date.
Sales & Distribution - Available to Promise (ATP) 2009
6 Posted by: Sudipta Sanyal on Aug 2009 @sdn.sap.som
Backwards Scheduling
Sales & Distribution - Available to Promise (ATP) 2009
7 Posted by: Sudipta Sanyal on Aug 2009 @sdn.sap.som
Control of Availability Check
Sales & Distribution - Available to Promise (ATP) 2009
8 Posted by: Sudipta Sanyal on Aug 2009 @sdn.sap.som
Forward Scheduling
Sales & Distribution - Available to Promise (ATP) 2009
9 Posted by: Sudipta Sanyal on Aug 2009 @sdn.sap.som
Result of Availability Check: Some Sample Scenarios
Above is the Availability Screen as seen in Sales Order. It has following Buttons:
Sales & Distribution - Available to Promise (ATP) 2009
10 Posted by: Sudipta Sanyal on Aug 2009 @sdn.sap.som
One-time delivery
In the results of Availability, we have 3 options to choose from. This is Case 1, when we can
confirm the Customer's Requested delivery Date. The details of this are visible in the first sub
screen below.
Complete dlv.
This is Case 2, when we can confirm the Customer's Requested complete delivery at a future
Date. The details of this are visible in the second sub screen below.
Delivery proposal
This is Case 3, when we can confirm the Customer's Requested delivery in partial quantities at
future dates. The details of this are visible in the third sub screen below.
Continue
If we select one of the above options, the same gets saved in the ATP results. Otherwise, we can
select this button. In that case, system leaves the ATP screen without saving the ATP results.
Sales & Distribution - Available to Promise (ATP) 2009
11 Posted by: Sudipta Sanyal on Aug 2009 @sdn.sap.som
Case: Confirmation on Requested Delivery Date
Sales & Distribution - Available to Promise (ATP) 2009
12 Posted by: Sudipta Sanyal on Aug 2009 @sdn.sap.som
Case: Confirmation after Requested Delivery Date (Complete Delivery)
Sales & Distribution - Available to Promise (ATP) 2009
13 Posted by: Sudipta Sanyal on Aug 2009 @sdn.sap.som
Case: Confirmation after Requested Delivery Date (Partial Delivery)
Sales & Distribution - Available to Promise (ATP) 2009
14 Posted by: Sudipta Sanyal on Aug 2009 @sdn.sap.som
See the screens below corresponding to this situation.
The first screen shows the Availability (CO09) Overview. We have an incoming PO on 19 Jan.
!image034.jpg!In the second screen
We have created a SO (VA01) on 09 Feb, with requested Delivery date for 09 Feb.
Now we change the Availability situation, by changing the PO Date to 12 Feb. See the screens below corresponding to this situation.
The first screen shows the Availability (CO09) Overview. We have an incoming PO on 12 Feb.
See the new Cum ATP qty. date wise accordingly.
!image038.jpg!In the second screen
We have created a SO on 09 Feb, with requested Delivery date for 09 Feb.
See that the Delivery got staggered according to the new Availability situation.
Sales & Distribution - Available to Promise (ATP) 2009
15 Posted by: Sudipta Sanyal on Aug 2009 @sdn.sap.som
Sales & Distribution - Available to Promise (ATP) 2009
16 Posted by: Sudipta Sanyal on Aug 2009 @sdn.sap.som
Case: Confirmation after Requested Delivery Date (Replenishment
Lead Time)
In the screens below, we have simulated the RLT.
In the first scenario RLT is not activated, see below: 'Check without RLT'. The system considers
only the confirmed inward movements. So out of 500 only 21 is confirmed.
See IMG Guide > SD > BF > AC & TOR > AC > AC with ATP > Control of Availability Check
Sales & Distribution - Available to Promise (ATP) 2009
17 Posted by: Sudipta Sanyal on Aug 2009 @sdn.sap.som
See VA01
In the second scenario RLT is activated, but corresponding data in material master is not
maintained. Material is procured In-House (E), but In-house Production time (1st screenshot) &
RLT (2nd
screenshot) are not maintained. The system assumes both these times as Zero. So,
complete 500 are confirmed immediately. See MM01
Sales & Distribution - Available to Promise (ATP) 2009
18 Posted by: Sudipta Sanyal on Aug 2009 @sdn.sap.som
Sales & Distribution - Available to Promise (ATP) 2009
19 Posted by: Sudipta Sanyal on Aug 2009 @sdn.sap.som
In the third scenario RLT is activated, corresponding data in material master is maintained.
Material is procured In-House (E), In-house Production time (10 days) & RLT (not maintained).
The system confirms 21 on basis of incoming material. Rest 479 is confirmed after 14 days. This
is because 10 working days for in-house production + 4 holidays (Sat-Sun).
Sales & Distribution - Available to Promise (ATP) 2009
20 Posted by: Sudipta Sanyal on Aug 2009 @sdn.sap.som
In the fourth scenario RLT is activated, corresponding data in material master is maintained.
Material is procured In-House (E), In-house Production time (10 days) & RLT (20 days). The
system confirms 21 on basis of incoming material. Rest 479 is confirmed after 14 days. This is
because 20 working days for in-house production + 8 holidays (Sat-Sun).
Sales & Distribution - Available to Promise (ATP) 2009
21 Posted by: Sudipta Sanyal on Aug 2009 @sdn.sap.som
What Configuration & Data do we need?
Controlling Elements:-
Requirements Type
Requirements Class
Schedule Line Category
Delivery Item Category
Checking Group
Checking Rule
Scope of Check
Strategy Group
Partial Delivery Agreement
Replenishment Lead Time
Sales & Distribution - Available to Promise (ATP) 2009
22 Posted by: Sudipta Sanyal on Aug 2009 @sdn.sap.som
Material Master Data:-
MRP 1 > MRP Group
MRP 2 > Planned Delivery Time
MRP 2 > GR Processing Time
MRP 3 > Checking Group for Availability Check
MRP 3 > Strategy Group
MRP 3 > Total Replenishment Lead Time
Scheduling Data:-
Transit Time
Loading Time
Pick/Pack Time
Transportation Planning Lead Time