Page 1: Sagamore Avenue Sewer Extension City Council Meeting...Feb 03, 2020  · •2018/2019 FB Environmental Completed Water Quality Sampling •2018 Sagamore Ave Sewer Extension Preliminary

City of Portsmouth, NH

Sagamore Avenue Sewer ExtensionCity Council Meeting

Suzanne Woodland, Deputy City Attorney

Terry Desmarais, PE, City Engineer

February 3, 2020

Page 2: Sagamore Avenue Sewer Extension City Council Meeting...Feb 03, 2020  · •2018/2019 FB Environmental Completed Water Quality Sampling •2018 Sagamore Ave Sewer Extension Preliminary

• Origin of the Sagamore Sewer Project

• Addressing Public Questions and Concerns at Public Meetings

• Motion for Work Session

Introduction

2City Council Meeting – February 3, 2020

Page 3: Sagamore Avenue Sewer Extension City Council Meeting...Feb 03, 2020  · •2018/2019 FB Environmental Completed Water Quality Sampling •2018 Sagamore Ave Sewer Extension Preliminary

• Pre 2005 Failed Septic And Use Of Holding Tanks

• 2005 Project First Appears CIP

• 2008 Engineering Study

• 2010 Bacteria Study by DES

• 2011 Engineering Update

• 2014 Great Bay Non-Point Source Study (DES)

Origin Of This Project

3City Council Meeting – February 3, 2020

Page 4: Sagamore Avenue Sewer Extension City Council Meeting...Feb 03, 2020  · •2018/2019 FB Environmental Completed Water Quality Sampling •2018 Sagamore Ave Sewer Extension Preliminary

• Supplemental Environmental Project

o Keeps the dollars local

o Delivers local environmental benefits

o Links with other projects in the watershed

• DPW Area Stormwater Treatment Project

• Water Quality Monitoring

• Lafayette Road (DOT) Stormwater Project

• Peverly Hill Road Stormwater Improvements

• March 2016 City Council Approves Consent Decree Second Modification

Incorporation of Project into Consent Decree

4City Council Meeting – February 3, 2020

Page 5: Sagamore Avenue Sewer Extension City Council Meeting...Feb 03, 2020  · •2018/2019 FB Environmental Completed Water Quality Sampling •2018 Sagamore Ave Sewer Extension Preliminary

• 2018/2019 FB Environmental Completed Water Quality Sampling

• 2018 Sagamore Ave Sewer Extension Preliminary Design Report

• July 2019 City Council Bond Authorization

Implementation

5City Council Meeting – February 3, 2020

Page 6: Sagamore Avenue Sewer Extension City Council Meeting...Feb 03, 2020  · •2018/2019 FB Environmental Completed Water Quality Sampling •2018 Sagamore Ave Sewer Extension Preliminary

CURRENT SAGAMORE PROJECT LIMITS

6

Page 7: Sagamore Avenue Sewer Extension City Council Meeting...Feb 03, 2020  · •2018/2019 FB Environmental Completed Water Quality Sampling •2018 Sagamore Ave Sewer Extension Preliminary

• Property Owners Will NOT Be Required To Tie-In If They Have A Functioning Septic System

o Sewer Use Ordinance update will include this provision

• Property Owners Will Have To Tie-In If Their Septic System Fails

o New Hampshire Department of Environmental Services (DES) will not issue a permit for a septic system replacement

Important Project Points

7City Council Meeting – February 3, 2020

Page 8: Sagamore Avenue Sewer Extension City Council Meeting...Feb 03, 2020  · •2018/2019 FB Environmental Completed Water Quality Sampling •2018 Sagamore Ave Sewer Extension Preliminary

• September 4, 2019 Public Meeting at DPW

o Kickoff to field work

o Cost apportionment greatest concern

• Questions Received at Multiple City Council Meetings

• November 25, 2019 Public Meeting at Council Chambers

o Responses to questions

o Updated cost proposal

• December 9, 2019 Public Meeting at Council Chambers

o Defined future City Council decisions needed

Public Meetings

8City Council Meeting – February 3, 2020

Page 9: Sagamore Avenue Sewer Extension City Council Meeting...Feb 03, 2020  · •2018/2019 FB Environmental Completed Water Quality Sampling •2018 Sagamore Ave Sewer Extension Preliminary

Low Pressure Sewer System• Advantages

o Lower construction costs due to shallower bury depth of pipe (Shallow ledge in project area)

o Is not dependent on grade and topography

o Less invasive construction

• Disadvantages

o Higher property owner annual operation and maintenance costs

Gravity Sewer (No Pressure)• Advantages

o Lower long term costs to the home owner

• Disadvantages

o Higher construction costs

o More invasive/destructive construction

o Requires pump stations based on topography

o Requires permanent easements for cross country sewer lines

Sewer System Type - Low Pressure (LPSS)

9Photo credits to Engenuity Group Inc. and the

Town of Ocean Ridge Florida

City Council Meeting – February 3, 2020

Page 10: Sagamore Avenue Sewer Extension City Council Meeting...Feb 03, 2020  · •2018/2019 FB Environmental Completed Water Quality Sampling •2018 Sagamore Ave Sewer Extension Preliminary

• Long Track Record

o 60,000 Installs in New England

• Industry Standard

• Simple And Reliable, Least Amount Of Worry

• 10-15 Year Pump Life Span

• Local Installation And Long Term Ownership Have Been Successful

EONE Low Pressure Pump Stations

10

Typical

Annual

Electric

Cost: $36

https://www.youtube.com/watch?v=VW7daUv18Rg

City Council Meeting – February 3, 2020

Page 11: Sagamore Avenue Sewer Extension City Council Meeting...Feb 03, 2020  · •2018/2019 FB Environmental Completed Water Quality Sampling •2018 Sagamore Ave Sewer Extension Preliminary

Existing EOne Pump System In Place

11

Pump

CoverElectrical

Panel

Page 12: Sagamore Avenue Sewer Extension City Council Meeting...Feb 03, 2020  · •2018/2019 FB Environmental Completed Water Quality Sampling •2018 Sagamore Ave Sewer Extension Preliminary

Current LPSS In the City of Portsmouth

12

Foyes CornerTuckers Cove

Jones Ave

Pleasant Point

Area

Edmond Ave

Islington Street

Page 13: Sagamore Avenue Sewer Extension City Council Meeting...Feb 03, 2020  · •2018/2019 FB Environmental Completed Water Quality Sampling •2018 Sagamore Ave Sewer Extension Preliminary

Cost Apportionment Proposal For City Council Consideration

13

Owner’s Cost

Street

Public Sewer Main

Sewer Lateral

Curb Stop

Private Sewer

Lateral (PSL)

All Work Executed By City Contract

Pump and Connection

(Close To House)

City’s Cost

RO

W o

r Ed

ge

of

Ro

ad

City Council Meeting – February 3, 2020

Page 14: Sagamore Avenue Sewer Extension City Council Meeting...Feb 03, 2020  · •2018/2019 FB Environmental Completed Water Quality Sampling •2018 Sagamore Ave Sewer Extension Preliminary

• Sagamore Ave Sewer Extension Work Session to Address Outstanding Policy Decisions Such As:

o Cost Apportionment

o What Happens At Sale Of Property

o How to Handle Properties That Do Not Connect Until Later

o If the Cost to Abandon Existing Septic Will be Private or City

o Who Pays for Replacement of Pump at End of Life (~15 Year Mark)

o Who Pays for Maintenance of Pumping System

o Additional Funding Authorization

Motion for Work Session

14City Council Meeting – February 3, 2020