Page 1: Safety Audit Checklist for Roadworks

Safety Audit Checklist

for Roadworks

MAIN ROADS Western Australiadocument.doc

Page 2: Safety Audit Checklist for Roadworks

September 1997

Road Safety Audits have been used in Western Australia for several years. They have, however largely focussed on projects at design stage and on existing roads. This document extends the general principles of Road Safety Auditing as detailed in the AUSTROADS publication – Road Safety Audit for road construction works. Before examining the checklists for road construction works it is necessary to quickly outline some key principles of Road Safety Auditing.

A Road Safety Audit is a formal examination of an existing or future road and traffic project, or any project which interacts with road users, by which an independent, qualified examiner who reports on the projects crash potential and safety performance.

The purpose of the Road Safety Audit is to examine the crash potential and safety performance of the road or road proposal. It is a formal process using a defined procedure rather than an informal check. The outcome of a road safety audit is a Road Safety Audit Report, which identifies any road safety deficiencies and if appropriate, makes recommendations aimed at removing or reducing these deficiencies. The benefit of this is;

The likelihood of crashes on the road network can be reduced

Severity of crashes is reduced

Road safety is given greater prominence in the minds of road designers and traffic engineers

The need for costly remedial work is reduced

The total cost of a project to the community, including crashes, disruption and trauma is reduced.

It is essential that personnel conducting a safety audit have previously acquired knowledge of a range of conditions and operational requirements associated with the roadworks to be audited.

A road construction safety audit should be performed by a person or team of people who have sufficient experience and expertise in the areas of road safety engineering, road construction works, crash investigation and prevention, and traffic engineering. A cross-fertilisation of ideas can result from discussions involving a team with diverse backgrounds who possess different approaches, thus leading to a more in-depth approach than that would be obtained using a single person.

Experience in road safety engineering and an aptitude for crash investigation and prevention techniques are key skills for a successful road safety auditor. These skills should be linked to an understanding of traffic engineering, road construction and traffic management together with knowledge in road design techniques. As well as these requirements a road safety auditor should have undertaken the Road Safety Audit Training course. The team leader for the road safety audit should have worked on at least five road safety audits as a team member.

General Process

MAIN ROADS Western Australiadocument.doc

Page 2

Page 3: Safety Audit Checklist for Roadworks

The whole basic process can be summed up in a few basic straight forward steps.

The designer or client needs to select the auditor or audit team with appropriate skills and independence.

The designer must then provide background information by collecting plans and site information for the auditor and provide a statement of the projects objectives.

A commencement meeting must then be held with the client, designer and auditor all present to discuss the audit and hand over the information.

The auditor must then assess the documents (use checklists, drawings, data and field notes) as well as inspect the site both by day and night. The types of road users and likely conditions must be considered as a result of the inspection.

A report must be written by the auditor to identify items of safety deficiency and make recommendations.

For major projects it is usually necessary for the client/designer plus the auditor to once again meet, in the form of a completion meeting, where the recommendations can be discussed.

The client/designer must then consider each recommendation, and document reasons for accepting or rejecting each one.

A copy of this report must be forwarded to the auditor for feedback.

Elements of the project are then redesigned according to the recommendations.

As well as knowledge of general road safety and traffic engineering reference documentation, roadworks safety audit personnel should be familiar with the following specific documents:

1. Road Safety Audit, AUSTROADS, 1994, Australia

2. Australian Standard 1742.3 – 1985 (Manual of Uniform Traffic Control Devices. Part 3 – Traffic Control Devices for works on roads)

3. Traffic Management At Road Works. Main Roads Competency – Based Training Manual.

4. General Field Guide, 1995. Main Roads. Traffic Management For Roadworks

5. Road Traffic Act and Road Traffic Code

6. Occupational Safety and Health Act 1984.

7. Code of Practice - Roadworks. Main Roads

8. Road Safety Audit - Operational Guidelines. Main Roads

 

 

 

 

MAIN ROADS Western Australiadocument.doc

Page 3

Page 4: Safety Audit Checklist for Roadworks

Roadworks Site

1. General items

1.Horizontal and Vertical Alignment

2.Turning Radii and Tapers

3.Sight and Stopping Distances

4.Traffic lane Safety and Visibility

5.Street Lighting and other Delineation

6.Roadworks Signs

7.Access to Property

2. Traffic Signs and Pavement Markings

1.Signs

2.Location/Placement

3.Day /Night Requirements

4.Control

5.Delineation and Reflective Markers

6.Pavement Marking

7.Detours

3. Traffic Signals

1.Temporary Traffic Signals

2.Location

3.Visibility

4.Signals Display

5.Traffic Movements

4. Pedestrians and Cyclists

1.Paths

2.Elderly and Disabled

3.Cyclists

4.Safe Grates

5.Warning

MAIN ROADS Western Australiadocument.doc

Page 4

Page 5: Safety Audit Checklist for Roadworks

5. Road Pavement

1.Pavement Defects

2.Skid Resistance

3.Ponding

4.Loose Screenings

6. Traffic Speed Management

1.Speed Restriction Signs

2.Speed Management

3.Signs Requirements

 

MAIN ROADS Western Australiadocument.doc

Page 5

Page 6: Safety Audit Checklist for Roadworks

ROAD WORKS SAFETY AUDITExisting Roadworks (Stage 5)

Location :_______________________________________________________

Date of On-Site Inspection : (Day) ___ /___ /___ (Night) ___ /___ / ___

Time : _______________________________ Weather : ___________________

CHECKLIST – General items

CHECKLIST – GENERAL ITEMS

 Item Issues to be considered Comments

1

Horizontal And Vertical Alignment

Are the road works located safely with respect to horizontal and vertical alignment?

If not, does works signing cater for this?

 

2

Turning Radii and Tapers

Are turning radii and tapers constructed in accordance with guidelines?

Are the tapers delineated by road works cones where necessary?

Are the width of the lanes satisfactory for the traffic using the works area?

Are the alignment of kerbs, traffic islands and medians satisfactory?

 

3

Sight and Stopping Distances

Are sight and stopping distances in accordance with guidelines?

 

 

MAIN ROADS Western Australiadocument.doc

Page 6

Page 7: Safety Audit Checklist for Roadworks

Item Issues to be considered Comments

4

Traffic Lane Safety and Visibility

Are bus stops appropriately located with adequate clearance from the traffic lane for safety and visibility?

Can passengers safely walk to and from bus stops?

 

5

Street Lighting and other Delineation

Is appropriate street lighting or other delineation provided at the road works to ensure that the site is safe at night? (Note: the site must be visited at night to determine this)

Is the work area safe for pedestrians and cyclists at night?

 

6

Roadworks Signs

Have unnecessary signs been removed when works are not in progress (eg. at night)?

 

7

Access to Property

Do the roadworks adversely affect property access?

Have the owners been consulted with, etc?

 

 

 

 

CHECKLIST – Traffic Signs and Pavement Markings

MAIN ROADS Western Australiadocument.doc

Page 7

Page 8: Safety Audit Checklist for Roadworks

Item Issues to be considered Comments

1

Signs

Are all necessary regulatory, warning and direction signs in place?

Are they correctly placed clean, and conspicuous?

Do they conform in general with AS 1724.3 – 1996 and Main Roads Department of WA Guidelines, or other recognised guidelines?

If Chevron alignment markers are installed, have the correct types of markers been used?

 

2

Location/

Placement

Are traffic signs in their correct locations, and properly positioned with respect to lateral clearance and height?

Are signs placed so as not to restrict sight distance, particularly for turning vehicles?

 

3

Day/Night Signs Requirements

Are the correct signs used for each situation including at night where required, and is each sign necessary?

 

4

Control

Are other traffic control devices according to standards and used correctly?

Are flagmen or temporary traffic signals requires – where, when and how?

 

5

Delineation and Reflective Markers

[a] Are traffic lanes clearly delineated

[b] Have temporary Reflective Markers been installed?

[c] Where coloured Reflective Markers are used, have they been installed correctly?

 

 

MAIN ROADS Western Australiadocument.doc

Page 8

Page 9: Safety Audit Checklist for Roadworks

 

Item Issues to be considered Comments

6

Pavement Marking

Are all necessary pavement markings installed in accordance with guidelines?

Are vehicle paths through the work area clear to motorists?

Are work areas clearly defined and clear of through traffic when flagmen not used?

Does the site present difficulties for motorcyclists day or night?

Have these been addressed?

 

7

Detours

Do temporary detours cater for heavy vehicles and buses to safely manoeuvre in their designated lane?

 

 

 

 

MAIN ROADS Western Australiadocument.doc

Page 9

Page 10: Safety Audit Checklist for Roadworks

CHECKLIST – Traffic Signals

 

Item Issues to be considered Comments

1

Temporary Traffic Signals

Are the temporary traffic signals clearly visible to approaching motorists?

Are additional warning signs required?

Are signs warning of temporary traffic signals adequate?

Are the ends of likely vehicle queues visible to motorists so that they may stop safely?

 

2

Location

Are traffic signals operating correctly? Is the number and location of signal displays adequate?

 

3

Visibility

Have any visibility problems caused by the rising or setting sun been addressed?

Do any site works or any construction equipment create visibility problems for traffic signals?

 

4

Signal Display

Are signal displays shielded so that they can be seen only by the motorist for whom they are intended?

 

5

Traffic Movements

Are all movements including pedestrians catered for by the temporary traffic signals?

 

 

 

 

 

 

 

MAIN ROADS Western Australiadocument.doc

Page 10

Page 11: Safety Audit Checklist for Roadworks

CHECKLIST – Pedestrians and Cyclists CHECKLIST – PEDESTRIANS AND CYCLISTS

Item Issues to be considered Comments

1

Paths

Are pedestrians and cyclists affected by the work area?

Are there appropriate travel paths and crossing points for pedestrians and cyclists?

 

2

Elderly and Disabled

Are there adequate safety access provisions for the elderly, disabled, children, wheel chairs and prams. [eg. holding rails, kerbs and median crossings, ramps] ?

 

3

Cyclists

Is the bicycle route continuous, i.e. free of squeeze points or gaps?

 

4

Safe Grates

Are bicycle safe grates provided at drainage gully pits where necessary?

 

5

Warning

Are pedestrian and cyclists adequately warned of obstructions and temporary works hazards on their travelled way?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MAIN ROADS Western Australiadocument.doc

Page 11

Page 12: Safety Audit Checklist for Roadworks

CHECKLIST – Road Pavement

CHECKLIST – ROAD PAVEMENT

Item Issues to be considered Comments

1

Pavement Defects

Is the pavement free of defects [eg. excessive roughness or rutting, potholes etc.] which could result in safety problems [eg. loss of steering control]?

 

2

Skid Resistance

Does the pavement appear to have adequate skid resistance, especially on steep descents?

 

3

Ponding

Is the pavement free of areas where ponding or sheet flow of water may occur, with resultant safety problems?

 

4

Loose Screenings

Is the pavement free of loose screenings?

 

 

 

 

 

 

 

 

 

 

 

 

 

MAIN ROADS Western Australiadocument.doc

Page 12

Page 13: Safety Audit Checklist for Roadworks

CHECKLIST – Traffic Speed Management

 

Item Issues to be considered Comments

1

Speed Restriction Signs

Are speed restriction signs required for these works?

If so are they correctly applied?

 

2

Speed Management

Are motorists informed of need to slow down through Roadworks site?

Are other devices required for speed management?

 

3

Signs Requirements

Do speed restriction signs require to be maintained all day and at night?

 

 

MAIN ROADS Western Australiadocument.doc