Page 1: Runway  Extension And  Culverts

04/15/23 1

Runway Extension and Culverts

Improvement Plans, Staking and Compaction Testing by

Cubit Engineering for General Atomics Aeronautical Systems.

Page 2: Runway  Extension And  Culverts

04/15/23 2

Project Overview

3000’ Runway Extension at Gray Butte Flight Test Facility.

Aluminum Arch Culverts from Contech used to bridge existing flood control channel.

Protective berm to direct sheet flows.

Project crossed two County jurisdictions.

Page 3: Runway  Extension And  Culverts

04/15/23 3

Improvement Plans

Page 4: Runway  Extension And  Culverts

04/15/23 4

Culvert Construction

Page 5: Runway  Extension And  Culverts

04/15/23 5

Finished Culverts

Page 6: Runway  Extension And  Culverts

04/15/23 6

Finished Runway

Page 7: Runway  Extension And  Culverts

04/15/23 7

Thank You for Viewing