What is Risk?
� Risk = f (Likelihood, Severity)
® All Rights Reserved
What is Risk Assessment?
A tool to
� Identify OSH hazards
� Evaluate risk
� Prioritise measures / actions
® All Rights Reserved
Why Risk Assessment?
� Reduce serious accidents
� Protect the safety & health of employees
� Legal obligation
® All Rights Reserved
How to Assess Risk?
CONTROLCONTROLFix itFix it
EVALUATEEVALUATEAssess itAssess it
IDENTIFYIDENTIFYFind itFind it
® All Rights Reserved
Find it
� Hazard Identification
� What can happen, why & how
� E.g. Electrocution, NID, Falling to death
� Approach
� Trade based (Occupation)
� Activity based (Tasks)
® All Rights Reserved
Assess it: Likelihood
� Analyse LIKELIHOOD� Usually underestimated
� Consider existing controls
� Work conditions & procedures
Common or repeating occurrenceFrequent
Possible or known to occurOccasional
Not likely to occurRemote
DescriptionLikelihood
® All Rights Reserved
Assess it: Severity
� Be realistic
� No. of people affected
� Individuals at risk
Injury requiring medical treatment or ill-health leading to disability
includes lacerations, burns, sprains, minor fractures, dermatitis, deafness, work-related upper limb disorders
Moderate
No injury, injury or ill-health requiring first aid treatment onlyincludes minor cuts & bruises, irritation, ill-health with temporary discomfort
Minor
DescriptionSeverity
Fatal, serious injury or life-threatening occupational disease
includes amputations, major fractures, multiple injuries, occupational cancer & acute poisoning & fatal diseases
Major
® All Rights Reserved
Assess it: MOM Risk Matrix
Medium riskLow riskLow riskMinor
High riskMedium riskLow riskModerate
High riskHigh riskMedium riskMajor
FrequentOccasionalRemote
Likelihood
Severity
® All Rights Reserved
Assess it: Risk Level
� Carry out careful hazard evaluation to ensure risk level is reduced to as low are reasonably possible within a defined time period.
� Interim risk control measures, such as admin controls, may be implemented.
� Management attention is required.
Moderatelyacceptable
MediumRisk
� No additional risk control measures may be needed.
� May need frequent review to ensure risk level is accurate & does not increase over time.
AcceptableLow Risk
Recommended actionsRisk
acceptability
Risk
Level
� High Risk level must be reduced to min. Medium Risk before work commences.� There should be no interim risk control measures� Risk controls not be too dependent on PPE.� Hazard should be eliminated before work commences.� Immediate management intervention is required before work commences.
Not acceptable
High Risk
® All Rights Reserved
Fix it: Hierarchy of Control
SUBSTITUTIONSUBSTITUTION
ENGINEERING ENGINEERING
CONTROLSCONTROLS
ELIMINATIONELIMINATION
ADMINISTRATIVEADMINISTRATIVE
Safe
Design
Safe
WorkerPPEPPE
® All Rights Reserved
MOM Risk Assessment Method
Main con
Engineer, Tan
TY (25 Jul 06)
Glass contract
or P/L(28 Aug
06)
Implement permit-to-work system
Markings to be
removed at the end of the installation
MedRe-mote
Moderate
Secure work platform
Fall arrest
harness and anchorage
DeathFalling off transparent
open edge / floor
opening or wet glass
Install-ing
skylight
1
Action
Officer
(Follow-
up date)
Risk Control Measure Risk
LevelLLH SEV
Existing Risk
Control
Possible
Accident /
Ill Health &
Persons-
at-Risk
HazardActivity#
Risk Control Risk EvaluationHazard Identification
Find itFind it Assess itAssess it Fix itFix it
® All Rights Reserved
Put simply…
HazardHazard
IdentificationIdentification
RiskRisk
ControlControl
Implement &Implement &
Regular ReviewRegular Review
RiskRisk
EvaluationEvaluation
® All Rights Reserved
RMAF
� $5 million Risk Management Assistance Fund
� 70% of consultancy cost
� cap of $7,500
� 200 or less employees
� incldg admin & managerial staff
� Not received any RA funding previously
� Recognized RM course conducted by an ATP
� Min 2 managerial /supervisory staffs
® All Rights Reserved
RMAF
� How to apply?� Thru’ 11 appointed RMAF agents
� Association of Aerospace Industries (S’pore)� Association of Singapore Marine Industries� EDC@ASME� EDC@SCCCI� EDC@SMa� EDC@SMCCI� Singapore Business Federation� Singapore Contractors Association Limited� Singapore National Employers Federation� Specialists Trade Alliance of Singapore� The Institution of Engineers, Singapore
® All Rights Reserved
http://http://http://http://http://http://http://http://www.mom.gov.sg/oshdwww.mom.gov.sg/oshdwww.mom.gov.sg/oshdwww.mom.gov.sg/oshdwww.mom.gov.sg/oshdwww.mom.gov.sg/oshdwww.mom.gov.sg/oshdwww.mom.gov.sg/oshd
® All Rights Reserved
® All Rights Reserved
® All Rights Reserved
® All Rights Reserved
® All Rights Reserved
[email protected][email protected][email protected][email protected]
http://http://http://http://www.mom.gov.sg/oshdwww.mom.gov.sg/oshdwww.mom.gov.sg/oshdwww.mom.gov.sg/oshd