REVISIONS TO THE 2020-2029 STIP ITEM N HIGHWAY PROGRAM STIP ADDITIONS DIVISION 7 BURLINGTON, CAPITAL FOR FIXED ROUTE VEHICLE REPLACEMENT ADD PROJECT TA-6733 TO STIP FOR FFY2020. NEW PROJECT DEVELOPED FOR FEDERAL FUNDING AWARD. PROJECT ADDED AT REQUEST OF BGMPO. CAPITAL FY 2020 - (L) $206,000 FY 2020 - (5307) $1,029,000 $1,235,000 * TA-6733 ALAMANCE PROJ.CATEGORY BURLINGTON, CAPITAL FOR PEDESTRIAN IMPROVEMENTS FOR FIXED ROUTR SERVICES ADD PROJECT TD-6322 TO STIP FOR FFY2020. NEW PROJECT DEVELOPED FOR FEDERAL FUNDING AWARD. PROJECT ADDED AT REQUEST OF BGMPO. CAPITAL FY 2020 - (L) $10,000 FY 2020 - (5307) $50,000 $60,000 * TD-6322 ALAMANCE BURLINGTON, ADA SERVICES ADD PROJECT TD-6322 TO STIP FOR FFY2020. NEW PROJECT DEVELOPED FOR FEDERAL FUNDING AWARD. PROJECT ADDED AT REQUEST OF BGMPO. OPERATIONS FY 2020 - (L) $42,000 FY 2020 - (5307) $169,000 $211,000 * TG-6812A ALAMANCE PROJ.CATEGORY BURLINGTON, OPERATING ASSISTANCE TO MAINTAIN CURRENT LEVEL OF SERVICE IN ADDITION TO SERVICE EXPANSION FOR WEEKEND SERVICE. ADD PROJECT TO-6170 TO STIP FOR FFY2020. NEW PROJECT DEVELOPED FOR FEDERAL FUNDING AWARD. PROJECT ADDED AT REQUEST OF BGMPO. OPERATIONS FY 2020 - (L) $1,697,000 FY 2020 - (5307) $1,697,000 $3,394,000 * TO-6170 ALAMANCE PROJ.CATEGORY BURLINGTON, PLANNING FOR PLANNING FOR FIXED ROUTE SERVICE EXPANSION ADD PROJECT TP-5161 TO STIP FOR FFY2020. NEW PROJECT DEVELOPED FOR FEDERAL FUNDING AWARD. PROJECT ADDED AT REQUEST OF BGMPO. PLANNING FY 2020 - (L) $1,000 FY 2020 - (5307) $4,000 $5,000 * TP-5161 ALAMANCE PROJ.CATEGORY BURLINGTON, PLANNING FOR PLANNING FACILITY FEASIBILITY STUDY ADD PROJECT TP-5162 TO STIP FOR FFY2020. NEW PROJECT DEVELOPED FOR FEDERAL FUNDING AWARD. PROJECT ADDED AT REQUEST OF BGMPO. PLANNING FY 2020 - (L) $19,000 FY 2020 - (5307) $76,000 $95,000 * TP-5162 ALAMANCE PROJ.CATEGORY DIVISION 10 NORTH DAVIDSON STREET, CONSTRUCT SIDEWALK FROM EAST 37TH STREET TO BEARWOOD AVENUE. ADD RIGHT-OF-WAY IN FY 21 AND CONSTRUCTION IN FY 21 NOT PREVIOUSLY PROGRAMMED AT THE REQUEST OF RAIL DIVISION. RIGHT-OF-WAY 2021 (O) $1,000,000 CONSTRUCTION 2021 (O) $600,000 2022 (O) $600,000 $2,200,000 * U-5008A MECKLENBURG EXEMPT PROJ.CATEGORY 1 Thursday, June 4, 2020 * INDICATES FEDERAL AMENDMENT

Upload: others

Post on 29-Sep-2020

12 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP ADDITIONS

DIVISION 7DIVISION 7BURLINGTON, CAPITAL FOR FIXED ROUTE VEHICLE REPLACEMENTADD PROJECT TA-6733 TO STIP FOR FFY2020. NEW PROJECT DEVELOPED FOR FEDERAL FUNDING AWARD. PROJECT ADDED AT REQUEST OF BGMPO.

CAPITAL FY 2020 - (L)$206,000FY 2020 - (5307)$1,029,000

$1,235,000

* TA-6733ALAMANCEPROJ.CATEGORY

BURLINGTON, CAPITAL FOR PEDESTRIAN IMPROVEMENTS FOR FIXED ROUTR SERVICESADD PROJECT TD-6322 TO STIP FOR FFY2020. NEW PROJECT DEVELOPED FOR FEDERAL FUNDING AWARD. PROJECT ADDED AT REQUEST OF BGMPO.

CAPITAL FY 2020 - (L)$10,000FY 2020 - (5307)$50,000

$60,000

* TD-6322ALAMANCE

BURLINGTON, ADA SERVICESADD PROJECT TD-6322 TO STIP FOR FFY2020. NEW PROJECT DEVELOPED FOR FEDERAL FUNDING AWARD. PROJECT ADDED AT REQUEST OF BGMPO.

OPERATIONS FY 2020 - (L)$42,000FY 2020 - (5307)$169,000

$211,000

* TG-6812AALAMANCEPROJ.CATEGORY

BURLINGTON, OPERATING ASSISTANCE TO MAINTAIN CURRENT LEVEL OF SERVICE IN ADDITION TO SERVICE EXPANSION FOR WEEKEND SERVICE.ADD PROJECT TO-6170 TO STIP FOR FFY2020. NEW PROJECT DEVELOPED FOR FEDERAL FUNDING AWARD. PROJECT ADDED AT REQUEST OF BGMPO.

OPERATIONS FY 2020 - (L)$1,697,000FY 2020 - (5307)$1,697,000

$3,394,000

* TO-6170ALAMANCEPROJ.CATEGORY

BURLINGTON, PLANNING FOR PLANNING FOR FIXED ROUTE SERVICE EXPANSIONADD PROJECT TP-5161 TO STIP FOR FFY2020. NEW PROJECT DEVELOPED FOR FEDERAL FUNDING AWARD. PROJECT ADDED AT REQUEST OF BGMPO.

PLANNING FY 2020 - (L)$1,000FY 2020 - (5307)$4,000

$5,000

* TP-5161ALAMANCEPROJ.CATEGORY

BURLINGTON, PLANNING FOR PLANNING FACILITY FEASIBILITY STUDYADD PROJECT TP-5162 TO STIP FOR FFY2020. NEW PROJECT DEVELOPED FOR FEDERAL FUNDING AWARD. PROJECT ADDED AT REQUEST OF BGMPO.

PLANNING FY 2020 - (L)$19,000FY 2020 - (5307)$76,000

$95,000

* TP-5162ALAMANCEPROJ.CATEGORY

DIVISION 10DIVISION 10NORTH DAVIDSON STREET, CONSTRUCT SIDEWALK FROM EAST 37TH STREET TO BEARWOOD AVENUE.ADD RIGHT-OF-WAY IN FY 21 AND CONSTRUCTION IN FY 21 NOT PREVIOUSLY PROGRAMMED AT THE REQUEST OF RAIL DIVISION.

RIGHT-OF-WAY 2021 (O)$1,000,000CONSTRUCTION 2021 (O)$600,000

2022 (O)$600,000$2,200,000

* U-5008AMECKLENBURG

EXEMPTPROJ.CATEGORY

1Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 2: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP ADDITIONS

DIVISION 13DIVISION 13NEW ROUTE- ENKA HERITAGE ROAD, CONSTRUCT ACCESS ROAD FOR HAAKON INDUSTRIES IN ENKA COMMERCE PARK. ADD NEW APPALACHIAN REGIONAL COMMISSION LOCAL ACCESS PROJECT

CONSTRUCTION FY 2021 - (APD)$2,000,000$2,000,000

* U-6251BUNCOMBE

EXEMPTPROJ.CATEGORY

STIP MODIFICATIONS

DIVISION 1DIVISION 1HYDE COUNTY AIRPORT (7W6), EXTEND RUNWAY TO 5000 FEET.ACCELERATE CONSTRUCTION FROM FY 23 TO FY 21 TO ALIGN SCHEDULE WITH DIVISION REPAVING WORK.

CONSTRUCTION FY 2021 - (T)$365,000$365,000

AV-5812HYDE

DIVISIONPROJ.CATEGORY

SR 1313 (HARGRAVES ROAD), REPLACE BRIDGE NO. 650052 OVER GUMBERRY SWAMP ON SR 1313 (HARGRAVES ROAD).TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 20 TO FY 21.

RIGHT-OF-WAY FY 2020 - (HFB)$20,000CONSTRUCTION FY 2021 - (O)$400,000

FY 2022 - (O)$400,000$820,000

BR-0117NORTHAMPTON

DIVISIONPROJ.CATEGORY

SR 1203 (JACKS SWAMP ROAD), REPLACE BRIDGE NO. 650093 OVER JACKS SWAMP ON SR 1203 (JACKS SWAMP ROAD).TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 20 TO FY 21.

RIGHT-OF-WAY FY 2020 - (HFB)$60,000CONSTRUCTION FY 2021 - (O)$650,000

FY 2022 - (O)$650,000$1,360,000

BR-0118NORTHAMPTON

DIVISIONPROJ.CATEGORY

SR 1505 (NORTHAMPTON COUNTY HIGH SCHOOL ROAD), REPLACE BRIDGE 650015 OVER WILDCAT SWAMP.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 20 TO FY 21.

CONSTRUCTION FY 2021 - (HFB)$1,100,000$1,100,000

BR-0240NORTHAMPTON

HWY FUNDSPROJ.CATEGORY

2Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 3: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 1DIVISION 1US 17 (FUTURE I-87), PASQUOTANK COUNTY LINE TO VIRGINIA STATE LINE. PAVEMENT REHABILITATION.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (NHPIM)$3,050,000FY 2023 - (NHPIM)$3,050,000

$6,100,000

I-6026CAMDEN

STATEWIDEPROJ.CATEGORY

US 64 (FUTURE I-87), NC 125 TO US 13/17 AND US 64 INTERCHANGE.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (NHPIM)$5,400,000$5,400,000

I-6028CMARTIN

STATEWIDEPROJ.CATEGORY

US 17, WASHINGTON BYPASS NORTH OF NC 171 TO MULTI-LANES SOUTH OF WILLIAMSTON. WIDEN TO

MULTI-LANES.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

RIGHT-OF-WAY FY 2020 - (T)$8,000,000UTILITIES FY 2020 - (T)$2,200,000CONSTRUCTION FY 2022 - (T)$21,600,000

FY 2023 - (T)$21,600,000FY 2024 - (T)$21,600,000

$75,000,000

R-2511BEAUFORTMARTIN

DIVISIONPROJ.CATEGORY

SR 1336 (HARVEY POINT ROAD), US 17 TO SR 1350 (CHURCHES LANE). MODERNIZE ROADWAY.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (BGLT5)$1,950,000FY 2023 - (BGLT5)$1,950,000

$3,900,000

R-5806PERQUIMANS

DIVISIONPROJ.CATEGORY

NC 461, NC 45 TO END OF STATE MAINTENANCE. MODERNIZE ROADWAY.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (T)$1,940,000FY 2023 - (T)$1,940,000

$3,880,000

R-5811HERTFORD

DIVISIONPROJ.CATEGORY

3Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 4: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 1DIVISION 1NC 32, NC 37 (GLIDEN ROAD) TO VIRGINIA STATE LINE. MODERNIZE ROADWAY.COST INCREASE EXCEEDING $2 MILLION AND 25% THRESHOLDS.

RIGHT-OF-WAY FY 2025 - (T)$4,000,000UTILITIES FY 2025 - (T)$7,928,000CONSTRUCTION FY 2027 - (T)$18,300,000

FY 2028 - (T)$18,300,000FY 2029 - (T)$18,300,000

$66,828,000

* R-5938CHOWANGATES

DIVISIONPROJ.CATEGORY

US 17 BUSINESS, SR 1145 (OAK STUMP ROAD). IMPROVE INTERSECTION.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 20 TO FY 22 AND CONSTRUCTION FROM FY 21 TO FY 22.

RIGHT-OF-WAY FY 2022 - (T)$240,000UTILITIES FY 2022 - (T)$40,000CONSTRUCTION FY 2022 - (T)$624,000

FY 2023 - (T)$624,000$1,528,000

U-5939PASQUOTANK

REGIONALPROJ.CATEGORY

DIVISION 2DIVISION 2SR 1715 (JACK JONES ROAD), REPLACE BRIDGE 730029 OVER FORK SWAMP.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 20 TO FY 21 AND CONSTRUCTION FROM FY 22 TO FY 23.

RIGHT-OF-WAY FY 2021 - (BGOFF)$90,000CONSTRUCTION FY 2023 - (BGOFF)$900,000

$990,000

B-4603PITT

DIVISIONPROJ.CATEGORY

SR 1777 (BLACK JACK / GRIMESLAND ROAD), REPLACE BRIDGE 730005 OVER CHICOD CREEK.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 20 TO FY 21.

CONSTRUCTION FY 2021 - (HFB)$1,100,000$1,100,000

B-4605PITT

DIVISIONPROJ.CATEGORY

SR 1127 (POSSUM TRACK ROAD), REPLACE BRIDGE NO. 060072 OVER CHOCOWINITY CREEK ON SR 1127 (POSSUM TRACK ROAD).TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 20 TO FY 21.

RIGHT-OF-WAY FY 2020 - (HFB)$40,000CONSTRUCTION FY 2021 - (O)$600,000

FY 2022 - (O)$600,000$1,240,000

BR-0110BEAUFORT

DIVISIONPROJ.CATEGORY

4Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 5: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 2DIVISION 2SR 1514 (STANTON MILL ROAD), REPLACE BRIDGE NO. 730109 OVER GRINDLE CREEK ON SR 1514 (STANTON MILL ROAD).TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 20 TO FY 21.

CONSTRUCTION FY 2021 - (O)$725,000FY 2022 - (O)$725,000

$1,450,000

BR-0119PITT

DIVISIONPROJ.CATEGORY

SR 1551, REPLACE BRIDGE NO. 730123 OVER MEADOW BRANCH ON SR 1551.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 20 TO FY 21.

RIGHT-OF-WAY FY 2020 - (HFB)$60,000CONSTRUCTION FY 2021 - (O)$375,000

FY 2022 - (O)$375,000$810,000

BR-0120PITT

DIVISIONPROJ.CATEGORY

SR 1418 (STATON HOUSE ROAD), REPLACE BRIDGE 730171 OVER JOHNSON MILL RUN CREEK.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 20 TO FY 21.

CONSTRUCTION FY 2021 - (HFB)$1,000,000$1,000,000

BR-0238PITT

HWY FUNDSPROJ.CATEGORY

SR 1971 (DURHAM CREEK ROAD), REPLACE BRIDGE 060014 OVER BRANCH OF DURHAM CREEK.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 20 TO FY 21.

CONSTRUCTION FY 2021 - (HFB)$1,500,000$1,500,000

BR-0239BEAUFORT

HWY FUNDSPROJ.CATEGORY

US 70 (FUTURE I-42), BEAR CREEK BRIDGE TO SR 1690 (WILLIE MEASLEY RD). PAVEMENT REHABILITATION.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (NHPIM)$2,000,000$2,000,000

I-6034LENOIR

STATEWIDEPROJ.CATEGORY

5Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 6: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 2DIVISION 2US 70 (HAVELOCK BYPASS), NORTH OF PINE GROVE TO NORTH OF CARTERET COUNTY LINE. CONSTRUCT MULTI-LANE FACILITY ON NEW LOCATION.PROJECT TO UTILIZE GARVEE BONDS ON RIGHT-OF-WAY AND UTILITIES.

GARVEE ROW FY 2020 - (NHP)$326,000FY 2021 - (NHP)$163,000FY 2022 - (NHP)$163,000FY 2023 - (NHP)$163,000FY 2024 - (NHP)$163,000FY 2025 - (NHP)$163,000FY 2026 - (NHP)$163,000FY 2027 - (NHP)$163,000FY 2028 - (NHP)$163,000FY 2029 - (NHP)$163,000POST YR- (NHP)$652,000

RIGHT-OF-WAY FY 2020 - (S(M))$158,000GARVEE UTL FY 2020 - (NHP)$190,000

FY 2021 - (NHP)$95,000FY 2022 - (NHP)$95,000FY 2023 - (NHP)$95,000FY 2024 - (NHP)$95,000FY 2025 - (NHP)$95,000FY 2026 - (NHP)$95,000FY 2027 - (NHP)$95,000FY 2028 - (NHP)$95,000FY 2029 - (NHP)$95,000POST YR- (NHP)$380,000

UTILITIES FY 2020 - (S(M))$92,000GARVEE CON FY 2020 - (NHP)$4,290,000

FY 2021 - (NHP)$4,290,000FY 2022 - (NHP)$4,290,000FY 2023 - (NHP)$4,290,000FY 2024 - (NHP)$4,290,000FY 2025 - (NHP)$4,290,000FY 2026 - (NHP)$4,290,000FY 2027 - (NHP)$4,290,000FY 2028 - (NHP)$4,290,000FY 2029 - (NHP)$4,290,000POST YR- (NHP)$17,160,000

CONSTRUCTION FY 2020 - (NHP)$8,577,000FY 2020 - (S(M))$9,460,000FY 2021 - (NHP)$8,577,000FY 2021 - (S(M))$9,460,000FY 2022 - (NHP)$8,578,000FY 2022 - (S(M))$9,460,000

$118,292,000

* R-1015DIVCRAVEN

DIVISIONPROJ.CATEGORY

6Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 7: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 2DIVISION 2US 70 (HAVELOCK BYPASS), NORTH OF PINE GROVE TO NORTH OF CARTERET COUNTY LINE. CONSTRUCT MULTI-LANE FACILITY ON NEW LOCATION.PROJECT TO UTILIZE GARVEE BONDS ON RIGHT-OF-WAY AND UTILITIES.

GARVEE ROW FY 2020 - (NHP)$326,000FY 2021 - (NHP)$163,000FY 2022 - (NHP)$163,000FY 2023 - (NHP)$163,000FY 2024 - (NHP)$163,000FY 2025 - (NHP)$163,000FY 2026 - (NHP)$163,000FY 2027 - (NHP)$163,000FY 2028 - (NHP)$163,000FY 2029 - (NHP)$163,000POST YR- (NHP)$652,000

RIGHT-OF-WAY FY 2020 - (S(M))$158,000GARVEE UTL FY 2020 - (NHP)$190,000

FY 2021 - (NHP)$95,000FY 2022 - (NHP)$95,000FY 2023 - (NHP)$95,000FY 2024 - (NHP)$95,000FY 2025 - (NHP)$95,000FY 2026 - (NHP)$95,000FY 2027 - (NHP)$95,000FY 2028 - (NHP)$95,000FY 2029 - (NHP)$95,000POST YR- (NHP)$380,000

UTILITIES FY 2020 - (S(M))$92,000GARVEE CON FY 2020 - (NHP)$4,290,000

FY 2021 - (NHP)$4,290,000FY 2022 - (NHP)$4,290,000FY 2023 - (NHP)$4,290,000FY 2024 - (NHP)$4,290,000FY 2025 - (NHP)$4,290,000FY 2026 - (NHP)$4,290,000FY 2027 - (NHP)$4,290,000FY 2028 - (NHP)$4,290,000FY 2029 - (NHP)$4,290,000POST YR- (NHP)$17,160,000

CONSTRUCTION FY 2020 - (NHP)$8,577,000FY 2020 - (S(M))$9,958,000FY 2021 - (NHP)$8,577,000FY 2021 - (S(M))$9,958,000FY 2022 - (NHP)$8,578,000

$109,828,000

* R-1015REGCRAVEN

REGIONALPROJ.CATEGORY

7Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 8: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 2DIVISION 2US 70, THURMAN ROAD TO HAVELOCK BYPASS. UPGRADE ROADWAY TO FREEWAY AND CONSTRUCT SERVICE ROADS.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

RIGHT-OF-WAY FY 2022 - (T)$14,250,000FY 2023 - (T)$14,250,000

UTILITIES FY 2022 - (T)$1,100,000CONSTRUCTION FY 2022 - (T)$41,166,000

FY 2023 - (T)$41,167,000FY 2024 - (T)$41,167,000

$153,100,000

R-5777CCRAVEN

STATEWIDEPROJ.CATEGORY

NC 58 (WEST FORT MACON), ATLANTIC BEACH CAUSEWAY. ADD RIGHT TURN LANE.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

RIGHT-OF-WAY FY 2020 - (T)$100,000UTILITIES FY 2020 - (T)$100,000CONSTRUCTION FY 2022 - (T)$700,000

$900,000

R-5816CARTERET

REGIONALPROJ.CATEGORY

NC 24, NC 58. INTERSECTION IMPROVEMENTS.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 20 TO FY 21 AND CONSTRUCTION FROM FY 22 TO FY 23.

RIGHT-OF-WAY FY 2021 - (T)$200,000CONSTRUCTION FY 2023 - (T)$2,650,000

FY 2024 - (T)$2,650,000$5,500,000

R-5858CARTERET

STATEWIDEPROJ.CATEGORY

US 13 (MEMORIAL DRIVE), NC 43 (5TH STREET). UPGRADE INTERSECTION.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (T)$100,000FY 2023 - (T)$1,900,000

$2,000,000

U-5730PITT

REGIONALPROJ.CATEGORY

NC 55 (NEUSE BOULEVARD), US 17 BUSINESS (MLK BOULEVARD). CONSTRUCT ROUNDABOUT.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 22 TO FY 23.

CONSTRUCTION FY 2023 - (T)$1,225,000FY 2024 - (T)$1,225,000

$2,450,000

U-5993CRAVEN

REGIONALPROJ.CATEGORY

US 70 (LIVE OAK STREET), NC 101. CONSTRUCT ONE LANE ROUNDABOUT.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 20 TO FY 21 AND CONSTRUCTION FROM FY 22 TO FY 23.

RIGHT-OF-WAY FY 2021 - (T)$200,000UTILITIES FY 2021 - (T)$100,000CONSTRUCTION FY 2023 - (T)$3,534,000

FY 2023 - (L)$16,000$3,850,000

U-6058CARTERET

REGIONALPROJ.CATEGORY

8Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 9: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 2DIVISION 2SR 1493, SR 1493 (LIVE OAK STREET) AT CAMPEN ROAD. REVISE TRAFFIC SIGNAL, INSTALL PEDESTRIAN CROSSING WITH SIGNAL HEADS, AND UPGRADE SIDEWALK.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (HSIP)$38,000$38,000

W-5802ACARTERET

DIVISIONPROJ.CATEGORY

NC 58, NC 58 (E. FORT MACON ROAD) AT BROOKS STREET. INSTALL RECTANGULAR RAPID FLASH BEACON AT CROSSWALK.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (HSIP)$30,000$30,000

W-5802BCARTERET

REGIONALPROJ.CATEGORY

NC 58, NC 58 (E. FORT MACON ROAD) AT E. BOGUE SOUND DRIVE. INSTALL RECTANGULAR RAPID FLASH BEACON AT CROSSWALK.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (HSIP)$30,000$30,000

W-5802CCARTERET

REGIONALPROJ.CATEGORY

SR 1598, SR 1598 (10TH STREET) AT ANDERSON STREET. INSTALL RECTANGULAR RAPID FLASH BEACON AND PAVEMENT MARKINGS AT CROSSWALK.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (HSIP)$32,000$32,000

W-5802DPITT

DIVISIONPROJ.CATEGORY

US 70, NC 55, US 70 BETWEEN NUNN STREET AND SR 1605 (FRIENDLY ROAD) IN MOREHEAD CITY, AND NC 55 BETWEEN US 17 IN BRIDGETON AND SR 1210 (1ST STREET) IN BAYBORO. INSTALL 6 INCH LONG LIFE PAVEMENT MARKINGS.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (HSIP)$865,000$865,000

W-5802ECARTERETCRAVENPAMLICO

STATEWIDEPROJ.CATEGORY

9Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 10: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 3DIVISION 3ALBERT J. ELLIS AIRPORT (OAJ), DESIGN AND CONSTRUCT RUNWAY 23 HOLDING APRON.TO STRATEGICALLY BALANCE LETTINGS, DELAY CON FROM FY 20 TO FY 25.

CONSTRUCTION FY 2025 - (T)$750,000$750,000

* AV-5733ONSLOW

REGIONALPROJ.CATEGORY

HENDERSON FIELD (ACZ), EXTEND RUNWAY TO 5500 FEET.ADD RIGHT-OF-WAY IN FY 21 NOT PREVIOUSLY PROGRAMMED.

RIGHT-OF-WAY FY 2021 - (T)$120,000CONSTRUCTION FY 2022 - (T)$6,796,000

$6,916,000

* AV-5744PENDER

DIVISIONPROJ.CATEGORY

SR 1342 (MAKATOKA ROAD NORTHWEST), REPLACE BRIDGE 090100 OVER MUDDY BRANCH.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 20 TO FY 21 AND CONSTRUCTION FROM FY 21 TO FY 22.

RIGHT-OF-WAY FY 2021 - (BGOFF)$125,000CONSTRUCTION FY 2022 - (BGOFF)$625,000

FY 2023 - (BGOFF)$625,000$1,375,000

B-4439BRUNSWICK

DIVISIONPROJ.CATEGORY

NC 133, REPLACE BRIDGE 640029 OVER SMITH CREEK.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (NHPB)$4,100,000$4,100,000

B-4590NEW HANOVER

REGIONALPROJ.CATEGORY

US 13, REPLACE BRIDGE 810009 OVER SOUTH RIVER OVERFLOW.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 20 TO FY 21.

CONSTRUCTION FY 2021 - (HFB)$2,250,000$2,250,000

B-4635SAMPSON

DIVISIONPROJ.CATEGORY

SR 1904 (PINE RIDGE ROAD), REPLACE BRIDGE 810248 OVER SIX RUNS CREEK.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 20 TO FY 21 AND CONSTRUCTION FROM FY 21 TO FY 22.

RIGHT-OF-WAY FY 2021 - (BGOFF)$109,000CONSTRUCTION FY 2022 - (BGOFF)$1,086,000

FY 2023 - (BGOFF)$1,085,000$2,280,000

B-5621SAMPSON

DIVISIONPROJ.CATEGORY

10Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 11: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 3DIVISION 3SR 1620 (TIMOTHY ROAD), REPLACE BRIDGE 810169 OVER BIG JUNIPER RUN.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (BGOFF)$875,000$875,000

B-5631SAMPSON

DIVISIONPROJ.CATEGORY

SR 1946 (NORTHEAST ROAD), REPLACE BRIDGE 300201 OVER ISLAND CREEK.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (BGOFF)$1,150,000$1,150,000

B-5641DUPLIN

DIVISIONPROJ.CATEGORY

SR 1300 (ASH-LITTLE RIVER ROAD NORTHWEST), REPLACE BRIDGE 090126 OVER CAWCAW SWAMP.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 21 TO FY 22 AND CONSTRUCTION FROM FY 21 TO FY 22.

RIGHT-OF-WAY FY 2022 - (BGOFF)$100,000CONSTRUCTION FY 2022 - (BGOFF)$1,000,000

$1,100,000

B-5996BRUNSWICK

DIVISIONPROJ.CATEGORY

SR 1804 (HOUSES MILL ROAD), REPLACE BRIDGE NO. 810178 OVER SEVENMILE SWAMP ON SR 1804 (HOUSES MILL ROAD).TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 20 TO FY 21.

CONSTRUCTION FY 2021 - (O)$400,000FY 2022 - (O)$400,000

$800,000

BR-0121SAMPSON

DIVISIONPROJ.CATEGORY

SR 1703 (OLD GOLDSBORO ROAD), REPLACE BRIDGE NO. 810348 OVER BEAVERDAM CREEK ON SR 1703 (OLD GOLDSBORO ROAD).TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 20 TO FY 21.

CONSTRUCTION FY 2021 - (O)$450,000FY 2022 - (O)$450,000

$900,000

BR-0122SAMPSON

DIVISIONPROJ.CATEGORY

SR 1162 (BAY ROAD), REPLACE BRIDGE 300045 OVER ISLAND CREEK.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (HFB)$1,700,000$1,700,000

BR-0243DUPLIN

HWY FUNDSPROJ.CATEGORY

11Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 12: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 3DIVISION 3I-140, US 17 TO NORTH OF US 74. PAVEMENT REHABILITATION.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 22 TO FY 23.

CONSTRUCTION FY 2023 - (NHPIM)$4,301,000$4,301,000

I-6036BRUNSWICK

STATEWIDEPROJ.CATEGORY

NC 53, US 117 BUSINESS (WALKER STREET/WILMINGTON STREET). IMPROVE INTERSECTION.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

RIGHT-OF-WAY FY 2020 - (T)$10,000FY 2020 - (L)$150,000

UTILITIES FY 2020 - (T)$400,000CONSTRUCTION FY 2022 - (T)$1,700,000

$2,260,000

R-5701PENDER

REGIONALPROJ.CATEGORY

NC 24 (WEST CORBETT AVENUE), REPLACE CULVERT EAST OF WEST SHORE DRIVE.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

RIGHT-OF-WAY FY 2020 - (NHP)$500,000UTILITIES FY 2020 - (NHP)$500,000CONSTRUCTION FY 2022 - (NHP)$2,500,000

$3,500,000

R-5885AONSLOW

REGIONALPROJ.CATEGORY

SR 1308 (GUM BRANCH ROAD), WEST OF SR 1313 (MILLS FIELDS ROAD) TO EAST OF SR 1324 (RAMSEY ROAD) IN JACKSONVILLE. WIDENING.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (BGANY)$8,700,000$8,700,000

U-4906ONSLOW

TRANSITIONPROJ.CATEGORY

NEW LOCATION, FROM SR 1409 (MILITARY CUTOFF ROAD) AT DRYSDALE DRIVE TO US 74 (EASTWOOD ROAD). ROADWAY ON NEW LOCATION.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 20 TO FY 21.

RIGHT-OF-WAY FY 2020 - (T)$1,870,000CONSTRUCTION FY 2021 - (BGANY)$4,800,000

$6,670,000

U-5710ANEW HANOVER

STATEWIDEPROJ.CATEGORY

US 17 BUSINESS (MARINE BOULEVARD), SR 1308 (BELL FORK ROAD) IN JACKSONVILLE. IMPROVE INTERSECTION.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (T)$2,000,000FY 2023 - (T)$2,000,000

$4,000,000

U-5728ONSLOW

REGIONALPROJ.CATEGORY

12Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 13: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 3DIVISION 3US 17 BUSINESS (MAIN STREET), WALL STREET/SHALLOTTE AVENUE. REALIGN INTERSECTION.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (T)$700,000$700,000

U-5788BRUNSWICK

DIVISIONPROJ.CATEGORY

NC 53 (WESTERN BOULEVARD), SR 2714 (JACKSONVILLE PARKWAY). IMPROVE INTERSECTION.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 22 TO FY 23.

CONSTRUCTION FY 2023 - (T)$2,050,000FY 2024 - (T)$2,050,000

$4,100,000

U-5789ONSLOW

REGIONALPROJ.CATEGORY

SR 1308 (GUM BRANCH ROAD), SR 1322 (SUMMERSILL SCHOOL ROAD) TO SR 1324 (RAMSEY ROAD).COST INCREASE EXCEEDING $2 MILLION AND 25% THRESHOLDS.

RIGHT-OF-WAY FY 2027 - (T)$6,250,000FY 2028 - (T)$6,250,000

UTILITIES FY 2027 - (T)$500,000CONSTRUCTION FY 2029 - (T)$4,500,000

POST YR- (T)$4,500,000$22,000,000

* U-5793AONSLOW

DIVISIONPROJ.CATEGORY

NC 133, US 17/US 74/US 76 TO SR 1554 (OLD RIVER ROAD). MODERNIZE ROADWAY.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (T)$900,000FY 2023 - (T)$900,000

$1,800,000

U-5914BRUNSWICK

DIVISIONPROJ.CATEGORY

DIVISION 4DIVISION 4SR 1958 (BENNETTS BRIDGE ROAD), REPLACE BRIDGE 950117 OVER NE CAPE FEAR RIVER.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 20 TO FY 21.

CONSTRUCTION FY 2021 - (HFB)$1,200,000$1,200,000

B-4844WAYNE

DIVISIONPROJ.CATEGORY

US 258, REPLACE BRIDGE 320022 OVER TOWN CREEK.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 20 TO FY 21.

CONSTRUCTION FY 2021 - (HFB)$1,950,000$1,950,000

B-4931EDGECOMBE

DIVISIONPROJ.CATEGORY

13Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 14: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 4DIVISION 4NC 33, REPLACE BRIDGE 320080 OVER TAR RIVER. REPLACE BRIDGE 320049 OVER TAR RIVER OVERFLOW.TO STRATEGICALLY BALANCE LETTINGS, DELAY RIGHT-OF-WAY FROM FY 20 TO FY 23 AND CONSTRUCTION FROM FY 21 TO FY 24.

RIGHT-OF-WAY FY 2023 - (T)$60,000FY 2024 - (T)$800,000

CONSTRUCTION FY 2024 - (NHPB)$4,600,000FY 2025 - (NHPB)$4,600,000

$10,060,000

B-4933EDGECOMBE

REGIONALPROJ.CATEGORY

NC 111 / NC 122, REPLACE BRIDGE 320011 OVER TOWN CREEK.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 20 TO FY 21.

CONSTRUCTION FY 2021 - (HFB)$1,950,000$1,950,000

B-5655EDGECOMBE

DIVISIONPROJ.CATEGORY

NC 97, BRIDGE 87 OVER SWIFT CREEK ON NC 97.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 20 TO FY 21.

ENGINEERING FY 2021 - (T)$17,000FY 2022 - (T)$17,000FY 2023 - (T)$17,000FY 2024 - (T)$17,000FY 2025 - (T)$17,000FY 2026 - (T)$17,000FY 2027 - (T)$17,000FY 2028 - (T)$17,000FY 2029 - (T)$17,000POST YR- (T)$102,000

BUILD NC CON FY 2021 - (T)$86,000FY 2022 - (T)$86,000FY 2023 - (T)$86,000FY 2024 - (T)$86,000FY 2025 - (T)$86,000FY 2026 - (T)$86,000FY 2027 - (T)$86,000FY 2028 - (T)$86,000FY 2029 - (T)$86,000POST YR- (T)$516,000

CONSTRUCTION FY 2021 - (T)$725,000FY 2022 - (T)$725,000

$2,995,000

B-5671EDGECOMBE

REGIONALPROJ.CATEGORY

SR 1126 (FAITH BAPTIST CHURCH ROAD), REPLACE BRIDGE 320064 OVER TOWN CREEK.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 20 TO FY 21.

CONSTRUCTION FY 2021 - (HFB)$1,200,000$1,200,000

B-6002EDGECOMBE

DIVISIONPROJ.CATEGORY

14Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 15: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 4DIVISION 4SR 2137 (PITTMAN ROAD) SR 2130 (E MAIN STREET) SR 2339 (BAGLEY ROAD), REPLACE BRIDGE 500109 ON SR 2137 (PITTMAN ROAD) OVER I-95, BRIDGE 500110 ON SR 2130 (EAST MAIN STREET) OVER I-95, AND BRIDGE 500112 ON SR 2339 (BAGLEY ROAD) OVER I-95.TO STRATEGICALLY BALANCE LETTINGS, DELAY CONSTRUCTION FROM FY 21 TO FY 23.

RIGHT-OF-WAY FY 2021 - (NHPB)$1,500,000CONSTRUCTION FY 2023 - (NHPB)$5,000,000

FY 2024 - (NHPB)$5,000,000FY 2025 - (NHPB)$5,000,000

$16,500,000

B-6050JOHNSTON

DIVISIONPROJ.CATEGORY

SR 1404 (SEVEN BRIDGES ROAD), REPLACE BRIDGE NO. 320003, 320004, 320005 OVER SWIFT CREEK ON SR 1404 (SEVEN BRIDGES ROAD).TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 20 TO FY 21.

RIGHT-OF-WAY FY 2020 - (O)$420,000UTILITIES FY 2020 - (O)$56,000CONSTRUCTION FY 2021 - (O)$2,850,000

FY 2022 - (O)$2,850,000$6,176,000

BR-0111EDGECOMBE

DIVISIONPROJ.CATEGORY

SR 1403 (COOPER ROAD), REPLACE BRIDGE 630080 OVER GIDEON SWAMP ON SR 1403 (COOPER ROAD).TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 20 TO FY 21.

CONSTRUCTION FY 2021 - (HFB)$700,000FY 2022 - (HFB)$700,000

$1,400,000

BR-0116NASH

DIVISIONPROJ.CATEGORY

SR 1243 (LEGGETT ROAD), REPLACE BRIDGE 320054 OVER TAR RIVER.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 20 TO FY 21.

CONSTRUCTION FY 2021 - (HFB)$3,600,000$3,600,000

BR-0241EDGECOMBE

HWY FUNDSPROJ.CATEGORY

SR 1006 (GRANTHAM SCHOOL ROAD), REPLACE BRIDGE 950096 OVER THOROUGHFARE SWAMP.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 20 TO FY 21.

CONSTRUCTION FY 2021 - (HFB)$900,000$900,000

BR-0242WAYNE

HWY FUNDSPROJ.CATEGORY

ROCKY MOUNT, BENVENUE ROAD (NC 43/NC 48) AT JEFFREYS ROAD. INTERSECTION IMPROVEMENTS.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (CMAQ)$130,000$130,000

C-5546NASH

EXEMPTPROJ.CATEGORY

15Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 16: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 4DIVISION 4ROCKY MOUNT, WINSTEAD AVENUE. CONSTRUCT SIDEWALKS.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 20 TO FY 22.

CONSTRUCTION FY 2022 - (CMAQ)$688,000$688,000

C-5549NASH

EXEMPTPROJ.CATEGORY

STONEY CREEK GREENWAY, US 70 BYPASS TO SR 1560 (ROYALL AVENUE). CONSTRUCT 10 FOOT WIDE ASPHALT GREENWAY.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 20 TO FY 22.

CONSTRUCTION FY 2022 - (SRTS)$110,000$110,000

EB-5707WAYNE

DIVISIONPROJ.CATEGORY

US 64 BUSINESS (SUNSET AVENUE), SR 1836 (MAY DRIVE) TO US 301 BUSINESS, NORTH BOUND (CHURCH STREET). INSTALL PEDESTRIAN SIGNALS.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (TA5200)$100,000FY 2022 - (L)$25,000

$125,000

EB-5711NASH

DIVISIONPROJ.CATEGORY

I-95, NC 561 (MILE MARKER 160) TO MILE MARKER 167.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 20 TO FY 21.

CONSTRUCTION FY 2021 - (BGLT5)$3,300,000FY 2022 - (BGLT5)$3,300,000

$6,600,000

I-5932AHALIFAX

STATEWIDEPROJ.CATEGORY

US 64 (FUTURE I-87), SR 1233 (THOMAS ROAD) OVERPASS TO NC 33. PAVEMENT REHABILITATION.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (NHPIM)$4,195,000FY 2023 - (NHPIM)$4,196,000

$8,391,000

I-6041EDGECOMBE

STATEWIDEPROJ.CATEGORY

US 64 (FUTURE I-87), REHABILITATE BRIDGE 320104, 320155, 320148, 320153, 320154, 320156, 320157, 320320, 320325, AND 320326.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 22 TO FY 23.

CONSTRUCTION FY 2023 - (NHPIM)$2,400,000$2,400,000

I-6041AEDGECOMBE

STATEWIDEPROJ.CATEGORY

16Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 17: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 4DIVISION 4US 64 (FUTURE I-87), REHABILITATE BRIDGE 320327 AND 320328.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 22 TO FY 23.

CONSTRUCTION FY 2023 - (NHPIM)$500,000$500,000

I-6042AEDGECOMBE

STATEWIDEPROJ.CATEGORY

SR 1003 (BUFFALO ROAD), US 70 TO SR 1934 (OLD BEULAH ROAD). WIDEN TO THREE LANES.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 20 TO FY 21.

RIGHT-OF-WAY FY 2021 - (T)$560,000UTILITIES FY 2021 - (T)$67,000CONSTRUCTION FY 2023 - (BG5200)$2,204,000

FY 2024 - (BG5200)$2,204,000FY 2025 - (BG5200)$2,204,000

$7,239,000

R-5718JOHNSTON

DIVISIONPROJ.CATEGORY

17Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 18: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 4DIVISION 4US 117, US 70 BYPASS TO SR 1306 (FEDELON TRAIL) IN GOLDSBORO. WIDEN ROADWAY AND MAKE SAFETY IMPROVEMENTS.PROJECT TO UTILIZE BUILD NC BONDS FOR RIGHT-OF-WAY.

ENGINEERING FY 2020 - (T)$156,000FY 2021 - (T)$156,000FY 2022 - (T)$156,000FY 2023 - (T)$156,000FY 2024 - (T)$156,000FY 2025 - (T)$156,000FY 2026 - (T)$156,000FY 2027 - (T)$156,000FY 2028 - (T)$156,000FY 2029 - (T)$156,000POST YR- (T)$780,000

BUILD NC ROW FY 2020 - (T)$232,000FY 2021 - (T)$232,000FY 2022 - (T)$232,000FY 2023 - (T)$232,000FY 2024 - (T)$232,000FY 2025 - (T)$232,000FY 2026 - (T)$232,000FY 2027 - (T)$232,000FY 2028 - (T)$232,000FY 2029 - (T)$232,000POST YR- (T)$1,160,000

BUILD NC CON FY 2020 - (T)$686,000FY 2021 - (T)$686,000FY 2022 - (T)$686,000FY 2023 - (T)$686,000FY 2024 - (T)$686,000FY 2025 - (T)$686,000FY 2026 - (T)$686,000FY 2027 - (T)$686,000FY 2028 - (T)$686,000FY 2029 - (T)$686,000POST YR- (T)$3,430,000

CONSTRUCTION FY 2020 - (T)$4,700,000FY 2021 - (T)$4,700,000

$25,510,000

* U-2714WAYNE

REGIONALPROJ.CATEGORY

US 13 (BERKELEY BOULEVARD), REALIGNMENT OF HOOD SWAMP ROAD.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (T)$1,500,000$1,500,000

U-3609BAWAYNE

REGIONALPROJ.CATEGORY

18Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 19: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 4DIVISION 4US 13 (BERKELEY BOULEVARD), REALIGNMENT OF SR 1709 (CENTRAL HEIGHTS ROAD) AT BERKELEY BOULEVARD IN GOLDSBORO.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 20 TO FY 21.

ENGINEERING FY 2021 - (T)$180,000FY 2022 - (T)$180,000FY 2023 - (T)$180,000FY 2024 - (T)$180,000FY 2025 - (T)$180,000FY 2026 - (T)$180,000FY 2027 - (T)$180,000FY 2028 - (T)$180,000FY 2029 - (T)$180,000POST YR- (T)$1,080,000

BUILD NC CON FY 2021 - (T)$515,000FY 2022 - (T)$515,000FY 2023 - (T)$515,000FY 2024 - (T)$515,000FY 2025 - (T)$515,000FY 2026 - (T)$515,000FY 2027 - (T)$515,000FY 2028 - (T)$515,000FY 2029 - (T)$515,000POST YR- (T)$3,090,000

CONSTRUCTION FY 2021 - (T)$4,200,000FY 2022 - (T)$4,200,000

$18,825,000

U-5724WAYNE

REGIONALPROJ.CATEGORY

SR 1556 (WAYNE MEMORIAL DRIVE), LOCKHAVEN DRIVE TO COUNTRY DAY ROAD. CONSTRUCT ACCESS MANAGEMENT IMPROVEMENTS.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (T)$676,000$676,000

U-5994WAYNE

DIVISIONPROJ.CATEGORY

US 70, SR 1711 (NORTH OAK FOREST ROAD). IMPROVE INTERSECTION.COST INCREASE EXCEEDING $2 MILLION AND 25% THRESHOLDS.

RIGHT-OF-WAY FY 2025 - (NHP)$400,000UTILITIES FY 2025 - (NHP)$3,199,000CONSTRUCTION FY 2027 - (NHP)$3,000,000

$6,599,000

* U-6110WAYNE

REGIONALPROJ.CATEGORY

SR 1556 (WAYNE MEMORIAL DRIVE), COUNTRY DAY ROAD TO NEW HOPE ROAD. ACCESS MANAGEMENT.COST INCREASE EXCEEDING $2 MILLION AND 25% THRESHOLDS.

RIGHT-OF-WAY FY 2026 - (T)$3,400,000UTILITIES FY 2026 - (T)$2,649,000CONSTRUCTION FY 2028 - (T)$4,700,000

FY 2029 - (T)$4,700,000$15,449,000

* U-6204WAYNE

DIVISIONPROJ.CATEGORY

19Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 20: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 4DIVISION 4SR 1560 (RANCH ROAD EXTENSION), US 70 BUSINESS/NC 42 TO SR 1560 (RANCH ROAD) IN CLAYTON. NEW LOCATION EXTENSION OF RANCH ROAD.TO REFLECT CURRENT TOWN DELIVERY SCHEDULE DELAY RIGHT-OF-WAY FROM FY 20 TO FY 21 AND CONSTRUCTION FROM FY 20 TO FY 22.

RIGHT-OF-WAY FY 2021 - (S)$434,000FY 2021 - (BGDA)$1,735,000

CONSTRUCTION FY 2022 - (S)$1,250,000FY 2022 - (BGDA)$5,000,000

$8,419,000

U-6223JOHNSTON

DIVISIONPROJ.CATEGORY

US 301, US 301 AT NC 581. CONSTRUCT A REDUCED CONFLICT INTERSECTION WITH TRUCK BULB-OUTS AT THE ADJACENT U-TURN POINTS.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 20 TO FY 21 AND CONSTRUCTION FROM FY 21 TO FY 22.

RIGHT-OF-WAY FY 2021 - (HSIP)$100,000CONSTRUCTION FY 2022 - (HSIP)$854,000

$954,000

W-5804AWILSON

REGIONALPROJ.CATEGORY

DIVISION 5DIVISION 5SR 2044 (LIGON MILL ROAD), REPLACE BRIDGE 910126 OVER SMITHS CREEK IN WAKE FOREST.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (BGANY)$2,550,000FY 2023 - (BGANY)$2,550,000

$5,100,000

B-5318WAKE

DIVISIONPROJ.CATEGORY

SR 2555 (RAYNOR ROAD), REPLACE BRIDGE 910247 OVER WHITE OAK CREEK IN GARNER.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (BGOFF)$2,450,000FY 2023 - (BGOFF)$2,450,000

$4,900,000

B-5326WAKE

DIVISIONPROJ.CATEGORY

SR 1609 (BAPTIST CHURCH ROAD), REPLACE BRIDGE 340078 OVER TAR RIVERTO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 22 TO FY 23.

RIGHT-OF-WAY FY 2021 - (BGOFF)$405,000CONSTRUCTION FY 2023 - (BGOFF)$4,050,000

$4,455,000

B-6003FRANKLIN

DIVISIONPROJ.CATEGORY

20Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 21: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 5DIVISION 5NC 55 (EAST WILLIAMS STREET), SR 1301 (SUNSET LAKE ROAD) TO NC 55 IN HOLLY SPRINGS. CONSTRUCT SIDEWALK.ADD RIGHT OF WAY IN FY 20 NOT PREVIOUSLY PROGRAMMED [DELAY FROM 18-27 STIP] TO REFLECT CURRENT TOWN DELIVERY SCHEDULE. TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 20 TO FY 21.

RIGHT-OF-WAY FY 2020 - (TAANY)$80,000FY 2020 - (L)$20,000

CONSTRUCTION FY 2021 - (TAANY)$400,000FY 2021 - (L)$100,000

$600,000

* EB-5895WAKE

DIVISIONPROJ.CATEGORY

I-440 / US 1, SR 2000 (WAKE FOREST ROAD) IN RALEIGH. INTERCHANGE IMPROVEMENTS.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

GARVEE ROW FY 2020 - (NHP)$858,000FY 2021 - (NHP)$858,000FY 2022 - (NHP)$858,000FY 2023 - (NHP)$858,000FY 2024 - (NHP)$858,000FY 2025 - (NHP)$858,000FY 2026 - (NHP)$858,000FY 2027 - (NHP)$858,000FY 2028 - (NHP)$858,000FY 2029 - (NHP)$858,000POST YR- (NHP)$4,290,000

RIGHT-OF-WAY FY 2020 - (NHP)$4,806,000CONSTRUCTION FY 2022 - (NHP)$8,900,000

$26,576,000

I-5708WAKE

STATEWIDEPROJ.CATEGORY

I-40, US 15 / US 501 TO EAST OF NC 147. PAVEMENT REHABILITATION.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

GARVEE CON FY 2022 - (NHPIM)$858,000FY 2023 - (NHPIM)$858,000FY 2024 - (NHPIM)$858,000FY 2025 - (NHPIM)$858,000FY 2026 - (NHPIM)$858,000FY 2027 - (NHPIM)$858,000FY 2028 - (NHPIM)$858,000FY 2029 - (NHPIM)$858,000POST YR- (NHPIM)$6,006,000

CONSTRUCTION FY 2022 - (NHPIM)$2,333,334FY 2022 - (S(M))$1,666,667FY 2023 - (NHPIM)$2,333,333FY 2023 - (S(M))$1,666,666

$20,870,000

I-5993DURHAM

STATEWIDEPROJ.CATEGORY

21Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 22: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 5DIVISION 5I-40, US 15 / US 501 TO EAST OF NC 147. BRIDGE REHABILITATION - MULTIPLE STRUCTURES.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

GARVEE CON FY 2022 - (NHPIM)$429,000FY 2023 - (NHPIM)$429,000FY 2024 - (NHPIM)$429,000FY 2025 - (NHPIM)$429,000FY 2026 - (NHPIM)$429,000FY 2027 - (NHPIM)$429,000FY 2028 - (NHPIM)$429,000FY 2029 - (NHPIM)$429,000POST YR- (NHPIM)$3,003,000

CONSTRUCTION FY 2022 - (NHPIM)$2,433,000FY 2022 - (S(M))$1,667,000

$10,535,000

I-5994DURHAM

STATEWIDEPROJ.CATEGORY

I-40, EAST OF NC 147 TO SR 3015 (AIRPORT BOULEVARD). PAVEMENT REHABILITATION.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (NHPIM)$5,272,000$5,272,000

I-5995DURHAMWAKE

STATEWIDEPROJ.CATEGORY

CSX, CROSSING 630607N AT NEW HOPE CHURCH ROAD IN RALEIGH. CONSTRUCT GRADE SEPARATION.TO ALLOW ADDITIONAL TIME FOR RIGHT OF WAY AND UTILITIES, DELAY CONSTRUCTION FROM FY 20 TO FY 21.

CONSTRUCTION FY 2021 - (T)$618,000FY 2021 - (O)$535,000FY 2022 - (T)$3,916,000FY 2023 - (T)$3,915,000FY 2024 - (T)$3,915,000

$12,899,000

P-5715WAKE

REGIONALPROJ.CATEGORY

CSX, CROSSING 630601X AT SR 2006 (DURANT ROAD) IN RALEIGH. CONSTRUCT GRADE SEPARATION.TO ALLOW ADDITIONAL TIME FOR RIGHT OF WAY AND UTILITIES, DELAY CONSTRUCTION FROM FY 20 TO FY 21.

CONSTRUCTION FY 2021 - (T)$516,000FY 2021 - (O)$480,000FY 2022 - (T)$4,902,000FY 2023 - (T)$4,902,000

$10,800,000

P-5720WAKE

REGIONALPROJ.CATEGORY

22Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 23: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 5DIVISION 5US 70 (GLENWOOD AVENUE), WEST OF SR 3067 (T.W. ALEXANDER DRIVE) TO I-540 IN RALEIGH. UPGRADE ROADWAY TO IMPROVE CAPACITY, SAFETY AND TRAFFIC OPERATIONS INCLUDING INTERCHANGES AT VARIOUS LOCATIONS.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT OF WAY AND CONSTRUCTION FROM FY 21 TO FY 22.

RIGHT-OF-WAY FY 2022 - (NHP)$153,204,000UTILITIES FY 2022 - (NHP)$12,720,000GARVEE CON FY 2022 - (NHP)$8,580,000

FY 2023 - (NHP)$8,580,000FY 2024 - (NHP)$8,580,000FY 2025 - (NHP)$8,580,000FY 2026 - (NHP)$8,580,000FY 2027 - (NHP)$8,580,000FY 2028 - (NHP)$8,580,000FY 2029 - (NHP)$8,580,000POST YR- (NHP)$60,060,000

CONSTRUCTION FY 2022 - (NHP)$8,589,000FY 2022 - (S(M))$11,111,000FY 2023 - (NHP)$8,589,000FY 2023 - (S(M))$11,111,000FY 2024 - (NHP)$8,589,000FY 2024 - (S(M))$11,111,000

$353,724,000

U-5518DURHAMWAKE

STATEWIDEPROJ.CATEGORY

US 401, WAKE TECHNICAL COMMUNITY COLLEGE TO SR 1010 (TEN-TEN ROAD). ADD LANES.TO ALLOW ADDITIONAL TIME FOR RIGHT OF WAY ACQUISITION DELAY CONSTRUCTION FROM FY 20 TO 21.

ENGINEERING FY 2021 - (T)$71,000FY 2022 - (T)$71,000FY 2023 - (T)$71,000FY 2024 - (T)$71,000FY 2025 - (T)$71,000FY 2026 - (T)$71,000FY 2027 - (T)$71,000FY 2028 - (T)$71,000FY 2029 - (T)$71,000POST YR- (T)$427,000

BUILD NC CON FY 2021 - (T)$129,000FY 2022 - (T)$129,000FY 2023 - (T)$129,000FY 2024 - (T)$129,000FY 2025 - (T)$129,000FY 2026 - (T)$129,000FY 2027 - (T)$129,000FY 2028 - (T)$129,000FY 2029 - (T)$129,000POST YR- (T)$774,000

CONSTRUCTION FY 2021 - (T)$2,300,000$5,301,000

U-5746WAKE

REGIONALPROJ.CATEGORY

23Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 24: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 5DIVISION 5NC 54, NC 540 TO PERIMETER PARK DRIVE IN MORRISVILLE. ADD LANES.TO ALLOW ADDITIONAL TIME TO COMPLETE PLANNING AND DESIGN DELAY RIGHT OF WAY FROM FY 20 TO FY 21 AND CONSTRUCTION FROM FY 21 TO 22.

ENGINEERING FY 2020 - (T)$135,000FY 2021 - (T)$135,000FY 2022 - (T)$135,000FY 2023 - (T)$135,000FY 2024 - (T)$135,000FY 2025 - (T)$135,000FY 2026 - (T)$135,000FY 2027 - (T)$135,000FY 2028 - (T)$135,000FY 2029 - (T)$135,000POST YR- (T)$675,000

BUILD NC ROW FY 2021 - (T)$601,000FY 2022 - (T)$601,000FY 2023 - (T)$601,000FY 2024 - (T)$601,000FY 2025 - (T)$601,000FY 2026 - (T)$601,000FY 2027 - (T)$601,000FY 2028 - (T)$601,000FY 2029 - (T)$601,000POST YR- (T)$3,606,000

RIGHT-OF-WAY FY 2021 - (T)$5,179,000UTILITIES FY 2021 - (T)$236,000CONSTRUCTION FY 2022 - (T)$7,650,000

FY 2023 - (T)$7,650,000$31,755,000

U-5750WAKE

REGIONALPROJ.CATEGORY

NC 56 (EAST C STREET), SR 1215 (WEST LYON STATION ROAD) IN BUTNER. REALIGN INTERSECTION.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (T)$1,825,000FY 2022 - (L)$200,000FY 2023 - (T)$1,825,000

$3,850,000

U-6020GRANVILLE

DIVISIONPROJ.CATEGORY

SR 1664 (DURALEIGH ROAD), SR 3009 (EDWARDS MILL ROAD) IN RALEIGH.COST INCREASE EXCEEDING $2 MILLION AND 25% THRESHOLDS.

RIGHT-OF-WAY FY 2025 - (T)$6,700,000UTILITIES FY 2025 - (T)$300,000CONSTRUCTION POST YR- (T)$10,200,000

$17,200,000

* U-6193WAKE

DIVISIONPROJ.CATEGORY

24Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 25: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 5DIVISION 5NC 98, CAMP KANATA RD AND NC 98 IN WAKE FOREST. IMPROVE INTERSECTION, ADD TURN LANES ON NC 98.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 20 TO FY 22.

RIGHT-OF-WAY FY 2020 - (S)$4,000FY 2020 - (BGDA)$18,000

CONSTRUCTION FY 2022 - (S)$210,000FY 2022 - (BGDA)$840,000

$1,072,000

U-6222WAKE

EXEMPTPROJ.CATEGORY

FAYETTEVILLE STREET (SR 2513), FAYETTEVILLE STREET AND THE CAROLINA COASTAL RAILWAY TRACKS CROSSING CLOSURE IN KNIGHTDALE.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (RR)$1,600,000$1,600,000

Y-4805FWAKE

DIVISIONPROJ.CATEGORY

DIVISION 6DIVISION 6I-95, US 421 (EXIT 73) AND SR 1793 (POPE ROAD) (EXIT 72). IMPROVE INTERCHANGES.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (T)$21,600,000FY 2023 - (T)$21,600,000FY 2024 - (T)$21,600,000

$64,800,000

I-5878HARNETT

STATEWIDEPROJ.CATEGORY

I-95, SR 1808 (JONESBORO ROAD) (EXIT 75) AND SR 1709 (HODGES CHAPEL ROAD) (EXIT 77). IMPROVE INTERCHANGES.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (T)$25,834,000FY 2023 - (T)$25,833,000FY 2024 - (T)$25,833,000

$77,500,000

I-5883HARNETT

STATEWIDEPROJ.CATEGORY

I-95, SR 1002 (LONG BRANCH ROAD - EXIT 71) TO I-40 (EXIT 81). WIDEN TO EIGHT LANES.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

RIGHT-OF-WAY FY 2020 - (T)$2,105,000FY 2021 - (T)$39,995,000

UTILITIES FY 2020 - (T)$700,000CONSTRUCTION FY 2022 - (T)$20,466,000

FY 2023 - (T)$20,467,000FY 2024 - (T)$20,467,000

$104,200,000

I-5986BHARNETTJOHNSTON

STATEWIDEPROJ.CATEGORY

25Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 26: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 6DIVISION 6I-95, US 301 (EXIT 22) TO NORTH OF I-95 BUSINESS/US 301 (EXIT 40). WIDEN TO EIGHT LANES.COST INCREASE EXCEEDING $2 MILLION AND 25% THRESHOLDS.

BUILD NC ROW FY 2021 - (T)$1,716,000FY 2022 - (T)$1,716,000FY 2023 - (T)$1,716,000FY 2024 - (T)$1,716,000FY 2025 - (T)$1,716,000FY 2026 - (T)$1,716,000FY 2027 - (T)$1,716,000FY 2028 - (T)$1,716,000FY 2029 - (T)$1,716,000POST YR- (T)$10,296,000

RIGHT-OF-WAY FY 2021 - (T)$6,000,000FY 2022 - (T)$6,000,000

UTILITIES FY 2021 - (T)$1,000,000BUILD NC CON FY 2021 - (T)$6,864,000

FY 2022 - (T)$19,734,000FY 2023 - (T)$19,734,000FY 2024 - (T)$19,734,000FY 2025 - (T)$19,734,000FY 2026 - (T)$19,734,000FY 2027 - (T)$19,734,000FY 2028 - (T)$19,734,000FY 2029 - (T)$19,734,000POST YR- (T)$131,274,000

CONSTRUCTION FY 2021 - (T)$72,266,000FY 2022 - (T)$72,267,000FY 2023 - (T)$72,267,000

$551,550,000

* I-5987CUMBERLANDROBESON

REGIONALPROJ.CATEGORY

US 74 / 76, ADVANCED CONSTRUCTION OF TEMPORARY REDUCED CONFLICT INTERSECTIONS AT SR 1735 (CHAUNCEY TOWN ROAD) AND SR 1740 (OLD LAKE ROAD).TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 20 TO FY 21.

CONSTRUCTION FY 2021 - (T)$2,395,000$2,395,000

R-5819ACOLUMBUS

REGIONALPROJ.CATEGORY

I-295, SOUTH OF SR 1003 (CAMDEN ROAD) TO SOUTH OF SR 1104 (STRICKLAND BRIDGE ROAD).TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (NHP)$27,666,000FY 2023 - (NHP)$27,667,000FY 2024 - (NHP)$27,667,000

$83,000,000

U-2519BACUMBERLAND

REGIONALPROJ.CATEGORY

26Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 27: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 6DIVISION 6I-295, SOUTH OF SR 1104 (STRICKLAND BRIDGE ROAD) TO SOUTH OF US 401.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (NHP)$13,100,000FY 2023 - (NHP)$13,100,000FY 2024 - (NHP)$13,100,000

$39,300,000

U-2519BBCUMBERLAND

REGIONALPROJ.CATEGORY

US 401 (RAEFORD ROAD), OLD RAEFORD ROAD TO EAST OF BUNCE ROADTO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (BGANY)$9,772,000FY 2023 - (BGANY)$9,772,000FY 2024 - (BGANY)$9,771,000

$29,315,000

U-4405ACUMBERLAND

DIVISIONPROJ.CATEGORY

SR 1102 (GILLIS HILL ROAD), FROM NORTH OF SR 1112 (STONEY POINT ROAD) TO US 401 (RAEFORD ROAD). WIDEN TO MULTI-LANES AND REPLACE BRIDGE 250075 OVER LITTLE ROCKFISH CREEK.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

RIGHT-OF-WAY FY 2020 - (T)$2,178,000UTILITIES FY 2020 - (T)$252,000CONSTRUCTION FY 2022 - (T)$16,100,000

$18,530,000

U-5798ACUMBERLAND

DIVISIONPROJ.CATEGORY

NC 87/24, SR 1117 (NURSERY ROAD). INTERSECTION IMPROVEMENTS.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 22 TO FY 23.

CONSTRUCTION FY 2023 - (T)$1,400,000FY 2024 - (T)$1,400,000

$2,800,000

U-5933HARNETT

STATEWIDEPROJ.CATEGORY

DIVISION 7DIVISION 7PIEDMONT TRIAD INTERNATIONAL AIRPORT (GSO), SURFACE MOVEMENT GUIDANCE AND CONTROL SYSTEM (SMGCS) UPDATE.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 20 TO FY 22.

CONSTRUCTION FY 2022 - (T)$500,000FY 2022 - (O)$7,500,000

$8,000,000

AV-5711GUILFORD

STATEWIDEPROJ.CATEGORY

PIEDMONT TRIAD INTERNATIONAL AIRPORT (GSO), RUNWAY 5R-23L GROUP VI UPGRADE.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 20 TO FY 24.

CONSTRUCTION FY 2024 - (T)$500,000FY 2024 - (O)$9,500,000

$10,000,000

* AV-5715GUILFORD

STATEWIDEPROJ.CATEGORY

27Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 28: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 7DIVISION 7SR 1138 (LINDSEY BRIDGE ROAD), REPLACE BRIDGE 780140 OVER DAN RIVERTO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

RIGHT-OF-WAY FY 2020 - (BGOFF)$610,000CONSTRUCTION FY 2022 - (BGOFF)$6,100,000

$6,710,000

B-5716ROCKINGHAM

DIVISIONPROJ.CATEGORY

ORANGE COUNTY BICYCLE ROUTE 1, CLELAND DRIVE TO WILLOW DRIVE IN CHAPEL HILL. UPGRADE EXISTING OFF-ROAD PATH AND CONSTRUCT NEW SECTION OF PATH.TO ALLOW TOWN ADDITIONAL TIME FOR PLANNING AND DESIGN, DELAY CONSTRUCTION FROM FY 20 TO FY 21.

CONSTRUCTION FY 2021 - (TAANY)$775,000FY 2021 - (L)$194,000

$969,000

EB-5721ORANGE

DIVISIONPROJ.CATEGORY

SR 1780 (ESTES DRIVE), SOUTH OF NORFOLK-SOUTHERN RR TRACKS TO NC 86 (MARTIN LUTHER KING, JR. BLVD) IN CHAPEL HILLTO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 20 TO FY 21 AND CONSTRUCTION FROM FY 21 TO FY 22.

RIGHT-OF-WAY FY 2021 - (TAANY)$691,000FY 2021 - (L)$173,000

CONSTRUCTION FY 2022 - (TAANY)$2,483,000FY 2022 - (L)$621,000

$3,968,000

EB-5886BORANGE

DIVISIONPROJ.CATEGORY

I-40 / US 421, SR 1850 (SANDY RIDGE ROAD) IN GREENSBORO. INTERCHANGE IMPROVEMENTS.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 20 TO FY 21 AND CONSTRUCTION FROM FY 22 TO FY 23.

RIGHT-OF-WAY FY 2021 - (NHP)$3,158,000FY 2022 - (NHP)$9,476,000

UTILITIES FY 2021 - (NHP)$126,000FY 2022 - (NHP)$376,000

CONSTRUCTION FY 2023 - (NHP)$4,833,000FY 2024 - (NHP)$4,833,000FY 2025 - (NHP)$4,834,000

$27,636,000

I-5712GUILFORD

STATEWIDEPROJ.CATEGORY

I-40 / BUSINESS 85 / US 29 / US 70 / US 220, ELM-EUGENE STREET IN GREENSBORO. INTERCHANGE IMPROVEMENTS.TO ASSIST IN BALANCING FUNDS, ADD CONSTRUCTION IN FY 23 NOT PREVIOUSLY PROGRAMMED [DELAY FROM 18-27 STIP].

CONSTRUCTION FY 2023 - (NHP)$500,000$500,000

* I-5964GUILFORD

STATEWIDEPROJ.CATEGORY

TRANSIT SAFETY INNOVATIONSFUNDING ADDED TO FY21, FY22 AT THE REQUEST OF GREENSBORO MPO

OPERATIONS FY 2021 - (L)$6,000FY 2021 - (5312)$22,000FY 2022 - (L)$3,000FY 2022 - (5312)$12,000

$43,000

* TT-5207GUILFORDPROJ.CATEGORY

28Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 29: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 7DIVISION 7SR 1818 (JOHNSON STREET) / SR 1850 (SANDY RIDGE ROAD), SR 1820 (SKEET CLUB ROAD) TO SOUTH OF I-40 IN HIGH POINT. WIDEN TO FOUR LANES.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 20 TO FY 21 AND CONSTRUCTION FROM FY 21 TO FY 23.

RIGHT-OF-WAY FY 2021 - (HP)$6,776,000FY 2021 - (BG5200)$139,000FY 2021 - (S(M))$1,694,000

UTILITIES FY 2021 - (BG5200)$1,147,000CONSTRUCTION FY 2023 - (BG5200)$8,975,000

FY 2024 - (BG5200)$8,975,000FY 2025 - (BG5200)$8,975,000FY 2026 - (BG5200)$8,975,000

$45,656,000

U-4758GUILFORD

DIVISIONPROJ.CATEGORY

US 29 / US 70 / US 220 (O'HENRY BOULEVARD), I-40 / BUSINESS 85 TO SOUTH OF FLORIDA STREET IN GREENSBORO. ADD LANE ON I-40 / BUSINESS 85 EASTBOUND RAMP ONTO NORTHBOUND US 29 / US 70 / US 220 AND EXTEND US 29 / US 70 / US 220 SOUTHBOUND RAMP ONTO SR 3762 (MARTIN LUTHER KING, JR. DRIVE)TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (T)$3,950,000$3,950,000

U-5754GUILFORD

REGIONALPROJ.CATEGORY

FRIENDLY AVENUE, WEST OF GREEN VALLEY ROAD TO LINDELL ROAD IN GREENSBORO. WIDENING AND INTERSECTION IMPROVEMENTS.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 23.

CONSTRUCTION FY 2023 - (T)$1,400,000$1,400,000

U-5841GUILFORD

DIVISIONPROJ.CATEGORY

29Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 30: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 7DIVISION 7US 29 / US 70 / BUSINESS 85, SR 1009 (SOUTH MAIN STREET) IN HIGH POINT. RECONSTRUCT INTERCHANGE.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

ENGINEERING FY 2020 - (T)$130,000FY 2021 - (T)$130,000FY 2022 - (T)$130,000FY 2023 - (T)$130,000FY 2024 - (T)$130,000FY 2025 - (T)$130,000FY 2026 - (T)$130,000FY 2027 - (T)$130,000FY 2028 - (T)$130,000FY 2029 - (T)$130,000POST YR- (T)$650,000

BUILD NC ROW FY 2020 - (T)$944,000FY 2021 - (T)$944,000FY 2022 - (T)$944,000FY 2023 - (T)$944,000FY 2024 - (T)$944,000FY 2025 - (T)$944,000FY 2026 - (T)$944,000FY 2027 - (T)$944,000FY 2028 - (T)$944,000FY 2029 - (T)$944,000POST YR- (T)$4,720,000

CONSTRUCTION FY 2022 - (BG5200)$1,240,000FY 2023 - (BG5200)$5,580,000FY 2024 - (BG5200)$5,580,000

$28,510,000

U-5896GUILFORD

DIVISIONPROJ.CATEGORY

SR 2085 (BRYAN BOULEVARD), NEW GARDEN ROAD AT HORSEPEN CREEK ROAD IN GREENSBORO. INTERCHANGE IMPROVEMENTS, INCLUDING NEW RAMP FROM WESTBOUND NEW GARDEN ROAD TO WESTBOUND SR 2085.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 20 TO FY 21 AND CONSTRUCTION FROM FY 21 TO FY 22.

RIGHT-OF-WAY FY 2021 - (T)$1,250,000UTILITIES FY 2021 - (T)$500,000CONSTRUCTION FY 2022 - (T)$2,250,000

$4,000,000

U-6008GUILFORD

DIVISIONPROJ.CATEGORY

SR 2124 (LEWISTON ROAD), SR 2136 (FLEMING ROAD). INTERSECTION IMPROVEMENTS.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 21 TO FY 22 AND CONSTRUCTION FROM FY 22 TO FY 23.

RIGHT-OF-WAY FY 2022 - (T)$100,000UTILITIES FY 2022 - (T)$50,000CONSTRUCTION FY 2023 - (T)$1,100,000

$1,250,000

U-6016GUILFORD

DIVISIONPROJ.CATEGORY

30Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 31: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 7DIVISION 7NC 54 (EAST HARDEN STREET), NC 49 (EAST ELM STREET) IN GRAHAM. INTERSECTION IMPROVEMENTS.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 20 TO FY 21 AND CONSTRUCTION FROM FY 21 TO FY 22.

RIGHT-OF-WAY FY 2021 - (T)$180,000UTILITIES FY 2021 - (T)$100,000CONSTRUCTION FY 2022 - (T)$936,000

$1,216,000

U-6017ALAMANCE

DIVISIONPROJ.CATEGORY

NC 62, SR 1154 (KERSEY VALLEY ROAD) TO SR 1162 (WEANT ROAD) IN ARCHDALE. IMPROVE INTERCHANGE AREA AND REALIGN SR 1154 AND SR 1162 INTERSECTIONS.TO ALLOW ADDITIONAL TIME FOR PLANNING AND DESIGN, DELAY RIGHT-OF-WAY FROM FY 20 TO FY 21.

ENGINEERING FY 2021 - (T)$62,000FY 2022 - (T)$62,000FY 2023 - (T)$62,000FY 2024 - (T)$62,000FY 2025 - (T)$62,000FY 2026 - (T)$62,000FY 2027 - (T)$62,000FY 2028 - (T)$62,000FY 2029 - (T)$62,000POST YR- (T)$372,000

BUILD NC ROW FY 2021 - (T)$129,000FY 2022 - (T)$129,000FY 2023 - (T)$129,000FY 2024 - (T)$129,000FY 2025 - (T)$129,000FY 2026 - (T)$129,000FY 2027 - (T)$129,000FY 2028 - (T)$129,000FY 2029 - (T)$129,000POST YR- (T)$774,000

RIGHT-OF-WAY FY 2021 - (T)$1,700,000UTILITIES FY 2021 - (T)$200,000BUILD NC CON FY 2022 - (T)$772,000

FY 2023 - (T)$772,000FY 2024 - (T)$772,000FY 2025 - (T)$772,000FY 2026 - (T)$772,000FY 2027 - (T)$772,000FY 2028 - (T)$772,000FY 2029 - (T)$772,000POST YR- (T)$5,404,000

CONSTRUCTION FY 2022 - (T)$1,300,000$17,645,000

U-6018GUILFORD

DIVISIONPROJ.CATEGORY

SR 2334 (AIR HARBOR ROAD), SR 2347 (LAKE BRANDT ROAD). CONSTRUCT TURN LANES AND SIDEWALKS.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (T)$400,000$400,000

U-6019GUILFORD

DIVISIONPROJ.CATEGORY

31Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 32: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 7DIVISION 7NC 54 (EAST HARDEN STREET), I-40 / I-85 INTERCHANGE IN GRAHAM. UPGRADE RAMP INTERSECTIONS.COST INCREASE EXCEEDING $2 MILLION AND 25% THRESHOLDS.

RIGHT-OF-WAY FY 2025 - (T)$600,000UTILITIES FY 2025 - (T)$300,000CONSTRUCTION FY 2026 - (T)$5,400,000

$6,300,000

* U-6115BALAMANCE

REGIONALPROJ.CATEGORY

LOWDERMILK STREET SYKES AVENUE, PINE STREET CROSSING CLOSURE AND LOWDERMILK STREET / SYKES AVENUE REALIGNMENT IN GREENSBORO.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (RR)$1,450,000FY 2022 - (O)$1,100,000

$2,550,000

Y-4807BGUILFORD

DIVISIONPROJ.CATEGORY

DIVISION 8DIVISION 8SR 2103 (EAST RALEIGH STREET), SOUTH 7TH AVENUE TO US 64 (EAST 11TH STREET) IN SILER CITY. CONSTRUCT SIDEWALK ON SOUTH SIDE.REVISE PROJECT DESCRIPTION TO ELIMINATE MULIT-USE PATH COMPONENT AT THE REQUEST OF TOWN AND RPO.

CONSTRUCTION FY 2020 - (TA5200)$595,000FY 2020 - (L)$149,000

$744,000

* EB-5734CHATHAM

DIVISIONPROJ.CATEGORY

US 1 / US 15 / US 501 (SANDHILLS BOULEVARD), MAPLE AVENUE IN ABERDEEN. CONSTRUCT MID-BLOCK CROSSWALK, MEDIAN REFUGE ISLAND, AND INSTALL PEDESTRIAN SIGNAL.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 22 TO FY 23.

CONSTRUCTION FY 2023 - (TA5200)$80,000FY 2023 - (L)$20,000

$100,000

EB-5741MOORE

DIVISIONPROJ.CATEGORY

US 1 BUSINESS (CARTHAGE STREET), NC 42 (WICKER STREET) TO CHATHAM STREET IN SANFORD. REDUCE NUMBER OF LANES AND CONSTRUCT BICYCLE / PEDESTRIAN ACCOMMODATIONS.TO ALLOW CITY ADDITIONAL TIME TO COMPLETE PLANNING AND DESIGN DELAY CONSTRUCTION FROM FY 20 TO 21.

RIGHT-OF-WAY FY 2020 - (TA5200)$120,000FY 2020 - (L)$30,000

CONSTRUCTION FY 2021 - (TA5200)$1,175,000FY 2021 - (L)$294,000

$1,619,000

EB-5863LEE

DIVISIONPROJ.CATEGORY

KNOLL ROAD, ARBORETUM DRIVE TO NORTH OF PADDOCK LANE IN SOUTHERN PINES. CONSTRUCT SIDEWALK.TO ALLOW TOWN ADDITIONAL TIME TO COMPLETE PLANNING AND DESIGN DELAY CONSTRUCTION FROM FY 20 TO 21.

CONSTRUCTION FY 2021 - (TA5200)$451,000FY 2021 - (L)$113,000

$564,000

EB-5864MOORE

DIVISIONPROJ.CATEGORY

32Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 33: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 8DIVISION 8SR 1203 (JOHNSON STREET), US 15 / US 501 TO MIKE PLACE IN ABERDEEN. CONSTRUCT SIDEWALKS.TO ALLOW TOWN ADDITIONAL TIME TO COMPLETE PLANNING AND DESIGN DELAY CONSTRUCTION FROM FY 20 TO 21.

RIGHT-OF-WAY FY 2020 - (TAANY)$80,000FY 2020 - (L)$20,000

CONSTRUCTION FY 2021 - (TA5200)$152,000FY 2021 - (L)$38,000

$290,000

EB-5869MOORE

DIVISIONPROJ.CATEGORY

SR 1579 (SOUTH MAIN STREET), SR 1531 (MANSFIELD DRIVE) TO END OF EXISTING SIDEWALK IN BROADWAY. CONSTRUCT SIDEWALK.TO ALLOW TOWN ADDITIONAL TIME TO COMPLETE PLANNING AND DESIGN DELAY CONSTRUCTION FROM FY 20 TO 21.

CONSTRUCTION FY 2021 - (TALT5)$69,000FY 2021 - (L)$17,000

$86,000

EB-5870LEE

DIVISIONPROJ.CATEGORY

I-73/I-74, SR 1455 (FIRE TOWER ROAD) TO MONTGOMERY COUNTY LINE.ACCELERATE CONSTRUCTION FROM FY 22 TO FY 21 TO CONFORM TO MARCH 2019 STIP REVISION

CONSTRUCTION FY 2021 - (BGIM)$3,450,000FY 2022 - (BGIM)$3,450,000

$6,900,000

I-5946BRICHMOND

STATEWIDEPROJ.CATEGORY

NC 751, SR 1731 (O'KELLY CHAPEL ROAD). UPGRADE AND REALIGN INTERSECTION.ADD CONSTRUCTION IN FY 23 NOT PREVIOUSLY PROGRAMMED [DELAY FROM 18-27 STIP] TO ASSIST IN BALANCING FUNDS.

CONSTRUCTION FY 2023 - (T)$541,000$541,000

* R-5825CHATHAM

DIVISIONPROJ.CATEGORY

US 1, SR 1640 (WIREGRASS ROAD) TO LOCH LAURIN LANE. WIDEN TO MULTILANES.COST INCREASE EXCEEDING $2 MILLION AND 25% THRESHOLDS.

RIGHT-OF-WAY FY 2025 - (T)$2,100,000FY 2026 - (T)$2,100,000

UTILITIES FY 2025 - (T)$1,434,000FY 2026 - (T)$1,434,000

BUILD NC CON FY 2027 - (T)$1,716,000FY 2028 - (T)$1,716,000FY 2029 - (T)$1,716,000POST YR- (T)$20,592,000

CONSTRUCTION FY 2027 - (T)$4,600,000FY 2028 - (T)$4,600,000

$42,008,000

* R-5928RICHMOND

DIVISIONPROJ.CATEGORY

33Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 34: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 8DIVISION 8SR 1547 (FINCH FARM ROAD), SR 3106 (KENNEDY ROAD) TO I-85 IN TRINITY. WIDEN TO MULTILANES.

ENGINEERING FY 2020 - (T)$180,000FY 2021 - (T)$180,000FY 2022 - (T)$180,000FY 2023 - (T)$180,000FY 2024 - (T)$180,000FY 2025 - (T)$180,000FY 2026 - (T)$180,000FY 2027 - (T)$180,000FY 2028 - (T)$180,000FY 2029 - (T)$180,000FY 2030 - (T)$180,000FY 2031 - (T)$180,000FY 2032 - (T)$180,000POST YR- (T)$363,000

BUILD NC ROW FY 2020 - (T)$429,000FY 2021 - (T)$429,000FY 2022 - (T)$429,000FY 2023 - (T)$429,000FY 2024 - (T)$429,000FY 2025 - (T)$429,000FY 2026 - (T)$429,000FY 2027 - (T)$429,000FY 2028 - (T)$429,000FY 2029 - (T)$429,000FY 2030 - (T)$429,000FY 2031 - (T)$429,000FY 2032 - (T)$429,000POST YR- (T)$429,000

RIGHT-OF-WAY FY 2020 - (T)$4,430,000UTILITIES FY 2020 - (T)$2,106,000CONSTRUCTION FY 2022 - (T)$10,300,000

FY 2023 - (T)$10,300,000$35,845,000

U-5308RANDOLPH

DIVISIONPROJ.CATEGORY

SR 1420 (GILLIS HILL ROAD), GILLIS HILL ROAD EXTENSION, SR 1406 (ROCKFISH ROAD) TO SR 1418 (LINDSAY ROAD) NEAR FAYETTEVILLE. CONSTRUCT MULTILANE FACILITY ON NEW LOCATION TO TIE IN AT THE INTERSECTION OF SR 1406 ROCKFISH ROAD AND WESTFIELD DRIVE.COST INCREASE EXCEEDING $2 MILLION AND 25% THRESHOLDS.

RIGHT-OF-WAY FY 2021 - (T)$8,904,000UTILITIES FY 2021 - (T)$9,598,000CONSTRUCTION FY 2022 - (T)$12,450,000

FY 2023 - (T)$12,450,000$43,402,000

* U-5707HOKE

DIVISIONPROJ.CATEGORY

34Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 35: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 9DIVISION 9SR 1724 (HURLEY SCHOOL ROAD), REPLACE BRIDGE 790066 OVER NORFOLK SOUTHERN RAILROAD.TO ALLOW ADDITIONAL TIME FOR PLANNING AND DESIGN, DELAY RIGHT-OF-WAY FROM FY 20 TO FY 21.

RIGHT-OF-WAY FY 2021 - (BGOFF)$77,000CONSTRUCTION FY 2021 - (BGOFF)$1,548,000

$1,625,000

B-5772ROWAN

DIVISIONPROJ.CATEGORY

I-40, 0.3 MILE EAST OF SR 3153 (HANES MALL BOULEVARD) TO 0.9 MILE EAST OF NC 150 (PETERS CREEK PARKWAY) IN WINSTON-SALEM AND SR 2747 (CLEMMONSVILLE ROAD) IN WINSTON-SALEM TO GUILFORD COUNTY LINE. PAVEMENT REHABILITATION AND REHABILITATION OF BRIDGES 330161, 330162, 330444, 330448, 330449, 330508, AND 330509.ACCELERATE CONSTRUCTION FROM FY 21 TO FY 20 TO CONFORM TO NATIONAL HIGHWAY FREIGHT PROGRAM FY 20 FUNDING PLAN, AND MODIFY SCOPE TO INCLUDE BRIDGE REHABILITATION.

CONSTRUCTION FY 2020 - (NHFP)$11,328,000FY 2020 - (NHPIM)$10,022,000

$21,350,000

* I-5795FORSYTHFORSYTH

STATEWIDEPROJ.CATEGORY

US 311, NC 65 IN WALNUT COVE. UPGRADE INTERSECTION AND IMPROVE RAILROAD CROSSING.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 22 TO FY 23.

CONSTRUCTION FY 2023 - (BGLT5)$3,550,000$3,550,000

R-5768STOKES

DIVISIONPROJ.CATEGORY

US 311 (NORTH MAIN STREET), SR 1918 (FIRST STREET) IN WALNUT COVE. CONSTRUCT ROUNDABOUT.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (T)$1,450,000$1,450,000

R-5828STOKES

DIVISIONPROJ.CATEGORY

FUTURE I-74, WINSTON-SALEM NORTHERN BELTWAY, EASTERN SECTION, US 421 / NC 150 / BUSINESS 40 TO US 158. STREAM RELOCATION.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 20 TO FY 21.

CONSTRUCTION FY 2021 - (NHP)$10,000,000$10,000,000

U-2579BAFORSYTH

TRANSITIONPROJ.CATEGORY

35Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 36: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 9DIVISION 9WILKESBORO STREET, YADKINVILLE ROAD IN MOCKSVILLE. CONSTRUCT ROUNDABOUT.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (T)$1,150,000$1,150,000

U-6002DAVIE

DIVISIONPROJ.CATEGORY

DIVISION 10DIVISION 10SR 1132 (MIAMI CHURCH ROAD), REPLACE BRIDGE 120137 OVER DUTCH BUFFALO CREEK.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (BGOFF)$600,000$600,000

B-5375CABARRUS

DIVISIONPROJ.CATEGORY

SR 2111 (BELK MILL ROAD), REPLACE BRIDGE 890129 OVER LANES CREEK.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (BGOFF)$1,225,000$1,225,000

B-5806UNION

DIVISIONPROJ.CATEGORY

SR 1142 (CITY POND ROAD), REPLACE BRIDGE 030075 OVER NORTH FORK JONES CREEK.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 20 TO FY 22.

RIGHT-OF-WAY FY 2020 - (BGOFF)$105,000CONSTRUCTION FY 2022 - (BGOFF)$1,050,000

$1,155,000

B-5809ANSON

DIVISIONPROJ.CATEGORY

SR 1434 (ROGERS ROAD), REPLACE BRIDGE 830042 OVER BIG BEAR CREEK.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 20 TO FY 22 AND CONSTRUCTION FROM FY 21 TO FY 22.

RIGHT-OF-WAY FY 2022 - (BGOFF)$15,000CONSTRUCTION FY 2022 - (BGOFF)$600,000

$615,000

B-5811STANLY

DIVISIONPROJ.CATEGORY

US 21, SR 5544 (CATAWBA AVENUE) IN CORNELIUS. CONSTRUCT ROUNDABOUTS.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

ENGINEERING FY 2020 - (CMAQ)$669,000FY 2020 - (BA)$333,000

RIGHT-OF-WAY FY 2020 - (CMAQ)$1,308,000FY 2020 - (BA)$785,000

CONSTRUCTION FY 2022 - (CMAQ)$7,474,000FY 2022 - (S(M))$1,869,000

$12,438,000

C-5621MECKLENBURG

EXEMPTPROJ.CATEGORY

36Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 37: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 10DIVISION 10CHARLOTTE, STEWART CREEK GREENWAY, STATE STREET TO ROZZELLES FERRY ROAD. CONSTRUCT GREENWAY.TO ALLOW ADDITIONAL TIME FOR PLANNING AND DESIGN, DELAY CONSTRUCTION FROM FY 20 TO FY 21.

CONSTRUCTION FY 2021 - (CMAQ)$1,090,000FY 2021 - (BGDA)$1,445,000FY 2021 - (L)$634,000

$3,169,000

EB-5781MECKLENBURG

DIVISIONPROJ.CATEGORY

CHARLOTTE, MCALPINE CREEK GREENWAY, GREEN REA ROAD TO FOUR MILE CREEK GREENWAY. CONSTRUCT GREENWAY.TO ALLOW ADDITIONAL TIME FOR PLANNING AND DESIGN, DELAY CONSTRUCTION FROM FY 20 TO FY 21.

CONSTRUCTION FY 2021 - (CMAQ)$3,926,000FY 2021 - (TAANY)$1,848,000FY 2021 - (L)$2,102,000

$7,876,000

EB-5782MECKLENBURG

DIVISIONPROJ.CATEGORY

MATTHEWS, SAM NEWELL ROAD MULTI-USE PATH, NORTHEAST PARKWAY TO CROWN POINT ELEMENTARY SCHOOL. CONSTRUCT GREENWAY.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 20 TO 21 AND CONSTRUCTION FROM FY 22 TO FY 23.

ENGINEERING FY 2020 - (BGDA)$185,000FY 2020 - (L)$46,000

RIGHT-OF-WAY FY 2021 - (BGDA)$268,000FY 2021 - (L)$67,000

CONSTRUCTION FY 2023 - (BGDA)$1,221,000FY 2023 - (L)$305,000

$2,092,000

EB-5783MECKLENBURG

DIVISIONPROJ.CATEGORY

MATTHEWS, CONSTRUCT FOUR MILE CREEK GREENWAY CROSSING UNDER SR 3448 (SOUTH

TRADE STREET)TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (BGDA)$48,000FY 2022 - (TADA)$1,397,000FY 2022 - (L)$471,000

$1,916,000

EB-5829MECKLENBURG

DIVISIONPROJ.CATEGORY

NORTH INDIAN TRAIL ROAD. SOUTH FORK ROAD TO LIBERTY LANE. CONSTRUCT COMPLETE STREET. INCLUDES INTERSECTION IMPROVEMENTS AT SR 1008 (INDIAN TRAIL ROAD) AND SR 1367 (UNIONVILLE-INDIAN TRAIL ROAD (FORMERLY U-6250).MODIFY PROJECT SCOPE, FUNDING AMOUNTS, AND SCHEDULE. PROJECT TO INCORPORATE WORK PREVIOUSLY UNDER U-6250.

ENGINEERING FY 2020 - (BGDA)$313,000FY 2020 - (L)$78,000

RIGHT-OF-WAY FY 2021 - (BGDA)$208,000FY 2021 - (L)$52,000

CONSTRUCTION FY 2022 - (BGDA)$4,719,000FY 2022 - (L)$1,903,000

$7,273,000

* EB-5931UNION

DIVISIONPROJ.CATEGORY

37Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 38: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 10DIVISION 10I-85, ITS FOR I-3802 ATO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 22 TO FY 23.

CONSTRUCTION FY 2023 - (CMAQ)$1,900,000$1,900,000

I-3802AACABARRUS

TRANSITIONPROJ.CATEGORY

I-277 (BROOKSHIRE FRWY), I-77 TO EAST 10TH STREET. RESURFACE ROADWAY AND REHABILITATE BRIDGES FROM JOHNSON STREET TO EAST 10TH STREET.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 23.

CONSTRUCTION FY 2023 - (NHPIM)$8,567,000FY 2024 - (NHPIM)$8,567,000FY 2025 - (NHPIM)$8,566,000

$25,700,000

I-5746CMECKLENBURG

STATEWIDEPROJ.CATEGORY

I-485, SR 1786 TO NC 27. BRIDGE REHABILITATION.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (NHPIM)$900,000$900,000

I-5902MECKLENBURG

STATEWIDEPROJ.CATEGORY

I-85, 0.2 MILE WEST OF NC 16 (BROOKSHIRE BOULEVARD) TO CONCRETE PAVEMENT JOINT AT US 29/NC 49 CONNECTOR. PAVEMENT REHABILITATION.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 20 TO FY 21.

CONSTRUCTION FY 2021 - (NHPIM)$6,585,000FY 2021 - (BGDA)$2,731,000FY 2021 - (S(M))$683,000FY 2022 - (NHPIM)$6,586,000FY 2022 - (BGDA)$2,732,000FY 2022 - (S(M))$683,000

$20,000,000

I-5905MECKLENBURG

STATEWIDEPROJ.CATEGORY

I-77, I-485 TO NC 150. CONSTRUCT PEAK PERIOD SHOULDER USE LANES.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 20 TO FY 21 AND CONSTRUCTION FROM FY 20 TO FY 21.

ENGINEERING FY 2020 - (BGDA)$760,000FY 2020 - (BA)$190,000

RIGHT-OF-WAY FY 2021 - (BGDA)$80,000FY 2021 - (S(M))$20,000

CONSTRUCTION FY 2021 - (BGDA)$12,253,000FY 2021 - (S(M))$3,063,000FY 2022 - (BGDA)$12,253,000FY 2022 - (S(M))$3,063,000FY 2023 - (BGDA)$12,254,000FY 2023 - (S(M))$3,064,000

$47,000,000

I-6065IREDELLMECKLENBURG

EXEMPTPROJ.CATEGORY

38Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 39: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 10DIVISION 10CHARLOTTE, WYE CONNECTION TRACK AT CHARLOTTE JUNCTIONTO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (T)$5,500,000FY 2023 - (T)$5,500,000

$11,000,000

P-5705AMECKLENBURG

STATEWIDEPROJ.CATEGORY

KANNAPOLIS, CONSTRUCT TRACK IMPROVEMENTS, SECOND PLATFORM, PEDESTRIAN UNDERPASS, SITEWORK, RETAINING WALL, SIGNALING EQUIPMENTTO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (T)$5,050,000FY 2023 - (T)$5,050,000

$10,100,000

P-5725CABARRUS

REGIONALPROJ.CATEGORY

NC 73, NC 115 TO SR 2693 (DAVIDSON-CONCORD ROAD).TO ALIGN SCHEDULE WITH R-5706A, DELAY RIGHT-OF-WAY FROM FY 21 TO FY 23 AND CONSTRUCTION FROM FY 23 TO FY 26. PROJECT TO UTILIZE BUILD NC BONDS.

BUILD NC ROW FY 2023 - (T)$429,000FY 2024 - (T)$429,000FY 2025 - (T)$429,000FY 2026 - (T)$429,000FY 2027 - (T)$429,000FY 2028 - (T)$429,000FY 2029 - (T)$429,000POST YR- (T)$3,432,000

RIGHT-OF-WAY FY 2023 - (T)$2,000,000FY 2024 - (T)$2,000,000FY 2025 - (T)$2,000,000

UTILITIES FY 2023 - (T)$500,000CONSTRUCTION FY 2026 - (BGANY)$6,850,000

FY 2027 - (BGANY)$6,850,000FY 2028 - (BGANY)$6,850,000FY 2029 - (BGANY)$6,850,000

$40,335,000

* R-2632ABMECKLENBURG

REGIONALPROJ.CATEGORY

NC 73 (DAVIDSON HIGHWAY), SR 2693 (DAVIDSON-CONCORD ROAD) TO SR 1394 (POPLAR TENT ROAD).COST INCREASE EXCEEDING $2 MILLION AND 25% THRESHOLDS. TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 22 TO FY 23 AND CONSTRUCTION FROM FY 24 TO FY 26. SCHEDULE TO ALIGN WITH R-2632AB.

RIGHT-OF-WAY FY 2023 - (T)$3,500,000FY 2024 - (T)$3,500,000

UTILITIES FY 2023 - (T)$500,000CONSTRUCTION FY 2026 - (T)$6,375,000

FY 2027 - (T)$6,375,000FY 2028 - (T)$6,375,000FY 2029 - (T)$6,375,000

$33,000,000

* R-5706ACABARRUSMECKLENBURG

REGIONALPROJ.CATEGORY

39Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 40: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 10DIVISION 10NC 73 (DAVIDSON HIGHWAY), SR 1394 (POPLAR TENT ROAD) TO US 29.COST INCREASE EXCEEDING $2 MILLION AND 25% THRESHOLDS. TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 22 TO FY 25 AND CONSTRUCTION FROM FY 24 TO FY 28.

RIGHT-OF-WAY FY 2025 - (T)$23,333,000FY 2026 - (T)$23,333,000FY 2027 - (T)$23,334,000

UTILITIES FY 2025 - (T)$1,050,000FY 2026 - (T)$1,050,000

CONSTRUCTION FY 2028 - (T)$36,525,000FY 2029 - (T)$36,525,000POST YR- (T)$73,050,000

$218,200,000

* R-5706BCABARRUS

REGIONALPROJ.CATEGORY

SR 3440 (MCKEE ROAD) EXTENSION, SR 3448 (PLEASANT PLAINS ROAD) TO SR 1009 (JOHN STREET)TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

ENGINEERING FY 2020 - (T)$58,000FY 2021 - (T)$58,000FY 2022 - (T)$58,000FY 2023 - (T)$58,000FY 2024 - (T)$58,000FY 2025 - (T)$58,000FY 2026 - (T)$58,000FY 2027 - (T)$58,000FY 2028 - (T)$58,000FY 2029 - (T)$58,000POST YR- (T)$290,000

BUILD NC ROW FY 2020 - (T)$86,000FY 2021 - (T)$86,000FY 2022 - (T)$86,000FY 2023 - (T)$86,000FY 2024 - (T)$86,000FY 2025 - (T)$86,000FY 2026 - (T)$86,000FY 2027 - (T)$86,000FY 2028 - (T)$86,000FY 2029 - (T)$86,000POST YR- (T)$430,000

RIGHT-OF-WAY FY 2020 - (T)$80,000FY 2021 - (T)$1,520,000

UTILITIES FY 2020 - (T)$500,000CONSTRUCTION FY 2022 - (T)$2,550,000

FY 2022 - (L)$2,000,000FY 2023 - (T)$2,550,000

$11,360,000

U-4713AMECKLENBURG

DIVISIONPROJ.CATEGORY

NORTHCROSS DRIVE EXTENSION, NC 73 IN HUNTERSVILLE TO WESTMORELAND ROAD IN CORNELIUS. CONSTRUCT ROAD ON NEW LOCATION.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

ENGINEERING FY 2020 - (BA)$960,000RIGHT-OF-WAY FY 2020 - (BGANY)$1,499,000

FY 2020 - (L)$489,000CONSTRUCTION FY 2022 - (BGANY)$9,416,000

FY 2022 - (L)$2,023,000FY 2022 - (S(M))$331,000

$14,718,000

U-5108MECKLENBURG

DIVISIONPROJ.CATEGORY

40Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 41: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 10DIVISION 10US 74 (ROOSEVELT BLVD), REALIGN JAMES HAMILTON ROAD TO INTERSECT WITH SR 1514 (ROCKY RIVER ROAD) AT MYERS ROAD.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 20 TO 21 AND CONSTRUCTION FROM FY 21 TO FY 22.

RIGHT-OF-WAY FY 2021 - (T)$500,000CONSTRUCTION FY 2022 - (T)$650,000

$1,150,000

U-5703BUNION

STATEWIDEPROJ.CATEGORY

NC 3 (DALE EARNHARDT BOULEVARD), INTERSECTION OF NC 3 (DALE EARNHARDT BOULEVARD) AND US 29/601 (CANNON BOULEVARD). CONSTRUCT INTERSECTION IMPROVEMENTS.TO ALLOW ADDITIONAL TIME FOR PLANNING AND DESIGN, DELAY CONSTRUCTION FROM FY 20 TO FY 21.

ENGINEERING FY 2021 - (T)$96,000FY 2022 - (T)$96,000FY 2023 - (T)$96,000FY 2024 - (T)$96,000FY 2025 - (T)$96,000FY 2026 - (T)$96,000FY 2027 - (T)$96,000FY 2028 - (T)$96,000FY 2029 - (T)$96,000POST YR- (T)$576,000

BUILD NC CON FY 2021 - (T)$300,000FY 2022 - (T)$300,000FY 2023 - (T)$300,000FY 2024 - (T)$300,000FY 2025 - (T)$300,000FY 2026 - (T)$300,000FY 2027 - (T)$300,000FY 2028 - (T)$300,000FY 2029 - (T)$300,000POST YR- (T)$1,800,000

CONSTRUCTION FY 2021 - (T)$1,900,000FY 2022 - (T)$1,900,000

$9,740,000

U-5761CABARRUS

REGIONALPROJ.CATEGORY

NC 160, SOUTH CAROLINA LINE TO NC 49 (SOUTH TRYON ROAD). WIDEN TO MULTI-LANES.COST INCREASE EXCEEDING $2 MILLION AND 25% THRESHOLDS. TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 22 TO FY 23 AND CONSTRUCTION FROM FY 24 TO FY 26.

RIGHT-OF-WAY FY 2023 - (T)$6,833,000FY 2024 - (T)$6,833,000FY 2025 - (T)$6,834,000

UTILITIES FY 2023 - (T)$500,000CONSTRUCTION FY 2026 - (T)$4,375,000

FY 2027 - (T)$4,375,000FY 2028 - (T)$4,375,000FY 2029 - (T)$4,375,000

$38,500,000

U-5766AMECKLENBURG

REGIONALPROJ.CATEGORY

41Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 42: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 10DIVISION 10NC 160, NC 49 (SOUTH TRYON ROAD) TO I-485. WIDEN TO MULTI-LANES.COST INCREASE EXCEEDING $2 MILLION AND 25% THRESHOLDS. TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 22 TO FY 23 AND CONSTRUCTION FROM FY 24 TO FY 26.

RIGHT-OF-WAY FY 2023 - (T)$22,833,000FY 2024 - (T)$22,833,000FY 2025 - (T)$22,834,000

UTILITIES FY 2023 - (T)$2,300,000FY 2024 - (T)$2,300,000

CONSTRUCTION FY 2026 - (T)$7,825,000FY 2027 - (T)$7,825,000FY 2028 - (T)$7,825,000FY 2029 - (T)$7,825,000

$104,400,000

U-5766BMECKLENBURG

REGIONALPROJ.CATEGORY

CORNELIUS, INTERSECTION OF NC 115 AND POTTS STREET. CONSTRUCT IMPROVEMENTS.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

ENGINEERING FY 2020 - (BA)$100,000RIGHT-OF-WAY FY 2020 - (BA)$1,700,000CONSTRUCTION FY 2022 - (CMAQ)$2,733,000

FY 2022 - (S(M))$683,000$5,216,000

U-5873MECKLENBURG

EXEMPTPROJ.CATEGORY

CORNELIUS, SR 2195 (TORRENCE CHAPEL ROAD) AND SR 5544 (WEST CATAWBA AVENUE). INTERSECTION IMPROVEMENTS.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

ENGINEERING FY 2020 - (BA)$849,000RIGHT-OF-WAY FY 2020 - (BA)$1,153,000CONSTRUCTION FY 2022 - (CMAQ)$9,473,000

FY 2022 - (S(M))$2,368,000$13,843,000

U-5906MECKLENBURG

DIVISIONPROJ.CATEGORY

DAVIDSON, POTTS-SLOAN-BEATTY CONNECTOR. CONSTRUCT ROADWAY ON NEW LOCATION.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22 AND ADD RIGHT-OF-WAY NOT PREVIOUSLY PROGRAMMED IN FY 20.

RIGHT-OF-WAY FY 2020 - (T)$500,000CONSTRUCTION FY 2022 - (T)$4,000,000

FY 2022 - (L)$477,000$4,977,000

* U-5907MECKLENBURG

EXEMPTPROJ.CATEGORY

SR 1009 (CHARLOTTE AVENUE), SEYMOUR STREET TO NC 200 (DICKERSON BOULEVARD). WIDEN TO FOUR-LANES DIVIDED.PROJECT TO NO LONGER USE BUILD NC BONDS. TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 20 TO FY 24 AND CONSTRUCTION FROM FY 24 TO FY 27.

RIGHT-OF-WAY FY 2024 - (T)$6,766,000FY 2025 - (T)$6,767,000FY 2026 - (T)$6,767,000

UTILITIES FY 2024 - (T)$500,000CONSTRUCTION FY 2027 - (T)$3,000,000

FY 2028 - (T)$3,000,000$26,800,000

* U-6031UNION

DIVISIONPROJ.CATEGORY

42Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 43: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 10DIVISION 10WESLEY CHAPEL, POTTER ROAD AT WESLEY CHAPEL ROAD. CONSTRUCT ROUNDABOUT.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

ENGINEERING FY 2020 - (CMAQ)$7,000FY 2020 - (S(M))$5,000

RIGHT-OF-WAY FY 2020 - (CMAQ)$74,000FY 2020 - (L)$26,000FY 2020 - (S(M))$26,000

CONSTRUCTION FY 2022 - (CMAQ)$1,006,000FY 2022 - (L)$390,000FY 2022 - (S(M))$313,000

$1,847,000

U-6087UNION

DIVISIONPROJ.CATEGORY

MARVIN, NEW TOWN ROAD AT MARVIN ROAD. CONSTRUCT ROUNDABOUT.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

ENGINEERING FY 2020 - (CMAQ)$45,000FY 2020 - (S(M))$55,000

RIGHT-OF-WAY FY 2020 - (CMAQ)$111,000FY 2020 - (L)$37,000FY 2020 - (S(M))$12,000

CONSTRUCTION FY 2022 - (CMAQ)$1,302,000FY 2022 - (L)$205,000FY 2022 - (S(M))$121,000

$1,888,000

U-6088UNION

DIVISIONPROJ.CATEGORY

WEDDINGTON, WEDDINGTON-MATTHEWS ROAD AT TILLEY MORRIS ROAD. CONSTRUCT ROUNDABOUT.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

ENGINEERING FY 2020 - (CMAQ)$258,000FY 2020 - (S(M))$133,000

RIGHT-OF-WAY FY 2020 - (CMAQ)$193,000FY 2020 - (L)$27,000FY 2020 - (S(M))$41,000

CONSTRUCTION FY 2022 - (CMAQ)$1,540,000FY 2022 - (L)$220,000FY 2022 - (S(M))$440,000

$2,852,000

U-6090UNION

DIVISIONPROJ.CATEGORY

NORFOLK SOUTHERN MAINLINE, GRADE SEPARATION AT ROGERS LAKE ROAD CROSSING (724408Y) IN KANNAPOLIS.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (T)$8,850,000FY 2022 - (O)$450,000

$9,300,000

Y-4810KCABARRUS

STATEWIDEPROJ.CATEGORY

DIVISION 11DIVISION 11ASHE COUNTY AIRPORT (GEV), CONSTRUCT APRON EXPANSONS.ACCELERATE CONSTRUCTION FROM FY 22 TO FY 21 PER REQUEST FROM DIVISION OF AVIATION.

CONSTRUCTION FY 2021 - (T)$2,700,000$2,700,000

AV-5848ASHE

DIVISIONPROJ.CATEGORY

43Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 44: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 11DIVISION 11SR 1313, REPLACE BRIDGE 960075 OVER FISH DAM CREEK.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 20 TO FY 21.

CONSTRUCTION FY 2021 - (HFB)$700,000$700,000

B-4977WILKES

HWY FUNDSPROJ.CATEGORY

US 21 BUS, REPLACE BRIDGE 980059 OVER JONESVILLE CREEK.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 20 TO FY 21.

CONSTRUCTION FY 2021 - (HFB)$1,600,000$1,600,000

B-4979YADKIN

HWY FUNDSPROJ.CATEGORY

US 52 (NORTHBOUND LANE), REPLACE BRIDGE 850122 OVER TOMS CREEK AND REPLACE BRIDGE 850342 OVER OLD US 52 SOUTHBOUND EXIT RAMP.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 20 TO FY 22 AND CONSTRUCTION FROM FY 21 TO FY 23.

RIGHT-OF-WAY FY 2022 - (BGLT5)$400,000CONSTRUCTION FY 2023 - (BGLT5)$2,000,000

FY 2024 - (BGLT5)$2,000,000$4,400,000

B-5527SURRY

STATEWIDEPROJ.CATEGORY

I-77 NORTH, REPLACE BRIDGE 850006 OVER NC 268, SOUTHERN RAILROAD, AND YADKIN RIVER.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 20 TO FY 21 AND CONSTRUCTION FROM FY 21 TO FY 22.

RIGHT-OF-WAY FY 2021 - (NHPB)$600,000CONSTRUCTION FY 2022 - (NHPB)$5,350,000

FY 2023 - (NHPB)$5,350,000$11,300,000

B-5831SURRY

STATEWIDEPROJ.CATEGORY

SR 2080 (QUAKER CHURCH ROAD), REPLACE BRIDGE 850152 OVER ARARAT RIVER.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 21 TO FY 22 AND CONSTRUCTION FROM FY 22 TO FY 23.

RIGHT-OF-WAY FY 2022 - (BGOFF)$200,000CONSTRUCTION FY 2023 - (BGOFF)$1,800,000

FY 2024 - (BGOFF)$1,800,000$3,800,000

B-5832SURRY

DIVISIONPROJ.CATEGORY

US 21 BUSINESS, REPLACE BRIDGE 980029 OVER I-77.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 20 TO FY 21 AND CONSTRUCTION FROM FY 21 TO FY 22.

RIGHT-OF-WAY FY 2021 - (NHPB)$300,000CONSTRUCTION FY 2022 - (NHPB)$2,300,000

FY 2023 - (NHPB)$2,300,000$4,900,000

B-5833YADKIN

REGIONALPROJ.CATEGORY

44Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 45: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 11DIVISION 11LENOIR, HOSPITAL AVENUE, HARPER AVENUE TO US 321 (BLOWING ROCK BOULEVARD). CONSTRUCT SIDEWALK.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 19 TO FY 20.

RIGHT-OF-WAY FY 2020 - (TADA)$40,000FY 2020 - (L)$10,000

CONSTRUCTION FY 2020 - (BGDA)$395,000FY 2020 - (TADA)$125,000FY 2020 - (L)$130,000

$700,000

EB-5806CALDWELL

DIVISIONPROJ.CATEGORY

I-74, I-77 TO US 601. PAVEMENT REHABILITATION.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 22 TO FY 23.

CONSTRUCTION FY 2023 - (BGIM)$2,082,000FY 2024 - (BGIM)$2,082,000

$4,164,000

I-5907SURRY

STATEWIDEPROJ.CATEGORY

NC 105, CONSTRUCT NEW BRIDGE OVER WATAUGA RIVER AND LEFT-TURN LANE AT SR 1112 (BROADSTONE ROAD).TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

UTILITIES FY 2020 - (T)$2,850,000BUILD NC CON FY 2022 - (T)$532,000

FY 2023 - (T)$532,000FY 2024 - (T)$532,000FY 2025 - (T)$532,000FY 2026 - (T)$532,000FY 2027 - (T)$532,000FY 2028 - (T)$532,000FY 2029 - (T)$532,000POST YR- (T)$3,724,000

CONSTRUCTION FY 2022 - (T)$6,200,000$17,030,000

R-2566BAWATAUGA

DIVISIONPROJ.CATEGORY

SR 1605 (OLD US 421), SR 1146 (SHACKTOWN ROAD) TO SR 1711 (SPEER BRIDGE ROAD). CONSTRUCT NEW ROADWAY TO REALIGN SR 1605 WITH SR 1711 AND CONSTRUCT A ROUNDABOUT AT THE INTERSECTION WITH SR 1146.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 22 TO FY 23.

CONSTRUCTION FY 2023 - (T)$2,050,000$2,050,000

R-5730YADKIN

DIVISIONPROJ.CATEGORY

GRANITE FALLS, INTERSECTION OF US 321 AND SR 1109 (PINEWOODS ROAD EXTENSION). CONSTRUCT INTERSECTION IMPROVEMENTS.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (BGDA)$840,000FY 2022 - (S(M))$210,000

$1,050,000

R-5775CALDWELL

EXEMPTPROJ.CATEGORY

45Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 46: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 11DIVISION 11US 601, US 601 (CAROLINA AVENUE) AND NC 67 (MAIN STREET). UPGRADE INTERSECTION.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (T)$750,000FY 2023 - (T)$750,000

$1,500,000

R-5831YADKIN

DIVISIONPROJ.CATEGORY

WESTERN PIEDMONT REGIONAL TRANSIT AUTHORITY, REPLACEMENT VANSMODIFY FUNDING IN FY 20, FY 21, FY 22, AND FY 23

CAPITAL FY 2020 - (S)$18,000FY 2020 - (L)$88,000FY 2020 - (5307)$353,000FY 2021 - (S)$18,000FY 2021 - (L)$93,000FY 2021 - (5307)$370,000FY 2022 - (S)$18,000FY 2022 - (L)$97,000FY 2022 - (5307)$389,000FY 2023 - (S)$18,000FY 2023 - (L)$102,000FY 2023 - (5307)$408,000

$1,972,000

* TA-4929ALEXANDERBURKECALDWELLCATAWBAPROJ.CATEGORY

WESTERN PIEDMONT REGIONAL TRANSIT AUTHORITY, PLANNING ASSISTANCEMODIFY FUNDING IN FY 20, FY 21, FY 22, AND FY 23

PLANNING FY 2020 - (S)$5,000FY 2020 - (L)$15,000FY 2020 - (5307)$60,000FY 2021 - (L)$16,000FY 2021 - (5307)$63,000FY 2022 - (L)$17,000FY 2022 - (5307)$66,000FY 2023 - (L)$16,000FY 2023 - (5307)$69,000

$327,000

* TP-4733B

ALEXANDERBURKECALDWELLCATAWBAPROJ.CATEGORY

WESTERN PIEDMONT REGIONAL TRANSIT AUTHORITY, PLANNING ASSISTANCE - 5303MODIFY FUNDING IN FY 21, FY 22, AND FY 23, CONSISTENT WITH FTA ALLOCATION FOR MPO REGION AND ADOPTED UPWP

PLANNING FY 2020 - (5303)$44,000FY 2020 - (S)$6,000FY 2020 - (L)$6,000FY 2021 - (5303)$55,000FY 2021 - (S)$7,000FY 2021 - (L)$7,000FY 2022 - (5303)$55,000FY 2022 - (S)$7,000FY 2022 - (L)$7,000FY 2023 - (5303)$55,000FY 2023 - (S)$7,000FY 2023 - (L)$7,000

$263,000

* TP-5106ALEXANDERBURKECALDWELLCATAWBAPROJ.CATEGORY

46Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 47: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 11DIVISION 11WESTERN PIEDMONT REGIONAL TRANSIT AUTHORITY, OPERATING ASSISTANCE - ELDERLY AND DISABLED PERSONSMODIFY FUNDING IN FY 20, FY 21, FY 22, AND FY 23

OPERATIONS FY 2020 - (L)$150,000FY 2020 - (5310)$150,000FY 2021 - (L)$158,000FY 2021 - (5310)$158,000FY 2022 - (L)$165,000FY 2022 - (5310)$165,000FY 2023 - (L)$174,000FY 2023 - (5310)$174,000

$1,294,000

* TQ-6507ALEXANDERBURKECALDWELLCATAWBAPROJ.CATEGORY

US 321, SR 1160 (MOUNT HERMAN ROAD). UPGRADE INTERSECTION TO SUPERSTREET DESIGN - WITHIN THE LIMITS OF U-4700 C.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

RIGHT-OF-WAY FY 2020 - (NHP)$420,000CONSTRUCTION FY 2022 - (NHP)$1,750,000

$2,170,000

U-4700CACALDWELL

REGIONALPROJ.CATEGORY

US 321, SR 1809/1952 (PINE MOUNTAIN ROAD). UPGRADE INTERSECTION TO SUPERSTREET DESIGN - WITHIN THE LIMITS OF U-4700 C.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

RIGHT-OF-WAY FY 2020 - (NHP)$400,000UTILITIES FY 2020 - (NHP)$100,000CONSTRUCTION FY 2022 - (NHP)$2,200,000

$2,700,000

U-4700CBCALDWELL

STATEWIDEPROJ.CATEGORY

US 321, SR 1108 (MISSION ROAD). UPGRADE INTERSECTION TO SUPERSTREET DESIGN - WITHIN THE LIMITS OF U-4700 C.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

RIGHT-OF-WAY FY 2020 - (NHP)$450,000UTILITIES FY 2020 - (NHP)$100,000CONSTRUCTION FY 2022 - (NHP)$2,200,000

$2,750,000

U-4700CCCALDWELL

STATEWIDEPROJ.CATEGORY

US 64 (NC 18), US 64 (NC 18) AND SR 1142 (CALLICO ROAD). INTERSECTION IMPROVEMENTS.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

RIGHT-OF-WAY FY 2020 - (T)$400,000CONSTRUCTION FY 2022 - (T)$250,000

$650,000

U-6033CALDWELL

DIVISIONPROJ.CATEGORY

US 321 ALT, SR 1109 (PINEWOOD ROAD) TO SR 1106 (DUKE STREET). UPGRADE ROADWAY.COST INCREASE EXCEEDING $2 MILLION AND 25% THRESHOLDS.

RIGHT-OF-WAY FY 2020 - (T)$100,000UTILITIES FY 2020 - (T)$100,000CONSTRUCTION FY 2022 - (T)$13,900,000

$14,100,000

* U-6034CALDWELL

DIVISIONPROJ.CATEGORY

47Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 48: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 11DIVISION 11SR 1002 (DUDLEY SHOALS ROAD), SR 1002 (DUDLEY SHOALS ROAD) AND SR 1751 (GRACE CHAPEL ROAD/CAMPGROUND ROAD)/SR 1752 (PEACH ORCHARD ROAD). CONSTRUCT ROUNDABOUT.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

RIGHT-OF-WAY FY 2020 - (T)$200,000CONSTRUCTION FY 2022 - (T)$975,000

$1,175,000

U-6035CALDWELL

DIVISIONPROJ.CATEGORY

DIVISION 12DIVISION 12SR 2402 (HOOVER ROAD), REPLACE BRIDGE 480020 OVER I-L CREEK.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 20 TO FY 21 AND CONSTRUCTION FROM FY 21 TO FY 22.

RIGHT-OF-WAY FY 2021 - (BGOFF)$67,000CONSTRUCTION FY 2022 - (BGOFF)$675,000

$742,000

B-5843IREDELL

DIVISIONPROJ.CATEGORY

SR 1892 (JENNINGS ROAD), REPLACE BRIDGE 480189 OVER SOUTH YADKIN RIVER.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 21 TO FY 22 AND CONSTRUCTION FROM FY 22 TO FY 23.

RIGHT-OF-WAY FY 2022 - (BGOFF)$200,000CONSTRUCTION FY 2023 - (BGOFF)$1,650,000

FY 2024 - (BGOFF)$1,650,000$3,500,000

B-5846IREDELL

DIVISIONPROJ.CATEGORY

SR 1421 (MARYS GROVE ROAD), REPLACE BRIDGE 350097 OVER UT OF MUDDY FORK CREEK.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 20 TO FY 21 AND CONSTRUCTION FROM FY 21 TO FY 22.

RIGHT-OF-WAY FY 2021 - (BGOFF)$67,000CONSTRUCTION FY 2022 - (BGOFF)$675,000

$742,000

B-5961GASTON

DIVISIONPROJ.CATEGORY

US 21, INTERSECTION OF US 21 AND SR 2375 (HOUSTON ROAD)/SR 1312 (FLOWER HOUSE ROAD). REALIGN AND SIGNALIZE.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (T)$50,000FY 2023 - (T)$2,900,000

$2,950,000

R-5711IREDELL

REGIONALPROJ.CATEGORY

NC 16 BUSINESS, INTERSECTION OF NC 16 BUSINESS AND SR 1439 (UNITY CHURCH ROAD)/SR 1387 (TRIANGLE CIRCLE). ADD TURN LANES.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (T)$120,000FY 2023 - (T)$2,280,000

$2,400,000

R-5712LINCOLN

REGIONALPROJ.CATEGORY

48Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 49: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 12DIVISION 12US 74, US 74 BUSINESS TO NC 226. CONSTRUCT ACCESS MANAGEMENT IMPROVEMENTS.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (T)$3,000,000$3,000,000

R-5713CLEVELAND

REGIONALPROJ.CATEGORY

NC 16, INTERSECTION OF NC 16 AND SR 1609 (COUNTY HOME ROAD). CONSTRUCT INTERSECTION IMPROVMENTS.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (T)$400,000$400,000

R-5762ALEXANDER

DIVISIONPROJ.CATEGORY

ALEXANDER COUNTY, CONSTRUCT ACCESS ROAD INTO ALEXANDER INDUSTRIAL PARK.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (APD)$1,125,000$1,125,000

R-5870ALEXANDER

EXEMPTPROJ.CATEGORY

WESTERN PIEDMONT REGIONAL TRANSIT AUTHORITY, REPLACEMENT VANSMODIFY FUNDING IN FY 20, FY 21, FY 22, AND FY 23

CAPITAL FY 2020 - (S)$18,000FY 2020 - (L)$88,000FY 2020 - (5307)$353,000FY 2021 - (S)$18,000FY 2021 - (L)$93,000FY 2021 - (5307)$370,000FY 2022 - (S)$18,000FY 2022 - (L)$97,000FY 2022 - (5307)$389,000FY 2023 - (S)$18,000FY 2023 - (L)$102,000FY 2023 - (5307)$408,000

$1,972,000

* TA-4929ALEXANDERBURKECALDWELLCATAWBAPROJ.CATEGORY

WESTERN PIEDMONT REGIONAL TRANSIT AUTHORITY, REPLACEMENT BUSES.FUNDING ADDED TO FY 21 AT THE REQUEST OF THE MPO (FUNDING UNCHANGED IN FY 20 ALREADY FLEXED FROM CMAQ TO FUZ)

CAPITAL FY 2020 - (L)$360,000FY 2020 - (5307)$1,440,000FY 2021 - (L)$90,000FY 2021 - (5307)$360,000

$2,250,000

* TA-6708CATAWBAPROJ.CATEGORY

49Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 50: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 12DIVISION 12WESTERN PIEDMONT REGIONAL TRANSIT AUTHORITY, REPLACEMENT LIGHT TRANSIT VEHICLESMODIFY FUNDING FOR FY 20, FY 21, FY 22, AND FY 23

CAPITAL FY 2020 - (L)$118,000FY 2020 - (5307)$470,000FY 2021 - (L)$123,000FY 2021 - (5307)$494,000FY 2022 - (L)$130,000FY 2022 - (5307)$519,000FY 2023 - (L)$136,000FY 2023 - (5307)$545,000FY 2024 - (L)$112,000FY 2024 - (5307)$448,000FY 2025 - (L)$112,000FY 2025 - (5307)$448,000

$3,655,000

* TA-6709CATAWBAPROJ.CATEGORY

WESTERN PIEDMONT REGIONAL TRANSIT AUTHORITY, MOBILITY MANAGERMODIFY FUNDING FOR FY 20, FY 21, FY 22, AND FY 23

CAPITAL FY 2020 - (L)$32,000FY 2020 - (5307)$126,000FY 2021 - (L)$32,000FY 2021 - (5307)$129,000FY 2022 - (L)$33,000FY 2022 - (5307)$132,000FY 2023 - (L)$34,000FY 2023 - (5307)$136,000

OPERATIONS FY 2024 - (L)$32,000FY 2024 - (5307)$126,000FY 2025 - (L)$32,000FY 2025 - (5307)$126,000

$970,000

* TG-6798CATAWBAPROJ.CATEGORY

WESTERN PIEDMONT REGIONAL TRANSIT AUTHORITY, PREVENTIVE MAINTANENCEMODIFY FUNDING FOR FY 20, FY 21, FY 22, AND FY 23

CAPITAL FY 2020 - (L)$125,000FY 2020 - (5307)$500,000FY 2021 - (L)$131,000FY 2021 - (5307)$525,000FY 2022 - (L)$138,000FY 2022 - (5307)$551,000FY 2023 - (L)$145,000FY 2023 - (5307)$579,000FY 2024 - (L)$120,000FY 2024 - (5307)$480,000FY 2025 - (L)$120,000FY 2025 - (5307)$480,000

$3,894,000

* TG-6799CATAWBAPROJ.CATEGORY

50Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 51: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 12DIVISION 12WESTERN PIEDMONT REGIONAL TRANSIT AUTHORITY, ROUTINE CAPITAL - BUS STOP SHELTERS, BENCHES, SHOP EQUIPMENT, SPARE PARTS, ENGINES, FAREBOX, SERVICE VEHICLES, COMPUTER HARDWARE AND SOFTWARE, AVL SOFTWARE, ETC.MODIFY FUNDING FOR FY 20, FY 21, FY 22, AND FY 23

CAPITAL FY 2020 - (L)$50,000FY 2020 - (5307)$200,000FY 2021 - (L)$53,000FY 2021 - (5307)$210,000FY 2022 - (L)$55,000FY 2022 - (5307)$221,000FY 2023 - (L)$58,000FY 2023 - (5307)$232,000FY 2024 - (L)$40,000FY 2024 - (5307)$200,000FY 2025 - (L)$40,000FY 2025 - (5307)$200,000

$1,559,000

* TG-6800CATAWBAPROJ.CATEGORY

WESTERN PIEDMONT REGIONAL TRANSIT AUTHORITY, OPERATING ASSISTANCE - ADA PARATRANSITMODIFY FUNDING IN FY 20, FY 21, FY 22, AND FY 23

OPERATIONS FY 2020 - (L)$75,000FY 2020 - (5307)$300,000FY 2021 - (L)$79,000FY 2021 - (5307)$315,000FY 2022 - (L)$83,000FY 2022 - (5307)$331,000FY 2023 - (L)$87,000FY 2023 - (5307)$347,000FY 2024 - (L)$50,000FY 2024 - (5307)$200,000FY 2025 - (L)$50,000FY 2025 - (5307)$200,000

$2,117,000

* TG-6801CATAWBAPROJ.CATEGORY

WESTERN PIEDMONT REGIONAL TRANSIT AUTHORITY, PROGRAM ADMINISTRATIONMODIFY FUNDING IN FY 20, FY 21, FY 22, AND FY 23

ADMINISTRATIVE FY 2020 - (5310)$40,000FY 2021 - (5310)$42,000FY 2022 - (5310)$44,000FY 2023 - (5310)$46,000FY 2024 - (5310)$30,000FY 2025 - (5310)$30,000

$232,000

* TL-1000CATAWBAPROJ.CATEGORY

WESTERN PIEDMONT REGIONAL TRANSIT AUTHORITY, OPERATING ASSISTANCEMODIFY FUNDING IN FY 20, FY 21, FY 22, AND FY 23

OPERATIONS FY 2020 - (L)$1,500,000FY 2020 - (5307)$1,500,000FY 2021 - (L)$1,575,000FY 2021 - (5307)$1,575,000FY 2022 - (L)$1,654,000FY 2022 - (5307)$1,654,000FY 2023 - (L)$1,736,000FY 2023 - (5307)$1,736,000FY 2024 - (L)$1,700,000FY 2024 - (5307)$1,700,000FY 2025 - (L)$1,700,000FY 2025 - (5307)$1,700,000

$19,730,000

* TO-6162CATAWBAPROJ.CATEGORY

51Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 52: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 12DIVISION 12WESTERN PIEDMONT REGIONAL TRANSIT AUTHORITY, PLANNING ASSISTANCEMODIFY FUNDING IN FY 20, FY 21, FY 22, AND FY 23

PLANNING FY 2020 - (S)$5,000FY 2020 - (L)$15,000FY 2020 - (5307)$60,000FY 2021 - (L)$16,000FY 2021 - (5307)$63,000FY 2022 - (L)$17,000FY 2022 - (5307)$66,000FY 2023 - (L)$16,000FY 2023 - (5307)$69,000

$327,000

* TP-4733B

ALEXANDERBURKECALDWELLCATAWBAPROJ.CATEGORY

WESTERN PIEDMONT REGIONAL TRANSIT AUTHORITY, PLANNING ASSISTANCE - 5303MODIFY FUNDING IN FY 21, FY 22, AND FY 23, CONSISTENT WITH FTA ALLOCATION FOR MPO REGION AND ADOPTED UPWP

PLANNING FY 2020 - (5303)$44,000FY 2020 - (S)$6,000FY 2020 - (L)$6,000FY 2021 - (5303)$55,000FY 2021 - (S)$7,000FY 2021 - (L)$7,000FY 2022 - (5303)$55,000FY 2022 - (S)$7,000FY 2022 - (L)$7,000FY 2023 - (5303)$55,000FY 2023 - (S)$7,000FY 2023 - (L)$7,000

$263,000

* TP-5106ALEXANDERBURKECALDWELLCATAWBAPROJ.CATEGORY

WESTERN PIEDMONT REGIONAL TRANSIT AUTHORITY, OPERATING ASSISTANCE - ELDERLY AND DISABLED PERSONSMODIFY FUNDING IN FY 20, FY 21, FY 22, AND FY 23

OPERATIONS FY 2020 - (L)$150,000FY 2020 - (5310)$150,000FY 2021 - (L)$158,000FY 2021 - (5310)$158,000FY 2022 - (L)$165,000FY 2022 - (5310)$165,000FY 2023 - (L)$174,000FY 2023 - (5310)$174,000

$1,294,000

* TQ-6507ALEXANDERBURKECALDWELLCATAWBAPROJ.CATEGORY

52Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 53: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 12DIVISION 12WESTERN PIEDMONT REGIONAL TRANSIT AUTHORITY, CAPITAL PURCHASE OF SERVICEMODIFY FUNDING IN FY 20, FY 21, FY 22, AND FY 23

CAPITAL FY 2020 - (L)$40,000FY 2020 - (5310)$160,000FY 2021 - (L)$42,000FY 2021 - (5310)$168,000FY 2022 - (L)$44,000FY 2022 - (5310)$176,000FY 2023 - (L)$46,000FY 2023 - (5310)$185,000FY 2024 - (L)$50,000FY 2024 - (5310)$160,000FY 2025 - (L)$50,000FY 2025 - (5310)$160,000

$1,281,000

* TQ-9039CATAWBAPROJ.CATEGORY

WESTERN PIEDMONT REGIONAL TRANSIT AUTHORITY, MOBILITY MANAGERMODIFY FUNDING IN FY 20, FY 21, FY 22, AND FY 23

CAPITAL FY 2020 - (L)$10,000FY 2020 - (5310)$40,000FY 2021 - (L)$11,000FY 2021 - (5310)$42,000FY 2022 - (L)$11,000FY 2022 - (5310)$43,000FY 2023 - (L)$11,000FY 2023 - (5310)$44,000FY 2024 - (L)$10,000FY 2024 - (5310)$40,000FY 2025 - (L)$10,000FY 2025 - (5310)$40,000

$312,000

* TQ-9040CATAWBAPROJ.CATEGORY

WESTERN PIEDMONT REGIONAL TRANSIT AUTHORITY, SAFETY AND SECURITYMODIFY FUNDING IN FY 20, FY 21, FY 22, AND FY 23

CAPITAL FY 2020 - (L)$13,000FY 2020 - (5307)$50,000FY 2021 - (L)$13,000FY 2021 - (5307)$53,000FY 2022 - (L)$14,000FY 2022 - (5307)$55,000FY 2023 - (L)$14,000FY 2023 - (5307)$58,000FY 2024 - (L)$8,000FY 2024 - (5307)$28,000FY 2025 - (L)$8,000FY 2025 - (5307)$28,000

$342,000

* TS-7002CATAWBAPROJ.CATEGORY

US 74 BUSINESS (MARION STREET), INTERSECTION OF US 74 BUSINESS (MARION STREET) AND NC 150 (CHERRYVILLE ROAD). REALIGN INTERSECTION.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (T)$100,000FY 2022 - (L)$300,000FY 2023 - (T)$1,600,000

$2,000,000

U-5775CLEVELAND

REGIONALPROJ.CATEGORY

53Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 54: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 12DIVISION 12NC 127, 1ST AVENUE SE TO 2ND AVENUE SE. ADD TURN LANES.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 22 TO FY 23.

RIGHT-OF-WAY FY 2020 - (T)$2,150,000CONSTRUCTION FY 2023 - (T)$570,000

$2,720,000

U-5777CATAWBA

REGIONALPROJ.CATEGORY

NC 150, INTERSECTION OF NC 150 AND SR 2399 (WIGGINS ROAD). REALIGN INTERSECTION.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 22 TO FY 23.

RIGHT-OF-WAY FY 2020 - (T)$550,000CONSTRUCTION FY 2023 - (T)$750,000

$1,300,000

U-5780IREDELL

REGIONALPROJ.CATEGORY

NC 27 (WEST CHARLOTTE AVENUE), INTERSECTION OF NC 27 (WEST CHARLOTTE AVENUE) AND SR 2534 (HAWTHORNE STREET). CONSTRUCT INTERSECTION IMPROVEMENTS.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 20 TO 21 AND CONSTRUCTION FROM FY 21 TO FY 22.

RIGHT-OF-WAY FY 2021 - (T)$450,000CONSTRUCTION FY 2022 - (T)$950,000

FY 2023 - (T)$950,000$2,350,000

U-5819GASTON

DIVISIONPROJ.CATEGORY

US 64 (DAVIE AVENUE), US 64 (DAVIE AVENUE) AND US 21 (SULLIVAN ROAD). CONVERT 5-APPROACH INTERSECTION TO A SINGLE LANE ROUNDABOUT.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 20 TO 21 AND CONSTRUCTION FROM FY 21 TO FY 22.

RIGHT-OF-WAY FY 2021 - (T)$200,000UTILITIES FY 2021 - (T)$100,000CONSTRUCTION FY 2022 - (T)$800,000

$1,100,000

U-5964IREDELL

REGIONALPROJ.CATEGORY

US 29 (FRANKLIN BOULEVARD), US 29 (FRANKLIN BOULEVARD) AND NC 274. CONSTRUCT INTERSECTION IMPROVEMENTS.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 20 TO 21 AND CONSTRUCTION FROM FY 21 TO FY 22.

RIGHT-OF-WAY FY 2021 - (T)$500,000UTILITIES FY 2021 - (T)$100,000CONSTRUCTION FY 2022 - (T)$1,200,000

FY 2023 - (T)$1,200,000$3,000,000

U-5965GASTON

REGIONALPROJ.CATEGORY

54Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 55: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 13DIVISION 13I-26 (US 19/US 23), SR 1781 (BROADWAY STREET) TO US 25COST INCREASE EXCEEDING $2 MILLION AND 25% THRESHOLDS. TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 21 TO FY 24 AND CONSTRUCTION FROM FY 24 TO FY 27. PROJECT TO UTILIZE BUILD NC BONDS.

BUILD NC ROW FY 2024 - (T)$343,000FY 2025 - (T)$343,000FY 2026 - (T)$343,000FY 2027 - (T)$343,000FY 2028 - (T)$343,000FY 2029 - (T)$343,000POST YR- (T)$3,087,000

RIGHT-OF-WAY FY 2024 - (T)$13,000,000FY 2025 - (T)$13,000,000FY 2026 - (T)$13,000,000

CONSTRUCTION FY 2027 - (T)$26,725,000FY 2028 - (T)$26,725,000FY 2029 - (T)$26,725,000POST YR- (T)$26,725,000

$151,045,000

* A-0010AABUNCOMBE

REGIONALPROJ.CATEGORY

SR 1306 (BILLS CREEK ROAD), REPLACE BRIDGE 800628 OVER LAKE LURE DAM AND BROAD RIVER.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 20 TO FY 21 AND CONSTRUCTION FROM FY 21 TO FY 22.

RIGHT-OF-WAY FY 2021 - (BGOFF)$250,000CONSTRUCTION FY 2022 - (BGOFF)$1,667,000

FY 2023 - (BGOFF)$1,667,000FY 2024 - (BGOFF)$1,666,000

$5,250,000

B-5871RUTHERFORD

DIVISIONPROJ.CATEGORY

US 74, REPLACE BRIDGE 800083 AND BRIDGE 800084 OVER SECOND BROAD RIVER.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 24.

CONSTRUCTION FY 2024 - (BGLT5)$4,900,000FY 2025 - (BGLT5)$4,900,000

$9,800,000

* B-5876RUTHERFORD

STATEWIDEPROJ.CATEGORY

SR 1430 (HARLAND ROAD), REPLACE BRIDGE 110145 OVER BRISTOL CREEK.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 21 TO FY 22 AND CONSTRUCTION FROM FY 21 TO FY 22.

RIGHT-OF-WAY FY 2022 - (BGOFF)$65,000CONSTRUCTION FY 2022 - (BGOFF)$725,000

$790,000

B-6011BURKE

DIVISIONPROJ.CATEGORY

SR 1106 (LYNN GAP ROAD), REPLACE BRIDGE 600207 OVER GRASSY CREEK.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 21 TO 22 AND CONSTRUCTION FROM FY 21 TO FY 22.

RIGHT-OF-WAY FY 2022 - (BGOFF)$40,000CONSTRUCTION FY 2022 - (BGOFF)$800,000

$840,000

B-6013MITCHELL

DIVISIONPROJ.CATEGORY

55Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 56: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 13DIVISION 13SR 1781 (POLLY SPOUT ROAD), REPLACE BRIDGE 580312 OVER SECOND BROAD RIVER.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 21 TO 22 AND CONSTRUCTION FROM FY 21 TO FY 22.

RIGHT-OF-WAY FY 2022 - (BGOFF)$100,000CONSTRUCTION FY 2022 - (BGOFF)$1,000,000

$1,100,000

B-6014McDOWELL

DIVISIONPROJ.CATEGORY

SR 2027 (MARTINS CREEK ROAD), REPLACE BRIDGE 100142 OVER MARTIN CREEK.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 21 TO 22 AND CONSTRUCTION FROM FY 21 TO FY 22.

RIGHT-OF-WAY FY 2022 - (BGOFF)$50,000CONSTRUCTION FY 2022 - (BGOFF)$700,000

$750,000

B-6016BUNCOMBE

DIVISIONPROJ.CATEGORY

MORGANTON, MORGANTON DOWNTOWN GREENWAY CONNECTOR.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 20 TO FY 22.

CONSTRUCTION FY 2022 - (BGANY)$1,000,000FY 2022 - (BGDA)$285,000FY 2022 - (L)$321,000

$1,606,000

EB-5807BURKE

DIVISIONPROJ.CATEGORY

HOMINY CREEK GREENWAY, CONSTRUCT MULTI-USE PATH FROM HOMINY VALLEY PARK AND ENKA HIGH SCHOOL TO EAST OF SAND HILL ROADTO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (BGANY)$4,400,000FY 2022 - (BGDA)$240,000FY 2022 - (L)$1,160,000

$5,800,000

EB-5824BUNCOMBE

DIVISIONPROJ.CATEGORY

THERMAL BELT RAIL TRAIL, US 64/74A IN RUTH TO FORREST HUNT DRIVE. CONSTRUCT INTERSECTION IMPROVEMENTS AT SELECTED LOCATIONS ALONG RAIL CORRIDOR.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 20 TO FY 22.

CONSTRUCTION FY 2022 - (TA)$267,000FY 2022 - (L)$67,000

$334,000

EB-5915RUTHERFORD

DIVISIONPROJ.CATEGORY

I-40, MILE MARKER 37 TO MILE MARKER 44. REHABILITATE BRIDGES.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (NHPIM)$3,400,000$3,400,000

I-5888BBUNCOMBE

STATEWIDEPROJ.CATEGORY

56Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 57: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 13DIVISION 13I-40, MILE MARKER 93 TO MILE MARKER 119. REHABILITATE BRIDGES.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (NHPIM)$2,000,000FY 2023 - (NHPIM)$2,000,000

$4,000,000

I-5891BBURKE

STATEWIDEPROJ.CATEGORY

I-40, SR 1761 (OLD HIGHWAY NC 10) - EXIT 116. UPGRADE INTERCHANGE AND REMOVE TWO-WAY TRAFFIC.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 20 TO FY 21 AND CONSTRUCTION FROM FY 24 TO FY 25.

RIGHT-OF-WAY FY 2021 - (NHP)$1,050,000FY 2022 - (NHP)$1,050,000

UTILITIES FY 2021 - (NHP)$800,000CONSTRUCTION FY 2025 - (NHP)$3,167,000

FY 2026 - (NHP)$3,166,000FY 2027 - (NHP)$3,167,000

$12,400,000

I-5971BURKE

STATEWIDEPROJ.CATEGORY

I-40, SR 1744 (MINERAL SPRINGS MOUNTAIN ROAD)/SR 1744 (ELDRED STREET SE) - EXIT 112. CONSTRUCT INTERCHANGE IMPROVEMENTS.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 20 TO FY 21 AND CONSTRUCTION FROM FY 23 TO FY 24.

RIGHT-OF-WAY FY 2021 - (NHP)$1,400,000FY 2022 - (NHP)$1,400,000

UTILITIES FY 2021 - (NHP)$500,000CONSTRUCTION FY 2024 - (NHP)$4,233,000

FY 2025 - (NHP)$4,234,000FY 2026 - (NHP)$4,233,000

$16,000,000

* I-5975BURKE

REGIONALPROJ.CATEGORY

US 25, US 25/70 BUSINESS (NORTH MAIN STREET) TO SR 1143 (BRUSH CREEK ROAD). WIDEN TO MULTI-LANES.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 21 TO FY 22.

RIGHT-OF-WAY FY 2022 - (T)$2,725,000FY 2023 - (T)$8,175,000

UTILITIES FY 2022 - (T)$1,300,000CONSTRUCTION FY 2024 - (T)$6,000,000

FY 2025 - (T)$6,000,000FY 2026 - (T)$12,000,000

$36,200,000

R-5837MADISON

REGIONALPROJ.CATEGORY

WESTERN PIEDMONT REGIONAL TRANSIT AUTHORITY, REPLACEMENT VANSMODIFY FUNDING IN FY 20, FY 21, FY 22, AND FY 23

CAPITAL FY 2020 - (S)$18,000FY 2020 - (L)$88,000FY 2020 - (5307)$353,000FY 2021 - (S)$18,000FY 2021 - (L)$93,000FY 2021 - (5307)$370,000FY 2022 - (S)$18,000FY 2022 - (L)$97,000FY 2022 - (5307)$389,000FY 2023 - (S)$18,000FY 2023 - (L)$102,000FY 2023 - (5307)$408,000

$1,972,000

* TA-4929ALEXANDERBURKECALDWELLCATAWBAPROJ.CATEGORY

57Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 58: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 13DIVISION 13WESTERN PIEDMONT REGIONAL TRANSIT AUTHORITY, PLANNING ASSISTANCEMODIFY FUNDING IN FY 20, FY 21, FY 22, AND FY 23

PLANNING FY 2020 - (S)$5,000FY 2020 - (L)$15,000FY 2020 - (5307)$60,000FY 2021 - (L)$16,000FY 2021 - (5307)$63,000FY 2022 - (L)$17,000FY 2022 - (5307)$66,000FY 2023 - (L)$16,000FY 2023 - (5307)$69,000

$327,000

* TP-4733B

ALEXANDERBURKECALDWELLCATAWBAPROJ.CATEGORY

WESTERN PIEDMONT REGIONAL TRANSIT AUTHORITY, PLANNING ASSISTANCE - 5303MODIFY FUNDING IN FY 21, FY 22, AND FY 23, CONSISTENT WITH FTA ALLOCATION FOR MPO REGION AND ADOPTED UPWP

PLANNING FY 2020 - (5303)$44,000FY 2020 - (S)$6,000FY 2020 - (L)$6,000FY 2021 - (5303)$55,000FY 2021 - (S)$7,000FY 2021 - (L)$7,000FY 2022 - (5303)$55,000FY 2022 - (S)$7,000FY 2022 - (L)$7,000FY 2023 - (5303)$55,000FY 2023 - (S)$7,000FY 2023 - (L)$7,000

$263,000

* TP-5106ALEXANDERBURKECALDWELLCATAWBAPROJ.CATEGORY

WESTERN PIEDMONT REGIONAL TRANSIT AUTHORITY, OPERATING ASSISTANCE - ELDERLY AND DISABLED PERSONSMODIFY FUNDING IN FY 20, FY 21, FY 22, AND FY 23

OPERATIONS FY 2020 - (L)$150,000FY 2020 - (5310)$150,000FY 2021 - (L)$158,000FY 2021 - (5310)$158,000FY 2022 - (L)$165,000FY 2022 - (5310)$165,000FY 2023 - (L)$174,000FY 2023 - (5310)$174,000

$1,294,000

* TQ-6507ALEXANDERBURKECALDWELLCATAWBAPROJ.CATEGORY

US 25 (MERRIMON AVENUE), INTERSECTION OF US 25 (MERRIMON AVENUE) AND EDGEWOOD ROAD. IMPROVE INTERSECTION.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 22 TO FY 23.

RIGHT-OF-WAY FY 2021 - (T)$180,000CONSTRUCTION FY 2023 - (T)$850,000

$1,030,000

U-5781BUNCOMBE

REGIONALPROJ.CATEGORY

58Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 59: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 13DIVISION 13US 25 (MERRIMON AVENUE), INTERSECTION OF US 25 (MERRIMON AVENUE) AND W. T. WEAVER BOULEVARD. IMPROVE INTERSECTION.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 22 TO FY 23.

RIGHT-OF-WAY FY 2021 - (T)$45,000CONSTRUCTION FY 2023 - (T)$1,750,000

$1,795,000

U-5782BUNCOMBE

REGIONALPROJ.CATEGORY

US 221 BUSINESS, US 221/NC 226 TO GEORGIA AVENUE. WIDEN EXISTING ROADWAY.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 20 TO FY 21.

RIGHT-OF-WAY FY 2021 - (T)$1,400,000UTILITIES FY 2021 - (T)$170,000CONSTRUCTION FY 2024 - (T)$4,000,000

FY 2025 - (T)$4,000,000FY 2026 - (T)$4,000,000

$13,570,000

U-5835McDOWELL

DIVISIONPROJ.CATEGORY

SR 2002 (RICEVILLE ROAD), US 70 (TUNNEL ROAD) TO SR 2285 (CLEAR VISTA LANE). UPGRADE ROADWAY.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 21 TO FY 22.

RIGHT-OF-WAY FY 2022 - (T)$100,000CONSTRUCTION FY 2023 - (T)$950,000

FY 2024 - (T)$950,000$2,000,000

U-5837BUNCOMBE

DIVISIONPROJ.CATEGORY

US 64 (BURKEMONT AVENUE), US 70 (W. FLEMING DRIVE) INTERSECTION. IMPROVE INTERSECTION.COST INCREASE EXCEEDING $2 MILLION AND 25% THRESHOLDS. TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 24 TO FY 29 AND CONSTRUCTION FROM FY 25 TO POST YEAR.

RIGHT-OF-WAY FY 2029 - (NHP)$540,000POST YR- (NHP)$4,860,000

UTILITIES FY 2029 - (NHP)$400,000CONSTRUCTION POST YR- (NHP)$12,600,000

$18,400,000

* U-6123BURKE

REGIONALPROJ.CATEGORY

DIVISION 14DIVISION 14SR 1326, REPLACE BRIDGE 159 OVER HANGING DOG CREEK.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 21 TO FY 22 AND CONSTRUCTION FROM FY 21 TO FY 22.

RIGHT-OF-WAY FY 2022 - (BGOFF)$295,000CONSTRUCTION FY 2022 - (BGOFF)$1,800,000

$2,095,000

B-4069CHEROKEE

DIVISIONPROJ.CATEGORY

59Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 60: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 14DIVISION 14SR 1114 (SHOPE ROAD), REPLACE BRIDGE 550244 OVER N. FORK COWEETA CREEK.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 20 TO 21 AND CONSTRUCTION FROM FY 21 TO FY 22.

RIGHT-OF-WAY FY 2021 - (BGOFF)$15,000CONSTRUCTION FY 2022 - (BGOFF)$550,000

$565,000

B-6025MACON

DIVISIONPROJ.CATEGORY

SR 1001 (ELLIJAY ROAD), REPLACE BRIDGE 550009 OVER NORTH PRONG ELLIJAY CREEK.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 21 TO FY 22 AND CONSTRUCTION FROM FY 21 TO FY 22.

RIGHT-OF-WAY FY 2022 - (BGOFF)$70,000CONSTRUCTION FY 2022 - (BGOFF)$700,000

$770,000

B-6029MACON

DIVISIONPROJ.CATEGORY

US 64, US 276, NC 280, US 64, US 276, NC 280 AND US 64. CONSTRUCT INTERSECTION IMPROVEMENTS.COST INCREASE EXCEEDING $2 MILLION AND 25% THRESHOLDS.

ENGINEERING FY 2021 - (T)$118,000FY 2022 - (T)$118,000FY 2023 - (T)$118,000FY 2024 - (T)$118,000FY 2025 - (T)$118,000FY 2026 - (T)$118,000FY 2027 - (T)$118,000FY 2028 - (T)$118,000FY 2029 - (T)$118,000POST YR- (T)$708,000

BUILD NC ROW FY 2020 - (T)$215,000FY 2021 - (T)$215,000FY 2022 - (T)$215,000FY 2023 - (T)$215,000FY 2024 - (T)$215,000FY 2025 - (T)$215,000FY 2026 - (T)$215,000FY 2027 - (T)$215,000FY 2028 - (T)$215,000FY 2029 - (T)$215,000POST YR- (T)$1,075,000

RIGHT-OF-WAY FY 2020 - (T)$2,350,000FY 2021 - (T)$2,350,000

UTILITIES FY 2020 - (T)$100,000CONSTRUCTION FY 2022 - (T)$4,800,000

FY 2023 - (T)$4,800,000$19,395,000

* R-5799TRANSYLVANIA

REGIONALPROJ.CATEGORY

60Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 61: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP MODIFICATIONS

DIVISION 14DIVISION 14NC 9, US 74 TO NC 108. ADD PAVED SHOULDERS.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 20 TO 21 AND CONSTRUCTION FROM FY 22 TO FY 23.

RIGHT-OF-WAY FY 2021 - (T)$300,000UTILITIES FY 2021 - (T)$100,000CONSTRUCTION FY 2023 - (T)$1,400,000

FY 2024 - (T)$1,400,000$3,200,000

R-5840POLK

DIVISIONPROJ.CATEGORY

SR 1321 (BRYSON WALK), SR 1336 (DEPOT STREET), SR 1323 (SLOPE STREET) TO SR 1336 (DEEP CREEK ROAD). IMPROVE INTERSECTIONS.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 22 TO FY 23.

CONSTRUCTION FY 2023 - (T)$1,500,000$1,500,000

R-5843SWAIN

DIVISIONPROJ.CATEGORY

US 64 BUSINESS, US 64 TO SR 1307 (MAIN STREET). UPGRADE ROADWAY.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 22 TO FY 23.

RIGHT-OF-WAY FY 2020 - (T)$4,000,000UTILITIES FY 2020 - (T)$100,000CONSTRUCTION FY 2023 - (T)$1,300,000

$5,400,000

R-5863CLAY

DIVISIONPROJ.CATEGORY

STIP DELETIONS

DIVISION 9DIVISION 9I-40, BRIDGE REHABILITATION.DELETE, WORK TO BE ACCOMPLISHED UNDER PROJECT I-5795.

CONSTRUCTION FY 2021 - (NHPIM)$2,516,000$2,516,000

* I-5952AFORSYTH

STATEWIDEPROJ.CATEGORY

DIVISION 10DIVISION 10I-277 (BROOKSHIRE FRWY), NORTH GRAHAM STREET TO NORTH OF JOHNSON STREET. BRIDGE REHABILITATION.DELETE PROJECT; WORK TO BE ACCOMPLISHED UNDER I-5746C

CONSTRUCTION FY 2020 - (NHPIM)$7,070,000$7,070,000

* I-5746DMECKLENBURG

STATEWIDEPROJ.CATEGORY

61Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT

Page 62: REVISIONS TO THE 2020-2029 STIP HIGHWAY PROGRAM …...revisions to the 2020-2029 stip item n highway program stip additions division 7 burlington, capital for fixed route vehicle replacement

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

STIP DELETIONS

DIVISION 10DIVISION 10I-277 (BROOKSHIRE FRWY), I-77 TO EAST 10TH STREET. RESURFACE ROADWAY.DELETE PROJECT; WORK TO BE ACCOMPLISHED UNDER I-5746C

CONSTRUCTION FY 2020 - (NHPIM)$5,000,000$5,000,000

* I-5746EMECKLENBURG

STATEWIDEPROJ.CATEGORY

NORFOLK SOUTHERN N LINE, MILEPOST 27.5 TO 29.6. UPGRADE THE RAIL ON US 52 TO ALLOW FOR FREIGHT.DELETE AT THE REQUEST OF RAIL DIVISION.

CONSTRUCTION FY 2020 - (T)$2,450,000$2,450,000

* P-5703STANLY

REGIONALPROJ.CATEGORY

SR 1008 (INDIAN TRAIL ROAD), SR 1367 (UNIONVILLE-INDIAN TRAIL ROAD) INTERSECTION. CONSTRUCT INTERSECTION IMPROVEMENTS.DELETE AT THE REQUEST OF MPO. WORK TO BE ACCOMPLISHED UNDER EB-5931.

ENGINEERING FY 2021 - (BGDA)$313,000FY 2021 - (L)$78,000

RIGHT-OF-WAY FY 2023 - (BGDA)$208,000FY 2023 - (L)$52,000

CONSTRUCTION FY 2025 - (BGDA)$2,209,000FY 2025 - (L)$552,000

$3,412,000

* U-6250UNION

DIVISIONPROJ.CATEGORY

ITEM N SUMMARY

ADDITION 8 $9,200,000PROJECTSS

MODIFICATION 254 PROJECTSS

DELETION 5 $20,448,000PROJECTSS

267 PROJECTS ($11,248,000)

62Thursday, June 4, 2020

* INDICATES FEDERAL AMENDMENT