J TOMLINSON LIMITEDOne Stop Fit-out Solution 1J TOMLINSON LIMITEDOne Stop Fit-out Solution
Retail & Fit-out Profile
J TOMLINSON LIMITEDOne Stop Fit-out Solution 2
Contents Page
Introduction 3
Organisational Structure 5
Professional Membership 6
Health & Safety 7
Considerate Constructors 10
Key Sectors 11
Quality Assurance 8
Environmental Assurance 9
Previous Experience 16
Why Choose J Tomlinson? 31
Key Clients 12
Office Locations 5
Operational Team 13
Financial Details 4
Contact Details 32
J TOMLINSON LIMITEDOne Stop Fit-out Solution 3
J Tomlinson Ltd were founded in 1950 by the Tomlinson family as an electrical contracting business which focused upon commercial contracts.
Today J Tomlinson are a £55 million turnover business directly employing 350 people providing the complete construction solution from its headquarters in Nottingham and branch offices in Derbyshire, Northamptonshire and Yorkshire.
Introduction
Construction Retail Refurbishment
Aftercare Maintenance
Internal Fit-outM&E Installation
J Tomlinson project teams have successfully completed projects in:
Retail Commercial Industrial
Social Housing
Local Authority
Leisure
Education
Health Care
High Security
J TOMLINSON LIMITEDOne Stop Fit-out Solution 4
Statement of Turnover:
2010 - £46m2009 - £41m2008 - £40m2007 - £33m2006 - £26m
Bank Details:
Yorkshire Bank plc 1st Floor Lock HouseCastle Meadow RoadNottinghamNG2 1AG
Registered Office:
Scimitar House,100 Lilac Grove,Beeston,Nottingham,NG9 1PF
Registration Number: 3168455
VAT Number: GB660-6070-53
Insurance Details Employers Liability
Name of Insurer AXA Insurance
Policy No. BM COM 6726629
Expiry Date 31/03/11
cover held £10M
Insurance Details Contractors All Risks
Name of Insurer AXA Insurance
Policy No. To be advised
Expiry Date 31/3/11
cover held £10M
Insurance Details Professional Indemnity
Name of Insurer Hiscox Insurance
Policy No. HU P16 1300217
Expiry Date 31/3/11
cover held £10M
Financial Details
Insurance Details Public Liability
Name of Insurer AXA Insurance
Policy No. Y011219QBE 0109A
Expiry Date 31/03/11
cover held £25M
J TOMLINSON LIMITEDOne Stop Fit-out Solution 5
J Tomlinson Ltd
Projects Maintenance
M&E Projects
Construction Partnering
Construction Projects
Engineering Services
Maintenance
Plumbing& Heating
ConstructionMaintenance
Retail: Refurbishment
and Fit-out
Planned Replacement
Works
Decent HomesImprovements
Organisational Structure
Unit 9 Newmarket CourtNewmarket DriveDerbyDE24 8NW
Unit 1C Mansard CloseWestgate Ind.EstNorthamptonNorthamptonshireNN5 5DL
Scimitar House, 100 Lilac Grove, Beeston, NottinghamNG91PF
Dallamires Way North,Ripon,HG41TL
J TOMLINSON LIMITEDOne Stop Fit-out Solution 6
No.58964
No.F381500/HV004670No. 68132
No. 003943000Joint Industry Board for the ElectricalContracting Industry No. Y1329000
No. C3541
Professional Membership
No. 184592
Gold Level, No. QE6639
ISO 9001 GB 16364
ISO 14001 GB 16365
No.86274
No. 1543
J TOMLINSON LIMITEDOne Stop Fit-out Solution 7
Our number one priority
Provide Detailed H&S Plans/Risk Assessments & Method Statements
We set clear Performance Targets of 10% Reduction per annum
Analyse all injuries by type & Implement Reduction Strategies
Work with our Supply Chain to ensure compliance with our Standards
Clear Communication through Inductions & Toolbox Talks
Provide High Levels of Safety Training
Gold Level CSCS Accreditation (100%)
Dedicated Health & Safety Manager (Eddie Hawthorne)
Health & Safety
J TOMLINSON LIMITEDOne Stop Fit-out Solution 8
Quality Assurance
Quality Management System accredited toISO 9001:2008
Provide sample areas / boards
Safe working environment’s
Zero defect methodology early introduction of customer care team
High caliber project teams
Dedicated Quality Manager
Use only approved subcontractors
Use only approved materials (quality not lowest price)
J TOMLINSON LIMITEDOne Stop Fit-out Solution 9
Environmental Assurance
Environmental Management System accredited to ISO 14001:2004
Use only managed and approved material sources
Use most efficient technology to achieve clients energy needs
Produce Environmental KPI’s / Plans and undertake Waste Audits
Efficiently manage material ordering and storage
Reduce energy consumption by Monitoring CO2 Emissions, Water Use And Transport Movements
Increase use of Sustainable Materials / Technologies / Prefabricated Items
Identify waste streams early, segregate waste and recycle
J TOMLINSON LIMITEDOne Stop Fit-out Solution 10
Considerate Constructors
Since the Latham Review in 1994, J Tomlinson has been proactive in introducing and promoting the Considerate Constructors scheme on all of it’s construction sites. We have now achieved corporate membership (No. 00072).
Considerate Constructors
Mr Peter Woods
J TOMLINSON LIMITEDOne Stop Fit-out Solution 11
Key Sectors
Retail Commercial Industrial
Social Housing
Local Authority
Leisure
Education
Health Care
High Security
J TOMLINSON LIMITEDOne Stop Fit-out Solution 12
Key Clients
J TOMLINSON LIMITEDOne Stop Fit-out Solution 13
Pete Woods
Position: Operations Manager
Qualifications/Training:
NVQ Level 3 – Carpentry & Joinery
Commercial Contract Training
Health & Safety System and CDM Training
Asbestos Awareness Training
CSCS Contracts Manager
Successful delivery of the contract
Quality, Health, Safety & the Environment
Customer Satisfaction
Staffing & Resources
Service Delivery
Key Performance Indicators
Continuous Improvement & Innovations
Added Value
Previous Project Experience:
£2.0m Alliance Boots
Building, maintenance and small projects Framework Agreement. Projects include the Structural Alterations to grade 2 listed D10 Building.
£500k Rank Amusement Leisure
Refurbishment of operational facilities on a 24/7 working national coverage basis including signage rebranding. Recent project include Liverpool, Bishop Auckland, Hull and Nottingham.
£300k Keith Hall
Refurbishment of head office Training Facility and refurbishment / fit-out of hair salons in Long Eaton, Ashbourne and Leicester.
£10.0m Leyland's Estate, Retail Trust
Refurbishment and alterations to existing listed buildings and construction of new extra care facility within operational.
£200k North West Leicestershire District Council
Complete office refurbishment to live fully operational council offices including mechanical & electrical installation.
£3.0m East Midlands Ambulance Service
Office fit-out of new state of the art facility for East Midlands Ambulance Service as part of their strategic plan to provide an up to date service to the public using modern technology.
Key Responsibilities:
Operational Team
J TOMLINSON LIMITEDOne Stop Fit-out Solution 14
Steve Godbehere
Position: Contracts Manager
Qualifications/Training:
City & Guilds Advanced C&J
CDM for Developers and Principle Contractors
Construction Site Managers Safety Certificate
Health, Safety & Environmental Procedures Course
CSCS Contracts Manager
Successful Delivery of Contracts
Health & Safety On Site
Customer Care & Satisfaction
Service Delivery
Key Performance Indicators
Staffing & Resources
Progress Meetings
Project Management
Client Relations
Previous Project Experience:
£25k-£1m Frankie & Benny’s
Various fast track restaurant fit-outs to install high quality joinery including bars, flooring, kitchen area, fixtures & fittings.
£500k Mechu Club, Bar & Grill
Three floor strip-out and refurbishment of one of Birmingham’s premier night spots.
£25k-£750k Airports
Stansted, Gatwick, Luton & Heathrow Airports. Various restaurant fit-outs & refurbishments for TRG concessions including, F&B O’Neils, etc.
£250k-£500k Après Bars
Various fit-outs & refurbishment works featuring large style booth seating and stone fronted bar.
£1.5m Peel Hotels
Cosmopolitan hotel refurbishments to public areas including, new reception, restaurant & bar area.
£25k-£500k Chiquitos
Re-branded Mexican restaurants & fast track fit-outs using hardwood manufactured joinery.
Key Responsibilities:
Operational Team
J TOMLINSON LIMITEDOne Stop Fit-out Solution 15
Eddie Hawthorne
Position: Health & Safety Manager
Qualifications/Training:
BSc Hons Building
BTEC National Diploma Building Studies
Elected Corporate Member of Institute of Health & Safety
NEBOSH National Certificate (Construction)
NEBOSH Diploma
Registered Safety Practitioner
Chartered Health & Safety Practitioner
Spread good H&S Culture
Carry out regular site inspections
Measure H&S Compliance of Subcontractors
Co-ordinate H&S Documents
Carry out inductions for employees
Prepare H&S Training
Ensure compliance with H&S Policy
Manage environmental performance
Previous Project Experience:
£10.0m Leylands Estate Extra Care Facility New Build & Refurbishment Project.
The demolish of nursing home and construct a new 38 bedroom extra care nursing home and the major refurbishment of listed buildings.
£4.8m Sheffield University Norfolk Park Campus Refurbishment Project.
The refurbishment of 645 student dwellings on a busy University campus.
£2.0m University of Derby Britannia Mill Refurbishment.
Major refurbishment of listed University building including roof, lead work, brickwork, windows, insulated render system and M&E systems.
Key Responsibilities:
Operational Team
Skill Development:
Site Safety Manual – Risk Assessment Training
Site Safety Manual Update May 2007
Safety Management System Update (Including CDM2007)
Asbestos Awareness
Customer Care Brief
Delivers various internal courses on Health & Safety to J Tomlinson employees
Attended various short courses on Health & Safety during employment
CSCS
J TOMLINSON LIMITEDOne Stop Fit-out Solution 16
Previous Experience
Client: Frankie & Benny’s
Value: £250k - £1m
Duration: 6 weeks (average)
Nationwide fast track restaurant fit-outs to install high quality specialist joinery products including bars, flooring, catering areas, fixtures & fittings.
Multiple Sites
Fast Track Construction
National Coverage
Key Features
J TOMLINSON LIMITEDOne Stop Fit-out Solution 17
Client: Mechu Club
Value: £500K
Duration: 10 weeks
Full strip-out and refurbishment to one of Birmingham’s premier night spot working across all three floors.Works included substantial external works to the listed façade full internal fit-out including bars, flooring works, walls, furniture, fixtures & fittings, decorative metalwork, decorations and mechanical & electrical installations.
City Centre location
Fast Track Construction
Close client liaison for minimised disruption
Local supply chain
Key Features
Previous Experience
J TOMLINSON LIMITEDOne Stop Fit-out Solution 18
Previous Experience
Client: Restaurant Group
Value: £1.5m
Duration: 6 weeks (average)
Fit-out of new retail outlets including bars, restaurants and pubs for the Restaurant Group within fully operational airport terminals at Stansted, Gatwick, Luton & Heathrow.
Working both air-side and non air side
High security protocols
Live operating environment
24 hour working minimising construction period
Logistically complex
Key Features
J TOMLINSON LIMITEDOne Stop Fit-out Solution 19
Previous Experience
Client: Rank Amusement Leisure
Value: £1.20m
Duration: Ongoing
The refurbishment of operational Rank Amusement Leisure facilities on a 24/7 working national coverage basis. Recent projects include Liverpool, Bishop Auckland, Hull and Nottingham.
Multiple Sites
Fast Track Construction
24 hour working minimising construction period
National Coverage
Key Features
J TOMLINSON LIMITEDOne Stop Fit-out Solution 20
Previous Experience
Client: Keith Hall
Value: £300k
Duration: 6 weeks (average)
Refurbishment of head office Training Facility and hair salons in Long Eaton, Ashbourne and Leicester.
Multiple sites
Exacting finishes
Fast-track construction methods
24 hour working to minimise construction period
Key Features
J TOMLINSON LIMITEDOne Stop Fit-out Solution 21
Client: Après Bar
Value: £250k - £500K
Duration: 8 weeks (average)
Various shop front replacements with rich hardwood and completeinterior refurbishments including, tiled / carpet / hardwood floors, stone & hardwood bars and pizza counters, red resin tops, polished screens, curved red leather banquette seating, new ceilings withslatted timber features, waney edged timber wall panels, large gas fires, toilets, prep areas and kitchens.
Stone fronted bar
High quality material specification
Full refurbishment with multi-discipline co-ordination
Key Features
Previous Experience
J TOMLINSON LIMITEDOne Stop Fit-out Solution 22
Previous Experience
Client: Peel Hotels
Value: £1.5m
Duration: 8 weeks (average)
Refurbishment to public areas of the Cosmopolitan Hotel including a new reception area, restaurant and bar area whilst maintaining the hotel fully operational.
24 Hour working and fast track techniques minimising programme
Logistically complex live environment
Phasing to maintain hotel full operational
Key Features
J TOMLINSON LIMITEDOne Stop Fit-out Solution 23
Previous Experience
Client: The Retail Trust
Value: £10m
Duration: 65 weeks
As part of our clients strategic property plan we successfullycompleted the construction of a new Extra Care Facility and fullrefurbishment of Listed Buildings including restaurant and kitchen area. whilst retailing the clients use of the remainder of the complex.
New Build Nursing Home
Major refurbishment and extension to grade two listed buildings
Sensitive & restricted site (logistically complex)
Phased working
Full refurbishment of restaurant and kitchen
Exacting finishes
Key Features
J TOMLINSON LIMITEDOne Stop Fit-out Solution 24
Previous Experience
Client: EMAS NHS Trust
Value: £3m
Duration: 52 weeks
J Tomlinson Ltd successfully completed this state of the art facility for the East Midlands Ambulance Service as part of their strategic plan to provide an up to date service to the public using modern technology – The fit out was completed in sections to allow the client direct specialist installations.
Ergonomic work stations
Concurrent with clients direct contractors
Specialist acoustic considerations
Phased working in a highly serviced building
Exacting finishes and antistatic surfaces
DDA compliant
Innovative design for work – life balance
Key Features
J TOMLINSON LIMITEDOne Stop Fit-out Solution 25
Client: John Bowler Group
Value: £850K
Duration: 22 weeks
Construction and fit-out of new Headquarter Offices for John Bowler Eggs, one of the UKs largest egg producers.
High specification offices
In–house M&E installation
Onsite anaerobic dispenser
Re-use of existing steel frame
Key Features
Previous Experience
J TOMLINSON LIMITEDOne Stop Fit-out Solution 26
Previous Experience
Client: University of Nottingham
Value: £500K
Duration: 22 weeks
Alterations and extensions to existing catering facilities at the East Midlands Conference Centre doubling the size of the facilities.
This has allowed the University to provide a full catering service for up to 500 people.
Tight site constraints
Working in fully operational building & campus
Staged handover
Complicated phasing to suit clients requirements
Key Features
J TOMLINSON LIMITEDOne Stop Fit-out Solution 27
Client: North West Leicestershire
District Council
Value: £200K
Duration: 7 weeks
Complete office refurbishment including mechanical & electrical installation.
Special acoustic considerations
Antistatic services
DDA compliant
Logistically complex live environment
Customer focused layout
Clear pedestrian route optimisation
Key Features
Previous Experience
J TOMLINSON LIMITEDOne Stop Fit-out Solution 28
Client: Alliance Boots Plc
Value: £2m
Duration: 4 Years
Building, fit-out, maintenance and small projects Framework Agreement. Projects include the Structural Alterations to grade 2 listed D10 Building.
Design & build projects
Logistically complex sites
Value engineering/whole life costing
Live sterile production & office environment
Key Features
Previous Experience
J TOMLINSON LIMITEDOne Stop Fit-out Solution 29
Previous Experience
Extensions, refurbishments and fit-outs for Council buildings across Rotherham including offices, schools and hospitals; part of the four year Rotherham Construction Partnership framework.
Client: Rotherham Construction
Partnership
Value: £4m
Duration: 4 Years
Fast track programme to suit clients needs
Logistically complex sites
Value engineering/whole life costing
Highly complex building service installations
Key Features
J TOMLINSON LIMITEDOne Stop Fit-out Solution 30
Tried & Tested Regional Project
Teams
Directly Employed Tradesmen
Retail Refurbishment
Fit-out Specialists
Established Regional Offices &
Supply Chain
Able To Provide Innovative &
Viable Solutions
Design & Build Specialists
All Encompassing Solution
Financial Strength
Why Choose J Tomlinson?
J TOMLINSON LIMITEDOne Stop Fit-out Solution 31
Contact Details
Pat CassidyManaging Director
Martin GallagherConstruction Director
Carl DerrickM&E Director
Eddie HawthorneHealth & Safety Manager
Jeremy WarmanQuality &
Environmental Manager
Pete WoodsOperations Manager
Steve GodbehereContracts Manager
Telephone:DDI: 0115 9574 356Mobile: 07971 156 731
E-mail: [email protected]
Main Office Contact Details:Switchboard: 0115 9574 300Facsimile: 0115 9431 079Email: [email protected]
Company Website:www.jtomlinson.co.uk
Richard GentKey Account Manager
J TOMLINSON LIMITED Your Complete Building Solution
J Tomlinson Limited Scimitar House 100 Lilac Grove Beeston Nottingham NG9 1PF
Tel: 0115 957 4300 Fax: 0115 943 1079 E-mail: [email protected] Website: www.jtomlinson.co.uk