retail brochure

32
J TOMLINSON LIMITED One Stop Fit-out Solution 1 J TOMLINSON LIMITED One Stop Fit-out Solution Retail & Fit-out Profile

Upload: j-tomlinson-ltd

Post on 07-Mar-2016

216 views

Category:

Documents


0 download

DESCRIPTION

Retail Brochure

TRANSCRIPT

Page 1: Retail Brochure

J TOMLINSON LIMITEDOne Stop Fit-out Solution 1J TOMLINSON LIMITEDOne Stop Fit-out Solution

Retail & Fit-out Profile

Page 2: Retail Brochure

J TOMLINSON LIMITEDOne Stop Fit-out Solution 2

Contents Page

Introduction 3

Organisational Structure 5

Professional Membership 6

Health & Safety 7

Considerate Constructors 10

Key Sectors 11

Quality Assurance 8

Environmental Assurance 9

Previous Experience 16

Why Choose J Tomlinson? 31

Key Clients 12

Office Locations 5

Operational Team 13

Financial Details 4

Contact Details 32

Page 3: Retail Brochure

J TOMLINSON LIMITEDOne Stop Fit-out Solution 3

J Tomlinson Ltd were founded in 1950 by the Tomlinson family as an electrical contracting business which focused upon commercial contracts.

Today J Tomlinson are a £55 million turnover business directly employing 350 people providing the complete construction solution from its headquarters in Nottingham and branch offices in Derbyshire, Northamptonshire and Yorkshire.

Introduction

Construction Retail Refurbishment

Aftercare Maintenance

Internal Fit-outM&E Installation

J Tomlinson project teams have successfully completed projects in:

Retail Commercial Industrial

Social Housing

Local Authority

Leisure

Education

Health Care

High Security

Page 4: Retail Brochure

J TOMLINSON LIMITEDOne Stop Fit-out Solution 4

Statement of Turnover:

2010 - £46m2009 - £41m2008 - £40m2007 - £33m2006 - £26m

Bank Details:

Yorkshire Bank plc 1st Floor Lock HouseCastle Meadow RoadNottinghamNG2 1AG

Registered Office:

Scimitar House,100 Lilac Grove,Beeston,Nottingham,NG9 1PF

Registration Number: 3168455

VAT Number: GB660-6070-53

Insurance Details Employers Liability

Name of Insurer AXA Insurance

Policy No. BM COM 6726629

Expiry Date 31/03/11

cover held £10M

Insurance Details Contractors All Risks

Name of Insurer AXA Insurance

Policy No. To be advised

Expiry Date 31/3/11

cover held £10M

Insurance Details Professional Indemnity

Name of Insurer Hiscox Insurance

Policy No. HU P16 1300217

Expiry Date 31/3/11

cover held £10M

Financial Details

Insurance Details Public Liability

Name of Insurer AXA Insurance

Policy No. Y011219QBE 0109A

Expiry Date 31/03/11

cover held £25M

Page 5: Retail Brochure

J TOMLINSON LIMITEDOne Stop Fit-out Solution 5

J Tomlinson Ltd

Projects Maintenance

M&E Projects

Construction Partnering

Construction Projects

Engineering Services

Maintenance

Plumbing& Heating

ConstructionMaintenance

Retail: Refurbishment

and Fit-out

Planned Replacement

Works

Decent HomesImprovements

Organisational Structure

Unit 9 Newmarket CourtNewmarket DriveDerbyDE24 8NW

Unit 1C Mansard CloseWestgate Ind.EstNorthamptonNorthamptonshireNN5 5DL

Scimitar House, 100 Lilac Grove, Beeston, NottinghamNG91PF

Dallamires Way North,Ripon,HG41TL

Page 6: Retail Brochure

J TOMLINSON LIMITEDOne Stop Fit-out Solution 6

No.58964

No.F381500/HV004670No. 68132

No. 003943000Joint Industry Board for the ElectricalContracting Industry No. Y1329000

No. C3541

Professional Membership

No. 184592

Gold Level, No. QE6639

ISO 9001 GB 16364

ISO 14001 GB 16365

No.86274

No. 1543

Page 7: Retail Brochure

J TOMLINSON LIMITEDOne Stop Fit-out Solution 7

Our number one priority

Provide Detailed H&S Plans/Risk Assessments & Method Statements

We set clear Performance Targets of 10% Reduction per annum

Analyse all injuries by type & Implement Reduction Strategies

Work with our Supply Chain to ensure compliance with our Standards

Clear Communication through Inductions & Toolbox Talks

Provide High Levels of Safety Training

Gold Level CSCS Accreditation (100%)

Dedicated Health & Safety Manager (Eddie Hawthorne)

Health & Safety

Page 8: Retail Brochure

J TOMLINSON LIMITEDOne Stop Fit-out Solution 8

Quality Assurance

Quality Management System accredited toISO 9001:2008

Provide sample areas / boards

Safe working environment’s

Zero defect methodology early introduction of customer care team

High caliber project teams

Dedicated Quality Manager

Use only approved subcontractors

Use only approved materials (quality not lowest price)

Page 9: Retail Brochure

J TOMLINSON LIMITEDOne Stop Fit-out Solution 9

Environmental Assurance

Environmental Management System accredited to ISO 14001:2004

Use only managed and approved material sources

Use most efficient technology to achieve clients energy needs

Produce Environmental KPI’s / Plans and undertake Waste Audits

Efficiently manage material ordering and storage

Reduce energy consumption by Monitoring CO2 Emissions, Water Use And Transport Movements

Increase use of Sustainable Materials / Technologies / Prefabricated Items

Identify waste streams early, segregate waste and recycle

Page 10: Retail Brochure

J TOMLINSON LIMITEDOne Stop Fit-out Solution 10

Considerate Constructors

Since the Latham Review in 1994, J Tomlinson has been proactive in introducing and promoting the Considerate Constructors scheme on all of it’s construction sites. We have now achieved corporate membership (No. 00072).

Considerate Constructors

Mr Peter Woods

Page 11: Retail Brochure

J TOMLINSON LIMITEDOne Stop Fit-out Solution 11

Key Sectors

Retail Commercial Industrial

Social Housing

Local Authority

Leisure

Education

Health Care

High Security

Page 12: Retail Brochure

J TOMLINSON LIMITEDOne Stop Fit-out Solution 12

Key Clients

Page 13: Retail Brochure

J TOMLINSON LIMITEDOne Stop Fit-out Solution 13

Pete Woods

Position: Operations Manager

Qualifications/Training:

NVQ Level 3 – Carpentry & Joinery

Commercial Contract Training

Health & Safety System and CDM Training

Asbestos Awareness Training

CSCS Contracts Manager

Successful delivery of the contract

Quality, Health, Safety & the Environment

Customer Satisfaction

Staffing & Resources

Service Delivery

Key Performance Indicators

Continuous Improvement & Innovations

Added Value

Previous Project Experience:

£2.0m Alliance Boots

Building, maintenance and small projects Framework Agreement. Projects include the Structural Alterations to grade 2 listed D10 Building.

£500k Rank Amusement Leisure

Refurbishment of operational facilities on a 24/7 working national coverage basis including signage rebranding. Recent project include Liverpool, Bishop Auckland, Hull and Nottingham.

£300k Keith Hall

Refurbishment of head office Training Facility and refurbishment / fit-out of hair salons in Long Eaton, Ashbourne and Leicester.

£10.0m Leyland's Estate, Retail Trust

Refurbishment and alterations to existing listed buildings and construction of new extra care facility within operational.

£200k North West Leicestershire District Council

Complete office refurbishment to live fully operational council offices including mechanical & electrical installation.

£3.0m East Midlands Ambulance Service

Office fit-out of new state of the art facility for East Midlands Ambulance Service as part of their strategic plan to provide an up to date service to the public using modern technology.

Key Responsibilities:

Operational Team

Page 14: Retail Brochure

J TOMLINSON LIMITEDOne Stop Fit-out Solution 14

Steve Godbehere

Position: Contracts Manager

Qualifications/Training:

City & Guilds Advanced C&J

CDM for Developers and Principle Contractors

Construction Site Managers Safety Certificate

Health, Safety & Environmental Procedures Course

CSCS Contracts Manager

Successful Delivery of Contracts

Health & Safety On Site

Customer Care & Satisfaction

Service Delivery

Key Performance Indicators

Staffing & Resources

Progress Meetings

Project Management

Client Relations

Previous Project Experience:

£25k-£1m Frankie & Benny’s

Various fast track restaurant fit-outs to install high quality joinery including bars, flooring, kitchen area, fixtures & fittings.

£500k Mechu Club, Bar & Grill

Three floor strip-out and refurbishment of one of Birmingham’s premier night spots.

£25k-£750k Airports

Stansted, Gatwick, Luton & Heathrow Airports. Various restaurant fit-outs & refurbishments for TRG concessions including, F&B O’Neils, etc.

£250k-£500k Après Bars

Various fit-outs & refurbishment works featuring large style booth seating and stone fronted bar.

£1.5m Peel Hotels

Cosmopolitan hotel refurbishments to public areas including, new reception, restaurant & bar area.

£25k-£500k Chiquitos

Re-branded Mexican restaurants & fast track fit-outs using hardwood manufactured joinery.

Key Responsibilities:

Operational Team

Page 15: Retail Brochure

J TOMLINSON LIMITEDOne Stop Fit-out Solution 15

Eddie Hawthorne

Position: Health & Safety Manager

Qualifications/Training:

BSc Hons Building

BTEC National Diploma Building Studies

Elected Corporate Member of Institute of Health & Safety

NEBOSH National Certificate (Construction)

NEBOSH Diploma

Registered Safety Practitioner

Chartered Health & Safety Practitioner

Spread good H&S Culture

Carry out regular site inspections

Measure H&S Compliance of Subcontractors

Co-ordinate H&S Documents

Carry out inductions for employees

Prepare H&S Training

Ensure compliance with H&S Policy

Manage environmental performance

Previous Project Experience:

£10.0m Leylands Estate Extra Care Facility New Build & Refurbishment Project.

The demolish of nursing home and construct a new 38 bedroom extra care nursing home and the major refurbishment of listed buildings.

£4.8m Sheffield University Norfolk Park Campus Refurbishment Project.

The refurbishment of 645 student dwellings on a busy University campus.

£2.0m University of Derby Britannia Mill Refurbishment.

Major refurbishment of listed University building including roof, lead work, brickwork, windows, insulated render system and M&E systems.

Key Responsibilities:

Operational Team

Skill Development:

Site Safety Manual – Risk Assessment Training

Site Safety Manual Update May 2007

Safety Management System Update (Including CDM2007)

Asbestos Awareness

Customer Care Brief

Delivers various internal courses on Health & Safety to J Tomlinson employees

Attended various short courses on Health & Safety during employment

CSCS

Page 16: Retail Brochure

J TOMLINSON LIMITEDOne Stop Fit-out Solution 16

Previous Experience

Client: Frankie & Benny’s

Value: £250k - £1m

Duration: 6 weeks (average)

Nationwide fast track restaurant fit-outs to install high quality specialist joinery products including bars, flooring, catering areas, fixtures & fittings.

Multiple Sites

Fast Track Construction

National Coverage

Key Features

Page 17: Retail Brochure

J TOMLINSON LIMITEDOne Stop Fit-out Solution 17

Client: Mechu Club

Value: £500K

Duration: 10 weeks

Full strip-out and refurbishment to one of Birmingham’s premier night spot working across all three floors.Works included substantial external works to the listed façade full internal fit-out including bars, flooring works, walls, furniture, fixtures & fittings, decorative metalwork, decorations and mechanical & electrical installations.

City Centre location

Fast Track Construction

Close client liaison for minimised disruption

Local supply chain

Key Features

Previous Experience

Page 18: Retail Brochure

J TOMLINSON LIMITEDOne Stop Fit-out Solution 18

Previous Experience

Client: Restaurant Group

Value: £1.5m

Duration: 6 weeks (average)

Fit-out of new retail outlets including bars, restaurants and pubs for the Restaurant Group within fully operational airport terminals at Stansted, Gatwick, Luton & Heathrow.

Working both air-side and non air side

High security protocols

Live operating environment

24 hour working minimising construction period

Logistically complex

Key Features

Page 19: Retail Brochure

J TOMLINSON LIMITEDOne Stop Fit-out Solution 19

Previous Experience

Client: Rank Amusement Leisure

Value: £1.20m

Duration: Ongoing

The refurbishment of operational Rank Amusement Leisure facilities on a 24/7 working national coverage basis. Recent projects include Liverpool, Bishop Auckland, Hull and Nottingham.

Multiple Sites

Fast Track Construction

24 hour working minimising construction period

National Coverage

Key Features

Page 20: Retail Brochure

J TOMLINSON LIMITEDOne Stop Fit-out Solution 20

Previous Experience

Client: Keith Hall

Value: £300k

Duration: 6 weeks (average)

Refurbishment of head office Training Facility and hair salons in Long Eaton, Ashbourne and Leicester.

Multiple sites

Exacting finishes

Fast-track construction methods

24 hour working to minimise construction period

Key Features

Page 21: Retail Brochure

J TOMLINSON LIMITEDOne Stop Fit-out Solution 21

Client: Après Bar

Value: £250k - £500K

Duration: 8 weeks (average)

Various shop front replacements with rich hardwood and completeinterior refurbishments including, tiled / carpet / hardwood floors, stone & hardwood bars and pizza counters, red resin tops, polished screens, curved red leather banquette seating, new ceilings withslatted timber features, waney edged timber wall panels, large gas fires, toilets, prep areas and kitchens.

Stone fronted bar

High quality material specification

Full refurbishment with multi-discipline co-ordination

Key Features

Previous Experience

Page 22: Retail Brochure

J TOMLINSON LIMITEDOne Stop Fit-out Solution 22

Previous Experience

Client: Peel Hotels

Value: £1.5m

Duration: 8 weeks (average)

Refurbishment to public areas of the Cosmopolitan Hotel including a new reception area, restaurant and bar area whilst maintaining the hotel fully operational.

24 Hour working and fast track techniques minimising programme

Logistically complex live environment

Phasing to maintain hotel full operational

Key Features

Page 23: Retail Brochure

J TOMLINSON LIMITEDOne Stop Fit-out Solution 23

Previous Experience

Client: The Retail Trust

Value: £10m

Duration: 65 weeks

As part of our clients strategic property plan we successfullycompleted the construction of a new Extra Care Facility and fullrefurbishment of Listed Buildings including restaurant and kitchen area. whilst retailing the clients use of the remainder of the complex.

New Build Nursing Home

Major refurbishment and extension to grade two listed buildings

Sensitive & restricted site (logistically complex)

Phased working

Full refurbishment of restaurant and kitchen

Exacting finishes

Key Features

Page 24: Retail Brochure

J TOMLINSON LIMITEDOne Stop Fit-out Solution 24

Previous Experience

Client: EMAS NHS Trust

Value: £3m

Duration: 52 weeks

J Tomlinson Ltd successfully completed this state of the art facility for the East Midlands Ambulance Service as part of their strategic plan to provide an up to date service to the public using modern technology – The fit out was completed in sections to allow the client direct specialist installations.

Ergonomic work stations

Concurrent with clients direct contractors

Specialist acoustic considerations

Phased working in a highly serviced building

Exacting finishes and antistatic surfaces

DDA compliant

Innovative design for work – life balance

Key Features

Page 25: Retail Brochure

J TOMLINSON LIMITEDOne Stop Fit-out Solution 25

Client: John Bowler Group

Value: £850K

Duration: 22 weeks

Construction and fit-out of new Headquarter Offices for John Bowler Eggs, one of the UKs largest egg producers.

High specification offices

In–house M&E installation

Onsite anaerobic dispenser

Re-use of existing steel frame

Key Features

Previous Experience

Page 26: Retail Brochure

J TOMLINSON LIMITEDOne Stop Fit-out Solution 26

Previous Experience

Client: University of Nottingham

Value: £500K

Duration: 22 weeks

Alterations and extensions to existing catering facilities at the East Midlands Conference Centre doubling the size of the facilities.

This has allowed the University to provide a full catering service for up to 500 people.

Tight site constraints

Working in fully operational building & campus

Staged handover

Complicated phasing to suit clients requirements

Key Features

Page 27: Retail Brochure

J TOMLINSON LIMITEDOne Stop Fit-out Solution 27

Client: North West Leicestershire

District Council

Value: £200K

Duration: 7 weeks

Complete office refurbishment including mechanical & electrical installation.

Special acoustic considerations

Antistatic services

DDA compliant

Logistically complex live environment

Customer focused layout

Clear pedestrian route optimisation

Key Features

Previous Experience

Page 28: Retail Brochure

J TOMLINSON LIMITEDOne Stop Fit-out Solution 28

Client: Alliance Boots Plc

Value: £2m

Duration: 4 Years

Building, fit-out, maintenance and small projects Framework Agreement. Projects include the Structural Alterations to grade 2 listed D10 Building.

Design & build projects

Logistically complex sites

Value engineering/whole life costing

Live sterile production & office environment

Key Features

Previous Experience

Page 29: Retail Brochure

J TOMLINSON LIMITEDOne Stop Fit-out Solution 29

Previous Experience

Extensions, refurbishments and fit-outs for Council buildings across Rotherham including offices, schools and hospitals; part of the four year Rotherham Construction Partnership framework.

Client: Rotherham Construction

Partnership

Value: £4m

Duration: 4 Years

Fast track programme to suit clients needs

Logistically complex sites

Value engineering/whole life costing

Highly complex building service installations

Key Features

Page 30: Retail Brochure

J TOMLINSON LIMITEDOne Stop Fit-out Solution 30

Tried & Tested Regional Project

Teams

Directly Employed Tradesmen

Retail Refurbishment

Fit-out Specialists

Established Regional Offices &

Supply Chain

Able To Provide Innovative &

Viable Solutions

Design & Build Specialists

All Encompassing Solution

Financial Strength

Why Choose J Tomlinson?

Page 31: Retail Brochure

J TOMLINSON LIMITEDOne Stop Fit-out Solution 31

Contact Details

Pat CassidyManaging Director

Martin GallagherConstruction Director

Carl DerrickM&E Director

Eddie HawthorneHealth & Safety Manager

Jeremy WarmanQuality &

Environmental Manager

Pete WoodsOperations Manager

Steve GodbehereContracts Manager

Telephone:DDI: 0115 9574 356Mobile: 07971 156 731

E-mail: [email protected]

Main Office Contact Details:Switchboard: 0115 9574 300Facsimile: 0115 9431 079Email: [email protected]

Company Website:www.jtomlinson.co.uk

Richard GentKey Account Manager

Page 32: Retail Brochure

J TOMLINSON LIMITED Your Complete Building Solution

J Tomlinson Limited Scimitar House 100 Lilac Grove Beeston Nottingham NG9 1PF

Tel: 0115 957 4300 Fax: 0115 943 1079 E-mail: [email protected] Website: www.jtomlinson.co.uk