RESUME CONRADOS.DAYRIT P.O. Box 11347, Yigo, Guam, 96929 Email Address: [email protected] WORKEXPERIENCE: 2006ͲPresent SERRANOCONST.&DEVT.,CORP. QCM/SSHO PROJECTINVOLVEMENT: I. Project:INSTALLSTREETLIGHTING,HANSELLAVENUE Location:ANDERSENAIRFORCEBASE,GUAM ContractNo.:N40192Ͳ09ͲDͲ2708Ͳ0034 ContractAmount.:$123,169.07 Position:QCManager/SSHO BriefProjectDescription:ProjectintendedtoprovideproperilluminationalongHansellAve., toimprovesafetywherelotsoffoottrafficwithdormitoriesanddiningfacilityalongthearea. ScopeincludesinstallationofnewLightPoles(UFGS265613.0040compliantandrated190 mphperAASHTOLTSͲ5)withLEDFixtures(150W,480V)andhighefficiencyluminaries. Trenchingworksforpowersupplydistributionincludingprovisionofnew drytypestepͲup transformercompletewithappurtenancesforitspowersupply. II. Project:MISCELLANEOUSREPAIRSTOBLDG.901 Location:NavalBaseGuamMunitionsSite,Guam ContractNo.:N40192Ͳ09ͲDͲ2708Ͳ0023 ContractAmount.:$484,275.74 Position:QCManager/SSHO BriefProjectDescription:Projectintendedtorepair/renovateBuilding901atNavalBase GuamMunitionsSite(NBGMS).Workincludesreplacementofexteriordoorsandfloortiles, removalofexistinglightfixtures(replacefluorescentlampswithLEDLightFixtures)enclose TSM2roomandprovisionofnewairconditioning(AC)unitsinTool/EquipmentCalibration Room,renovationofexistingtoilet,andinteriorandexteriorpaintingworks. III. Project:REPAIRMAGAZINE449,NBGMS Location:NAVALBASEGUAMMUNITIONSSITE,GUAM ContractNumber:N40192Ͳ09ͲDͲ2708Ͳ0037 ContractAmount:$138,878.30 Position:QC Manager/SSHO Jan. 16, 2012 - Mar. 16, 2012 May. 05, 2012 - Aug. 26, 2012 Sept. 02, 2012 - Jan. 20, 2013 8

Upload: phungtruc

Post on 31-Aug-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

RESUME

CONRADO S. DAYRITP.O. Box 11347, Yigo, Guam, 96929Email Address:[email protected]

WORK EXPERIENCE:

2006 Present SERRANO CONST. & DEVT., CORP. QCM/SSHO

PROJECT INVOLVEMENT:

I. Project: INSTALL STREET LIGHTING, HANSELL AVENUELocation: ANDERSEN AIR FORCE BASE, GUAMContract No.: N40192 09 D 2708 0034Contract Amount.: $ 123, 169.07Position: QC Manager/SSHO

Brief Project Description: Project intended to provide proper illumination along Hansell Ave.,to improve safety where lots of foot traffic with dormitories and dining facility along the area.Scope includes installation of new Light Poles (UFGS 26 56 13.00 40 compliant and rated 190mph per AASHTO LTS 5) with LED Fixtures (150W, 480 V) and high efficiency luminaries.Trenching works for power supply distribution including provision of new dry type step uptransformer complete with appurtenances for its power supply.

II. Project:MISCELLANEOUS REPAIRS TO BLDG. 901Location: Naval Base GuamMunitions Site, GuamContract No.: N40192 09 D 2708 0023Contract Amount.: $ 484,275.74Position: QC Manager/SSHO

Brief Project Description: Project intended to repair/renovate Building 901 at Naval BaseGuam Munitions Site (NBGMS). Work includes replacement of exterior doors and floor tiles,removal of existing light fixtures (replace fluorescent lamps with LED Light Fixtures) encloseTSM2 room and provision of new air conditioning (AC) units in Tool/Equipment CalibrationRoom, renovation of existing toilet, and interior and exterior painting works.

III. Project: REPAIR MAGAZINE 449, NBGMSLocation: NAVAL BASE GUAMMUNITIONS SITE, GUAMContract Number: N40192 09 D 2708 0037Contract Amount: $ 138, 878.30Position: QC Manager/SSHOJan. 16, 2012 - Mar. 16, 2012

May. 05, 2012 - Aug. 26, 2012

Sept. 02, 2012 - Jan. 20, 2013

8

Brief Project Description: Project intended to repair and paint leaking magazine. The projectscope includes repair structural cracks in the magazine walls, roofs and ceilings and othermiscellaneous repairs to the magazine

IV. Project: REPLACE EXISTING FIRE DETECTION SYSTEMWITH AUTOMATICFIRE SUPRESSION SYSTEM, CHAPEL 2

Location: Andersen Air Force Base, GuamContract No.: N40192 09 D 2708 0028Contract Amount.: $ 388,198.96Position: QC Manager/SSHO

Brief Project Description: Project intended for the replacement of existing Fire Alarm/Detection System currently installed at Bldg. 1623. Installation of new Mass notificationSystem for the Building including tapping of fire protection riser to district water supply.

V. Project: REPAIR/UPGRADE FIRE STATION NO. 5, NIMITZ HILL GUAMLocation: NIMITZ HILL, NAVAL BASE GUAMContract No.: N40192 09 D 2708 0035Contract Amount: $ 392,186.73Position: Alt. QC Manager/Alt. SSHO

Brief Project Description: Project intended to expand the existing Fire Station # 5 toaccommodate training, weight room, lounge, bunk room, ambulance garage and fireequipment storage room. The renovation includes air conditioning, power, lighting,grounding, fire alarm and sprinkler system.

VI. Project: REPLACE GRAVITY SEWER LINES UPSTREAM OF SLS4Location: Nimitz Hill, Naval Base GuamContract No.: N40192 09 D 2708 0020Contract Amount.: $ 367,529.59Position: Alt. QC Manager/Alt. SSHO

Brief Project Description: Project intended to replace part of the existing 8 inch gravity sewerline and sewer manholes at the upstream side of Sewer Lift Station No. 4. The replacementincludes new 8 inch PVC for sewer lines and pre cast concrete manhole base, walls, cone, andrings with cast iron frame and cover.

DUTIES AS QUALITY CONTROLMANAGER:

Coordinate all works with the Facility End users to ensure smooth execution of work withoutinterrupting the Operations of the Facilities.Attends/participates in Design, Pre con meetings and coordination meetings with end user'sandGovernment Representatives.Implements the Three Phase of Control for each Definable Features of Work and documentsPrep & initial Phase meetings.

March 15, 2012 - April. 28, 2012

Feb. 01, 2013 - Jul. 10, 2013

July. 15, 2013 - Oct. 15, 2013

9

Ensures that all submittals and drawings are complying to the specifications and contractrequirements; have been reviewed and approved by the DOR and accepted by the Governmentprior to any start of construction.Retain a copy of approved submittals at project site, including Contractor's copy of approvedsamples.Conducts regular QC inspections and direct immediate stoppage and removal of defective workitem. QC inspection log shall be kept on file/maintained.Conducts Regular Quality Control Meetings with the Government representatives, Designers,suppliers and prepare minutes of meetings.Prepare Daily Quality Control Report and submit them to the Government with the DailyProductionReports.Update As built Drawings Daily and maintain an up to date copy on site.Coordinate all factory and on site testing, Testing Laboratory personnel, QC Specialists, and anyother inspection and testing personnel required by the Contract.Assure that all applicable tests, special inspections, and observations required by the contract areperformed.Maintain rework log on site, noting dates deficiency identified, and date corrected.Prepare and facilitates close out documents after project completion. (As built drawings, DD1354,keys, OMSI Manuals, etc.)Updates and notify the Contracting Officer of any proposed changes to the QC plan.Perform Punch out and participate in Pre final and Final Inspections. Submit list of deficiencies tothe Contracting Officer for each inspection. Correct all deficiencies prior to the Final inspection.Notify Contracting Officer prior to final inspection to establish a schedule date acceptable by theContractingOfficer.

DUTIES AS SITE SAFETY & HEALTH OFFICER/SSHO:

Ensure that all necessary coordination is made with the Facility end users so the employeesoccupying the facility are not exposed to construction hazards.Be on site at all times whenever work or testing is being performed.Manage and implement the Safety and Health Plan of the Project. (APP's and AHA's)Attend the pre construction conference, preparatory/initial phasemeetings includingother periodic in progress meetings.Ensure that all employees including vendors and sub contractors are complying/observing Safetyand Health requirements and policies.Conduct daily safety and health inspections at jobsite and documents all safety inspectionperformed..Conduct mishap investigations and complete required reports. Maintain the OSHA Form 300 andDaily Production reports for prime and sub contractors.Maintain applicable safety reference material on the job site. (MSDS, AHA's etc.)Maintain a safety and health deficiency tracking system that monitors outstanding deficienciesuntil resolution.FacilitatesWeekly Indoctrination/Training and Tool BoxMeetings. Meetings and trainings aredocumented.

10

EMPLOYMENTHISTORY:

April 2004 May 2005Company: JMC EQUIPMENT RENTAL Position: Quality Control Manager, Alt. SSHO

• Responsible for managing and coordinating the three phases of control anddocumentation performed by others.

• Responsible for project management and engineering for the construction of the housingand fencing projects.

• Manage daily operations with superintendents and foreman to facilitate efficientoperations thus successful result.

• Responsible for overall project performance through control of cost, schedule, quality andsafety of project.

• Review plans and specifications, quantity take off preparation of Bills of materials obtainsubcontractors and material / labor / equipment estimates and final bid cost.

• In charge of operations and oversee project performance concerning quality and schedulecompliance.

• Investigate industrial accidents, injuries, or occupational diseases to determine causes andpreventive measures.

• Report or review findings from accident investigations, facilities inspections, orenvironmental testing.

• Maintain and apply knowledge of current policies, regulations and industrial processes.• Inspect facilities, machinery, and safety equipment to identify and correct potential

hazards, and to ensure safety regulation compliance.• Conduct or coordinate worker training in areas such as safety laws and regulations,

hazardous condition monitoring, and use of safety equipment.• Review employee safety programs to determine their adequacy.• Interview employers and employees to obtain information about work environments and

workplace incidents.• Review plans and specifications for construction of new machinery or equipment to

determine whether all safety requirements have been met.• Compile, analyze, and interpret statistical data related to occupational illnesses and

accidents.• Interpret safety regulations for others interested in industrial safety such as safetyengineers, labor representatives, and safety inspectors.

December 2001 December 2003 Company: ASANUMA CORPORATIONNature ofWork: General Construction Position: Site Project Engineer & Safety Officer

Inspect work in progress and assure that workmanship is of acceptable level and hasworkmanship is of acceptable level and has complywith the plans and specifications.

EDUCATION:

COLLEGE: UNIVERSITY OF STO. TOMAS, MANILAPHILIPINESDEGREE: BACHELOR OF SCIENCE IN ARCHITECTURELICENSE: REGISTERED ARCHITECH IN THE PHILIPPINES (Reg. # 3019)

11

REFERENCES:

1. Mr. Delfin Quitlong, GWA, ..................................................................... Tel. # 671 6472612

3. Eng’r Joe Villas, Private Contractor, ...................................................... Tel. # 671 6321446

12

13

14

15

16

17

18

19