alyssa mason - portfolio - scdc

11
UP DW REF. A105 1 A104 A105 A104 1 2 2 1 2 4 1y 3 A C B 18 18 18 18 10 5 6 9 3 2 4 Cx 8266 24820 4000 7546 10254 17799 8 7 26 26 26 1 A106 11 2 A106 Product Showcase Room 1 Product Finish Samples Room 2 Meeting Room 3 Kitchenette 4 Manager Office 5 Product Libary reading Room 6 Women's 7 Men's 8 2x 2936 1074 1x Ax Bx 2775 4182 14 15 26 26 17 17 17 18 18 18 18 18 18 18 1 A107 2 A107 11480 16 Reception Area 12 19 12 26 26 26 Vestibule 17 Corridor 1 18 Corridor 2 19 6 3 2 2 2 2 3 3 5 5 3 3 3 3 3 3 3 3 3 3 3 3 7 7 7 7 7 7 7 7 7 7 7 7 7 6 7 7 90mm Brick Veneer 50mm Air Space 6mil Vapour Barrier 38mm Rigid Insulation 13mm Sheathing 152mm Metal Stud w/ Batt Insulation 6mil Moisture Barrier 13mm GWB Paint Finish Exterior Brick on Metal Stud 90mm Stone Veneer 19mm Mortar Setting Bed 19mm Scratch Coat Metal Lath Fastened to Metal Stud 6mil Vapour Barrier 38mm Rigid Insulation 13mm Sheathing 152mm Metal Stud w/ Batt Insulation 6mil Moisture Barrier 13mm GWB Paint Finish Exterior Stone on Metal Stud Paint Finish 13mm GWB 300mm Plumbing Space w/ Staggared Metal Studs 13mm GWB Paint Finish Interior Plumbing Wall Paint Finish 13mm GWB 300mm Plumbing Space w/ Staggared Metal Studs 13mm GWB 13mm GWB Paint Finish Interior Partition Wall (1hr) 90mm Brick Veneer 50mm Air Space 190mm CMU 50mm Air Space 90mm Brick Veneer Exterior Brick Column Exterior Foundation Wall 300mm Poured Concrete 90mm Brick Veneer 50mm Air Space 6mil Vapour Barrier 190 CMU 38mm Batt Insulation 6mil Moisture Barrier 13mm GWB Paint Finish Exterior Brick on CMU 2 1 3 4 5 6 7 Scale Checked by Drawn by Date Project number As indicated 02/08/2013 7:09:57 PM First Floor 2013-001 Final Project - SCDC Mark Harris 02/08/2013 Checker A101 No. Description Date 1 : 100 First Floor 1 MBMP Design

Upload: jonathan-mohabir

Post on 21-Aug-2015

42 views

Category:

Documents


0 download

TRANSCRIPT

UP

DWREF.

A1051

A104

A105

A104

1

2

2

1 2 4

1y

3

A

C

B

18181818

10

5

6

9

32

4

Cx

8266

24820

4000

7546

1025

4

1779

9

8

7

26

26

261

A106

11

2

A106

Product ShowcaseRoom

1

Product Finish SamplesRoom

2

Meeting Room

3

Kitchenette

4

Manager Office

5Product Libary reading

Room

6

Women's

7

Men's

8

2x

2936

1074

1x

Ax

Bx

2775

4182

14 15

26 26

17

17

1718

181818

18 18 18

1

A107

2

A107

11480

16

Reception Area

12

19

12

2626

26

Vestibule

17

Corridor 1

18

Corridor 2

19

6

3

2

2

2

2

3

35

5

3

3

3

3

33

3

3

3

3

3

3

7

7

7

7

7

7

77

7

7

7

7

7

6

7

7

90mm Brick Veneer50mm Air Space6mil Vapour Barrier38mm Rigid Insulation13mm Sheathing152mm Metal Stud w/ Batt Insulation6mil Moisture Barrier13mm GWBPaint Finish

Exterior Brick on Metal Stud

90mm Stone Veneer19mm Mortar Setting Bed19mm Scratch CoatMetal Lath Fastened to Metal Stud6mil Vapour Barrier38mm Rigid Insulation13mm Sheathing152mm Metal Stud w/ Batt Insulation6mil Moisture Barrier13mm GWBPaint Finish

Exterior Stone on Metal Stud

Paint Finish13mm GWB300mm Plumbing Space w/Staggared Metal Studs13mm GWBPaint Finish

Interior Plumbing Wall

Paint Finish13mm GWB300mm Plumbing Space w/Staggared Metal Studs13mm GWB13mm GWBPaint Finish

Interior Partition Wall (1hr)

90mm Brick Veneer50mm Air Space190mm CMU50mm Air Space90mm Brick Veneer

Exterior Brick Column

Exterior Foundation Wall

300mm Poured Concrete

90mm Brick Veneer50mm Air Space6mil Vapour Barrier190 CMU38mm Batt Insulation6mil Moisture Barrier13mm GWBPaint Finish

Exterior Brick on CMU

2

1

3

4

5

6

7

Scale

Checked by

Drawn by

Date

Project number

As indicated

02/0

8/20

13 7

:09:

57 P

M

First Floor

2013-001

Final Project -SCDC

Mark Harris

02/08/2013

MBMP Design

Checker

A101

No. Description Date

1 : 100

First Floor1

MBMP Design

DN

A1051

A104

A105

A104

1

2

2

1 2 4

1y

3

A

C

B

Cx

18 18

26

26

1

A106

2

A106

26

Sample Project Room

9

Open to Below

10

2x

1x

Ax

Bx

1

A107

18 18 18 18

18 18

16

16

18

18

18

18

16

16

2

A107

11480 1074 8266 4000

24820

2775

4182

2936

7546

1025

4

1779

9

Precast ConcreteSloped RoofBelow

Mezzanine

14

Open to Below

15Kitchenette

16

4

4

4

4

45

5

4

4

4

4

4

4

4 4

4

4

4

4

4

7

7

7

90mm Brick Veneer50mm Air Space6mil Vapour Barrier38mm Rigid Insulation13mm Sheathing152mm Metal Stud w/ Batt Insulation6mil Moisture Barrier13mm GWBPaint Finish

Exterior Brick on Metal Stud

90mm Stone Veneer19mm Mortar Setting Bed19mm Scratch CoatMetal Lath Fastened to Metal Stud6mil Vapour Barrier38mm Rigid Insulation13mm Sheathing152mm Metal Stud w/ Batt Insulation6mil Moisture Barrier13mm GWBPaint Finish

Exterior Stone on Metal Stud

Paint Finish13mm GWB300mm Plumbing Space w/Staggared Metal Studs13mm GWBPaint Finish

Interior Plumbing Wall

Paint Finish13mm GWB300mm Plumbing Space w/Staggared Metal Studs13mm GWB13mm GWBPaint Finish

Interior Partition Wall (1hr)

90mm Brick Veneer50mm Air Space190mm CMU50mm Air Space90mm Brick Veneer

Exterior Brick Column

Exterior Foundation Wall

300mm Poured Concrete

90mm Brick Veneer50mm Air Space6mil Vapour Barrier190 CMU38mm Batt Insulation6mil Moisture Barrier13mm GWBPaint Finish

Exterior Brick on CMU

2

1

3

4

5

6

7

Scale

Checked by

Drawn by

Date

Project number

As indicated

02/0

8/20

13 7

:17:

02 P

M

Mezzanine Floor

2013-001

Final Project -SCDC

Mark Harris

02/08/2013

MBMP Design

Checker

A102

No. Description Date

1 : 100

Mezzanine Floor1

MBMP Design

A1051

A104

A105

A104

1

2

2

1 2 4

1y

3

A

C

B

Cx

2x

1x

Ax

Bx

22

22

22

1:11

1:11

1:11

1:11

SlopedRoof Below

22

22

22

22

22

22

22

22

22

22

22

22

22

Precast ConcreteCurved Roof

22

22

22

22

22

Skylights

Precast Concrete(Insul-Deck) SlopedRoof Below

Curtain Wall

11519 1035 8266 4000

24820

1025

475

46

1779

9

2974

2775

4182

5mm Finish Painter White3 Layers WaterproofingPrimer10mm Substrate300mm Precast Concrete (Insul-Deck)

Precast Concrete Sloped Roof

300mm Precast Concrete

Precast Concrete Curved Roof

Scale

Checked by

Drawn by

Date

Project number

As indicated

02/0

8/20

13 1

:16:

43 P

M

Top of Roof

2013-001

Final Project -SCDC

Mark Harris

02/08/2013

MBMP Design

Checker

A103

No. Description Date

1 : 100

Top of Roof1

MBMP Design

First Floor

0

Mezzanine Floor

4500

124

1y

3

Top of Footing

-1200

Top of Mezzanine

8100

Top of Roof

11800

U/S Footing-1400

2

A106 2x

BrickFinish

StoneFinish

1:11 1:11

CurtainWall

Precast ConcreteCurved Roof

ConcreteFoundation

2001

200

4500

3600

3700

1180

014

00

18 18 18 182626

26262626 18 18 18 18

181818181818

17

StoneFinish

BrickFinish

Precast Concrete(Insul-Deck) SlopedRoof

First Floor

0

Mezzanine Floor

4500

1 2 4

1y

3

Top of Footing

-1200

Top of Mezzanine

8100

Top of Roof

11800

26

U/S Footing-1400

2

A1062x

BrickFinish

StoneFinish

CurtainWall

PrecastConcrete CurvedRoof

CurtainWall

1:11 1:11

Exterior BrickColumns

Exterior BrickColumns

FlatRoof

3700

3600

4500

1180

0

1200

200 14

00

1

18 18

12

26

26

26 26 26 26 26 2626 26 26

18

26

26

1218 18 1814

BrickFinish

StoneFinish

Precast Concrete (Insul-Deck) Sloped Roof

Scale

Checked by

Drawn by

Date

Project number

1 : 100

02/0

8/20

13 6

:31:

28 P

M

Elevations

2013-001

Final Project -SCDC

Mark Harris

02/08/2013

MBMP Design

Checker

A104

No. Description Date 1 : 100

North Elevation1

1 : 100

South Elevations2

MBMP Design

First Floor

0

Mezzanine Floor

4500

AC B

Top of Footing

-1200

Top of Mezzanine8100

Top of Roof

11800

U/S Footing

-1400

1

A106 AxBx

1

A107

2

A107

BrickFinish

ExteriorBrickColumns

CurtainWall

CurtainWall

CurtainWall

StoneFinish

PrecastConcreteCurvedRoof

3700

3600

4500

1200

200

1180

014

00

81717

1616 1818 18 18 1616

2626 26 26 26 26 26

22222222 22 22 221:111:11

FlatRoof

Precast Concrete(Insul-Deck )Sloped Roof

First Floor

0

Mezzanine Floor

4500

A CB

Top of Footing

-1200

Top of Mezzanine8100

Top of Roof

11800

U/S Footing

-1400

1

A106

26

26

26

Ax Bx 1

A107

2

A107

BrickFinish

StoneFinish

ConcreteFoundation

Exterior BrickColumn

CurtainWall

26 26

26 26

26 26 262626

26

26 26 26 26 26 26 26 26

CurtainWall

3700

3600

4500

1200

200

1180

014

00

CurtainWall

Precast ConcreteCurved Roof

1:11 1:11

FlatRoof

Precast Concrete(Insul-Deck)Sloped Roof

Scale

Checked by

Drawn by

Date

Project number

1 : 100

02/0

8/20

13 6

:30:

51 P

M

Elevations

2013-001

Final Project -SCDC

Mark Harris

02/08/2013

MBMP Design

Checker

A105

No. Description Date

1 : 100

East Elevation1

1 : 100

West Elevation2

MBMP Design

First Floor

0

Mezzanine Floor

4500

124

1y

3

Top of Footing

-1200

Top of Mezzanine

8100

Top of Roof

11800

U/S Footing

-1400

2

A106

1A107

3A108

4A108

1A108

2A108

Product ShowcaseRoom

1

Open to Below

10

2001

200

4500

3600

3700

1180

014

00

90mm Brick Veneer50mm Air Space6mil Vapour Barrier38mm Rigid Insulation13mm Sheathing152mm Metal Stud w/ Batt Insulation6mil Moisture Barrier13mm GWBPaint Finish

1:111:11

90mm Brick Veneer50mm Air Space6mil Vapour Barrier38mm Rigid Insulation13mm Sheathing152mm Metal Stud w/ Batt Insulation6mil Moisture Barrier13mm GWBPaint Finish

SkylightCurtain Wall

26

26

26

MezzanineRailing

StairStringer

900

Run

16

2942

@ R

ise

17

Landing

1000

600x1200mmCompoundCeiling

90mm Stone Veneer19mm Mortar Setting Bed19mm Scratch CoatMetal Lath Fastened to Metal Stud6mil Vapour Barrier38mm Rigid Insulation13mm Sheathing152mm Metal Stud w/ Batt Insulation6mil Moisture Barrier13mm GWBPaint Finish

Precast Concrete(Insul-Deck)Sloped Roof

First Floor

0

Mezzanine Floor4500

AC B

Top of Footing

-1200

Top of Mezzanine

8100

Top of Roof

11800

U/S Footing

-1400

1

A106

AxBx

1

A107

5A108

3700

3600

4500

1200

200

1180

014

00

Reception Area

12

Manager Office

5

90mm Brick Veneer50mm Air Space6mil Vapour Barrier38mm Rigid Insulation13mm Sheathing152mm Metal Stud w/ Batt Insulation6mil Moisture Barrier13mm GWBPaint Finish

PrecastConcreteCurve Roof

1:11

CurtainWall

CurtainWall

Flat Roof

CurtainWall

Exterior BrickColumn

90mm Brick Veneer50mm Air Space6mil Vapour Barrier38mm Rigid Insulation13mm Sheathing152mm Metal Stud w/ Batt Insulation6mil Moisture Barrier13mm GWBPaint Finish

90mm Stone Veneer19mm Mortar Setting Bed19mm Scratch CoatMetal Lath Fastened to Metal Studs6mil Vapour Barrier38mm Rigid Insulation13mm Sheathing152mm Metal Stud w/ Batt Insulation6mil Moisture Barrier13mm GWBPaint Finish

7 Panel Skylight

1:11

18

26

14

Precast Concrete(Insul-Deck)Sloped Roof

Scale

Checked by

Drawn by

Date

Project number

1 : 100

02/0

8/20

13 6

:29:

49 P

M

Building Sections

2013-001

Final Project -SCDC

Mark Harris

02/08/2013

MBMP Design

Checker

A106

No. Description Date 1 : 100

Building Section1

1 : 100

Building Section 22

MBMP Design

First Floor

0

Mezzanine Floor

4500

43

Top of Footing-1200

Top of Mezzanine8100

U/S Footing

-1400

2

A106

6A108

3600

4500

1200

200

8100

1400

1:11

Landing

1000

900

90mm Stone Veneer19mm Mortar Setting Bed19mm Scratch CoatMetal Lath Fastened to Metal Stud6mil Vapour Barrier38mm Rigid Insulation13mm Sheathing152mm Metal Stud w/ Batt Insulation6mil Moisture Barrier13mm GWBPaint Finish

90mm Brick Veneer50mm Air Space6mil Vapour Barrier38mm Rigid Insulation13mm Sheathing152mm Metal Stud w/ Batt Insulation6mil Moisture Barrier13mm GWBPaint Finish

Brick Wall

ConcreteFoundation

MezzanineRailing

600x1200Compound Ceiling

900

Run

16

2942

@ R

ise

17

StairStringer

600x1200Compound Ceiling

First Floor

0

Mezzanine Floor4500

4

Top of Footing

-1200

Top of Mezzanine

8100

U/S Footing-1400

200

1200

4500

3600

8100

1400

Product Libary readingRoom

6

90mm Brick Veneer50mm Air Space6mil Vapour Barrier38mm Rigid Insulation13mm Sheathing152mm Metal Stud w/ Batt Insulation6mil Moisture Barrier13mm GWBPaint Finish

Curtain Wall

ConcreteFoundationWall

18

22

600x600mmCompoundCeiling

1:11

600x1200mmCompoundCeiling

Skylight

Scale

Checked by

Drawn by

Date

Project number

1 : 50

02/0

8/20

13 6

:30:

22 P

M

Wall/StairSection

2013-001

Final Project -SCDC

Mark Harris

02/08/2013

MBMP Design

Checker

A107

No. Description Date

1 : 50

Stair Section 11 1 : 50

Wall Section 12

MBMP Design

300mmInsul-Deck

Glazing (SealedUnit)

5mm Finish Painter White3 Layers WaterproofingPrimer10mm Substrate

Interior Trim

1

Glazing

Window Sill Mullion

Sill Brick w/ Drip

90mm Brick Veneer50mm Air Space6mil Vapour Barrier38mm Rigid Insulation13mm Sheathing152mm Metal Stud w/ Batt Insulation6mil Moisture Barrier13mm GWBPaint Finish

Flashing

Adjustable Tie @ Every 4 Bricks

350

358

905040178

1

90mm Brick Veneer50mm Air Space6mil Vapour Barrier38mm Rigid Insulation13mm Sheathing152mm Metal Stud w/ Batt Insulation6mil Moisture Barrier13mm GWBPaint Finish

Glazing

Window Head Mullion

Steel Shelf Angle

Weep

Flashing

Adjustable Tie @Every 4 Bricks

358

350

905040178

First Floor

0

173

900

173

275

Stringer

152

Prefabricated MetalHandrail

Prefabricated MetalPost

Anchors

200

Concrete Slab

14.5mm Travertine Flooring8mm Paste200mm Floating Slab150 Gravel Bed

First Floor

0

1

Top of Footing-1200

U/S Footing

-1400

200

1200

90mm Brick Veneer50mm Air Space6mil Vapour Barrier38mm Rigid Insulation13mm Sheathing152mm Metal Stud w/ Batt Insulation6mil Moisture Barrier13mm GWBPaint Finish

Grade

Earth

200

Earth

14.5mm Travertine Flooring8mm Paste200mm Floating Slab150mm Gravel Bed

100mm Weeper Tile

38mm Drainage Mat

330mm FoundationWall

350x200mmStrip Footing

Steel ShelfAngle

Adjustable Tie @ Every4 Bricks

WeepFlashing

Baseboard

Urethane RubberSealant

Mezzanine Floor4500

900

Prefrabricated MetalHandrail

Prefrabricated MetalPost

Stringer

400

200

Bent 125x75x6L.L.VAnchored toconcrete

L.L.V AnchoredWelded toMetal Stairs

14.5mm Travertine Flooring8mm Paste200mm Concrete Slab

Scale

Checked by

Drawn by

Date

Project number

1 : 10

02/0

8/20

13 6

:27:

32 P

M

Detail Sheet

2013-001

Final Project -SCDC

Mark Harris

02/08/2013

MBMP Design

Checker

A108

No. Description Date

1 : 10

Skylight Detail5 1 : 10

Window Sill4

1 : 10

Window Head3

1 : 10

Stair @ Base2

1 : 10

Foundation Detail1

1 : 10

Top of Stairs Detail6

MBMP Design

A1051

A104

A105

A104

1

2

2

1 2 4

1y

3

A

C

B

Cx1

A106

2

A106

2x

1x

Ax

Bx

1

A107

2

A107

11480 1074 8266 4000

2775

4182

2936

1025

475

46

1779

9

24820

600

1200

600

600

Meeting Room

3

Product ShowcaseRoom

1

Women's

7

Men's

8

Manager Office

5

Product Libary readingRoom

6

600x1200Conpound Ceiling3600mm A.F.F

GWB Ceiling3600mm A.F.F

600x1200Conpound Ceiling3300mm A.F.F

600x600 HighConpound Ceiling8100mm A.F.F

600x1200Conpound Ceiling8100mm A.F.F

600x600Conpound Ceiling4000mm A.F.F

600x1200Conpound Ceiling4000mm A.F.F

600x1200Conpound Ceiling4000mm A.F.F

600x600Conpound Ceiling3100mm A.F.F

600x12000 HighCompound Ceiling8050mm A.F.F

GWB Ceiling4000mm A.F.F

GWB Ceiling4000mm A.F.F

GWB Ceiling4000mm A.F.F

Legend

Symbol Description

Light - Flat Round : 60W - 277V

Light - Hemisphere : 100W - 120V

Light - Parabolic Rectangular : 600 x 1200mm (2 Lamp) - 120V

Light - Parabolic Square : 600 x 600mm (2 Lamp) - 120V

Square Return Register : 600 x 600mm

Square Supply Diffuser : 600 x 600mm

Scale

Checked by

Drawn by

Date

Project number

As indicated

02/0

8/20

13 6

:26:

54 P

M

Reflected CeilingFirst Floor

2013-001

Final Project -SCDC

Mark Harris

02/08/2013

MBMP Design

Checker

A109

No. Description Date

1 : 100

First Floor1

MBMP Design

A1051

A104

A105

A104

1

2

2

1 2 4

1y

3

A

C

B

Cx1

A106

2

A106

2x

1x

Ax

Bx

1

A107

2

A107

1200 600

600

600

Sample Project Room

9

11480 1074 8266 4000

24820

7546

1025

4

1779

9

2936

2775

4182

600x600Conpound Ceiling3600mm A.F.F

600x1200Conpound Ceiling6400mm A.F.F

600x1200Conpound Ceiling3600mm A.F.F

600x1200Conpound Ceiling3600mm A.F.F

600x1200Conpound Ceiling2600mm A.F.F

Footprint ofCurved Roof

1:11

1:11

1:11

1:11

Kitchenette

16

600x600Conpound Ceiling3600mm A.F.F

600x1200Conpound Ceiling2100mm A.F.F

600x1200Conpound Ceiling3600mm A.F.F

Legend

Symbol Description

Light - Flat Round : 60W - 277V

Light - Hemisphere : 100W - 120V

Light - Parabolic Rectangular : 600 x 1200mm (2 Lamp) - 120V

Light - Parabolic Square : 600 x 600mm (2 Lamp) - 120V

Square Return Register : 600 x 600mm

Square Supply Diffuser : 600 x 600mm

Scale

Checked by

Drawn by

Date

Project number

As indicated

02/0

8/20

13 6

:26:

13 P

M

Reflected CeilingMezzanine

2013-001

Final Project -SCDC

Mark Harris

02/08/2013

MBMP Design

Checker

A110

No. Description Date

1 : 100

Mezzanine Floor1

MBMP Design

915

2134

915

2134

M_Single-Flush M_Single-Glass 1 M_Double-Glass 1

1830

2134

610

610

915 1143

610

406

1830

610

1830

915

1830

915

1830

1195

M_Fixed M_Fixed

M_Skylight

M_Fixed M_Fixed M_Fixed M_Instance - Fixed

Scale

Checked by

Drawn by

Date

Project number

1 : 20

02/0

8/20

13 1

:30:

27 P

M

Schedules

2013-001

Final Project -SCDC

Mark Harris

02/08/2013

MBMP Design

Checker

A111

No. Description Date

Window QuantitiesNo. of Window Description Window Type Size Head Height Level

4 M_Fixed 16 0406 x 1830mm 2135 Mezzanine Floor2 M_Fixed 12 0610 x 0610mm 3454 First Floor2 M_Fixed 17 0610 x 1830mm 2135 First Floor1 M_Fixed 14 0915 x 0610mm 3800 First Floor24 M_Fixed 18 0915 x 1830mm48 M_Instance - Fixed 26 0915 x 1830mm21 M_Skylight 22 1180 x 1170mm Top of MezzanineGrand total

Door ScheduleCount Door Description Function Door Type Size Head Height Thickness Level

1 M_Curtain Wall-Store Front-Dbl Exterior 39 Store Front Double Door First Floor2 M_Double-Glass 1 Interior 26 1830 x 2134mm 2134 51 First Floor3 M_Single-Flush Interior 8 0915 x 2134mm 2134 51 First Floor11 M_Single-Glass 1 Interior 31 0915 x 2134mm 2134 51 First FloorGrand total

1 : 20

Door Elevations

1 : 20

Window Elevations

MBMP Design