resume

6
Vinay Dixit 101 Shiv krupa Apartment Near SB Sharma world school Mehul Nagar,Jamnagar-361006 Cell:9558008652,8878411921 Email:[email protected] [email protected] OB JECTIVE To secure a challenging position in an esteemed organization, where my capabilities can be utilized for the growth of the organization and ample scope obtained for my career growth. To use the knowledge, experience and skills acquired, to learn and adopt new and emerging technologies. SUMMARY Graduate Mechanical Engineer (B.Tech.) having experience in piping, Rotary & static Equipment in mechanical construction activities in Power Project, Oil and Gas, Refinery projects (12 years).Responsibilities have been included administering, organizing, delivering and executing different phases of construction projects. Sound knowledge of international piping codes and standards like ASME, ASTM, API etc. Strong interpersonal, team working and leadership skills, an effective communicator with excellent relationship. Additional Information Work experience Reliance industries Limited May 2016 to Till Jamnagar, Gujarat Designation: Senior construction Engineer(Senior Manager) Project: Jamnagar export refinery project J3 Program Jamnagar Department: C2 Complex Captive Power Plant(2x110 MW) Key Roles: To make the site planning for executing the piping erection, welding and Mechanical clearance. Review the detail drawings ISO,P&ID,LDT of piping. Preparation of isometric drawing for loops and spools.

Upload: vinay-dixit

Post on 12-Apr-2017

22 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: RESUME

Vinay Dixit 101 Shiv krupa Apartment

Near SB Sharma world schoolMehul Nagar,Jamnagar-361006Cell:9558008652,8878411921

Email:[email protected][email protected]

OBJECTIVE

To secure a challenging position in an esteemed organization, where my capabilities can be utilized for the growth of the organization and ample scope obtained for my career growth. To use the knowledge, experience and skills acquired, to learn and adopt new and emerging technologies.

SUMMARY

Graduate Mechanical Engineer (B.Tech.) having experience in piping, Rotary & static Equipment in mechanical construction activities in Power Project, Oil and Gas, Refinery projects (12 years).Responsibilities have been included administering, organizing, delivering and executing different phases of construction projects. Sound knowledge of international piping codes and standards like ASME, ASTM, API etc. Strong interpersonal, team working and leadership skills, an effective communicator with excellent relationship.

Additional Information

Work experienceReliance industries Limited May 2016 to Till Jamnagar, GujaratDesignation: Senior construction Engineer(Senior Manager)Project: Jamnagar export refinery project J3 Program JamnagarDepartment: C2 Complex Captive Power Plant(2x110 MW)Key Roles:

To make the site planning for executing the piping erection, welding and Mechanical clearance. 

Review the detail drawings ISO,P&ID,LDT of piping. Preparation of isometric drawing for loops and spools. Piping erection, alignment, testing, Mechanical clearance, Punch point attending

Category A &B. Monitoring and execution of Piping Hot & Cold Insulation and painting. P&M (Plant & machinery) like allocation of heavy lifts i.e. hydra, cranes & other 

tools and tackles, its validity. Conduct weekly meeting for contractors for progress review. Preparation of different types of work permits for the mechanical activities, attend

the Permit To Work training classes, identify and control the hazard.

Page 2: RESUME

Reliance industries Limited May 2014 to May 2016 Jamnagar, GujaratDesignation: Senior construction Engineer(Senior Manager)Project: Jamnagar export refinery project J3 Program JamnagarDepartment: DTA Captive Power Plant Syngas Modification ProjectKey Roles:

To make the site planning for executing the piping and equipment erection for Syngas Modification Job. 

Piping erection, alignment, testing, Mechanical clearance, Punch point attending category A&B and Box-up.

Equipments (Static & Rotary) erection, orientation, alignment P&M (Plant & machinery) like allocation of heavy lifts i.e. hydra, cranes & other 

tools and tackles, its validity Conduct weekly meeting for contractors for progress review Prepare detail erection scheme for equipment erection Preparation of different types of work permits for the mechanical activities, attend

the Permit To Work training classes, identify and control the hazard. Preparing work packages, inspecting and identifying required material and

equipment for performing construction work. Performing the tasks of identifying risk and solving high level technical issues by

coordinating with Mechanical Contractors. Ordering materials and equipment required for handling construction project.

BGR Energy Systems Ltd. Jan 2014 to May 2014Raigarh ChhattisgarhDesignation: Senior EngineerProject: 2x300MW Coal based Power Project Nawapara Raigarh Client : TRN Energy Pvt. LimitedKey Roles:

Involved in TG Piping like feed water system, condensate water system, gland steam supply and leakage, Turbine lube oil piping, TDBFP Jacket oil piping, TDBFP steam exhaust piping, stator cooling water, generator seal oil, H2/CO2 gas system, DEH system (Turbine & TDBFP), Main steam system, LP-HP by-pass system, HRH & CRH system, Extraction steam system, MDBFP Lube oil system, Turbine cross over piping fabrication, erection and hydro test.

Involved in TG Material joint verification based on detail packing list received from China western power corporation Limited.

Ensured that the project is being executed in compliance with the specific plans and specifications of the project.

Participated in weekly meetings and progress review of the project.

BGR Energy System Ltd. Jan 2011 to Jan 2014Jhalawar Rajasthan

Page 3: RESUME

Designation: Senior EngineerProject: 2x600MW Kalisindh thermal power project Jhalawar Rajasthan Client : Rajasthan Rajya vidyut utpadan Nigam Ltd.Key Roles:

Involved in TG Piping like feed water system, condensate water system, gland steam supply and leakage, Turbine lube oil piping, TDBFP Jacket oil piping, TDBFP steam exhaust piping, stator cooling water, generator seal oil,H2/CO2 gas system, DEH system(Turbine & TDBFP), Main steam system, LP-HP by-pass system, HRH & CRH system, Extraction steam system ,MDBFP Lube oil system, Turbine cross over system piping fabrication, erection and hydro test.

Involved in erection, alignment and fabrication of condenser. Erection & alignment of rotary equipments like MDBFP, Condensate extraction Pump,

Vacuum pump, Condensate water pump, Jacking oil pump, TDBFP Booster pump. Erection & alignment of static equipment like Dearator ,Gland steam condenser, HP

heater, LP heater, Lube oil cooler etc. Involved in turbine lube oil flushing, TDBFP lube oil flushing, DEH line flushing, MDBFP

lube oil flushing, LP/HP bypass line lube oil flushing. Coordination with design & documentation department. Material planning scheduling and billing. Preparing the protocols for completion of fabrication, erection and alignment work Participated in weekly meetings and progress review of the project.

Reliance industries Limited Jan 2008 to Jan 2011Jamnagar, GujratDesignation: Project EngineerProject: Jamnagar export refinery project J2 Program Jamnagar(Coker)Key Roles:

Inspection of erection and commissioning of Rotary equipments like pump and compressor.

Inspection of fit-up and welding for process piping. execute and monitor erection of piping and equipments. Planning, site Co-ordination for issue material follow-up material inspection. check machinery availability at site as per planning. Co-ordination with client and QA for solving critical problem of site. Witness the Hydro test on the piping works. involved in Box-up and insulation of piping and equipments. Study of P&ID,Isometric drawing, GA drawing,PFD drawings etc. Participated in weekly meetings and progress review of the project. Performed responsibilities of preparing work instruction manuals, delivery schedules

and other technical data. Handled the tasks of determining scope, budget, and required resource for successful

execution of the project

Reliance industries Limited July 2006 to Jan 2008Pune, MaharashtraDesignation: Project EngineerProject: Reliance East West Gas Pipeline Project (48”x1386km)

Page 4: RESUME

Key Roles:

Fit-up and welding for front end welding and back end welding using internal clamp. Co-ordination with QC for Welder Qualification, Procedure Qualification as per project

requirement, Stage wise inspection as per Inspection Test Plan. Co-ordination for NDT Clearance with QC Dept, before lowering for

underground pipeline works. Witness the Hydro tests on the pipeline works. Verification and final clearance for the RFI given by the contractor such

as pipeline Laying, Holiday Test, Peel Test, Joint Coating & QA/QC Activity etc. Hydro test arrangement and witnessing for Road crossing areas and GRE Pipe spools

insertion and lowering of Casing pipe assembly at Road cross areas. Performed responsibilities of preparing work instruction manuals, delivery schedules

and other technical data. Handled the tasks of determining scope, budget, and required resource for successful

execution of the project

Punj Lloyd Limited June 2004 to July 2006Guwahati, AssamDesignation: Maintenance EngineerProject: East west Corridor ProjectKey Roles:

Involved with maintenance, servicing & overhauling of the plant & equipment. Make a proper plan for minimum utilization of equipment & manpower at optimum

output. Procurement first moving materials diagnosis the fault of the equipment at break

down level.

Achievements

Upgrade quality system for supplier quality control. Declare qualify in GATE 2004 with 87 percentile of marks. Awarded best performance in safety on 42nd national safety day.

TECHNICAL SKILL:

Mechanical engineering 12 year experience in Thermal Power project, Refinery, oil & gas Commercial awareness and cost effectiveness Coordinates preparation of planning package and procedures

Page 5: RESUME

Review project schedule. Assists project Manager, Section Head & Construction Manager

Co-ordinates activities with all departments Coordinates and assist in directing all site construction activities Compliance in accordance with HSE Standard Job instructions & variation proposals Project specific procedures Sub-contractor scope of work Client deliverables/progress plan Report writing skill Committed team player

Personnel Information

Date of Birth: 16/06/1982

Marital status: Married

Sex: Male

Religion: Hindu

Nationality: Indian