Victoria Oil & Gas plc

General Meeting 12th May 2010

Page 2: Result of General Meeting - May 2010

Disclaimer THIS PRESENTATION IS BEING SUPPLIED TO YOU SOLELY FOR YOUR INFORMATION AND MAY NOT BE REPRODUCED, FURTHER DISTRIBUTED TO

ANY OTHER PERSON OR PUBLISHED IN WHOLE OR IN PART, FOR ANY PURPOSE.

These presentation materials are confidential and are directed only at persons who fall within the exemptions contained in Articles 19 and 49 of the Financial Services and Markets Act 2000 (Financial Promotion) Order 2005 (such as persons who are authorised or exempt persons within the meaning of the Financial Services and Markets Act 2000 (“FMSA”), or in the United States who qualify as an “accredited investor”, “qualified institutional buyer” or “qualified purchaser” under United States Securities laws, or an "accredited investor" under National Instrument 45-106 in Canada, and certain other investment professionals, high net worth companies, unincorporated associations or partnerships and the trustees of high value trusts) and persons who are otherwise permitted by law to receive them. These presentation materials are directed only at persons having professional experience in matters relating to investments and any investment or investment activity to which these presentation materials relate is available only to such persons. Persons of any other description, including those who do not have professional experience in matters relating to investments, should not rely on these presentation materials or act upon their content.

This document is exempt from the general restriction on the communication of invitations or inducements to enter into investment activity and has therefore not been approved by an authorised person as would otherwise be required by section 21 of the FSMA. Any investment to which this document relates is available to (and any investment activity to which it relates will be engaged with) only those persons described above. Persons who do not fall within this category of investor should not take any action upon this document, but should return it immediately to Fox Davies Capital Limited (“FDC”). Postage and other reasonable delivery costs will be refunded. It is a condition of your receiving this document that you fall within, and you warrant to Victoria Oil & Gas Plc (the “Company”) and FDC that you fall within, the category of person described above.

The presentation materials do not constitute or form any part of any offer or invitation to sell or issue or purchase or subscribe for any shares in the Company nor shall they or any part of them, or the fact of their distribution, form the basis of, or be relied on in connection with, any contract with the Company relating to any securities. Any decision regarding any proposed subscription for shares in the Company must be made solely on the basis of public information on the Company. The presentation materials are not intended to be distributed or passed on, directly or indirectly, or to any other class of persons. They are being supplied to you solely for your information and may not be reproduced, forwarded to any other person or published, in whole or in part, for any other purpose. Any other person who receives this document should not rely or act upon it. By accepting this document the recipient represents and warrants that they are a person who falls within the above description of persons who are entitled to receive this document. The information contained in this document is confidential and the property of the Company.

No reliance may be placed for any purpose whatsoever on the information contained in this document or on its completeness, sufficiency, accuracy or fairness. No representation or warranty, express or implied, is made or given by or on behalf of the Company or its directors or employees, or FDC or their professional advisers or any other person as to the completeness, sufficiency, accuracy or fairness of the information, beliefs or opinions contained in this document and in the presentation and no responsibility or liability is accepted to placees for any such information or opinions. Any reliance on this communication could potentially expose you to a significant risk of losing all of the property invested by you or the incurring by you of additional liability. Save in the case of fraud, no liability is accepted for any loss, cost or damage suffered or incurred as a result of the reliance on such information, opinions or beliefs.

Certain statements and graphs throughout the presentation are “forward-looking statements” including management’s and third party assessments of future plans, operations, values and returns and represent the company’s international projects, expectations or beliefs concerning, among other things, future operating results and various components thereof or the company’s future economic performance.

These projections, estimates and beliefs contained in such forward-looking statements necessarily involve known and unknown risks and uncertainties which may cause the company’s actual performance and financial results in future periods to differ materially from any estimates or projections.

These risks include, but are not limited to, risks associated with the oil and gas industry in general, delays or changes in plans with respect to exploration and development activities and capital expenditures, the uncertainties of estimates and projections relating to production, political risks, costs and expenses and health and safety and environmental risks, commodity price and exchange rate fluctuations, and uncertainties resulting from competition and ability to access sufficient capital, and risks relating to the ability to complete capital markets transactions referred to in the presentation.

If you are in any doubt about the investment to which these presentation materials relate, you should consult a person authorised by the Financial Services Authority who specialises in advising on securities of the kind described in this document. FDC is acting solely for the Company as broker in relation to matters described in this document and is not acting for any other persons and will not be responsible in respect of such matters to any other person (whether or not a recipient of this document) for providing protections afforded to customers of FDC or for providing advice in relation to those matters.

The distribution of this document in certain jurisdictions may be restricted by law and therefore persons into whose possession this document comes should inform themselves about and observe any such restrictions. Any such distribution could result in a violation of the law of such jurisdictions. Neither this document, nor any copy of it, may be taken or transmitted into Australia, Ireland, South Africa or Japan or into any jurisdiction where it would be unlawful to do so. Any failure to comply with this restriction may constitute a violation of relevant local securities laws.

Page 3: Result of General Meeting - May 2010

Key Points o  Victoria Oil & Gas Plc (VOG) is emerging as a

significant player in natural gas production o  Logbaba gas and condensate field in Douala,

Cameroon, is the only onshore gas discovery in the country

o  The West Medvezhye (West Med) project in Siberia has independently estimated recoverable prospective resources of over 5 Tcf of gas

o  Logbaba is poised to deliver first cash flows and profits for VOG o  Over 300 feet of gross sandstone pay in the first and

second wells o  In-principal agreements signed with industrial

customers o  First revenues from Logbaba targeted in Q4 2010 o  VOG boasts a balanced asset portfolio strategy

3

Page 4: Result of General Meeting - May 2010

Logbaba: First Mover Advantage o  The Logbaba field represents a unique opportunity

to dominate the nascent natural gas market in Cameroon

o  Competitive advantages:   The field lies beneath the major industrial city in the

Central African Region   Agreements for gas off-take already signed with industrial

customers in Douala   The only onshore gas discovery in the country   All facilities (drilling, processing and pipeline) will be

owned by VOG   Pipeline will be the only municipal gas pipeline in sub-

Saharan Africa o  Plans announced to triple Cameroon power

generation capacity in the next 10 years

4

Government priority for domestic market for next 30 years: 75 MMcf/d for electricity and 25 MMcf/d for industry

Page 5: Result of General Meeting - May 2010

Cameroon: Heart of Central Africa o  Cameroon is a member of the

Economic Community of Central African States (ECCAS) o  Members share trade

markets and currency o  Douala is the deep-water port

and industrial heart of the region o  The city is the most

expensive in Africa o  Major companies such as

Guinness and Nestle have facilities there

o  Rio Tinto Alcan have a major aluminium smelter at Edea close to Douala

o  Douala handles around 95% of import/exports for Cameroon, Chad and CAR

o  Logbaba is located in the eastern suburbs of Douala 5

ECCAS

Page 6: Result of General Meeting - May 2010

Cameroon Gas: No Competition

o  Logbaba remains the only onshore natural gas discovery in the country

o  Offshore production cannot compete with onshore in servicing local industrial markets

o  Total currently flaring all associated gas production from its offshore fields (approx. 50 MMcf/d)

o  Due to Logbaba’s position and development, VOG also has the opportunity to beat larger operators in feeding new power projects

o  Perenco’s offshore Sanaga Sud field yet to come into development despite location next to Kribi power station

o  Limbe power station, north of Douala, relies solely on liquid fuels despite Total’s offshore discoveries nearby

6

Page 7: Result of General Meeting - May 2010

7

Logbaba: Exceptional Progress Winter 2008 Spring 2009

Autumn 2009 Summer 2009

Page 8: Result of General Meeting - May 2010

Logbaba: Well La-105 Drilling o  La-105 was drilled to a total

depth of 8,920 feet

o  Multiple gas-bearing sands with over 300 feet of gross pay between 1,836 and 2,540 m correlating to La-103

o  La-105 was completed as a production well

8

o  Logbaba wells are more complex and difficult to control than predicted

o  Chronic lack of oil and gas infrastructure

o  Drilling progress being far slower than expected due to the need for heavier mud weights.

Page 9: Result of General Meeting - May 2010

Logbaba: Encouraging Early Results

9

LWD GR/Res Log from La-105

Sandstone

Sandstone

Sandstone

Sandstone

Top Logbaba Fm at 1,735m TVDRKB

Due to encouraging initial results, significant additional rig-time and expenditure was devoted to subsurface data acquisition to better evaluate the reservoir rock and fluid properties.

This and the application of latest technology are enabling VOG to realise the true reservoir and well potential at Logbaba.

Page 10: Result of General Meeting - May 2010

Logbaba: Well La-105 Testing

o  Multiple pay zones tested at depths between 7,005 - 8,500 feet.

o  Rates between 11 - 56 million standard cubic feet per day (MMscf/d) of natural gas and 210 - 1,000 barrels per day of condensate. Flowing wellhead pressures varied between 2,750 - 4,552 psi.

o  The Upper Logbaba A through C sands, although indicated as the best quality hydrocarbon-bearing sands encountered in the well logs, were not tested as the well indicated more than sufficient production capacity to meet initial gas demand of 8 MMscf/d. 10

La-105 Testing

Page 11: Result of General Meeting - May 2010

  Drilled deeper than planned to 10509 ft due to the better than expected observed sand quality in the Lower Logbaba sections.

  Multiple gas-bearing sands encountered between 5482 feet and 10400 feet (measured depth) - Over 300 feet of gross pay

11

Logbaba: Well La-106 – Initial Data

Example of deeper sand 9100 ft (2773m)

Top most sand starts at 5482 ft (1671m)

Page 12: Result of General Meeting - May 2010

Logbaba: Further Exploration

o  90% of the block is as-yet unexplored

o  In late 2009, a passive seismic survey was commissioned o  Passive seismic is a

direct hydrocarbon indicator

o  Significant new structure outside current drilling location

o  Best location on the current structure is as yet undrilled

o  The new accumulations lie outside the area evaluated by RPS

Passive Seismic Survey

12

Page 13: Result of General Meeting - May 2010

Wells 105+106 and processing

facility

Approx 85% of industrial market

within 10km

13

VOG plans to install and commission a gas processing facility and its own gas pipeline to the industrial customers

Vertically Integrated Strategy - Pipeline Route

Page 14: Result of General Meeting - May 2010

Production Facilities Conceptual Engineering Process

  Two production concepts agreed by VOG Board:   Low pressure gas distribution in polyethylene pipe to industrial customers in

Douala with an initial demand of 7 to 8 MMscf/d;   10 MW leased temporary power plant using 2.8 MMscf/d gas delivering power

at 90 kV to the Logbaba substation. 14

Page 15: Result of General Meeting - May 2010

Wells Well Chokes

Manifold LP

Separator Skid

LP Pipeline System

Diesel Generator (own use)

Flare

Condensate Storage

Condensate Tanker Loading

Condensate Tankers

To Limbe Refinery

To Industrial Consumers

(Condensate)

Resurfaced Road

~ ~

Power Generator

Transformer

Transmission Line

To Substation

Switchgear

~ ~

Pressure Let Down

Station

Concept Block Diagram

15

Page 16: Result of General Meeting - May 2010

Front End Engineering Design (FEED) Data collection studies

  Graphical Information System Project to merge satellite data with site and pipeline route survey

  Pipeline Route Selection and Network Design   Definition of Customer Conversions   Logbaba Site and Pipeline Route Survey   Civil works

  Soil sampling and analysis   Logbaba Site-

•  Essential requirements: Process and Power Plant •  Accommodation, offices and warehousing

  Pipeline construction and installation   Pre-qualification of Cameroon Civils Contractors   HV Transmission Line to Logbaba Substation

We have commenced and nearly completed FEED studies

16

Page 17: Result of General Meeting - May 2010

Production Facilities Schedule

17

Page 18: Result of General Meeting - May 2010

VOG: High Impact Events o  VOG is targeting first revenues in Q4-2010

o  While La-106 is drilled, La-105 was tested

o  Test data and superior modern logs will be incorporated in an independent reserve re-estimation

o  Installation of the facility and construction of the pipeline is expected to be completed relatively quickly now that concept is confirmed

18

Page 19: Result of General Meeting - May 2010

Appendix

Page 20: Result of General Meeting - May 2010

20

Key Management Team

Radwan Hadi

COO VOG

Sam Metcalfe Assistant Project

Manager Senior petroleum engineer with over 30 yrs experience in oil and gas including in Nigeria, Ghana and Equatorial Guinea. Former Head of Planning in ADCO

Over 25 yrs oil industry experience, worldwide. Has brought several North Sea gas projects into production for major corporations

Kevin Foo

Chairman

39 yr career in the resources sector including 19 years in the FSU; former MD of Celtic Resources Holdings

Austen Titford Financial Director

Jonathan Scott Barratt Commercial

Director

Francois Nguene Gov’t Relations

Manager

Chartered Accountant with more than 17 years experience, covering both the project development and operational phases in quoted natural resource companies.

Former Exploration and Production Manager for SNH in charge of Chad-Cameroon Pipeline

Former CEO of Eureka Mining Plc & executive director of Celtic Resources Plc

TEC

HN

ICA

L C

OM

MER

CIA

L Geoff Gill

Senior Petroleum Engineer

15 yr career in oil and gas, predominantly with Schlumberger Testing and then senior petroleum engineer with Blackwatch

Kamal Jardaneh Drilling

Supervisor

30 yrs of oil and gas experience, 23 yrs as drilling superintendent / senior drilling engineer for BP and currently a drilling consultant

Page 21: Result of General Meeting - May 2010

Logbaba: Discovery

21

o  Logbaba was discovered in 1950s by Elf SEREPCA

o  Four wells were drilled by Elf:

o  All encountered gas and condensate in multiple reservoir layers

o  Three wells tested over limited intervals with individual sands testing 10 – 20 MMcf/d per well

o  In 2008, RPS Energy calculated 2P reserves of: o  Gas – 104 Bcf o  Liquids – 4 MMbbl o  NPV10 – $168 MM*

* Attributable to VOG

Page 22: Result of General Meeting - May 2010

Logbaba: Well La-105 Testing continued

o  The test covered horizons of the Lower Logbaba formation, which had not been tested before, and the Upper Logbaba D sands.

o  The Upper Logbaba A through C sands, although indicated as the best quality hydrocarbon-bearing sands encountered in the well logs, were not tested as the well indicated more than sufficient production capacity to meet initial gas demand of 8 MMscf/d.

o  The Upper Logbaba A - C sands will be perforated and added to the completion interval when required for production.

22

Elf La-103 Flow Test Results

1,780 to 1,789m 4.75 MMcf/d

2,019 to 2,038m 12.25 MMcf/d

2,051 to 2,063m 9.1 MMcf/d

2,364 to 2,378m 12.25 MMcf/d

La-105 Targets

Page 23: Result of General Meeting - May 2010

23

Logbaba: Well La-106 o  La-106 was drilled from

La-104 pad

o  Well spudded on schedule early February 2010 and reached a measured total depth of 10509 feet

o  Drilled deeper than originally planned because of presence of sands to 10400 feet.

Page 24: Result of General Meeting - May 2010

Pipeline Route and peripheral Customer Sites

24

Wells 105+106 and processing facility

Approx 85% of industrial market within 10km

Packindustry & CCIC

SABC Brewery

Page 25: Result of General Meeting - May 2010

o  VOG will install and commission its own processing facility and pipeline

o  Processing: o  Phase 1 will be a basic separation and dehydration process to

produce sales gas and liquids

o  Phase 2 will add processing capability to extract additional Natural Gas Liquids (NGL)

o  Pipeline

o  A c.10km high-pressure gas pipeline will be laid underground to the industrial customers

o  The initial section will only access the nearest customers to the well-site, but this covers about 85% of the market

25

Processing & Pipeline Strategy

Raw gas Separation & Dehydration Process

Sales gas

Liquids

Page 26: Result of General Meeting - May 2010

Logbaba Elf Cross-section

26

Page 27: Result of General Meeting - May 2010

27

RPS Independent Valuation

  RPS Energy undertook an evaluation of the Logbaba field in July 2008

  65Bcf of 2P reserves with an NPV10 valuation of $169MM

  The evaluation only encompassed a small section of the total 64km2 licence area

RSP Energy Competent Person’s Report Net Attributable Reserves and Resources

1P 2P 3P Total Liquids MMbbl 0.28 2.35 4.51

Natural Gas Bcf 7.92 64.53 123.91

Total MMboe 1.71 13.97 26.81

NPV valuation at 10% $MM 18.17 168.65 412.16

RPS review area (~6km2)

Source: RPS Energy

Page 28: Result of General Meeting - May 2010

28

Social Responsibility

o  VOG, through its local entity Rodeo Development Ltd (RDL), has strived to be an excellent corporate citizen:

o  During rig mobilisation, 300 local people were employed

o  RDL currently employs about 100 people on the rig (roustabouts, medics, safety officers, guards etc)

o  VOG has also invested in the local infrastructure with the local council

o  Local community members have seized on business opportunities created by RDL

Page 29: Result of General Meeting - May 2010

29

Abbreviations Bnboe Billion barrels of oil equivalent

MMboe Million barrels of oil equivalent

MMbbl Million barrels of oil

bbl/d Barrels per day

mcf Thousand cubic feet of natural gas

mcf/d Thousand cubic feet per day

MMcf/d Million standard cubic feet of gas per day

Bcf Billion cubic feet of natural gas

Tcf Trillion cubic feet of natural gas

$MM Million US$

$Bn Billion US$

km2 Square kilometres

m Metres

MMBtu Million British thermal units

MW Megawatts

tpa Tonnes per annum

CFA Central African Franc

Page 30: Result of General Meeting - May 2010