Reservoir Purge Valve (RPV) Installation Instructions L31281 Rev. 8/17 DESCRIPTION: The Reservoir Purge Valve (RPV) is used with the vehicle’s pneumatic system to drain condensates from an air reservoir. The draining occurs when the vehicle is parked, and the supply air pressure is released to atmosphere. INSTALLATION PRIOR TO WORKING ON THE VEHICLE, BLOCK WHEELS AND DRAIN THE AIR PRESSURE FROM THE RESERVOIR. NPT FITTINGS: Liquid sealant is preferred over tape to decrease the risk of contamination. Tighten NPT fittings using the turns from finger tight (T.F.F.T.) method, typically 2 – 3 turns. Weight ...................................................... 0.5 lbs Opening Pressure, min ........................... 105 PSI Port Connections ............................... See Above Ambient Temperature ................ -40°F to 180°F Envelope Dimensions, inch ..........3.5 x 3.1 x 2.0 Closing Pressure, X ....................... 75< X <95 PSI Max. Working Pressure .......................... 150 PSI Finish ............................................. E-Coat, Black SPECIFICATIONS Reservoir Purge Valve Features Reservoir Purge Valve Orientation Options PLUMBING DIAGRAM Port 1 - Reservoir 3/8”-18 NPTF 5/16” Hex Wrench Port 3 - Exhaust 3/8”-18 NPTF Port 4 - Supply 3/8”-18 NPTF 1. Install fittings into the RPV: A. Port 1 - Reservoir: 3/8” - 18 NPT x 3/8” Tube Elbow B. Port 3 - Exhaust: 3/8” -18 NPT x 3/8” Tube C. Port 4 - Supply: 3/8”- 18 NPT x 3/8” Tube or 1/2” Tube 2. Position the valve on the vehicle with sufficient space to facilitate service and ~ 6” above the bottom of the reservoir. Orient the valve with exhaust port downward or horizontal. Mount the valve to a rigid structure using two ¼” bolts, washers and nuts. 3. Remove the manual drain valve from the reservoir and install a branch tee. Install a 3/8” tube fitting and the manual drain valve into the branch tee. 4. Connect 3/8” tubing between the branch tee and the valve Port 1 - Reservoir. 5. Cut the existing 3/8” or 1/2” Emergency/Supply line tubing and insert the corresponding size tube tee fitting. 6. Connect 3/8” or 1/2” tubing from the open port of the Emergency/ Supply line tee to the valve Port 4 - Supply. 7. Connect a short [~ 6”] piece of 3/8” tubing to the valve Port 3 - Exhaust. 8. Start engine or apply shop air to the Emergency/Supply line to build system pressure in reservoir to 120 PSI. Check for leaks. Perform Test Operation. TEST OPERATION Set parking brakes or remove shop air from the Emergency/Supply line. Release of the Emergency/Supply line air pressure will allow the RPV to expel condensates and contaminants from reservoir until the pressure depletes to 75 - 95 PSI. Retrofit Kit P/N 42123048 Installation Instructions shown on Reverse Side. Mounting Bracket 2X O.27” Holes, 2” Center Serviceable Filter & O-Ring (Kit #48100200) 4 3 1 1 3 4 4 3 1 4 3 1 Trailer Emergency/ Supply – 3/ 8” or 1/ 2’’ Tubing 3/ 8” Tubing Manual Drain Valve Reservoir RESERVOIR (IN) PORT [1] EXHAUST PORT [3] MOUNT VALVE6” ABOVETHE RESERVOIRBOTTOM DRAIN IS RECOMMENDED Siphon Drain [IF APPLICABLE] SUPPLY (CONTROL) PORT [4] 3/ 8”or 1/ 2’’ Tubing

Upload: dangnhu

Post on 11-Apr-2018

235 views

Category:

Documents


1 download

TRANSCRIPT

Reservoir Purge Valve (RPV)Installation Instructions

L31281Rev. 8/17

DESCRIPTION: The Reservoir Purge Valve (RPV) is used with the vehicle’s pneumatic system to drain condensates from an air reservoir. The draining occurs when the vehicle is parked, and the supply air pressure is released to atmosphere.

INSTALLATIONPRIOR TO WORKING ON THE VEHICLE, BLOCK WHEELS AND DRAIN THE AIR PRESSURE FROM THE RESERVOIR.NPT FITTINGS: Liquid sealant is preferred over tape to decrease the risk of contamination. Tighten NPT fittings using the turns from finger tight (T.F.F.T.) method, typically 2 – 3 turns.

Weight ......................................................0.5 lbsOpening Pressure, min ........................... 105 PSIPort Connections ...............................See AboveAmbient Temperature ................ -40°F to 180°F

Envelope Dimensions, inch ..........3.5 x 3.1 x 2.0Closing Pressure, X .......................75< X <95 PSIMax. Working Pressure .......................... 150 PSIFinish ............................................. E-Coat, Black

SPECIFICATIONS

Reservoir Purge Valve Features Reservoir Purge Valve Orientation Options

PLUMBING DIAGRAM

Port 1 - Reservoir3/8”-18 NPTF

5/16” Hex Wrench

Port 3 - Exhaust3/8”-18 NPTF

Port 4 - Supply3/8”-18 NPTF

1. Install fittings into the RPV: A. Port 1 - Reservoir: 3/8” - 18 NPT x 3/8” Tube Elbow B. Port 3 - Exhaust: 3/8” -18 NPT x 3/8” Tube C. Port 4 - Supply: 3/8”- 18 NPT x 3/8” Tube or 1/2” Tube

2. Position the valve on the vehicle with sufficient space to facilitate service and ~ 6” above the bottom of the reservoir. Orient the valve with exhaust port downward or horizontal. Mount the valve to a rigid structure using two ¼” bolts, washers and nuts.

3. Remove the manual drain valve from the reservoir and install a branch tee. Install a 3/8” tube fitting and the manual drain valve into the branch tee.

4. Connect 3/8” tubing between the branch tee and the valve Port 1 - Reservoir.

5. Cut the existing 3/8” or 1/2” Emergency/Supply line tubing and insert the corresponding size tube tee fitting.

6. Connect 3/8” or 1/2” tubing from the open port of the Emergency/ Supply line tee to the valve Port 4 - Supply.

7. Connect a short [~ 6”] piece of 3/8” tubing to the valve Port 3 - Exhaust.

8. Start engine or apply shop air to the Emergency/Supply line to build system pressure in reservoir to 120 PSI. Check for leaks. Perform Test Operation.

TEST OPERATIONSet parking brakes or remove shop air from the Emergency/Supply line. Release of the Emergency/Supply line air pressure will allow the RPV to expel condensates and contaminants from reservoir until the pressure depletes to 75 - 95 PSI.

Retrofit Kit P/N 42123048 Installation Instructions shown on Reverse Side.

Mounting Bracket2X O.27” Holes, 2” Center

Serviceable Filter & O-Ring(Kit #48100200)

4

3

1

1

3

4

4

3

1

4

3

1

Trailer Emergency/ Supply – 3/ 8” or 1/ 2’’ Tubing

3/ 8” Tubing

Manual Drain Valve

Reservoir

RESERVOIR (IN)

PORT [1]

EXHAUST PORT [3]

MOUNT VALVE 6” ABOVE THE RESERVOIR BOTTOM DRAIN IS

RECOMMENDED

Siphon Drain [IF APPLICABLE] SUPPLY

(CONTROL)PORT [4]

3/ 8”or 1/ 2’’ Tubing

Reservoir Purge Valve (RPV)Retrofit Kit P/N 42123048 Installation Instructions

L31281Rev. 8/17

Item Description Qty.

1 WASHER, 3/8” PLAIN 2

2 SCREW, 3/8”-16 X 1.25” 2

3 WASHER, 3/8” LOCK 2

4 PANEL 1

5 BRACKET, TOP 1

6 1/4” NPT ELBOW 1

7 1/4” BRANCH TEE 1

8 1/4” NPT X 3/8” PTC 1

9 3/8” NPT X 3/8” PTC ELBOW

1

Item Description Qty.

10 VALVE, RESERVOIR PURGE 1

11 SCREW, 1/4” - 20 X 1.25” 2

12 3/8” NPT X 3/8” PTC 2

13 WASHER, FLAT 1/4” 4

14 3/8” NPT X 1/2” PTC 1

15 1/2” TEE PTC 1

16 3/8” TEE PTC 1

17 NUT, HEX LOCK 1/4”-20 2

1. Install fittings into the RPV [Item 10]: A. Port 1 - Reservoir [Item 9] B. Port 3 - Exhaust [Item 12] C. Port 4 - Supply [Item 12 OR Item 14]

2. Mount the RPV [Item 10] to the Panel [Item 4] using Items 11, 13 and 17. Tighten the 1/4” screws to 100-120 in-lbs.

3. Clamp the Panel/RPV Assembly to the trailer rail, close to the reservoir, using Top Bracket [Item 5] with Items 1, 2 and 3. Tighten the 3/8” screws to 27-35 ft-lbs.

4. Remove the manual drain valve from the reservoir: A. Bottom Port Manual Drain Valve - Install Branch Tee [Item 7] into the reservoir. Install PTC [Item 8] and the manual drain valve into the Branch Tee [Item 7]. B. Upper Port (Siphon) Manual Drain Valve - Install 1/4” Elbow [Item 6]. Install 1/4” Branch Tee [Item 7] into the 1/4” Elbow [Item 6]. Install PTC [Item 8] and manual drain valve into the 1/4” Branch Tee [Item 7]. Connect 3/7” tubing between PTC [Item 8] in the 1/4” Branch Tee [Item 7] to PTC Elbow [Item 9] in Port 1 [Reservoir IN] of the RPV [Item 10].

5. Cut the existing 3/8” or 1/2” Emergency/Supply line tubing and insert the appropriate sized PTC Tee - 1/2” [Item 15] or 3/8” [Item 16].

6. Connect 1/2” or 3/8” tubing from the open port of the Emegency/ Supply line PTC Tee to 1/2” PTC [Item 14] or 3/8” PTC [Item 12] in Port 4 [Control] of the RPV.

7. Connect 3/8” x 6” tubing to PTC [Item 12] in Port 3 [Exhaust] of the RPV.

8. Start engine or apply shop air to the Emergency/Supply line to build system pressure in reservoir to 120 PSI. Check for leaks.

TEST OPERATIONSet parking brakes or remove shop air from the Emergency/Supply line. Release of the Emergency/Supply line air pressure will allow the RPV to expel condensates and contaminants from reservoir until the pressure depletes to 75 - 95 PSI.

TRAILER RAIL INSTALLATION

PERIODIC MAINTENANCE: Check RPV filter approximately every three (3) monhs or when the air flow is significantly reduced. Use a 5/16” hex wrench to remove the filter. The filter can be cleaned or replaced using Kit P/N 48100200.

RETROFIT KIT P/N 42123048 CONTENTS

17

21 3

16

15 14

13

12

11

10

9

8

7

6

5

4

6

16

1514

13

12

11

10

7894

12

17

16

15

12

14

13

4

11

12

10

8 7

6

9

DOLLY HOSE

HANGER INSTALLATION

DOLLY BRAKE

CONTROL VALVE

INSTALLATION

L312

81 M

EX R

ev. 8

/17

1.5

M A

LPPr

inte

d In

Th

e U

SA