bushman rpv pres2

18
The Water Forum Way PLANNING WITH COMPLEXITY | CH. 3 PT. 1 Judith E. Innes, David E. Booher | CMP 6240

Upload: tracey-bushman

Post on 26-Jan-2017

128 views

Category:

Environment


0 download

TRANSCRIPT

Page 1: Bushman rpv pres2

The Water Forum Way

P L A N N I N G W I T H C O M P L E X I T Y | C H . 3 P T. 1

Judith E. Innes, David E. Booher | CMP 6240

Page 2: Bushman rpv pres2

Case Studies in Collaborative Rationality

Indepth, interpretive inquiry (I&B, p. 41) Like Flyvbjerg’s phronesis without the narratology Black box metaphor: how collaborative processes

operate Verification of authenticity during and after the

process

R E V I E W O F D I A D I N P RA C T I C E

Verifying DIAD as a model1. Context2. How they started3. Structure and process4. First order results5. Implementation strategy6. Second and third order

effects (adaptations)

Page 3: Bushman rpv pres2

O B J E C T I V E S O F T H E S W FSeven Elements

Divert more surface water Reduce diversion impacts in drier years Improve the pattern of fishery flow releases Habitat management Water conservation Groundwater management Successor Effort

Page 4: Bushman rpv pres2

Sacramento Water ForumC O N T E X T

Flooding / Erosion Increased water

demand Historic dam conflict Sacramento County

parks

Page 5: Bushman rpv pres2

C O N T E X TThe Water Forum WayDIAD DiversityInterdependent interestsAuthenticDialogue

DIAD+ (SWF)DiversityInterdependent interestsAuthenticDialogue$CatalystFlexibilityPolitical PowerPatience

Page 6: Bushman rpv pres2

C O N T E X TThe Water Forum WayDIAD DiversityInterdependent interestsAuthenticDialogue

DIAD+ (SWF)DiversityInterdependent interestsAuthenticDialogue$CatalystFlexibilityPolitical PowerPatience

Page 7: Bushman rpv pres2

A C O L L A B O RAT I V E P R O C E S S I N S P I R I N G A D O P T E R SThe Water Forum WayDIAD DiversityInterdependent interestsAuthenticDialogue

DIAD+ (SWF)DiversityInterdependent interestsAuthenticDialogue$CatalystFlexibilityPolitical PowerPatience

Elected Expertise from: Water interests Development/

business Environment Public

Indirect involvement: EBMUD Bureau of

Reclamation

Page 8: Bushman rpv pres2

A C O L L A B O RAT I V E P R O C E S S I N S P I R I N G A D O P T E R SThe Water Forum WayDIAD DiversityInterdependent interestsAuthenticDialogue

Caucuses: Surface water Ground water Demand

conservation Habitat management

DIAD+ (SWF)DiversityInterdependent interestsAuthenticDialogue$CatalystFlexibilityPolitical PowerPatience

Page 9: Bushman rpv pres2

A C O L L A B O RAT I V E P R O C E S S I N S P I R I N G A D O P T E R SThe Water Forum WayDIAD DiversityInterdependent interestsAuthenticDialogue

Awareness of biases Disclosure Transparency

DIAD+ (SWF)DiversityInterdependent interestsAuthenticDialogue$CatalystFlexibilityPolitical PowerPatience

Page 10: Bushman rpv pres2

A C O L L A B O RAT I V E P R O C E S S I N S P I R I N G A D O P T E R SThe Water Forum WayDIAD DiversityInterdependent interestsAuthenticDialogue

Leadership: Susan Sherry, California Center for Public Dispute Resolution

Ongoing negotiation training

Scenarios

DIAD+ (SWF)DiversityInterdependent interestsAuthenticDialogue$CatalystFlexibilityPolitical PowerPatience

Page 11: Bushman rpv pres2

A C O L L A B O RAT I V E P R O C E S S I N S P I R I N G A D O P T E R SThe Water Forum WayDIAD DiversityInterdependent interestsAuthenticDialogue

HelpsDIAD+ (SWF)DiversityInterdependent interestsAuthenticDialogue$CatalystFlexibilityPolitical PowerPatience

Page 12: Bushman rpv pres2

A C O L L A B O RAT I V E P R O C E S S I N S P I R I N G A D O P T E R SThe Water Forum WayDIAD DiversityInterdependent interestsAuthenticDialogue

Lawsuit 20 years in the making Ruling in favor of

ecological management

Time is right for opening the discussion on water management

DIAD+ (SWF)DiversityInterdependent interestsAuthenticDialogue$CatalystFlexibilityPolitical PowerPatience

Page 13: Bushman rpv pres2

A C O L L A B O RAT I V E P R O C E S S I N S P I R I N G A D O P T E R SThe Water Forum WayDIAD DiversityInterdependent interestsAuthenticDialogue

Succession Feedback-looping

DIAD+ (SWF)DiversityInterdependent interestsAuthenticDialogue$CatalystFlexibilityPolitical PowerPatience

Page 14: Bushman rpv pres2

A C O L L A B O RAT I V E P R O C E S S I N S P I R I N G A D O P T E R SThe Water Forum WayDIAD DiversityInterdependent interestsAuthenticDialogue

Sacramento County Environmental

groups

DIAD+ (SWF)DiversityInterdependent interestsAuthenticDialogue$CatalystFlexibilityPolitical PowerPatience

Page 15: Bushman rpv pres2

A C O L L A B O RAT I V E P R O C E S S I N S P I R I N G A D O P T E R SThe Water Forum WayDIAD DiversityInterdependent interestsAuthenticDialogue

UnverifiableDIAD+ (SWF)DiversityInterdependent interestsAuthenticDialogue$CatalystFlexibilityPolitical PowerPatience

Page 16: Bushman rpv pres2

E X PA N D E D S P H E R E S O F I N F LU E N C E F O R PA RT I C I PA N T SBATNA Change

Page 17: Bushman rpv pres2

I M P L E M E N TAT I O N A N D R E S U LT SConcurrent Adaptation

Implementation

MOU / EIR

Concurrent by agreement

Successor Effort

Results I

Flexible agreement

Innovative feedback

Spin-off river agreements

Results II

System adaptation

Successor Effort

Spin-off Transportation and Air Quality agreements

Page 18: Bushman rpv pres2

Q U E S T I O N SDiscussion

What role does a political climate like California’s play in this process?

Were there any ‘losers’ in this process?

Which of the mentioned advantages worked most in favor of the process?