replacing a 2 ’ long pipe component with a flange pair preceded with a pipe

5
Replacing a 2’ long Pipe Component with a Flange Pair preceded with a Pipe 1 TRIFLEX® WINDOWS PipingSolutions, Inc. 12 June 2004

Upload: reuel

Post on 25-Feb-2016

41 views

Category:

Documents


0 download

DESCRIPTION

1. Replacing a 2 ’ long Pipe Component with a Flange Pair preceded with a Pipe. TRIFLEX ® WINDOWS PipingSolutions, Inc. 12 June 2004. 2. Existing Pipe Components. TRIFLEX ® WINDOWS PipingSolutions, Inc. 12 June 2004. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Replacing a 2 ’  long Pipe Component with a Flange Pair preceded with a Pipe

Replacing a 2’ long Pipe Component with a Flange Pair preceded with a Pipe

1

TRIFLEX® WINDOWS PipingSolutions, Inc. 12 June 2004

Page 2: Replacing a 2 ’  long Pipe Component with a Flange Pair preceded with a Pipe

Existing Pipe Components

Objective is to replace the 2’ section of pipe from data point 10 to 15 with a flange pair with a preceding run of pipe that fills the 2’ long gap.

2

TRIFLEX® WINDOWS PipingSolutions, Inc. 12 June 2004

Page 3: Replacing a 2 ’  long Pipe Component with a Flange Pair preceded with a Pipe

Existing Piping Components

TRIFLEX® WINDOWS PipingSolutions, Inc. 12 June 2004

3

Page 4: Replacing a 2 ’  long Pipe Component with a Flange Pair preceded with a Pipe

TRIFLEX® WINDOWS PipingSolutions, Inc. 12 June 2004

4

Page 5: Replacing a 2 ’  long Pipe Component with a Flange Pair preceded with a Pipe

Edited Pipe Components5

TRIFLEX® WINDOWS PipingSolutions, Inc. 12 June 2004