  • 7/31/2019 Repetitive Manufacturing Cycle

    1/20

    Repetitive Manufacturing Cycle

    1. Create REM Profile using SPRO

    SPROProductionRep ManufacturingControl Data Create REM Profile Using Wizard.

  • 7/31/2019 Repetitive Manufacturing Cycle

    2/20

  • 7/31/2019 Repetitive Manufacturing Cycle

    3/20

  • 7/31/2019 Repetitive Manufacturing Cycle

    4/20

  • 7/31/2019 Repetitive Manufacturing Cycle

    5/20

  • 7/31/2019 Repetitive Manufacturing Cycle

    6/20

  • 7/31/2019 Repetitive Manufacturing Cycle

    7/20

  • 7/31/2019 Repetitive Manufacturing Cycle

    8/20

    Repetitive Manufacturing Cycle

    ...Previous

    http://www.sapfunctional.com/PP/REM/page1.htmhttp://www.sapfunctional.com/PP/REM/page1.htmhttp://www.sapfunctional.com/PP/REM/page1.htm
  • 7/31/2019 Repetitive Manufacturing Cycle

    9/20

    Save the profile and exit from SPRO.

  • 7/31/2019 Repetitive Manufacturing Cycle

    10/20

    1. Create Material Master with Fert and ROH as usual.

    2. Create BOM as Usual.

    3. Create Production Line with Capacity Category as : 0007 (i.e normal work center)

    4. Create Rate Routing for Fert Material using TC: CA21

    5. Go to Change Material Master (Fert Material ) and Attach REM Profile, Mark tick indicator for REMManufacturing. In MRP-4 View.

    6. Create Production Version for this Fert material.

    Select BOM, Select Rate Routing with No.

    Defn: REM Profile

    Repetitive manufacturing profile

    Controls, via order type, whether you are working with make-to-order repetitive manufacturing, basedon sales orders, or with make-to-stock repetitive manufacturing, based on no specific orders.

    Use

    The repetitive manufacturing profile also determines;

    How the system deals with activities when back flushing

    Which movement type is used to post goods receipts and goods issues

    How planned order and run schedule quantities are reduced in the

    Back flush transaction

    How BOM corrections are made - if errors should occur when postingQuantities to be back flushed

    Dependencies

    Repetitive manufacturing profiles are defined in Customizing for Repetitive Manufacturing.

    Material Screen Shot:

  • 7/31/2019 Repetitive Manufacturing Cycle

    11/20

    Click on Production Version:

    Enter the Prodn Ver No., Validity Period.

  • 7/31/2019 Repetitive Manufacturing Cycle

    12/20

    Double Click Selected line.

    Enter The Necessary Data as in Item no.6.

    Click on Check button to check the entries:

  • 7/31/2019 Repetitive Manufacturing Cycle

    13/20

    Green light should glow (if there is any inconsistency found then it glows with red color).

    Save The Material Master and Exit.

    Step No: 3

    Create Independent Requirements TC: MD61

    Step No:4

    Run MRP TC: MD02

    Step No: 5

    Go to Planning Table TC: MF50 and assign the quantities to production line.

  • 7/31/2019 Repetitive Manufacturing Cycle

    14/20

    Repetitive Manufacturing Cycle

    ...Previous

    http://www.sapfunctional.com/PP/REM/page2.htmhttp://www.sapfunctional.com/PP/REM/page2.htmhttp://www.sapfunctional.com/PP/REM/page2.htm
  • 7/31/2019 Repetitive Manufacturing Cycle

    15/20

  • 7/31/2019 Repetitive Manufacturing Cycle

    16/20

    Run Schedule Quantities are assigned and go to MD04 all planned order are converted to RS Qty.

  • 7/31/2019 Repetitive Manufacturing Cycle

    17/20

    Step No 6:

    Create Product Cost Collector for Fert Material: TC: KKF6N

    Click on Create icon

  • 7/31/2019 Repetitive Manufacturing Cycle

    18/20

    Note: Maintain Division in Accounting View 1 for Fert Material which as linkage between business areaand division, Valuation area.

  • 7/31/2019 Repetitive Manufacturing Cycle

    19/20

    Step 7:

    Do the Back flush Using TC: MFBF

  • 7/31/2019 Repetitive Manufacturing Cycle

    20/20

    Enter and save the file.