- UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV "611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-8064 June 13, 2001 Garry L. Randolph, Senior Vice President and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, Missouri 65251 Dear Mr. Randolph: This refers to the Regulatory Performance Meeting conducted in Callaway Plant Emergency Operations Facility on June 7, 2001. This meeting was conducted to discuss corrective actions associated with a violation and three related, white findings involving failures to maintain radiation doses as low as reasonably achievable. The presentation included information concerning self-assessment results, corrective actions, and measures of effectiveness. The attendance list and presentation are enclosed with this summary (Enclosures 1 and 2). In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosures will be available electronically for public inspection jn the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc/qov/NRC/ADAMS/index.html (the Public Reading Room). Should you have any questions concerning this matter, we will be pleased to discuss them with you. Sincerely, Gail M. Good, Chief Plant Support Branch Division of Reactor Safety Docket No.: 50-483 License No.: NPF-30 Enclosures: 1. Attendance List 2. Licensee Presentation

Upload: others

Post on 28-Jun-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: REGION IV 611 RYAN PLAZA DRIVE, SUITE · -UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV "611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-8064 June 13, 2001 Garry L

- UNITED STATES

NUCLEAR REGULATORY COMMISSION REGION IV

"611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-8064

June 13, 2001

Garry L. Randolph, Senior Vice President and Chief Nuclear Officer

Union Electric Company P.O. Box 620 Fulton, Missouri 65251

Dear Mr. Randolph:

This refers to the Regulatory Performance Meeting conducted in Callaway Plant Emergency Operations Facility on June 7, 2001. This meeting was conducted to discuss corrective actions associated with a violation and three related, white findings involving failures to maintain radiation doses as low as reasonably achievable.

The presentation included information concerning self-assessment results, corrective actions, and measures of effectiveness. The attendance list and presentation are enclosed with this summary (Enclosures 1 and 2).

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosures will be available electronically for public inspection jn the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc/qov/NRC/ADAMS/index.html (the Public Reading Room).

Should you have any questions concerning this matter, we will be pleased to discuss them with you.

Sincerely,

Gail M. Good, Chief Plant Support Branch Division of Reactor Safety

Docket No.: 50-483 License No.: NPF-30

Enclosures: 1. Attendance List 2. Licensee Presentation

Page 2: REGION IV 611 RYAN PLAZA DRIVE, SUITE · -UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV "611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-8064 June 13, 2001 Garry L

Union Electric Company

cc w/enclosures: Professional Nuclear Consulting, Inc. 19041 Raines Drive Derwood, Maryland 20855

John O'Neill, Esq. Shaw, Pittman, Potts & Trowbridge 2300 N. Street, N.W. Washington, D.C. 20037

Mark A. Reidmeyer, Regional Regulatory Affairs Supervisor

Quality Assurance Union Electric Company P.O. Box 620 Fulton, Missouri 65251

Manager - Electric Department Missouri Public Service Commission 301 W. High P.O. Box 360 Jefferson City, Missouri 65102

Ronald A. Kucera, Director of Intergovernmental Cooperation

P.O. Box 176 Jefferson City, Missouri 65102

Otto L. Maynard, President and Chief Executive Officer

Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, Kansas 66839

Dan I. Bolef, President Kay Drey, Representative Board of Directors Coalition

for the Environment 6267 Delmar Boulevard University City, Missouri 63130

Lee Fritz, Presiding Commissioner Callaway County Court House 10 East Fifth Street Fulton, Missouri 65151

-2-

Page 3: REGION IV 611 RYAN PLAZA DRIVE, SUITE · -UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV "611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-8064 June 13, 2001 Garry L

Union Electric Company

Alan C. Passwater, Manager Licensing and Fuels AmerenUE One Ameren Plaza 1901 Chouteau Avenue P.O. Box 66149 St. Louis, Missouri 63166-6149

J. V. Laux, Manager Quality Assurance Union Electric Company P.O. Box 620 Fulton, Missouri 65251

Jerry Uhlmann, Director State Emergency Management Agency P.O. Box 116 Jefferson City, Missouri 65101

-3-

Page 4: REGION IV 611 RYAN PLAZA DRIVE, SUITE · -UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV "611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-8064 June 13, 2001 Garry L

Union Electric Company

Electronic distribution from ADAMS by RIV: ADAMS distribution code (IE45) Regional Administrator (EWMvI) DRP Director (KEB) DRS Director (ATH) DRS, Branch Chief, Plant Support Branch (GMG) DRS, Health Physicist Inspector (LTR) Senior Resident Inspector (VGG) Branch Chief, DRP/B (WDJ) Senior Project Engineer, DRP/B (RAK1) Branch Chief, DRP/TSS (PHH) RITS Coordinator (NBH)

DOCUMENT NAME: R:\_CW\CW6-07-O1MS-PSB.WPD [RIV:PSB G:DRS\PSB LTRifkes__:nh__ _ _

SI 1 /01OFFICIAL RECORD COPY I=lelephone I==-mail I-=l-ax

ADAMS # Template =77 0', Date o QC'd by -

-4-

Page 5: REGION IV 611 RYAN PLAZA DRIVE, SUITE · -UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV "611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-8064 June 13, 2001 Garry L

ENCLOSURE 1

MANAGEMENT MEETING ATTENDANCE

LICENSEE/FACILITY Union Electric/Callaway Plant

DATE/TIME June 7, 2001/10:00 a.m.

CONFERENCE LOCATION Callaway Plant Emergency Operations Facility

NAME (PLEASE PRINT) 1 ORGANIZATION TITLE

1-- i•, A-; -IN( \,{ 6,pH •,-)r,-,, (,R/ZES--,-t

(7.a _. - _, -___d\ I.,,- C"I v_ <,.

Onap ('_tCai ( Cie h Pa/ er

(~In-~tA,f 4J.gbe--rek 717" 1&.J W6 0

kL"I, gM/ 4e&A U6 d~&

Y~v )'r"ee. LO -, c6- 3ý-j

U'

Page 1 of 3

4

I

I

Page 6: REGION IV 611 RYAN PLAZA DRIVE, SUITE · -UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV "611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-8064 June 13, 2001 Garry L

MANAGEMENT MEETING ATTENDANCE

LICENSEE/FACILITY Union Electri c/CallIaway Plant

DATE/TIME June 7, 2001/1 0:00 a.m.

CONFERENCE LOCATION Callaway Plant Emergency Operations Facility

[NAME (PLEASE PRINT)) ORGANIZATION JTITLE 'ZI 46(e4.' &- 6fal

a~ &f a&~v ___ __ ___ __ c--jo IAYc 41we

ý4L~6 P472f 4A;

/%~~d~Y-% ?cTf 're/V5d;oii~~~~

Ob_ _ _ __ _ _ _ 05_________ c-z '~k&La v~ G:-YV M -,

)or\ f e p c Am er (__e__________"(

~aclcs _ ___ ____ ___ _ __ ___ ____ ___

7AJAW C-1/~v C~7A/fJ ~~

T)~n~aP v'Žs' vz'ev7(2LL$u-V -A.) Lk~~ev P? ____ ___ ___ 5c&1p~ v L

___ __ __ __ 2mýe ( AIZlTS~

A4kfe~ __ __ __ __ _ e_____________

7~~~~~T wýj7 __________________

Page 2 of 3

Page 7: REGION IV 611 RYAN PLAZA DRIVE, SUITE · -UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV "611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-8064 June 13, 2001 Garry L

MANAGEMENT MEETING ATTENDANCE

LICENSEE/FACILITY Union Electric/Callaway Plant

DATE/TIME June 7,2001/10:00 a.m.

CONFERENCE LOCATION Callaway Plant Emergency Operations Facility

NAME (PLEASE PRINT) ORGANIZATION I TITLE

/v ii? oA,/ 7-1/o SOa' v4,e Ric)&- t //~L 7 ______________&-,,t~a q

N4 eost-T1.6u,ýýýc -B,00-7r-rj f Ies-~

______ .1 ______ I ______

4

I 1-

4 4-

4.

-4 4

4 4

1 1-

4 4-

4. *

.4 4

Page 3 of 3

Page 8: REGION IV 611 RYAN PLAZA DRIVE, SUITE · -UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV "611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-8064 June 13, 2001 Garry L

ENCLOSURE 2

Callaway Plant AmerenUE

NRC Public Meeting

June 7, 2001

AlmerenUE

Page 9: REGION IV 611 RYAN PLAZA DRIVE, SUITE · -UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV "611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-8064 June 13, 2001 Garry L

Agenda "• Opening Remarks.

"* Dose Performance Self Assessment

"* Self Assessment Results

"* Corrective Actions - Corrective Actions to Address NRC Findings

- Corrective Actions For Root Causes

- Remaining Corrective Actions

"• Measures of Effectiveness

"• Closing Remarks "m2E

Page 10: REGION IV 611 RYAN PLAZA DRIVE, SUITE · -UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV "611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-8064 June 13, 2001 Garry L

0pening Remarks R. D. Affolter, VP Nuclear Operations

"• Refuel 10 As Low As Reasonably Achievable (ALARA) Performance Issues Recognized

"* Performance Concern Addressed in Corrective Action Program

"• Scope and Causes Assessed

"* Strategic Initiative to Improve Performance "* Actions Effective - Performance has improved

4" 3 •AmerenUE

Page 11: REGION IV 611 RYAN PLAZA DRIVE, SUITE · -UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV "611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-8064 June 13, 2001 Garry L

Dose Performance Self Assessment

Performance Concerns Recotnized Durin Refuel 10: - ALARA Program Work In Progress Reviews

- Review by Management Oversight Committee

- Corrective Action Documents Initiated - Requested Institute of Nuclear Power Operations

(INPO) to assist with performance assessment

• 4 •-AmerenUE

Page 12: REGION IV 611 RYAN PLAZA DRIVE, SUITE · -UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV "611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-8064 June 13, 2001 Garry L

Dose Performance Self Assessment

Self-Assessment Methods: - Performed ALARA Post Job Review Procedures

- Conducted INPO Assistance Team Assessment

- Chartered scaffold optimization team to investigate outage scaffold dose

- Performed a self assessment with industry peer evaluators

- Assigned issue highest priority and performed a structured, systematic Root Cause Analysis

ImernOUE

Page 13: REGION IV 611 RYAN PLAZA DRIVE, SUITE · -UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV "611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-8064 June 13, 2001 Garry L

Self Assessment Results

Internal and Peer Assessments Identified Improvement Opportunities in these areas: - ALARA Culture and Accountability

- Plant ALARA Review Committee

- Source Term Reduction

- Dose Reduction Initiatives and Plans

- Promotion and Communication of ALARA

- Planning and Scheduling for ALARA

- ALARA Program and Procedures

4ýmerenlUE

Page 14: REGION IV 611 RYAN PLAZA DRIVE, SUITE · -UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV "611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-8064 June 13, 2001 Garry L

Self Assessment Results

Root Cause Analysis identified the extent of condition in 4 key areas:

Management systems

Work direction

Procedure improvement opportunities

Training improvement opportunities

4"UE7 •AmuemnUE

Page 15: REGION IV 611 RYAN PLAZA DRIVE, SUITE · -UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV "611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-8064 June 13, 2001 Garry L

Corrective Actions R. R. Roselius, Superintendent Health Physics

Corrective Actions Addressed:- NRC Findings - Self Assessment Findings

- Root Cause Analysis Findings

- Broad Scope Issues

4"AmwnU8

Page 16: REGION IV 611 RYAN PLAZA DRIVE, SUITE · -UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV "611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-8064 June 13, 2001 Garry L

Corrective Actions Taken to Address NRC Inspection Report No. 50-483/00-17 Findings

Activities were scheduled and sequenced to reduce personnel dose: - Review by the Plant ALARA Review Committee (PARC) - A 24-hour Bioshield entry delay - Activities restricted during midloop - Steam Generators remain filled until end of outage. - The Steam Generator primary work scheduled after RCS clean

up and reactor core off load. - Sludge lancing scheduled after most activities in the Bioshield

are complete.

"A 9

Page 17: REGION IV 611 RYAN PLAZA DRIVE, SUITE · -UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV "611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-8064 June 13, 2001 Garry L

Corrective Actions Taken to Address NRCInspection Report No. 50-483/00-17 Findings

Reactor coolant pump seal work performed when S/G secondary side was filled:

- RCP seal work scheduled and performed for optimum dose reduction.

- Outage scope growth was controlled. - Plant ALARA Review Committee review of emergent work.

•AuU 10

Page 18: REGION IV 611 RYAN PLAZA DRIVE, SUITE · -UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV "611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-8064 June 13, 2001 Garry L

Corrective Actions Taken to Address NRC Inspection Report No. 50-483/00-17 Findings Mockup training was conducted to familiarize the workers with plant equipment, use of tools and techniques to reduce dose: - S/G Vendor held accountable for more experienced workers. - S/G Vendor required to develop an ALARA Plan addressing

mockup training. - Vendor ALARA Plan addressed worker experience issues. - Mockup training was conducted, evaluated and documented for

S/G manway, nozzle dam and robotics activities. - Mock up training conducted for reactor head crew, RCP seal

crew and other activities.

•: 11 •-AmurenUE

Page 19: REGION IV 611 RYAN PLAZA DRIVE, SUITE · -UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV "611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-8064 June 13, 2001 Garry L

Corrective Actions Taken to Address NRC Inspection Report No. 50-483/00-17 Findings

Scaffoldin ownership work package review, schedulin2 and alternatives were improved: - A Scaffold Optimization Task Team was formed. - Each scaffold package received review by stake holders.

- Activity coordinators accountable for the scaffold dose.

- Alternatives to scaffolding were utilized.

- Scaffold activities not allowed in the Bioshield during high dose rate periods.

- Dedicated HP crew for scaffold coverage and review of scaffold permits.

Ur• 13 •AmerenUE

Page 20: REGION IV 611 RYAN PLAZA DRIVE, SUITE · -UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV "611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-8064 June 13, 2001 Garry L

Corrective Actions For Root Causes Mananement Systems: - Established Plant ALARA Review Committee - Increased line ownership for ALARA - Developed departmental and long range dose reduction initiatives. - Reviewed ALARA standards, policies and good practices.

Benchmarking teams sent to 4 low dose plants. - Established ALARA goals and performance incentives. - Implemented process that assures ALARA objectives are achieved.

Procedures revised to provide guidance for stopping work. - Promoted higher ALARA standards and expectations. - Communication of dose performance improved. - Increased participation in ALARA suggestion program.

4U 14 •AmerenUE

Page 21: REGION IV 611 RYAN PLAZA DRIVE, SUITE · -UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV "611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-8064 June 13, 2001 Garry L

Corrective Actions For Root Causes

Work Direction:- Improved job planning and pre-job walkdowns. - Improved guidance to work planners for incorporation of

ALARA. - Established expectations for ALARA in pre-job briefs. - Established criteria for PARC review of work scope changes.

- Instituted ALARA performance incentives.

- Activity coordinators accountable for ALARA.

154mrn lUE

Page 22: REGION IV 611 RYAN PLAZA DRIVE, SUITE · -UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV "611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-8064 June 13, 2001 Garry L

Corrective Actions For RootCauses

Procedure Improvement: - Procedures have revised to provide appropriate ALARA

guidance. - Plant ALARA Review Committee proceduralized. - Implemented lower thresholds for ALARAreviews.

- Instituted more rigorous ALARA reviews.

"4"AmUE16

Causes

Page 23: REGION IV 611 RYAN PLAZA DRIVE, SUITE · -UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV "611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-8064 June 13, 2001 Garry L

Corrective Actions For Root Causes

Trainin2: - Provided ALARA guidance to personnel responsible for

scheduling and coordinating radiological work. - Increased mockup training.

- Reinforced radiological work expectations with Safety Simulator.

- ALARA awareness campaign.

4"mrenUE17

Page 24: REGION IV 611 RYAN PLAZA DRIVE, SUITE · -UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV "611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-8064 June 13, 2001 Garry L

Remaining Corrective Actions

* Broad scope actions complete.

• Additional actions to enhance ALARA performance - A follow-up self assessment to evaluate effectiveness of

corrective actions

- Advanced training for work planners - Develop guidelines and acceptance criteria for mockup

training

- Improve ALARA planning in Work Control process

- Institutionalize actions that add value

18

Page 25: REGION IV 611 RYAN PLAZA DRIVE, SUITE · -UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV "611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-8064 June 13, 2001 Garry L

Measures of Effectiveness

Dose Performance -Normal Operations

-Refuel 11

19 • AmerenUE

Page 26: REGION IV 611 RYAN PLAZA DRIVE, SUITE · -UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV "611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-8064 June 13, 2001 Garry L

Cumulative Plant Dose Vs. 2001 Goal

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49 51

Week

Weekly Dose ';Weekly Dose Projection -- o- Cumulative Dose - Dc

500

450

400

E 350

300 E

250 0

>- 200

150

100

50

0

10000

9000

8000

7000

6000

5000

4000

3000

2000

1000

0

0

E

E

0J

w'AwerenUEse Goal

20

3se Goal I

Page 27: REGION IV 611 RYAN PLAZA DRIVE, SUITE · -UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV "611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-8064 June 13, 2001 Garry L

PRE OUTAGE DOSE COMPARISION

5000

4500

4000

3500

3000

2500

2000

1500

1000

500

0-

60 Days Pre-RFO9 ;60 Days Pre-RFO10 60 Days Pre-RFO11

21IAmerenuE

f * ________________________________ L J _______________________________ I ________

i

iý-

i--

f--

I

Page 28: REGION IV 611 RYAN PLAZA DRIVE, SUITE · -UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV "611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-8064 June 13, 2001 Garry L

Refuel 11 Dose Trend

180000

160000

140000

120000

E 100000

*- 80000

60000

40000

20000

0

--*-Acce

"'A moro -A1 r u1

V C) LO) 1- M) Cv) U) ~ M- 0 CO) U~ ' ) r C') LC) r- m) M ' U) m m V) of CO lot "t C% 'JN ' ' C)c

Day of Outage ptable Goal -u-Good Goal -u-Excellent Goal --0-Cumulative Exmosure

2222

Page 29: REGION IV 611 RYAN PLAZA DRIVE, SUITE · -UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV "611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-8064 June 13, 2001 Garry L

CALLAWAY PLANT REFUEL OUTAGE DOSE TRENDS

450,000

400,000

350,000

300,000

250,000

200,000

150,000

100,000

50,000

0

RF1 RF2 RF3 RF4 RF5 RF6 RF7 RF8 RF9 RFlo RF11

23WAmerOnUE

Page 30: REGION IV 611 RYAN PLAZA DRIVE, SUITE · -UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV "611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-8064 June 13, 2001 Garry L

Closing RemarksG. L. Randolph, Senior Vice President Nuclear

24 •'AmerenuE