railway transportation 1. mass rapid transit in bkk and region silpachai jarukasemrattana

10
Railway Transportation 1. Mass rapid transit in BKK and region Silpachai Jarukasemrattana

Upload: audra-franklin

Post on 14-Jan-2016

219 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Railway Transportation 1. Mass rapid transit in BKK and region Silpachai Jarukasemrattana

• Railway Transportation

1. Mass rapid transit in BKK and region

Silpachai Jarukasemrattana

Page 2: Railway Transportation 1. Mass rapid transit in BKK and region Silpachai Jarukasemrattana

Urban Railway Network : 10 routes (444.3 km)

Page 3: Railway Transportation 1. Mass rapid transit in BKK and region Silpachai Jarukasemrattana

Railway Project of MRTA 6 routes : 11 Projects

Status ProjectOpen 1) East Blue Line (Chaloem

Ratchamongkhon Line)Under construction 2) North Purple, 3) West Blue, 4)

South GreenBidding stage 5) North GreenGetting Approval 6) East Orange, 7) Pink, 8) YellowDesign stage 9) West Orange, 10) South Purple,

11) South Blue

Page 4: Railway Transportation 1. Mass rapid transit in BKK and region Silpachai Jarukasemrattana

Railway Project of SRT Red line

Bangkok MRT Red Line

Bangsue-Talingchun 15.26 km

Talingchun -Salaya14.8 km

Talingchun -Siriraj5.7 km

Rangsit-Thammasat8.65 km

Bangsue-Rangsit26.3 km

Bangsue-Phayathai-Makkasan25.9 km

Hualampong-Mahahai38 km

Page 5: Railway Transportation 1. Mass rapid transit in BKK and region Silpachai Jarukasemrattana

Airport Link : BKK – Suvannabhumi airport

Project informationDistance 21.8 kmBudget 31,139 MBProject statusStatus EIA report approved

by ONEP at 31 October 2012MOT reported to Cabinet on 6 February 2015 to send draft expropriate for approval by Cabinet

Page 6: Railway Transportation 1. Mass rapid transit in BKK and region Silpachai Jarukasemrattana

Current railway network

Railway network has Meter Gauge at 1.00 m for 4,043 km

Single Track 3,685 km

Double Track 251 km

Triple Track 107 km

Service area cover 47 provinces

Page 7: Railway Transportation 1. Mass rapid transit in BKK and region Silpachai Jarukasemrattana

Overview of railway development strategiesNetwork Distance (km)

Current Strategy (8 yr)

Total

Meter gauge (1.0 meter)Single 3,685 - 1,156Double 251 2,527 2,780Triple 107 - 107Total 4,043 2,527 4,043Standard gauge (1.435 m)Double - 1,060 1,060Total of Double

251 3,589 3,840

Page 8: Railway Transportation 1. Mass rapid transit in BKK and region Silpachai Jarukasemrattana

1. Collaboration of railway infrastructure development between Thai-China

Page 9: Railway Transportation 1. Mass rapid transit in BKK and region Silpachai Jarukasemrattana

Plan and Schedule : Construction Plans

Route Distance (km)

1 BKK-Kangkoy 133.0

2 Kangkoy-Mabtapud 246.5

3 Kangkoy-Nakonratchasima

138.5

4 Nakonratchasima-Nongkhai

255.0

Total 873.0

Page 10: Railway Transportation 1. Mass rapid transit in BKK and region Silpachai Jarukasemrattana

Collaboration of railway development Thai-Japan: Lower East-West Corridor

1) BKK-Kanjanaburi2) BKK-Chachengsao-Arunyaprates3) BKK-Chachengsao-Lam Chabung

Route between Chachensao-Lam Chabung is a common route which use with China

Route Distance (km)

Status

BKK-Kanchanburi

180 Under feasibility study by SRTBKK-

Arunyaprates255

BKK-Lamchabang

139