IC1 Systems Fully Integrated, Infrastructure Systems Sewage and Industrial Waste Water Processing /Treatment Compressed Natural Gas Production Solution/ Ultra Clean Gas Agricultural and Potable Water Processing and Treatment Clean, Sustainable, Electrical Power Production Solution Fully Integrated Solid Waste Destruction Systems SEWAGE & INDUSTRIAL WASTE WATER Less - ELEMENTS OF WASTE Equals - SUSTAINABLE PRODUCTION PRODUCTS “No Waste” Agricultural Water Potable Water Compressed Natural Gas New Products, Textiles, and Recovered Elements The Government of Hong Kong S.A.R. Financial Services and the Treasury Bureau 財經事務及庫務局

Upload: ricky-nathaniel

Post on 16-Apr-2017

409 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: PVHL IC1 Global HongKong.Gov Shatin District Depollution Project Master Presentation RW-1

IC1 Systems Fully Integrated, Infrastructure Systems

Sewage and Industrial Waste Water Processing /Treatment

Compressed Natural Gas Production Solution/ Ultra Clean Gas

Agricultural and Potable Water Processing and Treatment

Clean, Sustainable, Electrical Power Production Solution

Fully Integrated Solid Waste Destruction Systems

SEWAGE & INDUSTRIAL

WASTE WATER

Less

-ELEMENTS OF

WASTE

Equals

-SUSTAINABLE PRODUCTION

PRODUCTS “No Waste”

Agricultural Water

Potable Water

Compressed Natural Gas

New Products, Textiles, and Recovered Elements

The Government of Hong Kong S.A.R.Financial Services and the Treasury Bureau

財經事務及庫務局

Page 2: PVHL IC1 Global HongKong.Gov Shatin District Depollution Project Master Presentation RW-1

1st Stage grinders

2nd Stage micro particle grinder

3rd Stage Molecular Separations

4th Stage Waste Destruction and Molecule Reconstruction Gasification to fuels & water

OUR ADVANCED, INTEGRATED SEWAGE, WATER TREATMENT PROCESSING & ENERGY PLANT

THE OLD TECHNOLOGY SEWAGE TREATMENT PROCESSING PLANT INCLUDES THESE STAGES

CNG/Gas

Compressed SynGas

IC1Langenburg Production Equipment

IC1 Group Equipment

Output Production Products

Page 3: PVHL IC1 Global HongKong.Gov Shatin District Depollution Project Master Presentation RW-1

Contact: William M. Fields Email: [email protected]: (852) 8170 2971Cell /Text: (852) 6054 0905www.ic1.biz,www.talansoft.com/ic1

Proposal for site redevelopment solution. By implementing the newest technologies, we can reduce the treatment plant size to under 14% of the current area and free up 86% of the land for redevelopment. The transition can be done without disruption of services with 50% increased service capacity

The Government of Hong Kong S.A.R.Financial Services and the Treasury Bureau

財經事務及庫務局

Page 4: PVHL IC1 Global HongKong.Gov Shatin District Depollution Project Master Presentation RW-1

EXAMPLE: Hong Kong, ShaTin District; Existing Sewage Treatment Facility (Site Assessment)

Currently the site is processing an estimated 340,000 Cubic Meters of Sewage and 120 tons of sludge per day.With our new technologies we can supersede the current specifications with much more efficiency in less than 14% of the current area. Redevelopment can begin in 12-18 months for 86% of the land as the new system is installed.

We offer an expanded treatment capacity solution of both scope and scale. Our Advanced Technology Sewage System on this site can be expanded to 510,000 Cubic Meters/day with the sludge capacity increased to over 500 Metric tons per day. In addition we increase the scope of production with potable water of 100 Million Gallons/day.

Page 5: PVHL IC1 Global HongKong.Gov Shatin District Depollution Project Master Presentation RW-1

Precise Venture Holdings Limited offers the services and production contract with our advanced technology for ShaTin, Sewerage Treatment Facility.

ShaTin facility, site reduction in physical size to about 13.5% of the current footprint within location.

Redeveloped Treatment Facility plan; to install 510,000 m3/d base capacity with total site capacity for over 680,000 cubic meters /day

Our Sludge destruction process will achieve onsite destruction without waste stream with the base capacity of 510 tons/day

Our advanced systems produces high grade potable water, electric and SynGas in large volumes

• site upgrade with redeveloped and new technology processing systems

Treatment Facility

• currently, 340,000 cubic meters per day and requires production increased for new development

Sewage Capacity

• ShaTin Facility produces and handles 120 Metric tons of toxic sludge per day and is transported to disposal sites

Sludge Capacity

• this site requires outside electricity, water and transport for sludge and toxic waste for the facility

Current Utilities

Sludge Capacity

Current Utilities

Page 6: PVHL IC1 Global HongKong.Gov Shatin District Depollution Project Master Presentation RW-1

This reduction of site does not create any problems for handling the production for sewage and sludgehandling. The current ship dock would need to be increased in size to handle the additional volume ofproduction and the green line represent 150 meters in length for ship safety and loading zone for ourprocessing sewage creating SynGas for power production and for Potable Water Tankers

Example: 150 X 30 Meter Ship

Page 7: PVHL IC1 Global HongKong.Gov Shatin District Depollution Project Master Presentation RW-1

This area should be our dedicated buffer zone for transport ships.

From our preliminary evaluation we believe that none of the buildings on the sewage treatment site would need to exceed 7 commercial floors for the total site. By utilization of the cubic area we can effectively process additional gas for electrical power in excess of the treatment plants requirements

After a full site evaluation we would be able to provide additional information in total site services and production capacities.The information below is about additional land development usage, it is not our intent, however noted that it would not effect our operational requirements for the long term site development.

Page 8: PVHL IC1 Global HongKong.Gov Shatin District Depollution Project Master Presentation RW-1

This area is about160 feet X 40 feet6400 square foot area to be used as the start point for the STAGE #1 system installation.

This area is about260 feet X 50 feet13,000 square foot . This area would be used for the STAGE #2 system installation.

Building H F1, F2STAGE #2

We would start with theses two areas by placing our modular units in place for handling the main sewage treatment directly from input lines of raw sewage after removal of floating or heavy solids.

Building A1-F1, F2STAGE #1

Our Implementation Strategies with portable technologies allow for functional and operational facilities in short time without disruption of Treatment, Processing or Services

Page 9: PVHL IC1 Global HongKong.Gov Shatin District Depollution Project Master Presentation RW-1

OPTIONAL: Municipal Solid Waste Destruction FacilityThe area in red is approximately 70,400 Square Meters. With our modern solid waste systems, this area would have the base processing capacity of more than 240 Metric tons/hour. For 5,760 Metric Tons per day.Clean production products would be loaded on ships daily with no waste stream

VISUAL OF TOTAL SITE

The site integrated with the sewage treatment site has the combined capacity of handling all categories of solid waste for up to 600 Metric Tons per hour without any backload of waste or buildup during production. That’s equal to 25 machine stations for 14,400 Metric tons per day.

Page 10: PVHL IC1 Global HongKong.Gov Shatin District Depollution Project Master Presentation RW-1

The Government of Hong Kong S.A.R.Financial Services and the Treasury Bureau

財經事務及庫務局

Page 11: PVHL IC1 Global HongKong.Gov Shatin District Depollution Project Master Presentation RW-1

The Government of Hong Kong S.A.R.Financial Services and the Treasury Bureau

財經事務及庫務局

Page 12: PVHL IC1 Global HongKong.Gov Shatin District Depollution Project Master Presentation RW-1
Page 13: PVHL IC1 Global HongKong.Gov Shatin District Depollution Project Master Presentation RW-1
Page 14: PVHL IC1 Global HongKong.Gov Shatin District Depollution Project Master Presentation RW-1
Page 15: PVHL IC1 Global HongKong.Gov Shatin District Depollution Project Master Presentation RW-1
Page 16: PVHL IC1 Global HongKong.Gov Shatin District Depollution Project Master Presentation RW-1
Page 17: PVHL IC1 Global HongKong.Gov Shatin District Depollution Project Master Presentation RW-1
Page 18: PVHL IC1 Global HongKong.Gov Shatin District Depollution Project Master Presentation RW-1
Page 19: PVHL IC1 Global HongKong.Gov Shatin District Depollution Project Master Presentation RW-1
Page 20: PVHL IC1 Global HongKong.Gov Shatin District Depollution Project Master Presentation RW-1
Page 21: PVHL IC1 Global HongKong.Gov Shatin District Depollution Project Master Presentation RW-1
Page 22: PVHL IC1 Global HongKong.Gov Shatin District Depollution Project Master Presentation RW-1
Page 23: PVHL IC1 Global HongKong.Gov Shatin District Depollution Project Master Presentation RW-1
Page 24: PVHL IC1 Global HongKong.Gov Shatin District Depollution Project Master Presentation RW-1
Page 25: PVHL IC1 Global HongKong.Gov Shatin District Depollution Project Master Presentation RW-1
Page 26: PVHL IC1 Global HongKong.Gov Shatin District Depollution Project Master Presentation RW-1
Page 27: PVHL IC1 Global HongKong.Gov Shatin District Depollution Project Master Presentation RW-1
Page 28: PVHL IC1 Global HongKong.Gov Shatin District Depollution Project Master Presentation RW-1
Page 29: PVHL IC1 Global HongKong.Gov Shatin District Depollution Project Master Presentation RW-1
Page 30: PVHL IC1 Global HongKong.Gov Shatin District Depollution Project Master Presentation RW-1