proton magnetometer king's bay project nts 52-j-2 phantom

48
, , --.—. -. ...•...••••••••••••l l S2J02SW0e48 52J02SWM44 FOURBAY LAKE 010 Proton Magnetometer and VLF Electromagnetic Surveys King's Bay Project NTS 52-J-2 Phantom Exploration Services July, 1983 R. D. Middaugh

Upload: others

Post on 08-Dec-2021

4 views

Category:

Documents


0 download

TRANSCRIPT

, , — --.—. -. ...•...••••••••••••l lS2J02SW0e48 52J02SWM44 FOURBAY LAKE

010

Proton Magnetometerand

VLF Electromagnetic Surveys

King's Bay Project NTS 52-J-2

Phantom Exploration Services

July, 1983 R. D. Middaugh

INTRODUCTION

Steep Rock Iron Mines Limited of Atikokan, Ontario

contracted Phantom Exploration Services Ltd. of Thunder

Bay, Ontario, to conduct magnetic and electromagnetic

surveys on the King's Bay project during the fall and

winter of 1982-1983.

LOCATION. ACCESS AND GRIDS

The survey area is located on King's Bay on

Sturgeon Lake approximately 25 kilometers south of

Savant Lake, Ontario. The area is protected by 13

patented claims numbered BG 128, BG 129, BO 13**, BG 135,

BG 136, BG 149, and AL 367-AL373 inclusive and 131

unpatented claims numbered 612198-612205 inclusive,

570992-570998inclusive, 6l2083-864 inclusive, 475230-

34 inclusive, 612072-82 inclusive, 487247-66 inclusive,

487673-80 inclusive, 569540-45 inclusive, 570217-266

inclusive,569987-95 inclusive, 704758, 704760, 437022,

and 486281. These claims are either held by or are

under option to Steep Rock Iron Mines Limited. The

claims under option are from several different parties.

Access to the general area via highway #599 is

excellent all year round. The Great Lakes Forest

Products Six Mile Lake Road and related haul roads can

be easily travelled during the summer and greatly facilitate

access to the property by snow machine in the winter.

-2-

The grid was established by Steep Rock Iron Mines

Limited, who contracted the work to Mrt Allen Best of

Savant Lake, Ontario. Approximately 270 kilometers of

wing lines and 19 kilometers of base and tie lines were

cutt chained, and picketed at 25 meter intervals. The

work was done during the fall and winter of 1982-83.

PERSONNEL - .

The day to day and over-all supervision of the

geophysical program was under R.D. Middaugh of Phantom

Exploration Services Ltd.

INSTRUMENTATION

Magyetic•OMMMMMaMMMMOOTMM ^

A proton precession magnetometer (model MP-2)

manufactured by Scintrex Ltd. of Concord, Ontario

was used for this survey. The total field measure

ment was read with a resolution of one gamma and

all values were corrected for diurnal variations

using a MBS-2 model base station recorder, also

manufactured by Scintrex Ltd. Readings were re

corded at 25 meter intervals on the grid lines. Where

the magnetic gradient exceeded 300 gammas between

25 meter stations, an intermediate reading wan

taken at 12.5 meters.

-3-

Electromagnetic

A VLF EM-16 unit manufactured by Geonics Ltd. of

Mississauga, Ontario was used for this survey. Both

in and out of phase readings were taken at 25 meter

intervals on the grid lines. The transmitter station

used was Cutler, Maine with a frequency of 17.8 KHz.

DISCUSSION OF RESULTS

Magnetic

The survey area is presented in plan form on

seven maps at a scale of 112500. The corrected

magnetic data is plotted on these maps and con

toured at 200 gamma intervals where feasible. The

datum was selected to be 59)000 gammas.

While no regional magnetic gradient is evident,

the data does indicate a sequence of rocks that

exhibit an east-west regional trend. East of line

21+OOE, however, this trend bends east north-east.

The sequence is magnetically heterogeneous although

broad bands of rather quiet magnetics do exist.

These areas probably represent thick flow sequences

within the volcanic pile. The magnetic highs are

narrow in width and are discontinuous along strike*

Magnetic lows are intimately associated with these*

highs and are due to dipole effects. These highs

probably represent interflow exhalative iron rich

J

units within the volcanogenic sequence.

Other magnetic lows found within the survey

area and not associated with magnetic highs may

be due to felsic intrusive rocks. This is definitely

true of large areas located on the eastern portion

of the grid.

One very prominent magnetic feature is located

between lines 1+OOE and 7+OOE at about 8+OOS to 9+OOS,

This feature seems to be quite isolated and' could

possibily represent the result of some sort of

north-south tectonic movement.

f'

Electromagnetic

The survey area is presented in plan form

at a scale of 112500 on seven maps with a vertical

scale set at l cm a 20# for the EM profiles. A

second set of maps at the same scale presentsithe

filtered data which is contoured at +20 intervals.

The numerous conductive trends located within

the survey area conform, for the most part, to

the regional magnetic trend and commonly are

directly related to the magnetic features. A few

trends, however, cut across strike at both north

east and north-west angles: suggesting that the ;

area has undergone east-west compressional forces.

The origin of these features was probably con-

-5-

temporaneous with the emplacement of the felsic

intrusive rocks found in the general area.

Some of the trends are traceable across the

entire survey area although the conductivity is

variable along strike. Many of the anomalies,'

however, tend to be discontinous along strike

while others pinch out completely.

The anomalies located in Sturgeon Lake

under King's Bay and Shore's Bay commonly have

moderate to good conductivity but no magnetic

signature. Although these conductors may be lake

bottom effect, their location relative to the

volcanic-intrusive contact area, warrant them;

some consideration.*

Many of the more prominent conductive trends

are summarized below.

MAGNETICANOMALY

A-A

B-B

B'-B'

B"-B" '

B"'-B H '

C-C

D-D

E-E

CONDUCTIVITY

Good

Good

Moderate-poor

Moderate

Poor

Poor- goo d

Poor-good

Good

ASSOCIATION

Strong

Strong

Strong

Strong

Nil

Strong

Nil-good

Strong

COMMENTS

Sulphide horizon

Sulphide horizon

Fault related?

East extention B-B

Lake- swamp

^ ,

-6-

MAGNETICANOMALY

E'-E 1

F-F

G-G

H-H

I-I

J-J

K-K

L-L

M-M

N-N

0-0

O'-O*

P-P

Q-Q

R-R

S- S

T-T

VP1

F2-F2

F3-P3

F4-F4

F5-F5

FA-P*

CONDUCTIVITY

Poor

Good

Poor

Poor

Poor

Poor

Poor

Poor

Moderate

Moderate- good

Poor

Moderate -poor

Poor

Poor

Good

Moderate

Good

Poor

Poor

Poor-good

Poor

Poor

Poor

ASSOCIATION

Strong

Nil

Nil

Nil

Strong

Nil

Strong

Nil

Nil

Nil

Nil

Nil

Strong

Nil

Strong

Strong

Nil

Nil

. Nil

Strong

Weak -

Weak

Weak

COMMENTS

Lake bottom/contact?

Lake bottom

Lake bottom '

Creek

Lake bottom

Lake bottom/swamp

Swamp/N-N extent ion?\

Discontinous

Oiscontinous lakebottom/swamp

Fault related?

Lake bottom/contact?

N 600 E fault

N 600 E fault

N 600 W faulti

N 450 W fault

N 300 W fault

N 300 W fault

-7-

Conclusions and Recommendations

The area is underlain by an east- west strikingi

near vertical dipping sequence of volcanogenic

rocks. They consist for the most part of intermediate

flows with minor tuffs and associated volcano-

clastic sediments. This sequence has undergone

minor regional east-west compressionali forces which

v&s contemporaneous with the emplacement of large

felsic intrusives found in the general area. The

magnetic and electromagnetic trends probably outline

the more sulphide rich interflow exhalative sequences'

Detailed mapping and prospecting should be

carried out in order to better evaluate the geo

physical results. Since the main economic interest

on the property is gold mineralization, geochemical

sampling of a suitable nature may better define

any gold bearing horizons not necessarily outlined

by the geophysical methods used to date. A detailed*,

tightly controlled magnetic survey over a relatively

small area around the discovery could possibly aid

in any structural control interpretation of the

gold mineralization.

Subsequent to the above recommendations a

drill program should be considered to test the

resulting target areas*

//r Submitted by

Phantom Exploration.Services Ltd.

R. D. Middaugh otologist

APPENDIX

Envelope 1. VLF Survey Profiles 7 Maps

Envelope 2. VLF Survey Filtered Data 7 Maps

Envelope 3. Magnetometer Survey 7 Maps

Z',:": -Viff:

fei?ft

^.-....

.1

L ..

- -

. -. l. - -

— 4

. - - - ~

1.T

- - -

Ontnr;o t-***!*. (Vi

Grroup X

Report o l WorkiGeophyMCul, oi okiy.i d', Geochomical and Expenditures)

The Mining Act

Instruct rms - Pic IM i*;-* ;.i piinili Mint.- ot n,!nir,g ' . ;\ I M 1'avi :-* ! ' '•-i ^ i. rv(),K* p on th'S lo'm, ;*U4irh ('i hsi

Nnip - (i''\ (I.'V. r f(!:u ulcuialfJ si. the "f .iM.-iitiii'- .'s" section may t^'enterfil in 'in- "Expend Osys C'." (Olumns. D 1"; i!Oi nil ihjrtf il areal br'otv.

Type ol

G ^ . l . l Q -- _ *?.iiLpJ!)yiJ5!j Cc^ L .r* VCraim Holde"rTsV

k M

Address(f

v/

Survey Company

P h a n fo n Ir x pi o ra l it) y^i 'Name and Address of Author (of Geo Technical report)

bate of Survey (lrom.fi tol tolel Miles of line Cut

2 7. 85

Credits Requested per Each Claim in Columns at ri Mining Claims Traversed ( ist in numerical sequence)Special Piovijiont

For first survey:

Enter 40 days. (This includes line cutting)

- Electromagnetic

For each additional survey: using the tame grid:

Enter 20 days (for each)

Geophysical

* ElectromagneticComplete reverse side and enter total(s) here

Radiometric

Airborne Credits

Not*: Special provisions credits do not apply to Airborne Surveys.

Electromagnetic

Magnetometer

Radiometric

Expenditures (excludes power stripping)Type Of Work Performed

Performed on Qaim(t)

Calculation of Expenditure Days Credits

Total ExpendituresTotal

Days Credits

InstructionsTotal Days Oedits may be apportioned at the claim holder's choice.. Enter number of de y J credits per claim selected In columns at right.

Recorded Holder or Actnl (Signature)

Certification Verifying Report of Work

lO-t GM* k) o*- i

MfO'i!v d;s"E*pcmMgriV section rray, IK- ••ntcii-i);n the "Enpend. Days C" " en umnsDo not u',c shadftl areas below

83 ~ 110

The Mining Act

yv 5 v CAoClaim HolderltT

" 2.788)*-****-" ~

Address

/X-Survey Company

-

Qy.'ttxr.'ft oTotal Miles ci line Cut

Day \ Mo. j Yr. ] Day J Mo. f YiT j '.J^L^ 'Nim* and Addratt of Author (of Geo-Technical report)

''•Credits Requested per Each Claim in Columns rt rightSpecial Provision!

For first survey:Enter 40 days. (This includes line cutting)

For each additional survey: using the same grid:

Enter 20 days (for each)

Man O* y t

Complete reverse side and enter total (s) here

OCT5

r, i AAirborne Credits

Note: Special provisionscredits do not apply to Airborne Surveys.

Geophytiol

- Electromagnetic

- Magnetometer

- Radiometric

. Olh.r

Geological

Geochemical

Geophysical

- Electromagnetic

- Magnetometer

' O ther

Mognatomet*'

Radiometric

Oayk par Cmm

• O

HO

Oayi per Claim

Days p*r Claim

Expenditures (excludes power stripping)

Mining Claims Traversed (List hrnumerical sequence)Mining C**im

Number

61 i l

6(22 00

6 l 2.7. OS

Expend. Days C'.

M i ni ftg--Cj*J nPt01(K Nurr*b*r

Expend. Days Cr.

Type of Work Performed

Performed on Clalmd)

Calculation of Expenditure Dtyt C'ediu

"Total ExpendituresTotal

Days C'edits

mtructloni' Total Days Credit! may be apportioned at the claim holder's choice. Enter number of days credits per claim selected In columns at right.

Certification Verifying Report of Workl hereby certify that l have a personal and intimate knowledge of the facts set forth in the Report of Work annexW-hfireio, having performed the work or witnessed same during and/or after its completion and the annexed report is true.

Name and Costal Address of Person Certifying

Oni.vio

(•y r-biA p lil

Report of Work (Geof)i Geoclicmicai and

Instructions' -

Noio: -

Cu-;i c tyjic CM j, "r, t H no^.t'"' ol MI *i H-, t . -M'. tjrfc'ls \;i,in: on IN.-, tti-t'i ,.r Only d.iy, cn-'lut (..'IM./V ."Expl'lldltUtl i" MrCIItil. IIliH l.

in the "Expend. Do*' O." Do not use ihaiird a'e.v. lifin\

e....^0 - 2 B 7 *?Ptasrcciof'i Liconc* No

__ - Namtand Address of Author (4l Gio-Technical report)

....... ... _ . . ... —....... ^ . ... __ , ,. .Djio ol Survey (from 4 to) . om Mile* o* imt-

^r. J D. yj Vj. .Y.r, .

- P70Credits Requested pet Eacli Claim in Columns at right

f*

*

lFjrVrt

l r/.

Special Provisions

For first survey:Enter todays. (This includes line cutting)

For each additional survey: using the same grid:

Enter 20 days (for each)

Man Days

Complete reverse side and enter total(s) here

ocAirborne Ci edits

MININGNote: Special provisions

credits do not apply to Airborne Surveys.

Geophysical

~ Electromagnetic

- Magnetometer

- Radiometric

- Other

Geological

Geochemical

Geophysical

- Electromagnetic

- Magnetometer

* Radiornetrlc

Geological

LANDS SECTIONElectromagnetic

Magnetometer

Radiometric

Days per Claim

~————

Days pe' Claim

Days p*r Claim

Expenditures (excludes power stripping)Type of Work Performed

Performed on Claim(s)

Calculation of Expenditure Days Credits - Total

Total Expenditures ' Days Credits

S -i- 1 5 * |rutructions

Total Days Credits may b* apportioned 21 the claim holder's ' choice. Enter number of days credits per claim selected

In columns at right.

Mining Claims Traversed (List in niKpbtical sequence)Mining CUim Expmd,

Diyi Cr.Mining Claim

NumberExpind. Davs C'.

f Date Recordad Hold** or Agent (Sloflature)

; Certification Verifying Report of Workl hereby certify that l have a personal and intimate knowledge of the facti set forth in the Report of Work annexed l or witnessed same during and/or after its completion and the annexed report is true.

, having performed the work

Name and Postal Address of Person Certifying

C* r L iv.* p Ty

M.iiiMryof Report ol Work Instructions: -

Ontano f?

Type of :

GcochcmiLal yid

fit-nv M il* HUM,i

f:"' (Til:, '.,

The Mining A ct

; fin inn i.i'm, Ht!:i'h i ' l -s' Note: — OrVy c. , ntxltts roiiuintcil ii Hir

"Exti'.'iul :.iri iv" M-ctir.i fl rndv't)!- pntr^inj in the f 'pend. Days C'." columns.

— Do not ir.i shaded artas below

Clain,

Township o' Area

—Address

o o ,,A^.cUcj4l\JLE)JL^i'i'i'';^..::. v :.^:::iii'-..._•J [PTOIO^Cto/'i Licence No.

Survey Company .V

5era (f 5 L c/Name and Address of Author (of Geo-TechnicAi report)

rt.ck.

Data ol Survey (from 6. to) IT'OUI Miles of line Cut

15. ^75

Credits Requested per EacfS Claim in Columns at right Mining Claims Traversed (List in nixiierical sequence)Qvfr. f

4-'.'

K-S r;;

Special Provisions

For first survey:

Enter 40 days. (This includes line cutting)

For each additions! survey: using the same grid:

Enter 20 days (foi each)

Man Days

Complete reverse side ; and entsr total(s) here

Airborne Credits

Nott: Special provisions credits do to Airborne^

O

Geophysical Days per Claim

- Magnotomoter

- Radiometric

- Other

Geological

Geochemicalj———

Geophysical

- Electromagnetic

- Magnetometer

- Radiometric

- Other

Geologicel

CEIV E DPT 2 8 '983

E tec t' o m* jnet le

Radiometric

Da y t p* r Claim

Days per Claim

•xpcnditures (excludes power stripping)T y p* o l W ork Performed

" rformed on Claim(s)

Calculation o( Expenditur* Days Credits

Total ExpendituresTotal

Days Credits

15mtructions' : Total Days Credit! m*y b* apportioned at the claim holder's ,'- choice. Enter number of deyi credits p*i claim selected

In columns at right.

Mining CUimPrefix Numb* r

4862.fi!

Expend. Days Cr.

Mining ClaimPrefix Numbtr

Expend. Diys Cr,

Date Recorded Holder or Agent (Signature)'Certification Verifying Report of Work

l hereby certify that l have a personal and intimate knowledge of the facts set forth in the Report of Work annexed hereto, having performed the work or witnessed same during and/or after its completion and the annexed report is true.

Name and Postal Address of Penon Certifyin

ftou-nonc/ tf.s Dtt* Certili*d (Signature)

: 1302 (81/9)

"'f^S ty?i?;~*jF'ffiisiiffi!'!'' P'^ty^f'-K^sfi^^j'^vffV!f'frvf^K^ff

Ontario

Report of Work(Gfophysic di, Gt'oi Gt'octu'mtccjl iHid E

-*

(Ml.l.S. ' ;n r; ". : f i-, ' u 'ct ion *VMV *'( pn'foO

'". i'tp C xjienti L**v* *-' f i'O'unms Do r r.{ us* stuul'Hi flu-cis hftow

ce *Jb.z 7 n e y. S. ^t-Jtt t— '

Survey Company.**J

,t

Nami and Aodret. o' Author (of Geo Tectm-cai rsno'U

.Dal. of Su'.ey I'-om fc lo)/(Jov a A^ i Miiet of line Cut

SB?Credits Requested per Each Claim in Columns at right___ Mining Claims Traversed (List in numerical sequence)Special Proviiiont

For first survey:

Enter 40 days, (This includes lin* cutting)

For each additional survey: using the same grid:

Enter 20 days (lor each)

Man Da y i

Complete reverse side and enter totel(s) here

Airborne Credit*

Note: Special provisions credits do not apply to Airborne Surveys.

^

Geophysical

- Electromagnetic

- Magnetometer

- Radiometric

- Other

Geological

Geochemical

Geophysical

' Electromagnetic

- Magnetometer

- Radiometric

- Olh*r

Geological

Geochnrpicel i ! '

Electromagnetic

Magnetometer

Hftriinmplrir

Days per Claim

20

40i

Od y t per Claim

—— ,^^-

.^,

Da yi por Claim

Expenditures (excludes J^TO^'fiU WIWK, VP. Of Work Performed W (fe (^ ]fi l) V/ lb M

Performed on CI*imU) Q P j g !J 1PR3

7|8i9ilpiIIil2il|?i9iM|pCalculation of Expenditure Days Credits!

i Total v Total Expenditures Days Credit!

rls +IIF -Initructiont

Total Days Cradits m* y b* apportioned at the claim holder't choice. Enter number of days credits per claim selected in columni at right.

Mining ClaimPrefix Number

5702.il

57o2 2.1

5.702,2V

570235"57023^5701*7

Expend. Days Cr. Prefix

Mining ClaimNumber

S702

570?-

S70J.

Expend. Days Cr.

Total number of mining claims covered by this report of work.

Date i

O cto b f r^ '3/33Recorded Holder or Agent (Signature)

Certification Verifying Report of Work

For Office Use OnlyTotarDayTCr. Recorded

Date Recorded Mi n i n g"pegp r**r

tsztf'*'

jz:l hert-tiy certify thai l have a personal and intimate knowledge of the facts set forth in the Report of Work annexed heTetO, having performed the wotk O! witnessed same during and/or after its completion end the annexed report is true.

Name and Postal

./l AV 7*70*7

of Person Cerf

d A -AtCtfo. Tt Ae zDate Certified

^-^m,

2iicCertified by (Signature)j? h. 0 .t—, KM ffcimZcZts. 7s162 (61/9)

Ontario

Ministry olNaturalRe^^ces

GeotechnicalReportApproval

Mining Lands Comments

O

lAO

To: Geophysics Mr^Comment!

f~l With to tea agein with correction!Signttu

To: Geology - ExpendituresComment*

[~] Approved [ ] With to tee egein with correction)D* t* Sl8netore

To: Geochemistry

Commentt

(~) Approved j) With to tee egiin with correction!Date SlBtKtur*

j JTo: Mining Lands Section, Room 6462, Whitney Block. (Tel: 5- 1380)

' 1693 (81/10)

!^^^

x>rrt-H

ZLJ*

X*y*hh

y'xM-Zx

XsrIb

X1tbOf.

IbJLTS"

Qx"xrrxr X"xx*

*vr X1

rT0)/Lx

xxr-f- O0)

X

xxx*

rX1xx"t rX"X*Ir3

x15or

*"X1b'Xsxx"

Xs

O*x"

XsLL

X"x"

x"

S" t X *(,Xs

x"x*

S(-b

/o•f /^x*X1

f)

X,x1X"

ALi*-,U49 VJUl

TELEPHONE (41B) 977-USO TELEX 065-2*758

STEEP ROCK RESOURCES INC.40 UNIVERSITY AVENUE, SUITE 710

TORONTO, ONTARIOMSI 2G5

December 6 , 1983

Mr. E. F. Anderson, Director Land Management Branch Whitney Block Room 6550 Queen's Park Toronto, Ontario M7A 1W3

Re: Geophysical reports (Magnetic and Electro magnetic) on mining claims 612072 ec al; Group I, I I f III, IV, and V in the Fourbay Lake area, Claim Map M-2879^^^^^^^^^^^^^.^^^.^^

Dear Sir:

We are submitting the geophysical reports as per work reports submitted October 20, 1983 on Group I, II, III, IV, and V for your evaluation. We have enclosed a claim boundary sketch of our property located in the King Bay area with the reports. We have plotted the location of the claim post on one set of magnev'c survey maps identi fied as Set I.

Yours truly,

R. A. Bernatchez, P. Eng Geologist

RAB*blk Encls.

Df. C l 4 we j

MINING LANDS SE

•'A W.'

V .,. Jv.

\ J

1983 12 21 Your File: 109,110,111,112,113 Our File: 2.6160

Mr. Albert HansonMining RecorderMinistry of natural ResourcesP.O. Box 669Sioux Lookout, OntarioPOV 2TO

Dear Sir:

He have received reports and maps for a Geophysical {Electromagnetic and Magnetometer) Survey submitted under Special Provisions (credit for Performance and Coverage) on Minimi Claims PA 486281 ot al 1n the Area of Fourbay Lake.

This material will be examined and assesset' and a statement of assessment work credits will be Issued.

Yours very truly,

E.F. AndersonDirectorLand Ma.^ jement Branch

Whitney Block, Room 6643 Queen's Park Toronto, Ontario M7A 1W3 Phone:(416)965-1380

A. Barr:me

cc: A. BestSavant Lake, Ontario POV 2SO

cc: G. Armstrong707 Victoria Avenue Fort Frances, Ontario PflA 2C9

cc: R.A. Bernatchez P. Eng.Atikokan, Ontario POT ICO

f Initial Checl.

Assessed

Approved Reports of Work sent out

Notice of Intent filed

Approval after Notice of Intent sent out

Duplicate sent to Resident Geologist

Duplicate sent to A.F.R.O.

''frfflt-

Our File: 2.6160

March 13, 1904.

Mr. G. Armstrong 707 Victoria Avenue Fort Frances, Ontario P9A 2C9

Dear Sir:

^ ,i, nitrate for the above-mentionedEnclosed are the plans. In duplicate, for^t ^ s 1gn survey. Plea se have the ut tor o ft he ^ ^^ plfiase

as soon as possible.

For further mfor^o*. pie- conUct Hr. F .H. Matthews ,t

(416) 965-6918.

Yours sincerely,

S.l. Y undtDirectorLand Management Branch

Whitney Block, Room 6643 Queenis Park Toronto, Ontario

Sne: 3 416/965-1918

ec: Mining RecorderSioux Lookout, Ontario

H.E. Anderson:dg

TELE.PHONE(4^977.USO TELEX 065-24758

y

STEEP ROCK RESOURCES INC.40 UNIVERSITY AVENUE, SUITE 710

TORONTO. ONTARIOM5J 205

Atikokan, Ontario Aorll 13, 1984

Mr. S. E. Yundt, Director Land Management Branch Whitney Block Room 6643 Queen's Park Toronto, Ontario M7A 1W3

Dear Sir:Re: Geophysical (Electromagnetic and Magnetometer) Survey submitted on mining claims PA 486281 et al In the area of Four Bay Lake H 2879 ———--—

Enclosed are plans in duplicate for the above-mentioned survey showing the author's signature, date and all claim lines and numbers.

Mr. Armstrong forwarded these reports to our field office in Atikokan to carry out the instructions given in your letter of March 13, 1984. I have personal knowledge of all the work carried out on the property since our option.

Yours truly,

Raymond A. Bernatche Geologist

RAB*blk Enclosures

p. r- s* r "1 t * f :— c-vk \: ^ i: i v !; U

P.Eng

SEE ACCOMPANYING

MAP(S) IDENTIFIED AS

53 r'jC#

LOCATED IN THE MAP CHANNEL IN THEFOLLOWING SEQUENCE

(X)

FOR ADDITIONAL

INFORMATION

SEE MAPS

SIX

M

ILE

LA

KE

R

OA

D

B.L

. 9

+ 0

0 S

SH

OR

E

BA

Y

B.L

.ll

+ O

ON

B.L

.11

+ 0

0 N

IB.L

.S+O

CN

i

48

76

73

\

437

02

2JU

MP

ING

B.L

-5 +

00

S

IT

570233

A.L

. 3

67

A.L

. 368

A.L

. 3

73

MIN

ER

S

LOO

P

RO

AD

KIN

G

BA

Y R

OA

D

STE

EP

R

OC

K R

ES

OU

RC

ES

IN

C.

KIN

G

BA

Y

PR

OJE

CT

- S

TU

RG

EO

N

LA

KE

, O

NT.

CLA

IM

BOU

ND

ARY

LOC

ATI

ON

DR. B

Y:-

SCAL

E:-

i: to

ooo

CKD.

BY:-

N.T

.S. - 5

2-

J-2

APPR

OVED

:-

rniiD

Riv

t

AL

T

o o 4-

O

O H- o 10

O o 4-

O)

o o -H

00

o o 4-

o o -*-

ro

o

o 4- OU

(O

o o 4-

(D

0+

00

B;L

. 9

-I-O

O

( 4+

00 S

5 +

00

S

10

+0

0 S

10 +

00

S f f

MA

GN

ETO

ME

TER

S

UR

VE

YIN

STR

UM

EN

T: S

CIN

TRE

X

MP

-2

PRO

TON

M

AG.

DAT

UM

:

59

,00

0C

ON

TOU

R

INT

ER

VA

L1

< 2

OO

O *

* at

2O

O ;

^00

0"*

at

50

0M

AGN

ETIC

LO

W -

^

^

BA

SE

ST

ATIO

N

RE

CO

RD

ER

IN

FOR

MA

TIO

N1

INS

TRU

ME

NT

: S

CIN

TRE

X

MB

S -

2 R

EC

OR

DE

R

RA

NG

E:

100

^

REC

OR

DIN

G

INTE

RV

AL'

10

SE

CO

ND

S C

HA

RT

SP

EE

D:

20 M

M X

HR

V.L

.F.

SU

RV

EY

INS

TR

UM

EN

T:

GE

ON

ICS

E

M-1

6

TR

AN

SM

ITT

ER

S

TATI

ON

:

CU

TL

ER

, M

AIN

EIN

PH

AS

E

RE

AD

ING

S

: ' —

——

- —

— -

——

'

OU

T O

F P

HA

SE

R

EA

DIN

GS

: *-------*-

PR

OF

ILE

S

CA

LE :

l c

m -

2

0 0

Xc

CO

ND

UC

TOR

A

XIS

- —

— m

~ ~

——

PO

SIT

IVE

R

EA

DIN

GS

-

EA

ST

O

F LI

NE

CO

NTO

UR

IN

TE

RV

AL:

20

TOP

OG

RA

PH

Y

SHO

RE

:R

OAD

1 -

CLA

IM

PO

ST

:

STE

EP

R

OC

K IR

ON

M

INES

LI

MIT

ED

AT

IKO

KA

N,

ON

TAR

IO

King

's Ba

y . P

roje

ctS

TUR

GE

ON

LA

KE

A

RE

A

MAG

NET

OM

ETER

SU

RVE

YD

ate:

May

, 19

83

Scal

e :

1-25

00N.

T. S

. ; 5

2-J

- 2

PH

AN

TOM

EX

PLO

RAT

ION

SE

RVI

CES

52Je2SW8048

52J82SW0044

FOURBAY

LAKE

210

fe+OO N

Jumping

0+00

"Y.

^T t-^ i ^ ij iiJi'" f S - i-M."

^5+0 s

O OH-

OO+ in

o o o o+ to

oo+CM

Oo

oo

o o

orO

O O-t-CD ro

-J

OO

ro-J

OO

ro-l

O O

ro

O O

rO

O O ^ ro ro

O O-f(M fO

Oo-f-to

o o -f-oro

Oo

CM

57-&Z47

S70Z579/0

-W

•f Af

L fctf \-roj.

————— i

377 f

38}

-'07/Jm^^^^^

W?

-1/&

-9*/b ———————————————— M ——— ———————————————— ^^

03 5V'00 W-

52J02SWa94B 52JB2SWa044 FOURBAY LAKE

LAKE

5702

5695LAKE

?70Z3S

570Z4-357ZJZ44-

57024]

52J0aSW(W48 52J02S**ei44 FOURBAY LAKE

as-o

o N

20

+0

0 N

15

+0

0 N

B.L

. 11

+ 0

0 N

o

o .J

O

O * 00

o o

o o

+

to

o o -h

IO

o

oo

o -I-o

o (M -J

O oo

o

LU o

o -H

LU o

o CVJ

UJ o o + ro

UJ O

O

UJ O

O IO

UJ

LULU

O o 00

UJ o o 5 -J

UJ o o o CM

5703

57

7047

6061

2082

20

+ 0

0

N

15 +

00 N

IQ+

OQ

N

MAG

NET

OM

ETER

S

UR

VE

YIN

STR

UM

EN

T: S

CIN

TRE

X

MP

-2

PRO

TON

M

AG.

DA

TUM

:

59

,000

CO

NTO

UR

IN

TER

VA

L: <

200

0 at

2

00

oc

, >

2000

at

50

0M

AG

NE

TIC

LO

W :

^*"

BA

SE

ST

ATIO

N

REC

OR

DER

IN

FOR

MA

TIO

N:

INS

TR

UM

EN

T:

SC

INTR

EX

M

BS

- 2

R

EC

OR

DE

R

RA

NG

E1 1

00

e*

REC

OR

DIN

G

INTE

RV

AL:

10

SE

CO

ND

S C

HA

RT

SP

EE

D:

20

MM

/HR

V.L

.F.

SU

RV

EY

INS

TRU

ME

NT

:GE

ON

ICS

E

M-1

6

TR

AN

SM

ITT

ER

S

TATI

ON

: C

UT

LER

, M

AIN

E

INP

HA

SE

R

EA

D4N

GS

:

'——

—'—

—-

——

—'

OU

T O

E

PH

AS

E

RE

AD

ING

S: *-- -

*—

—*-

PR

OF

ILE

S

CA

LE '

\ c

m ^

20

0Xe

COND

UCTO

R AX

IS:

-—*

— * —

PO

SITIVE

RE

ADIN

GS :

EAST

OF

LINE

CONT

OUR

INTE

RVAL

: 20

TO

PO

GR

AP

HY

SH

OR

E :

RO

AD

:

CLA

IM

PO

ST

:

STEE

P RO

CK

IRO

N M

INES

LI

MIT

EDA

TIK

OK

AN

, ON

TAR

IO

Kin

g's

Bay

Pro

ject

STU

RG

EON

LA

KE

A

RE

A

MA

GN

ETO

ME

TER

S

UR

VE

YD

ate

: May

, 19

83

Sca

le:

h 25

00N

T. S

. 5

2-J

-2

PHAN

TOM

EX

PLO

RAT

ION

SE

RVI

CES

LTD

.

570935

475231

__^ ^———— ruf "!OZ8^~*—-ttZ--—,

B.i,. 5+00 S

250

LJ O O 4- CM -1

UJ o

o -f CM .w -J

UJ o o H- ro CM -J

UJ o o •1- st- CVJ —l

UJ o o -f- .

in (M ,

Ul o o -1- co CM

UJ o o H- K

CM

UJ O O * CO CM

UJ O

O * m CM

UJ o

o H- o ro

UJUJ O O -h ro -t

Ul o o -r- CM ro -l

UJ o o H- ro

ro -l

UJ O o H- * to -1

UJ o o H- in

ro -l

UJ o o •f (D ro -J

UJ o o -f- h-

ro -J

UJ O O -f- OD 10 -1

O o H-

0* 10 -l

ST

UR

GE

ON

LA

KE

9+

00

N

8+

00

N

7+

00

N

6 +

00

N

5+

00

N

4 +

00

N

3+

00

N

2+

00

N

l +

00

N

MA

GN

ETO

MET

ER

SU

RV

EY

INST

RUME

NT; S

CINT

REX

Mp-

2 PR

OTON

MAG

.D

ATU

M :

5

9,0

00

CO

NTO

UR

IN

TER

VA

L ^2

00

0.

at

200

** ;

>

2000

at

500

MA

GN

ETI

C

LOW

: dZ

t?

BA

SE

STA

TIO

N R

ECO

RD

ER I

NFO

RM

ATI

ON

!IN

STR

UM

EN

T: S

CIN

TREX

M

BS

-2

REC

OR

DER

R

AN

GE

: 10

0 **

REC

OR

DIN

G

INTE

RV

AL;

10

SE

CO

ND

S C

HA

RT

SP

EE

D:

20 M

M/H

R

V.L.

F.

SUR

VEY

INS

TRU

ME

NT;

GE

ON

ICS

E

M-1

6 TR

AN

SM

ITTE

R

STA

TIO

N:

CU

TLE

R ,

MA

INE

IN

PH

AS

E

RE

AD

ING

S

: -—

——

-"——

—-—

—-

OU

T O

F P

HA

SE

R

EA

DIN

GS

: *-

——

- -—

" -

PR

OFI

LE

SC

ALE

M c

m *

20

VoCO

NDUC

TOR

AXIS

: —

* —

PO

SITIVE

REA

DING

S: E

AST

OF L

INE

CONT

OUR

INTE

RVAL

: 20

TOP

OG

RA

PH

Y

SHO

RE :

RO

AD :

CLA

IM

PO

ST:

STEE

P RO

CK

IRO

N M

INES

LIM

ITED

ATIK

OKA

N, O

NTAR

IO

King

's Ba

y P

roje

ct__

__S

TU

RG

EO

N

LAK

E

AR

EA

MAG

NETO

MET

ER

SURV

EYDo

te :

May

. 19

83

Scal

e:

1:25

00

N.T.

S.

52-J

- 2

PHAN

TOM

EX

PLO

RATI

ON

SERV

ICES

LTD

.

6120 BS#76

KING'S

A .t- 372

LJ LU

0 0 0 04 ^-^ -OJCM CM

.J -1

LJ

Oo4roOJ

-i

L±J

Oo+sfrCNJ

-J

LJ

OO+ID OJ

-1

UJ

O O4toOJ

- J

UJ

OO+r-OJ

-1

* '-

UJ

oo400 OJ

-J

UJo o+CiOJ

J

UJ

Oo+oro

.J

UJ

o o4ro.j

UJ

Oo+CMro-j

UJ

3O -fro ro

j

ijjQ O4-

*^t ro-l

UJ

Oo + inro

LU

O O

ro

o o

ro

UJ

o ooo ro-l

52ja2S*ee44 FOURBAY LAKE

o o H-

in

O

o o

m

o

o H- O)

o o H-

00 t -i

o o -f

o o 10

o o -J- C\J

(O

o

o -h (D

0+

00

B.L

. 9

+ O

OS

(

4-1-

00 S

5 +

00

S

10

+0

0 S

5702

46

LrS

+ O

O S

(0+

00)

5 +

00 S

10 +

00

S

MA

GN

ETO

ME

TER

S

UR

VE

YIN

STR

UM

EN

T: S

CIN

TRE

X

MP

-2

PRO

TON

M

AGD

ATU

M :

5

9,0

00

CO

NTO

UR

IN

TE

RV

AL

1 <

20

00 ^

at

2O

O ;

MAGN

ETIC

LOW

- ""

~^

BASE

STA

TION

RECO

RDER

INF

ORMA

TION

1 IN

STRU

MENT

^ SC

INTR

EX

MBS

-2R

EC

OR

DE

R

RA

NG

E :

100

of

RE

CO

RD

ING

IN

TE

RV

AL:

10

SE

CO

ND

S C

HA

RT

SP

EE

D:

20

MM

X H

R

V,L

F.

SU

RV

EY

INS

TR

UM

EN

T:

GE

ON

ICS

E

M-1

6

TR

AN

SM

ITT

ER

S

TA

TIO

N:

CU

TL

ER

, M

AIN

EIN

PH

AS

E

RE

AD

ING

S

: ' —

——

- —

— -

——

-

OU

T O

F P

HA

SE

R

EA

DIN

GS

: *---*---*-

PR

OF

ILE

S

CA

LE :

lcm

* 2

0 y

. C

ON

DU

CTO

R

AX

IS :

——

~ —

— * —

PO

SIT

IVE

R

EA

DIN

GS

: E

AS

T

OF

LIN

E

CO

NTO

UR

IN

TE

RV

AL:

20

TO

PO

GR

AP

HY

SH

OR

E '

RO

AD:

-

at 5

00

CLA

IM

PO

ST

:

STE

EP

R

OC

K IR

ON

M

INES

LI

MIT

ED

ATI

KO

KA

N,

ON

TAR

IO

King

's Ba

y Pr

ojec

tS

TUR

GE

ON

LA

KE

A

RE

A

VLF

PR

OFI

LE

MAP

Dat

e:

May

, 19

85

Scal

e -

h2

50

0N

.T.S

. ; 5

2-J

- 2

PH

AN

TOM

EX

PLO

RAT

ION

SE

RVI

CES

LT

D.

52J02SW0e48

52J02SW0*44

FOURBAY

LAKE

28

0

O O-h (0

o o*in

o o

o oro

5 f 00 N

Jumping

0+00

o oCVJ

-J

o oo oo

o o

-l

o o-f-CO ro

Oo

ro

O O

ro

o oH- lO

OO

ro

-l

OO-t- ro ro

O O-fC\J iO

o o-4-

to

o o-T-

orO

OoH- cn

570Z47\

SIQ2-4.5.

*i*^'a*''i"MiMin^^

5aJ92SW884fl 52J92SWae44 FOURBAY LAKE 230

52JG2SW8048 52J*2S*a*44 FOURBAY LAKE 300

25-^

-00 N

20

+O

O N

I54-

OO

N

B.L

. 114-0

0 N

o

oO o 4-

00

o oO o H

-

o o tn .j

5 O

Oo o ro -l

O o * CO

5 o

oO

O H- O

UJ O

O -I-

LU O

O CJ

UJ o

o + rO

UJ o o H-

UJ o o in -i

UJU

JUJ o o H- o CM

20 +

OO

N

15

+00

N

iO+

00

N

MAG

NET

OM

ETER

S

UR

VE

YIN

ST

RU

ME

NT

: S

CIN

TR

EX

M

P-2

P

RO

TON

M

AG

DA

TUM

:

59

,000

CO

NTO

UR

IN

TE

RV

AL:

MA

GN

ETI

C

LOW

:

BA

SE

S

TATI

ON

R

EC

OR

DE

R

INFO

RM

ATI

ON

IN

ST

RU

ME

NT

: S

CIN

TR

EX

M

BS

- 2

R

EC

OR

DE

R

RA

NG

EM

OO

**

RE

CO

RD

ING

IN

TE

RV

AL:

IO

S

EC

ON

DS

CH

AR

T

SP

EE

D:

20

M

M/H

R

V.L

.F.

SUR

VEY

INS

TRU

ME

NT

:GE

ON

ICS

E

M-1

6

TR

AN

SM

ITT

ER

S

TA

TIO

N:

CU

TLE

R,

MA

INE

IN

PH

AS

E

RE

AD

ING

S

: '—

——

-——

—-

——

*—

——

——

*

——

— K

——

KO

UT

OF

PH

AS

E

RE

AD

ING

S:

PR

OF

ILE

S

CA

LE -

l c

m -

20

7cCO

NDUC

TOR

AXIS

: —

^ —

*

POSI

TIVE

READ

ING?

; EA

ST O

F LIN

ECO

NTOU

R IN

TERV

AL^

20

TO

PO

GR

AP

HY

SH

OR

E R

OA

D:

CLA

IM

POST

:

STEE

P RO

CK

IRO

N M

INES

LI

MIT

EDA

TIK

OK

AN

.ON

TAR

IO

Kin

g's

Bay

Pro

ject

STU

RG

EO

N

LAK

E

AR

EA

VLF

PR

OFI

LE

MAP

Dot

e : M

ay,

1983

S

cale

: h

2500

.T S

. 52-J

-2

PHAN

TOM

EX

PLO

RAT

ION

SE

RVI

CES

LT

D.

52Je2SWW48 52J02SWee44

FOURBAY

LAKE

310

570995 510996

6IZ03Q 12019

r T ir

is r\ f \

^H"l "7r ^ l "

48^255-1rf •K* ** - 7

\ l V s\ M \ \

^v" \ f/f-its \

v \ . Nli/ r/, ,7 . v ,' -kb .L,\

l LI y "irli l^ * 7

\ I

ri *nr -a r-t f

f \ / \ l

tfi f ffi ' -/rf': j-t-27 -'6 * -tf*

56954

i v/^ --/

T y^ "

\ f9 "V\ f \ A.L-369j rr

-2p Vj^ -j-fl *

' \ ! v

fsV . ~/4 f

v 7 -

17 -"t/""*ri /^ i ^ ^ i\

.7/t#f{-t1 "'

S2J02SW8046 Saj*2S*ea44 FOURBAY LAKE

^"'i-^' v^ ik- i*"*ii^' !^s*ssi4:: .'iffi"' '-•i"'.' i '" r "'^.vii'''?''r'''""^"

Ul o o + CM -1

LJ O o CM CM -1

UJ O O + IO CM -J

UJ o o -\- CM -J

Ul o o in CM -1

UJ O o H- U)

CM -1

UJ o o H- CM -J

UJ O o H- 00 CM -J

UJ O

O 4. o CM -J

uj O o 4- o

to -1

UJ o o H- ro .J

UJ O o H- CM ro -i

UJ o o •4- IO

10 U

UJ O

O H- IO -i

UJ o o -*- m IO -i

LJ O

O 4- (O io -J

td o o -h IO -J

UJ o o -t- 00

IO -I

UJ o o -J- OJ

10 -1

ST

UR

GE

ON

LA

KE

— yt r ft

jp-im

.A.

~-Q

..5Td

a, \ \ +Z HO

f/0 f? "V i l"i/-4 •-

t -s ~IO ^G

J&

\0 \ \ •r/^ Tf

,ri j f "t

ji

T ''l *7

l

9+

00 N

8 +

00

N

7+

00

N

6 +

00

N

5 +

00

N

4 +

00

N

3 +

00

N

2 +

00

N

+ 0

0

N

STU

RG

EON

LAK

E

O 5

kml

i i

i i

l

MAG

NET

OM

ETER

S

UR

VE

YIN

STRU

MENT

: SCI

NTRE

X M

P-2

PROT

ON M

AGD

ATU

M :

59,0

00

CO

NTO

UR

IN

TER

VA

L:

MA

GN

ETI

C

LOW

: d

BA

SE

S

TATI

ON

R

EC

OR

DE

R I

NFO

RM

ATI

ON

: IN

STR

UM

EN

T:

SC

INTR

EX

M

BS

-2

RE

CO

RD

ER

R

AN

GE

MO

O

oC

REC

OR

DIN

G

INT

ER

VA

L:

10

SEC

ON

DS

CH

AR

T S

PE

ED

: 20

M

M/H

R

V.L.

F.

SUR

VEY

INS

TRU

ME

NT

iGE

ON

ICS

E

M-1

6

TRA

NS

MIT

TER

S

TA

TIO

N:

CU

TLE

R ,

MA

INE

IN

PH

AS

E

RE

AD

ING

S

: -—

——

-——

—-—

—-

OU

T O

F P

HA

SE

R

EA

DIN

GS

: *~

P

RO

FIL

E

SC

ALE

M c

m *

20 0

XoCO

NDUC

TOR

AXIS

: —

^*

POSIT

IVE

READ

INGS

^ EA

ST O

F LIN

E CO

NTOU

R IN

TERV

AL:

20

TOPO

GR

APH

Y SH

ORE

:R

OA

D:

CLA

IM

PO

ST

:

STEE

P RO

CK

IRO

N M

INES

LIM

ITED

ATI

KO

KA

N,

ON

TAR

IO

King

's

Bay

Pro

ject

STU

RG

EO

N

LAK

E

AR

EA

VLF

PR

OFI

LE

MAP

Dat

e : M

oy,

1983

S

cale

: 1:

2500

N.T.

S.

52-J

- 2

PHAN

TOM

EX

PLO

RAT

ION

SE

RVIC

ES

LTD.

UJ LJ

O 0 0 0 4 4 CM TO CM CM

U)

O O4

CM

-J

UJ

O O 4 IO CM

-J

* *f

LJ

Oo4

CM

UJ

Oo4 r--CM

UJOO400CM

-1

UJo o4O) CM

-J

LJ

Oo4O ro

LJ

Oo4 ro-j

UJ

O O4CMro

UJ

OO-t-ro ro

tjjOo4 to-J

UJ

O O 4 in(O'

LU

O O4ti) ro

o o 4r- ro

52J02SW0848 52J82sw0a44 FOURBAY LAKE 340

O O

57074^.

MAGNETOMETER S URVEYINSTRUMENT: SCINTREX MP-2'PROTON MAG.DATUM : 5y ; 000

CONTOUR INTERVAL: < 2000 at 200 oc ; > 2000 at 500 c*MAGNETIC LOW :

BASE STATION RECORDER INFORMATION: INSTRUMENT: SCINTREX MBS - 2 RECORDER RANGE: 100 cX

RECORDING INTERVAL. 10 SECONDS CHART SPEED; 20 MM X HR

V.LF. SURVEYINSTRUMENT: GEONICS EM-16 TRANSMITTER STATION ; CUTLER, MAINEINPHASE READINGS - ' —— ' ——— -——- OUT OF PHASE READINGS: —---- ~--^-

PROFILE SCALE: l cm = 20 0Xo CONDUCTOR AXIS : —— * —— ^ ——

POSITIVE READINGS : EAST OF LINE CONTOUR INTERVAL:

TOPOGRAPHY SHORE ;ROAD - "

CLAIM POST'

- 00 W 4 Z

STEEP ROCK IRON MINES LIMITEDATIKOKAN, ONTARIO

King's Bay ProjectSTURGEON LAKE AREA

MAGNETOMETER SURVEYDate ; November 82 Scale : l: 2500 N.T.S. :52-J -2

PHANTOM EXPLORATION SERVICES LTD.

SOJ'OO

5702/1

702 Z4570?

4674774-87679

0238

MAGNETOMETER SURVEYNSTRUMENT: SCINTREX MP-2 PROTON MAG.

DATUM : 59 t OOO

CONTOUR INTERVAL: C 2000 at 200 cX *, > 2000 at 500MAGNETIC LOW :

BASE STATION RECORDER INFORMATION: INSTRUMENT: SCINTREX MBS - 2 RECORDER RANGE: 100

RECORDING INTERVAL: 10 SECONDS CHART SPEED : 2O MM 7 HR

V.L.F. SURVEYINSTRUMENT: GEONICS EM-16 TRANSMITTER STATION : CUTLER , MAINE

INPHASE READINGS :OUT OF PHASE READINGS: x----------PROF1LE SCALE M cm ? 2O CONDUCTOR AXIS:POSITIVE READINGS : EAST OF LINE CONTOUR INTERVAL:

TOPOGRAPHY SHORE :

ROAD :

r X

STEEP ROCK IRON MINES LIMITEDATIKOKAN, ONTARIO

King s Bay ProjectSTURGEON LAKE AREA

MAGNETOMETER SURVEYDate ; November 82 Scale: h 2500 N.T.S. : 52-J- 2

PHANTOM EXPLORATION SERVICES LTD.

570955

05* CJ&ftg^

MAGNETOMETER SURVEYSCINTREX MP-2 PROTON MAG

59,OOO

TOUR INTERVAL. ^000 a t 200 ^ ; > 2000 at 500MAGNETIC LOW

BASE STATION RECORDER INFORMATION

INSTRUMENT SCINTREX MBS - 2 RECORDER RANGE 100 ex

RECORDING INTERVAL K) SECONDS

CHART SPEED ZO MM /' MR

VLF SURVEYINSTRUMENT GEONlCS EM -16

TRANSMITTER STATION CUTLFR , MAINE

INPHASE READINGS -

OUT OF PHASE HEADINGS - ' ' PROFILE SCALE l cm - "?0 "/ CONDUCTOR AXIS —— ^ —— ^

POSITIVE READINGS EAST OF LINE

CONTOUR INTERVAL

TOPOGRAPHYSHORE

ROAD

STEEP ROCK IRON MINES LIMITEDATIKOKAN , ONTARIO

King's Bay ProjectSTURGEON ' l^AKE AREA

MAGNETOMETER

B.L 11+00 N

- 75,5 5 + 00 N

B.L. 0 + 00 ( 3 + CON

KfNG'S BAY

MAGNETOMETER SURVEYINSTRUMENT- SCINTREX MP-2 PROTON MAGDATUM 59,000

CONTOUR INTERVAL ^2000 at 200^ ; > 2000 at 500MAGNETIC LOW

52.tr/o2

BASE STATION RECORDER INFORMATION:

NSTRUMENT SCINTREX MBS -2 RECORDER RANGE. 100 ^

RECORDING INTERVAL 10 SECONDS

CHART SPEED 20 MM j H R

VLF SURVEYINSTRUMENT. GEONICS EM-16 TRANSMITTER STATION CUTLER , MAINE

INPHASE READINGS --- - --- — ---

OUT OF PHASE READINGS " ~ PROFILE SCALE - l cm = 20 07o CONDUCTOR AXIS —— ^ —— ^ ——

POSITIVE READINGS EAST OF LINE

CONTOUR INTERVAL-

TOPOGRAPHYSHORE . ^

ROAD —

CLAIM POST

r/i

UJ LU UJ LU LU LU LU -U LU LU LU LU ' U LU LU LJ 'U UJ LU

8 888g88888888888go:Jiwio^w^-^i^^oo.Jg-^^J^cvicvjcvj ro lo ro rorororororo^^^^r^^^

i i -J i i i j —i l iij.j.j—i— i-J—i— i_ i _ i — ' — i . — i — i — i — * — " - p -

e ' e

STEEP ROCK IRON MINES LIMITEDATIKOKAN , ONTARIO

King's Bay Project1 STURGEON LAKE AREA

MAGNETOMETER SURVEYDate : November '82 Scale : 1 : 2500 NT. S. : 52 -J- 2

PHANTOM EXPLORATION SERVICES LTD.

s v

o o

f S - r//

98 S/f/i --0 ^

\ 569989

"fyTSf r"J'|' —---

MAGNETOMETER S URVEYINSTRUMENT SCINTREX MP-2 PROTON MAGDATUM : 5y ; 000 CONTuUR INTERVAL:

MAGNETIC LOW -

BASE STATION RECORDER INFORMATION: INSTRUMENT: SCINTREX MBS- 2 RECORDER RANGE: 100 ex:

RECORDING INTERVAL. 10 SECONDS CHART SPEED 20 MM X HR/' T i 5703.33 f-r

V L.F. SURVEYINSTRUMENT :GEONICS EM-16 TRANSMITTER STATION ; CUTLER, MAINE

INPHASE READINGSOUT OF PHASE READINGS: *------

PROFILE SCALE: l cm * 20 0Xo CONDUCTOR AXIS : —— ^ —— ^ POSITIVE READINGS ; EAST OF LINE CONTOUR INTERVAL:

TOPOGRAPHY SHORE 'ROAD -

CLAIM POST-"

0259

\

WSTEEP ROCK IRON MINES LIMITED

ATIKOKAN, ONTARIO

/

King s Bay ProjectSTURGEON LAKE A REA

V.LR PROFILE MAPDate : November 82 Scale; 1:2500 N.T.S. :52-J -2

PHANTOM EXPLORATION SERVICES LTD

-7 /A O O ^/O Z d 4-

4 X"\ ——v . -""7 t*— o l 6 7 o

7022/&r

4 *"**\ -"^ -^i 876;

5^9541

MAGNETOMETER SURVEYINSTRUMENT: SCINTREX MP-Z PROTON MAGDATUM : 59,000 CONTOUR INTERVAL: MAGNETIC LOW :

BASE STATION RECORDER INFORMATION: INSTRUMENT: SCINTREX MBS - 2 RECORDER RANGE: 100 oc

RECORDING INTERVAL - 10 SECONDS CHART SPEED ; 20 MM ' HR

V.L.F. SURVEYINSTRUMENT: GEONICS EM-16 TRANSMITTER STATION: CUTLER , MAINE

1NPHASE READINGS :OUT OF PHASE READINGS: -c-----—-"

PROFILE SCALE : l cm? ZQ

CONDUCTOR AXIS:POSITIVE READINGS : EAST OF LINECONTOUR INTERVAL:

STEEP ROCK IRON MINES LIMITEDATIKOKAN .ONTARIO

King s Bay ProjectSTURGEON LAKE A REA

VLF PROFILE MAPNT.S. : 52-J- Z . fDate ; November 82 Scale : l: 2500

PHANTOM EXPLORATION SERVICES LTD.

STURGEON

LAKE

\ ^^, til "f* f- /rW*

2571

B L 3400N

-4 rt*': o \ v*/V

A \ \ r ff i ****S

;1 r^5"" 'f j"3 "T i "* 'r /' i il il i J

^ i *2t\ rf i *20 \- *6 */ ' //'

t/t* 1*6 - t /it 7f it o i

4S7ES/2f.0 O

,/^ -^ y'-?*6 r ^

MAGNETOMETER SURVEYINSTRUMENT: SCI NTREX MP-2 PROTON MAG DATUM : 59,000 CONTOUR INTERVAL: MAGNETIC LOW :

BASE STATION RECORDER INFORMATION:iINSTRUMENT : SCINTREX MBS - 2 RECORDER RANGE - 1 00 cxl RECORDING INTERVAL: 10 SECONDS CHART SPEED' 20 MM X HR

V.L.F. SURVEYINSTRUMENT GEONICS EM-16 TRANSMITTER STATION : CUTLER , MAINE INPHASE READINGS :WS" -/Si f W7 -VfOUT OF PHASE READINGS 1 --- PROFILE SCALE : lcm= 20 CONDUCTOR AXIS: —— ^ —— *

POSITIVE READINGS - EAST OF LINE CONTOUR INTERVAL:

TOPOGRAPHYSHORE :

ROAD :

y ^7 i -ft f** -j* r

STEEP ROCK IRON MINES LIMITEDATIKOKAN , ONTARIO

King's Bay ProjectSTURGEON LAKE AREA

VLF PROFILE MAPDate : November '82 Scale : l: 2500 N.T.S.: 52-J- 2

PHANTOM EXPLORATION SERVICES LTD.

UJ

o o

in

5-hOO N

B.L 0+00 ( 3+OON

SLIEVE T

SCINTREX MP M

::ASE STATiQN RtCOiOER IN^

'INSTRUMENT SCIN^HE ^ MI-..^t-"C'O^OER RANGE. 100 -

RLCORONG INTERVAL 10 S CHART SPEED ' M M X H F?

!'#

J ~ F SJRVEY•MSTR'JMENT GEONiCS EM-16 "RANSVIT'SER STATION CUTLt

INPHA^L READINGS

''JU'T OF PHASE READINGS "' H! - " t., 4.. o L, A L- il "C

CONDUCTOR AXIS POSITIVE READINGS CONTOUR INTERVAL

EAST OF L IN

15

UJ

O O

o

LU

Oo-\-OJro

LaJ

O O -f ro ro

O O

ro

LLl

O O*inro

UJ

Oo^IDro

oo4- N- ro

UJ

oo00roJ

O

-J

UJ

O O 4-O

UJ

Oo

UJOo4-OJ

••L)

C O-f- ro "t

UJOOt-

-J

UJ

}i4-LO

STEEP ROCK I RON MINES LIMITEDATIKOKAN , ONTARIO

King*s Bay ProjectSTURGEON LAKE AREA

VLF PROFILE MAPDate : November 82 Scale l : 2500 NT.s. . 52 -J- 2

PHANTOM EXPLORATION SERVICES LTD.