PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE ROAD WEST TOWN OF OAKVILLE Traffic Impact Study Prepared For: Kingsmen Group Inc. June 2017

Upload: others

Post on 18-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE ROAD WEST TOWN OF OAKVILLE Traffic Impact Study

Prepared For: Kingsmen Group Inc. June 2017

Page 2: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

© BA Consulting Group Ltd. 45 St. Clair Avenue West, Suite 300 Toronto, ON M4V 1K9 www.bagroup.com

Page 3: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

346-362 LAKESHORE RD W

JUNE 2017 7086-12 P:\70\86\12\Report\Lakeshore Road West\TIS 2017.docx

TABLE OF CONTENTS

1.0 INTRODUCTION .................................................................................................... 1 1.1 Study Scope .............................................................................................. 1

2.0 TRANSPORTATION CONTEXT ............................................................................ 1 2.1 Area Road Network .................................................................................... 1 2.2 Transit Context .......................................................................................... 2

3.0 TRAFFIC VOLUMES ............................................................................................. 5 3.1 Existing Traffic Volumes ............................................................................. 5 3.2 Lakeshore Road West Improvements .......................................................... 5 3.3 Future Background Traffic Volumes ............................................................. 6

3.3.1 Corridor Growth......................................................................................................... 6

3.4 Site Traffic ................................................................................................. 6 3.4.1 Trip Generation ......................................................................................................... 6

3.4.2 Distribution and Assignment ..................................................................................... 6

3.5 Future Total Traffic ..................................................................................... 7

4.0 TRAFFIC OPERATIONS ..................................................................................... 12 4.1 Capacity Analysis Review ......................................................................... 12 4.2 Capacity Analysis Results ......................................................................... 12

5.0 SUMMARY AND CONCLUSIONS ....................................................................... 14

Page 4: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

346-362 LAKESHORE RD W

JUNE 2017 7086-12 P:\70\86\12\Report\Lakeshore Road West\TIS 2017.docx

LIST OF TABLES Table 1 Traffic Counts ......................................................................................................................... 5

Table 2 Trip Generation ...................................................................................................................... 6

Table 3 Trip Distribution Pattern ......................................................................................................... 7

Table 4 Capacity Analysis Summary – Lakeshore Road / Morden Road ......................................... 12

Table 5 Unsignalized Intersections – Capacity Analysis Summary .................................................. 13

LIST OF FIGURES Figure 1: Site Location .......................................................................................................................... 2

Figure 2: Site Plan ................................................................................................................................. 4

Figure 3: Existing Traffic Volumes ........................................................................................................ 8

Figure 4: Future Background Traffic Volumes ...................................................................................... 9

Figure 5: Site Traffic Volumes ............................................................................................................. 10

Figure 6: Future Total Traffic Volumes ................................................................................................ 11

TABLE OF APPENDICES APPENDIX A: Traffic Count Data and Signal Timing Plan

APPENDIX B: Synchro Analysis

Page 5: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

346-362 LAKESHORE RD W

JUNE 2017 7086-12 1

1.0 INTRODUCTION BA Group has been retained by Kingsmen Group Inc. to prepare a Traffic Impact Study (TIS) in support of a proposed residential subdivision located at 346-462 Lakeshore Road West. The site is located on the south side of Lakeshore Road Dorval Drive. The location of the site is illustrated in Figure 1. The program involves the construction of 19 detached homes on minor local public road. The Site Plan is provided in Figure 2. This report documents the results of the traffic impact study.

1.1 Study Scope An overview of key parameters is outlined below: Analysis Periods

• The typical weekday morning and afternoon peak hours were reviewed Horizon Years

• A 5-year beyond build-out horizon was adopted for the evaluation of future traffic conditions. Build-out is anticipated for 2019 and 5-year horizon of 2024 was adopted accordingly.

Background Traffic • The study includes traffic allowances for area growth from general corridor and area development

sources. Study Intersections Analysis presented reviews traffic operations at the following intersections:

• Lakeshore Road West / Morden Road; • Lakeshore Road West / Tavistock Square / Shorewood Place; and • Lakeshore Road West / Proposed Public Road.

2.0 TRANSPORTATION CONTEXT

2.1 Area Road Network An overview of the study area roads which serve the site is provided below: Lakeshore Road West is an east-west minor arterial road under the jurisdiction of the Town of Oakville. It has a two-lane rural cross section, is largely residential in nature and provides access for large executive homes. It extends east-west across the Town, continues west through the City of Burlington and east through the City of Mississauga. As its name implies, the road closely follows the shoreline of Lake Ontario, The Lakeshore Road West / Morden Road intersection is under pedestrian-actuated signal control. Lakeshore Road has a posted speed on 50 Km/h. Morden Road is a north-south Town of Oakville collector road. It has a two-lane cross section and extends north from Lakeshore Road West to the south side of the GO Rail. It provides connectivity to Town and

Page 6: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

346-362 LAKESHORE RD W

JUNE 2017 7086-12 2

Regional arterial roads which in turn provides connectivity to the Queen Elizabeth Way. Morden Road has a posted speed on 50 Km/h. Tavistock Square and Shorewood Place are north-south minor local roads which extend north and south, respectively, from Lakeshore Road West.

2.2 Transit Context The area is serviced by Oakville Transit. A description of area bus routes is provided below. Route 14 Lakeshore West operates between the Oakville Main GO Station and the Appleby GO Station via Rebecca Street, Lakeshore Road West (west of the site), Great Lakes Boulevard, Burloak Road and Harvester Road in Burlington. AM/PM peak period headways (average time between buses) for this route are in range of 20 to 30 minutes Route 15 Bridge operates generally east-west along Wildwood between Kerr Street and the RioCan Centre at Burloak and Wyecroft Road. An illustration of the local area routes is provided in Exhibit 1

Source: Oakville Transit Website

FIGURE 1: SITE LOCATION

EXHIBIT 1 - AREA TRANSIT FACILITIES

Page 7: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

Site

SITE LOCATION

Dat

e P

lotte

d: J

une

5, 2

017

F

ilena

me:

\\ba

fp02

\dat

a\W

P\7

0\86

\12\

Gra

phic

s\Fi

g01-

00-S

L.dw

g

Figure 1Lakeshore Road/Morden Road Subdivision, Oakville7086-12 June 2017

Page 8: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington
Page 9: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

346-362 LAKESHORE RD W

JUNE 2017 7086-12 5

3.0 TRAFFIC VOLUMES Traffic Volumes were developed for the following scenarios for the weekday morning and afternoon peak hours:

• Existing Traffic – baseline traffic levels reflective of current peak hour traffic activity levels for 2016. • Future Background Traffic – forecast traffic levels 6 years into the future. • Site Traffic – traffic activity levels associated with the site. • Future Total Traffic – future traffic volumes 6 years into the future inclusive of site traffic.

Traffic volume figures are provided in Appendix A.

3.1 Existing Traffic Volumes Existing baseline traffic volumes were established through traffic counts performed by Spectrum Traffic Data Services Inc. on behalf of BA Group. Traffic counts were performed during the weekday morning and afternoon peak periods to document typical peak hour traffic volumes. A list of intersections counted is provided in Table 1.

TABLE 1 TRAFFIC COUNTS

Intersection Count Date Source

Lakeshore Road West / Morden Road Monday, September 14, 2015 Town of Oakville

Lakeshore Shore Road / Morden Road Wednesday, March 20, 2017 Spectrum on behalf of BA Group

Lakeshore Shore Road / Tavistock Square / Shorewood Place Wednesday, March 20, 2017 Spectrum on behalf of BA Group

Turning movements counts completed September 14, 2015, were also obtained from the Town of Oakville. Existing peak hour traffic volumes are shown in Figure 3. Traffic count data is provided in Appendix A.

3.2 Lakeshore Road West Improvements The Town of Oakville has initiated a Municipal Class Environmental Assessment (Class EA) study for improvements to Lakeshore Road West from Mississauga Street to Dorval Drive, east of the subject site. The Class EA study did not identify the indicates that the Lakeshore Road / Fourth Line and Lakeshore Road / Dorval Drive west and east of the subject site, respectively, currently operate at level of service (LOS) B during peak hours. Both Lakeshore Road West intersections operates at an acceptable LOS ‘B’ at horizon year 2031.maintaining 1 through lane in each direction. We note that the Lakeshore Road / Morden Road intersection was not included in the Class EA study.

Page 10: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

346-362 LAKESHORE RD W

JUNE 2017 7086-12 6

3.3 Future Background Traffic Volumes Future background traffic volumes were established for a horizon year 5-years beyond buildout. Construction of the site is anticipated to be completed for 2019, and therefore future background traffic volumes were established for 2024. Future background traffic volumes include allowances for Corridor Growth on Collector and Arterial roads in the site environs and for traffic volumes related to active development applications in the area. An overview of corridor growth and site specific allowances is provided below.

3.3.1 Corridor Growth Corridor growth was estimated for area roadways based on discussions with Town of Oakville transportation planning staff and a review of historical traffic count data. Growth rates for Lakeshore Road West and Morden Road were estimated based on a review of historical traffic data at the intersection. The resulting future background traffic volumes are shown in Figure 4.

3.4 Site Traffic 3.4.1 Trip Generation Trip generation rates for the proposed development were developed based upon trip generation rates observed during trip generation surveys conducted at the existing residential subdivision along Shorewood Place. Resultant trip rates are 0.28 and 0.44 for AM and PM peak hours, respectively. As indicated in Table 2 the resulting site traffic is approximately 5 and 8 two-way trips during the weekday morning and afternoon peak hours.

TABLE 2 TRIP GENERATION

Land Use Morning Peak Hour Afternoon Peak Hour

In Out 2-Way In Out 2-Way

Trip Rates based upon survey 0.11 0.17 0.28 0.22 0.22 0.44

Vehicle Trips 2 3 5 4 4 8

3.4.2 Distribution and Assignment Site traffic was assigned to the road network based on a review of network peak hour traffic volumes and distribution pattern evidenced by the residential subdivision on Shorewood Place. The distribution pattern applied is summarized in Table 3.

Page 11: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

346-362 LAKESHORE RD W

JUNE 2017 7086-12 7

TABLE 3 TRIP DISTRIBUTION PATTERN

Outbound Inbound

Route Distribution Route Distribution

Lakeshore Road – to the east 75% Lakeshore – from the east 75%

Lakeshore Road – to the west 25% Lakeshore Road – to the west 25%

Total 100% Total 100%

Site traffic volumes are shown in Figure 5.

3.5 FUTURE TOTAL TRAFFIC Future total traffic volumes represent the addition of site traffic to future background traffic activity levels and are illustrated in Figure 6.

Page 12: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

Morden Rd.

535

(275

)

(470

)

230

0(0

)

0(0

)

(5)

0(5

)0

(0)0(0)

0(0)

50

(0) 5(5)

5(0)

530

(270

)

(465

)

205

35(1

0)

(5)

30

15(30) 5

(5) 535

(275

)

(470

)

235

0(0

)

(0)

0

(0)0(0)

0

Lake

shor

e Rd.

Tavistock Sq.

Shorewood Pl.

Street 1

EXISTING TRAFFIC VOLUMES

Dat

e P

lotte

d: J

une

5, 2

017

F

ilena

me:

\\ba

fp02

\dat

a\W

P\7

0\86

\12\

Gra

phic

s\Fi

g03-

00-E

xT.d

wg

Figure 3Lakeshore Road/Morden Road Subdivision, Oakville7086-12 June 2017

00

(00)

AM Peak Hour

PM Peak Hour

Existing Traffic Signal

Page 13: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

Morden Rd.

570

(295

)

(500

)

245

0(0

)

0(0

)

(5)

0(5

)0

(0)0(0)

0(0)

50

(0) 5(5)

5(0)

565

(290

)

(495

)

220

35(1

0)

(5)

30

15(30) 5

(5) 570

(295

)

(500

)

250

0(0

)

(0)

0

(0)0(0)

0

Lake

shor

e Rd.

Tavistock Sq.

Shorewood Pl.

Street 1

FUTURE BACKGROUND TRAFFIC VOLUMES

Dat

e P

lotte

d: J

une

5, 2

017

F

ilena

me:

\\ba

fp02

\dat

a\W

P\7

0\86

\12\

Gra

phic

s\Fi

g04-

00-F

BT.

dwg

Figure 4Lakeshore Road/Morden Road Subdivision, Oakville7086-12 June 2017

00

(00)

AM Peak Hour

PM Peak Hour

Existing Traffic Signal

Page 14: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

Morden Rd.

2(3

)

(3)

2

0(1

)

(1)

1

0(1

)

(3)

2

(3)2(1)

1

Lake

shor

e Rd.

Tavistock Sq.

Shorewood Pl.

Street 1

SITE TRAFFIC VOLUMES

Dat

e P

lotte

d: J

une

5, 2

017

F

ilena

me:

\\ba

fp02

\dat

a\W

P\7

0\86

\12\

Gra

phic

s\Fi

g05-

00-S

T.dw

g

Figure 5Lakeshore Road/Morden Road Subdivision, Oakville7086-12 June 2017

00

(00)

AM Peak Hour

PM Peak Hour

Existing Traffic Signal

Page 15: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

Morden Rd.

572

(298

)

(503

)

247

0(0

)

0(0

)

(5)

0(5

)0

(0)0(0)

0(0)

50

(0) 5(5)

5(0)

565

(291

)

(496

)

221

35(1

0)

(5)

30

15(30) 5

(5) 570

(295

)

(500

)

250

0(1

)

(3)

2

(3)2(1)

1

Lake

shor

e Rd.

Tavistock Sq.

Shorewood Pl.

Street 1

FUTURE TOTAL TRAFFIC VOLUMES

Dat

e P

lotte

d: J

une

5, 2

017

F

ilena

me:

\\ba

fp02

\dat

a\W

P\7

0\86

\12\

Gra

phic

s\Fi

g06-

00-F

TT.d

wg

Figure 6Lakeshore Road/Morden Road Subdivision, Oakville7086-12 June 2017

00

(00)

AM Peak Hour

PM Peak Hour

Existing Traffic Signal

Page 16: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

346-362 LAKESHORE RD W

JUNE 2017 7086-12 12

4.0 TRAFFIC OPERATIONS

4.1 Capacity Analysis Review Traffic operations analyses have been undertaken in accordance with the methodologies outlined in the Highway Capacity Manual (HCM) using the Synchro (Version 7) software package. The primary product of the signalized intersection capacity analysis evaluation is two sets of intersection performance indices. Synchro parameters identified in Town of Oakville guidelines have been adopted. The first is a volume-to-capacity (or v/c) ratio that provides an indication of the capacity utilization for movements at an intersection and at the intersection overall. A v/c ratio of 1.0 indicates that a turning movement or intersection may be operating at or near its theoretical capacity. The second measure is a Level of Service (LOS) indicator that provides a measure of the average level of delay that a motorist may experience while travelling through an intersection. The level of service indicator ranges from ‘A’ (minor delay) to ‘F’ (extended delays). The product of the unsignalized intersection capacity evaluation is the Level of Service indicator that characterizes operational conditions for key movements in terms of the average delay that may be experienced by motorists travelling through an intersection. The level of service indicator ranges, as for signalized intersections, ‘A’ (minor delay) to ‘F’ (extended delays). A summary of the results, key observations and conclusions made on the basis of the traffic operations evaluations undertaken at the area intersections is provided in the following sections. Detailed print-outs of the capacity analysis calculations are attached in Appendix C.

4.2 Capacity Analysis Results Capacity analysis results are summarized for signalized intersection in Table 4 and unsignalized intersections in Table 5. A discussion of the results is provided below.

TABLE 4 CAPACITY ANALYSIS SUMMARY – LAKESHORE ROAD / MORDEN ROAD

Existing Future Background Future Total

v/c Delay LOS v/c Delay LOS v/c Delay LOS

Weekday Morning Peak Hour

Overall 0.40 3.1s A 0.42 3.2s A 0.42 3.2s A

Weekday Afternoon Peak Hour

Overall 0.32

3.7s A 0.34 3.6s A 0.34 3.6s A

:

Page 17: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

346-362 LAKESHORE RD W

JUNE 2017 7086-12 13

TABLE 5 UNSIGNALIZED INTERSECTIONS – CAPACITY ANALYSIS SUMMARY

Existing Future Background Future Total

Delay LOS Delay LOS Delay LOS

Lakeshore / Tavistock /Shorewood

WBTL 0.1s (0.1s) A (A) 0.1s (0.1s) A (A) 0.1s (0.1s) A (A)

NBLR 12.9s (14.3s) B (B) 12.9s (14.9s) B (B) 13.0s (15.0s) B (B)

SBLR 15.8s (17.7s) (C) (C) 15.8s (18.7s) C (C) 15.9s (18.8s) C (C)

Lakeshore / Site Driveway

WBLR n/a 0.1s (10.0s) A (B)

NBLR n/a 13.6s (19.3s) B (C) Notes: 1. “ n/a” indicates intersection does not exist under existing and future background conditions. The Lakeshore Road / Morden Road intersection (which operates a pedestrian-actuated signalized intersection) operates at good levels of services (LOS) A with minimal delay and significant reserve capacity. Under future background and future total traffic conditions the intersection will continue to operate at good levels overall. Site traffic may result in minimal delay. Traffic operations at the Lakeshore Road / Tavistock Square / Shorewood Place intersection reflect acceptable operating conditions. Northbound and southbound turns from the side street operate acceptably at LOS C or better during the peak hours. Under future traffic condition this intersection will continue to operate at LOS ‘C’ or better. Site traffic will have minimal impact on this intersection. Site Driveway The proposed driveway (public road) will be aligned approximately 84 degrees to Lakeshore Road West which is well within the range of an acceptable angle of intersection. The proposed new road will have a minimum Town of Oakville standard road allowance of 18.0 metres. Standard 7.5 by 7.5 metre daylight triangle will be provided at the Lakeshore Road West intersection with the new public road. The proposed new road will be located approximately 30.0 east of Morden Road, measured centre to centre. Traffic operations at the proposed site driveway reflect acceptable operating conditions. The northbound exit movement will operate at LOS ‘C’ or better during peak hours. Westbound left turns will experience minimal delay and will operate at LOS ‘B’ or better. Generally, Lakeshore Road operate under free-flow conditions at Morden Road, except when the pedestrian push-button is activated. Southbound left turn demand from Morden Road is quite low (approximately 5 vehicles) during peak hours. We note that a residential driveway on Lakeshore Road is located within 18 metres from Morden Road. Therefore, the proposed driveway (public road) intersection on Lakeshore Road is consistent with the closely-spaced driveways along Lakeshore Road West. Taking into consideration the small southbound left turn demand from Morden Road and northbound from the proposed development, both intersections will operate at acceptable levels.

Page 18: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

346-362 LAKESHORE RD W

JUNE 2017 7086-12 14

5.0 SUMMARY AND CONCLUSIONS Kingsmen Group Inc. is proposing to develop a 19-unit residential subdivision on the south side of Lakeshore Road west of Dorval Drive. This Traffic Impact Study that was completed in this report permits the following conclusions to be made:

• The Lakeshore Road West subdivision will generate approximately 5 and 8 two-way trips during the weekday morning and afternoon peak hours, respectively. This magnitude of vehicle demand can easily be accommodated by the existing roadway network and intersection configurations.

• The study area intersections operate in a satisfactory manner under existing traffic conditions. All unsignalized intersections operate with good levels of service. The Lakeshore Road intersections operate with satisfactory v/c ratios during the weekday morning and afternoon peak hours.

• Under future traffic conditions, the Lakeshore Road West intersection will continue to operate in a satisfactory manner.

• Site generated traffic will be small and will have minimal impact on traffic operations at the existing Lakeshore Road West intersections. As such, the area study intersections can appropriately accommodate site related traffic activity.

• The site driveways will operate with good levels of service providing high accessibility for residents and visitors.

• The location of the proposed access (public road) is satisfactory. Adequate separation to existing low volumes driveways and Morden Road intersection will be provided.

Based on our review of the development proposal, the traffic impacts associated with the site can readily be accommodated on the existing roadway network. .

Page 19: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

346-362 LAKESHORE RD W JUNE 2017 7086-12

APPENDIX A: Traffic Count Data and Signal Timing Plan

Page 20: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

Tu

rnin

g M

ove

men

t C

ou

nt

(2 .

LA

KE

SH

OR

E R

D W

& S

HO

RE

WO

OD

PL

/ T

AV

IST

OC

K S

Q)

Sta

rt T

ime

N A

pp

roac

h

TA

VIS

TO

CK

SQ

E A

pp

roac

h

LAK

ES

HO

RE

RD

WS

Ap

pro

ach

S

HO

RE

WO

OD

PL

W A

pp

roac

h

LAK

ES

HO

RE

RD

WIn

t. T

ota

l(1

5 m

in)

Int.

To

tal

(1 h

r)

Rig

htN

:WT

hru

N:S

Left

N:E

U-T

urn

N:N

Ped

sN

:A

ppro

ach

Tot

alR

ight

E:N

Thr

uE

:WLe

ftE

:SU

-Tur

nE

:EP

eds

E:

App

roac

h T

otal

Rig

htS

:ET

hru

S:N

Left

S:W

U-T

urn

S:S

Ped

sS

:A

ppro

ach

Tot

alR

ight

W:S

Thr

uW

:ELe

ftW

:NU

-Tur

nW

:WP

eds

W:

App

roac

h T

otal

07:0

0:00

00

20

02

023

00

023

00

00

10

070

00

070

95

07:1

5:00

00

20

02

021

00

021

00

00

00

082

00

082

105

07:3

0:00

00

10

01

033

00

033

00

00

00

010

11

00

102

136

07:4

5:00

00

10

11

046

00

046

10

00

11

013

30

00

133

181

517

08:0

0:00

20

10

13

085

10

086

00

00

00

013

40

00

134

223

645

08:1

5:00

20

10

03

158

00

059

10

00

01

015

40

00

154

217

757

08:3

0:00

00

10

01

138

10

040

10

00

31

011

40

00

114

156

777

08:4

5:00

00

10

01

046

00

046

20

00

12

012

00

00

120

169

765

***B

RE

AK

***

15:0

0:00

20

20

34

288

00

090

10

00

01

078

00

078

173

15:1

5:00

00

20

32

177

20

080

00

10

01

078

00

078

161

15:3

0:00

00

00

10

010

31

00

104

10

00

21

079

00

079

184

15:4

5:00

00

10

11

010

81

00

109

10

00

21

169

00

070

181

699

16:0

0:00

00

00

40

011

00

00

110

00

10

21

062

00

062

173

699

16:1

5:00

10

00

11

010

80

10

109

00

00

20

156

00

057

167

705

16:3

0:00

10

00

01

010

60

00

106

10

00

21

172

10

074

182

703

16:4

5:00

00

00

10

111

00

00

111

00

10

21

057

00

157

169

691

17:0

0:00

00

20

02

313

22

00

137

00

00

00

077

10

078

217

735

17:1

5:00

00

20

22

012

41

00

125

10

10

32

067

00

067

196

764

17:3

0:00

00

10

01

172

20

075

00

00

10

091

00

091

167

749

17:4

5:00

00

10

01

164

20

067

00

00

10

162

10

064

132

712

Gra

nd

To

tal

80

210

1829

1115

5213

10

1577

100

40

2314

417

564

01

1764

3384

-

Ap

pro

ach

%27

.6%

0%72

.4%

0%-

0.7%

98.4

%0.

8%0.

1%-

71.4

%0%

28.6

%0%

-0.

2%99

.5%

0.2%

0%-

--

To

tals

%0.

2%0%

0.6%

0%0.

9%0.

3%45

.9%

0.4%

0%46

.6%

0.3%

0%0.

1%0%

0.4%

0.1%

51.9

%0.

1%0%

52.1

%-

-

Hea

vy1

00

0-

020

00

-0

00

0-

024

00

--

-

Hea

vy %

12.5

%0%

0%0%

-0%

1.3%

0%0%

-0%

0%0%

0%-

0%1.

4%0%

0%-

--

Bic

ycle

s0

00

0-

01

00

-0

00

0-

01

00

--

-

Bic

ycle

%0%

0%0%

0%-

0%0.

1%0%

0%-

0%0%

0%0%

-0%

0.1%

0%0%

--

-

BA

Gro

up45

St.

Cla

ir A

venu

e W

est,

Sui

te 3

00T

oron

to O

N, C

AN

AD

A, M

4V 1

K9

Tur

ning

Mov

emen

t Cou

ntLo

catio

n N

ame:

LA

KE

SH

OR

E R

D W

& S

HO

RE

WO

OD

PL

/ TA

VIS

TO

CK

SQ

Dat

e: W

ed, M

ar 2

2, 2

017

D

eplo

ymen

t Lea

d: W

alte

r F

ugaj

Tur

ning

Mov

emen

t Cou

ntB

AC

17S

4PP

age

1 of

5

Page 21: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

Pea

k H

ou

r: 0

7:45

AM

- 0

8:45

AM

Wea

ther

: C

lear

(-8

.1 °

C)

Sta

rt T

ime

N A

pp

roac

h

TA

VIS

TO

CK

SQ

E A

pp

roac

h

LAK

ES

HO

RE

RD

WS

Ap

pro

ach

S

HO

RE

WO

OD

PL

W A

pp

roac

h

LAK

ES

HO

RE

RD

WIn

t. T

ota

l(1

5 m

in)

Rig

htT

hru

Left

U-T

urn

Ped

sA

ppro

ach

Tot

alR

ight

Thr

uLe

ftU

-Tur

nP

eds

App

roac

h T

otal

Rig

htT

hru

Left

U-T

urn

Ped

sA

ppro

ach

Tot

alR

ight

Thr

uLe

ftU

-Tur

nP

eds

App

roac

h T

otal

07:4

5:00

00

10

11

046

00

046

10

00

11

013

30

00

133

181

08:0

0:00

20

10

13

085

10

086

00

00

00

013

40

00

134

223

08:1

5:00

20

10

03

158

00

059

10

00

01

015

40

00

154

217

08:3

0:00

00

10

01

138

10

040

10

00

31

011

40

00

114

156

Gra

nd

To

tal

40

40

28

222

72

00

231

30

00

43

053

50

00

535

777

Ap

pro

ach

%50

%0%

50%

0%-

0.9%

98.3

%0.

9%0%

-10

0%0%

0%0%

-0%

100%

0%0%

--

To

tals

%0.

5%0%

0.5%

0%1%

0.3%

29.2

%0.

3%0%

29.7

%0.

4%0%

0%0%

0.4%

0%68

.9%

0%0%

68.9

%-

PH

F0.

50

10

0.67

0.5

0.67

0.5

00.

670.

750

00

0.75

00.

870

00.

87-

Hea

vy0

00

00

08

00

80

00

00

08

00

8-

Hea

vy %

0%0%

0%0%

0%0%

3.5%

0%0%

3.5%

0%0%

0%0%

0%0%

1.5%

0%0%

1.5%

-

Lig

hts

40

40

82

219

20

223

30

00

30

527

00

527

-

Lig

hts

%10

0%0%

100%

0%10

0%10

0%96

.5%

100%

0%96

.5%

100%

0%0%

0%10

0%0%

98.5

%0%

0%98

.5%

-

Sin

gle

-Un

it T

ruck

s0

00

00

05

00

50

00

00

06

00

6-

Sin

gle

-Un

it T

ruck

s %

0%0%

0%0%

0%0%

2.2%

0%0%

2.2%

0%0%

0%0%

0%0%

1.1%

0%0%

1.1%

-

Bu

ses

00

00

00

30

03

00

00

00

20

02

-

Bu

ses

%0%

0%0%

0%0%

0%1.

3%0%

0%1.

3%0%

0%0%

0%0%

0%0.

4%0%

0%0.

4%-

Ped

estr

ian

s-

--

-2

--

--

-0

--

--

-4

--

--

-0

--

Ped

estr

ian

s%-

--

-33

.3%

-

--

-0%

-

--

-66

.7%

-

--

-0%

-

Bic

ycle

s o

n C

ross

wal

k-

--

-0

--

--

-0

--

--

-0

--

--

-0

--

Bic

ycle

s o

n C

ross

wal

k%-

--

-0%

-

--

-0%

-

--

-0%

-

--

-0%

-

Bic

ycle

s o

n R

oad

00

00

0-

00

00

0-

00

00

0-

00

00

0-

-

Bic

ycle

s o

n R

oad

%-

--

-0%

-

--

-0%

-

--

-0%

-

--

-0%

-

BA

Gro

up45

St.

Cla

ir A

venu

e W

est,

Sui

te 3

00T

oron

to O

N, C

AN

AD

A, M

4V 1

K9

Tur

ning

Mov

emen

t Cou

ntLo

catio

n N

ame:

LA

KE

SH

OR

E R

D W

& S

HO

RE

WO

OD

PL

/ TA

VIS

TO

CK

SQ

Dat

e: W

ed, M

ar 2

2, 2

017

D

eplo

ymen

t Lea

d: W

alte

r F

ugaj

Tur

ning

Mov

emen

t Cou

ntB

AC

17S

4PP

age

2 of

5

Page 22: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

Pea

k H

ou

r: 0

4:30

PM

- 0

5:30

PM

Wea

ther

: C

lear

(-0

.2 °

C)

Sta

rt T

ime

N A

pp

roac

h

TA

VIS

TO

CK

SQ

E A

pp

roac

h

LAK

ES

HO

RE

RD

WS

Ap

pro

ach

S

HO

RE

WO

OD

PL

W A

pp

roac

h

LAK

ES

HO

RE

RD

WIn

t. T

ota

l(1

5 m

in)

Rig

htT

hru

Left

U-T

urn

Ped

sA

ppro

ach

Tot

alR

ight

Thr

uLe

ftU

-Tur

nP

eds

App

roac

h T

otal

Rig

htT

hru

Left

U-T

urn

Ped

sA

ppro

ach

Tot

alR

ight

Thr

uLe

ftU

-Tur

nP

eds

App

roac

h T

otal

16:3

0:00

10

00

01

010

60

00

106

10

00

21

172

10

074

182

16:4

5:00

00

00

10

111

00

00

111

00

10

21

057

00

157

169

17:0

0:00

00

20

02

313

22

00

137

00

00

00

077

10

078

217

17:1

5:00

00

20

22

012

41

00

125

10

10

32

067

00

067

196

Gra

nd

To

tal

10

40

35

447

23

00

479

20

20

74

127

32

01

276

764

Ap

pro

ach

%20

%0%

80%

0%-

0.8%

98.5

%0.

6%0%

-50

%0%

50%

0%-

0.4%

98.9

%0.

7%0%

--

To

tals

%0.

1%0%

0.5%

0%0.

7%0.

5%61

.8%

0.4%

0%62

.7%

0.3%

0%0.

3%0%

0.5%

0.1%

35.7

%0.

3%0%

36.1

%-

PH

F0.

250

0.5

00.

630.

330.

890.

380

0.87

0.5

00.

50

0.5

0.25

0.89

0.5

00.

88-

Hea

vy0

00

00

02

00

20

00

00

02

00

2-

Hea

vy %

0%0%

0%0%

0%0%

0.4%

0%0%

0.4%

0%0%

0%0%

0%0%

0.7%

0%0%

0.7%

-

Lig

hts

10

40

54

470

30

477

20

20

41

271

20

274

-

Lig

hts

%10

0%0%

100%

0%10

0%10

0%99

.6%

100%

0%99

.6%

100%

0%10

0%0%

100%

100%

99.3

%10

0%0%

99.3

%-

Sin

gle

-Un

it T

ruck

s0

00

00

02

00

20

00

00

02

00

2-

Sin

gle

-Un

it T

ruck

s %

0%0%

0%0%

0%0%

0.4%

0%0%

0.4%

0%0%

0%0%

0%0%

0.7%

0%0%

0.7%

-

Bu

ses

00

00

00

00

00

00

00

00

00

00

-

Bu

ses

%0%

0%0%

0%0%

0%0%

0%0%

0%0%

0%0%

0%0%

0%0%

0%0%

0%-

Ped

estr

ian

s-

--

-3

--

--

-0

--

--

-7

--

--

-1

--

Ped

estr

ian

s%-

--

-27

.3%

-

--

-0%

-

--

-63

.6%

-

--

-9.

1%

-

Bic

ycle

s o

n C

ross

wal

k-

--

-0

--

--

-0

--

--

-0

--

--

-0

--

Bic

ycle

s o

n C

ross

wal

k%-

--

-0%

-

--

-0%

-

--

-0%

-

--

-0%

-

Bic

ycle

s o

n R

oad

00

00

0-

00

00

0-

00

00

0-

00

00

0-

-

Bic

ycle

s o

n R

oad

%-

--

-0%

-

--

-0%

-

--

-0%

-

--

-0%

-

0

2 (0.0%)

2 (0.0%)

227 (3.5%)

2

(0.0

%) 4

(0

.0%

) 0

(0.0

%) 4

4

3 (0

.0%

) 0

(0.0

%)

0 (0

.0%

)

0

535

0

0

2

N

8

3

S

2

231 E 542

BA

Gro

up45

St.

Cla

ir A

venu

e W

est,

Sui

te 3

00T

oron

to O

N, C

AN

AD

A, M

4V 1

K9

Tur

ning

Mov

emen

t Cou

ntLo

catio

n N

ame:

LA

KE

SH

OR

E R

D W

& S

HO

RE

WO

OD

PL

/ TA

VIS

TO

CK

SQ

Dat

e: W

ed, M

ar 2

2, 2

017

D

eplo

ymen

t Lea

d: W

alte

r F

ugaj

Tur

ning

Mov

emen

t Cou

ntB

AC

17S

4PP

age

3 of

5

Page 23: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

Pea

k H

ou

r: 0

7:45

AM

- 0

8:45

AM

Wea

ther

: C

lear

(-8

.1 °

C)

0

2 (0.0%)

2 (0.0%)

227 (3.5%)

2

(0.0

%) 4

(0

.0%

) 0

(0.0

%) 4

4

3 (0

.0%

) 0

(0.0

%)

0 (0

.0%

)

0

(1.5%) 5

35

(0.0%)

0

(0.0%)

0

2

N

8

3

S

2

231 E 542

231 W 535

Leg

end

:

###

(#.#

%)

T

OT

AL

VE

HIC

LES

(H

EA

VY

%)

Bic

ycle

s on

Cro

ssw

alk

Ped

estr

ians

N0

2

S0

4

E0

0

W0

0

0

4 (0.0%)

3 (0.0%)

472 (0.4%)

3

(0.0

%) 4

(0

.0%

) 0

(0.0

%) 1

7

2 (0

.0%

) 0

(0.0

%)

2 (0

.0%

)

1

273

2

1

6

N

5

4

S

4

479 E 279

BA

Gro

up45

St.

Cla

ir A

venu

e W

est,

Sui

te 3

00T

oron

to O

N, C

AN

AD

A, M

4V 1

K9

Tur

ning

Mov

emen

t Cou

ntLo

catio

n N

ame:

LA

KE

SH

OR

E R

D W

& S

HO

RE

WO

OD

PL

/ TA

VIS

TO

CK

SQ

Dat

e: W

ed, M

ar 2

2, 2

017

D

eplo

ymen

t Lea

d: W

alte

r F

ugaj

Tur

ning

Mov

emen

t Cou

ntB

AC

17S

4PP

age

4 of

5

Page 24: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

Pea

k H

ou

r: 0

4:30

PM

- 0

5:30

PM

Wea

ther

: C

lear

(-0

.2 °

C)

2

(0.0

%) 4

(0

.0%

) 0

(0.0

%) 4

0

(1.5%) 5

35

(0.0%)

0

(0.0%)

0

8

231 W 535

0

4 (0.0%)

3 (0.0%)

472 (0.4%)

3

(0.0

%) 4

(0

.0%

) 0

(0.0

%) 1

7

2 (0

.0%

) 0

(0.0

%)

2 (0

.0%

)

1

(0.7%) 2

73

(0.0%)

2

(0.0%)

1

6

N

5

4

S

4

479 E 279

475 W 276

Leg

end

:

###

(#.#

%)

T

OT

AL

VE

HIC

LES

(H

EA

VY

%)

Bic

ycle

s on

Cro

ssw

alk

Ped

estr

ians

N0

3

S0

7

E0

0

W0

1

BA

Gro

up45

St.

Cla

ir A

venu

e W

est,

Sui

te 3

00T

oron

to O

N, C

AN

AD

A, M

4V 1

K9

Tur

ning

Mov

emen

t Cou

ntLo

catio

n N

ame:

LA

KE

SH

OR

E R

D W

& S

HO

RE

WO

OD

PL

/ TA

VIS

TO

CK

SQ

Dat

e: W

ed, M

ar 2

2, 2

017

D

eplo

ymen

t Lea

d: W

alte

r F

ugaj

Tur

ning

Mov

emen

t Cou

ntB

AC

17S

4PP

age

5 of

5

Page 25: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

Turn

ing

Mov

emen

t Cou

nt (1

. LA

KES

HO

RE

RD

W &

MO

RD

EN R

D)

Sta

rt T

ime

N A

pp

roac

h

MO

RD

EN

RD

E A

pp

roac

h

LAK

ES

HO

RE

RD

WW

Ap

pro

ach

LA

KE

SH

OR

E R

D W

Int.

To

tal

(15

min

)In

t. T

ota

l(1

hr)

Rig

htN

:WLe

ftN

:EU

-Tur

nN

:NP

eds

N:

App

roac

h T

otal

Rig

htE

:NT

hru

E:W

U-T

urn

E:E

Ped

sE

:A

ppro

ach

Tot

alT

hru

W:E

Left

W:N

U-T

urn

W:W

Ped

sW

:A

ppro

ach

Tot

al

07:0

0:00

10

00

13

210

024

723

01

7510

0

07:1

5:00

12

00

32

170

019

785

02

8310

5

07:3

0:00

10

00

11

360

037

103

40

010

714

5

07:4

5:00

21

00

37

380

045

131

80

013

918

753

7

08:0

0:00

62

00

815

740

089

133

160

114

924

668

3

08:1

5:00

52

01

73

570

060

150

60

015

622

380

1

08:3

0:00

31

02

43

360

039

114

50

211

916

281

8

08:4

5:00

45

01

93

430

046

113

40

011

717

280

3

***B

RE

AK

***

15:0

0:00

53

00

84

850

089

761

00

7717

4

15:1

5:00

32

01

52

770

079

761

01

7716

1

15:3

0:00

42

00

61

102

00

103

771

01

7818

7

15:4

5:00

72

02

92

109

00

111

681

02

6918

971

1

16:0

0:00

21

01

32

108

00

110

622

06

6417

771

4

16:1

5:00

52

02

71

107

00

108

545

01

5917

472

7

16:3

0:00

63

00

91

106

00

107

713

01

7419

073

0

16:4

5:00

60

00

62

106

00

108

570

00

5717

171

2

17:0

0:00

72

00

91

133

00

134

763

00

7922

275

7

17:1

5:00

122

02

143

117

00

120

653

02

6820

278

5

17:3

0:00

83

00

117

690

076

881

00

8917

677

1

17:4

5:00

41

00

51

630

064

630

01

6313

273

2

Gra

nd

To

tal

9236

012

128

6415

040

015

6817

2772

021

1799

3495

-

Ap

pro

ach

%71

.9%

28.1

%0%

-4.

1%95

.9%

0%-

96%

4%0%

--

-

To

tals

%2.

6%1%

0%3.

7%1.

8%43

%0%

44.9

%49

.4%

2.1%

0%51

.5%

--

BA

Gro

up45

St.

Cla

ir A

venu

e W

est,

Sui

te 3

00T

oron

to O

N, C

AN

AD

A, M

4V 1

K9

Tur

ning

Mov

emen

t Cou

ntLo

catio

n N

ame:

LA

KE

SH

OR

E R

D W

& M

OR

DE

N R

DD

ate:

Wed

, Mar

22,

201

7

Dep

loym

ent L

ead:

Wal

ter

Fug

aj

Tur

ning

Mov

emen

t Cou

ntB

AC

17S

4PP

age

1 of

6

Page 26: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

Hea

vy4

70

-3

190

-19

20

--

-

Hea

vy %

4.3%

19.4

%0%

-4.

7%1.

3%0%

-1.

1%2.

8%0%

--

-

Bic

ycle

s0

00

-0

10

-0

00

--

-

Bic

ycle

%0%

0%0%

-0%

0.1%

0%-

0%0%

0%-

--

BA

Gro

up45

St.

Cla

ir A

venu

e W

est,

Sui

te 3

00T

oron

to O

N, C

AN

AD

A, M

4V 1

K9

Tur

ning

Mov

emen

t Cou

ntLo

catio

n N

ame:

LA

KE

SH

OR

E R

D W

& M

OR

DE

N R

DD

ate:

Wed

, Mar

22,

201

7

Dep

loym

ent L

ead:

Wal

ter

Fug

aj

Tur

ning

Mov

emen

t Cou

ntB

AC

17S

4PP

age

2 of

6

Page 27: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

Peak

Hou

r: 0

7:45

AM

- 08

:45

AM

W

eath

er: C

lear

(-8.

1 °C

)

Sta

rt T

ime

N A

pp

roac

h

MO

RD

EN

RD

E A

pp

roac

h

LAK

ES

HO

RE

RD

WW

Ap

pro

ach

LA

KE

SH

OR

E R

D W

Int.

To

tal

(15

min

)

Rig

htLe

ftU

-Tur

nP

eds

App

roac

h T

otal

Rig

htT

hru

U-T

urn

Ped

sA

ppro

ach

Tot

alT

hru

Left

U-T

urn

Ped

sA

ppro

ach

Tot

al

07:4

5:00

21

00

37

380

045

131

80

013

918

7

08:0

0:00

62

00

815

740

089

133

160

114

924

6

08:1

5:00

52

01

73

570

060

150

60

015

622

3

08:3

0:00

31

02

43

360

039

114

50

211

916

2

Gra

nd

To

tal

166

03

2228

205

00

233

528

350

356

381

8

Ap

pro

ach

%72

.7%

27.3

%0%

-12

%88

%0%

-93

.8%

6.2%

0%-

-

To

tals

%2%

0.7%

0%2.

7%3.

4%25

.1%

0%28

.5%

64.5

%4.

3%0%

68.8

%-

PH

F0.

670.

750

0.69

0.47

0.69

00.

650.

880.

550

0.9

-

Hea

vy2

20

40

80

85

00

5-

Hea

vy %

12.5

%33

.3%

0%18

.2%

0%3.

9%0%

3.4%

0.9%

0%0%

0.9%

-

Lig

hts

144

018

2819

70

225

523

350

558

-

Lig

hts

%87

.5%

66.7

%0%

81.8

%10

0%96

.1%

0%96

.6%

99.1

%10

0%0%

99.1

%-

Sin

gle

-Un

it T

ruck

s1

00

10

50

55

00

5-

Sin

gle

-Un

it T

ruck

s %

6.3%

0%0%

4.5%

0%2.

4%0%

2.1%

0.9%

0%0%

0.9%

-

Bu

ses

12

03

03

03

00

00

-

Bu

ses

%6.

3%33

.3%

0%13

.6%

0%1.

5%0%

1.3%

0%0%

0%0%

-

Ped

estr

ian

s-

--

3-

--

-0

--

--

3-

-

Ped

estr

ian

s%-

--

50%

-

--

0%

--

-50

%

-

Bic

ycle

s o

n C

ross

wal

k-

--

0-

--

-0

--

--

0-

-

Bic

ycle

s o

n C

ross

wal

k%-

--

0%

--

-0%

-

--

0%

-

Bic

ycle

s o

n R

oad

00

00

-0

00

0-

00

00

--

Bic

ycle

s o

n R

oad

%-

--

0%

--

-0%

-

--

0%

-

BA

Gro

up45

St.

Cla

ir A

venu

e W

est,

Sui

te 3

00T

oron

to O

N, C

AN

AD

A, M

4V 1

K9

Tur

ning

Mov

emen

t Cou

ntLo

catio

n N

ame:

LA

KE

SH

OR

E R

D W

& M

OR

DE

N R

DD

ate:

Wed

, Mar

22,

201

7

Dep

loym

ent L

ead:

Wal

ter

Fug

aj

Tur

ning

Mov

emen

t Cou

ntB

AC

17S

4PP

age

3 of

6

Page 28: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

Peak

Hou

r: 0

4:30

PM

- 05

:30

PM

Wea

ther

: Cle

ar (-

0.2

°C)

Sta

rt T

ime

N A

pp

roac

h

MO

RD

EN

RD

E A

pp

roac

h

LAK

ES

HO

RE

RD

WW

Ap

pro

ach

LA

KE

SH

OR

E R

D W

Int.

To

tal

(15

min

)

Rig

htLe

ftU

-Tur

nP

eds

App

roac

h T

otal

Rig

htT

hru

U-T

urn

Ped

sA

ppro

ach

Tot

alT

hru

Left

U-T

urn

Ped

sA

ppro

ach

Tot

al

16:3

0:00

63

00

91

106

00

107

713

01

7419

0

16:4

5:00

60

00

62

106

00

108

570

00

5717

1

17:0

0:00

72

00

91

133

00

134

763

00

7922

2

17:1

5:00

122

02

143

117

00

120

653

02

6820

2

Gra

nd

To

tal

317

02

387

462

00

469

269

90

327

878

5

Ap

pro

ach

%81

.6%

18.4

%0%

-1.

5%98

.5%

0%-

96.8

%3.

2%0%

--

To

tals

%3.

9%0.

9%0%

4.8%

0.9%

58.9

%0%

59.7

%34

.3%

1.1%

0%35

.4%

-

PH

F0.

650.

580

0.68

0.58

0.87

00.

880.

880.

750

0.88

-

Hea

vy0

00

00

20

23

00

3-

Hea

vy %

0%0%

0%0%

0%0.

4%0%

0.4%

1.1%

0%0%

1.1%

-

Lig

hts

317

038

746

00

467

266

90

275

-

Lig

hts

%10

0%10

0%0%

100%

100%

99.6

%0%

99.6

%98

.9%

100%

0%98

.9%

-

Sin

gle

-Un

it T

ruck

s0

00

00

20

23

00

3-

Sin

gle

-Un

it T

ruck

s %

0%0%

0%0%

0%0.

4%0%

0.4%

1.1%

0%0%

1.1%

-

Bu

ses

00

00

00

00

00

00

-

Bu

ses

%0%

0%0%

0%0%

0%0%

0%0%

0%0%

0%-

Ped

estr

ian

s-

--

2-

--

-0

--

--

3-

-

Ped

estr

ian

s%-

--

40%

-

--

0%

--

-60

%

-

Bic

ycle

s o

n C

ross

wal

k-

--

0-

--

-0

--

--

0-

-

Bic

ycle

s o

n C

ross

wal

k%-

--

0%

--

-0%

-

--

0%

-

Bic

ycle

s o

n R

oad

00

00

-0

00

0-

00

00

--

Bic

ycle

s o

n R

oad

%-

--

0%

--

-0%

-

--

0%

-

0

28 (0.0%)

205 (3.9%)

3

(33.3

%) 6

(12.5

%) 16

3

63

N

22

233 E 534

BA

Gro

up45

St.

Cla

ir A

venu

e W

est,

Sui

te 3

00T

oron

to O

N, C

AN

AD

A, M

4V 1

K9

Tur

ning

Mov

emen

t Cou

ntLo

catio

n N

ame:

LA

KE

SH

OR

E R

D W

& M

OR

DE

N R

DD

ate:

Wed

, Mar

22,

201

7

Dep

loym

ent L

ead:

Wal

ter

Fug

aj

Tur

ning

Mov

emen

t Cou

ntB

AC

17S

4PP

age

4 of

6

Page 29: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

Peak

Hou

r: 0

7:45

AM

- 08

:45

AM

W

eath

er: C

lear

(-8.

1 °C

)

0

28 (0.0%)

205 (3.9%)

3

(33.3

%) 6

(12.5

%) 16

3

(0.9%) 5

28

(0.0%)

35

63

N

22

233 E 534

221 W 563

Leg

end

:

###

(#.#

%)

T

OT

AL

VE

HIC

LES

(H

EA

VY

%)

Bic

ycle

s on

Cro

ssw

alk

Ped

estr

ians

N0

3

E0

0

W0

3

0

7 (0

.0%) 462 (0.4%)

2

(0.0%

) 7

(0.0%

) 31

3

16

N

38

469 E 276

BA

Gro

up45

St.

Cla

ir A

venu

e W

est,

Sui

te 3

00T

oron

to O

N, C

AN

AD

A, M

4V 1

K9

Tur

ning

Mov

emen

t Cou

ntLo

catio

n N

ame:

LA

KE

SH

OR

E R

D W

& M

OR

DE

N R

DD

ate:

Wed

, Mar

22,

201

7

Dep

loym

ent L

ead:

Wal

ter

Fug

aj

Tur

ning

Mov

emen

t Cou

ntB

AC

17S

4PP

age

5 of

6

Page 30: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

Peak

Hou

r: 0

4:30

PM

- 05

:30

PM

Wea

ther

: Cle

ar (-

0.2

°C)

3

(33.3

%) 6

(12.5

%) 16

3

(0.9%) 5

28

(0.0%)

35

221 W 563

0

7 (0

.0%) 462 (0.4%)

2

(0.0%

) 7

(0.0%

) 31

3

(1.1%) 2

69

(0.0%)

9

16

N

38

469 E 276

493 W 278

Leg

end

:

###

(#.#

%)

T

OT

AL

VE

HIC

LES

(H

EA

VY

%)

Bic

ycle

s on

Cro

ssw

alk

Ped

estr

ians

N0

2

E0

0

W0

3

BA

Gro

up45

St.

Cla

ir A

venu

e W

est,

Sui

te 3

00T

oron

to O

N, C

AN

AD

A, M

4V 1

K9

Tur

ning

Mov

emen

t Cou

ntLo

catio

n N

ame:

LA

KE

SH

OR

E R

D W

& M

OR

DE

N R

DD

ate:

Wed

, Mar

22,

201

7

Dep

loym

ent L

ead:

Wal

ter

Fug

aj

Tur

ning

Mov

emen

t Cou

ntB

AC

17S

4PP

age

6 of

6

Page 31: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

Dorval Dr @ Speers Rd (Master) Lakeshore Rd @ Morden Rd (IPS) 8/26/2014 16:08

Configuration-----------------------------------------------------------------

Controller Sequence Priority 1 2 3 4 5 6 7 8 9 10 11 12

Ring 1 Phases . . 1 2 | 3 4 | 9 10 | 0 0 0 0 0 0 Ring 2 Phases . . 5 6 | 7 8 |11 12 | 0 0 0 0 0 0

Phase 1 2 3 4 5 6 7 8 9 10 11 12

In Use. . . . . . . X . X . . . . . . . .Exclusive Ped . . . . . X . . . . . . . .Direction . . . .SBLT NB WBLT EB SB WB

Overlap A B C DDirection . . .

Load Switch Channel/Driver Group Assign (Info Only): Load Signal Switch Driver Group (MMU) Phase/ Channel Ovlap Ped 1 . . . . . . 1 . 2 . . . . . . 2 . 3 . . . . . . 3 . 4 . . . . . . 4 . 5 . . . . . . A . 6 . . . . . . B . 7 . . . . . . 2 X 8 . . . . . . 4 X 9 . . . . . . 0 . 10 . . . . . . 0 . 11 . . . . . . 0 . 12 . . . . . . 0 . 13 . . . . . . 0 . 14 . . . . . . 0 . 15 . . . . . . 0 . 16 . . . . . . 0 .

Page 32: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

Dorval Dr @ Speers Rd (Master) Lakeshore Rd @ Morden Rd (IPS) 8/26/2014 16:08

Configuration Continued-----------------------------------------------------------------

Enable BIU: 1 2 3 4 5 6 7 8Terminal/Facilities. . . . X . . . . . . .Detector Rack. . . . . . . . . . . . . . .

Type 2 Runs as Type 1. . . .MMU Disable. . . . . . . . .Diagnostic Enable. . . . . .Peer-Peer Comm Enable. . . .

1 2 3 4 5 6 7 8 9 10Peer To Peer Addresses . . 255 255 255 255 255 255 255 255 255 255

Port 2:

Port 2 Protocol . . . . . . . . TerminalPort 2 Enable . . . . . . . . . YESAB3418 Address. . . . . . . . . 1AB3418 Group Address. . . . . . 0AB3418 Response Delay . . . . . 0AB3418 Single Flag Enable . . . NOAB3418 Drop-Out Time. . . . . . 0AB3418 TOD SF Select. . . . . . 0Data Rate . . . . . . . . . . . 1200 bpsData, Parity, Stop. . . . . . . 8, 0, 1

Port 3:

Port 3 Protocol . . . . . . . . TelemetryPort 3 Enable . . . . . . . . . NOTelemetry Address . . . . . . . 0System Detector 9-16 Address. . 0Telemetry Response Delay. . . . 8700AB3418 Address. . . . . . . . . 0AB3418 Group Address. . . . . . 0AB3418 Response Delay . . . . . 0AB3418 Single Flag Enable . . . NOAB3418 Drop-Out Time. . . . . . 0AB3418 TOD SF Select. . . . . . 0Duplex. . . . . . . . . . . . . FullData Rate . . . . . . . . . . . 1200 bpsData, Parity, Stop. . . . . . . 8, 0, 1

Page 33: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

Dorval Dr @ Speers Rd (Master) Lakeshore Rd @ Morden Rd (IPS) 8/26/2014 16:08

Configuration Continued-----------------------------------------------------------------

Event Enabling Alarm Enabling

Critical RFE'S (MMU/TF) . . . . . X ALARM 1 . . . . . . . . . . . XNon-Critical RFE'S (DET/TEST) . . . ALARM 2 . . . . . . . . . . . .Detector Errors . . . . . . . . . . ALARM 3 . . . . . . . . . . . .Coordination Errors . . . . . . . . ALARM 4 . . . . . . . . . . . .MMU Flash Faults. . . . . . . . . X ALARM 5 . . . . . . . . . . . .Local Flash Faults. . . . . . . . X ALARM 6 . . . . . . . . . . . .Preempt . . . . . . . . . . . . . X ALARM 7 . . . . . . . . . . . .Power On/Off. . . . . . . . . . . X ALARM 8 . . . . . . . . . . . .Low Battery . . . . . . . . . . . X ALARM 9 . . . . . . . . . . . . ALARM 10. . . . . . . . . . . . ALARM 11. . . . . . . . . . . . ALARM 12. . . . . . . . . . . . ALARM 13. . . . . . . . . . . . ALARM 14. . . . . . . . . . . . ALARM 15. . . . . . . . . . . . ALARM 16. . . . . . . . . . . .

Supervisor Access Code. . . ****Data Change Access Code . . ****

MMU Compatibility Program (Info Only)

Channel Is Allowed to Time With Channel 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 . . . . . . . . . . . . . . X . . . 2 . . . . . . . . . . . . X . X . . 3 . . . . . . . . . . . . . X . . 4 . . . . . . . . . . . X . X . 5 . . . . . . . . . . . . X . 6 . . . . . . . . . . . X . 7 . . . . . . . . . . . . 8 . . . . . . . . . . . 9 . . . . . . . . . . 10. . . . . . . . . 11. . . . . . . . 12. . . . . . . 13. . . . . . 14. . . . . 15. . . .

Version Info:Software Assy. Part No. VersionBoot 27831 2.83Program 45561 7.9 Application . 3Help 27891 6.33Configuration 27913 C165�

Page 34: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

Dorval Dr @ Speers Rd (Master) Lakeshore Rd @ Morden Rd (IPS) 8/26/2014 16:08

By-Phase Timing Data-----------------------------------------------------------------

Phase 1 2 3 4 5 6 7 8 9 10 11 12Direction SBLT NB WBLT EB SB WB

Minimum Green 0 64 0 0 0 0 0 0 5 5 5 5

Bike Min Green 0 0 0 0 0 0 0 0 0 0 0 0

Cond Serv Min Grn 0 0 0 0 0 0 0 0 0 0 0 0

Walk 0 0 0 10 0 5 0 5 0 10 0 10

Ped Clearance 0 7 0 7 0 7 0 7 0 16 0 16

Veh Extension 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5.0 5.0 5.0 5.0

Alt Veh Exten 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Max Extension 0 0 0 0 0 0 0 0 0 0 0 0

Max 1 0 0 0 0 0 0 0 0 35 35 35 35

Max 2 0 0 0 0 0 0 0 0 40 40 40 40

Max 3 0 0 0 0 0 0 0 0 0 0 0 0

Det. Fail Max 0 0 0 0 0 0 0 0 0 0 0 0

Yellow Change 3.0 3.3 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

Red Clearance 1.0 2.7 1.0 2.7 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0

Red Revert 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0

Act. B4 Init 0 0 0 0 0 0 0 0 0 0 0 0

Sec/Actuation 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Max Initial 30 30 30 30 30 30 30 30 30 30 30 30

Time B4 Reduction 0 0 0 0 0 0 0 0 0 0 0 0

Cars Waiting 0 0 0 0 0 0 0 0 0 0 0 0

Time To Reduce 0 0 0 0 0 0 0 0 0 0 0 0

Minimum Gap 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 35: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

Dorval Dr @ Speers Rd (Master) Lakeshore Rd @ Morden Rd (IPS) 8/26/2014 16:08

Option Data-----------------------------------------------------------------

Phase 1 2 3 4 5 6 7 8 9 10 11 12Guaranteed Passage . . . . . . . . . . . . . .Call To NonActuated 1 . . X . . . . . . . . . .Call To NonActuated 2 . . . . . . . . . . . . .Dual Entry. . . . . . . . . . . . . . . . . . .Conditional Service . . . . . . . . . . . . . .Conditional Reservice . . . . . . . . . . . . .Actuated Rest in Walk . . . . . . . . . . . . .Flashing Walk . . . . . . . . . . . . . . . . .

Enable Programmable OptionsDual Entry. . . . . . . . . . . OFF Backup Protection Group 1 . . . . OFFConditional Service . . . . . . OFF Backup Protection Group 2 . . . . OFFPed Clearance Protection. . . . OFF Backup Protection Group 3 . . . . OFFSpecial Preempt Overlap Flash . OFF Simultaneous Gap Group 1. . . . . OFFCond Service Det Cross Switch . OFF Simultaneous Gap Group 2. . . . . OFFLock Detectors in Red Only. . . OFF Simultaneous Gap Group 3. . . . . OFF

Five Section Left Turn Control Phases: 5-2 7-4 1-6 3-8 11-10 9-12Left Turn Head. . . . . . . . . .

Page 36: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

Dorval Dr @ Speers Rd (Master) Lakeshore Rd @ Morden Rd (IPS) 8/26/2014 16:08

Recall Data, Dimming-----------------------------------------------------------------

Phase 1 2 3 4 5 6 7 8 9 10 11 12Locking Detector. . . . . . . . . . . . . . . .Vehicle Recall. . . . . . X . . . . . . . . . .Pedestrian Recall . . . . X . . . . . . . . . .Recall To Max . . . . . . . . . . . . . . . . .Soft Recall . . . . . . . . . . . . . . . . . .Don't Rest Here . . . . . . . . . . . . . . . .Ped Dark if No Call . . . . . . . . . . . . . .

Dimming: Load Switch 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16Green/Walk. . . . NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NOYellow/Ped Clear. NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NORed/Don't Walk. . NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO

Page 37: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

Dorval Dr @ Speers Rd (Master) Lakeshore Rd @ Morden Rd (IPS) 8/26/2014 16:08

Detector Phase Assignment-----------------------------------------------------------------

PhaseDet. 1 2 3 4 5 6 7 8 9 10 11 12 1 X . . . . . . . . . . . 2 . X . . . . . . . . . . 3 . . X . . . . . . . . . 4 . . . X . . . . . . . . 5 . . . . X . . . . . . . 6 . . . . . X . . . . . . 7 . . . . . . X . . . . . 8 . . . . . . . X . . . . 9 . . . . . . . . X . . . 10 . . . . . . . . . X . . 11 . . . . . . . . . . X . 12 . . . . . . . . . . . X 13 . . . . . . . . . . . . 14 . . . . . . . . . . . . 15 . . . . . . . . . . . . 16 . . . . . . . . . . . . 17 . . . . . . . . . . . . 18 . . . . . . . . . . . . 19 . . . . . . . . . . . . 20 . . . . . . . . . . . . 21 . . . . . . . . . . . . 22 . . . . . . . . . . . . 23 . . . . . . . . . . . . 24 . . . . . . . . . . . . 25 . . . . . . . . . . . . 26 . . . . . . . . . . . . 27 . . . . . . . . . . . . 28 . . . . . . . . . . . . 29 . . . . . . . . . . . . 30 . . . . . . . . . . . . 31 . . . . . . . . . . . . 32 . . . . . . . . . . . .

Page 38: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

Dorval Dr @ Speers Rd (Master) Lakeshore Rd @ Morden Rd (IPS) 8/26/2014 16:08

Detector Cross Switching-----------------------------------------------------------------

PhaseDet. 1 2 3 4 5 6 7 8 9 10 11 12 1 . . . . . . . . . . . . 2 . . . . . . . . . . . . 3 . . . . . . . . . . . . 4 . . . . . . . . . . . . 5 . . . . . . . . . . . . 6 . . . . . . . . . . . . 7 . . . . . . . . . . . . 8 . . . . . . . . . . . . 9 . . . . . . . . . . . . 10 . . . . . . . . . . . . 11 . . . . . . . . . . . . 12 . . . . . . . . . . . . 13 . . . . . . . . . . . . 14 . . . . . . . . . . . . 15 . . . . . . . . . . . . 16 . . . . . . . . . . . . 17 . . . . . . . . . . . . 18 . . . . . . . . . . . . 19 . . . . . . . . . . . . 20 . . . . . . . . . . . . 21 . . . . . . . . . . . . 22 . . . . . . . . . . . . 23 . . . . . . . . . . . . 24 . . . . . . . . . . . . 25 . . . . . . . . . . . . 26 . . . . . . . . . . . . 27 . . . . . . . . . . . . 28 . . . . . . . . . . . . 29 . . . . . . . . . . . . 30 . . . . . . . . . . . . 31 . . . . . . . . . . . . 32 . . . . . . . . . . . .

Page 39: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

Dorval Dr @ Speers Rd (Master) Lakeshore Rd @ Morden Rd (IPS) 8/26/2014 16:08

Detector Cross Switching-----------------------------------------------------------------

PhaseDet. 1 2 3 4 5 6 7 8 9 10 11 12 33 . . . . . . . . . . . . 34 . . . . . . . . . . . . 35 . . . . . . . . . . . . 36 . . . . . . . . . . . . 37 . . . . . . . . . . . . 38 . . . . . . . . . . . . 39 . . . . . . . . . . . . 40 . . . . . . . . . . . . 41 . . . . . . . . . . . . 42 . . . . . . . . . . . . 43 . . . . . . . . . . . . 44 . . . . . . . . . . . . 45 . . . . . . . . . . . . 46 . . . . . . . . . . . . 47 . . . . . . . . . . . . 48 . . . . . . . . . . . . 49 . . . . . . . . . . . . 50 . . . . . . . . . . . . 51 . . . . . . . . . . . . 52 . . . . . . . . . . . . 53 . . . . . . . . . . . . 54 . . . . . . . . . . . . 55 . . . . . . . . . . . . 56 . . . . . . . . . . . . 57 . . . . . . . . . . . . 58 . . . . . . . . . . . . 59 . . . . . . . . . . . . 60 . . . . . . . . . . . . 61 . . . . . . . . . . . . 62 . . . . . . . . . . . . 63 . . . . . . . . . . . . 64 . . . . . . . . . . . .

Page 40: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

Dorval Dr @ Speers Rd (Master) Lakeshore Rd @ Morden Rd (IPS) 8/26/2014 16:08

Coordinator Manual Command and Options-----------------------------------------------------------------

Manual Enable . . . . . Pattern . . . . . . . 0

Split Units . . . . . Percent OffsetUnits . . . . . PercentInterconnect Format . STD Interconnect Source . TLMTransition. . . . . . SMOOTH Dwell Period. . . . . 0Resync Count. . . . . 0

Actuated Coord Phase . . . . Actuated Walk Rest . . . XInhibit Max Timing . . . . . Max 2 Select . . . . . . .Floating Force Off . . . . . Multisync. . . . . . . . .

PhaseSplit Demand: Call Time Cyc Count 1 2 3 4 5 6 7 8 9 10 11 12Demand 1 . . 0 0 . . . . . . . . . . . .Demand 2 . . 0 0 . . . . . . . . . . . .

Phase 1 2 3 4 5 6 7 8 9 10 11 12Auto Permissive Min Green . 0 0 0 0 0 0 0 0 0 0 0 0

A B C D E FFree Alternate Sequence . . . . . . . .

Page 41: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

Dorval Dr @ Speers Rd (Master) Lakeshore Rd @ Morden Rd (IPS) 8/26/2014 16:08

Coordination Patterns-----------------------------------------------------------------

Page 42: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

Dorval Dr @ Speers Rd (Master) Lakeshore Rd @ Morden Rd (IPS) 8/26/2014 16:08

NIC/TOD Clock/Calendar-----------------------------------------------------------------

Manual NIC Program Step . . . . . . . . 0

Manual TOD Program Step . . . . . . . . 0

NIC Resync Time . . . . . . . . . . . . 0315

Sync Reference is . . . . . . . . . . . Reference Time

Week 1 Begins on 1st Sunday . . . . . . NO If NO, then week containing Jan. 1

Disable Daylight Savings Time . . . . . NO

Daylight SavingsBegins Last Sunday in March . . . . . . NO If NO, then Second Sunday as per 2007 DST Law

Page 43: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

Dorval Dr @ Speers Rd (Master) Lakeshore Rd @ Morden Rd (IPS) 8/26/2014 16:08

TOD Weekly/Yearly-----------------------------------------------------------------

Weekly Program Numbers 1 2 3 4 5 6 7 8 9 10

Sunday . . . 1 1 1 1 1 1 1 1 1 1 Program No.Monday . . . 1 1 1 1 1 1 1 1 1 1 Program No.Tuesday. . . 1 1 1 1 1 1 1 1 1 1 Program No.Wednesday. . 1 1 1 1 1 1 1 1 1 1 Program No.Thursday . . 1 1 1 1 1 1 1 1 1 1 Program No.Friday . . . 1 1 1 1 1 1 1 1 1 1 Program No.Saturday . . 1 1 1 1 1 1 1 1 1 1 Program No.

Week of Year 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18Prog 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36Prog 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53Prog 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

Page 44: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

Dorval Dr @ Speers Rd (Master) Lakeshore Rd @ Morden Rd (IPS) 8/26/2014 16:08

NIC Program Steps-----------------------------------------------------------------

Step Program Step Begins Pattern Override

Page 45: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

Dorval Dr @ Speers Rd (Master) Lakeshore Rd @ Morden Rd (IPS) 8/26/2014 16:08

TOD Program Steps-----------------------------------------------------------------

Page 46: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

346-362 LAKESHORE RD W JUNE 2017 7086-12

APPENDIX B: Synchro Analysis

Page 47: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

HCM Signalized Intersection Capacity Analysis EXAM4: Lakeshore Rd & Morden Rd Baseline

2017-05-16 Synchro 9 ReportJYK Page 1

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 35 530 205 30 5 15Future Volume (vph) 35 530 205 30 5 15Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Total Lost time (s) 5.7 5.7 4.0Lane Util. Factor 1.00 1.00 1.00Frpb, ped/bikes 1.00 1.00 0.96Flpb, ped/bikes 1.00 1.00 1.00Frt 1.00 0.98 0.90Flt Protected 1.00 1.00 0.99Satd. Flow (prot) 1876 1794 1371Flt Permitted 0.97 1.00 0.99Satd. Flow (perm) 1822 1794 1371Peak-hour factor, PHF 0.87 0.87 0.87 0.87 0.87 0.87Adj. Flow (vph) 40 609 236 34 6 17RTOR Reduction (vph) 0 0 2 0 16 0Lane Group Flow (vph) 0 649 268 0 7 0Confl. Peds. (#/hr) 3 3 3Heavy Vehicles (%) 0% 1% 4% 2% 33% 13%Turn Type Perm NA NA ProtProtected Phases 4 8 6Permitted Phases 4Actuated Green, G (s) 80.5 80.5 4.1Effective Green, g (s) 80.5 80.5 4.1Actuated g/C Ratio 0.85 0.85 0.04Clearance Time (s) 5.7 5.7 4.0Vehicle Extension (s) 3.0 3.0 3.0Lane Grp Cap (vph) 1555 1531 59v/s Ratio Prot 0.15 c0.00v/s Ratio Perm c0.36v/c Ratio 0.42 0.17 0.11Uniform Delay, d1 1.6 1.2 43.4Progression Factor 1.00 1.00 1.00Incremental Delay, d2 0.8 0.2 0.9Delay (s) 2.4 1.4 44.2Level of Service A A DApproach Delay (s) 2.4 1.4 44.2Approach LOS A A D

Intersection SummaryHCM 2000 Control Delay 3.1 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.40Actuated Cycle Length (s) 94.3 Sum of lost time (s) 9.7Intersection Capacity Utilization 61.0% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

Page 48: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

HCM Signalized Intersection Capacity Analysis EXPM4: Lakeshore Rd & Morden Rd Baseline

2017-05-16 Synchro 9 ReportJYK Page 1

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 10 270 465 5 5 30Future Volume (vph) 10 270 465 5 5 30Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Total Lost time (s) 5.7 5.7 4.0Lane Util. Factor 1.00 1.00 1.00Frpb, ped/bikes 1.00 1.00 0.95Flpb, ped/bikes 1.00 1.00 1.00Frt 1.00 1.00 0.89Flt Protected 1.00 1.00 0.99Satd. Flow (prot) 1878 1897 1593Flt Permitted 0.98 1.00 0.99Satd. Flow (perm) 1848 1897 1593Peak-hour factor, PHF 0.88 0.88 0.88 0.88 0.88 0.88Adj. Flow (vph) 11 307 528 6 6 34RTOR Reduction (vph) 0 0 0 0 33 0Lane Group Flow (vph) 0 318 534 0 7 0Confl. Peds. (#/hr) 2 2 3Heavy Vehicles (%) 0% 1% 0% 0% 0% 0%Turn Type Perm NA NA ProtProtected Phases 4 8 6Permitted Phases 4Actuated Green, G (s) 80.5 80.5 4.1Effective Green, g (s) 80.5 80.5 4.1Actuated g/C Ratio 0.85 0.85 0.04Clearance Time (s) 5.7 5.7 4.0Vehicle Extension (s) 3.0 3.0 3.0Lane Grp Cap (vph) 1577 1619 69v/s Ratio Prot c0.28 c0.00v/s Ratio Perm 0.17v/c Ratio 0.20 0.33 0.11Uniform Delay, d1 1.2 1.4 43.3Progression Factor 1.00 1.00 1.00Incremental Delay, d2 0.3 0.5 0.7Delay (s) 1.5 2.0 44.0Level of Service A A DApproach Delay (s) 1.5 2.0 44.0Approach LOS A A D

Intersection SummaryHCM 2000 Control Delay 3.7 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.32Actuated Cycle Length (s) 94.3 Sum of lost time (s) 9.7Intersection Capacity Utilization 37.0% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 49: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

HCM Unsignalized Intersection Capacity Analysis EXPM5: Shorewood Pl/Tavistock Sq & Lakeshore Rd Baseline

2017-05-16 Synchro 9 ReportJYK Page 2

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 2 275 1 5 470 5 2 0 2 5 0 1Future Volume (Veh/h) 2 275 1 5 470 5 2 0 2 5 0 1Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88Hourly flow rate (vph) 2 313 1 6 534 6 2 0 2 6 0 1Pedestrians 7 3Lane Width (m) 3.6 3.6Walking Speed (m/s) 1.2 1.2Percent Blockage 1 0Right turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m) 114pX, platoon unblocked 0.99 0.99 0.99 0.99 0.99 0.99vC, conflicting volume 543 321 874 880 320 872 877 540vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 543 307 867 872 307 864 870 540tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2tC, 2 stage (s)tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3p0 queue free % 100 100 99 100 100 98 100 100cM capacity (veh/h) 1033 1243 267 283 725 269 284 544

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 316 546 4 7Volume Left 2 6 2 6Volume Right 1 6 2 1cSH 1033 1243 390 290Volume to Capacity 0.00 0.00 0.01 0.02Queue Length 95th (m) 0.0 0.1 0.2 0.6Control Delay (s) 0.1 0.1 14.3 17.7Lane LOS A A B CApproach Delay (s) 0.1 0.1 14.3 17.7Approach LOS B C

Intersection SummaryAverage Delay 0.3Intersection Capacity Utilization 38.3% ICU Level of Service AAnalysis Period (min) 15

Page 50: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

HCM Signalized Intersection Capacity Analysis FBAM4: Lakeshore Rd & Morden Rd Baseline

2017-06-05 Synchro 9 ReportJYK Page 1

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 35 565 220 30 5 15Future Volume (vph) 35 565 220 30 5 15Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Total Lost time (s) 5.7 5.7 4.0Lane Util. Factor 1.00 1.00 1.00Frpb, ped/bikes 1.00 1.00 0.96Flpb, ped/bikes 1.00 1.00 1.00Frt 1.00 0.98 0.90Flt Protected 1.00 1.00 0.99Satd. Flow (prot) 1876 1796 1371Flt Permitted 0.97 1.00 0.99Satd. Flow (perm) 1823 1796 1371Peak-hour factor, PHF 0.87 0.87 0.87 0.87 0.87 0.87Adj. Flow (vph) 40 649 253 34 6 17RTOR Reduction (vph) 0 0 2 0 16 0Lane Group Flow (vph) 0 689 285 0 7 0Confl. Peds. (#/hr) 3 3 3Heavy Vehicles (%) 0% 1% 4% 2% 33% 13%Turn Type Perm NA NA ProtProtected Phases 4 8 6Permitted Phases 4Actuated Green, G (s) 80.5 80.5 4.1Effective Green, g (s) 80.5 80.5 4.1Actuated g/C Ratio 0.85 0.85 0.04Clearance Time (s) 5.7 5.7 4.0Vehicle Extension (s) 3.0 3.0 3.0Lane Grp Cap (vph) 1556 1533 59v/s Ratio Prot 0.16 c0.00v/s Ratio Perm c0.38v/c Ratio 0.44 0.19 0.11Uniform Delay, d1 1.6 1.2 43.4Progression Factor 1.00 1.00 1.00Incremental Delay, d2 0.9 0.3 0.9Delay (s) 2.5 1.5 44.2Level of Service A A DApproach Delay (s) 2.5 1.5 44.2Approach LOS A A D

Intersection SummaryHCM 2000 Control Delay 3.2 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.43Actuated Cycle Length (s) 94.3 Sum of lost time (s) 9.7Intersection Capacity Utilization 62.8% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

Page 51: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

HCM Unsignalized Intersection Capacity Analysis FBAM5: Shorewood Pl/Tavistock Sq & Lakeshore Rd Baseline

2017-06-05 Synchro 9 ReportJYK Page 2

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 0 570 0 2 245 2 0 0 5 5 0 5Future Volume (Veh/h) 0 570 0 2 245 2 0 0 5 5 0 5Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83Hourly flow rate (vph) 0 687 0 2 295 2 0 0 6 6 0 6Pedestrians 4 2Lane Width (m) 3.6 3.6Walking Speed (m/s) 1.2 1.2Percent Blockage 0 0Right turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m) 114pX, platoon unblocked 0.91 0.91 0.91 0.91 0.91 0.91vC, conflicting volume 299 691 997 994 691 995 993 298vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 299 609 946 943 609 944 942 298tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2tC, 2 stage (s)tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3p0 queue free % 100 100 100 100 99 97 100 99cM capacity (veh/h) 1260 877 217 239 451 217 239 745

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 687 299 6 12Volume Left 0 2 0 6Volume Right 0 2 6 6cSH 1260 877 451 336Volume to Capacity 0.00 0.00 0.01 0.04Queue Length 95th (m) 0.0 0.1 0.3 0.9Control Delay (s) 0.0 0.1 13.1 16.1Lane LOS A B CApproach Delay (s) 0.0 0.1 13.1 16.1Approach LOS B C

Intersection SummaryAverage Delay 0.3Intersection Capacity Utilization 41.8% ICU Level of Service AAnalysis Period (min) 15

Page 52: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

HCM Signalized Intersection Capacity Analysis FBPM4: Lakeshore Rd & Morden Rd Baseline

2017-06-05 Synchro 9 ReportJYK Page 1

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 10 290 495 5 5 30Future Volume (vph) 10 290 495 5 5 30Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Total Lost time (s) 5.7 5.7 4.0Lane Util. Factor 1.00 1.00 1.00Frpb, ped/bikes 1.00 1.00 0.95Flpb, ped/bikes 1.00 1.00 1.00Frt 1.00 1.00 0.89Flt Protected 1.00 1.00 0.99Satd. Flow (prot) 1879 1897 1593Flt Permitted 0.98 1.00 0.99Satd. Flow (perm) 1848 1897 1593Peak-hour factor, PHF 0.88 0.88 0.88 0.88 0.88 0.88Adj. Flow (vph) 11 330 562 6 6 34RTOR Reduction (vph) 0 0 0 0 33 0Lane Group Flow (vph) 0 341 569 0 7 0Confl. Peds. (#/hr) 2 2 3Heavy Vehicles (%) 0% 1% 0% 0% 0% 0%Turn Type Perm NA NA ProtProtected Phases 4 8 6Permitted Phases 4Actuated Green, G (s) 80.5 80.5 4.1Effective Green, g (s) 80.5 80.5 4.1Actuated g/C Ratio 0.85 0.85 0.04Clearance Time (s) 5.7 5.7 4.0Vehicle Extension (s) 3.0 3.0 3.0Lane Grp Cap (vph) 1577 1619 69v/s Ratio Prot c0.30 c0.00v/s Ratio Perm 0.18v/c Ratio 0.22 0.35 0.11Uniform Delay, d1 1.2 1.4 43.3Progression Factor 1.00 1.00 1.00Incremental Delay, d2 0.3 0.6 0.7Delay (s) 1.6 2.0 44.0Level of Service A A DApproach Delay (s) 1.6 2.0 44.0Approach LOS A A D

Intersection SummaryHCM 2000 Control Delay 3.6 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.34Actuated Cycle Length (s) 94.3 Sum of lost time (s) 9.7Intersection Capacity Utilization 38.6% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 53: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

HCM Unsignalized Intersection Capacity Analysis FBPM5: Shorewood Pl/Tavistock Sq & Lakeshore Rd Baseline

2017-06-05 Synchro 9 ReportJYK Page 2

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 2 295 1 5 500 5 2 0 2 5 0 1Future Volume (Veh/h) 2 295 1 5 500 5 2 0 2 5 0 1Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88Hourly flow rate (vph) 2 335 1 6 568 6 2 0 2 6 0 1Pedestrians 7 3Lane Width (m) 3.6 3.6Walking Speed (m/s) 1.2 1.2Percent Blockage 1 0Right turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m) 114pX, platoon unblocked 0.98 0.98 0.98 0.98 0.98 0.98vC, conflicting volume 577 343 930 936 342 928 933 574vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 577 323 921 926 323 918 923 574tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2tC, 2 stage (s)tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3p0 queue free % 100 100 99 100 100 98 100 100cM capacity (veh/h) 1004 1220 244 262 707 246 263 521

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 338 580 4 7Volume Left 2 6 2 6Volume Right 1 6 2 1cSH 1004 1220 363 266Volume to Capacity 0.00 0.00 0.01 0.03Queue Length 95th (m) 0.0 0.1 0.3 0.6Control Delay (s) 0.1 0.1 15.0 18.9Lane LOS A A C CApproach Delay (s) 0.1 0.1 15.0 18.9Approach LOS C C

Intersection SummaryAverage Delay 0.3Intersection Capacity Utilization 40.0% ICU Level of Service AAnalysis Period (min) 15

Page 54: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

HCM Signalized Intersection Capacity Analysis FTAM4: Lakeshore Rd & Morden Rd Baseline

2017-06-05 Synchro 9 ReportJYK Page 1

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 35 565 221 30 5 15Future Volume (vph) 35 565 221 30 5 15Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Total Lost time (s) 5.7 5.7 4.0Lane Util. Factor 1.00 1.00 1.00Frpb, ped/bikes 1.00 1.00 0.96Flpb, ped/bikes 1.00 1.00 1.00Frt 1.00 0.98 0.90Flt Protected 1.00 1.00 0.99Satd. Flow (prot) 1876 1796 1371Flt Permitted 0.97 1.00 0.99Satd. Flow (perm) 1823 1796 1371Peak-hour factor, PHF 0.87 0.87 0.87 0.87 0.87 0.87Adj. Flow (vph) 40 649 254 34 6 17RTOR Reduction (vph) 0 0 2 0 16 0Lane Group Flow (vph) 0 689 286 0 7 0Confl. Peds. (#/hr) 3 3 3Heavy Vehicles (%) 0% 1% 4% 2% 33% 13%Turn Type Perm NA NA ProtProtected Phases 4 8 6Permitted Phases 4Actuated Green, G (s) 80.5 80.5 4.1Effective Green, g (s) 80.5 80.5 4.1Actuated g/C Ratio 0.85 0.85 0.04Clearance Time (s) 5.7 5.7 4.0Vehicle Extension (s) 3.0 3.0 3.0Lane Grp Cap (vph) 1556 1533 59v/s Ratio Prot 0.16 c0.00v/s Ratio Perm c0.38v/c Ratio 0.44 0.19 0.11Uniform Delay, d1 1.6 1.2 43.4Progression Factor 1.00 1.00 1.00Incremental Delay, d2 0.9 0.3 0.9Delay (s) 2.5 1.5 44.2Level of Service A A DApproach Delay (s) 2.5 1.5 44.2Approach LOS A A D

Intersection SummaryHCM 2000 Control Delay 3.2 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.43Actuated Cycle Length (s) 94.3 Sum of lost time (s) 9.7Intersection Capacity Utilization 62.8% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

Page 55: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

HCM Unsignalized Intersection Capacity Analysis FTAM5: Shorewood Pl/Tavistock Sq & Lakeshore Rd Baseline

2017-06-05 Synchro 9 ReportJYK Page 2

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 0 572 0 0 247 0 0 0 5 5 0 5Future Volume (Veh/h) 0 572 0 0 247 0 0 0 5 5 0 5Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83Hourly flow rate (vph) 0 689 0 0 298 0 0 0 6 6 0 6Pedestrians 4 2Lane Width (m) 3.6 3.6Walking Speed (m/s) 1.2 1.2Percent Blockage 0 0Right turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m) 114pX, platoon unblocked 0.92 0.92 0.92 0.92 0.92 0.92vC, conflicting volume 300 693 997 993 693 995 993 300vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 300 618 950 946 618 948 946 300tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2tC, 2 stage (s)tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3p0 queue free % 100 100 100 100 99 97 100 99cM capacity (veh/h) 1259 877 218 240 449 218 240 743

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 689 298 6 12Volume Left 0 0 0 6Volume Right 0 0 6 6cSH 1259 877 449 337Volume to Capacity 0.00 0.00 0.01 0.04Queue Length 95th (m) 0.0 0.0 0.3 0.9Control Delay (s) 0.0 0.0 13.1 16.1Lane LOS B CApproach Delay (s) 0.0 0.0 13.1 16.1Approach LOS B C

Intersection SummaryAverage Delay 0.3Intersection Capacity Utilization 41.9% ICU Level of Service AAnalysis Period (min) 15

Page 56: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

HCM Unsignalized Intersection Capacity Analysis FTAM8: Site Dwy & Lakeshore Rd Baseline

2017-06-05 Synchro 9 ReportJYK Page 3

Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (veh/h) 570 0 2 250 1 2Future Volume (Veh/h) 570 0 2 250 1 2Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 620 0 2 272 1 2PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m) 33pX, platoon unblocked 0.91 0.91 0.91vC, conflicting volume 620 896 620vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 537 839 537tC, single (s) 4.1 6.4 6.2tC, 2 stage (s)tF (s) 2.2 3.5 3.3p0 queue free % 100 100 100cM capacity (veh/h) 942 306 497

Direction, Lane # EB 1 WB 1 NB 1Volume Total 620 274 3Volume Left 0 2 1Volume Right 0 0 2cSH 1700 942 412Volume to Capacity 0.36 0.00 0.01Queue Length 95th (m) 0.0 0.1 0.2Control Delay (s) 0.0 0.1 13.8Lane LOS A BApproach Delay (s) 0.0 0.1 13.8Approach LOS B

Intersection SummaryAverage Delay 0.1Intersection Capacity Utilization 40.0% ICU Level of Service AAnalysis Period (min) 15

Page 57: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

HCM Signalized Intersection Capacity Analysis FTPM4: Lakeshore Rd & Morden Rd Baseline

2017-06-05 Synchro 9 ReportJYK Page 1

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 10 291 496 5 5 30Future Volume (vph) 10 291 496 5 5 30Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Total Lost time (s) 5.7 5.7 4.0Lane Util. Factor 1.00 1.00 1.00Frpb, ped/bikes 1.00 1.00 0.95Flpb, ped/bikes 1.00 1.00 1.00Frt 1.00 1.00 0.89Flt Protected 1.00 1.00 0.99Satd. Flow (prot) 1879 1897 1593Flt Permitted 0.98 1.00 0.99Satd. Flow (perm) 1848 1897 1593Peak-hour factor, PHF 0.88 0.88 0.88 0.88 0.88 0.88Adj. Flow (vph) 11 331 564 6 6 34RTOR Reduction (vph) 0 0 0 0 33 0Lane Group Flow (vph) 0 342 570 0 7 0Confl. Peds. (#/hr) 2 2 3Heavy Vehicles (%) 0% 1% 0% 0% 0% 0%Turn Type Perm NA NA ProtProtected Phases 4 8 6Permitted Phases 4Actuated Green, G (s) 80.5 80.5 4.1Effective Green, g (s) 80.5 80.5 4.1Actuated g/C Ratio 0.85 0.85 0.04Clearance Time (s) 5.7 5.7 4.0Vehicle Extension (s) 3.0 3.0 3.0Lane Grp Cap (vph) 1577 1619 69v/s Ratio Prot c0.30 c0.00v/s Ratio Perm 0.19v/c Ratio 0.22 0.35 0.11Uniform Delay, d1 1.2 1.4 43.3Progression Factor 1.00 1.00 1.00Incremental Delay, d2 0.3 0.6 0.7Delay (s) 1.6 2.0 44.0Level of Service A A DApproach Delay (s) 1.6 2.0 44.0Approach LOS A A D

Intersection SummaryHCM 2000 Control Delay 3.6 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.34Actuated Cycle Length (s) 94.3 Sum of lost time (s) 9.7Intersection Capacity Utilization 38.7% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 58: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

HCM Unsignalized Intersection Capacity Analysis FTPM5: Shorewood Pl/Tavistock Sq & Lakeshore Rd Baseline

2017-06-05 Synchro 9 ReportJYK Page 2

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 0 298 0 5 503 5 0 0 0 5 0 0Future Volume (Veh/h) 0 298 0 5 503 5 0 0 0 5 0 0Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88Hourly flow rate (vph) 0 339 0 6 572 6 0 0 0 6 0 0Pedestrians 7 3Lane Width (m) 3.6 3.6Walking Speed (m/s) 1.2 1.2Percent Blockage 1 0Right turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m) 114pX, platoon unblocked 0.99 0.99 0.99 0.99 0.99 0.99vC, conflicting volume 581 346 933 939 346 929 936 578vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 581 331 926 932 331 922 929 578tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2tC, 2 stage (s)tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3p0 queue free % 100 100 100 100 100 98 100 100cM capacity (veh/h) 1001 1217 244 262 702 247 263 518

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 339 584 0 6Volume Left 0 6 0 6Volume Right 0 6 0 0cSH 1001 1217 1700 247Volume to Capacity 0.00 0.00 0.00 0.02Queue Length 95th (m) 0.0 0.1 0.0 0.6Control Delay (s) 0.0 0.1 0.0 20.0Lane LOS A A CApproach Delay (s) 0.0 0.1 0.0 20.0Approach LOS A C

Intersection SummaryAverage Delay 0.2Intersection Capacity Utilization 40.8% ICU Level of Service AAnalysis Period (min) 15

Page 59: PROPOSED RESIDENTIAL SUBDIVISION 346- 362 LAKESHORE … planning/da-17006171801-tis.pdf · homes. It extends east-west across the Town, continues west through the City of Burlington

HCM Unsignalized Intersection Capacity Analysis FTPM8: Site Dwy & Lakeshore Rd Baseline

2017-06-05 Synchro 9 ReportJYK Page 3

Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (veh/h) 295 1 3 500 1 3Future Volume (Veh/h) 295 1 3 500 1 3Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 321 1 3 543 1 3PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m) 31pX, platoon unblocked 0.97 0.97 0.97vC, conflicting volume 322 870 322vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 285 851 285tC, single (s) 4.1 6.4 6.2tC, 2 stage (s)tF (s) 2.2 3.5 3.3p0 queue free % 100 100 100cM capacity (veh/h) 1238 320 731

Direction, Lane # EB 1 WB 1 NB 1Volume Total 322 546 4Volume Left 0 3 1Volume Right 1 0 3cSH 1700 1238 553Volume to Capacity 0.19 0.00 0.01Queue Length 95th (m) 0.0 0.1 0.2Control Delay (s) 0.0 0.1 11.6Lane LOS A BApproach Delay (s) 0.0 0.1 11.6Approach LOS B

Intersection SummaryAverage Delay 0.1Intersection Capacity Utilization 38.7% ICU Level of Service AAnalysis Period (min) 15