Project: MISSION SURE
�������� ����� ���� ������������������� ���� ������ ���
�
����������������������
�
�
����� � �� ���������������� � ������� ! "# $%&�'&&"��(%&&�
End User Training Manual
for
SAP PP – Production Planning & Control
Process Name: Production Execution – Capacity Planning (T-code CM01)
Process No: TRF/O2C/6.0
Control Copy No: TRF/O2C/6.0/
����� � �#)� *�#� �����
Doc Version Description Prepared by Date Reviewed by Approved by 00 Original Palani Dorai 24.12.2009 AK Anal,
Sachin Kumar Rajak, Minu Singh
Project: MISSION SURE
�������������� � ����TRF/O2C/6.0�'&&"��(%&&
Page 2 of 13
Introduction
The Production Planning and Control functional area in TRF has the following business processes.
��%
� �% �������� � ���� ���+������������ �� �
�� ������������ �!�
�� �� ��
�� ��������"� !���#� ����$��� ���% �&#���$ ���
�� �� ��
'� ��������"��� ������( ��������$$ ����$���
�� �� ��
�� ��������"��� !���#� ���&#���$ ���
�� �� ��
"� ��������)��� !���#� ������#� ���
For each of the above processes, there are separate End User Training Manuals are available
This End user Training manual covers from sl. no. 5 of the above list, that is, the Capacity planning of the Production Execution process
a) Capacity planning - Transaction code CM01
Project: MISSION SURE
�������������� � ����TRF/O2C/6.0�'&&"��(%&&
Page 3 of 13
1. Capacity Planning - Transaction code – CM01
Procedural Steps
Menu Path
To access CM01, use the following menu path
SAP Easy Access > SAP menu > Logistics > Production > Capacity planning > Evaluation > Work center View > CM01 - Load
Transaction Code CM01
Procedure
Enter the Transaction code CM01 in the command field (as shown in the below screen)
Or go as per the navigation shown below and click CM01 – Load
Project: MISSION SURE
�������������� � ����TRF/O2C/6.0�'&&"��(%&&
Page 4 of 13
Press <Enter> key or click on the check mark icon in the top left side corner of the
Screen, the following screen Project Builder screen appears.
Project: MISSION SURE
�������������� � ����TRF/O2C/6.0�'&&"��(%&&
Page 5 of 13
1) Key-in the work center value in the Work Center field. We have keyed in 102005 as the work center value in the work center field.
2) Key-in the Plant number in the Plant field. We have keyed-in 1000 for this field.
The screen will look as shown below
Project: MISSION SURE
�������������� � ����TRF/O2C/6.0�'&&"��(%&&
Page 6 of 13
Click on the check mark button, the following screen will appear
Project: MISSION SURE
�������������� � ����TRF/O2C/6.0�'&&"��(%&&
Page 7 of 13
Select the first week, as shown below
Project: MISSION SURE
�������������� � ����TRF/O2C/6.0�'&&"��(%&&
Page 8 of 13
And click on the Cap. Details / period push button, the following screen appears
Project: MISSION SURE
�������������� � ����TRF/O2C/6.0�'&&"��(%&&
Page 9 of 13
Click on the Choose Fields push button to display any other fields, the following pop up window appears.
Planned Orders
Production Orders
Project: MISSION SURE
�������������� � ����TRF/O2C/6.0�'&&"��(%&&
Page 10 of 13
Scroll the slide bar of the Field column up and down to locate the field. We have located the field name “Material Description”.
Select (click once) this field and
Click on the left side arrow button to move this selected field to the Selected Field column.(Refer screen below, the Material Description field is moved to the Left Hand Side)
Scroll this bar up and down
Project: MISSION SURE
�������������� � ����TRF/O2C/6.0�'&&"��(%&&
Page 11 of 13
Click on the check mark button of the pop up window, the following screen appears showing the description also.
Return back to the earlier screen by clicking the left side arrow , the following screen appears
Project: MISSION SURE
�������������� � ����TRF/O2C/6.0�'&&"��(%&&
Page 12 of 13
Click on the Standard View button, to the see the details in the graphical form.
The following pop up window appears.
Return back to the Home Screen or SAP Easy Access Screen.
End of document on T-code CM01 – Load