PROCEEDING OF ORDINARY MEETING OF THE BOARD HELD ON 28th DAY OF MARCH, 2013 (i.e. THRUSDAY) AT 0900 HOURS IN THE OFFICE OF CANTONMENT BOARD CLIFTON SITUATED AT CC-38, STREET NO.10 KH-E-RAHAT PHASE- VI DHA KARACHI
PRESENT
1) Brig. Anis Ahmed Station Commander, Karachi ….. President Cantt Board
2) Mr. Adil Rafi Siddiqui ….. Secretary Executive Officer, Clifton Cantonment.
3) Lt. Col. Abrar Hussain Khan, HQ 5 Corps Karachi ….. Nominated Member
4) Mr. Aziz Suharwardy ….. Nominated Member
The meeting started with the recitation of Holy Quran.
ACCOUNT BRANCH
1. MONTHLY ACCOUNT To note the monthly statement of account of income and expenditure of the Cantt. Board Clifton for the month of February, 2013 under Section 90 of the Pakistan Cantonments Account Code, 1955:- February, 2013. Opening Balance Rs. 202.884 (M) Receipts (+) Rs. 128.537 (M) Total Rs. 331.421 (M)
Expenditure (-) Rs. 190.547 (M) Closing Balance Rs. 140.874 (M)
DETAIL OF RECEIPT FOR THE MONTH OF FEBRUARY, 2013
S.No. H E A D AMOUNT
(M)
1. House Tax 31.460
2. Water Charges 9.963
3. Conservancy Tax 9.605
4 Transfer Tax 29.791
5 Miscellaneous Charges 8.209
6 Income From Survey Building Plan (Scrutiny Fees)
8.733
7 Hoarding / Advertisement Charges 19.426
8 Composition Fee 2.219
9 Professional Tax 0.200
T O T A L : 119.606
Other Miscellaneous Heads ( + ) 8.931
GRAND TOTAL : 128.537
2
DETAIL OTHER MISCELLANEOUS HEADS OF RECEIPT FOR THE MONTH OF FEBRUARY, 2013.
S. No. H E A D AMOUNT
(M)
1 Shop Board Fee 1.268
2 Entertainment Fee 0.120
3 Rent from Lease 0.016
4 Cantt. Fund Building Residential 0.027
5 Cantt. Fund Building Commercial 0.020
6 Sewerage Connection Fees 0.917
7 Mutation Fees 0.005
8 Water Connection Fee 0.155
9 Fees & Revenue from Hospital Fee 0.077
10 Demand Notices / Warrant Fees 0.023
11 Copying Fees 0.032
12 Registration Fees 0.635
13 Sale of Water 0.656
14 Sale of Form 1.805
15 License Fee 0.001
17 Income from Investment 2.592
18 Refund of Advances 0.032
19 Deposit 0.550
Total: 8.931
MAJOR EXPENDITURE FOR THE MONTH OF FEBRUARY, 2013.
S.NO. HEAD Amount (Million)
1 Establishment 37.456
2 Original Works 3.522
3 M&R Works 48.867
4 Electric Bill 18.369
5 KW&SB 31.162
6 Conservancy Contractor 23.516
7 P.O.L. Bills 13.878
Total:- 176.770
8 Other Misc. Expenditure 13.777
Grand Total: 190.547
OTHER MISCELLANEOUS EXPENDITURE
S. No Description Amount (Million)
1 Refund of structural Vetting Fees 0.289
2 Payment to M/s. Excise & Taxation Department for registration of 02 nos. newly purchased of Suzuki cultus.
0.045
3
3 M/s. Pakistan Telecommunication for UAN Service Charges
0.019
4 Newspaper 0.013
5 Payment to M/s. World Call Pakistan Ltd for internet Charges.
0.061
6 Payment to NADRA. 0.025
7 Supply of Medicines 0.310
8 Telephone 0.345
9 Stationery 0.058
10 Printing 0.247
11 Payment to Hiring of CB Staff 0.085
12 TA/DA of CB Staff. 0.208
13 Payment to Sale Tax Department. 0.492
14 Payment to Income Tax Department 0.020
15 Security service charges 0.166
16 M/s. Megatech Communication for renewal of PABAX System
0.015
17 Refund of Transfer Tax 0.216
18
Supply of Miscellaneous Store Items of various Branches. (Engineering Branch, Sanitation Branch, Water Supply, Electric Branch, Garden Branch)
11.163
Total 13.777
All connected papers are placed on the table.
RESOLUTION: The Board checked the major entries on receipts and expenditures sides and noted the monthly accounts.
2. MEDICAL REIMBURSEMENT
a) To consider and approve the application dated 27.09.2012 submitted by Mr. Muhammad Farhan, Driver, CBC where in he has requested for grant of Medical reimbursement amounting to Rs.2,37,562/- incurred by him on his medical treatment through a private Hospital at Liaquat National Medical Hospital, Karachi. The said case has been recommended by Medical Reimbursement Committee vide its meeting held on 21.01.2013 at S.No.9.
The medical bills have been duly verified by Senior Medical Officer, CBC Health Centre, Phase-II, DHA, Karachi.
b) To consider and approve the application dated 22.03.2012 submitted by Mr. Jamil Ahmad, Peon, CBC wherein he has requested for grant of Medical reimbursement amounting to Rs.63,760/- incurred by him on medical treatment of his son through a private hospital at A.O Clinic, Karachi. The said case has been recommended by Medical Reimbursement Committee vide its meeting held on 21.01.2013 at S.No.15.
The medical bill has been duly verified by Senior Medical Officer, CBC Health Centre, Phase-II, DHA, Karachi.
4
c) To consider and approve the application dated 21.05.2012 submitted by Mr. Waqar-ul_Hassan, Asstt. Revenue Supdt. (Retd) has requested for grant of Medical reimbursement amounting to Rs.34,172/- incurred by him on medical treatment of his wife through Dow University Hospital, Karachi. The said case has been recommended by Medical Reimbursement Committee vide its meeting held on 21.01.2013 at S.No.20.
The medical bill has been duly verified by SMO CBC health centre, Phase-II, DHA, Karachi.
All connected papers are placed on the table.
RESOLUTION: The Board considered the agenda and approved. The cases be sent to competent authorities for sanction.
ADMIN BRANCH
3. CORRIGENDUM
To consider the following amendents in CBR No.10 dated: 12.02.2012 and CBR No.03 dated: 30.03.2012 which was due to typographical mistake: i). In CBR No.10 dated: 12.02.2012 at line 15 and 26 of Resolution side.
For “CBR No.31 dated: 27.09.2012” Read “CBR No.24 dated 30.11.2012”
ii) In CBR No.03 dated: 30.03.2012 at column 8 serial 3 of Agenda side.
For “Re-hiring” Read “Hiring”
All connected papers are placed on the table. RESOLUTION: The Board considered the agenda and approved the subject
amendments.
4. RENEWAL OF CONTRACT FOR DEPLOYING SANITARY VIGILANCE INSPECTORS
Reference: CBR No.03 Dated 02-02-2012
To consider the report of Manager IWMP Cell regarding employment of the following individuals as 1x Sanitary Vigilance Inspector and 6x Assistant Sanitary Vigilance Inspectors on contract basis for further one year from the date mentioned against each:-
S. NO.
NAME DESIGNATION PERIOD OF
EXISTING DATE OF EXPIRY
EXSITING SALARY
PROPOSED CONTRACT PERIOD
PROPOSED SALARY
1 Abdul Ghafoor
Sanitary Vigilance Inspector
6-2-2013
Rs.15000
7-2-2013 to
6-2-2014
Rs.17000
2 Asad Iqbal
Assistant Sanitary Vigilance Inspector
6-2-2013
Rs.14000
7-2-2013 to
6-2-2014
Rs.16000
3 Dilawar Khan
Assistant Sanitary Vigilance Inspector
13-4-2013
Rs.14000
14-4-2013 to
13-4-2014
Rs.16000
5
4 Rakib Khan
Assistant Sanitary Vigilance Inspector
6-2-2013
Rs.14000
7-2-2013 to
6-2-2014
Rs.16000
5 Sikandar Ali
Assistant Sanitary Vigilance Inspector
6-2-2013
Rs.14000
7-2-2013 to
6-2-2014
Rs.16000
6 Munawar Masih
Assistant Sanitary Vigilance Inspector
6-2-2013
Rs.14000
7-2-2013 to
6-2-2014
Rs.16000
7 Irfan Rafiq
Assistant Sanitary Vigilance Inspector
31-12-2012
Rs.14000
1-1-2013 to
31-12-2013
Rs.16000
In this connection it is brought to the notice of the Board that vide above referred CBR the period of 1 x Sanitary Vigilance Inspector and 6 x Assistant Sanitary Vigilance Inspectors was renewed for further one year in order to monitor and levy fine on contractors/residents not ensuring general cleanliness etc, within CBC limits. Their services are still required for efficient working of the IWMP / Sanitation Branch
Budget provision exists under head _F-4 (a)
All connected papers are placed on the table.
RESOLUTION: The Board considered the agenda and resolved to approve the renewal of contract of the officials as mentioned on agenda side at serial 01 to 07 subject to sanction of the competent financial authority.
CBC HEALTH CENTRE
5. PURCHASE OF MEDICINES FOR CBC HEALTH CENTERS
To consider and approve an amount of Rs.3,825,000/- for the purchase of following medicines for CBC Health Centers during third quarter (i.e. January to March , 2013) of financial year 2012-2013 directly from the pharmaceutical companies of their authorized distributors on trade /hospital discount of special offered rates as submitted / quoted in their tenders offered for the financial year 2012-2013, as per demand of the SMO/Incharge CBC Health Centre:-
S.No. Description Amount Required for
1. Purchase of bulk medicine Rs.30,00,000/- CBC Health Centers
2. Purchase of bulk Homeopathic medicines
Rs.75,000/- Homeopathic department of CBC Health Centre
3. Purchase of bulk Dental medicines
Rs.150,000/- Dental Department of CBC Health Centers
4. Purchase of bulk accessories/ chemicals/ kits / reagents
Rs.450,000/- Pathological Lad
5. Purchase of bulk accessories / chemicals / kits / reagents / equipments
Rs.150,000/- X-Ray Department
Total Rs.3,825,000/-
6
All connected papers are placed on the table.
RESOLUTION: The Board approved the requested demand mentioned at serial
No.1 to 5 on agenda side subject to verification by the Civil
Member of the Board
SANITATION BRANCH
6. PURCHASE OF TYRES – CBC VEHICLE
To consider & approve the purchase of 24 Tyres, Tubes & Flaps for the vehicle as per detail below at total cost of Rs. 457320/- from M/s General Tyres & Rubber Company of Pakistan Ltd (Pvt) the said items shall be procured directly from M/s. General Tyres and Rubber Company being the manufacturer. The condition of existing tyres are deplorable and needs to be replaced.
Reg. No Type Model No of Tyres
Required
Last date of change of Tyres
Size & Design Rate Per Set Rs.
Amount Rs.
GA-4001 Mazda T-3500 Sludge Water
Bowzer 1990 06 23.06.2008 750.16 14 Ply 14075/- 84450/-
GA-7159 Hino FG Water Supply Bowzer
2005 06 19.08.2010 11.00.20 16 ply 33995/- 203970/-
JX-5778 Mazda T-3500 Water Supply
Bowzer 2003 06 21.08.2010 750.16 14 Ply 14075/- 84450/-
GA-8384 Isuzu NPR
Water Supply Bowzer
2006 06 10.02.2011 750.16 14 Ply 14075/- 84450/-
Total 457320/-
Note: All legal and codal formalities including conditions of the PPRA have fulfilled in this regard.
All connected papers are placed on the table.
RESOLUTION: The Board considered and resolved to purchase the tyre, tube and flaps at the offered company’s rate of Rs.457320/- directly from the M/s General Tyres and Rubber Company being the manufacturer subject to physical inspection of the purchased items at the time of fixing by Lt. Col. Mumtaz Ahmed, AQ Station Headquarters.
7. PURCHASE OF SKIP BINS
Reference: CBR No. 8 dated 03.01.2013.
To consider and approve the purchase of 200 Skip Bins from M/S. Pakistan Steel Fabricating Company Limited. It may be mentioned here that earlier 100 skip bins as per details below were approved by the Board vide CBR No.45 dated 19.07.2012 @Rs.11976/-
7
per skip bin and accordingly were supplied by M/S. Pakistan Steel Fabricating Company Limited.
S # Description of Job Quantity Rate Each Rs.
Amount Rs.
1. Skip Bin MS Sheet (printed Logo) size 56” x 38” x 35” as per sample Floor: 10 Guage Walls: 14 Guage Complete oil painting
100 Nos
11,976/-
11,97,600/-
TOTAL 11,97,600/-
It is for their maintained that Cantt Board vide CBR No.8 dated 03.01.2013 approved the purchase of 200 skip bins from M/S. Pakistan Steel Fabricating Company Limited at already approved rates of Rs.11,976/- per skip bin. M/S. Pakistan Steel Fabricating Company Limited were therefore issued supply order vide this office No. CBC/Sanitation/435 dated 24.01.2013.
M/S. Pakistan Steel Fabricating Company Limited vide letter No. PSF/DGM PSFCL/2013/128 dated 04.02.2013 have showed inability to supply 200 skip bins at old rates and offered the supply of skip bins @Rs.18,000/- per skip bin. It will not be out of place to mention here that rates offered by M/S. Pakistan Steel Fabricating Company Limited @Rs.18,000/- per skip bin are still reasonable. Total expenditure involved would be Rs.36,00,000/-.
RESOLUTION: The Board considered and resolved that the rates quoted by M/S
Pakistan Steel Fabricating Company Limited be re-negotiated as
the rates received are much higher than earlier approved rates of
the Board. Also the quantity should be reduced upto 100 skip bins.
8. PURCHASE OF DELTANOR FOR FUMIGATION
To consider and approve the purchase of the following insecticide from M/s. Jaffer Brothers (Pvt.) Ltd on retail price for fumigation in DHA/CBC area. The said insecticide shall be purchased directly from M/s. Jaffar Brother (Pvt) Ltd being manufacturers.
S. No. Name of insecticide Qty
Rate Per
Liter
Rs.
Amount
Rs.
1. Delta nor EC15 256 Liters 882/- 2,25,792/-
Note: All legal and codal formalities including conditions of the PPRA have
fulfilled in this regard.
RESOLUTION: The Board considered and approved the purchase of 256 liters
Delta nor EC 15 from M/s Jaffar Brothers (Pvt) Ltd at the rate of
Rs.882/- per liter. The Board further resolved that the Civil Member
will ensure the quality of said insecticide. The public be informed
through media campaign for the fumigation campaign.
8
9. HIRING OF CASUAL LABOUR FOR CLEANING & DESILTING OF
SMALL DRAINS CBC
To consider & approve hiring of 30 skilled worker from the local market @ Rs.600/- per day per worker for a period of three months from the date of commencement of work for cleanliness of 33 small drains as per list below:-
S. No. Location/Address of Nullah
1) Sunset Avenue from Sunset Blvd , Kh-e-Jami, Ph-II Ext
2) 12th Commercial Street from Sunset Lane Kh-e-Jami Ph-II Ext
3) South Park Avenue from Sunset Lane Kh-e-Jami, Ph-II Ext
4) 21st Commercial Street, Ph-II Ext.
5) 24th Commercial Street, Ph-II Ext.
6) 4th Sunset Street, Ph-II Ext.
7) 6th Sunset Street, Ph-II Ext.
8) 7th Sunset Street, Ph-II Ext.
9) 1st Comm Lane, Ph-IV.
10) 3rd Comm Lane, Ph-IV.
11) 5th Comm Lane, Ph-IV
12) 7th Comm Lane, Ph-IV.
13) Kh-e-Badar from 2nd Street to Comm Avenue, Ph-V.
14) Drain from 22nd Street to 24th Street, Kh-e-Tauheed, Ph-V.
15) 9th Gizri Lane, Ph-IV
16) Dada Bhai Building to Prime Arcade Block-9, Clifton
17) Charted Accountant Road, Block-8.
18) F-1(Quality Heights) to F-18, Block-8.
19) Bohri Mosque, Block-8.
20) Moti Mosque, Block-8.
21) French Culture Center, Block-8.
22) F-21 to G-10. , Block-8(infront of Col Kamran House.)
23) Service Road, Kh-e-Iqbal, Block-8 & 9.
24) D -25 (Foreign Affair Office) to Nehr-e-Khayam, Block-9.
25) Nullah of Islamic Chamber Road, Block-9 Clifton.
26) F-66 to F-31, Block-8(Back side of Eid Gah ground).
27) C-1 to C-13 Bolck-8 Clifton (Welfare shop Askari apartment to Shamim Masjid).
28) Shamim Masjid to Ch.Khaliq-uz-Zaman Road, Bolck-8 Clifton.
29) D-32 (Shamim Masjid) to D-43 National square Bolck-8 Clifton
30) G- 24 to Nehr-e-Khayam, , Bolck-9 Clifton (Bath View Apartments).
31) Nullah Edhi Centre Block-8 to Nher-e-Khayam (Forum Park).
32) G-10to G-15, Bolck-9 Clifton (1st Zamzama Street to Haroon House).
33) Street-13 (Danish Gah)to Nehr-e-Khayam, Bolck-9
Total expenditures involved would be Rs.16,20,000/- (@Rs.600/- per day per worker (Rs.600 x 30 x 90 = Rs.16,20,000/-).
All connected papers are placed on the table.
RESOLUTION: The Board considered and resolved the hiring of casual labour @ Rs.500/- per day per worker. The Board resolved that Lt. Col. (R) Abdul Qayum shall personally supervise all execution.
9
WATER SUPPLY BRANCH
10. APPROVAL OF TENDERS WATER SUPPLY WORKS-2012-13
To consider the rates received on 05-03-2013 in response of tender notice published in the daily “Dawn” dated 13-02-2013, for Water Supply Works 2012-13. The Comparative statement of tendered rates alongwith description of work is as under:
S#
Description of work
QTY (M)
Name of firm
Quoted rate
Remarks
M/S M.I & Bros. 10,20,000.00 Lowest
M/S Uzma Associates 11,40,000.00 1 Installation of 12x12” dia water
meter stainer at water supply pumping stations.
12
M/S Amir Sawab & Bros 11,69,760.00
M/S M.I & Bros. 4,30,000.00 M/S Uzma Associates 2,50,000.00 Lowest
2 Installation of 2x24” dia water meter stainer at water supply pumping stations.
02
M/S Amir Sawab & Bros 2,96,900.00
All connecting documents are place on the table.
RESOLUTION: The Board considered the lowest rates on agenda side and resolved to approve the same. Necessary codal formalities be completed.
LAND BRANCH
11. GRANT OF LEASE OF PLOT NO.C-81/23, PUNJAB COLON, BAZAR AREA, CLIFTON CANTONMENT.
To consider the application submitted by the M/s. Muhammad Yaqub & Wahid Bux. M/s. Muhammad Yaqub S/o Shadi Khan & Wahid Bux S/o Allah Bux, has submitted “Sch-V” form (Application Form for Lease) duly verefied / signed by the Councilor Anwar Khan Niazi, for grant of lease of plot No.C-81/23, measuring 82.84 Sq. yards (Residential-cum-Commercial Purpose) situated at Punjab Colony, Bazar Area, Clifton Cantt.
They have also submitted KESC Bill and KESC statement dated 21-12-1983, Old NICs as a proof/evidence of his occupation prior to 23.03.1985, as a original occupier.
The case was placed before the Board. The Board vide CBR No.7 dated 30.06.2000, had pended the case till the finalization of widening of Kh-e-Jami Road. Now Kh-e-Jami has been up graded and there is as such no issue for grant of lease of subject plot.
The site has been checked by the LS/ALS and reported / certified there are no encroachment, illegal construction and violation involved at site.
A public notice was also published in “Daily Jang” dated 16-1-2013 and “Daily Express” dated 16-1-2013 for inviting objection against grant of lease in respect of plot No.C-81/23, area measuring 82.84 Sq.yards situated at Punjab Colony, Bazar Area, Clifton Cantt in favour of M/s Mr.Muhammad Yaqub S/o Shadi Khan & Mr. Wahid Bux
10
S/o Allah Bux, but no objection has been received from any person/authority as yet. . It is pointed out that the case was placed before the Bazar/Lease Committee for consideration. The committee after detailed scrutiny has recommended / approved the case for grant of lease in favour of applicants vide item No.01 dated 07.02.2013.
Proceeding of the committee alongwith other connected papers are placed on the table for perusal of the Board.
All connecting documents are place on the table.
RESOLUTION: The Board considered the proposal and resolved to approve the case subject to verification of the Civil Member and fulfillment of necessary formalities including payment of all related dues.
12 . APPLICATION FOR REGULARIZATION OF PROPERTY BYGRANTING OF LEASE IN SCH VIII OF CLAR 1937 IN KATCHI ABADI, LOWER GIZRI, BAZAR AREA, CLIFTON CANTT.
To consider the application dated 14.06.2010 submitted by M/s. (1) Faisal S/o Shehzada Saleem & (2) Faisal Ahmed S/o Sultan Ahmed, regarding grant of lease of plot No.G-9/5, Lower Gizri, Bazar Area, Clifton Cantt.
Plot No. G-9/5, measuring 48.00 Sq. yards (Commercial) situated at Lower Gizri, Bazar Area, Clifton Cantt was originally occupied by Mr. Muhammad Aslam S/o Haji Dost Muhammad. Who expired on 28.9.1999, as per death certificate.
The deceased left behind seven legal heirs as per heirship certificate issued by Justice of Peace dated 18.03.2009, namely 1) Mst. Rasool Be (Widow), 2) Mst. Wakif Sultana (Daughter), 3) Mst. Wajib Sultana (Daughter), 4) Mst. Rabia Sultana (Daughter), 5) Mst. Shafqat Sultana (Daughter), 6) Mst. Farah Naz (Daughter), 7) Mst. Fakhar Naz (Daughter), all legal heirs of deceased sold out the property to M/s.(1) Faisal S/o Shehzada Saleem & (2) Faisal Ahmed S/o Sultan Ahmed through sale agreement dated 30.01.2010.
Now M/s. (1) Faisal S/o Shehzada Saleem & (2) Faisal Ahmed S/o Sultan Ahmed
have applied for grant of lease for Commercial purpose in respect of property No.G-9/5,
Lower Gizri, Bazar Area, Clifton Cantt in their favour. They have submitted Sch-V form
and copy of KESC bill the meter tariff is commercial, KESC statement / record meter
installed at site dated 18.07.1983 and Old NIC of Muhammad Aslam S/o Dost Muhammad
dated 04.10.1979, as proof / evidence of his occupation prior to 23.03.1985.
A public notice was published in “Daily Jang” dated 21.05.2010 for inviting objections against grant of lease in respect of plot No.G-9/5, area measuring 48.00 Sq. yards situated at Lower Gizri, Bazar area, Clifton Cantt in favour of M/s. (1) Faisal S/o Shehzada Saleem & (2) Faisal Ahmed S/o Sultan Ahmed but no objection has been received from any person / authority as yet.
The site has been checked LS/ALS and certified that no encroachment, illegal construction, and violation are involved at site. It is pointed out that the case was placed before the Bazar/Lease Committee for consideration. The committee after detailed scrutiny has recommended / approved the case for grant of lease in favour of applicants vide item No.02 dated 07.02.2013.
Proceeding of the committee alongwith other connected papers are placed on the table for perusal of the Board.
11
All connecting documents are place on the table.
RESOLUTION: The Board considered the proposal and resolved to approve the case subject to verification of the Civil Member and fulfillment of necessary formalities including payment of all related dues.
13. GRANT OF LEASE OF PLOT NO.G-10/10-A, LOWER GIZRI, BAZARAREA, CLIFTON CANTONMENT.
To consider the application submitted by Syed Mehboob Shah on Schedule “V” form regarding grant of lease of plot No.G-10/10-A, Lower Gizri, Bazar Area, Clifton Cantt.
Plot No.G-10/10-A, measuring 66.18 Sq. yards (Commercial Purpose) situated at Lower Gizri, Bazar Area, Clifton Cantt was originally occupied by Syed Muhammad Kho S/o Syed Muhammad Ali.
Syed Muhammad Kho S/o Syed Muhammad Ali, Gifted the un-leased property to his real son Syed Mehboob Shah through un-registered Declaration of Gift dated 15.04.2006.
Now Syed Mehboob Shah S/o Syed Muhammad Kho, has applied for grant of lease in his favour. He has also submitted KESC Bill, PTCL Bill, Receipt of Income Tax return, Verification letter from Muntizma Committee, New CNIC and Old NIC dated 16.03.1978, as a proof/evidence of occupation of Syed Muhammad Kho, prior to 23.03.1985 as an original occupier.
A public notice was published in “Daily Express” dated 13.10.2012 for inviting objections against grant of lease in respect of plot No.G-10/10-A, situated at Lower Gizri, Bazar area, Clifton Cantt in favour of Syed Mehboob Shah S/o Syed Muhammad Kho, but no objection has been received from any person / authority as yet.
The site has been checked by the LS/ALS-I and reported / Certified that no encroachment, illegal construction and violation are involved at site. It is pointed out that the case was placed before the Bazar/Lease Committee for consideration. The committee after detailed scrutiny has recommended / approved the case for grant of lease in favour of applicants vide item No.03 dated 07.02.2013.
Proceeding of the committee alongwith other connected papers are placed on the table for perusal of the Board.
All connected papers are placed on the table.
RESOLUTION: The Board considered the proposal and resolved to approve the case subject to verification of the Civil Member and fulfillment of necessary formalities including payment of all related dues.
12
REVENUE BRANCH
14. IMPOSITION OF LICENSE FEE. To consider the proposal for imposition of license fee for issuance of trade license from all types of trades, calling or occupation in any part of the Clifton Cantonment. In this regard, it is apprised that license fee will be charged at the time of processing of annual trade license / renewal of trade license from the shopkeepers / business outlet, including any other business which has not be mentioned in the list, with in the jurisdiction of Clifton Cantonment. It is further mentioned that presently this office charging an amount of Rs.1,000/- on this account as a flat rate for all categories of business.
S. No. Category Nature License fee per Sft
per annum
i. A (Air conditioned) Restaurants ,Business, shops , Offices etc
Rs.15/-
ii. B (Non - air conditioned) Rs.12 /-
iii. C Vegetable /pan shop, small business, cloth vendors etc.
Rs.10/-
iv. D Cobblers, shoe shiner etc Rs.8/-
All connected papers are placed on the table.
RESOLUTION: The Board considered at length and resolved to approve the proposal given on the agenda side.
15. REVISION OF RATES / SLAB FOR FEE BEING CHARGED FOR TEMPORARY INSTALLATION OF GENERATOR SETS.
Reference: CBR No.11 dated 9-12-2006. To consider the revision of rates and slab for fee being charged for temporary installation of generator sets within the jurisdiction of Cantonment Board Clifton. In this regard, it is apprised that in compliance of CBR referred to above, at present the said fee is being charged as per following rates / slab:-
S. No. KVA of Generator set Fee per annum
i. 25 KVA to 50 KVA Rs.50000/-
ii. 51 KVA to 100 KVA Rs.100000/-
iii. 101 KVA to 200 KVA and above Rs.200000/-
Proposed amendment in rates as well as slab to cover the maximum number of generator sets being installed temporarily especially in commercial areas according to their KVA (increase in KVA is directly proportionate to the size of generator set) is as under:-
S. No. KVA of Generator set Fee per annum
i. Upto 5 KVA No fee will be charged. However, formal permission is necessary to be obtained from CBC
ii. Above 5 KVA upto 15 KVA Rs.1000/- per KVA
iii. Above 15 KVA upto 25 KVA Rs.25000/-
13
iv. Above 25 KVA upto 50 KVA Rs.50000/-
v. Above 50 KVA upto 100 KVA Rs.100000/-
vi. Above 100 KVA upto 200 KVA Rs.200000/-
vii. Above 200 KVA Rs.1000/- per KVA
All connected papers are placed on the table.
RESOLUTION: The Board considered at length and resolved to approve the proposal given on the agenda side.
16. WAIVER OF NON-CONNECTION CHARGES Reference: Application dated 23-10-2012. To consider an application dated 23-10-2012 submitted by M/s The Royal Rodale property bearing No.TC-5, 34th Street, Phase-VI, DHA, Karachi, requesting therein to waive off non connection charges against the said property as water connection does not exist in the said premises. In this connection it is apprised that, to settle the audit para, recovery notice under section 259 of the Cantonments Act 1924 was served but the occupant of the said premises stated in the court that the water connection does not exist in the premises and requested to delete the same. The committee was constituted comprising DHA and CBC senior Officials to settle the issue, after discussion the committee recommended on 16-05-2008 to issue bill of non-connection charges for Rs.5,50,000/- instead of water charges for the period from Nov-1998 to 30-06-2008 as no connection exist. After abolition of non-connection charges vide CBR No.4-a, dated 30-05-2009 w.e.f. 13-05-2008 the amount of non-connection charges comes to Rs.5,50,000/- upto 12-05-2008 against the said property. The detail of amount of non-connection charges to be waived off is as under:-
S. No Period Billing upto 30-06-2008
Actual Non-Connection Charges from 01-11-1998 to
12-05-2008
Requested Amount for waiver of non-connection charges w.e.f 01-11-1998
Remarks
1 01-11-1998 to 30-06-2008
Rs.550000/- Rs.545000/- Rs.550000/- Non-Connection charges levied vide CBR No.13, dated 20-12-2003 and CBR No.4-a, dated 30-05-2009 for the period from 01-11-1998 to 12-05-2008
All connected papers are placed on the table. RESOLUTION: The Board considered and resolved to approve the case subject to
the verification by the Chief Cantonment Engineer. 17. WAIVER OF NON-CONNECTION CHARGES To consider an application dated 8-11-2012 submitted by M/s Food Consults (Pvt) Ltd, requesting therein to waive off non-connection charges against the property Salt “n” Pepper Restaurant Beach Avenue, Phase-V, DHA, Karachi as water connection does not exist in the said premises.
14
In this connection, it is apprised that, to settle the audit para, recovery notice under section 259 of Cantonments Act 1924 was served to M/s Salt “n” Pepper Restaurant at Beach View, Phase-V, DHA. Karachi. The Occupant of the said premises stated in the court that water connection does not exist in the premises and requested to delete the same. The committee was constituted comprising DHA and CBC senior Officials to settle the issue, after discussion the committee recommended on 16-05-2008 to issue bill of non-connection charges for Rs.5,50,000/- instead of water charges Rs.1,69,36,815/- for the period from Nov-1998 to 30-06-2008 as no connection exists. After abolition of non-connection charges vide CBR No.4-a, dated 30-05-2009 w.e.f 13-05-2008 the amount of non-connection charges comes to Rs.5,40,000/- upto 12-05-2008 against the said property. The detail of amount of non-connection charges to be waived off is as under:-
S. No Period Billing upto 30-06-2008
Actual Non-Connection
Charges from 01-11-1998 to 12-05-
2008
Requested Amount for
waiver of non-connection charges w.e.f. 01-11-1998
Remarks
1 01-11-1998 to 30-06-2008
Rs.540000/- Rs.545000/- Rs.540000/- Non-Connection charges levied vide CBR No.13, dated 20-12-2003 and CBR No.4-a, dated 30-05-2009 for the period from 01-11-1998 to 12-05-2008
RESOLUTION: The Board considered and resolved to approve the case subject to
the verification by the Chief Cantonment Engineer. 18. REVISION OF ASSESSMENT OF COMMERCIAL PROPERTIES ON THE
BASIS OF ‘FAIR LETTING VALUE’
To consider the proposal of revision of assessment of commercial areas within the jurisdiction of Cantonment Board Clifton on the basis of ‘fair letting value’ as required under section 64 (b) of the Cantonments Act, 1924. In this regard, it is apprised that the rental value of commercial properties have been increased manifold over the years but the assessment has not been revised at par with the said increase which is mandatory to be revised in accordance with Section 71 (I) (d) of the Cantonments Act, 1924. On the other hands, owners / occupants / tenants are reluctant to disclose their rent agreement. Now it is proposed that the revision of assessment of commercial properties falling in different zones may be made keeping in view of the market rental valve and according to the commercial potential of the area. Area-wise detail of average fair letting value per square feet per month prepared on the basis of available rent agreements is as under:
DETERMINATION OF FAIR LETTING VALUE FOR COMMERCIAL UNITS
Rent per Sft per month Zone Locality
G. Floor
Mezz. Floor
1st to 4th Floor
5th Floor and above
Basement
I Block-8 & 9, Zamzama Comm, Main Kh-e-Shamsheer, Main Kh-e-Hafiz, Main 26th Street, Main Kh-e-Shahbaz
150 115 104 98 85
15
II Phase-I, II, II (Ext), IV, V, V (Ext), VI, VII, Khaliq-Uz- Zaman Colony
125 100 90 85 80
III Phase-VII (Ext), VIII, VIII-A 95 85 77 72 75
IV Dehli Colonies, Punjab Colony 80 70 63 60 65
V Chandio Village, Bukhshan Village, Neelum Colony, Hazara Colony, Madniabad, Lower Gizri etc
50 45 41 38 40
Following points will be given due regard while calculation of proposed annual rental value of the commercial properties:-
i. Rental value of commercial properties in bazar area / katchi abadies situated at main roads having prime locations shall be calculated with the rates applied to the adjacent/facing roads/locality.
ii. Properties built for residential purposes, if being used for commercial purposes shall be assessed at prescribed commercial rates of that zone.
iii. When wavying rates are found through Rent Agreement and Fair Letting Value (FLVs), rates for ARV shall be considered on the basis of which is higher.
All connected papers are placed on the table. RESOLUTION: The Board considered and deferred. 19. EXEMPTION OF PROPERTY TAX UNDER SECTION 76 OF THE
CANTONMENTS ACT, 1924.
To consider the applications dated 9-6-2008 and 5-1-2009 submitted by the owner of property No.BC-4 Basement & Ground Floor KDA-5, Block-9, Clifton requesting therein to waive off the amount of property tax as these units remained vacant and unproductive of rent. In this regard, it is apprised that the notice required regarding vacation of property for consideration of exemption under section 76 of the Cantonments Act 1924 had been given by the owner of the said units. The concerned staff of revenue branch has also visited the site and reported that the said units are still lying vacant and recommended that the exemption as per detail mentioned below may please be considered. i. Basement Rs.90125/- (w.e.f the date of first application i.e, 9-6-2008 to 30-6-2013) ii. G/floor Rs.223125/- (w.e.f the date of first application i.e, 9-6-2008 to 30-6-2013)
Following have been done to authenticate the exemption claim of the applicant: i. Site visited by the concerned officials of Revenue Branch. ii. Snaps showing vacant status of the premises taken.
All connected papers are placed on the table.
RESOLUTION: The Board considered and exemption under section 76 of the Cantonments Act, 1924 was granted for the period mentioned on agenda side.
16
GARDEN BRANCH
20. AWARD ON GOOD PERFORMANCE To consider and approve the expenditure an amount of Rs.400,000/- which is to be paid to Gardening Staff on account of best performance during flower show 2013 and in recognition of their efforts in uplifting the cantonment Parks and CBC area :
1
Lunch (Chicken Biryani) in Hilal Park for 325 Staff Garden Branch in the presence of CEO, PCB, ADR & DSRA Members in token of good performance throughout Year of Horticulture Branch, Development of CBC Family Park, Beach view Park & Spring Season of 2012 to 2013.
Rs.60,000/-
2 Catering / tenting & Decoration Items Rs.20,000/-
3 Cash award for good performance by Garden Supdt, Mr. Hassan Anwar
Rs.50,000/-
4 246 Nos Staff @ Rs.1000/- each Rs.2,46,000/-
5 08 Nos Skilled Staff @ Rs.3000/- each Rs.24,000/-
Total… Rs.4,00,000/-
All connected papers are placed on the table.
RESOLUTION: The Board considered the proposal and resolved to approve the award money to Garden staff on good performance as mentioned on the agenda side subject to sanction of the Competent Financial Authority.
ENGINEERING BRANCH
21. PROCEEDING OF MEETING OF BUILDING COMMITTEE HELD ON 15-2-2013
(a)
ROPOSED / REVISED PLANS-NOTICES U/S 179 OF THE CANTONMENT ACT, 1924
(RESIDENTIAL PLANS) To consider notices under section 179 of the Cantonment Act, 1924 (II of 1924) alongwith building plans of bungalows submitted by the following allottees / lessees received through DHA requesting approval of the Cantonment Board Clifton from municipal point of view, MEO Karachi Circle has been asked to grant NOC from land and tenure point of view as required under section 181 (3) of Cantonments Act, 1924 (II of 1924):-
S. NO
NAME OF ALLOTEE/LESSE
E
PLOT NO. / LOCATION
AREA OF
PLOT
NATURE OF
CONSTRUCTION
TOTAL COVERE
D AREA
Name of Architect
REMARKS
1. Mrs. Sophia Shabbir Africa Wala
201/II, 27th Street, Ph-VIII-A, DHA.
1000 SQ.Yds
B+G+I 10964.95 Sft
Adil Kerai
(one window) CCC, DHA
17
2. Mr. Syed Aqil Shah Mr. Faisal Niaz Tanoli
S-5, Iqbal Lane-13, Ph-VIII-B, DHA.
120 SQ.Yds
G+I 2169.50 Sft
Shoaib A Hashmi
(one window) CCC, DHA
3. Syed Muhammad Ahmed
78, 30th Street, Ph-VI, DHA.
2000 SQ.Yds
B+G+I 12405.46 Sft
Abdul Aleem
(one window) CCC, DHA
4. Mr. Arshad Mehmood Bhatti
112/I, 19th Street, Ph-VI, DHA.
500 SQ.Yds
B+G+I 7058.00 Sft
Nasim Najmi
(one window) CCC, DHA
5. Mrs. Razia Siddiqui
177/II, 21st Street, Ph-VIII-A, DHA.
496 SQ.Yds
B+G+I 6233.88 Sft
Abdul Aleem
(one window) CCC, DHA
6. Mr. Nasim-ul-Haque
36-A, Zulfiqar Street-3, Ph-VIII-A, DHA.
495.83 SQ.Yds
B+G+I 7150.21 Sft
Bashir Ahmed Ansari
(one window) CCC, DHA
7. Mr. Muhammad Saleem
S-101, 4th Street, Ph-VII-Ext, DHA.
120 SQ.Yds
G+I 2215.27 Sft
Irshad Ahmed
(one window) CCC, DHA
8. Mr. Zakwan kodvani
86/III, 30th Street, Ph-VI, DHA.
500 SQ.Yds
G+I 5508.64 Sft
Farhan Ahmed
(one window) CCC, DHA
9. Mr.Sheikh Muhammad Jawaid
47/II, Saba Avenue, Ph-V-Ext, DHA.
500 SQ.Yds
G+I 564.98 Sft
Shoaib A Hashmi
(one window) CCC, DHA
10. Mr.Abdul Bashir Khan
204, Kh-e-M. Hussain Shaheed, Ph-VII-Ext, DHA.
500 SQ.Yds
B+G+I 6081.75 Sft
Nasim Najmi
(one window) CCC, DHA
11. Mrs.Irshad Begum S-26, Staff Lane – 8, Ph-I, DHA.
120 SQ.Yds
G+I 2143.79 Sft
Shoaib A Hashmi
(one window) CCC, DHA
12. Mr.Tufail Umair 12/II, Kh-e-Amir Khusro, Ph-VI
1000 SQ.Yds
B+G+I 12020.66 Sft
Fahim Anwar
(one window) CCC, DHA
13. Mr. Muhammas Akram Bhatti
SS-173, 5th Street, Ph-VII-Ext
100 SQ.Yds
G+I 1851.40 Sft
Jehangir Qureshi
(one window) CCC, DHA
14. Mr. Gul Nawaz 103/I/I, Kh-e-Iqbal, Ph-VIII-A, DHA.
500 SQ.Yds
B+G+I 6400.89 Sft
Shoab A Hashmi
(one window) CCC, DHA
15 Mrs. Noor Jehan Begum
S-90, Kh-e-Muhammad Hussain Shaeed, Ph-VII-Ext, DHA.
150 SQ.Yds
G+I 2553.36 Sft
Abdul Aleem
(one window) CCC, DHA
16 Mrs. Sakina Hussaain
246/II, Beach Street-1, Ph-VIII-A, DHA.
501.68 SQ.Yds
G+I 5609.00 Sft
Irshad Ahmed
(one window) CCC, DHA
17 Mst. Nosheen Zaidi
202/II, Kh-e-Tariq, Ph-VI, DHA.
500 SQ.Yds
B+G+I 7646.15 Sft
Ansar A Farooqui
(one window) CCC, DHA
18 Mr. Hasan Manzoor Kureishy
R-80, Kh-e-Rizwan, Ph-VII, DHA.
600 SQ.Yds
G+I 6224.00 Sft
Shoaib A Hashmi
(one window) CCC, DHA
18
19 Mrs. Shaista Bano S-143, 4th ‘B’ Street, Ph-VII-Ext, DHA.
100 SQ.Yds
G+I 1716.61 Sft
Bashir Ahmed Ansari
(one window) CCC, DHA
20 Mr. Saleemullah Abbasi
107-A, 2nd Street, Ph-VII-Ext, DHA.
500 SQ.Yds
B+G+1 6346.25 Sft
Bashir Ahmed Ansari
(one window) CCC, DHA
21 Mr. Muhammad Madni
83/I, 7th Comm Street, Ph-IV, DHA.
300 SQ.Yds
G+1 4229.43 Sft
Irshad Ahmed
(one window) CCC, DHA
22 Mr. Muhammad Nasir
130/II, 9th Street, Ph-VI, DHA.
1000 SQ.Yds
B+G+1 10526.37 Sft
Bashir Ahmed Ansari
(one window) CCC, DHA
23 Mr. Abdul Rafay Nadeem
27-B/II, ‘Q’ Street, Ph-VI, DHA.
514. SQ.Yds
G+1 5669.71 Sft
Faisal Bilwany
(one window) CCC, DHA
24 Mrs. Kanwal 34, Kh-e-Ittehad, Ph-VI, DHA
3000 SQ.Yds
B+G+1 25810.62 Sft
Irshad Ahmed
(one window) CCC, DHA
25 Mr. Ellahi Bukhsh B-11-B/I, Central Avenue , Ph-VII, DHA.
500 SQ.Yds
G+I 5627.50 Sft
Ansar A Farooqui
(one window) CCC, DHA
26 Mr. Mohammad Saleem
S-78, Kh-e-Muhammad Hussain Shaheed, Ph-VII-Ext.
2000 SQ.Yds
G+I 2081.22 Sft
Irshad Ahmed
(one window) CCC, DHA
27 Mrs. Shaban Channa
153/III, kh-e-Hafiz, Ph-VI, DHA.
500 SQ.Yds
B+G+I 7896.22 Sft
Bashir Ahmed Ansari
(one window) CCC, DHA
28 Mr. Muhammad Rizwan
55/II, 13th Lane, Ph-VII, DHA.
500 SQ.Yds
G+I 5751.16 Sft
Abdul Aleem
(one window) CCC, DHA
29 Mr. Abdul Rehman
S-182, Ayyubia Staff Lane-8, Ph-VII-Ext, DHA.
100 SQ.Yds
G+I 1795.23 Sft
Irshad Ahmed
(one window) CCC, DHA
30 1.Mr.Samiullah Jung 2.Mrs. Abidah Ziauddin
68/II, 3rd Street, Ph-V, DHA.
975 SQ.Yds
B+G+I 11663.44 Sft
Naheed Mashooq Ullah
(one window) CCC, DHA
31 Mr.Syed Masood Ali
233/II, 36th Street, Ph-VIII-A, DHA.
996.5 SQ.Yds
B+G+I 11380.65 Sft
Syed Tahseen Ahmed
On left side 10’-0’’ wide COS required wheres as per plan 5’-0’’ provided.
32 1. Mr. Naeem Baig 2. Mr. Imran Baig
155, 21st Street, Ph-VIII-A, DHA.
996 SQ.Yds
B+G+I 13522.45 Sft
Faisal Bilwany
All connected papers are placed on the table.
Recommendations of the Building Committee held on 15-02-2013:-
Recommended for approval by the Board except sr. no. “31 ” same to be rescrutize in the light of Building byelaws.
19
RESOLUTION: The Board considered all proposals from serial 1 to 32 along with
recommendations of the Building Committee and approved all of
them except the case at Sr. No.31 and subject to fulfillment of all necessary formalities including payment of all related dues.
(b) PROPOSED / REVISED PLANS-NOTICES U/S 179 OF THE CANTONM1ENT ACT, 1924
(COMMERCIAL PLANS)
To consider notices Under Section 179 of the Cantonments Act, 1924 (II of 1924) alongwith building plans of commercial buildings submitted by the following allottees / lessees received through DHA requesting therein for approval of the Cantonment Board Clifton from municipal point of view. MEO Karachi Circle has granted NOC from land and tenure point of view as required Under Section 181 (3) of Cantonments Act, 1924 (II of 1924). The building plans mentioned below have been checked / vetted / by Staff of Engineering Branch:-
S.
NO
NAME OF
ALLOTEE/LESSEE
PLOT NO. / LOCATION
AREA OF
PLOT
NATURE OF
CONSTRUCTION
TOTAL COVERED
AREA
Name of Architect
1 Mr. Mohammed Ghuffran A. Sattar
21-F, Sunset Lane-4, Ph-II-Ext
100
Sq Yds
B+G+4th Floors+S.To
wer
5666.59 Sft Najeeb Khan
2 Mr. Iftikhar Ahmed Shaikh
1-C, Sehar Lane-8, Ph-VII,
200
Sq Yds
B+G+4th Floors+S.To
wer
11811.14 Sft Najeeb Khan
All connected papers are placed on the table.
Recommendations of the Building Committee held on 15-02-2013:- Recommended for approval by the Board.
RESOLUTION: The Board considered all proposals from serial 1 to 2 along with
recommendations of Building Committee and approved all of
them subject to concurrence of the competent authority and
fulfillment of all necessary codal formalities including payment of all related dues.
(c) COMPOSITION OF OFFENCE OF ILLEGAL CONSTRUCTION
(RESIDENTIAL BUNGALOW)
To consider the completion building plans (with violation) mentioned below received through DHA. The plans have been checked / vetted / by by Staff of Engineering Branch & found in accordance with the already approved building plan. The site has not been checked / verified as on ground checking of Building Control is a responsibility of DHA office as per practice in vogue.
20
S.NO.
NAME OF OWNER / LESSEE
PROPERTY NO.
APPROVED VIDE
BCR/CBR & DATE
NATURE
OF ILLEGAL CONSTRUCTI
ON
COMPOSITION FEE
REMITTED BY THE DHA
DHA LETTER NO. & DATE
ARCHITECT
AS PER COMPLETION PLAN
1. Mr. Akash Jai Leemani
92/I, 7th Street, Ph-VI, DHA
1(36) 06-01-2011
Excess.Area of Basement
Rs. 973/-
DHA/TP&BC/AF-5902
Dt: 31-01-2013
Hamid Hussain Ibrahim
2. Mr. Raza Ali E-4/I, 4th Gizri Street, Ph-IV, DHA
1(6) 15-11-2010
Excess.Area of G.Floor+F.Floor+
Rear COS
Rs. 10,3017/-
DHA/TP&BC/A-2328
Dt: 31-01-2013
Azmat A. Rahim
3.33333333
Mr. Abdul Aziz 110/II, Kh-e-Amir Khusro, Ph-VI, DHA
1(12) 05-05-2011
Excess.Area of Carporch in Front COS
Rs. 47,000/-
DHA/TP&BC/A-11658
Dt: 06-02-2013
Najeeb Khan
4. Mr. Nasrullah Khan
176/II, Kh-e-Shahbaz, Ph-VI, DHA
1(14) 17-03-2011
Excess.Area of G.Floor+F.Floor
Rs. 18,513/-
DHA/TP&BC/A-7381
Dt: 07-02-2013
Najeeb Khan
All connected papers are placed on the table.
Recommendations of the Building Committee held on 15-02-2013:-
Recommended for approval by the Board.
RESOLUTION: The Board considered the proposals from serial 1 to 4 along with
recommendations of Building Committee and approved all of
them subject to concurrence of competent authority and
fulfillment of all necessary formalities including payment of all related dues.
(d) COMPLETION PLAN WITH NO VIOLAITON CASES
(RESIDENTIAL BUNGALOW)
To consider following completion plans received from lessees / allottees through DHA Karachi. The completion building plans mentioned below have been checked / vetted / by Staff of Engineering Branch & found in accordance with the already approved building plan. The site has not been checked / verified as on ground checking of Building Control is a responsibility of DHA office as per practice in vogue.
21
S. NO
NAME OF OWNER / LESSEE
PROPERTY NO. APPROVED
VIDE BCR
& DATE
DHA LETTER
NO. & DATE
NAME OF ARCHITECT
AS PER APPROVED PROPOSE PLAN
NAME OF ARCHITECT
AS PER COMPLETION PLAN
1. Mr. Asad Qadir 111/III, 22nd Street, Ph-VI, DHA
1(33)
18-01-2007
DHA/TP&BC/A-9892
Dt 20-07-2012
Shariq Saud Ahmed
Tariq Saud Ahmed
2. Mrs. Zehra Rukhsana
78-A/I, Kh-e-Amir Khusro, Ph-VI, DHA
1(24)
07-02-2012
DHA/TP&BC/A-20014
Dt 30-01-2013
Shoaib A. Hashmi
Shoaib A. Hashmi
3. Mr. Salman Hanif & Mr. Muhammad Salman
S-5, Tariq Street-9, Ph-VII-Ext DHA
1(28)
29-11-2011
DHA/TP&BC/S-33068
Dt 04-02-2013
Syed Tahseen Ahmed
Syed Tahseen Ahmed
4. Mr. Taufique Kodvavi
120/I, 34th Street, Ph-VI, DHA
1(21)
20-09-2011
DHA/TP&BC/A-12906
Dt 06-02-2013
Irshad Ahmed Syed Zainuddin
5. Mr. Salman Hanif
S-7, Tariq Street-9, Ph-VII-Ext, DHA
1(9)
06-02-2012
DHA/TP&BC/S-33078
Dt 04-02-2013
Shoaib A. Hashmi
Syed Tahseen Ahmed
6. Mrs. Farzana Iqbal
75-A, Kh-e-Abbasi, Ph-VII, DHA
1(1)
29-06-2009
DHA/TP&BC/A-29460
Dt 11-02-2013
Tarique Ahmed Abro
Syed Tahseen Ahmed
7. Mr. Sajjad Basheer
111/I, Kh-e-Tariq, Ph-VI, DHA
1(13)
17-08-2011
DHA/TP&BC/A-10520
Dt 11-02-2013
Syed Zainuddin
Syed Tahseen Ahmed
All connected papers are placed on the table.
Recommendations of the Building Committee held on 15-02-2013:- Recommended for approval by the Board.
RESOLUTION: The Board considered all proposals from serial 1 to 7 along with
recommendations of the Building Committee and approved all of
them subject to fulfillment of all necessary formalities including
payment of all related dues.
22
(e) COMPLETION PLAN WITH NO VIOLAITON CASES
( COMMERCIAL BUILDINGS)
To consider following completion plans received from lessees / allottees through DHA:
All connected papers are placed on the table.
Recommendations of the Building Committee held on 15-02-2013:- Recommended for approval by the Board.
RESOLUTION: The Board considered all proposals from serial 1 to 2 along with
recommendations of the Building Committee and approved all of
them subject to fulfillment of all necessary codal formalities including payment of all related dues.
(f) EXTENSION U/S 183 (A) OF THE CANTONMENTS ACT, 1924 (RESIDENTIAL /COMMERCIAL PLANS).
To consider applications regarding extension in time for the completion / construction of building / bungalows under section 183 (A) of the CantonmentsAct,1924 (II of 1924).
S. NO.
NAME OF
OWNER /
LESSEE
PROPERTY NO.
DATE OF APPROVAL OF PLAN
DATE OF EXPIRY OF
SANCTION
DATE OF
APPLICATION
EXTENSION REQUIRED FROM
EXTENSION REQUIRED
UPTO
REMARKS
1. Mrs. Saima Irfan
34-E, Kh-e-Ittehad, Ph-VI
16-01-10 15-01-2012 1st Extension Expired on Dt: 16-01-2013
11-01-2013
15-01-2013 16-01-2014 2nd Extension Applied For
S. NO
NAME OF OWNER / LESSEE
PROPERTY NO.
APPROVED
VIDE BCR
& DATE
DHA LETTER
NO. & DATE
NAME OF ARCHITECT AS PER
APPROVED
BUILDING PLAN
NAME OF ARCHITECT AS PER COMPLETION PLAN
1. Mr. Rashid Hussain & Other (4)
27-E, Badar Comm. Street-7, Ph-V.
1(7)
28-06-2008
DHA/TP&BC/SSI/WL-7079
Dt: 31/01/2013
Tarique Ahmed Abro
Irshad Ahmed
2. 1. Mr. Kamran 2. Syed Sanaullah 3. Meraj Ali
14-C, 24th Comm. Street, Ph-II-Ext.
2(11)
17-03-2011
DHA/TP&BC/SSI/WL-446
Dt: 31/01/2013 Syed Zainuddin
Ansar A Farooqi
23
2. Mrs. Samna Sohail
77, Kh-e-Rizwan, Ph-VII
12-02-2011 11-02-2013 08-02-2013
12-02-2013 11-02-2014 1st Extension Applied For
3. Mr. Shaikh Shan Elahi
198, Kh-e-Shujaat, Ph-VIII
06-03-2010 05-03-2012 1st Extension Expired on 05-03-2013
06-02-2013
06-03-2013 05-03-2014 2nd Extension Applied For
All connected papers are placed on the table.
Recommendations of the Building Committee held on 15-02-2013:-
Recommended for approval by the Board.
RESOLUTION: The Board considered the proposal along with recommendations
of Building Committee and approved all of them subject to
fulfillment of all necessary formalities including payment of all related dues.
(g). COMPOSITION OF OFFENCE OF ILLEGAL CONSTRUCTION
(COMMERCIAL BUILDINGS)
To consider completion plans received from lessee / allottees through DHA for composition under section 185 of the Cantonments Act, 1924 for regularization of illegal construction and deviation form the sanctioned commercial plans as per list below. The composition fee has been levied by the DHA as shown against and deposited in the CBC:
S.NO.
NAME OF OWNER / LESSEE
PROPERTY NO.
APPROVED VIDE BCR/CBR & DATE
NATURE
OF ILLEGAL CONSTRUCTION
COMPOSITION FEE REMITTED BY THE DHA
LETTER NO. & DATE
NAME OF ARCHITECT
AS PER COMPLETION PLAN
1. Mr. Anwer Mateen
1-C, Muslim Comm Street-2, Ph-VI, DHA
1(7)
28-06-2008
Exccessive area of Stair Tower+Lift Room
Rs. 26,757/-
DHA/TP&BC/SSI-WL-7270
Dt: 28-01-2013
Syed Zainuddin
All connected papers are placed on the table.
Recommendations of the Building Committee held on 15-02-2013:- Recommended for approval by the Board.
RESOLUTION: The Board considered proposal along with recommendation of
the Building Committee and approved the same subject to
concurrence of the competent authority and fulfillment of all
necessary codal formalities including payment of all related dues.
24
(h) RENEWAL OF LICENCE
To consider the following application received from registered architects for “Renewal” of license for the year 2013, who got registered in the year 2012.
S.NO.
NAME OF
PROFESSIONAL
NAME OF FIRM
APPLICATION
DATED
REGISTRATION
DECISION OF
BUILDING COMMITTEE / REMARKS
REMARKS
ARCHITECTS
1 Mahera Nizam M/s SNM Partners
Application dt: 30-01-2013.
PCATP Approved
2 Shoaib A. Hashmi
M/s Archways
Application dt: 13-12-2012.
PCATP Approved
3 Mukhtar Hussain - Application dt: 01-02-2013.
PCATP Approved
4 Nasir Lotia M/s Lotia & Lotia
Application dt: 12-02-2013.
PCATP Approved
5 Rizwan Saddiq - Application dt: 23-11-2012.
PCATP Approved
6 Nasim-ul-Haq-Siddiqui
- Application dt: 18-01-2013
PCATP Approved
7 Nazir Ahmed s/o Nawab-din
M/s Mansoor & Nazir Associates
Application dt: 05-12-2012
PCATP Approved
STRUCTURAL ENGINEERS
8 Engr. Anwar Rasheed
M/S Rasheed Consultants
Application dt: 04-02-2013
PEC Approved
9 Engr. Mushtaq H Dawood
M/S Mushtaq & Bilal
Application dt: 07-02-2013
PEC Approved
10 Engr. Muhammad Anis
M/S Muhammad Anis Consuting Engineers.
Application dt: 07-02-2013
PEC Approved
11 Engr. M. Najam Bilal
M/S Mushtaq & Bilal
Application dt: 07-02-2013
PEC Approved
GEO-TECH CONSULTANTS
12 Syed Niaz Hussain
M/S Soil Testing Service
Application dt: 04-02-2013
PEC Approved
25
All connected papers are placed on the table.
Recommendations of the Building Committee held on 15-02-2013:- Recommended for approval by the Board.
RESOLUTION: The Board considered the cases at serial 1 to 12 along with
recommendations of the Building Committee and approved all of them subject to fulfillment of all necessary codal formalities including payment of all related dues.
22. SUSPENSION / CANCELLATION OF ENLISTMENT / REGISTRATION
OF ARCHITECT MR. ABDUL ALEEM FROM CBC PANEL.
Ref:- DHA letter no. DHA/TP&BC/107-Gen/Bldg dated 07-02-2013
To consider the DHA letter referred above dated 07-02-2013 regarding suspension of enlistment / registration of Mr. Abdul Aleem from panel of CBC. The contents of the letter are reproduced as under:-
“It is intimated that Mr. Abdul Aleem (Architect) has been enlisted in list of architect on panel of CBC for the year 2012 but the drawing submitted / vetted by him under his signature are not as per BC&TP regulations 2011. These drawings are repeatedly objected and returned to owner, which causes lot of inconvenience to owner besides wastage of precious time and efforts in processing of building plans by DHA. Competent Authority has observed this anomaly seriously and desird to consider Mr. Abdul Aleem and his firm for suspension / cancellation from CBCs architect panel list. ”
Note: Architect Abdul Aleem has been called in person in Building Committee for inquiry / clarification.
All connected papers are placed on the table.
Recommendations of the Building Committee held on 15-02-2013:-
After hearing the point of view of the architect wherein he stressed to give a chance to him and assured the committee that the mistakes shall not be repeated again, the Committee recommends to continue his enlistment as architect with CBC for further 90 days. If the architect fails to fulfil his committent, his license will be cancelled.
RESOLUTION: The Board considered the recommendations of the Building Committee and approved the same. The Architect be informed accordingly.
26
23. SUSPENSION / CANCELLATION OF ENLISTMENT / REGISTRATION OF ARCHITECT MR. FARHAN AHMED FROM CBC PANEL.
DHA letter no. DHA/TP&BC/107-Gen/Bldg dated 13-02-2013
To consider the DHA letter referred above dated 07-02-2013 regarding suspension of enlistment / registration of Mr. Farhan Ahmed from panel of CBC. The contens of the letter are reproduced as under:-
“It is intimated that Mr. Farhan Ahmed (Architect) has been enlisted in list of architect on panel of CBC for the year 2012 but the drawing submitted / vetted by him under his signature are not as per BC&TP regulations 2011. These drawings are repeatedly objected and returned to owner, which causes lot of inconvenience to owner besides wastage of precious time and efforts in processing of building plans by DHA. Competent Authority has observed this anomaly seriously and desird to consider Mr. Farhan Ahmed and his firm for suspension / cancellation from CBCs architect panel list. Detail of objection / observations in respect of plot no. 84, Kh-e-Muhammad Akram Shaheed, Ph-VII, is also attached as Annex-A to this letter.”
Note: Architect Abdul Aleem has been called in person in Building Committee for inquiry / clarification.
All connected papers are placed on the table.
Recommendations of the Building Committee held on 15-02-2013:-
After hearing the point of view of the architect wherein he stressed to give a chance to him and assured the committee that the repeatation of mistakes shall not be happened again, the Committee recommends to continue his enlistment as Architect with CBC for further 90 days. If the architect fails to fulfil his committent, his license will be cancelled.
RESOLUTION: The Board considered the recommendations of the Building Committee and approved the same. The Architect be informed accordingly.
24. ENHANCEMENT IN VETTING FEES / CHARGES OF CANTONMENT BOARD PROJECTS.
Reference:- (i) Application dated: 03/01/2013 submitted by Liaq-Ul-Islam on behalf of Association of Consulting Engineers (Pakistan) &
(ii) The Building Committee held on 04-01-2013 & 21-01-2013. ii. To re-consider the case regarding enhancement in vetting fees of structural Engineers. The case was already placed before the Building Committee twice times in response of application submitted by Liaq-Ul-Islam on behalf of Association of Consulting Engineers (Pakistan.) regarding enhancement in vetting charges paid to proof vetting Engineer. The contents of the application are reproduces as under please:-
� The vetting charges of Rs. 0.50 per sft was set by both Cantonment board and KBCA about 15 years back, after which the cost of all items have increased ten fold. In view of this the SBCA has increased its rate to Rs. 10/- per sft (Rs. 5/- for vetting Engineer and Rs. 5 retained by SBCA) minimum of Rs. 25,000/- about one month back, it was increased to Rs. 2/- about 5 years back from Rs. 0.50/-
27
� Therefore it is requested in order to get proper vetting from Senior Structural Consultants, rate of Clifton Cantonment Board should be also be increased in similar manner. Rs. 3000 to 4000/- for a B+G+4th floors building of 100 sq yds is not appropriate in our opinion.
� Soil investigation to be conducted before architectural planning. � Some law to be devised which creates fear of blacklisting. � It should be analyzed how much jobs can be handled by a Soil / Structural
consultant within a period of 01 month. If a consultant is performing more than he should be called for an explanation.
� CBC enlistment and renewal fees are too high Rs. 25,000/ compared to SBCA Rs. 2,000/- for Structural Engineers and Rs. 25,000/- compared to SBCA Rs. 15,000/- for Proof Engineers.”
iii. In this connection it is relevant to mention that the case was placed before Building Committee in its meeting held on 04-01-2013 the committee resolved as under:-
“The Engineers and builders may be called for meeting on the next Building Committee meeting. Representative of Sindh Out-door Advertising Associations should also be called for consultation on rates for vetting of Billboards”
iv. In the light of Building Committee’s Resolution this office has called the associations / Nominees of ABAD, DBA, SBCA ACEP, Vetting Engineers & officials of this office in the building committee in order to discuss the issue & all the members attend the meeting held on 21-01-2013 & after detailed discussion & deliberation it was decided to devise a fee slab for next Building Committee.
v. It is pertinent to mention that ABAD has requested vide letter no. ABAD/CBC/13-0080 dated 21-1-2013 that the vetting fees which is currently 50 paisa p.s.f and and if it has to be increased it should be up to Rs. 1.50/ per sft
vi. Now this office has worked out a very user friendly Fee Slab hereinbelow keeping in view the plot size for small projects G+4 floors & for bigger size of high-rise projects as per sft.
S No. Plot Size Total Fee for vetting of Structural Drawings
Fees to be paid to the Vetting Engineer
25% Fees to be retained in CBC.
1 Upto 100 sq yds Rs. 20,000/- Rs. 15,000/- Rs. 5,000/- 2 101 upto 250
sq yds Rs. 32,000/- Rs. 24,000/- Rs. 8,000/-
3 251 upto 400 sq yds
Rs. 60,000/- Rs. 45,000/- Rs. 15,000/-
4 401 & above Rs. 5 per sft 75% of total fees 25% of total fees
Rates for Billboars (For Advertising )
Hoarding size Rates for Vetting including Stability Certificate
Remarks
10’ x 20’ 10,000/-
15’ x 45’ 15,000/-
20’ x 60’ 15,000/-
60’ & above 20,000/-
28
All connected papers are placed on the table.
Recommendations of the Building Committee held on 15-02-2013:-
Recommended for approval by the Board.
RESOLUTION: The Board considered and approved the proposal on the agenda side provided that the Vetting Fee/Charges shall be divided at the ratio of 60:40 between the Builder and the Cantonemnt Board Clifton respectively.
25. PROCEEDING OF MEETING OF BUILDING COMMITTEE HELD ON 22-2-2013
(a) PROPOSED / REVISED PLANS-NOTICES U/S 179 OF THE CANTONMENT ACT,
(RESIDENTIAL PLANS)
To consider notices under section 179 of the Cantonment Act, 1924 (II of 1924) alongwith building plans of bungalows submitted by the following allottees / lessees received through DHA requesting approval of the Cantonment Board Clifton from municipal point of view, MEO Karachi Circle has been asked to grant NOC from land and tenure point of view as required under section 181 (3) of Cantonments Act, 1924 (II of 1924):-
S. NO
NAME OF ALLOTEE/LESSEE
PLOT NO. / LOCATION
AREA OF
PLOT
NATURE OF
CONSTRUCTION
TOTAL COVERED AREA
Name of Architect
REMARKS
1. Mr.Munawar Opel 61, Kh-e-Muhammad Akram Shaheed, Ph-VII-Ext, DHA.
500 SQ.Yds
B+G+1 5901.00 Sft
Syed Tahseen Ahmad
(one window) CCC, DHA
2. Mrs. Sajida Jawed 115, Popular Avenue, Ph-VI, DHA.
2000 SQ.Yds
B+G+1 20807.50 Sft
Abdul Aleem
(one window) CCC, DHA
3. Mr.Aamir Ahmed S-92, Ayyubia Staff Lane-6, Ph-VII-Ext, DHA.
100 SQ.Yds
G+1 1546.88 Sft
Shoaib A Hashmi
(one window) CCC, DHA
4. Mr.Muhammad Zahid
55/I, 13th Lane, Ph-VII, DHA.
500 SQ.Yds
G+1 5751.16 Sft
Abdul Aleem
(one window) CCC, DHA
5. Mr.Muhammad Saqib
106/II, Kh-e-Amir Khusro, Ph-VI, DHA
1000 SQ.Yds
B+G+1 11474.76 Sft
Faisal Bilwany
(one window) CCC, DHA
6 Mr. Syed Mansoor Ahmed
104-A/I, Comm Avenue, Ph-VII, DHA.
1000 SQ.Yds
B+G+1 11043.88 Sft
Abdul Aleem
(one window) CCC, DHA
7 Mrs. Huma Mujeeb 129/II, 12th Street, Ph-VI, DHA.
500 SQ.Yds
G+1 5569.33 Sft
Faisal Bilwany
(one window) CCC, DHA
8 Mr. Muhammad Ashraf
81, Kh-e-Sehar, Ph-VI, DHA
600 SQ.Yds
B+G+1 6922.50 Sft
Faisal Bilwany
(one window) CCC, DHA
29
9. Mrs. Nasreen Parvez Makhdumi
41, Kh-e-Shamsheer, Ph-V
2000 Sq.Yds.
B+G+1
11069.93 Sft
Habib Fida Ali
Revised Plan
10 Mr. Umar Farooq 56/I, Zulfiqar Street-5, Ph-VIII-A, DHA
493.42 Sq.Yds.
G+1
5404.70 Sft
Syed Zainuddin
Revised Plan
11 Mr. Jawaid Iqbal Paracha
176, Kh-e-Shujat, Ph-VIII-A, DHA
990 Sq.Yds.
B+G+1
12179.83 Sft
Irshad Ahmed
(one window) CCC, DHA
12 Mrs. Hina Ibrahim Q-8/II, 10th East Street, Ph-I, DHA
497.00 Sq.Yds.
B+G+1
5822.40 Sft
Faisal Bilwany
(one window) CCC, DHA
13 Mr. Muhammad Amin & Mr. Muhammad Naeem Farooq
113/I, Kh-e-Tariq, Ph-VI, DHA
501.66 Sq.Yds.
B+G+1
5590.44 Sft
Shoaib A Hashmi
(one window) CCC, DHA
All connected papers are placed on the table.
Recommendations of the Building Committee held on 22-02-2013:- Recommended for approval by the Board.
RESOLUTION: The Board considered all proposals from serial 1 to 13 along with
recommendations of the Building Committee and approved all of
them subject to fulfillment of all necessary formalities including payment of all related dues.
(b). PROPOSED / REVISED PLANS-NOTICES U/S 179 OF THE CANTONMENT ACT, 1924
(COMMERCIAL PLANS ) To consider notices Under Section 179 of the Cantonments Act, 1924 (II of 1924) alongwith building plans of commercial buildings submitted by the following allottees / lessees received through DHA requesting therein for approval of the Cantonment Board Clifton from municipal point of view. MEO Karachi Circle has granted NOC from land and tenure point of view as required Under Section 181 (3) of Cantonments Act, 1924 (II of 1924). The building plans mentioned below have been checked / vetted / by Staff of Engineering Branch:-
S. NO
NAME OF ALLOTEE/LESS
EE
PLOT NO. / LOCATION
AREA OF
PLOT
NATURE OF
CONSTRUCTION
TOTAL COVERE
D AREA
Name of Architect
REMARKS
1 Mr. Noor Muhammad
40-C, Kh-e-Zafar Shaheed, Ph-VII-Ext, DHA
100 Sq yds
B+G+4th Floor + Stair Tower
5770.65 Sq Yds
Aziz Ahmed Ansari
2 Mr. Muhammad Zahid Ali
118, 10th Comm Street, Ph-IV, DHA
401 Sq yds
B+G+5th Floor + Stair Tower+M. room
26414.81 Sq Yds
Sana Yousuf
All connected papers are placed on the table.
30
Recommendations of the Building Committee held on 22-02-2013:- Recommended for approval by the Board.
RESOLUTION: The Board considered all proposals from serial 1 to 2 along with
recommendations of Building Committee and approved all of
them subject to concurrence of the competent authority and
fulfillment of all necessary codal formalities including payment of all related dues.
(c). COMPOSITION OF OFFENCE OF ILLEGAL CONSTRUCTION
(RESIDENTIAL BUNGALOW)
To consider the completion building plans (with violation) mentioned below received through DHA. The plans have been checked / vetted / by by Staff of Engineering Branch. The site has not been checked / verified as on ground checking of Building Control is a responsibility of DHA office as per practice in vogue.
S.NO.
NAME OF OWNER / LESSEE
PROPERTY NO.
APPROVED VIDE
BCR/CBR & DATE
NATURE
OF ILLEGAL CONSTRUCTI
ON
COMPOSITION FEE REMITTED BY THE DHA
DHA LETTER NO. & DATE
ARCHITECT
AS PER COMPLETION PLAN
1. Mr. Abdul
Basit Seedat
G-28/I, 4th Gizri Lane, Ph-IV
- Excess.Area of
Ground Floor + First Floor + Mezzanine +Basement
Rs. 39668/- DHA/TP&BC/A-10113
Dt: 21-02-2013
Shoaib A. Hashmi
2. Mrs. Anjum
Aziz
55/II, 20th Lane, Ph-VII
1(22)
05-04-2011
COS + Exess Area of First
Floor
+ Parapet Wall
Rs. 30,250/- DHA/TP&BC/A-8317
Dt: 18-02-2013
Irshad Ahmed
3. Mr. Athar
Sultan
22-A/III, North Circular Avenue, Ph-I
1(22)
05-04-2011
Exess Area of First Floor
+ constructed S.tower & guard room without
permission
Rs. 15,146/- DHA/TP&BC/A-1258
Dt: 21-02-2013
Abdul Aleem
All connected papers are placed on the table.
Recommendations of the Building Committee held on 22-02-2013:- Recommended for approval by the Board.
RESOLUTION: The Board considered the proposals from serial 1 to 3 along with
recommendations of the Building Committee and approved all of
them subject to concurrence of competent authority and
fulfillment of all necessary formalities including payment of all related dues.
31
(d). COMPLETION PLAN WITH NO VIOLAITON CASES
(RESIDENTIAL BUNGALOW)
To consider following completion plans received from lessees / allottees through DHA Karachi. The completion building plans mentioned below have been checked / vetted / by Staff of Engineering Branch. The site has not been checked / verified as on ground checking of Building Control is a responsibility of DHA office as per practice in vogue.
S. NO
NAME OF OWNER / LESSEE
PROPERTY NO. APPROVED VIDE BCR
& DATE
DHA LETTER NO. & DATE
NAME OF ARCHITECT
AS PER APPROVED PROPOSE PLAN
NAME OF ARCHITECT
AS PER COMPLETION PLAN
1. Mr. Ghulam Muhammad
22-A/I/I, Golf Course Road-2, Ph-IV, DHA
1(16) 04-05-2010
DHA/TP&BC/A-12199
Dt 14-02-2013
Nazir Ahmed Abdul Aleem
2. Mr. Fareed Rizwan
S-7, Tariq Street-6, Ph-VII-Ext, DHA
1(24) 09-02-2011
DHA/TP&BC/A-17343A
Dt 12-02-2013
Syed Tahseen Ahmed
Shoaib A. Hashmi
3. Mr. Muhammad Hanif
71/II, 3rd Street, Ph-VI, DHA
1(46) 25-02-2011
DHA/TP&BC/AF-3627
Dt 11-02-2013
Abdul Aleem Najeeb Khan
4. Mr. Muhammad Abid
113/II, 17th Street, Ph-VI
1(12) 05-06-2009
DHA/TP&BC/A-3085
Dt 13-02-2013
Tariq Ahmed Abro
Shoaib A. Hashmi
5. Mr. Hafiz Muhammad Zeeshan Paracha
115, 28th Street, Ph-VI, DHA
1(17) 14-02-2013
DHA/TP&BC/A-6682
Dt 14-02-2013
Syed Tahseen Ahmed
Syed Tahseen Ahmed
6. Mrs. Nighat Aftab
114/I, Kh-e-Hilal, Ph-VI, DHA
1(45) 05-05-2011
DHA/TP&BC/AF-7045
Dt 18-02-2013
Syed Tahseen Ahmed
Syed Tahseen Ahmed
7. Mr. Shahid Zafar
30, 5th Comm. Street, Ph-IV
1(21) 17-01-2012
DHA/TP&BC/SSI-702
Dt 18-02-2013
Syed Zainuddin
Syed Zainuddin
8. Mr. Waseem Ahmed Mr. Tariq Mahmood & Mr. Adnan Abrar
168/I, 32nd Street, Ph-VI
1(50) 13-07-2012
DHA/TP&BC/A-8381
Dt 12-02-2013
Kaiser Ashrat Shoaib A. Hashmi
9 Mr. Shakeel Ahmed
M-49/I, Kh-e-Ittehad, Ph-VII
1(47) 07-02-2012
DHA/TP&BC/A-15219
Dt 21-02-2013
Shoaib A. Hashmi
Syed Tahseen Ahmed
10 Mr. Ammar Marfani
60-B/II, “Q” Street, Ph-VII
1(88) 05-05-2011
DHA/TP&BC/A-8424
Dt 19-02-2013
Abdul Aleem Najeeb Khan
11 Mst. Fahmida Haque
M-104/IV, Kh-e-Ittehad, Ph-VII
1(3) 25-03-2010
DHA/TP&BC/A-18197
Dt 19-02-2013
Fahim Anwar Fahim Anwar
12 Mr. Amer Aziz 98/I/II, Kh-e-Ittehad, Ph-VI
1(13) 11-10-2011
DHA/TP&BC/A-27469A
Dt 19-02-2013
Najeeb Khan Najeeb Khan
32
13 Mr. Muhammad Sharif
156/I, Kh-e-Tariq, Ph-VI
1(25) 17-04-2012
DHA/TP&BC/A-10985
Dt 21-02-2013
Shoaib A. Hashmi
Syed Tahseen Ahmed
All connected papers are placed on the table.
Recommendations of the Building Committee held on 22-02-2013:-
Recommended for approval by the Board.
RESOLUTION: The Board considered all proposals from serial 1 to 13 along with
recommendations of the Building Committee and approved all of
them subject to fulfillment of all necessary formalities including
payment of all related dues.
(e). COMPLETION PLAN WITH NO VIOLAITON CASES
(COMMERCIAL BUILDINGS) To consider following completion plans received from lessees / allottees through DHA.
S. NO
NAME OF OWNER / LESSEE
PROPERTY NO.
APPROVED VIDE BCR & DATE
DHA LETTER NO. & DATE
NAME OF ARCHITECT AS PER APPROVED
BUILDING PLAN
NAME OF ARCHITECT AS PER COMPLETION PLAN
1. Mr. Muhammad Hanif
18-C, Ittehad Lane-1, Ph-VI.
2(9) 26-07-2008
DHA/TP&BC/SSI/WL-1091 Dt: 19/02/2013
Faisal Bilwani Faisal Bilwani
All connected papers are placed on the table.
Recommendations of the Building Committee held on 22-02-2013:- Recommended for approval by the Board.
RESOLUTION: The Board considered proposal along with recommendations of
the Building Committee and approved the same subject to
fulfillment of all necessary codal formalities including payment of all related dues.
(f). REGISTRATION OF ARCHITECTS, STRUCTURAL ENGINEERS
To consider the following applications recived from Archetects, Structural Engineers and GEO Tech for “Registration” in CBC. Who have been called for an interview, alongwith original document for verification by the Building Committee:
S. No.
Name of Proffesional
Name of the Firm
Qualification & Date of application
Registration with
Decision of the Committee
held on 22-02-2013
(a) ARCHITECTS
1 Arch. Huma M/S (i) Bachelor of PCATP
33
Turk Young Associates
Arch (NED) (ii) 11-02-2013
Recommended
2 Arch. Kareem Kasam Ali
M/S Kareem Thobani
(i) Bachelor of Arch (ii) 15-02-2013
PCATP
Recommended
(b) STRUCUTURAL ENGINEER
3 Engr. Muneeruddin Memon
M/S Young Associates
(i) MSc (Structural) (NED) (ii) 11-02-2013
PEC SBCA
Recommended
(c) GEO-TECH CONSULTANT
4 Engr. Zaki Yasin
M/S Khalid Associates
(i) MSc (Structural) (NED) (ii) 22-02-2013
PEC SBCA
Not Recommended
All connected papers are placed on the table.
Recommendations of the Building Committee held on 22-02-2013:-
All above four professionals have been interviewed and recommended for approval by the Board except serial no. 04 i.e Engr. Zaki Yasin is not recommended for Geo-Tech Consultant.
RESOLUTION: The Board considered the cases at serial 1 to 4 along with recommendations of the Building Committee and approved the same except case at serial 4 and subject to fulfillment of all necessary codal formalities.
(g). RENEWAL OF LICENSE7
To consider the following application received from registered architects for “Renewal” of license for the year 2013, who got registered in the year 2012.
S.NO.
NAME OF
PROFESSIONAL
NAME OF FIRM
APPLICATION
DATED
REGISTRATION
DECISION OF BUILDING
COMMITTEE / REMARKS
REMARKS
ARCHITECTS
1 Arch. Murlidhar Dawani
M/s Architecture Plus
Application dt: 22-02-2013
PCATP
STRUCTURAL ENGINEERS
2 Engr. Zaki Yasin M/S Khalid Associates
Application dt: 22-02-2013
PEC
3 Kamran Ahmed M/s Consult-Tech International
Application dt: 28-01-2013.
PEC
VETTING ENGINEERS
4 Engr. Zaki Yasin M/S Khalid Associates
Application dt: 22-02-2013
PEC
5 Kamran Ahmed M/s Consult- Application dt: 28- PEC
34
Tech International
01-2013.
GEO-TECH CONSULTANTS
6 Syed Akhtar Hussain
M/S Earth Testing Laboritories
Application dt: 04-02-2013
PEC
All connected papers are placed on the table.
Recommendations of the Building Committee held on 22-02-2013:- Recommended for approval by the Board.
RESOLUTION: The Board considered the cases at serial 1 to 6 along with recommendation of the Building Committee and approved all of them subject to fulfillment of all necessary codal formalities including payment of all related dues.
26. APPROVAL OF TENDERS FOR CONSTRUCTION OF STORM WATER/ INTERCEPTOR DRAINS) ORIGINAL WORKS-2012-13 To consider the rates received on 21.2.2013 in response of tender notice published in the daily “Dawn” dated 2.2.2013, for Construction of Storm Water / Interceptor Drains (Original works) 2012-13. The Comparative statement of tendered rates alongwith description of work is as under:-
S# Description of work
Est. Cost (M)
Name of firm Quoted rate MES. Sch.
2009
Remarks
M/s. N.R Enterprises 20% Above
M/s. Saleh Muhammad & Bro. 5% Above
M/s. Amir Sawab & Bro. 9.75% Above
M/s. Sheikh Hayat Khan & Bro. 7.86% Above
M/s. Uzma Associates 20% Above
M/s. Amir Khan & Sons 30% Above
M/s. S. Hassan Engineers 07% Below Lowest
M/s. Al-Zaman Const. Co 0.5% Below
M/s. Syed Builders 20% Above
M/s. United Business Corp. 16% Above
1
Construction of Storm Water Drain at Popular Ave. from Kh-e-Hilal, Kh-e-Rahat to Comm. Ave., Ph-VI
18.39
M/s. Rehman & Bukhari (J.V) 15% Above
M/s. N.R Enterprises 20% Above
M/s. United Business Corp. 16% Above
M/s. Syed Builders 18% Above
M/s. Saleh Muhammad & Bro. 5.15% Above
M/s. S. Hassan Engineers 7.5% Below Lowest
M/s. Al-Zaman Const. Co 0.60% Below
M/s. Amir Khan & Sons 28% Above
M/s. Amir Sawab & Bro. 12.75% Above
M/s. Uzma Associates 20% Above
2 Construction of Storm Water Drain at Kh-e-Behria from Comm. Avenue to 12th Lane, Ph-IV
17.23
M/s. Sheikh Hayat Khan & Bro. 7.86% Above
M/s. Saleh Muhammad & Bro. 6.95% Above
M/s. Al-Zaman Const. Co 0.55% Below
M/s. N.R Enterprises 20% Above
3 Construction of interceptor drain at Q-Street from 17th Lane to 12th Lane, Ph-VII
17.90
M/s. Uzma Associates 20% Above
35
All connected papers are placed on the table.
RESOLUTION: The Board considered the lowest rates and resolved to approve the same. Necessary codal formalities be completed.
27. UP-GRADATION OF FIRM
To consider an application of the following contractor / firm for up-gradation of firm as Civil Contractor as per detail given below. It is worth-mentioning that the firm / contractor is already registered in this office in category “B”. The engineering branch has recommended for the said upgradation.
All connected papers are placed on the table.
RESOLUTION: The Board considered and approved the request of up-gradation
of firm as mentioned on agenda side subject to fulfillment of all
necessary formalities including payment of all related dues in this
regard.
M/s. Syed Builders 25% Above
M/s. Amir Khan & Sons 15% Above
M/s. S. Hassan Engineers 7.25% Below Lowest
Ph-VII
M/s. United Business Corp. 16% Above
M/s. Abdul Ghaffar & Sons 28% Above
M/s. N.R Enterprises 2% Above
M/s. Al-Hakeem Builders 25% Above
M/s. Saleh Muhammad & Bro. 4.75% Above
M/s. Aliya Associates 14% Above
M/s. M.I & Brother 15.75% Below Lowest
M/s. A.H Warsi & Sons 7.6% Above
M/s. OAK Corp. 12.50% Below
M/s. Pak Const. Co. 17.25% Above
M/s. Morning Sun Crop. 25.90% Above
M/s. S. Hassan Engineers 9% Below
M/s. Al-Zaman Const. Co. 0.55% Below
4 Construction of interceptor drain at 8th Comm. St. from 7th Comm. Lane to 6th Comm. Lane, Ph-IV
4.92
M/s. Bukhari Group of Co. 15% Above
Name of firm
Existing category
P.E.C registration & category Recommended category
M/s. K.N Builders
“B”
Category C-1, alongwith field of Specialization CE01, 09, 10, EE04, ME06 category i.e Roads, Pavements, Drainage, Relating Structure, signcraft installation, sewerage work, water supply, general civil works, water supply, concrete repairs, soil investigation and stabilization, landscaping and Horticulture Reclamation works, general building and maintenance and water proofing upto Rs.1000 (M)
“A”
36
28. PROCEEDING OF MEETING OF BUILDING COMMITTEE HELD ON
08-03-2013 (a) PROPOSED / REVISED PLANS-NOTICES U/S 179 OF
THE CANTONMENTACT, 1924
(RESIDENTIAL PLANS)
To consider notices under section 179 of the Cantonment Act, 1924 (II of 1924) alongwith building plans of bungalows submitted by the following allottees / lessees received through DHA requesting approval of the Cantonment Board Clifton from municipal point of view, MEO Karachi Circle has been asked to furnish NOC from land and tenure point of view as required under section 181 (3) of Cantonments Act, 1924 (II of 1924):-
S.
NO
NAME OF
ALLOTEE/LESSEE
PLOT NO. / LOCATION
AREA OF
PLOT
NATURE
OF
CONSTRU
CTION
TOTAL
COVERE
D
AREA
Name of
Architect
REMARKS
1. Mr.Ali Asim Almakky
91/I, Kh-e-Muslim, Ph-VI, DHA.
1000
SQ.Yds
B+G+I 11929.20
Sft
Farhan
Ahmed
(one
window)
CCC, DHA
2. 1. Mr. Faisal 2. Mr. Khalid Usman 3. Mr. M.Amin
25-B/II, 31st Street, Ph-V-Ext, DHA.
625
SQ.Yds
G+I 6914.81
Sft
Naseem
Siddiqui
(one
window)
CCC, DHA
3. Mr. Haji Muhammad Israr
139/II, Kh-e-Ittehad, Ph-VI, DHA.
666.66
SQ.Yds
G+I 7394.59
Sft
Shoaib A
Hashmi
(one
window)
CCC, DHA
4. Mrs. Rukhsana 6-B/II, Golf course Road-2, Ph-IV, DHA.
500
SQ.Yds
B+G+I 7914.83
Sft
Najeeb Khan (one
window)
CCC, DHA
5. Mr. Kashif Mumtaz
6-B/IV, Golf course Road-2, Ph-IV, DHA.
500
SQ.Yds
B+G+I 7960.38
Sft
Mian
Mohammad
Naseer
(one
window)
CCC, DHA
6. Mr. Mirza Sarfaraz Mohammad Baig
186/II, Kh-e-Shujat, Ph-VIII-A, DHA.
496
SQ.Yds
G+I 5419.80
Sft
Naveed A
Sheikh
(one
window)
CCC, DHA
7. Mr. Mohammad Hanif Shaikh
6-B/III, Golf course Road-2, Ph-IV, DHA.
500
SQ.Yds
B+G+I 7960.38
Sft
Mian
Mohammad
Naseer
(one
window)
CCC, DHA
8. Mr. Muhammad Parvaiz Mirza
60/I, Zulfiqar Street 1-B, Ph-VIII-A, DHA.
500
SQ.Yds
B+G+I 8010.50
Sft
Ansar A
Farooqui
(one
window)
CCC, DHA
9. Mrs. Rukhsana Zulfiqar
93/I, 3rd Comm Street, Ph-IV, DHA.
300
SQ.Yds
B+G+I 4468.33
Sft
Najeeb Khan (one
window)
CCC, DHA
37
10. Mrs. Shama Tariq Puri
215, 19th Street, Ph-VIII-A, DHA.
SQ.Yds
Sft
(one
window)
CCC, DHA
11. 1.Mr. Khurshid Alam 2.Mr. Muhammad Saleem Thobani
31/I, Kh-e-Amir Khusro, Ph-VI, DHA.
500
SQ.Yds
G+I 5518.62
Sft
Faisal
Bilwany
(one
window)
CCC, DHA
12. Mr. Abdus Samad Qureshi
227/II, 37th Street, Ph-VIII, DHA, Karachi.
496
SQ.Yds
B+G+I 6570.16
Sft
Shoaib A
Hashmi
(one
window)
CCC, DHA
13. Mr. Aurangzaib Khan
123/II, 26th Street, Ph-VI, DHA.
995.50
SQ.Yds
G+I 9283.80
Sft
Shoaib A
Hashmi
(one
window)
CCC, DHA
14. Mr. Shahid Mehmood
3, Park Lane-02, Ph-VI, DHA.
600
SQ.Yds
B+G+I 6541.64
Sft
Faisal
Bilwany
(one
window)
CCC, DHA
15. Mr. Hasnain Waheed
S-186, Ayyubia Staff Lane-8, Ph-VII, DHA.
100
SQ.Yds
B+G+I 2469.57
Sft
Abdul
Aleem
(one
window)
CCC, DHA
16. Mr. Abdul Basit 110/I, 31st Street, Ph-VI, DHA.
500
SQ.Yds
G+I 5671
Sft
Shoaib A
Hashmi
(one
window)
CCC, DHA
17. Mr. Sajid Azmat Q-32/I, 10th East Street, Ph-I, DHA.
428
SQ.Yds
G+I 5600.34
Sft
Shoaib A
Hashmi
(one
window)
CCC, DHA
18. Mrs. Zakia Khanum
22, Saba Avenue, Ph-V, DHA.
800
SQ.Yds
G+I 7312.03
Sft
Shoaib A
Hashmi
(one
window)
CCC, DHA
19. Mr. Iqbal Ahmed 432-D, 18th Street, Ph-VIII, DHA.
500
SQ.Yds
B+G+I 7440.75
Sft
Saima
Hashim
(one
window)
CCC, DHA
20. Mr. Muneer Umer 12/I, Kh-e-Amir Khusro, Ph-VI, DHA.
1000
SQ.Yds
B+G+I 11704.16
Sft
Fahim
Anwer
(one
window)
CCC, DHA
21. Mr. Hafiz Muhammad Zubair Yameen
S-46, Ayyubia Staff Lane-5, Ph-VII-Ext, DHA.
100
SQ.Yds
G+I 1709.17
Sft
Faisal
Bilwany
(one
window)
CCC, DHA
22. Mr. Sohail Hanif 60/II, 16th Lane, Ph-VII, DHA.
1000
SQ.Yds
B+G+I 8972.21
Sft
Najeeb Khan (one
window)
CCC, DHA
23. Mrs. Nabila 12-A/I, Golf Course Road-I, Ph-IV, DHA.
1000
SQ.Yds
B+G+I 11230.52
Sft
Najeeb Khan (one
window)
CCC, DHA
24. Mrs. Nusrat Iqbal S-37, Ayyubia Staff Lane-5, Ph-VII, DHA.
100
SQ.Yds
B+G+I 2401.23
Sft
Syed
Tahseen
Ahmed
(one
window)
CCC, DHA
38
25. Mrs. Shaheen Javed
S-73, Kh-e-Aziz Bhatti Shaeed, Ph-VII-Ext, DHA.
100
SQ.Yds
G+I 1895.50
Sft
Shoaib A
Hashmi
(one
window)
CCC, DHA
26 Maj ® Naseem Haider Chaudhry
10-B/I, Kh-e-Hilal, Ph-VI, DHA.
990
SQ.Yds
B+G+I 11224.67
Sft
Shoaib A
Hashmi
(one
window)
CCC, DHA
27 Mr. Muhammad Hanif
106/II, 26th Street, Ph-VI, DHA.
SQ.Yds
G+I 7329.99
Sft
Bashir
Ahmed
Ansari
(one
window)
CCC, DHA
28 Mr. Jamil Ahmed Arijo
95/II, Kh-e-Bokhari, Ph-VI, DHA.
488
SQ.Yds
G+I 5498.75
Sft
Shoaib A
Hashmi
(one
window)
CCC, DHA
29 Mr. Owais Abdul Ghani
S-61, Kh-e-Aziz BHatti Shaheed, Ph-VII-Ext, DHA
100
SQ.Yds
G+I 1883.50
Sft
Irshad
Ahmed
(one
window)
CCC, DHA
30 Mrs. Naima Haroon
12/I, Creek Lane-7, Ph-VII, DHA.
600
SQ.Yds
B+G+I 9445.33
Sft
Shoaib A
Hashmi
(one
window)
CCC, DHA
31 Mrs. Saadia Amin 60, Sunrise Stree-2, Ph-VII-Ext, DHA.
300
SQ.Yds
G+I 3944.41
Sft
Syed
Tahseen
Ahmed
(one
window)
CCC, DHA
32 Maj ® Wasif Ali Mahmud
124/II, 16th Street, Ph-VI, DHA.
1000
SQ.Yds
B+G+I 11232.18
Sft
Usama Amir
Khan
(one
window)
CCC, DHA
33 Miss. Sara Abdul Yaqeen
17/II/I, Kh-e-Shaheen, Ph-V, DHA.
525
SQ.Yds
G 425.75
Sft
Irshad
Ahmed
(one
window)
CCC, DHA
34 1.Mrs. Aliya Mohsin 2.Mrs. Shamima Aftab
112/II, 30th Street, Ph-VI
2000
SQ.Yds
B+G+I 27154.11
Sft
Rizwan
Sadiq
(one
window)
CCC, DHA
35 Mr. Zeeshan Ahmed Sheikh Through General Power of Attorny Mr. Nasir Butt.
100/I, Kh-e-Rahat, Ph-VI, DHA.
722.22
SQ.Yds
G+I 5258.00
Sft
Ali Shamim
Naqvi
(one
window)
CCC, DHA
36 Mr. Mian Muhammad Naseer
55/II/I, 33rd Street, Ph-V-Ext, DHA.
500
SQ.Yds
G+I 5618
Sft
Mian
Muhammad
Naseer
(one
window)
CCC, DHA
37 Mr. Syed Masood Ali
233/II, 36th Street, Ph-VIII-A, DHA
996.5
SQ.Yds
B+G+I 11380.65
Sft
Syed
Tahseen
Ahmed
(one
window)
CCC, DHA
38 Mrs. Salva Akram S-13, 4th “A” Street, Ph-VII-Ext
120
SQ.Yds
G+I 2042.44
Sft
Kaiser
Ashrat
(one
window)
CCC, DHA
All connected papers are placed on the table.
39
Recommendations of the Building Committee held on 08-03-2012:- Recommended for approval by the Board.
RESOLUTION: The Board considered all proposals from serial 1 to 38 along with
recommendations of the Building Committee and approved all of
them subject to fulfillment of all necessary formalities including payment of all related dues.
(b) PROPOSED / REVISED PLANS-NOTICES U/S 179 OF THE
CANTONMENT ACT, 1924
(COMMERCIAL PLANS )
To consider notices under section 179 of the Cantonments Act, 1924 (II of 1924) along with building plans of commercial buildings submitted by the following allottees / lessees received through DHA requesting approval of the Cantonment Board Clifton from municipal point of view. Plans conform to the building bye-laws and MEO Karachi Circle has granted NOC from land and tenure point of view as required under se.ction 181 (3) of Cantonments Act, 1924 (II of 1924):-
S.
NO
NAME OF
ALLOTEE/LESSEE
PLOT NO. / LOCATION
AREA OF
PLOT
NATURE OF
CONSTRUCTION
TOTAL COVERED
AREA
MEO’S NOC NO.
& DATED
Name of
Architect
1. Mrs. Farzana Muhammad Iqbal
22-C, Kh-e-Shahbaz, Ph-VI, DHA
200 Sq Yds
B+G+4th Floors
11306.87 Sft
K-15/PDSO/ 26267/2
Dt 28-02-2013
Syed Akbar
Jamil
2. Mr. Muhammad Adnan & Syed Muhammad Adil Ibrahim
161-N, Kh-e-Muslim, Ph-VI, DHA
100 Sq Yds
B+G+4th Floors +
Stair Tower
5707.91 Sft
Subject to clearance of dues and
obtain NOC from MEO
Sana
Yousuf
3. Mr. Aijaz Ahmed Mr. Kamran Ahmed
Mr. Abdul Majid Shaikh
18-C, Ittehad Lane-6, Ph-VI. DHA
200 Sq Yds
B+G+4th Floors +
Stair Tower
11741.73 Sft
Subject to clearance of dues and
obtain NOC from MEO
Ansar A.
Farooqui
4. Mr. Shaban Elahi Mr. Imran Elahi
107-C, Al-Murtaza Comm Lane-1-A, Ph-VIII-A. DHA
200 Sq Yds
B+G+4th Floors + Stair
Tower+M.Room
11796.31 Sft
Subject to clearance of dues and
obtain NOC from MEO
Shoaib A.
Hashmi
40
All connected papers are placed on the table.
Recommendations of the Building Committee held on 08-03-2012:- Recommended for approval by the Board.
RESOLUTION: The Board considered all proposals from serial 1 to 4 along with
recommendations of the Building Committee and approved all of
them subject to concurrence of the competent authority and
fulfillment of all necessary codal formalities including payment of
all related dues.
(c) COMPLETION PLAN WITH NO VIOLAITON CASES
(RESIDENTIAL BUNGALOW)
To consider following completion plans received from lessees / allottees through DHA Karachi. The completion building plans mentioned below have been checked / vetted / by Staff of Engineering Branch & found in accordance with the already approved building plan. The site has not been checked / verified as on ground checking of Building Control is a responsibility of DHA office as per practice in vogue:
S. NO
NAME OF OWNER / LESSEE
PROPERTY NO. APPROVED VIDE BCR
& DATE
DHA LETTER NO. & DATE
NAME OF ARCHITECT
AS PER APPROVED PROPOSE PLAN
NAME OF ARCHITECT
AS PER COMPLETION PLAN
1. Mr. Ahsan-Ul-Haque
60-B/I, Kh-e-Bahria, Ph-VII, DHA
1(31) 17-01-2012
DHA/TP&BC/AF-7787
Dt 22-02-2013
Syed Zainuddin
Irshad Ahmed
2. Syed Muhammad Ghiasuddin Alvi
70/I, 6th Street, Ph-V, DHA
1(23) 10-03-1998
DHA/TP&BC/AF-6845
Dt 26-02-2013
Qazi Syed Ahsanuddin
Abdul Aleem
3. Mr. Mahmood Ahmed Khan
154/II,Kh-e-Tariq, Ph-VI, DHA
1(38) 21-03-2012
DHA/TP&BC/A-12092
Dt 27-02-2013
Syed Zainuddin
Saleh Saleem Memon
4. Mr. Muhammad Aamir Raza
249/II, 31st Street, Ph-VIII-A
1(28) 09-02-2011
DHA/TP&BC/A-10553
Dt 27-02-2013
Kaiser Ashrat Kaiser Ashrat
5. Mr. Muhammad Younus
109/II, Kh-e-Tariq, Ph-VI, DHA
1(10) 07-02-2012
DHA/TP&BC/A-10668
Dt 27-02-2013
Syed Tahseen Ahmed
Shoaib A. Hashmi
6. Mr. Maroof Ali Shahani
S-27-A, Tariq Street-8, Ph-VII Ext, DHA
1(80) 22-12-2011
DHA/TP&BC/S-33471
Dt 27-02-2013
Najeeb Khan Syed Tahseen Ahmed
7. Mr. Adnan Naseer Mr. Saeed Akhtar
81, 5th Lane, Ph-VI, DHA
1(32) 11-10-2011
DHA/TP&BC/A-8549
Dt 05-03-2013
Sana Yousuf Sana Yousuf
8. Mrs. Kauser Parveen
A-48, Kh-e-Abbasi, Ph-VII, DHA
1(36) 02-03-2010
DHA/TP&BC/A-24878
Dt 18-02-2013
Nazir Ahmed Najeeb Khan
41
9. Mr. Abid Usman
114/II, 27th Street, Ph-VI, DHA
1(11) 17-01-2012
DHA/TP&BC/A-5733
Dt 04-03-2013
Abdul Aleem Shoaib A. Hashmi
10. Mr. Muhammad Khurshid Khalid
6/I, Zulfiqar Street-7, Ph-VII, DHA
1(35) 13-07-2012
DHA/TP&BC/A-15931
Dt 04-03-2013
Syed Zainuddin
Syed Tahseen Ahmed
11. Mr. Khawaja Shahid Amin Sethi Mrs. Farah Shahid Sethi
99/III, 23rd Street, Ph-VI, DHA
1(32) 08-11-2006
DHA/TP&BC/A-4849
Dt 04-03-2013
Syed Tahseen Ahmed
Shoaib A. Hashmi
12. Mr. Sheikh Abdul Aziz
S-46, 4th Street, Ph-VII Ext, DHA
1(55) 03-11-2011
DHA/TP&BC/S-33031
Dt 28-02-2013
Abdul Aleem Syed Zainuddin
13. Mr. Muhammad Shahzad Pasta & Mrs. Mehreen
84/I, “J” Street, Ph-VI, DHA
1(3) 15-07-2011
DHA/TP&BC/A-16919
Dt 01-03-2013
Matinuddin Abdul Aleem
14. Mrs. Zahida Shariq
M-108/III, Kh-e-Ittehad, Ph-VII, DHA
1(14) 17-11-2007
DHA/TP&BC/A-16302
Dt 06-03-2013
Syed Tahseen Ahmed
Syed Tahseen Ahmed
15. Mr. Shaikh Mohammad Aslam
W-21, 17th East Street, Ph-I, DHA
1(146) 02-08-2005
DHA/TP&BC/A-3449
Dt 07-03-2013
Bashir Ahmed Ansari
Syed Tahseen Ahmed
16. Mr. Arif Inam Osmani
152, 37th Street, Ph-VI, BV-2
1(29) 13-05-2006
DHA/TP&BC/A-19831
Dt 07-03-2013
Tahseen Ahmed
Atif Inam Osmani
17. Mr. Muhammad Amir
37-B/I, Kh-e-Hilal Ph-VI
1(6) 07-02-2012
DHA/TP&BC/AF-7580
Dt 28-02-2013
Irshad Ahmed Abdul Aleem
18 Mr. Muhammad Faizan
161, Kh-e-Hilal, Ph-VI,
1(48) 17-04-2012
DHA/TP&BC/N-8109
Dt 05-03-2013
Abdul Aleem Abdul Aleem
19 Mr. Muhammad Shehroz Bhadelia
66/II, Kh-e-Tariq, Ph-VI, DHA
1(19) 21-03-2012
DHA/TP&BC/AF-11049
Dt 05-03-2013
Kaiser Ashrat Shoaib A. Hashmi
20 Mr. Shoail Yousuf
105/II, 6th Street, Ph-VI
1(29) 05-05-2011
DHA/TP&BC/AF-7297
Dt 07-03-2013
Sana Yousuf Sana Yousuf
All connected papers are placed on the table.
Recommendations of the Building Committee held on 08-03-2012:- Recommended for approval by the Board.
RESOLUTION: The Board considered all proposals from serial 1 to 20 along with
recommendations of the Building Committee and approved all of
them subject to fulfillment of all necessary formalities including
payment of all related dues.
42
(d) COMPLETION PLAN WITH NO VIOLAITON CASES
(COMMERCIALBUILDINGS)
To consider following completion plans received from lessees / allottees through DHA:
All connected papers are placed on the table.
Recommendations of the Building Committee held on 08-03-2012:- Recommended for approval by the Board.
RESOLUTION: The Board considered the proposal along with recommendations
of the Building Committee and approved subject to fulfillment of all necessary formalities including payment of all related dues.
(e) COMPOSITION OF OFFENCE OF ILLEGAL CONSTRUCTION FOR RESIDENTIAL BUNGALOW.
To consider the completion building plans (with violation) mentioned below received through DHA. The plans have been checked / vetted / by by Staff of Engineering Branch & found in accordance with the already approved building plan. The site has not been checked / verified as on ground checking of Building Control is a responsibility of DHA office as per practice in vogue.
S.NO.
NAME OF OWNER / LESSEE
PROPERTY NO.
APPROVED VIDE
BCR/CBR & DATE
NATURE
OF ILLEGAL CONSTRUCTI
ON
COMPOSITION FEE REMITTED BY THE DHA
DHA LETTER NO. & DATE
ARCHITECT
AS PER COMPLETION PLAN
1. Mrs. Aasma Hanif
54/I, 25th Street , Ph-V, DHA
1(43) 25-05-2011
Right COS, Left COS &
Rear COS
Rs. 92,490/- DHA/TP&BC/AF-629
Dt: 22-02-2013
Murlidhar Dawani
2. Mr. Parvaiz 13/I, Zulfiqar Street-1 , Ph-VIII-A, DHA
1(32) 05-05-2011
Right COS, Left COS
Rs. 62,187/- DHA/TP&BC/A-15977
Dt: 26-02-2013
Syed Tahseen Ahmed
S. NO
NAME OF
OWNER /
LESSEE
PROPERTY
NO.
APPROVED
VIDE BCR
& DATE
DHA LETTER
NO. & DATE
NAME OF ARCHITECT
AS PER APPROVED BUILDING
PLAN
NAME OF ARCHITECT
AS PER COMPLETION PLAN
1. Mr. Mohammed Ghufran A. Sattar
29-C, South Park
Avenue, Ph-II
2(4)
17-04-2012
DHA/TP&BC/SSI/WL-929
Dt: 05/05/2013
Irshad Ahmed Najeeb Khan
43
3. Mrs. Shamim Rahim
4-A/I, Kh-e-Tanzeem , Ph-V, DHA
1(68) 14-01-2005
Exe. Area of G.Floor
Rs. 6,415/- DHA/TP&BC/A-4347
Dt: 13-02-2013
Yawar Abbas Jilani
4. Mrs. Ishrat Atief
95/I, 10th Street , Ph-VI, DHA
1(68) 09-07-2003
Exe. Area of G.Floor +S.Tower+ left COS
Rs. 49,077/- DHA/TP&BC/AF-5486
Dt: 27-02-2013
Irshad Ahmed
5. Mr. Bader Munir
152-A, 24th Street , Ph-VIII-A, DHA
1(11) 15-11-2010
Exe. Area of Basement+G.Room
Rs. 21,924/- DHA/TP&BC/AF-19874
Dt: 27-02-2013
Tariq Hasan
6. Mrs. Yasmeen 80/I, Kh-e-Shahbaz , Ph-VI, DHA
1(60) 15-11-2010
Exe. Area of G.Floor+F.Floor
Rs. 3,442/- DHA/TP&BC/N-12627
Dt: 25-02-2013
Faisal Bilwany
7. Mr. Amer Iqbal 71, Kh-e-Rizwan , Ph-VII, DHA
1(23) 12-10-2010
G.Room without approval
Rs. 1,875/- DHA/TP&BC/A-30547
Dt: 27-02-2013
Hamid Hussain Ibrahim
8. Mr. Shakil Shafi Zindani
90, Kh-e-Bokhari , Ph-VI, DHA
1(11) 09-12-2006
Front COS + G.Room
Rs. 59,836/- DHA/TP&BC/A-6879
Dt: 27-02-2013
Shoaib A. Hashmi
9. Mst. Elizabeth S-35, Staff Lane-8 , Ph-I, DHA
1(40) 05-05-2011
Exe. Area of G.Floor + F.Floor
Rs. 4,900/- DHA/TP&BC/S-11384
Dt: 01-03-2013
Jehangir Qureshi
10. Mrs. Anila Kamran
228, Kh-e-Muhammad Hussain Shaheed , Ph-VII-Ext, DHA
1(3) 23-06-2011
Exe. Area of Basement + F.Floor +Rear COS
Rs. 25,737/- DHA/TP&BC/A-24562
Dt: 01-03-2013
Abdul Aleem
11. Mrs. Shahida Malik
30, 20th Street, Ph-V
1(20) 24-05-2004
Exe. Area of G.Floor+Rear COS+Left COS + Guard room not approved
Rs. 2,46,347/-
DHA/TP&BC/A-5488
Dt: 24-01-2013
Syed Zainuddin
All connected papers are placed on the table.
Recommendations of the Building Committee held on 08-03-2012:-
Recommended for approval by the Board.
RESOLUTION: The Board considered all proposals from serial 1 to 11 along with
recommendations of Building Committee and approved all of
them subject to concurrence of the competent authority and
fulfillment of all necessary codal formalities including payment of
all related dues.
44
(f) EXTENSION U/S 183 (A) OF THE CANTONMENTS ACT, 1924 (RESIDENTIAL / COMM)
To consider applications regarding extension in time for the completion / construction of building / bungalows under section 183 (A) of the CantonmentsAct,1924 (II of 1924).
S. NO.
NAME OF OWNER / LESSEE
PROPERTY NO.
DATE OF APPROVAL OF PLAN
DATE OF EXPIRY OF
SANCTION
DATE OF APPLICATION
EXTENSION REQUIRED
UPTO
REMARKS
1. Mr. Muhammad Salman
121/I, 10th Street, Ph-VI
23-02-2011 22-02-2013 19-02-2013 23-02-2014 1st Extension
2. Mr. Abdul Ghaffar & Mr. Muahammad Irfan
121/II, 10th Street, Ph-VI
23-02-2011 22-02-2013 19-02-2013 23-02-2014 1st Extension
3. Mr. Saqib Rasheed Siddiqui & Mr. Abdul Haq Siddiqui
105/II, Kh-e-Iqbal, Ph-VIII-A
16-05-2011 15-05-2013 27-02-2013 16-05-2014 1st Extension
4. Mrs. Shagufta Rafique
R-57/II, Kh-e-Saadi, Ph-VII
16-07-2011 15-07-2013 05-03-2013 16-07-2014 1st Extension
5. M/S. Fujifilm Pakistan Pvt Ltd. Through Dir. Mrs. Attia Haider Through General Power of Attorney Syed Jamil Hussain
23-C, Bokhari Comm Lane-2, Ph-VI
15-04-2011 14-04-2013 26-02-2013 15-04-2014 1st Extension
All connected papers are placed on the table. Recommendations of the Building Committee held on 08-03-2012:- Recommended for approval by the Board.
RESOLUTION: The Board considered the proposal along with recommendations
of the Building Committee and approved the same subject to
fulfillment of all necessary formalities including payment of all related dues.
45
(g) RENEWAL OF LICENSE To consider the following application received from registered architects for
“Renewal” of license for the year 2013, who got registered in the year 2012 (dated: 08-03-2013).
S.NO.
NAME OF
PROFESSIONAL
NAME OF FIRM
APPLICATION
DATED
REGISTRATION
DECISION OF
BUILDING COMMITTEE / REMARKS
REMARKS
ARCHITECTS
1 Arch. Ejaz Ahmed M/s Design Approach
Application dt: 05-03-2013.
PCATP Recommended
2 Arch. Syed Zainuddin
M/s Creative Design Group
Application dt: 28-02-2013.
PCATP Recommended
3 Arch. Farhan Ahmed
M/S Firco International
Application dt: 28-02-2013.
PCATP Recommended
4 Arch. Bashir Ahmed Ansari
M/s Al-Amaar
Application dt: 28-02-2013.
PCATP Recommended
5 Arch. Mateenuddin
M/S Matin Associates
Application dt: 20-02-2013.
PCATP Recommended
6 Arch. Muhammad Nasir
M/s A.R.A Application dt: 22-02-2013.
PCATP Recommended
7 Arch. Khadiju-Tul-Kubra
- Application dt: 25-02-2013.
PCATP Recommended
STRUCTURAL ENGINEERS
8 Abdul Haseeb M/S Abdul Haseeb Associates
Application dt: 28-02-2013
PEC Recommended
9 Amjad Ali M/s Classic Construction Consultant
Application dt: 06-03-2013
PEC Recommended
All connected papers are placed on the table. Recommendations of the Building Committee held on 08-03-2012:- Recommended for approval by the Board.
RESOLUTION: The Board considered the case alongwith recommendations of the
the Building Committee and approved the same. (h) SUSPENSION OF ENLISTMENT / REGISTRATION OF ARCHITECT SYED
TEHSEEN AHMED FROM CBC PANEL. DHA letter no. DHA/TP&BC/107-Gen/Bldg dated 20-02-2013 To consider the DHA letter referred above dated 20-02-2013 regarding suspension of
enlistment / registration of Syed Tehseen Ahmed from panel of CBC. The contens of the letter are reproduced as under:-
“It is intimated that Syed Tehseen Ahmed (Architect) has been enlisted in list of architect on panel of CBC for the year 2012 but the
46
drawing submitted / vetted by him under his signature are not as per BC&TP regulations 2011. These drawings are repeatedly objected and returned to owner, which causes lot of inconvenience to owner besides wastage of precious time and efforts in processing of building plans by DHA. Competent Authority has observed this anomaly seriously and desires to consider Syed Tehseen Ahmed and his firm for suspension / cancellation from CBCs architect panel list. Detail of objection / observations in respect of plot no. 44-C, Kh-e-Bokhari, Ph-VI, is also attached as Annex-A to this letter.”
Note: Architect Syed Tehseen Ahmed has been called in person in Building Committee for inquiry / clarification.
All connected papers are placed on the table. Recommendations of the Building Committee held on 08-03-2013:- This architect suspended on DHA’s complaints in the past, and now he is doing the same mistakes and the attitude is that I have not anything wrong. Recommended that this architect suspended for 6 months from 8th March 2013.
RESOLUTION: The Board considered the case alongwith recommendations of the Building Committee and approved. The Architect be informed accroingly.
(i) SUSPENSION OF ENLISTMENT / REGISTRATION OF ARCHITECT MR. NAJEEB KHAN FROM CBC PANEL. (DATED 08-03-2013). DHA letter no. DHA/TP&BC/107-Gen/Bldg dated 20-02-2013 To consider the DHA letter referred above dated 20-02-2013 regarding
suspension of enlistment / registration of Mr. Najeeb Khan from panel of CBC. The contens of the letter are reproduced as under:-
“It is intimated that Mr. Najeeb Khan (Architect) has been enlisted in list of architect on panel of CBC for the year 2012 but the drawing submitted / vetted by him under his signature are not as per BC&TP regulations 2011. These drawings are repeatedly objected and returned to owner, which causes lot of inconvenience to owner besides wastage of precious time and efforts in processing of building plans by DHA. Competent Authority has observed this anomaly seriously and desird to consider Mr. Najeeb Khan and his firm for suspension / cancellation from CBCs architect panel list. Detail of objection / observations in respect of plot no. 21-A/I, Kh-e-Shamsheer, Ph-V, is also attached as Annex-“A” “B” & “C” to this letter.”
Note: Architect Mr. Najeeb Khan has been called in person in Building Committee for inquiry / clarification.
All connected papers are placed on the table.
47
Recommendations of the Building Committee held on 08-03-2013:- The architect agreed to the observations and has apologized for his negligience and as it is first mistake, has promised to be more vigilant. Architect is put on warning / observation for 6 months as of 8th March 2013. RESOLUTION: The Board considered the case alongwith recommendations of the
Building Committee and approved the same. The Architect be informed accroingly.
(j) COMPLETION PLAN FOR APPROVAL OF CANTONMENT BOARD
CLIFTON PLOT NO. A-2-A/II, SOUTH SEAVIEW AVENUE, PH-II, DHA . Reference: (i) MEO letter No. K-15/PDSO/8000/06 dated: 15-11-2012
(ii) RHQ letter no. 6/153/DKR/Clifton/39 dated 07-012013 (iii) An application dated 04-03-2013. To consider the It is reported that the lessee of the subject property has submitted an application referred above addressed to the Add. Director, TP&BC, DHA copy forwarded to this office wherein he has ventilate his concerns against the composition of un-authorized construction of the subject property. The contents of the application are reproduced as under:-
“With due respect, it is brought to your kind notice that DHA after approval of completion plan of above metioned plot forwarded it to Clifton Cantonment Board vide their letter no. DHA/TP&BC/N-1196 dt: 12-01-2012 but same was returned back by CBC vide letter dated 09-03-2012 that excess area has ben constructed by the lessee. DHA authorities informed the CBC authorities vide their letter no. DHA/TP&BC/N-1196 dt: 22-03-2012 that approval for additional area was granted to the owner vide their no. DHA/TP&BC/N-1196 dt: 16-06-2009 and approval may be accorded accordingly. CBC issued a demand notice after lapse of 08 months for recovery of composition fees Rs. 48840/- (photocopy enclosed) for the additional excessive area. The compostion fee has been imposed without any fault of the lessee / owner whereas proper approval was obtained from the Competent Authority of DHA. Yours authorities are requested to approach the CBC authority for withdrawal of demand notice for recovery of composition fees which which has been imposed illegally. Hope my request will be considered sympathetically and early action will be taken to settle down the matter.”
In this context, tt is relevant to mention that the Completion Building Plans of subject property was forwarded by DHA Karachi vide their letter dated 12-01-2012 as a “No violation case”. The technical staff of this office has checked the completion plan in accordance with the approved building plan and found the following deviations regarding covered against approved building plan.
Plot Area = 502.50 Sq yds S. No
Nature of Floor
Covered Area as per Approved Building Plan
Covered Area as per Completion Building Plan
Excessive / Deviated
Area alonwith cost of construction
Total Cost of construction
Rs.
1. 1st Floor 2190.00 Sft 2421.50 Sft 231.50 Sft @ 1200/- Rs. 2,77,800/-
2. Stair Tower
Not approved 175.50 sft 175.50 Sft @ 1200/- Rs. 2,10,600/-
Total Rs. 4,88,400/-
48
Thereafter, the completion plan of subject property was returned to DHA vide this office letter no. CBC/BC/A-2-A/II, South Seaview Ave/1191 dated 09-03-2012 for rectification. The DHA vide their letter also referred above dated 22-03-2012 returned the same stating therein the reason that excessive covered area of first floor is already permitted vide their (DHA) letter no. DHA/TP&BC/N-1196 dt: 16-06-2009 (photocopy attached). It is relevant to mention that the case was placed before building Committee meeting held on 17-04-2012 and Committee resolved as “ The Committee may be detailed by the Board, to evaluate and suggest resolution of deviations, approved by DHA, upto / within allowable area of a plot” Consequently the case was placed before Board in its meeting held on 09-05-2012 and the Board vide CBR no. 37 (j) resolved as “ Considered and resolved that the Building Committee may re-consider the cases under provisions of the Cantonment Act, 1924 and as per Bye-laws framed under this Act, then re-submit recommendations for consideration of the Board.”
Thereafter, the case was again placed before Building Committee meeting held on 14-09-2012 & the Committee resolved as under:-
“It is recommended to take a lenient view in this regard as the DHA was on-board during course of construction. Being not in conformity with the legal requirement of CBC, least minimum Composition fee be imposed”.
Consequently the case was placed before the Board in its meeting held on 27-09-2012 & the Board vide CBR no. 36(l) dated 27-09-2012 & the Board resolved as under:-
“The Board agreed with the recommendation of the Building Committee and approved composition to be calculated on formula as decided vide CBR No. 31 of this Board meeting subject to necessary formalities and concurrence of the Competent Authority, wherever required.”
In the light of SOP approved by the Board vide CBR No. 31 dated 27-09-2012 this office calculated composition fee @10% same is mentioned below including area of stair towerr:-
S No Cost of Construction of deviated area
10% of cost of construction
1
1st Floor area = 231.50 sft Stair Tower area = 175.50 sft Net Area = 407.00 sft 407.00 sft @ 1200/- = Rs. 4,88,400/-
Rs. 48,840/-
This office forwarded the case to DML&C through MEO for concurrence. Consequently the DML&C, Karachi RHQ vide letter no. 6/153/DKR/Clifton/39 dated 07-01-2013 has granted concurrence for the composition fee amounting to Rs. 48,840/-
All connected papers are placed on the table.
Recommendations of the Building Committee held on 08-03-2012:- As the excessive covered area of first floor is already permitted by DHA, therefore, composition fee imposed by CBC is not recommended.
49
RESOLUTION: The Board considered the proposal along with recommendations of
the Building Committee and resolved to reject the case. However, the Board further resolved that in order to avoid any such complications, henceforth DHA should send the revised plans at the time of submission of the same so that residents are spared from the payment of composition fee at the completion stage.
29. PROPOSED SUB-DIVISION OF DEMOLISHED OPEN PLOT NO.
63, 21ST STREET, PH-V, MEASURING 982.00 SQ YDS. DHA CLIFTON CANTT. KARACHI.
Reference:- MEO Karachi, letter No. K-15/PDSO/6298/9 dated: 28/02/2013.
To consider MEO Karachi, letters No. K-15/PDSO/6298/9 dated:
28/02/2013 regarding grant of NOC from municipal point of view to the proposed sub-division of Plot No. 63, 21st Street, Ph-V, DHA, Karachi measuring 982 Sq.Yds into two separate plots i.e . 63, 21st Street, Ph-V, DHA, Karachi measuring 491 Sq.Yds & 63/I, 21st Street, Ph-V, DHA, Karachi measuring 491 Sq.Yds. The DHA Karachi vide letter No. DHA/TP&BC/AF-3649 dated 04/03/2013 has also furnished the NOC in this regard. RESOLUTION: The Board considered the proposal on agenda side and approved
the same.
30. ENLISTMENT AS CONTRACTOR To consider the application of the contractor /firm for enlistment as contractor in CBC. The Engineering Branch has scrutinized their documents and recommended their enlistment as Cantonment Board contractor in category mentioned against the name of each firm: -
S# Name of firm Recommended Category
1 M/s. AAA Enterprises “C”
All connecting papers are placed on the table. RESOLUTION: The Board considered and resolved to approve the enlistment of
the firm as CBC Contractor in the category mentioned against the name of the firm subject to fulfillment of all legal and codal formalities.
31. SHIFTING OF ELECTRIC CONNECTION.
To consider an estimate amounting to Rs.11,41,951/- sent by the KESC in
response of this office letter No. CBC/29/WS/10270, dated 20.12.2012 regarding shifting of electric connection bearing No.BL.001240 from load shedding zone to Non-load shedding zone at Ghazi Pumping Station ( Chakra Goth). RESOLUTION: The Board considered and approved Rs.11, 41, 951/- for shifting of
electric connection from Load Shedding Zone to Non-Load Shedding Zone.
50
HORDING BRANCH 32. REVAMPING OF WATER SEWERAGE WATER TREATMENT PLANT .
To consider an estimate of Rs.24.00 (M) for revamping of sewerage water treatment plant located at Qublie Khan Phase-V, DHA, and Karachi.
In this context, it is relevant to mention that an amount of Rs.64.00 (M) was earmarked in budget estimates 2012-2013 for the construction of sewerage treatment plant at said location in the light of the directives issued by honorable Supreme Court of Pakistan in Environmental pollution case No.14 of 1992, 11 of 1994, 30 of 1994 and 3747 of 2006 for disposal of raw sewage in Sea.
Consequently, the existing abandoned treatment plant has been thoroughly studied and revamping of the existing are considered feasible and economical.
All connected papers are placed on the table. RESOLUTION: The Board discussed the point and observed that with this new
proposal the long desired revamping of the Sewerage Water Treatment Plant would be made possible in a shorter period of time, as well as the Board would be able to save Rs. 56 (M) which would be a considerable saving.
The Board, therefore approved the proposed estimate of Rs. 24.00 (M) for revamping subject to concurrence of the competent financial authority.
33. REFUND OF PAYMENT ON ACCOUNT OF HOARDING.
To consider the request of M/s Cubes for re-fund of payment, in this regard it is apprised that a hoarding measuring 60’ x 20’ was allotted to M/s Cubes Advertising at Do Talwar, Block-9 vide this office letter No. CBC/ADV/2 dated 29-03-2008 and renewed for a period of further one year from 05-05-2009 to 04-05-2010 vide this office letter No. CBC/ADV/5402 dated 06.05.2009 subject to following terms and conditions:
a. 50% of annual amount i.e. 16,91,580/- to be deposited by 15th June 2009.
b. Post dated cheques for remaining 50% amount i.e. 16,91,580/- to deposited by 15th June to be cashable on or before 1st August 2009.
c. In case the amount is not deposited along with post dated cheques(cashable
on or before 1st August 09) sites will be automatically cancelled/ without further notice / intimation to the advertiser and structure will be removed through the agency of Cantt Board Clifton (on 16th May 2009 or on 3rd August 2009) at their risk & cost. On the grounds failing to deposit the 50% amount along with post dated cheque for remaining 50% amount by 15th June 09, and in case the remaining 50% amount is not in CBC account on or before 1st August 09.”
51
In response to above permission/renewal letter the Advertiser has made following payment:
Financial year Demand Arrears Total Demand Payment Balance
29-03-2008 to 29-03-2009 (Approval) 3075600 Nil 3075600 3075600 Nil
06-05-2009 to 06-05-2010 (Renewal) 3383160 Nil 3383160 1537800 1845360
The said Advertiser (M/s Cubes) is requesting for re-fund of payment made for the 2nd quarter Rs. 7,68,900/- vide Cantt 4-B No. 73/4070 dated 27.04.2010 as his contention is that the Cantonment Board Clifton has removed the site in Aug-2009 due to Non-payment, whereas, as per record there is no any correspondence made regarding cancellation of said hoarding as the company can not fulfill the financial requirements. However, the case for re-fund of payment made for second quarter was placed before the Board and the Board vide CBR No. 48 dated 29-09-2011 has considered and decided to refer the case to Hoarding committee for its consideration and recommendations. An amount of Rs. 18,45,360/- is outstanding in demand and collection register 2009-10, correspondence in this regard is carried out by this office to pay the outstanding amount and case No.1250/2011 is also filed in the Court of Hon’ able Cantt. & Judicial Magistrate U/S 259 of the Cantonments Act 1924 for recovery of dues and it is pertinent to mention here that at present the said site is allotted to M/s Links Ad, vide this office letter No. CBC/ADV-9/12061 dated 31-12-2010 In this regard it is added that the matter was placed before the hoarding Committee for consideration as per CBR No. 48 dated 29-09-2011 and the Hoarding Committee/Board vide CBR No. 12 (g) dated 03-01-2013 “Considered the matter at length and decided to obtain Legal opinion from the Cantonment Legal Advisor before next meeting”. Consequently the Legal Advisor vide letter No. ALA/85/03/2013 dated 04-03-2013 opined as follows: “In my humble opinion, the M/s Cubes are not entitled for re-fund of any amount as requested by them. It is not revealed from record that the Hoarding was ever removed by the Cantonment Board Clifton. This is admitted position that no such facts was brought in the knowledge of the Clifton Cantonment by the Advisor at the relevant time”. “The case of the Advertiser also has no legs to stand as appears to be false and baseless as a man of prudent mind cannot accept that the Hoarding was ever removed in August-2009 but the company was making payment on 23-10-2009 and even another payment was also made on 27-04-2010. Thereafter the office of the Cantonment Board Clifton demanded their balance payment vide letters dated 20-05-2010 and 02-06-2010, which were not responded but later on as a counter blast on 07-07-2010, a letter was received for re-fund which doesn’t appears to be genuine.” “In view of above circumstances, claim of the company does not appear to be genuine; rather the Clifton Cantonment is entitled to recover the balance amount. Application for recovery is already pending before Judicial Magistrate. It is suggested to let the Magistrate to decide the issue and claim of the company be declined.” All connected papers are put up on table. Committee Decision: Considered the Legal opinion of CLA / case and resolved to decline
the claim of company for re-fund, meanwhile, let the Cantonment Magistrate to decide the issue accordingly.
52
RESOLUTION: The Board considered and approved the Committee’s
recommendations. The company be informed accordingly.
34. REWARD AND APPERCIATION OF HOARDING STAFF BY THE HOARDING COMMITTEE. In recognition of relentless hard work and dedication which has effected a record
recovery of hoarding charges from all advertisers including the long outstanding dues, following reward is highly recommended for the hoarding staff of CBC:
S. # NAME OF OFFICIAL
DESIGNATION AND DUTIES REWARD
i. Mr. Muhammad Sohail
(ALS) Incharge Hoarding Branch
Appreciation letter by the PCB, CBC
ii. Mr. Nadeem Akhtar (LDC) Incharge outdoor staff Hoarding Branch
Appreciation letter by the PCB, CBC
iii. Mr. Farrukh Afzal (SPO) Office working Hoarding Branch
Appreciation letter by the PCB, CBC
iv. Mr. Naeem Shah (CR) Out door staff, Hoarding Branch
Reward of Rs. 5000/-
v. Mr. Shabbir Ahmed (DC) Out door staff, Hoarding Branch
Reward of Rs. 5000/-
vi. Mr. Asad Amanat (Daily Wages) Out door staff, Hoarding Branch
89 Days office order for pure temporary employment
vii. Mr. Sadiq (Daily Wages) Out door staff, Hoarding Branch
89 Days office order for pure temporary employment
viii. Mr. Noman Mahmood
(Daily Wages) Computer Operator, Hoarding Branch
89 Days office order for pure temporary employment
RESOLUTION: The Board considered and resolved to approve the reward and
appreciation to the Hoarding Staff as recommended by Hoarding Committee.
53
35. MINUTES OF THE HOARDING COMMITTEE MEETING HELD AT 04:00 PM
ON 15th MARCH-2013
i. To consider the following applications submitted by Advertisers for new registration in Cantonment Board Clifton as Advertiser. Detail of the company as under:
S. NO.
NAME OF COMPANY
COMPANY STATUS
NTN REMARKS OF COMMITTEE
A M/s Add 4 u Proprietorship 1123770 Approved
B M/s Ads Plus -do- 0779052-0 Approved
C M/s Comet Campaigns
-do- 2254263-9 Approved
D M/s Infinity Advertising
-do- 1536154-3 Approved
RESOLUTION: The Board considered and approved the recommendations of
theHoarding Committee. Necessary codal formalities including Cantonment Board dues be completed.
ii. Regularization/amendment of the previously Allotted hoardings/Policy
Ser
Details Staff remarks Decision
a
To consider the letter dated 02-01-2013 received from M/S A.S.T Advertising for permission to enhance the size of 30 Nos Pole Sign at Kh-e-Shamsheer from 6 x 4 sft to 8 x 4 sft.
Due blockage of Footpath / size of Pole may kindly be regretted.
Subject to Site visit.
b
REQUEST FOR CORRECTION OF HOARDING CHARGES IN RESPECT OF WALL PANEL 100X15 INSTALLED AT DEAN ARCADE, AGHA SUPER MARKET, SCHONE CIRCLE,CLIFTON, KARACHI.
To consider the request for correction of hoarding charges amounting to Rs. 1210000/= upto 30-06-2012 as pointed by the Audit during year 2011-12 in respect of wall Panel measuring 100 x 15 located at Dean Arcade Agha’s Super Market, Shone Circle, Clifton, Karachi duly permitted to M/S Blue Sky Adv vide this office latter No.CBC/ADV-307/206 Dated 29-03-2012 @ Rs.1800000/= P.A
In this regard it is apprised that the calculation of arrears in respect of said site upto 30-06-2012 is as under:-
S.NO PERIOD W-E-F 29-04-2012 ANNUAL ADVERTISEMENT DUES UPTO 30-06-2012
a) 2 month & 2 days. @ Rs.1800000/= P.A Rs.310000/=
In view of the above, since the amount Rs.1210000/= mentioned in demand & Collection Register 2011-2012 and as pointed out by the
May please be recommended for correction accordingly.
Approved
54
audit is in-correct, therefore, it needs to be corrected accordingly.
c
REQUEST FOR WAIVER OF TWO MONTH HOARDING CHARGES IN REPECT OF HOARDING 60X20 INSTALLED AT KORANGI ROAD, QT STOP, DHA, KARACHI
To consider letter dated 29-01-2013 received from M/S Spectrum Lines Advertising, requesting therein to charge Advertisement / Hoarding charges in respect of Hoarding 60 x 20 located at Korangi Road, Q.T Stop dully allotted by this office vide permission letter No. CBC/ADV-23/5132 dated 31-05-2011 from 25-07-2011 instead of 01-05-2011 as the D.H.A delayed in issuance of N.O.C, in this regard an amount of Rs.354167/= from 01-05-2011 upto 25-07-2011 is calculated.
All connected papers are put up.
Recommended Approved
d
REQUEST FOR WAIVER OF HOARDING CHARGES IN REPECT OF HOARDING 60 X 20 INSTALLED AT KORANGI ROAD, NEAR TOOBA APARTMENT, DHA, KARACHI.
To consider letter dated 29-01-2013 received from M/S Links Ad, requesting therein to charge Advertisement / Hoarding charges in respect of Hoarding 60 x 20 located at Korangi Road, Q.T Stop dully allotted by this office vide permission letter No. CBC/ADV-09/5132 dated 31-05-2011 from 25-07-2011 instead of 01-05-2011 as the D.H.A delayed in issuance of N.O.C, in this regard an amount of Rs.354167/= from 01-05-2011 upto 25-07-2011 is calculated.
All connected papers are put up.
Recommended Approved
e
REQUEST FOR RE-LOCATION OF HOARDING 10X20 INSTALLED AT SUB-MARINE ROUNDABOUT, KARACHI.
To consider letter dated 31-01-2013 received from M/S Unique Neon sign Service, requesting therein to re-locate the Hoarding 10x20 installed at Sub-Marine Chowrangi vide this office permission letter No.CBC/ADV/10601 dated 18-08-2009 at following alternate locations:-
i. At Sub-Marine Roundabout at traffic Police Chowki
ii. Opposite Vincy Shopping Mall, TFCF boat Basin to Sub-Maine.
All connected papers are put up.
May kindly be regretted as no space to erect the site is available at proposed locations moreover an amount of Rs. 684687/- is recoverable upto 30-06-2013 against this site.
Pend till clearance of dues. Trimming of tree be done.
f
REQUEST FOR INCREASE IN WALL PANEL SIZE.
To consider letter dated 29-01-2013 received from M/S Microvision Inc, requesting therein for permission to increase/enhance the size of Wall Panel from 110x20 to 120x20 sft i.e. 10ft already installed at Sub-Marine Chowrangi, Danish Gah vide this office permission letter No.CBC/ADV-317/2609 dated 29-03-2012
May please be recommended subject to undertaking by the Advertiser that he will be responsible if any kind of complaint/probl
Approved
55
Connected papers are put up. em arisen in this regard.
g.
REQUEST FOR DECREASE IN WALL PANEL SIZE.
To consider letter dated 15-01-2013 received from M/S Absa Advertising, requesting therein for permission to decrease the size of Wall Panel from 100x14 to 110x10 vide this office permission letter No.CBC/ADV-/157 dated 07-01-2012 and the date of installation of Bridge Panel is 15-03-2013.
Connected papers are put up.
May please be recommended as the DHA has also issue NOC of the size as requested by the Advertiser vide DHA letter No. DHA/Svcs/Adv/BB-32/13 dated 25-02-2013
Approved
h.
HOARDING (PRIVATE) SITE LOCATED AT DEFENCE POLICE STATION.
To consider letter dated 21-01-2013 and dated 26-02-2013received from M/S Aamna’s Advertising in response of CBC letter No. CBC/ADV-/10286 dated 26-12-2012, requesting therein to charge Advertisement charges against subject Hoarding which was permitted vide letter No. CBC/ADV-309/5469 dated 02-11-2011 as 60x20 (D/S) instead of 60x30 (D/S) in this regard the dues detail upto December-2012 is mentioned below:
S. No
Period Advertisement charges
50 %DHA shares
Recoverable CBC
Remarks
a. 07-12-2011 upto 30-06-2012
Rs. 1020000/-
Rs. 510000/- Rs. 510000/-
Charged as 60x20 (D/S)
b. 01-07-2012 upto 31-10-2012
Rs. 600000/-
Rs. 300000/- Rs. 300000/-
Charged as 60x20 (D/S)
c. 01-11-2012 upto 31-12-2012
Rs. 750000/-
Rs. 375000/- Rs. 375000/-
Charged as 60x30 (D/S)
Total Rs. 2370000/-
Rs. 1185000/- Rs. 1185000/-
Less Payment Rs. 353014/-
Less 02 Months relief Rs. 150000/- less DHA shares
Balance Recoverable Rs. 681986/-
In this regard a request vide letter dated 02-01-2013 for waiver of 06 months Advertisement charges amounting to Rs. 450000/- received in this office as the view of the Hoarding was blocked by another site 60x20 allotted to M/s Spectrum Lines at Korangi Road. The same relief was given by the DHA.
Connected papers are put up
In this regard it is apprised that initially the view of Hoarding in question were remain blocked by another site for which the Advertiser vide letter dated 22-03-2012 requested this office to resolve the issue, which has not been resolved till todate resulting loss and claims of the Advertiser to give them relief and resolve the matter accordingly. The Advertiser be charged Rs. 231,986/- only and the site be treated cancelled w-e-f 31-12-2012.
Approved
56
i
To consider letter dated 07-03-2013 received from M/s Spectrum Lines requesting therein to issue NOC for transfer of rights in their name in respect of Wall Panel measuring 90x30 located at Three Swords duly permitted to M/s Intermedia Comm. Vide this office letter No. CBC/ADV-5/8027 dated 26-09-2012 in this regard an amount of Rs. 715500/- is recoverable upto 31-03-2013.
As per para No. 11 of the said permission letter “The advertisement rights are not transferable except prior permission of the Board at a cost of transfer fee to be levied by the Board on case to case basis”.
NOC be issued
subject to clearance of dues and undertaking that they will clear all previous
dues against the
site
j.
To consider letters dated 16-02-2011, dated 09-01-2012, dated 05-01-2012,24-01-2013, dated 20-02-2013 and 01-03-2013.received from M/s Intermedia Communication requesting therein to relocate/ waive the dues for following billboards/pole boxes due to reason mentioned below.
S#
Hoarding Size/
Permission Dated
Location Problem/ Issue Dues Upto 30-06-2013
Remarks
a Pole Box 6X4 cross 26th street
Kh-e-Shamsheer cross 26th street
Dues to Pole Box removed
Rs.32574/-
Now the Advertiser to waive the dues and to re-fund the amount Rs. 5000/- paid by the Advertiser against the site, therefore case may please be placed before the Hoarding Committee
b
Hoarding 10X20 Permission dated 25-01-2011
Sub-Marine roundabout
Due to another site 60X20 was allowed by this office at the right back side of approval of said hoarding M/s Intermedia Comm. Requested for enhancement of size vide letter dated 16-07-2011 and 01-08-2012 which were not consider till to date.
Rs.326616/-
The Advertiser is not making payment against this dude to problem mentioned in proper column, if agreed, case may please be placed before the Hoarding Committee
c
Hording 10X20 Permission dated 27-05-2010
Sunset Boulevard
Due to Categorization of Hoardings rated w.e.f 01-01-2013 as approved by the Board vide CBR No. 12 (d) dated 03-01-2013 the rates of Hoarding are enhanced @ Rs.3000/- per sft, therefore, the said Advertise has asked this office to charge @ old rates as per contract/Govt of Pakistan rated moreover to allow wavier of Monsoon period of pervious year 2011-12
274714/-
The Advertiser is requesting to charge @ old rates instead of present categorization rates, moreover requesting for waiver of dues on account of monsoon season. If agreed, case may please be placed before the Hoarding Committee.
d Gantry 48X10 (S/S) permissio
Sunset Boulevard
Due to Categorization of Hoardings rated w.e.f 01-01-2013 as approved by the Board vide CBR
354400/- The Advertiser is requesting to charge @ old rates instead of present categorization
May please be considered as per rules and policy.
a. Cancellation of Pole Box 6x4 Shamsheer cross 26th Street is approved w-e-f 16-02-2011. b. Advertisement charges shall be recovered. c. As per CBR No. 12 (d) dated 03-01-2013 the Board approved the categorization of Advertisement charges of all the Hoardings exists in CBC w-e-f 01-01-2013, hence the Advertiser is required to pay the same as per policy and no waiver is allowed for Monsoon period.
57
n dated 15-10-2009
No. 12 (d) dated 03-01-2013 the rates of Hoarding are enhanced @ Rs.3000/- per sft, therefore, the said Advertise has asked this office to charge @ old rates as per contract/Govt of Pakistan rated moreover to allow wavier of Monsoon period of pervious year 2011-12
rates, moreover requesting for waiver of dues on account of monsoon season. If agreed, case may please be placed before the Hoarding Committee.
e
Wall Panel 90X30
permission dated
26-09-2012
At Play House, Three Sword, Clifton, Karachi.
Due to some reason Advertiser has showed un-willingness to continue business against this site and have given the same to another Advertising firm namely M/s Spectrum Lines w.e.f. 01-12-2012
Rs.1926000/-
It is the sheer breach of para No.11 of the permission letter no. CBC/ADV-5/8027 dated 26-09-2012 moreover the Advertiser has sold the site without prior intimation/approval of this office and even without clearance of dues. If agreed case may please be placed before the Hording committee.
All connected papers and relevant file is put up on table.
d. –do- e. NOC will be issued after clearance of dues.
k.
To consider letter dated 06-03-2013 received from M/s Rock & Rock requesting therein to adjust six month payment on account of Advertisement charges in respect of 2X Hoardings located at following location:-
S.No.
Hoarding
Location
Permission letter No. Date
Demand 2001-02
Payment Receipt No. and Date
a 60 X 20 Gizri Boulevard
CBC/AD/316428/5/2002
Rs.375600/=
Rs.375600/=
50/1411 20/06/2002
b 60 X 20 Tree Sword
Do Rs.435600
/= Rs.435600/
=
51/1411
20/06/2002
In this regard stay order was issued by Hon’ able senior Civil No.VII South
Karachi vide suit No.619/2002 having status Quo for non-installation of above
Hoardings and the same was conveyed by this office vide CBC letter No.
CBC/Advt/ARS/4872 dated 18-07-2002 to the Advertiser to not install Hoarding
till further orders of the Hon’ able Court, on later the said stay was vacated by the
Hon’ able Court vide order dated 16-11-2002, the said Advertiser has paid amount
in full and making payment upto date, hence, the they are requesting for
May please be considered
Strongly recommend
ed
58
waiver/adjustment of dues for period of (06) six month against the Hoardings in
question..
Connected papers are put up on table
l.
To consider the request by M/s Nash Inc for relocating/issuance of permission for another location within the jurisdiction of CBC, as this office issued permission to install 06xPylon at Kh-e-Shamsheer vide letter No. CBC/ADV/525 dated 23-01-2013 but DHA not granting the NOC.
May please be re-located at center median belt of Kh-e-Jami
Approved
m.
• To consider letter dated 05-10-2012 received from M/s Prime Services regarding relocation of 2x damaged Pylon in this regard the Advertiser is not making payment against these Pylons till todate.
• Another request is made the Advertiser that the actual sizes of 60x Pole sign inside Zamzama are:
a. 20x Pole Signs 6x3. b. 20x Pole Signs 6x4. c. 20x Pole Signs 8x4.
• Date of installation of 15x45 hoarding at Ashiyana Mall is 05-08-2012 due to objection by Ashiyana Management as the permission letter No. CBC/ADV-50/5192 dated 15-06-2012 was issued by this office.
Connected papers are put up.
• May pleased be cancelled w-e-f 01-07-2012 as the Pylons are danaged and not exists on site.
• May please be corrected the record accordingly as the Board as previously the Board vide CBR No. 34 (iii) dated 30-11-2012 regularized the size of Pole Signs as 8x5.
• Dues may please be waived off for the period as the site was not installed due to hinderences by then Ashiyana Shopping Mall management.
Approved
n.
To consider letter dated 16-09-2008 and 14-03-2013 received from M/s Sign of the Times regarding correction in the commencement date of following Hoardings:-
a. Horading 60x20 at Lalazar Nursery b. Horading 60x20 at Sub-Marine Chowrangi
In this regard permission from this office was issued vide letter No.
CBC/ADV-/6901 dated 29-05-2008 and No. CBC/ADV-/6901 dated 29-05-2008
but due to hindrences by the owners of adjourning properties said Horadings was
installed on 30-08-2008 hence, they are requesting for waiver/adjustment of dues
for period of (03) three month against the Hoardings in question.
May please be considered
Strongly Recommen
ded
59
RESOLUTION: The Board considered and approved the recommendations of Hoarding Committee. The Board further resolved that:-
i) Grace period should be made uniform ii) Letter for approval should be issued timely for avoiding
problems regarding payments. iii) DHA permissions should also be synced. iv) Dues should be maintained only on completion of official
process at CBC/DHA level and completion of the due grace period.
iii. Cancellation of the previously Allotted hoardings
Ser
Details Staff
remarks Decision
a
REQUEST FOR CANCELLATION OF HOARDING 60 X 20 NOT INSTALLED AT 26TH STREET.
To consider letter dated 29-01-2013 received from M/S Links Ad, requesting therein to cancel the Hoarding permission granted vide this office letter No. CBC/ADV-09/1196 dated 02-02-2012 in respect of Hoarding 60 x 20 located at 26th Street, DHA, Karachi, as the said site is not installed by the Advertisers till to date.
All connected papers are put up.
Recommended for cancellation as the Hoarding has not been installed due to Non-issuance of NOC by DHA
Approved
b
REQUEST FOR CANCELLATION OF HOARDING 15 X 45 NOT INSTALLED AT ENTERANCE OF CREEK VISTAS CITY, PHASE-VIII, DHA, KARACHI.
To consider letter dated 29-01-2013 received from M/S Links Ad, requesting therein to cancel the Hoarding permission granted vide this office letter No. CBC/ADV-09/1191 dated 02-02-2012 in respect of Hoarding 15 x 45 located at Entrance of Creek Vistas City, Phase-VIII, DHA, Karachi, as the said site is not installed by the Advertisers till to date.
All connected papers are put up.
Recommended for cancellation as the Hoarding has not been installed due to Non-issuance of NOC by DHA
Approved
c
CANCELLATION OF PERMISSION OF HOARDING 60X20 INSTALLED AT INFRONT OF GOLDMARK, DEFENCE MORR, KORANGI ROAD, DHA, KARACHI.
To consider the request for cancellation of Hoarding 60x20 alloted to M/s BZB installed at infront of Gold Mark Plaza, Korangi Road, Defence Morr, DHA, Karachi vide permission letter No. CBC/ADV-/5201 dated 14-06-2012 as the said firm defaulted in payment and the DHA vide letter No. DHA/Svcs/Adv/N-24/12 dated 04-10-2012 black listed the said Advertiser and requested to cancel the site. In this regard an amount of Rs. 30,00,000/- upto 30-06-2013 is recoverable.
All connected papers are put up.
May kindly be cancelled and suit for recovery of Cantt. Dues amounting to Rs. 3000000/- on account of Hoarding/ Advertisement charges upto 30-06-2013 U/s 259 of the C.A 1924 against the site may kindly be filed and recommended to be auctioned.
Approved
60
RESOLUTION: The Board considered and approved the recommendations of the
Hoarding Committee.
iv. To consider the Auction of new Sites:- A) Gizri Fly over
a
The Advertisement for open Auction of 35 Nos of Pole Signs sizes 6x4 or 8x4 at Centre Belt of Gizri Fly over were published in following dailies/newspapers on 1st and 2nd of February, 2013 having following terms and condition:-
a. Daily dawn b. Daily Jang
1. Starting rate of the bid will be Rs. 300/- per square feet. 2. The participant must bring a call deposit of Rs.300,000/- drawn in favour
of Executive Officer, Cantonment Board Clifton, in order to take part in the auction
3. The period of auction will be for one year.
4. Successful bidder will have to deposit 1/4th of the bid amount on the spot. Balance amount will be received in three equal quarters as installment in the shape of post dated chques.
5. If due to any reason, the bid could not take place on 18 Feb, 2013, the same will be held again on 19 Feb-2013 and again on 20 Feb, 2013.
6. Executive Officer, Cantonment Board Clifton reserves the right to reject or accept any bid, without assigning any reason(s) thereof.
7. Other terms & conditions can be obtained from Hoarding Branch of the office of Cantonment Board Clifton during working hours.
In this regard due to law in order situation and strikes in city Karachi no one has participated in the said Auction on 18-02-2013 However, on 19-02-2013 at 04:00 PM following bidders have participated and offered the bid:-
S. # Company Name Name of Bidder Bid offered
a. M/s M. Ahmed Mr. Abdul Samad Rs. 300/- per sft
b. M/s Ad Media Mr. Naveed Hamid Rs. 305/- per sft
c. M/s Comet Campaigns Syed M. Ali Mehdi Rs. 310/- per sft
All connected papers are put up.
Recommended for approval to the successful bidder i.e. M/s Comet Campaigns
Approved
RESOLUTION: The Board considered and approved the recommendations of Hoarding Committee.
v. DISPLAY OF INDIAN ACTOR PHOTOS.
To consider letter No. 232/2/Gar dated 12-03-2013 received from H.Q 5 Corps with direction to ensure that Photographs / Video Clips / Footage of Indian Actors/Actresses will not be displayed on Billboards, Hoardings, LED screens and other
61
such expedients. In this regard a deadline of 22nd March, 2013 is given for strict compliance on the matter.
Decision of the Committee: Notice be issued to all the Advertisers through S.O.A.A to adhere the latest Policy in true letter and spirit.
RESOLUTION: The Board considered and approved the recommendations of the
Hoarding Committee. The Sind Out Adevertistor Association be
informed accordingly.
vi. To consider the applications from various Advertisers for the allotment of new Sites:-
a) Two Sword
S/No.
Company Details of Hoarding being installed
D/o Application
Location Status of dues
Decision
i M/s
Promote
10X20 Hoarding already installed
in CDGK area needs to be
regularized after consultation
with Director of CDGK
05-03-2013 Two Sword Upto
date
Approved
RESOLUTION: The Board considered and approved the recommendations of the
Hoarding Committee. The Director CDGK be cousultant accordingly.
vii. Hoarding Sites installed without permission:-
a) DETAIL OF ILLEGAL/UN-AUTHORIZED SITES BYCDGK AT HINO
CHOWRANGI
AREA AND DETAIL OF HOARDING
APPROX: INCOME P.A
ACTION TAKEN
• 01 Nos Hoarding measuring 60x20 at PSO Petrol Pump near Hino Chowrangi.
• 01 Nos Hoarding measuring 60x20 at Hino Chowrangi Opp: Sir Syed Hospital.
• 01 Nos Hoarding measuring 60x20 at Hino Chowrangi.
• 02 Nos Bridge Panel at KPT Fly over near Hino Chowrangi.
a)
03x Hoardings of 60x20 @ Rs. 1500/- per annum
Rs. 5.400 (M)
b)
02x Bridge Panel
@ Rs. 1200/- per annum
This office issued letter to DDO Advertisement, CDGK vide letter No. CBC/ADV-/620 dated 30-01-2013 and further reminder letter dated 22-02-2013 to direct all the Advertisers whose sites are installed within the jurisdiction of CBC to get registered their firms in CBC and to ensure payment of Hoarding charges regularly.
Committee Decision: The DML&C Karachi Region may be requested to take up the matter with CDGK
62
RESOLUTION: The Board considered and approved the recommendations of
the Hoarding Committee.
b) DETAIL OF ILLEGAL/UN-AUTHORIZED SITES BY NAVY
NAVY/PNS HAIDER APPROX:
INCOME P.A
ACTION TAKEN
• 02 Nos Hoarding measuring 60x20 at PNS Haider TFCF Sub-Marine Roundabout towards Saudi Embassy.
• 02 Nos Hoarding measuring 60x20 at PNS Haider TFCF Saudi Consualte towards Sub-Marine roundabout.
• 01 Nos Hoarding measuring 60x20 at PNS Haider TFCF Saudi Consualte towards Sub-Marine
roundabout.
05x Hoardings
(Pvt Site) of 60x20
@ Rs. 1250/- per
annum
Rs. 7.500 (M)
This office issued letter to Commander Navy, PNS
Haider vide letter No. CBC/ADV-/619 dated 30-01-
2013 and further reminder letter dated 25-02-2013 to
direct all the Advertisers whose sites are installed
within the jurisdiction of CBC to get registered their
firms in CBC and to ensure payment of Hoarding
charges regularly.
Committee Decision: The DML&C Karachi Region may
be requested to take up the matter with PAK NAVY
RESOLUTION: The Board considered and approved the recommendations of
the Hoarding Committee.
c) DETAIL OF ILLEGAL/UN-AUTHORIZED SITES BY RAILWAY
RAILWAY
LAND/KALAPUL
APPROX: INCOME
P.A
ACTION TAKEN
• 01 Nos Hoarding measuring 20x10 (Pvt) at Kalapul TFCF Korangi Road towards FTC.
• 02 Nos Hoarding (Private) measuring 60x20 at Kalapul TFCF, F.T.C towards Korangi Road.
• 01 Nos Hoarding (Private) measuring 60x20 at Kalapul TFCF, F.T.C towards Korangi Road.
• 01 Nos Hoarding (Private) measuring
a)
08x Hoardings
(Private) of 60x20
@ Rs. 1250/- per
annum
Rs. 12.000 (M)
b)
01x Hoardings
(Private) of 100x30
@ Rs. 1250/- per
annum
The action on illegal sites was not taken due to case CP No. D-
854/2009 United Mobile Vs CBC and others was filed in the High
Court of Sindh for as the claim of the advertiser was that the 3 Nos
of Hoardings are installed at Railway Land and Railway issued
Permission accordingly, whereas as per rules and being municipal
body it is prerogative of CBC to levy Sky charges and to issue
permissions, therefore, Upon request of a Advertiser for
permission to install Hoarding 15x45 at Private Site falls in the
Railway land this office sough legal opinion from the CLA that
whether this office can proceed with their request or else. The CLA
opined that “The request for present permission can be granted
provided view of Hoarding already installed by M/s United
Mobile is not affected. The CBC has authority to grant permission
being municipal authority and it is legitimate right to levy sky
63
60x20 at Kalapul TFCF, Kalapul towards Korangi Road.
• 01 Nos Hoarding (Private) measuring 60x20 at Kalapul TFCF, Korangi Road towards Kalapul.
• 01 Nos Hoarding (Private) measuring 100x30 at Kalapul TFCF, Korangi Road towards Kalapul.
• 03 Nos Hoarding (Private) measuring 60x20 at Kalapul TFCF, Korangi Road towards Kalapul (Sub-judice in the High Court of Sindh vide CP No. 854/2009).
Rs. 3.750 (M)
c)
01x Hoardings
(Private) of 10x20
@ Rs. 1250/- per
annum
Rs. 0.250 (M)
Total 16.000 (M)
charges”.
Upon said legal Advice by the CLA this office carried out the
survey and worked to bring all un-authorized sites except 03 Nos
60x20 Hoarding which is sub-judice and according to CBR No. 12
(f) (c) (ii) dated 03-01-2013 the Deferred the request for permission
to erect a Hoarding at Kala Pul Railway Land till decision of the
Court, hence, the matter is still pending in the Court of Law.
Committee Decision: The DML&C Karachi Region may be requested to
take up the matter with Pak Railways.
RESOLUTION: The Board considered and approved the recommendations of
the Hoarding Committee.
36. PROCUREMENT OF MEDCINE .
To consider and approve the procurement of Pegylated Interferon (Inj. Pegsays) and
Ribavin Capsules (Cap. Evorin 400 Mg) at the cost of 136,200/- as requested by the Senior Medical Officer, CBC Health Centre, Ph-II, DHA Karachi vide her letter No.CBC/HC/ PH-II/No.240 dated 06-03-2013 for medical treatment of Mrs. Ghazala Nasreen wife of Mr. Nazakat Khan, Labour a case of Hepatitis-C.
All connected papers are placed on the table.
RESOLUTION: The Board considered and approved the same subject to
verification by the Civil Member and fulfillment of necessary formalities.
37. WAIVER OF WATER CHARAGES Reference: Application dated 28-03-2012. To consider the request of applicant under reference to waive off water charges, on the ground that there is no water connection in the property No.76, Kh-e-Amir Khusro, Phase-VI, DHA. Karachi. The case was referred to Cantt. Engineer water supply on 27-06-2012, after verification the Cantt. Engineer reported on 25-07-2012 that the water connection of the house No.76, Kh-e-Amir Khusro, Phase-VI, DHA. was disconnected on 10-05-2009. In this connection court order of IXTH CIVIL JUDGE / JUDICIAL MAGISTRATE CANTONMENT MAGISTRATE KARACHI SOUTH dated 28-03-2012, also refer that “After
64
hearing both the parties and perused the material available on record, I came to the conclusion that the respondent had paid the dues/ taxes upto 30th June-2012 except water charges as there is no water connection as per water report produced by respondent. Hence respondent is not entitled to pay the water charges as well as surcharge on water dues. Applicant is directed to correct his record.”
In view of above report of Cantt. Engineer dated 25-07-2012, as well as court order
dated 28-03-2012, the bill of water charges levied w.e.f July-2009 against the said premises may be deleted detail as under:- S. No. Period Billing
Upto 30-06-2013
Actual Recoverable
Upto 30-06-2013
Amount to be Deleted / waived off upto
30-06-2013
1 Arrears From 07/2009 to 06/2012
Rs.85050/- Nil Rs.85050/-
2 Current from07/2012 to 06/2013
Rs.28620/- Nil Rs.28620/-
3 Total Upto 30-06-2013
Rs.113670/- Nil Rs.113670/- All connected papers are placed on table.
RESOLUTION: The Board considered and allowed the proposed correction in
demand to the extent of deletion of Rs.113670/- in light of the decision of the Court and recommendation of the concerned branch.
38. RE-CONSTITUTION OF VARIOUS COMMITTEES.
Reference: CBR No.60 dated 29-12-2010, CBR No.25 dated 29-11-2012 and CBR No. 36(b) dated 19, 20 and 22-08-2008.
To consider re-constitution of various committees in the light of general discussion
during the last Board meeting held on 12-02-2013. In the said discussion it was generally observed that there was a need to re-shuffle members in certain committees in order to re-invigorate these committees and to infuse new ideas with those changes. It may also be highlighted here that the “ABAD” has also requested vide their letter No. C-38/ABAD/ 13-0381 dated 13.03.2013 for inclusion of their nominated members in the building committee, which also needs to be considered by the Board.
The PCB had expressed his desire to consider a proposal in this regard in the next Board meeting.
Foregoing in view, the following committees are proposed to be reviewed accordingly:
S. No. Committee Existing composition
01 Building Committee
a) Lt. Col. Abrar Hussain (Chairman), AQ Garrison HQ 5 Crops,
b) Lt. Col. ® Muhammad Asad, Director, TP&BC, DHA,
c) Mr. Shahab Ghani, Achitect.
d) S. M. Shaikh, Civil Engineer.
e) Engineer Ismat Beg, Structural Engineer.
65
02 Assessment Committee
a) Mrs. Masuda Pirzada, Chairperson
b) Mr. Usman Masud Khan, Member
c) Pir Moeen Ahsanuddin, Member
d) Mr. Javid Zaidi, Member
03. Sports Committee
a) Mr. Aziz Suharwardy, Member, CBC
b) Mrs. Humaira Mehmood, Joint Secretary, ADR
c) Mr. Jamil Ahmed Chandio, Chief Organizer Gladiator Boxing Club
d) Mr. Nadeem Khan, Former Test Cricketer
e) Mr. Najeeb Wali, Ex-Member, CBC
f) Mr. Anwar Khan Niazi, Social Worker
04. Security Committee
a) Mr. Aziz Suhrwardy (Member Cantt Board, CBC)
b) Mr. Asad Kizilbash (Hon. General Secretary, ADR/V.P, DSRA)
c) Cantonment Magistrate, CBC
d) Dr. Mir Paracha (Vice Chairman ADR)
e) Mr. Aijaz Nabi (Treasure ADR)
f) Ms. Humaira Mehmood (Joint Secretary, ADR)
g) Capt. Farooq Hereker (Member ADR)
h) Mr. Javaid Zaidi (Member DRS)
i) Mr. Rafat Pasha (Member ADR)
Ex-Officio members
j) Ms. Shamim Zaman (Member DRS)
k) Mr. Sharfuddin Memon (former CPLC Chief)
l) Mr. Aftab Nabi (former IG Police Sindh)
RESOLUTION: The Board considered and resolved to approve the following
revisions in the committees:
S. No.
Committee Existing composition Revised composition
01 Building Committee
a) Lt. Col. Abrar Hussain (Chairman), AQ Garrison HQ 5 Crops,
b) Lt. Col. ® Muhammad Asad, Director, TP&BC, DHA,
c) Mr. Shahab Ghani, Achitect.
d) S. M. Shaikh, Civil Engineer.
e) Engineer Ismat Beg, Structural Engineer.
a) Mr. Aziz Suharwardy (Chairman), Member, CBC
b) Lt. Col. ® Muhammad Asad, Director, TP&BC, DHA,
c) S. M. Shaikh, Civil Engineer.
d) Engineer Ismat Beg, Structural Engineer.
e) Representative from “ABAD”. The Board decided that the rep of ABAD may be called in cases of High Rise Building Plans in Block-8 & 9 of Clifton only
02 Assessment Committee
a) Mrs. Masuda Pirzada, Chairperson
b) Mr. Usman Masud Khan, Member
c) Pir Moeen Ahsanuddin, Member
d) Mr. Javid Zaidi, Member
a) Lt. Col. Abrar Hussain (Chairman), AQ Garrison HQ 5 Crops,
b) Mr. Asad Kizilbash, Member
c) Mrs. Masuda Pirzada, Member
d) Mr. Usman Masud Khan, Member
e) Pir Moeen Ahsanuddin, Member
f) Mr. Javid Zaidi, Member
03. Sports Committee
a) Mr. Aziz Suharwardy, Member, CBC
b) Mrs. Humaira Mehmood, Joint Secretary, ADR
c) Mr. Jamil Ahmed Chandio, Chief Organizer Gladiator Boxing Club
d) Mr. Nadeem Khan, Former Test Cricketer
e) Mr. Najeeb Wali, Ex-Member, CBC
f) Mr. Anwar Khan Niazi, Social Worker
a) Mr. Aziz Suharwardy, Member, CBC
b) Mrs. Humaira Mehmood, Joint Secretary, ADR
c) Mr. Jamil Ahmed Chandio, Chief Organizer Gladiator Boxing Club
d) Mr. Nadeem Khan, Former Test Cricketer
e) Mr. Najeeb Wali, Ex-Member, CBC
f) Mr. Anwar Khan Niazi, Social Worker
g) Mr. Muhammad Yamin Rajput, Member
h) Mr. Atiq-ur-Rehman Khan Niazi, Member
66
04. Security Committee
a) Mr. Aziz Suhrwardy (Member Cantt Board, CBC)
b) Mr. Asad Kizilbash (Hon. General Secretary, ADR/V.P, DSRA)
c) Cantonment Magistrate, CBC
d) Dr. Mir Paracha (Vice Chairman ADR)
e) Mr. Aijaz Nabi (Treasure ADR)
f) Ms. Humaira Mehmood (Joint Secretary, ADR)
g) Capt. Farooq Hereker (Member ADR)
h) Mr. Javaid Zaidi (Member DRS)
i) Mr. Rafat Pasha (Member ADR) Ex-Officio members
j) Ms. Shamim Zaman (Member DRS)
k) Mr. Sharfuddin Memon (former CPLC Chief)
l) Mr. Aftab Nabi (former IG Police Sindh)
a) Mr. Aziz Suhrwardy (Member Cantt Board, CBC)
b) Mr. Asad Kizilbash (Hon. General Secretary, ADR/V.P, DSRA)
c) Cantonment Magistrate, CBC
d) Dr. Mir Paracha (Vice Chairman ADR)
e) Mr. Aijaz Nabi (Treasure ADR)
f) Ms. Humaira Mehmood (Joint Secretary, ADR)
g) Capt. Farooq Hereker (Member ADR)
h) Mr. Javaid Zaidi (Member DRS)
i) Mr. Rafat Pasha (Member ADR)
j) Addl: Director Vigilance, DHA Ex-Officio members
k) Ms. Shamim Zaman (Member DRS)
l) Mr. Sharfuddin Memon (former CPLC Chief)
m) Mr. Aftab Nabi (former IG Police Sindh)
39. CONFIRMATION OF ACTION TAKEN BY THE EXECUTIVE OFFICER UNDER
SECTION 25 OF THE CANTONMENTS ACT, 1924.
To confirm the action taken by the Executive Officer under Section 25 Cantonments Act 1924 (II of 1924) with prior approval of the PCB vide Office Note No. CBC/Sanitation/2028 dated 19.03.2013 regarding Constitution of Evaluation / Scrutiny Committee for Pre-Qualification of Firms / Companies for Purchase and after Sales Service of fully equipped Snorkel. In this connection, it is pointed out that the applications were invited through advertisement published in daily “Jang & Dawn” dated 14.02.2013. In response to the above advertisement, the following 06 firms obtained tender documents but only 04 firms mentioned at serial No.(i) to (iv) have submitted their documents/ Company profile for prequalification :-
i) M/s. Leapfrog:Solutions ii) M/s. Cemcon Associates iii) M/s. ICC (Pvt) Limited iv) M/s. Interglobe Commerce Pakistan (Pvt) Ltd v) M/s. Safety Solutions (Pvt) Ltd vi) M/s. Pakistan Vehicle Engineering (Pvt) Ltd
In this connection, it is proposed that a Evaluation / Scrutiny Committee may be constituted for the purpose of scrutiny of pre-qualification documents submitted by the above firms. The followings are proposed for the said Committee:
i) Mr. Aziz Suharwardy, Member CBC and Chairman Fire Fighting Committee
ii) Lt Col Mumtaz Ahmed, AAQMG Station Headquarters iii) Engr. Niaz Ahmed Shaikh, Chief Cantonment Engineer, CBC iv) Mr. Kabbir Ali, Chief Sanitary Inspector, CBC v) 1 x Officer from EME Workshop vi) Fire Officer from KMC. vii) Mr. Atiq-ur-Rehman.
RESOLUTION: The Board noted and confirmed.
67
40. CONFIRMATION OF ACTION TAKEN BY THE EXECTIVE OFFICER UNDER SECTION 25 OF THE CANTONMENTS ACT, 1924
To confirm the action taken by the Executive Officer under section 25 of Cantonments Act, 1924 (II of 1924) with prior approval of the PCB vide office note No.CBC/Store/Auction/1894 dated 14th March, 2013 regarding open auction of unserviceable stores.
All connected papers are placed on the table
RESOLUTION: The Board noted and confirmed. 41. NOTICES U/S 179 OF THE CANTONMENTS ACT, 1924 (BAZAR AREA) FOR
APPROVAL. To consider notices under Section 179 of the Cantonments Act, 1924 (II of 1924) along with building plans submitted by the following lessees for approval of the proposed residential / commercial building on their plot mentioned against each. The proposed building plans have been checked by the Land Branch and found correct as per building bye-laws of the Cantonment Board Clifton. Cantt. Overseer has also checked and found according to technical point of view. It is pointed out that building plans of following properties were placed before the Building Committee in its meetings held on 08.03.2013 for scrutiny and recommendations. The said committee after detailed scrutiny recommended the building plans for approval vide item No.11 of Building Committee meeting dated 08.03.2013.
Proceeding of the Building Committee alongwith connected papers are placed on the table for perusal of the Board. All connected papers are placed on the table for perusal.
RESOLUTION: The Board considered both the proposals alongwith the recommendation of the Building Committee and approved all
of them subject to fulfillment of all necessary formalities
including payment of all related dues.
S #
NAME OF LESSEE PLOT NO. & LOCATION
AREA IN SQ.
YARDS
NATURE OF LEASE
NATURE OF CONSTRUCTION
1 Mst. Muneer Begum C-2/14, Punjab Colony
237.50 Residential Ground floor+ 1st
Floor.
2 Mr. Arshad Ali Khan K-5/6, Ch.Khaliq-uz-Zaman Colony
14.50 Residential -cum-Commercial
Ground floor+1st Floor.
68
42. PROCEEDING OF MEETING OF BUILDING COMMITTEE HELD ON 22-03-2013
a) PROPOSED / REVISED PLANS-NOTICES U/S 179 OF THE
CANTONMENT ACT, 1924
(RESIDENTIAL PLANS) To consider notices under section 179 of the Cantonment Act, 1924 (II of 1924) alongwith building plans of bungalows submitted by the following allottees / lessees received through DHA requesting approval of the Cantonment Board Clifton from municipal point of view, MEO Karachi Circle has been asked to furnish NOC from land and tenure point of view as required under section 181 (3) of Cantonments Act, 1924 (II of 1924):
S. NO
NAME OF ALLOTEE/LESSEE
PLOT NO. / LOCATION
AREA OF
PLOT
NATURE OF CONSTRUC
TION
TOTAL COVERED
AREA
Name of Architect
REMARKS
1. Mr. Sheikh Rehan Ahmed
201/II, 20th Street, Ph-VIII-A, DHA.
498 SQ.Yds
G+I 5252.01 Sft
Syed Tahseen Ahmed
(one window) CCC, DHA
2. 1. Mrs. Qurat ulain Adnan 2. Mrs. Shireen Saba
19, 33rd ‘A’ Street, Ph-V-Ext (B.V.I), DHA.
800 SQ.Yds
B+G+I 9451.83 Sft
Shoaib A Hashmi
(one window) CCC, DHA
3. Mr. Mohammad Asghar
95-C, Kh-e-Bharia, Ph-VII, DHA.
600 SQ.Yds
G+I 6827.73 Sft
Shoaib A Hashmi
(one window) CCC, DHA
4. Mrs. Rukhsana Syed
287-D, 16th Street, Ph-VIII-B, DHA.
498 SQ.Yds
B+G+I 7634.66 Sft
Syed Tahseen Ahmed
(one window) CCC, DHA
5. Mr. Anil Aziz 14/II, Creek Lane-2, Ph-VII, DHA.
495 SQ.Yds
G+I 5426.75 Sft
Najeeb Khan
(one window) CCC, DHA
6. Mrs. Rehana Parveen
33, 37th Street, Ph-VI (DAR), DHA.
600 SQ.Yds
G+I 6758.66 Sft
Shoaib A Hashmi
(one window) CCC, DHA
7. Mr. Muhammad Ali Paracha
44/I, 28th Street, Ph-V-Ext, DHA.
1000 SQ.Yds
B+G+I 12361.03 Sft
Najeeb Khan
(one window) CCC, DHA
8. Mrs. Sadia Shabbir 132/II, 33rd Street, Ph-VI, DHA.
500 SQ.Yds
G+I 5597.05 Sft
Irshad Ahmed
(one window) CCC, DHA
9. Mrs. Najma Khurshid
69/I, 20th Lane, Ph-VII
499.5 SQ.Yds
G+I 5594.64 Sft
Abdul Aleem
(one window) CCC, DHA
10 Mr. Haji Muhammad Israr
139/III, Kh-e-Ittehad, Ph-VI, DHA.
666.68 SQ.Yds
B+G+I 7326.67 Sft
Shoaib A Hashmi
(one window) CCC, DHA
11 Mr. Abdul Razzak 17-A/IV, Golf Course Road-3, Ph-IV, DHA.
525.24 SQ.Yds
B+G+I 7930.87 Sft
Rizwan Sadiq
(one window) CCC, DHA
12 1- Mr. Rauf Abbas 2-Muhammad Altaf
158/I, 32nd Street, Ph-VI, DHA.
500 SQ.Yds
G+I 5597.05 Sft
Irshad Ahmed
(one window) CCC, DHA
13 1-Mr. Muhammad Faisal 2-Mr.Muhammad Arif
Q-11, 9th East Street, Ph-I, DHA.
500 SQ.Yds
G+I 5752.25 Sft
Abdul Aleem
(one window) CCC, DHA
69
14 Mr. Muhammad Yousuf
50-A/I/I, 3rd Sunset Street, Ph-II-Ext, DHA.
500 SQ.Yds
B+G+I 8017.92 Sft
Abdul Aleem
(one window) CCC, DHA
15 1-Mr. Mohammad Amin 2-Mrs. Fahmina
54/I, Kh-e-Sehar, Ph-VI, DHA.
977 SQ.Yds
B+G+I 10319.05 Sft
Shoaib A Hashmi
(one window) CCC, DHA
16 Mr. Shaikh Muhammad Yaqinuddin
S-1, Ayyubia Staff Lane-5, Ph-VII-Ext, DHA.
100 SQ.Yds
G+I 1810.58 Sft
Shoaib A Hashmi
(one window) CCC, DHA
17 Mr. Muhammad Amin
238/I, 31st Street, Ph-VIII-A, DHA.
490 SQ.Yds
G+I 5636.92 Sft
Shoaib A Hashmi
(one window) CCC, DHA
18 Mr. Muhammad Abbas Baloch
102/IV, Kh-e-Roomi, Ph-VIII-A, DHA.
500 SQ.Yds
G+I 5133.71 Sft
Jehangir Qureshi
(one window) CCC, DHA
19 Mr. Arij Ahsan Bilgrami
221/I, 36th Street, Ph-VIII-A, DHA.
995 SQ.Yds
G+I 7399.34 Sft
Ali Shamim Naqvi
(one window) CCC, DHA
20 1-Mr. Najmul Hasan Burney 2-Mrs. Khadija Najam Burney
124/I, 16th Street, Ph-VI, DHA.
1000 SQ.Yds
G+I 5044.75 Sft
Shoaib A Hashmi
(one window) CCC, DHA
21 Mr. Muhammad Mohib Haroon
53/II, 17th Lane, Ph-VII, DHA.
979.95 SQ.Yds
B+G+I 979.95 Sft
Syed Tahseen Ali
(one window) CCC, DHA
22 Mr. Muhammed Saleem Admani
84, 14th Street, Ph-VI, DHA.
1244 SQ.Yds
B+G+I 12357.66 Sft
Rizwan Sadiq
(one window) CCC, DHA
23 Mr. Saeeda Mandviwalla
62, 15th Street, Ph-V, DHA.
1966 SQ.Yds
B+G+I 17404.08 Sft
Tariq A Qaiser
(one window) CCC, DHA
24 Mrs. Nighat Iqbal 108/II, 6th Lane, Ph-VII, DHA.
995 SQ.Yds
B+G+I 11303.44 Sft
Najeeb Khan
(one window) CCC, DHA
25 Miss. Arifa Rehana 98/II, 10th Lane, Ph-VII, DHA.
1000 SQ.Yds
G+I 9252.80 Sft
Muhammad Ashraf
(one window) CCC, DHA
26 Mr. Khalid Mehmood
S-48, 4Th ‘A’ Street, Ph-VII-Ext, DHA.
120 SQ.Yds
G+I 2002.70 Sft
Syed Tahseen Ahmed
(one window) CCC, DHA
27 Mr. Majid Ali 430-D, 18th Street, Ph-VIII-B,DHA.
500 SQ.Yds
B+G+I 7467.25 Sft
Saima Hashin
(one window) CCC, DHA
28 Mr. Abdul Razzak 17-A/I, Golf Course Road-3, DHA.
519.12 SQ.Yds
B+G+I 7832.79 Sft
Rizwan Sadiq
(one window) CCC, DHA
29 Mrs. Farhat 245/II, 36th Street, Ph-VIII-A, DHA.
500 SQ.Yds
G+I 4908.69 Sft
Shoaib A Hashmi
(one window) CCC, DHA
30 Mrs. Naheed Saleem
A-58, Kh-e-Abbasi, Ph-VII, DHA.
500 SQ.Yds
G+I 5449.48 Sft
Shoaib A Hashmi
(one window) CCC, DHA
31 Mr. Abdul Hameed 152/I, 30th Street, Ph-VIII-A, DHA.
497.75 SQ.Yds
Ground floor 2304.10 Sft
Ali Shamim Naqvi
(one window) CCC, DHA
32 Mr. Javaid Iqbal Puri
96/I, Kh-e-Tariq, Ph-VI, DHA.
500 SQ.Yds
G+1 5530.75 Sft
Najeeb Khan
(one window) CCC, DHA
34 Mrs. Zuleikha 25/III, 4th Zamzama Street, Ph-V, DHA.
451.38 SQ.Yds
B+G+I 6154.64 Sft
Tanveer Ahmed
(one window) CCC, DHA
35 Mrs. Seemi Rehman M-18/I, Kh-e-Ittehad, Ph-VII, DHA.
498.16 SQ.Yds
G+1 5547.08 Sft
Faisal Bilwany
(one window) CCC, DHA
36 Mrs. Naheed Hadique
81, Kh-e-Muhammad Akram Shaheed, Ph-VII-Ext, DHA.
500 SQ.Yds
B+G+1 80211.11 Sft
Irshad Ahmed
(one window) CCC, DHA
70
37 Mrs. Shahla Wasi 195/II, 14th Street, Ph-VIII-B, DHA.
1000 SQ.Yds
B+G+1 11339.00 Sft
Shoaib A Hashmi
(one window) CCC, DHA
38 Mr. Shah Abu Taher (Through General Power of Attorney)
8/II, Zulfiqar Street-11, Ph-VIII-A, DHA.
500 SQ.Yds
G+1 5061.87 Sft
Shoaib A Hashmi
(one window) CCC, DHA
39 Mr.Amjad Ali Siddiqui
S-11, 3rd Street, Ph-VII-Ext, DHA.
100 SQ.Yds
G+1 1736.58 Sft
Syed Zainuddin
(one window) CCC, DHA
40. Mr. Kashif Rehman 98-B/II, Comm Avenue, Ph-VII, DHA.
1007.22 SQ.Yds
G+1 9149.59 Sft
Mansoor-uz-Zaman Khan
(one window) CCC, DHA
41 1.Mr. Amjad Ali 2.Mrs. Shazia
26/II, 31st Street, Ph-V-Ext, DHA.
1028.41 SQ.Yds
B+G+1 S9914.74 dft
Najeeb Khan
(one window) CCC, DHA
42 Syed Yasir Shah Mr. Tasir Shah
46-A/I, 33rd Street, Ph-V-Ext, DHA
500 Sq.Yds
G+I 5620.18 Sft
Bashir Ahmed Ansari
Revised
43 Mr. Asim Wahab Khan
131, Kh-e-Shujaat, Ph-VI, DHA
600 Sq.Yds
B+G+I 7470.09 Sft
Shoaib A Hashmi
The relevant files are placed on the table.
Recommendations of the Building Committee held on 22-03-2013:- Recommended for approval by the Board
RESOLUTION: The Board considered all proposals from serial 1 to 43 along with
recommendations of Building Committee and approved all of
them subject to fulfillment of all necessary formalities including payment of all related dues.
b) PROPOSED / REVISED PLANS-NOTICES U/S 179 OF THE CANTONMENT ACT, 1924
(COMMERCIAL PLANS ) To consider notices under section 179 of the Cantonments Act, 1924 (II of 1924) along with building plans of commercial buildings submitted by the following allottees / lessees received through DHA requesting approval of the Cantonment Board Clifton from municipal point of view. Plans conform to the building bye-laws and MEO Karachi Circle has granted NOC from land and tenure point of view as required under se.ction 181 (3) of Cantonments Act, 1924 (II of 1924):- S. NO
NAME OF ALLOTEE/LES
SEE
PLOT NO. / LOCATION
AREA OF
PLOT
NATURE OF
CONSTRUCTION
TOTAL COVERED AREA
Name of Architect
1. Mr. Hammad Haroon Pothiawala
10-C/I, Sehar Lane-2, Ph-VII, Dha
100 Sq Yds
B+G+4th Floors
5681.48 Sft
Saleh Saleem Memon
2. Mr. Shahid Hussain
C-15-D, Sunset Lane-5, Ph-II Ext, DHA
99 Sq Yds
G+4th Floors
4762.01 Sft
Ansar A. Farooqui
71
3. Dr. Mushtaq Ahmed Quraishi
11-C, Sehar Lane-2, Ph-VII, DHA.
200 Sq Yds
B+G+4th Floors, Stair Tower, M. Room
11394.00 Sft
Jahangir Qureshi
4. Mr. Anil Kumar Mr. Satram Das
21-C, Rahat Lane-I, Ph-VI, DHA.
200 Sq Yds
B+G+4th Floors, Stair Tower, M. Room
11418.38 Sft
Ansar A Farooqui
Recommendations of the Building Committee held on 22-03-2013:- Recommended for approval by the Board
RESOLUTION: The Board considered all proposals from serial 1 to 04 along with
recommendations of Building Committee and approved all of
them subject to concurrence of the competent authority and
fulfillment of all necessary codal formalities including payment of all related dues.
c) COMPLETION PLAN WITH NO VIOLAITON CASES
(RESIDENTIAL BUNGALOW) To consider following completion plans received from lessees / allottees through DHA Karachi. The completion building plans mentioned below have been checked / vetted / by Staff of Engineering Branch & found in accordance with the already approved building plan. The site has not been checked / verified as on ground checking of Building Control is a responsibility of DHA office as per practice in vogue.
S. NO
NAME OF OWNER / LESSEE
PROPERTY NO. APPROVED VIDE BCR
& DATE
DHA LETTER NO. & DATE
NAME OF ARCHITECT
AS PER APPROVED PROPOSE PLAN
NAME OF ARCHITECT
AS PER COMPLETION PLAN
1. Mrs. Abida Tufail Palijo
44-B/II, Kh-e-Shahbaz, Ph-VII, DHA
1(21) 06-09-2010
DHA/TP&BC/A-9024
Dt 11-02-2013
Najeeb Khan Shoaib A. Hashmi
2. Mr. Abdul Jabbar Surya
S-4, Staff Lane-12-A, Ph-IV, DHA
1(47) 03-11-2011
DHA/TP&BC/S-20417
Dt 11-03-2013
Syed Tahseen Ahmed
Syed Tahseen Ahmed
3. Mrs. Farzana Shahid
82-B/I, 17th Lane, Ph-VII, DHA
1(20) 11-10-2011
DHA/TP&BC/A-17491
Dt 18-03-2013
Syed Zainuddin
Shoaib A. Hashmi
The relevant files are placed on the table.
Recommendations of the Building Committee held on 22-03-2013:- Recommended for approval by the Board
RESOLUTION: The Board considered all proposals from serial 1 to 3 along with
recommendations of Building Committee and approved all of
72
them subject to fulfillment of all necessary formalities including payment of all related dues.
d) COMPLETION PLAN WITH NO VIOLAITON CASES
(COMMERCIAL BUILDINGS)
To consider following completion plans received from lessees / allottees through DHA:
S. NO
NAME OF OWNER / LESSEE
PROPERTY NO. APPROVED VIDE BCR & DATE
DHA LETTER NO. & DATE
NAME OF ARCHITECT AS
PER APPROVED BUILDING
PLAN
NAME OF ARCHITECT AS
PER COMPLETION
PLAN
1. Mr. Zafar Iqbal 8-C, Nishat Lane-4, Ph-VI.
2(8) 22-12-2011
DHA/TP&BC/SSI/WL-1253
Dt: 05/03/2013 Syed Zainuddin
Syed Tahseen Ahmed
2. Miss Saba Mohsin
51-C, 24th Street, Ph-V.
2(9) 23-06-2011
DHA/TP&BC/SSI/WL-1253
Dt: 05/03/2013 Syed Zainuddin
Saleh Saleem Memon
3. Mr. Asif Salim 15-C, Nishat Lane-11, Ph-VI.
2(8) 02-04-2007
DHA/TP&BC/SSI/WL-1190
Dt: 13/03/2013
Agha Muhammad Mirza
Irshad Ahmed
The relevant files are placed on the table.
Recommendations of the Building Committee held on 22-03-2013:- Recommended for approval by the Board
RESOLUTION: The Board considered all proposals from serial 1 to 3 along with
recommendations of Building Committee and approved all of
them subject to fulfillment of all necessary codal formalities
including payment of all related dues.
e) “RENEWAL” OF LICENSE
To consider the following application received from Registered Architects, Structural Engineers & vetting engineers for “Renewal” of license FOR THE YEAR 2013, who got rgistered in the year 2012-13:
� RENEWAL CASES (Already registered in 2012)
S. No.
Name of Proffesional
Name of the Firm Date of application
Registration with
Decision of the Committee held on 22-03-2013
(a) ARCHITECTS
1 Arch. Faisal Bilwany
M/s F. Bilwany Associates
13-03-2013 PCATP Recommended
2 Arch. Abdul Aleem M/s Abdul Aleem Assciates
14-03-2013 PCATP Recommended
73
3 Arch. Ajaz Khan M/s as Design
20-03-2013 PCATP Recommended
4 Arch. Shaista Khaliq M/s Arshad Shahid Abdulla
PCATP Recommended
(b) STRUCUTURAL ENGINEER
5 Engr. Muddasar Abbas Khan
M/s Abdullah Associates
08-03-2013 PEC Recommended
(c) VETTING ENGINEER
6 Vet Engr. Anwar Rasheed
M/s Rasheed Consultants
22-03-2013 PEC Recommended
The relevant files are placed on the table.
Recommendations of the Building Committee held on 22-03-2013:- Recommended for approval by the Board
RESOLUTION: The Board considered the cases at serial 1 to 6 along with
recommendation of Building Committee and approved all of them subject to fulfillment of all necessary codal formalities including payment of all related dues.
f) “REGISTRATION “ IN CBC
To consider the following applications received from Architects and Structural
Engineer for reigistration in CB. Who have been called for an Interview alongwith original document for verification by the Building Committtee: FRESH REGISTRATION CASE
S. No.
Name of Proffesional
Name of the Firm Qualification & Date of application
Registration with
Decision of the Committee held on 22-03-2013
(a) ARCHITECT
1 Arch. Syed Hasssan Shahzad
M/S Shahzad Brothers.
Address:- 21-C, Sunset Comm Street-1, Ph-IV, DHA, Karachi , Cell# 0300- 8281833
(i) B Arch (Indus Valley) (ii) 21-03-2013
PCATP
Recommended
(b) STRUCUTURAL ENGINEER
2 Engr. Noman Faisal Dar
M/S Noman Faisal Dar Address:- 221/L, Block-2, PECHS Karachi , Cell# 0301- 8211135
(i) BE (Civil) (NED) (ii) 14-03-2013
PEC
Recommended
The relevant files are placed on the table.
74
Recommendations of the Building Committee held on 22-03-2013:- Recommended for approval by the Board
RESOLUTION: The Board considered the cases at serial 1 and 2 above on the
agenda side along with recommendations of Building Committee and approved the same subject to fulfillment of all necessary codal formalities including payment of all related dues.
g) REVISED BUILDING PLAN FOR APPROVAL OF CANTONMENT BOARD
CLIFTON, PLOT NO. 67/III, 3rd STREET, PH-V, DHA KARACHI. Ref:- DHA letter no. . DHA/TP&BC/N-400/I, dated 23-11-2012 To consider the revised building plan of subject property forwarded by DHa vide their letter referred above. Consequently the Technical staff of this office has checked the subject site & found that bungalow constiting of G + 1st Floor is constructed at site beyond the approved plan.
This office vide letter no. CBC/BC/67/III, 3rd St./2341 dated 31-12-2012 returned the case to DHA with the following questions & DHA vide their letter no. DHA/TP&BC/N-400, dated 19-02-2013, re-submit the case alongwith following replies / remarks; same are reproduced as under:-
CBC’s Questions DHA Replies
1. The revised building plan of the subject property returned un-actioned herewith the observation that it revealed from the existing site that the construction is already completed no such constructional work has been left so far. 2. Kindly ask the lessee to submit the Completion Building Plan through DHA office to proceed further in the matter accordingly.
1. No composition fee has been received from the lessee and the permission for 1st floor beyond the approved building plan was granted to the lessee through deviation / addition / alteration by this office. 2. Furthermore, the composition fees, if any will be prcessed to CBC at the time of completion as in practice.
The relevant files are placed on the table. Recommendations of the Building Committee held on 22-03-2013:- Stance of DHA may be accepted and revised plan is recommended for approval by the Board.
RESOLUTION: The Board considered the cases at serial 1 and 2 above on the
agenda side along with recommendations of Building Committee and approved the same subject to fulfillment of all necessary codal formalities including payment of all related dues.
h) REVISED BUILDING PLAN IN RESPECT OF PLOT NO. D-62/I, BLOCK-9, KDA
SCHEME-5, CLIFTON, KARACHI. (DT 22-03-2013) Reference:- Revised Building plan application dated 06/11/2012 submitted by Mr. M. Ramzan Baluch To consider the matter of unauthorized construction of 2nd floor on subject property. It is relevant to mention that the lessee of the subject property submitted
75
revised building plan of subject property & requested therein for approval. In this context, it is pertinent to mention that the Proposed Building Plan of the subject property was approved by the Board vide CBR no. 36(b) dated 19-07-2012 & the approval was conveyed to the lessee vide this office letter No. CBC/BC/717 dated 27-07-2012. Consequent upon submission of Revised Building Plan the technical staff of this office has checked the site & found that only structure of B+G+1st floor was completed in that time. The revised building plan was placed before Building Committee meeting held on 21-01-2013 & the Committee vide BCR 3(2) dated 21-01-2013 recommended for approval by the Board same was approved by the Board vide CBR no. 8(c) dated 12-02-2013 & concurrently as per practice in vogue a letter was issued to the DDO, KDA Wing with the request to furnish NOC from Land and tenure point of view. In response DDO furnished NOC vide their letter no. KDA Wing/DLM/Clif/D-62(I)/9/61 dated 01-03-2013. Meanwhile, the field staff of this office has checked the site again and found that the lessee has unauthorizedly constructed 2th floor in violation of byelaws, approved building plan as well as the terms of the lease. However, the revised bilding plan approval accorded vide CBR no. 8(c) dated 12-02-2013 has not been issued to the lessee yet.
The relevant files are placed on the table.
Recommendations of the Building Committee:- May be dealt as CBC Building Byelaws.
RESOLUTION: The Board considered and resolved to ask the owner to demolish the existing unathourized construction of 2nd floor, after demolition the Building Plan shall be re-considered accordingly.
(Adil Rafi Siddiqui) Secretary / Executive Officer Cantonment Board Clifton
Brig. (Anis Ahmed)
President Cantonment Board Clifton