problem filamentous microorganisms solution aluminium or ozone? control of sludge age?
DESCRIPTION
Prevention of filaments with aluminium or ozone at Klagshamn WWTP? Marika Wennberg*, Ulf Nyberg* and Karin Jönsson** * VA SYD **Lund University. Problem Filamentous microorganisms Solution Aluminium or ozone? Control of sludge age?. Aluminium. Ozone. Dimensioned p.e. 90 000 Actual p.e. - PowerPoint PPT PresentationTRANSCRIPT
Prevention of filaments with aluminium or ozone at Klagshamn WWTP?
Marika Wennberg*, Ulf Nyberg* and Karin Jönsson***VA SYD **Lund University
ProblemFilamentous microorganisms
SolutionAluminium or ozone?
Control of sludge age?
Aluminium Ozone
0 10 20 30 40 50 60 70 800
40
80
120
160
200
240 Experimental line Control line
DS
VI (
ml/g
)
Days of ozone addition0 10 20 30 40 50 60 70 80 90 100
0
40
80
120
160
200
240 06 07 08 09
DS
VI (
ml/g
)
Days of aluminium addition
Dimensioned p.e. 90 000Actual p.e. 70 000Actual flow800 m3/h
Discharge limitsBOD7 10 mg/l*Tot-P 0.3 mg/l*Tot-N 12 mg/l**
*monthly average**annual average
Klagshamn WWTP
Effects of filaments
Aluminium treatmentChemical: PAX-15 (polyaluminium chloride)Dose: 1.2 g Al/m3
Simple technical equipmentTreatment performed 2006-20091-3 monthsFocus on DSVI (ml/g)
Four periods of Al-treatment – four different outcomes
0 10 20 30 40 50 60 70 80 90 1000
40
80
120
160
200
240 06 07 08 09
DS
VI (
ml/g
)
Days of aluminium addition
Ozone treatmentFull-scale test, performed in one of the two lines2.5-months treatmentDose: 550 g O3/h 0.006 g O3/g MLSS
Process parametersMLSS-concentration: 3 g/LSludge age: 20 days at start-upWater temperature: 14°C at start-up
Process layout
Ozone makes a difference
0 10 20 30 40 50 60 70 800
40
80
120
160
200
240 Experimental line Control line
DS
VI (
ml/g
)
Days of ozone addition
No ozone Ozone
No ozone Ozone
Improved settling properties
0 10 20 30 40 50 60 70 800,0
0,5
1,0
1,5
2,0
2,5
Slu
dge
leve
l (m
)
Days of ozone addition
Experimental line Control line
Effects on nitrification
Lower nitrification rate (mg NH4-N/gVSS,d) in experimental line during lab tests
Higher concentrations of NH4-N in secondary effluent in experimental line
Control of sludge age
2009-03-10 2009-04-18 2009-05-27 2009-07-05 2009-08-13 2009-09-210
40
80
120
160
200
240
280
DSVI Measured sludge age Theoretical sludge age
DS
VI (
ml/g
)
0
10
20
30
40
50
Sludge age (d)
Estimated costs
Operating cost
Investment cost
Total cost
Ozone 48 000 250 000 298 000
Aluminium 32 000 5 000 37 000
Removal of floating sludge 300 000
(SEK/year)
Dosing of Aluminium was and was not…Ozonation was…Controlling aerobic sludge age was not… …an option to prevent filamentous growth at Klagshamn WWTP.