prioritization review eshmc august 2008 b. contor 1

16
Prioritization Review ESHMC August 2008 B. Contor 1

Upload: winfred-sims

Post on 17-Jan-2016

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Prioritization Review ESHMC August 2008 B. Contor 1

Prioritization Review

ESHMC

August 2008

B. Contor1

Page 2: Prioritization Review ESHMC August 2008 B. Contor 1

Review

• In 2007 we brainstormed possible modifications to conceptual model & modeling procedures

2

Page 3: Prioritization Review ESHMC August 2008 B. Contor 1

List of activities from Sean's discussion

From 11/2007 ESHMC presentation 3

Page 4: Prioritization Review ESHMC August 2008 B. Contor 1

Review

• We all ranked the activities & summarized

4

Page 5: Prioritization Review ESHMC August 2008 B. Contor 1

Activites Ranking

0 5 10 15 20 25

1-month

River stage

Uncertainty

Returns

Target & weight

King H gage

Canal Seep

NIR

Variable T

P EST recharge

Mixed-source

Extend data

Multi spring

On-farm

Trib under

No balancing

Soil moisture

Anisotropy

Rech Tool

Boundaries

Cond reach

No. reaches

Act

ivit

y(excluding IWRRI)

(high numbers mean preferred activities)From 11/2007 ESHMC presentation 5

Page 6: Prioritization Review ESHMC August 2008 B. Contor 1

Activites Ranking

0 5 10 15 20 25

1-month

River stage

Uncertainty

Returns

Target & weight

King H gage

Canal Seep

NIR

Variable T

P EST recharge

Mixed-source

Extend data

Multi spring

On-farm

Trib under

No balancing

Soil moisture

Anisotropy

Rech Tool

Boundaries

Cond reach

No. reaches

Act

ivit

y(excluding IWRRI)

(high numbers mean preferred activities)6

IDWR

IDWR

IDWRIWRRI IWRRI

IWRRI

IWRRI IWRRI

IWRRI IWRRI

IDWR

Page 7: Prioritization Review ESHMC August 2008 B. Contor 1

Items Assigned

• 1-month Stress Periods– Design Document in review– Data collection ongoing– Requires small mod. to recharge tools

• FORTRAN mod complete

• GIS mod nearly complete

Page 8: Prioritization Review ESHMC August 2008 B. Contor 1

Items Assigned

• River & Reservoir Stage– Design Doc being written– Data are on hand

• Uncertainty Analysis– (discussion from IDWR at this meeting)

• Return flows– (discussion from IWRRI at this meeting)

Page 9: Prioritization Review ESHMC August 2008 B. Contor 1

Items Assigned

• Canal Seepage– Design Doc published– Data-gathering ongoing

• Non-irrigated Recharge– Agreement on method– Data available from UI Kimberly, fall 2008

Page 10: Prioritization Review ESHMC August 2008 B. Contor 1

Items Assigned

• Recharge on Mixed-source Lands– Design Doc in review– Data are on hand

Page 11: Prioritization Review ESHMC August 2008 B. Contor 1

Items Assigned

• Extend data set– Data collection ongoing– Recharge tool mods also needed for this

activity– (discussion at this meeting about Irrigated

Lands & ET Adjustment Factors)

Page 12: Prioritization Review ESHMC August 2008 B. Contor 1

Items Assigned

• Trib Underflow– (brief discussion?)

• Grouping of Riverbed Conductance Zones– (brief discussion?)

• Number of River Reaches– (brief discussion?)

Page 13: Prioritization Review ESHMC August 2008 B. Contor 1

Items Implicit inCalibration Process

• Targets & Weights– King-Hill gage as part of targets

• Variable Transmissivity

• PEST Adjustment of Recharge

• Multiple Springs per Model Cell

Page 14: Prioritization Review ESHMC August 2008 B. Contor 1

Items Implicit inCalibration Process

• No balancing of water budget

• Anisotropy

Page 15: Prioritization Review ESHMC August 2008 B. Contor 1

Items Not Assigned

• On-farm Water Budgets

• Soil Moisture

• Recharge Tool

• Revised Model Boundaries

Page 16: Prioritization Review ESHMC August 2008 B. Contor 1