Page 1: PREQUALIFICATION DOCUMENTS - Arab Bank for · PDF fileNOTICE FOR CONTRACTORS PREQUALIFICATION ... The prequalification documents in English language only must be duly ... Standard
Page 2: PREQUALIFICATION DOCUMENTS - Arab Bank for · PDF fileNOTICE FOR CONTRACTORS PREQUALIFICATION ... The prequalification documents in English language only must be duly ... Standard

PREQUALIFICATION DOCUMENTS

REHABILITATION & EXTENTION Of

BADEA H.Q BUILDING

ARAB BANK FOR ECONOMIC DEVELOPMENT IN AFRICA (BADEA)

P.O Box 2640 Khartoum 11111,

PREQUALIFICATION DOCUMENTS

REHABILITATION & EXTENTION Of

BADEA H.Q BUILDING

December 2011

ARAB BANK FOR ECONOMIC DEVELOPMENT IN AFRICA (BADEA)

P.O Box 2640 Khartoum 11111,

Khartoum (Sudan)

PREQUALIFICATION DOCUMENTS

ARAB BANK FOR ECONOMIC DEVELOPMENT IN AFRICA (BADEA)

Page 3: PREQUALIFICATION DOCUMENTS - Arab Bank for · PDF fileNOTICE FOR CONTRACTORS PREQUALIFICATION ... The prequalification documents in English language only must be duly ... Standard

Page 2

TABLE OF CONTENTS

- NOTICE FOR CONTRACTORS PREQUALIFICATION

- PREQUALIFICATION DOCUMENTS

Page 4: PREQUALIFICATION DOCUMENTS - Arab Bank for · PDF fileNOTICE FOR CONTRACTORS PREQUALIFICATION ... The prequalification documents in English language only must be duly ... Standard

Page 3

NOTICE FOR

CONTRACTORS PREQUALIFICATION

Page 5: PREQUALIFICATION DOCUMENTS - Arab Bank for · PDF fileNOTICE FOR CONTRACTORS PREQUALIFICATION ... The prequalification documents in English language only must be duly ... Standard

Page 4

NOTICE FOR CONTRACTORS PREQUALIFICATION

for the Rehabilitation & Extension of

BADEA H.Q Building in Khartoum

The Arab Bank for Economic Development in Africa (BADEA) an International Financial

Institution located in Khartoum intends to invite bids from prequalified contractors for

the Rehabilitation & Extension of BADEA H.Q Building.

The contract is expected to be signed in the second quarter of 2012 and it is anticipated that

the work covered by this contract, excluding defect liability period will be completed in 18

months.

The contract shall comprise the following:

1. Rehabilitation of BADEA existing building which is located at the junction of Tabia &

Sayed Abdel EL Rahman st, Khartoum Town.

The existing building is a six storey office building having a foot print of 700 m2 with

a total area of 4200 m2

The building has also an annex block comprising a social

building of total area 850 m2

.

The rehabilitation includes complete renewal of existing building systems which

includes but not limited to Architectural, HVAC, MEP, Interiors, Landscaping,

Furniture, Fittings and Equipments.

2. A new six stories extension having a foot print of 175 m2 with a total area of

approximately 1050 m2.

3. An extension for an annex block which will give an extra area of

750 m2.

An applicant may if he wishes form a joint venture with local or foreign contractor for the

purpose of prequalification for the contract works. A prequalification application submitted

by a joint venture must be accompanied by documents in support of the formation of the

Page 6: PREQUALIFICATION DOCUMENTS - Arab Bank for · PDF fileNOTICE FOR CONTRACTORS PREQUALIFICATION ... The prequalification documents in English language only must be duly ... Standard

Page 5

joint venture. Such documents must set forth the extent of responsibility and participation of

each member of the joint venture, its duration, and the person(s) authorized to represent and

obligate it. The members of the joint venture shall each be jointly and severally liable.

A complete set of prequalification documents may be collected by any interested eligible

applicant in English from Arab Bank for Economic Development in Africa (BADEA) at

their address shown below.

Furthermore the prequalification documents will be posted at BADEA web site

www.badea.org

The Prequalification Documents submitted by the applicants in English language must be

duly completed, the original returned to the BADEA address below and one copy returned to

the Consultant Arab Consulting Engineers (ACE -Moharram.Bakhoum) at their address

shown below.

Documents which are received late will not be considered and will be returned unopened.

The decision of the Director General of the Arab Bank for Economic Development in Africa

(BADEA) as to whether or not the applicant is eligible to bid, shall be final and binding.

ARAB BANK FOR ECONOMIC DEVELOPMENT IN AFRICA (BADEA)

Abdel- Rahman El Mahdi Street,

P.O Box 2640 Khartoum 11111, Republic of Sudan

Telex: 22248/22739/22098 BADEA SD

Tel: +249-183773709/773646

Fax: +249-183770498/770600

E-mail: [email protected]

Website: www.badea.org

Page 7: PREQUALIFICATION DOCUMENTS - Arab Bank for · PDF fileNOTICE FOR CONTRACTORS PREQUALIFICATION ... The prequalification documents in English language only must be duly ... Standard

Page 6

ARAB CONSULTING ENGINEERS (ACE- MOHARRAM. BAKHOUM)

5, EL GOMHORIA EL MOTTAHEDA SQUARE

DOKKI, GIZA, EGYPT

P.O. BOX 62 , DOKKI

TEL : +(202) 33377120

FAX: +(202) 37.62.21.61

Website: www.ace-consultants.com

Page 8: PREQUALIFICATION DOCUMENTS - Arab Bank for · PDF fileNOTICE FOR CONTRACTORS PREQUALIFICATION ... The prequalification documents in English language only must be duly ... Standard

Page 7

CONTENTS

I. TERMS AND CONDITIONS FOR CONTRACTORS PREQUALIFICATION

1. Invitation

2. Presumed Date of Contract Award

3. Contract Execution

4. Brief Description of Work

5. Contracts Preliminary Information

6. Conditions of Contract

7. Required Prequalification Information

8. Prequalification Application Submittal Date and Conditions

9. Prequalification Application Evaluation Criteria

10. Language – Metric system – Currency

II. PROJECT LOCATION MAP

III. APPENDICES

1. Form A - Title page

2. Form B - Notes

3. Form C - Structure and Organization 1

4. Form D - Structure and Organization 2

5. Form E - Financial Statement

6. Form F - Joint Venture

7. Form G - Resources : Personnel 1

8. Form H - Resources : Personnel 2

9. Form I - Resources : Plant

10. Form J - Resources : Other

11. Form K - Experience: Geographical

12. Form L - Experience : Relevant Projects Completed

13. Form M - Experience : Projects in progress

14. Form N - Additional Information

Page 9: PREQUALIFICATION DOCUMENTS - Arab Bank for · PDF fileNOTICE FOR CONTRACTORS PREQUALIFICATION ... The prequalification documents in English language only must be duly ... Standard

Page 8

1. Invitation

The Arab Bank for Economic Development in Africa (henceforth referred to as

(BADEA) invites Application, on the prescribed forms for prequalification from

eligible intending bidders for the Rehabilitation & Extension of BADEA H.Q

Building.

Tenders will be solicited and opened only from those firms whom BADEA will

consider qualified to perform the proposed work efficiently and expeditiously,

after having analyzed the information and documents which interested firms are

hereby invited to submit. Said data shall be submitted on the prequalification

forms (sheets A-N) attached hereto. The decision of the Director General of

BADEA as to whether or not the applicant is eligible to bid, shall be final.

2. Presumed Date of Contract award

Tenders are scheduled to be floated mid February 2012. Contracts are scheduled

to be awarded in May 2012.

3. Contract Execution

The construction (excluding defect liability period) must be completed within a

time period of Eighteen (18) months. The defect liability period is one year.

4. Brief description of works

The work for which prospective tenderers are herewith invited to prequalify

includes the following:

Construction of a new six storey extension having a foot print of 175 m2 with a total area of 1050 m2 together with complete rehabilitation of the existing building. The building also has an annex block which will be extended to give an extra area of 750 m2. It is also envisaged that all building services will be totally refurbished which include all systems i.e. Electrical, Mechanical, Air conditioning, Elevators...etc. The rehabilitation will also include interior works and supply of furniture.

5. Contract – Preliminary Information

Tender documents for the project will be provided only to prequalified contractors.

The intention is to start construction by June 2012.

The construction shall be a “lump sum” type of contract.

Page 10: PREQUALIFICATION DOCUMENTS - Arab Bank for · PDF fileNOTICE FOR CONTRACTORS PREQUALIFICATION ... The prequalification documents in English language only must be duly ... Standard

Page 9

6. Conditions of Contract

The legal relationship with the Contractor shall be governed by the Conditions of

Contract included in the Tender Documents. These shall comprise the General

Conditions (Part I), which will essentially be based on the General Conditions

(International) published by the F.I.D.I.C., and of conditions of Particular

Application (part II). These Conditions of Contract, together with the Instructions

to tenderers, Drawings, Specifications and Bills of Quantities will be furnished

only to those prospective tenderers who have expressed the wish to participate in

the tendering and who have been selected by BADEA.

7. Required Prequalification Information

To participate in the call for tenders, the following documents must be submitted:

a) Title page ( Appendix, Page A );

b) Notes ( Appendix, Page B);

c) Structure and Organization of the firm ( Appendix, Page C and D);

d) Financial statement (Appendix, page E). In addition to the information

required on form E, the applicant shall submit a written statement by the

bank of the firm or by a well known credit information agency on the

regularity of the activities of the firm;

e) Joint venture information (Appendix, page F). In addition to the

information required on page F, applicants wishing to form a joint venture

must submit accompanying documents which set forth the extent of

responsibility and participation of each member of the joint venture, its

duration, and the person(s) authorized to represent and obligate it. The

members of the joint venture shall be jointly and severally liable.

f) Personal, Plant and other resources (Appendix G, H, I and J). Additional

sheets to be included as necessary. Key personnel identification on Form H,

“Resources: personnel 2 “ shall be management and technical person who

would be available for employment on the proposed works;

g) Geographical experiences ( Appendix, Page K);

h) All similar projects completed over the last six years ( Appendix, page L);

i) All projects presently in progress ( Appendix, Page M);

j) Additional information, if considered relevant by the applicant

(Appendix, Page N).

Page 11: PREQUALIFICATION DOCUMENTS - Arab Bank for · PDF fileNOTICE FOR CONTRACTORS PREQUALIFICATION ... The prequalification documents in English language only must be duly ... Standard

Page 10

8. Prequalification Application Submittal Date and Conditions

The prequalification documents in English language only must be duly

completed, and the original returned to the BADEA address below, and must be

received no later than 12:00 noon local time ( Khartoum ) on Monday January

30th 2012 in a sealed envelope sent by mail ( DHL , TNT …etc.) or submitted in

person against receipt.

BADEA may at its discretion extend this deadline by issuing the required

notification.

ARAB BANK FOR ECONOMIC DEVELOPMENT IN AFRICA ( BADEA )

Abdel- Rahman El Mahdi Street,

P.O Box 2640 Khartoum 11111, Republic of Sudan

Telex: 22248/22739/22098 BADEA SD

Tel: +249-183773709/773646

Fax: +249-183770498/770600

E-mail: [email protected]

Website: www.badea.org

The sealed envelope containing the prequalification documents must be marked

only, in addition to the above address: “Prequalification of Contractors for the

Rehabilitation & Extension of BADEA H.Q Building “

In addition to the original sent to BADEA, one copy of all prequalification

documents must be sent by mail or submitted in person against receipt to :

ARAB CONSULTING ENGINEERS (ACE- MOHARRAM. BAKHOUM)

5, EL GOMHORIA EL MOTTAHEDA SQUARE

DOKKI, GIZA, EGYPT

P.O. BOX 62 , DOKKI

TEL:+(202) 33377120

FAX: +(202) 37.62.21.61

Website: www.ace-consultants.com

Page 12: PREQUALIFICATION DOCUMENTS - Arab Bank for · PDF fileNOTICE FOR CONTRACTORS PREQUALIFICATION ... The prequalification documents in English language only must be duly ... Standard

Page 11

The sealed envelope must be marked as described above.

The documents must be received no later than 11:00 noon local time (Cairo) on

Monday January 30th 2012.

9. Prequalification Application Evaluation Criteria

BADEA/ ACE should evaluate the prequalification applications to identify those

companies/joint ventures whom they consider to be suitably qualified and

experienced to undertake the project.

The evaluation should determine, for each company or joint venture:

- Structure and organization.

- Experience in both the type of work and the country or region in which it is

to be undertaken.

- Available resources, in terms of management capability, technical staff,

construction and fabrication facilities , maintenance and training facilities,

or other relevant factors.

- Quality assurance procedures and environmental policy.

- Extent to which any work would be likely to be subcontracted.

- Financial stability and resources necessary to execute the project.

- Litigation or arbitration history.

Applicants will be notified individually of the decision as regards their application.

In case discrepancies are found in the information submitted, the application shall

be considered unsatisfactory, and the applicant not eligible to bid until such

discrepancies have been satisfactory explained or resolved.

BADEA will not enter into any correspondences with applicants except to seek

clarification when necessary.

Documents submitted in connection with the prequalification will not be returned.

Prequalification applicants shall bear all costs associated with the preparation and

submission of this application, and BADEA will in no case be responsible or liable

for those costs, regardless of the conduct or outcome of the prequalification

process.

Page 13: PREQUALIFICATION DOCUMENTS - Arab Bank for · PDF fileNOTICE FOR CONTRACTORS PREQUALIFICATION ... The prequalification documents in English language only must be duly ... Standard

Page 12

10. Language – Metric System – Currency

The English language will be used in the prequalification applications. The tender

documents (Instructions to Tenders, Conditions of Contract – parts I and II,

Technical Specifications and Bill of Quantities) will be made available in English.

The metric system will be used in the prequalification applications and in all

documents concerning the present project.

Applicants must express all financial figures in U.S Dollars, otherwise the

exchange rate to be used for comparison must be indicated.

Page 14: PREQUALIFICATION DOCUMENTS - Arab Bank for · PDF fileNOTICE FOR CONTRACTORS PREQUALIFICATION ... The prequalification documents in English language only must be duly ... Standard

Page 13

ANNEXES

Page 15: PREQUALIFICATION DOCUMENTS - Arab Bank for · PDF fileNOTICE FOR CONTRACTORS PREQUALIFICATION ... The prequalification documents in English language only must be duly ... Standard

Pre- qualification form Page of total pages

Page A

Standard

Pre-Qualification

Form for Contractors

Name of Contractor:

Name of Employer: Arab Bank for Economic Development in Africa (BADEA)

Title of Project : Rehabilitation & Extension of BADEA Building

Location : Khartoum, (SUDAN)

Name of Consulting Engineer: Arab Consulting Engineer (ACE) Moharram – Bakhoum

Date : December 2011

Page 16: PREQUALIFICATION DOCUMENTS - Arab Bank for · PDF fileNOTICE FOR CONTRACTORS PREQUALIFICATION ... The prequalification documents in English language only must be duly ... Standard

Pre- qualification form Page of total pages

Page B

Project:

Company:

Notes to Applicants

1. Please answer all questions.

2. Supplementary pages may be inserted if required.

3. Additional standard pages H,L and M are available in pad form.

4. Please number each page in the space provided at the top of each page.

5. Please retain a copy of your complete submission.

6. If a joint venture is proposed, all Companies are to respond to all questions.

7. Project financial data is to be given in US dollars unless otherwise requested.

Standard pages

A. Title page H. Resources: Personnel 2

B. Notes I. Resources: plant

C. Structure and organization 1 J. Resources: other

D. Structure and organization 2 K. Experience: geographical

E. Financial statement L. Experience: relevant projects completed progress

F. Joint venture M. Experience: projects in progress

G. Resources: personnel 1 N. Additional information

Please list below any additional pages attached to each standard page:

Page 17: PREQUALIFICATION DOCUMENTS - Arab Bank for · PDF fileNOTICE FOR CONTRACTORS PREQUALIFICATION ... The prequalification documents in English language only must be duly ... Standard

Pre- qualification form Page of total pages

Page C

Project:

Company:

Structure and Organization 1

1. Name of company:

Address:

Telephone number: Telex number:

Registered office addresses Fax number:

ــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ

2. Description of Company (for example, General Civil Engineering Contractor):

ــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ

3. Number of years experience as a General Contractor - in own country:

- Internationally:

ــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ

4. Number of years experience as a Sub- contractor - in own country:

- Internationally:

ــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ

5. Names and addresses of associated Companies to be involved in the project –and whether

parent/subsidiary/other:

ــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ

6. If the Company is a subsidiary, what involvement, if any, will the parent Company have in

the project?

Page 18: PREQUALIFICATION DOCUMENTS - Arab Bank for · PDF fileNOTICE FOR CONTRACTORS PREQUALIFICATION ... The prequalification documents in English language only must be duly ... Standard

Pre- qualification form Page of total pages

Page D

Project:

Company:

Structure and Organization 2

7. Names and addresses of any associates the Company has in the country of the Project,

knowledgeable in the procedures of customs, immigration etc:

ــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ

8. Please indicate here or attach an organization chart showing the Company structure

including the positions of directors and key personnel, if relevant.

Page 19: PREQUALIFICATION DOCUMENTS - Arab Bank for · PDF fileNOTICE FOR CONTRACTORS PREQUALIFICATION ... The prequalification documents in English language only must be duly ... Standard

Pre- qualification form Page of total pages

Page E

Project:

Company:

Financial Statement

1. Capital:

Authorized:

Issued:

ـــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ

2. Annual value of construction work undertaken for each of the last five years and projected

for current year:

Year Current

Home

Abroad

3. Approximate value of work in hand:

ــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ

4. Please attach copies of the Company’s previous three years’ accounts (profit/loss,

assets/liabilities) and other financial data which you consider to be useful.

ــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ

5. Name and address of Bankers from whom references can be obtained:

Page 20: PREQUALIFICATION DOCUMENTS - Arab Bank for · PDF fileNOTICE FOR CONTRACTORS PREQUALIFICATION ... The prequalification documents in English language only must be duly ... Standard

Pre- qualification form Page of total pages

Page F

Project:

Company:

Joint Venture

If the Company intends to enter into a Joint Venture for the Project, please give the

following information, otherwise state “not applicable”:

ــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ

1. Names and addresses of Joint Ventures partners:

ــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ

2. Name of Company leading the Joint Venture:

ــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ

3. Name and address of Bankers to the Joint Venture:

Page 21: PREQUALIFICATION DOCUMENTS - Arab Bank for · PDF fileNOTICE FOR CONTRACTORS PREQUALIFICATION ... The prequalification documents in English language only must be duly ... Standard

Pre- qualification form Page of total pages

Page G

Project:

Company:

Resources: personnel 1

1. Number of staff: Technical: Administrative:

ــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ

2. Please list present executive directors:

Name Present Position Years of experiences with the

Company/ in Construction

Page 22: PREQUALIFICATION DOCUMENTS - Arab Bank for · PDF fileNOTICE FOR CONTRACTORS PREQUALIFICATION ... The prequalification documents in English language only must be duly ... Standard

Pre- qualification form Page of total pages

Page H

Project:

Company:

Resources: personnel 2

List information about other key personnel below:

ــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ

Name: Present position:

Years of experience – with the Company:

- In construction:

Major works for which responsible (type and value):

Linguistic ability relevant to project:

ــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ

Name: Present position:

Years of experience – with the Company:

- In construction:

Major works for which responsible (type and value):

Linguistic ability relevant to project:

ــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ

Name: Present position:

Years of experience – with the Company:

- In construction:

Major works for which responsible (type and value):

Linguistic ability relevant to project:

Page 23: PREQUALIFICATION DOCUMENTS - Arab Bank for · PDF fileNOTICE FOR CONTRACTORS PREQUALIFICATION ... The prequalification documents in English language only must be duly ... Standard

Pre- qualification form Page of total pages

Page I

Project:

Company:

Resources: plant

On the basis of the information provided in the pre-qualification documents please indicate

the main plant and equipment considered by the Company to be necessary for undertaking

the project and whether this plant is already in the Company’s ownership or will be

purchased or hired:

Page 24: PREQUALIFICATION DOCUMENTS - Arab Bank for · PDF fileNOTICE FOR CONTRACTORS PREQUALIFICATION ... The prequalification documents in English language only must be duly ... Standard

Pre- qualification form Page of total pages

Page J

Project:

Company:

Resources: other

1. If it is foreseen that any part of the Contract will be sub-contracted state the type of work to be

undertaken by the sub-contractor(s) and, if known, give the name and address of the sub-

contractor(s) to be used.

ــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ

2. Fabrication facilities (to be completed only if relevant to the project):

Summary:

Description:

Location:

Capacity:

Annual throughput:

Page 25: PREQUALIFICATION DOCUMENTS - Arab Bank for · PDF fileNOTICE FOR CONTRACTORS PREQUALIFICATION ... The prequalification documents in English language only must be duly ... Standard

Pre- qualification form Page of total pages

Page K

Project:

Company:

Experience: geographical

1. Countries in which work similar to the project has been undertaken:

ــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ

2. Summary of experience of Company in the country of the project and/or neighboring states:

Page 26: PREQUALIFICATION DOCUMENTS - Arab Bank for · PDF fileNOTICE FOR CONTRACTORS PREQUALIFICATION ... The prequalification documents in English language only must be duly ... Standard

Pre- qualification form Page of total pages

Page L

Project: Company:

Experience: relevant projects completed

Please fill in information about the relevant projects completed over the past six years

Name of Employer Name, location and type

of projects

Name of ( Consulting)

Engineer responsible for

supervision

Contract price and date Percentage of

participation of company

in project

Was contract

satisfactorily completed,

including time provision

Page 27: PREQUALIFICATION DOCUMENTS - Arab Bank for · PDF fileNOTICE FOR CONTRACTORS PREQUALIFICATION ... The prequalification documents in English language only must be duly ... Standard

Pre- qualification form Page of total pages

Page M

Project: Company:

Experience: all projects in progress

Give information about all projects in progress, including those where the Company has received a letter of intent, but a formal contract has

not yet been awarded.

Employer (Consulting) Engineer

responsible for

supervision

Location and

description of the work

Percentage

participation

of company in

the project

Value of

contract

Value

completed and

certified

Percentage of

practical

completion

Scheduled date

of completion of

work

Page 28: PREQUALIFICATION DOCUMENTS - Arab Bank for · PDF fileNOTICE FOR CONTRACTORS PREQUALIFICATION ... The prequalification documents in English language only must be duly ... Standard

Pre- qualification form Page of total pages

Page N

Project:

Company:

Additional information

Please add any further information which you consider to be relevant to the evaluation of your

application for pre-qualification. If you wish to attach other documents please list below,

otherwise state “not applicable”.