pre-qualification questionnaire templateportaldecomert.ro/files/long form1._20101129340597.doc  ·...

64
CONTRACTOR ASSESSMENT QUESTIONNAIRE FOR Iraq West Qurna 1 ExxonMobil Iraq Limited

Upload: lydan

Post on 06-Mar-2018

219 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: Pre-Qualification Questionnaire Templateportaldecomert.ro/Files/Long Form1._20101129340597.doc  · Web viewProvide an example of a typical Inspection & Test Plan (ITP) ... (NDT)

CONTRACTOR ASSESSMENT QUESTIONNAIRE

FOR

Iraq West Qurna 1

ExxonMobil Iraq Limited

Page 2: Pre-Qualification Questionnaire Templateportaldecomert.ro/Files/Long Form1._20101129340597.doc  · Web viewProvide an example of a typical Inspection & Test Plan (ITP) ... (NDT)

Iraq WQ1 Project ExxonMobil Iraq LimitedPre-Qualification Questionnaire Proprietary

TABLE OF CONTENTSCOVER LETTER AND INSTRUCTIONS....................................................................................................................1

1. RECEIPT CONFIRMATION.............................................................................................................................12. INTRODUCTION..............................................................................................................................................13. IRAQI CONTENT..............................................................................................................................................14. INSTRUCTIONS................................................................................................................................................25. MISCELLANEOUS...........................................................................................................................................36. CHECKLIST.......................................................................................................................................................4

CONTRACTOR PRE-QUALIFICATION QUESTIONNAIRE.............................................................................5

1. CORPORATE INFORMATION........................................................................................................................52. FINANCIAL AND LEGAL...............................................................................................................................83. SAFETY, SECURITY, HEALTH AND ENVIRONMENT (SSH&E)...........................................................104. CAPACITY.......................................................................................................................................................125. EXPERIENCE..................................................................................................................................................156. AVAILABILITY..............................................................................................................................................167. QUALITY.........................................................................................................................................................178. PROJECT MANAGEMENT AND EXECUTION..........................................................................................199. PROJECT CONTROLS....................................................................................................................................2010. GOVERNMENT RELATIONS AND PUBLIC AFFAIRS.........................................................................2111. SUBCONTRACTING..................................................................................................................................2212. INTERFACE MANAGEMENT...................................................................................................................2213. PROCUREMENT & MATERIALS MANAGEMENT...............................................................................2314. LABOR RELATIONS..................................................................................................................................2415. CONSTRUCTION EQUIPMENT................................................................................................................2516. ENGINEERING...........................................................................................................................................2817. CONSTRUCTION........................................................................................................................................29A1. CONTRACTOR GROUPS................................................................................................................................31A2. PROSPECTIVE BUSINESS ASSOCIATES (PBA) QUESTIONNAIRE.......................................................32A3.A CONTRACTOR EXPERIENCE FORM – PROCESS UNIT AREAS..........................................................36A3.B CONTRACTOR EXPERIENCE FORM – DISCIPLINES.............................................................................37A3.C CONTRACTOR EXPERIENCE FORM – SPECIALTIES............................................................................44A3.d CONTRACTOR EXPERIENCE FORM – ONSHORE PIPELINES.............................................................46

Page 3: Pre-Qualification Questionnaire Templateportaldecomert.ro/Files/Long Form1._20101129340597.doc  · Web viewProvide an example of a typical Inspection & Test Plan (ITP) ... (NDT)

Iraq WQ1 Project ExxonMobil Iraq LimitedPre-Qualification Questionnaire Proprietary

INSTRUCTIONS

1. INSTRUCTIONS1. Due to the extensive volume and nature of information included in this Contractor

Assessment Questionnaire and the Invitation to Tender (“ITT”) documents, respondent is advised that EMIL currently plans to only issue an English language version of the Contractor Assessment Questionnaire and ITT documents.

2. Failure to complete this questionnaire in full may limit the scope of work a respondent will be considered qualified to perform. Please complete the survey within this document by inserting responses in the designated fields. The request to 'describe' an item in regards to a specific question is intended to obtain a brief, concise statement. Questions that do not apply to respondent shall be clearly marked as “Not Applicable”.

3. Where additional information is required in order to complete a response to the questionnaire, please answer each question or item on a separate sheet. For example, Section 1.3 of the questionnaire requires respondent to attach copies of required certificates/registrations/permits to work legally in Iraq. The response should restate the specific question or item at the top of the page, including the number of such question or item, followed by the response. Responses should be in sequential order, consistent with the questionnaire format.

4. Please only submit supporting documents that are required as specified within this document. Extra attachments not requested within the questionnaire will not be reviewed.

5. Upon completion, please submit two (2) electronic versions (CD-ROM or flash drive) of your entire response to the mailing address listed below. Do not email your response. This questionnaire shall be returned as a “native file” (e.g. this Microsoft Excel format). All supporting documents (as requested / specified within this questionnaire) shall also be sent electronically (e.g. in Microsoft Word, PowerPoint, Excel, or PDF format). Please do not send any hard copies of this questionnaire file or supporting documents.

Mailing Address:

[email protected]@[email protected]

1

Page 4: Pre-Qualification Questionnaire Templateportaldecomert.ro/Files/Long Form1._20101129340597.doc  · Web viewProvide an example of a typical Inspection & Test Plan (ITP) ... (NDT)

Iraq WQ1 Project ExxonMobil Iraq LimitedPre-Qualification Questionnaire Proprietary

2. MISCELLANEOUS 1. EMIL considers information in this questionnaire provided to respondent to be

proprietary and should be treated as confidential by respondent. The respondent may release information related to the proposed ExxonMobil project to third parties whom the respondent intends to include in the performance of any work related to this project provided that the respondent conveys such confidentiality obligations to said third parties prior to disclosure.

2. All Contractor Entities submitting responses to this questionnaire do so with the understanding that EMIL accepts no obligation of confidentiality with respect to any information disclosed to EMIL in respondent's submittal, unless specifically covered by a separate written confidentiality agreement. By submitting responses, all respondents agree that they will place no restrictive notices on any document (including drawings) provided as part of this questionnaire. The respondents further agree that if they do place such notices on documents, EMIL is authorized to remove and/or disregard any such restrictive clauses and shall be free to use and disclose to third parties any or all information contained therein without accounting to the respondent.

3. The respondents' submittals and any participation therein, including any statements whether oral or written between EMIL and any respondent shall not create or be deemed or construed in any way so as to create any binding legal relationship or contract between either or both jointly of EMIL and any respondent. Furthermore, submittals will not guarantee placement on a bid list or the award of any contract or work. THIS CONTRACTOR ASSESSMENT IS FOR EMIL INFORMATIONAL PURPOSES ONLY.

4. EMIL reserves the right to reject any and all submittals at its sole discretion.

5. All costs and expenses incurred by respondent, or any other party participating in this assessment with respondent, shall not be reimbursed by EMIL and are solely for the respondent's / party's account.

6. EMIL reserves the right to contact all references proved by respondent, visit any respondent work locations and interview any respondent personnel in the performance of this assessment.

2

Page 5: Pre-Qualification Questionnaire Templateportaldecomert.ro/Files/Long Form1._20101129340597.doc  · Web viewProvide an example of a typical Inspection & Test Plan (ITP) ... (NDT)

Iraq WQ1 Project ExxonMobil Iraq LimitedPre-Qualification Questionnaire Proprietary

3. CHECKLISTYou may wish to utilize the checklist below to insure that you have completed each tab before returning your response to EMIL. Click on the entry listed in the checklist to easily direct you its corresponding section within this document. You may also click on the entries listed in the Table of Contents while holding the Control button to navigate through the questionnaire.

Section Completed

1 Corporate Information ………………………………………

2 Financial & Legal ……………………………………………

3 SSH&E ……………………………………………………….

4 Capacity ……………………………………………………...

5 Experience …………………………………………………..

6 Availability ……………………………………………………

7 Quality ………………………………………………………..

8 Project Management & Execution ………………………...

9 Project Controls ……………………………………………..

10 Government Relations and Public Affairs ………………..

11 Subcontracting ………………………………………………

12 Interface Management ……………………………………..

13 Procurement & Materials Management …………………..

14 Labor Relations ……………………………………………..

15 Construction Equipment ……………………………………

16 Engineering ………………………………………………….

17 Construction …………………………………………………ATTACHMENTS

A1 Contractor Groups …………………………………………..

A2 Prospective Business Associates (PBA) Questionnaire ..

A3.A Contractor Experience Form--Process Unit Areas ………

A3.B Contractor Experience Form--Disciplines ………………..

A3.C Contractor Experience Form--Specialties ………………..

A3.D Contractor Experience Form--Onshore Pipelines ……….

3

NoYes

NoYes

NoYes

NoYes

NoYes

NoYes

NoYes

NoYes

NoYes

NoYes

NoYes

NoYes

NoYes

NoYes

NoYes

NoYes

NoYes

NoYes

NoYes

NoYes

NoYes

NoYes

NoYes

Page 6: Pre-Qualification Questionnaire Templateportaldecomert.ro/Files/Long Form1._20101129340597.doc  · Web viewProvide an example of a typical Inspection & Test Plan (ITP) ... (NDT)

Iraq WQ1 Project ExxonMobil Iraq LimitedPre-Qualification Questionnaire Proprietary

CONTRACTOR PRE-QUALIFICATION QUESTIONNAIRE

1. CORPORATE INFORMATION

1.1. Provide the following information about the Contractor Entity and/or parent company that would submit a proposal for the work contemplated for the proposed ExxonMobil project.

Respondent's Information:

Contractor Entity Name:

Established as: (please select one from list)

Primary Services

If applicable, list your “other” primary services below:

Specialty Services

If applicable, list your “other” specialty services below:

4

OtherMechanical / Piping

SubseaInspections and Testing

Process DesignInfrastructure

Pipeline DesignERW / UXO Consulting

Onshore FacilitiesERW / UXO Removal

Onshore PipelayElectrical / Instrumentation

Offshore FacilitiesCivil / Structural

Offshore PipelayCamps / Buildings

Other

General Contracting / Construction

Conceptual / Pre-FEED / FEED

Fabrication

Transport and InstallationEPCM / EPC

Supplier (Equipment)Environmental

SecurityDrilling / Reservoir

LogisticsCommunications

General EngineeringConsulting

Contractor GroupIndividual

National CompanyPartnership / Joint Venture

AffiliateCorporation

Page 7: Pre-Qualification Questionnaire Templateportaldecomert.ro/Files/Long Form1._20101129340597.doc  · Web viewProvide an example of a typical Inspection & Test Plan (ITP) ... (NDT)

Iraq WQ1 Project ExxonMobil Iraq LimitedPre-Qualification Questionnaire Proprietary

Operating Regions

Number of Regular Employees

Number of Contract Employees

Date Established:

Main Office Physical Street Address:

City:

State or Province:

Postal Code:

Country:

Phone Number:

Fax Number

Web site address:

Email Address:

Main Office Mailing Address:

City:

State or Province:

Postal Code:

Country:

Respondent's Contact Information:Contact Name:

Contact Address:City:

State or Province:Postal Code:

Country:Region:

Office Phone Number:Cell Phone Number:

Fax Number:

5

South AmericaEurope

AfricaSoutheast Asia

AustraliaNorth Asia

North America (USA)Middle East

North America (Canada)International (All)

Page 8: Pre-Qualification Questionnaire Templateportaldecomert.ro/Files/Long Form1._20101129340597.doc  · Web viewProvide an example of a typical Inspection & Test Plan (ITP) ... (NDT)

Iraq WQ1 Project ExxonMobil Iraq LimitedPre-Qualification Questionnaire Proprietary

Email Address:

Respondent's Primary Bank Information:Bank Name:

Bank Address: City:

State or Province:Postal Code:

Country:Bank Website Address:

Email Address:

Parent Company Information:Is the Contractor Entity owned or controlled

by a parent company?Full Name of Parent Company:

Physical Street Address:City:

State or Province:Postal Code:

Country:Region:

Phone Number:Fax Number:

Website address:Email Address:

1.2. Provide a high-level description of your company and typical services provided.

Place response (description, supporting information, and / or comments) here:

1.3. Describe your interest in submitting a competitively bid proposal to perform work for the proposed ExxonMobil project.

Place response (description, supporting information, and / or comments) here:

1.4. Do you hold the required certificates/registrations/permits to work legally in Iraq?

If yes, please attach copies. If no, describe plans to obtain the required certificates/ registrations/permits.

Place response (description, supporting information, and / or comments) here:

6

NoYes

NoYes

Page 9: Pre-Qualification Questionnaire Templateportaldecomert.ro/Files/Long Form1._20101129340597.doc  · Web viewProvide an example of a typical Inspection & Test Plan (ITP) ... (NDT)

Iraq WQ1 Project ExxonMobil Iraq LimitedPre-Qualification Questionnaire Proprietary

1.5. Describe the corporate structure of respondent, including the relationships between respondent and parent/associate organizations and any consortia, joint ventures, partnerships or alliances in which you are a participant including any projects currently or being considered in the vicinity of the proposed ExxonMobil project. Describe the authoritative and fiscal relationship between respondent, the parent company and affiliated companies.

Place response (description, supporting information, and / or comments) here:

1.6. Provide organizational charts that indicate all corporate divisions, companies, and subsidiaries, as well as the organizational relationship between the parent company and the respondent.

Place response (description, supporting information, and / or comments) here:

1.7. Have you had any type of reorganization in the past 3 years? (merger, acquisitions, change of ownership)?

If yes, provide background, rationale and current state of the reorganization.

Place response (description, supporting information, and / or comments) here:

1.8. Briefly describe respondent's history, size, core field of activity or business expertise.

Place response (description, supporting information, and / or comments) here:

1.9. List the primary spoken and written languages used to conduct business by respondent.

Place response (description, supporting information, and / or comments) here:

2. FINANCIAL AND LEGAL

2.1 Provide the credit rating for the respondent or parent company as issued by S&P, Moody's, Dun & Bradstreet and/or equivalent rating agencies.

Place response (description, supporting information, and / or comments) here:

2.2 Provide audited financial statements (including balance sheet, income statement and cash flow statements) for the current as well as the past 3 years for both the bidding subsidiary and the parent company. If respondent does not have standalone financial statements, a detailed breakdown of the parent company's financial statements for each the major operating divisions, including the respondent are required.

Place response (description, supporting information, and / or comments) here:

2.3 If the respondent is assessed to be financially inadequate in relation to the size of the proposed ExxonMobil project, would the parent company be prepared to provide a corporate guarantee on

7

NoYes

Page 10: Pre-Qualification Questionnaire Templateportaldecomert.ro/Files/Long Form1._20101129340597.doc  · Web viewProvide an example of a typical Inspection & Test Plan (ITP) ... (NDT)

Iraq WQ1 Project ExxonMobil Iraq LimitedPre-Qualification Questionnaire Proprietary

behalf of the respondent?

Place response (description, supporting information, and / or comments) here:

2.4 If the respondent is assessed to be financially inadequate in relation to the size of the proposed ExxonMobil project, would the respondent or parent company be prepared to provide a bank guarantee at its own costs with terms acceptable to EMIL?

Provide name and registered location of the bank(s) that would issue the guarantee by the respondent or the parent company.

Place response (description, supporting information, and / or comments) here:

2.5 If unable to provide a guarantee from a bank acceptable to EMIL, would the respondent or its parent company be prepared to secure at its own costs confirmation of the bank guarantee from an acceptable bank?

Place response (description, supporting information, and / or comments) here:

2.6 If respondent is currently operating under any form of bankruptcy protection, describe the background and explain the current situation.

Place response (description, supporting information, and / or comments) here:

2.7 In all of EMIL's contracting forms, a provision is included that essentially holds both Contractor and EMIL fully responsible for losses caused by such party's gross negligence or willful misconduct which is attributable to that party's managerial or senior supervisory personnel. The provision relates to hazard loss and supersedes all other indemnifications/releases provided for in the distribution of risk, release and indemnity section of the agreement. Does respondent agree with this concept?

Place response (description, supporting information, and / or comments) here:

2.8 Does respondent have a policy to address information brokering?

If yes, please attach policy.

Place response (description, supporting information, and / or comments) here:

2.9 Has anyone associated with respondent ever been convicted of illegal information brokering?

8

NoYes

NoYes

NoYes

NoYes

NoYes

NoYes

Page 11: Pre-Qualification Questionnaire Templateportaldecomert.ro/Files/Long Form1._20101129340597.doc  · Web viewProvide an example of a typical Inspection & Test Plan (ITP) ... (NDT)

Iraq WQ1 Project ExxonMobil Iraq LimitedPre-Qualification Questionnaire Proprietary

If yes, please describe, giving background and explaining actions taken.

Place response (description, supporting information, and / or comments) here:

2.10 Describe the Comprehensive General Liability, Workers Compensation and Employers Liability, Automobile Liability (Owned/Non-owned) for your company.

Place response (description, supporting information, and / or comments) here:

2.11 List any work (recent, ongoing, future/anticipated) that may require further consideration for conflict of interest. If applicable, provide examples or explain the type of conflict of interest indicated.

Place response (description, supporting information, and / or comments) here:

2.12 List any current litigation that the respondent is involved in with EMIL or EMIL's Affiliates.

Place response (description, supporting information, and / or comments) here:

2.13 Describe any litigation pending against your company that may impact this project.

Place response (description, supporting information, and / or comments) here:

2.14 Complete Attachment 2.

Place response (description, supporting information, and / or comments) here:

3. SAFETY, SECURITY, HEALTH AND ENVIRONMENT (SSH&E)

3.1 Describe or provide a copy of your corporate Safety, Health, Environmental and Security (SHES) Policy.

Place response (description, supporting information, and / or comments) here:

3.2 Provide of summary, including a list of major components (i.e.: Table of Contents), of your SHES Management Systems/Program.

Place response (description, supporting information, and / or comments) here:

3.3 Provide a list of SHES work practices including policies, rules, and safe work practices. Describe how this is made available to the workers.

Place response (description, supporting information, and / or comments) here:

3.4 Provide a summary and include examples of established SHES performance goals that are supported by senior management.

9

Page 12: Pre-Qualification Questionnaire Templateportaldecomert.ro/Files/Long Form1._20101129340597.doc  · Web viewProvide an example of a typical Inspection & Test Plan (ITP) ... (NDT)

Iraq WQ1 Project ExxonMobil Iraq LimitedPre-Qualification Questionnaire Proprietary

Place response (description, supporting information, and / or comments) here:

3.5 Describe any established programs to increase worker SHES awareness and motivate workers to be actively involved in SHES activities, such as safety training and orientation programs. Provide a listing of available training modules and indicate the frequency and duration of each session. Include examples of completed training records for workers.

Place response (description, supporting information, and / or comments) here:

3.6 Describe any established hazard assessment programs, which recognizes, evaluates, and controls SHES-related hazards associated with your operations such as formal and informal risk assessments, pre-task safety planning, or Permit to Work. Describe any periodic SHES-focused inspections and walkthroughs of your work sites. Summarize these efforts and include at least one example of a completed hazard assessment and one example of a completed inspection or walkthrough.

Place response (description, supporting information, and / or comments) here:

3.7 Describe any established Fitness for Duty program, which addresses medical screening, physical condition, and substance abuse considerations? Provide a program summary. If your organization does not have such a program, would you consider implementing such a program?

Place response (description, supporting information, and / or comments) here:

3.8 Describe the key elements of your company's Incident Management and its Emergency Response processes. Please provide a copy of these processes.

Place response (description, supporting information, and / or comments) here:

3.9 Provide an overview of your company's processes for the selection and monitoring of subcontractors to ensure a high performance in Safety, Health, and Environmental (SHE).

Place response (description, supporting information, and / or comments) here:

3.10 Provide an example of a SHE Final Report from a major project completed by your company within the last two years.

Place response (description, supporting information, and / or comments) here:

3.11 Provide the following safety performance information for your company for the past 5 years using the following format. These statistics should include your employees and on-site contractors.

10

NoYes

Page 13: Pre-Qualification Questionnaire Templateportaldecomert.ro/Files/Long Form1._20101129340597.doc  · Web viewProvide an example of a typical Inspection & Test Plan (ITP) ... (NDT)

Iraq WQ1 Project ExxonMobil Iraq LimitedPre-Qualification Questionnaire Proprietary

Year Work Hours Fatalities LTI* TRI** NMI***

2006          2007          2008          2009          2010          

Provide an explanation of each fatality.

Place response (description, supporting information, and / or comments) here:

*Lost time Injuries (LTI) - If a person's condition resulting from an occupational injury or illness prevents him or her from performing their normal job description during their next scheduled work shift, the case is considered a lost time injury.

**Total Recordable Incidents (TRI) - A work-site accident that results in specific medical treatment, loss of consciousness, restriction of work or motion, or transfer to another job. Specific medical treatment includes treatment of infection, second or third degree burns or a fracture, application of sutures or other wound closing device, follow-up medication or treatment after an initial treatment for a minor injury, and admission to a hospital or an equivalent medical facility for treatment.

***Near Miss Incidents (NMI) - An undesirable or unexpected work-site event that could have resulted in an injury, operation incident, or property damage under slightly different conditions of timing, space, position, or sequence of events.

3.12 Provide information regarding any safety violations respondent has faced during the last 5 years:

2006 2007 2008 2009 2010Number of safety violations / fines respondent has received each year from regulatory agencies

         

Provide an explanation of each violation.

Place response (description, supporting information, and / or comments) here:

4. CAPACITY

4.1 Describe what elements of the FEED (front end engineering design), project management, engineering management, detailed engineering, procurement, construction management, fabrication and construction work that respondent would consider performing for the proposed ExxonMobil project.

Place response (description, supporting information, and / or comments) here:

4.2 Describe respondent’s strategy to maximize local content.

Place response (description, supporting information, and / or comments) here:

11

Page 14: Pre-Qualification Questionnaire Templateportaldecomert.ro/Files/Long Form1._20101129340597.doc  · Web viewProvide an example of a typical Inspection & Test Plan (ITP) ... (NDT)

Iraq WQ1 Project ExxonMobil Iraq LimitedPre-Qualification Questionnaire Proprietary

4.3 Describe the project management personnel currently employed or under contract by respondent. Include Project Managers, Project Engineers, Discipline Leads, Process / Design Engineers, Site Managers, Quality Managers, Safety Managers, Construction / Site Managers, Quality Inspectors, Construction Engineers, Cost Engineers, Schedulers, Contract Management, Procurement and Materials Management Personnel, etc. For each position, indicate the number employed, the average years of experience in that position, and if employee or contract.

Place response (description, supporting information, and / or comments) here:

4.4 Describe the project management / supervision currently employed or under contract by respondent who may be assigned to the proposed ExxonMobil project. Include Discipline Leads, Construction Superintendents and General Foreman. For each position, indicate the number employed, the average years of experience in that position, and if employee or contract.

Place response (description, supporting information, and / or comments) here:

4.5 Describe the sources typically used to source contracted project management personnel and construction management personnel.

Place response (description, supporting information, and / or comments) here:

4.6 Describe the direct engineering / design personnel currently employed or under contract by respondent. Include civil, structural, piping, mechanical, instrument, electrical, instrumentation, control systems, and HVAC. For each discipline, indicate number currently employed by discipline level, average years’ experience in that discipline, and, if employee, agent hired or subcontract.

Place response (description, supporting information, and / or comments) here:

4.7 Describe the direct craft labor personnel currently employed or under contract by respondent. Include civil, structural, piping, mechanical, instrument, electrical, equipment operators, painters, insulators, HVAC, non-destructive examination, post-weld heat treat, fiber optics, distributed control systems, hydrotesting. For each direct craft labor type, indicate number currently employed by craft level, average years’ experience in that craft, and, if employee, agent hired or subcontract.

Place response (description, supporting information, and / or comments) here:

4.8 Show man-hour plot of direct engineering / design force employed over the past 5-10 years. Show forecast of labor required for projects currently under consideration by your company including labor for the proposed ExxonMobil project.

Place response (description, supporting information, and / or comments) here:

4.9 Show man-hour plot of direct craft labor force employed over the past 5 years. Show forecast of engineers / designers required for projects currently under consideration by your company including labor for the proposed ExxonMobil project.

Place response (description, supporting information, and / or comments) here:

12

Page 15: Pre-Qualification Questionnaire Templateportaldecomert.ro/Files/Long Form1._20101129340597.doc  · Web viewProvide an example of a typical Inspection & Test Plan (ITP) ... (NDT)

Iraq WQ1 Project ExxonMobil Iraq LimitedPre-Qualification Questionnaire Proprietary

4.10 If available, describe direct craft labor productivity (relative to the US Gulf Coast) achieved for each craft in the same region or location as the proposed ExxonMobil project.

Place response (description, supporting information, and / or comments) here:

4.11 Describe the typical sources (locations) for engineers / designers and if direct hire, agent hired or subcontract.

Place response (description, supporting information, and / or comments) here:

4.12 Describe the typical sources (locations) for craft labor personnel and if direct hire, agent hired or subcontract.

Place response (description, supporting information, and / or comments) here:

4.13 Describe respondent's strategy to mobilize an experienced workforce (all areas) for the proposed ExxonMobil project. Include the source, location, and experience of the labor.

Place response (description, supporting information, and / or comments) here:

4.14 Indicate the typical average number of direct craft labor personnel assigned to each craft foreman and the typical average number of craft foreman assigned to a general foreman.

Place response (description, supporting information, and / or comments) here:

4.15 Describe respondent's programs to supply, manage, repair and maintain small tools to support the craft labor crews.

Place response (description, supporting information, and / or comments) here:

4.16 Describe respondent's typical sources for leased construction equipment and strategy for providing construction equipment for the proposed ExxonMobil project.

Place response (description, supporting information, and / or comments) here:

4.17 Describe respondent's equipment maintenance strategy, organization, and program.

Place response (description, supporting information, and / or comments) here:

4.18 List the temporary construction facilities, such as camps, offices, warehouses, maintenance facilities, field fabrication shops, temporary power generation and distribution, scaffolding, communications, used by respondent. Indicate the number employed, size, capacity and type for each piece of equipment. Indicate for each piece or type if owned or leased.

Place response (description, supporting information, and / or comments) here:

13

Page 16: Pre-Qualification Questionnaire Templateportaldecomert.ro/Files/Long Form1._20101129340597.doc  · Web viewProvide an example of a typical Inspection & Test Plan (ITP) ... (NDT)

Iraq WQ1 Project ExxonMobil Iraq LimitedPre-Qualification Questionnaire Proprietary

4.19 Describe respondent's sources for leased temporary construction facilities and strategy for providing and managing temporary construction facilities for the proposed ExxonMobil project.

Place response (description, supporting information, and / or comments) here:

5. EXPERIENCE

5.1 Provide a general description of the types of goods & services (Equipment, Materials, Front End Engineering Design, Detailed Engineering, Procurement, Construction, Infrastructure, etc.) that respondent typically provides / performs (directly, not subcontracted). Indicate for each if this is a primary or secondary business for respondent. List your quality certifications and awards to local, national, or international standards for quality and identify recognized authority.

Place response (description, supporting information, and / or comments) here:

5.2 Describe respondent's recent experience with working in climates similar to Iraq. Provide examples of techniques employed to overcome challenges associated with this environment.

Place response (description, supporting information, and / or comments) here:

5.3 Describe respondent's recent experience with working in terrain similar to Iraq. Provide examples of techniques employed to overcome challenges associated with this environment.

Place response (description, supporting information, and / or comments) here:

5.4 Using the following table, describe each project in the oil & gas industry that respondent has contracted in a key role over the past 5-10 years including current work in progress. Attach a separate table (you may copy and paste the table below) for each project and include the following information:

Name of Project:Contract Award Date:

Client Information:

Name of Client/Owner:Client Contact Point:

Name:Title:Telephone No.:Facsimile No.:Email Address:

Contract Type:(FEED, EPC, Construction, Construction Management)Compensation Method:(Lump Sum, Target Price,

14

Page 17: Pre-Qualification Questionnaire Templateportaldecomert.ro/Files/Long Form1._20101129340597.doc  · Web viewProvide an example of a typical Inspection & Test Plan (ITP) ... (NDT)

Iraq WQ1 Project ExxonMobil Iraq LimitedPre-Qualification Questionnaire Proprietary

Reimbursable Cost, Unit Price, etc)Contracted Scope of Work:(provide details of actual work performed, man-hours, etc.)Brief description of project facilities: (technical description, location, grass roots or greenfield etc.)Type of Construction:(stick build, pre-assembly, modularization, skid mounted, etc)

Estimated Value of Project:_________________ USD

Estimated Contract Value of Your Scope of Work _________________ USD

Schedule (Start/Finish):(If in progress, provide expected mechanical completion date and start-up date)

/

Average and Peak direct labor for project, Peak Engineers, and Total Man-hours for project:Average and Peak direct labor for Your Scope of Work, and Your Total Man-hours for project:Camp size (number of camps, number of beds)

5.5 Complete Attachments 3a - 3d regarding respondent's detailed work experience.

Place response (description, supporting information, and / or comments) here:

6. AVAILABILITY

6.1 Using the following table, list ongoing and anticipated projects that the proposed ExxonMobil project will be competing for resources with. Attach a separate table (you may copy and paste the table below) for each project. If any information below is considered confidential, please omit the details and indicate "Confidential" in the appropriate field).

Name of Project:  Location:  Contract Award Date:  Client Name:  Brief description of project facilities: (technical description, location, grass roots or greenfield etc.)

 

Contracted Scope of Work:(provide details of actual work performed, man-hours, etc.)

 

Contract Type:  

15

Page 18: Pre-Qualification Questionnaire Templateportaldecomert.ro/Files/Long Form1._20101129340597.doc  · Web viewProvide an example of a typical Inspection & Test Plan (ITP) ... (NDT)

Iraq WQ1 Project ExxonMobil Iraq LimitedPre-Qualification Questionnaire Proprietary

(Engineering / Procurement Services, EPC, Construction, Construction Management)Compensation Method:(Lump Sum, Target Price, Reimbursable Cost, Unit Price, etc)

 

Estimated Value of Project: _________________ USD

Estimated Contract Value of Your Scope of Work:

_________________ USD

Estimated construction completion date:  Estimated average and peak home office hours:  Estimated average and peak construction management (field) hours:  

Estimated average and peak direct labor hours:  Estimated total man-hours:  

Also, describe any relevant projects (i.e. major oil & gas projects) and/or projects in Iraq that respondent is currently seeking a contract award for.

Place response (description, supporting information, and / or comments) here:

6.2 Considering the projects described in question 6.1, above, describe the availability of personnel for the proposed ExxonMobil project and any plans to adjust existing / anticipated project groups to support the project.

Place response (description, supporting information, and / or comments) here:

7. QUALITY

7.1 List respondent's quality certifications and awards to local, national, or international standards for quality and identify recognized authority. Provide copies of certifications.

Place response (description, supporting information, and / or comments) here:

7.2 Provide an organization chart for respondent which shows where the quality group fits into the respondent's overall organizational structure.

Place response (description, supporting information, and / or comments) here:

7.3 Provide a copy of respondent's Quality Assurance Manual and an audit schedule of the quality assurance system.

Place response (description, supporting information, and / or comments) here:

7.4 Describe how the principle of continuous improvement is incorporated into respondent's quality assurance system.

Place response (description, supporting information, and / or comments) here:

16

Page 19: Pre-Qualification Questionnaire Templateportaldecomert.ro/Files/Long Form1._20101129340597.doc  · Web viewProvide an example of a typical Inspection & Test Plan (ITP) ... (NDT)

Iraq WQ1 Project ExxonMobil Iraq LimitedPre-Qualification Questionnaire Proprietary

7.5 Provide an example of a typical Inspection & Test Plan (ITP) respondent has used.

Place response (description, supporting information, and / or comments) here:

7.6 Provide a full list of respondent's work instructions / procedures.

Place response (description, supporting information, and / or comments) here:

7.7 Provide a copy of respondent's mechanical completion and commissioning program.

Place response (description, supporting information, and / or comments) here:

7.8 Provide copy of respondent's traceability and final documentation turnover procedures.

Place response (description, supporting information, and / or comments) here:

7.9 Describe fabrication yard management system.

Place response (description, supporting information, and / or comments) here:

7.10 Describe the frequency of audits of the quality assurance program in a fabrication yard. Who performs the audits? Provide a copy of the most recent audit report and status of non-conformance corrective actions.

Place response (description, supporting information, and / or comments) here:

7.11 Describe how respondent ensures appropriate dimensional controls when performing work.

Place response (description, supporting information, and / or comments) here:

7.12 Describe respondent's nondestructive testing (NDT) program, including methods used in various phases of construction, qualification of NDT operators, and control and resolution of defective welding.

Place response (description, supporting information, and / or comments) here:

7.13 Provide a diagram indicating the reporting relationships and interrelationships of respondent's overall quality organization and project quality organizations including remote engineering site(s) (a.k.a. Low Cost / High Value Engineering Centers), if applicable.

Place response (description, supporting information, and / or comments) here:

17

Page 20: Pre-Qualification Questionnaire Templateportaldecomert.ro/Files/Long Form1._20101129340597.doc  · Web viewProvide an example of a typical Inspection & Test Plan (ITP) ... (NDT)

Iraq WQ1 Project ExxonMobil Iraq LimitedPre-Qualification Questionnaire Proprietary

7.14 List all available welding procedures (SMAW, FCAW, SAW, etc.), type of qualification (AWS, ASME, etc.), and applicability to what metallurgy.

Place response (description, supporting information, and / or comments) here:

7.15 Provide your quality statistics in the table below.Carbon Steel

YearStructural Welding Reject

Rate (cm per cm NDT'd)

Pipe Welding Reject Rate (welds per welds NDE'd)

20062007200820092010

8. PROJECT MANAGEMENT AND EXECUTION

8.1 How many projects does respondent's Project Manager routinely handle at any one time?

Place response (description, supporting information, and / or comments) here:

8.2 Describe your project management systems and procedures for planning and executing work. Include a copy of the procedure for further clarification.

Place response (description, supporting information, and / or comments) here:

8.3 Attach a typical project execution plan.

Place response (description, supporting information, and / or comments) here:

8.4 Describe your typical project management organization. Provide a typical project organization chart including all key personnel down to discipline lead / general foreman level.

Place response (description, supporting information, and / or comments) here:

8.5 Provide a brief description of the roles and responsibilities for each member of the typical project management organization.

Place response (description, supporting information, and / or comments) here:

8.6 Provide an organization chart of key company personnel including president, vice president(s) and department managers.

Place response (description, supporting information, and / or comments) here:

18

Page 21: Pre-Qualification Questionnaire Templateportaldecomert.ro/Files/Long Form1._20101129340597.doc  · Web viewProvide an example of a typical Inspection & Test Plan (ITP) ... (NDT)

Iraq WQ1 Project ExxonMobil Iraq LimitedPre-Qualification Questionnaire Proprietary

8.7 Provide the following information on the key personnel named on the organization chart in question 8.6, above.

Name of Key Personnel Job Title Years with

RespondentYears in Industry

                                                                 

9. PROJECT CONTROLS

9.1 Describe your cost estimating techniques and software utilized. Discuss any differences between home office, fabrication yard and field. Provide an example of how these tools have been used in a relevant project.

Place response (description, supporting information, and / or comments) here:

9.2 Describe your cost reporting and forecasting techniques and software utilized. Discuss any differences between home office, fabrication yard and field. Provide an example of how these tools have been used in a relevant project.

Place response (description, supporting information, and / or comments) here:

9.3 Describe your scheduling techniques and software utilized. Discuss any differences between home office, fabrication yard and field. Provide an example of how these tools have been used in a relevant project.

Place response (description, supporting information, and / or comments) here:

9.4 Explain how progress and productivity are measured, weighted, and reported including physical progress. Explain how progress and productivity are used to update project schedules. Discuss any differences between home office, fabrication yard and field. Provide an example of how progress and productivity measurement have been used in a relevant project.

Place response (description, supporting information, and / or comments) here:

19

Page 22: Pre-Qualification Questionnaire Templateportaldecomert.ro/Files/Long Form1._20101129340597.doc  · Web viewProvide an example of a typical Inspection & Test Plan (ITP) ... (NDT)

Iraq WQ1 Project ExxonMobil Iraq LimitedPre-Qualification Questionnaire Proprietary

9.5 Describe your system of change management and reporting. Describe how contract change orders are identified, estimated, logged, and tracked. Include a copy of the procedure, including forms used, for further clarification. Discuss any differences between home office, fabrication yard and field.

Place response (description, supporting information, and / or comments) here:

9.6 Provide an example copy of a monthly client report for a current project

Place response (description, supporting information, and / or comments) here:

9.7 Describe any other methods, tools or software respondent employs to assure completion of a successful project--in particular, any formalized practices (e.g. lessons learned).

Place response (description, supporting information, and / or comments) here:

9.8 This project will require appropriate handling and controlled distribution of confidential information within a defined project team to protect intellectual property. Please describe the methodologies respondent would utilize to ensure security for hard copy, electronic, and verbal confidential information.

Place response (description, supporting information, and / or comments) here:

10. GOVERNMENT RELATIONS AND PUBLIC AFFAIRS

10.1 Describe your community relations program(s) in any local community(ies), and provide a copy if respondent has a formal plan.

Place response (description, supporting information, and / or comments) here:

10.2 Describe your public affairs and human resources representation in any local community(ies), including any past incidents.

Place response (description, supporting information, and / or comments) here:

10.3 Describe any recent experience with community relations and public affairs in Iraq.

Place response (description, supporting information, and / or comments) here:

10.4 Is respondent able to immigrate your workers through block visas or otherwise?

If yes, please explain how.

Place response (description, supporting information, and / or comments) here:

20

NoYes

Page 23: Pre-Qualification Questionnaire Templateportaldecomert.ro/Files/Long Form1._20101129340597.doc  · Web viewProvide an example of a typical Inspection & Test Plan (ITP) ... (NDT)

Iraq WQ1 Project ExxonMobil Iraq LimitedPre-Qualification Questionnaire Proprietary

10.5 Describe the history of any substantial work you have performed within Iraq or local / similar to the site for the proposed ExxonMobil project.

Place response (description, supporting information, and / or comments) here:

10.6 Describe any recent experience interacting with the Iraqi government or jurisdictions local / similar to the site for the proposed ExxonMobil project, including any regulatory and permitting authorities.

Place response (description, supporting information, and / or comments) here:

10.7 Describe any foreseeable challenges in interacting with any of the entities mentioned in question 10.6, above.

Place response (description, supporting information, and / or comments) here:

11. SUBCONTRACTING

11.1 Describe the types of work typically subcontracted by respondent and list the companies you have recently used for these activities.

Place response (description, supporting information, and / or comments) here:

11.2 Describe the process you use to pre-qualify and select subcontractors, including the criteria used and how it is applied. If necessary, include a flowchart of the steps to go through to a final subcontract award.

Place response (description, supporting information, and / or comments) here:

11.3 Describe how applicable SSH&E guidelines are used when screening, selecting and monitoring subcontractors.

Place response (description, supporting information, and / or comments) here:

11.4 Describe your approach / controls used to manage multiple subcontractors to achieve project objectives.

Place response (description, supporting information, and / or comments) here:

12. INTERFACE MANAGEMENT

12.1 Describe your interface management processes.

Place response (description, supporting information, and / or comments) here:

21

Page 24: Pre-Qualification Questionnaire Templateportaldecomert.ro/Files/Long Form1._20101129340597.doc  · Web viewProvide an example of a typical Inspection & Test Plan (ITP) ... (NDT)

Iraq WQ1 Project ExxonMobil Iraq LimitedPre-Qualification Questionnaire Proprietary

12.2 Describe your proposed strategy for interfacing between engineering, procurement and construction contractors to facilitate timely receipt of deliverables to support.

Place response (description, supporting information, and / or comments) here:

12.3 Describe your proposed strategy for managing multiple interfaces within your organization (including subcontractors) and with external parties such as the EMIL project management team, security contractors and the government. Describe (examples) where you have used this strategy on previous projects.

Place response (description, supporting information, and / or comments) here:

13. PROCUREMENT & MATERIALS MANAGEMENT

13.1 Describe your overall procurement process for equipment and materials, including tools used.

Place response (description, supporting information, and / or comments) here:

13.2 Describe equipment and materials that you typically have procurement responsibility for on a project.

Place response (description, supporting information, and / or comments) here:

13.3 Describe how your approved vendor list is maintained and updated. What is the process to add a vendor? Please attach a current copy.

Place response (description, supporting information, and / or comments) here:

13.4 The U.S. and other governments control the “export” of equipment, materials, software, information, and technology to certain countries. Such exports include physical materials, electronic information, and deemed export of information via certain foreign nationals. Does respondent have an export controls policy?

Do you have specific export controls guidelines, procedures and/or software?

Place response (description, supporting information, and / or comments) here:

13.5 Describe your overall materials management system, including tools used (e.g., materials handling plan).

Place response (description, supporting information, and / or comments) here:

22

NoYes

NoYes

Page 25: Pre-Qualification Questionnaire Templateportaldecomert.ro/Files/Long Form1._20101129340597.doc  · Web viewProvide an example of a typical Inspection & Test Plan (ITP) ... (NDT)

Iraq WQ1 Project ExxonMobil Iraq LimitedPre-Qualification Questionnaire Proprietary

13.6 Describe how material identification and traceability is maintained through ordering, fabrication, transportation, warehousing, and construction. Indicate how the materials are received, maintained, protected, stored and secured.

Place response (description, supporting information, and / or comments) here:

13.7 What is the customs clearance process that you use?

Place response (description, supporting information, and / or comments) here:

13.8 Have you interacted with Iraq's Southern Oil Company personnel to help import oilfield-related materials?

Place response (description, supporting information, and / or comments) here:

13.9 Have you transported materials inside Iraq?

If so, how? Indicate if you have your own transport group or if you subcontract or have a joint venture arrangement.

Place response (description, supporting information, and / or comments) here:

13.10 How do you manage security for your movements of equipment and materials?

Place response (description, supporting information, and / or comments) here:

13.11 How are materials and equipment at fabrication yard or in the field?

Place response (description, supporting information, and / or comments) here:

13.12 Describe how nonconforming equipment and materials are handled.

Place response (description, supporting information, and / or comments) here:

13.13 Describe facilities and material handling procedures for owner furnished equipment and materials (OFE).

Place response (description, supporting information, and / or comments) here:

14. LABOR RELATIONS

14.1 How does respondent prequalify workforce candidates before hiring?

23

NoYes

NoYes

Page 26: Pre-Qualification Questionnaire Templateportaldecomert.ro/Files/Long Form1._20101129340597.doc  · Web viewProvide an example of a typical Inspection & Test Plan (ITP) ... (NDT)

Iraq WQ1 Project ExxonMobil Iraq LimitedPre-Qualification Questionnaire Proprietary

Place response (description, supporting information, and / or comments) here:

14.2 Describe any labor affiliations (e.g., union) and/or agreements you are a party to that are applicable to work in Iraq. Provide details and the expiration date of such agreements.

Place response (description, supporting information, and / or comments) here:

14.3 Relative to any past or current work in Iraq, list any labor strikes or other work stoppages involving respondent or a project respondent was associated with during the last five years. If stoppages have occurred during the past two years, identify what action has been taken to avoid similar stoppages in the future.

Place response (description, supporting information, and / or comments) here:

14.4 Relative to working in Iraq, describe how labor relations are managed by respondent. If no relevant experience, describe proposed strategy for managing labor relations.

Place response (description, supporting information, and / or comments) here:

14.5 What are your standard weekdays worked (days per week, shifts per day, and hours per shift) and not worked, and what is the approximate allocation of craft labor on each work shift?

Place response (description, supporting information, and / or comments) here:

15. CONSTRUCTION EQUIPMENT

15.1 Using the following table, describe major construction equipment currently in your inventory. Specify if the equipment is owned or leased. Specify if the equipment is currently available.

Equipment Type Quantity Describe Capability/Capacity

Cranes / Lifting Equipment (fork lifts, steel transporters, etc.)

   

                        

Earthworks    Bulldozers    

      

24

Page 27: Pre-Qualification Questionnaire Templateportaldecomert.ro/Files/Long Form1._20101129340597.doc  · Web viewProvide an example of a typical Inspection & Test Plan (ITP) ... (NDT)

Iraq WQ1 Project ExxonMobil Iraq LimitedPre-Qualification Questionnaire Proprietary

Scrappers             

Shovels             

Breakers/Picks             

Loaders             

Graders             

Compactors          

Water Tankers                   

Other              Plate Cutting & Pipe Profiling    

                         Welding/General                             Welding/Automatic                   Power Generators         

25

Page 28: Pre-Qualification Questionnaire Templateportaldecomert.ro/Files/Long Form1._20101129340597.doc  · Web viewProvide an example of a typical Inspection & Test Plan (ITP) ... (NDT)

Iraq WQ1 Project ExxonMobil Iraq LimitedPre-Qualification Questionnaire Proprietary

     Lighting Pods                   Air Tools / Equipment                             Electrical Tools / Equipment    

                         Hydrostatic Test Equipment    

                              Pipe Fitting / Cutting Equipment    

                         Stress Relieving                             Mobility    Trucks    Concrete    Water    Fuel    Service    Pick-ups    Flat-beds    Stake    Tractors    Trailers    Trailers    

26

Page 29: Pre-Qualification Questionnaire Templateportaldecomert.ro/Files/Long Form1._20101129340597.doc  · Web viewProvide an example of a typical Inspection & Test Plan (ITP) ... (NDT)

Iraq WQ1 Project ExxonMobil Iraq LimitedPre-Qualification Questionnaire Proprietary

Girder Frame    Gravel Haulers    Dump    Articulating Dump    Lo-Boy    Flat-beds    Enclosed    Pipe stake    SPT's - 4 axle    SPT's - 6 axle    SPMT's - 4 axle    SPMT's - 6 axle    Communication                        Other    List any additional equipment owned / leased not described above

   

               

15.2 Please attach a copy of your equipment maintenance/service program.

Place response (description, supporting information, and / or comments) here:

16. ENGINEERING

16.1 Provide a description of respondent's capabilities and how you would use the following tools on a typical project:

Databases including integration with other design tools  

Data sheet development (instrument, mechanical, other)  

CAD capabilities (e.g. 2D/3D, isometrics, number of workstations and licenses  

Hazard and operability studies and risk assessments  

Weight estimating  Technical computing (pipe stress analysis, structural analysis, process simulation, electrical design, line sizing, layouts, blast analysis, dispersion analysis, radiation analysis, dynamic riser analysis, finite element analysis, etc.)

 

27

Page 30: Pre-Qualification Questionnaire Templateportaldecomert.ro/Files/Long Form1._20101129340597.doc  · Web viewProvide an example of a typical Inspection & Test Plan (ITP) ... (NDT)

Iraq WQ1 Project ExxonMobil Iraq LimitedPre-Qualification Questionnaire Proprietary

16.2 Describe the process for incorporating engineering design concepts from previous experience, as well as from subcontractors, into the overall design.

Place response (description, supporting information, and / or comments) here:

16.3 Does respondent use remote engineering service site(s) (a.k.a. high value engineering centers) for execution of engineering and technical work?

If yes, describe the relationship (internal Division/subsidiary or subcontractor). If yes, provide descriptions of how they have been utilized.

Place response (description, supporting information, and / or comments) here:

16.4 Describe quality control and verification procedures used for engineering designs.

Place response (description, supporting information, and / or comments) here:

16.5 Describe respondent's document control system for the home office, fabrication yard and jobsite. Include a copy of the system for further clarification.

Place response (description, supporting information, and / or comments) here:

16.6 Describe your fabrication yard and jobsite engineering capabilities (include the use of computer-aided design and manufacturing (CAD/CAM)). Be specific regarding how software and CAD/CAM are used. Briefly describe your information technology (IT) support capabilities at fabrication yards and jobsites.

Place response (description, supporting information, and / or comments) here:

16.7 Describe your ability to generate shop drawings at fabrication yards or jobsites.

Place response (description, supporting information, and / or comments) here:

17. CONSTRUCTION

17.1 Describe your constructability program. How are constructability issues incorporated into front-end engineering design and detailed engineering?

Place response (description, supporting information, and / or comments) here:

17.2 Describe your typical planning prior to start of fabrication and/or construction including a list of major activities and relevant timing.

Place response (description, supporting information, and / or comments) here:

28

NoYes

Page 31: Pre-Qualification Questionnaire Templateportaldecomert.ro/Files/Long Form1._20101129340597.doc  · Web viewProvide an example of a typical Inspection & Test Plan (ITP) ... (NDT)

Iraq WQ1 Project ExxonMobil Iraq LimitedPre-Qualification Questionnaire Proprietary

17.3 Provide a copy of a typical relevant project (oil & gas industry) mechanical completion plan.

Place response (description, supporting information, and / or comments) here:

17.4 What type of systems completion database (SCD) do you use? (MS Excel, MS Access, WINpcs, Variant or other?)

Place response (description, supporting information, and / or comments) here:

17.5 With respect to your SCD, how many items can be tracked and what are your typical project requirements?

Place response (description, supporting information, and / or comments) here:

17.6 Does your SCD facilitate a consolidated punchlist?

Place response (description, supporting information, and / or comments) here:

29

NoYes

Page 32: Pre-Qualification Questionnaire Templateportaldecomert.ro/Files/Long Form1._20101129340597.doc  · Web viewProvide an example of a typical Inspection & Test Plan (ITP) ... (NDT)

Iraq WQ1 Project ExxonMobil Iraq LimitedPre-Qualification Questionnaire Proprietary

A1. CONTRACTOR GROUPSContractor Entity is advised that the acceptability of any Contractor Group will require, in part, joint and several liability on the part of each member of the Contractor Group and parent company guarantees from each Contractor Group member in a form acceptable to EMIL.

1. Provide the name of the companies that will form/have formed the Contractor Group and the ownership percentage of each party in the Contractor Group. Include addresses and contact information for each party.

2. State the type of Contractor Group structure for this proposed work, i.e. unincorporated Contractor Group, special purpose Contractor Group, other.

3. Has the Contractor Group already been formed?

If so, provide date of formation.

4. Have the members of the Contractor Group worked with each other as a Contractor Group on previous or current projects?

If so, please attach details of such other projects. Include brief scope, role played by each Contractor Group member, date performed, client, value, etc.

5. If already formed, has the Contractor Group been registered to perform engineering work in Iraq?

If yes, provide details of registration. If yes, has the Contractor Group met applicable statutory requirements to perform engineering work outside Iraq?

If no, provide details and status in meeting such requirements.

6. If the Contractor Group has not already been formed, what is the proposed date of formation?

7. If not yet formed, what is the proposed Iraqi registration plan?

8. If not yet formed, what international registrations will the Contractor Group seek?

9. If not indicated in response to question 1, above, what member will serve as the managing entity of the Contractor Group?

10. If applicable, provide the name of the parent company of each Contractor Group member. Include address and contact information.

30

NoYes

NoYes

NoYes

NoYes

Page 33: Pre-Qualification Questionnaire Templateportaldecomert.ro/Files/Long Form1._20101129340597.doc  · Web viewProvide an example of a typical Inspection & Test Plan (ITP) ... (NDT)

Iraq WQ1 Project ExxonMobil Iraq LimitedPre-Qualification Questionnaire Proprietary

A2. PROSPECTIVE BUSINESS ASSOCIATES (PBA) QUESTIONNAIRE 1 Identifying Information

1.1

Please provide the following:

Name of business, company or individualBusiness Address (principal place of business and address for purposes of communication with EMIL, if different from the principal place of business)TelephoneFaxTelexE-Mail

2 Company Background2.1

What is your business type (i.e. corporation, partnership, etc.)?

2.2

Date and place of formation (please attach copies of formation documents)

2.3

Principal lines of business of company or individual, (please attach any recent reports filed with the regulator of a public stock exchange) and length of time in each line of business

2.4

Other locations of business activities

2.5

Have you, or your company, or any officer or director of your company, or any of the individuals who may perform work under a contract with EMIL or any affiliate of ExxonMobil ever been charged with or investigated for a criminal offense, including money laundering, tax evasion, or bribery? If yes, provide details.

2.6

If company, have any of your shareholders (provided your company shares are not traded on a public stock exchange) ever been charged with or investigated for a criminal offense, including money laundering, tax evasion, or bribery? If Yes, provide details.

3 Ownership and Management3.1

If company, are your shares publicly traded on a stock exchange?

If yes, what percent? If yes, please attach a copy of your most

31

NoYes

NoYes

NoYes

Page 34: Pre-Qualification Questionnaire Templateportaldecomert.ro/Files/Long Form1._20101129340597.doc  · Web viewProvide an example of a typical Inspection & Test Plan (ITP) ... (NDT)

Iraq WQ1 Project ExxonMobil Iraq LimitedPre-Qualification Questionnaire Proprietary

recent public filing showing the company’s shareholders, partners, or owners; if this filing does not list major (>5%) shareholders, please identify any major shareholders, to the best of knowledge of your company.

3.2

If you are not publicly held, please give the names, nationalities and countries of residence of all of your shareholders, partners, and beneficial owners. Please indicate the exact ownership interest of each person or company listed. (If one or more of your owners is a company, list the ultimate beneficial owner(s) and any intermediate entities or persons owning an interest in that company. Please note that this questionnaire will be returned as incomplete unless all of the ownership information is included.).

3.3

Give the names, nationalities and countries of residence of all officers, directors, managers, or other employees with executive or management authority, and the "key employees": who may perform services on behalf of the company under any contract. Please provide this information as well for any company that is the ultimate beneficial owner of your company, and of all employees who will be managing the performance of services under the proposed contract.

3.4

Do any of the persons listed anywhere in the responses to the questions in this Section 3 hold director, officer or other management positions with other companies, businesses, or entities? If yes, give the name of each company and the title of the relevant position.

3.5

Please list the names and addresses of any other individual, company or entity that will receive any portion of the payment as a result of participating in any type of partnership, joint venture, subcontract, or alliance with your company in performing the work covered by the proposed contract.

4 Relationships with Governments and Public International Organizations(Please refer to the definition of "Official"2)

4. Are any of the persons listed anywhere in the

32

NoYes

Page 35: Pre-Qualification Questionnaire Templateportaldecomert.ro/Files/Long Form1._20101129340597.doc  · Web viewProvide an example of a typical Inspection & Test Plan (ITP) ... (NDT)

Iraq WQ1 Project ExxonMobil Iraq LimitedPre-Qualification Questionnaire Proprietary

1 responses to the questions in Section 3 above or any persons with direct or indirect ownership interest in the company or business:

Officials?

Close relatives of Officials?

Prior Officials?

Involved in any business relationship, including acting as an agent or consultant for, or holding common ownership of any business enterprise or partnership with, any Official or close family member of an Official?

4.2

If the answer to any part of question 4.1, above, is yes, provide details for each such person, including:

Full name of Official  Official responsibilities  Dates of service (current or past)  For relatives, the relationship  For common business interest, the type of business relationship, including the name of any enterprise or partnership, and the nature of any agency agreement

 

5 References5.1

Please list two references for the work for which you are being considered by EMIL.

Reference 1:Name of Contact  Company Name  Telephone  Email  Fax  

Reference 2:Name of Contact  Company Name  Telephone  Email  Fax  

6 Important NoticePERSONAL INFORMATION:- ExxonMobil collects personal information directly from you through the above questionnaire. - ExxonMobil also collects personal information about you and about your employees, owners and/or business associates. By completing this questionnaire you consent to the information you have provided

33

NoYes

NoYes

NoYes

NoYes

Page 36: Pre-Qualification Questionnaire Templateportaldecomert.ro/Files/Long Form1._20101129340597.doc  · Web viewProvide an example of a typical Inspection & Test Plan (ITP) ... (NDT)

Iraq WQ1 Project ExxonMobil Iraq LimitedPre-Qualification Questionnaire Proprietary

being used by ExxonMobil for the purposes described below. You should also obtain the written consent of anyone whose information you have included in this questionnaire for its use and transfer as appropriate.

PURPOSES & DISCLOSURES:- This information is used by ExxonMobil for legitimate business purposes and in connection with a potential business relationship with your company. In particular, it is used to evaluate potential risks which ExxonMobil may be exposed to under the U.S. Foreign Corrupt Practices Act and other anti-bribery laws as a result of entering into a commercial relationship with your company or associated third parties. For this purpose, ExxonMobil shares your information with other ExxonMobil Affiliates if necessary. - Any ExxonMobil Affiliate receiving and processing this information is expected to do so consistently with the purposes and disclosures description set out in this notice and they will protect such data consistent with applicable policies and laws.- This processing may occur in another country that may not have been deemed by your country to provide adequate data privacy protection.

YOUR CHOICES:- Your participation is voluntary. - By signing at the bottom of this document, you declare that you have the proper authority to disclose the relevant information and that you consent to the processing as described above accepting that such collection, storing or other processing may be conducted by a third party or may occur in another country.

I understand how the personal information content in this questionnaire will be used and I consent to the use, transfer and disclosure of the information for the purposes and disclosures described above.

            Signed: ___________________________________________ Dated:

___________________________        Printed Name and Title:

________________________________________________________________       

1 "ExxonMobil" and/or "ExxonMobil Affiliates" mean (a) Exxon Mobil Corporation or any parent of Exxon Mobil Corporation, (b) any company or partnership in which Exxon Mobil Corporation or any parent of Exxon Mobil Corporation now or hereafter, directly or indirectly (1) owns or (2) controls, more than fifty percent (50%) of the ownership interest having the right to vote or appoint its directors or functional equivalents ("Affiliated Company"), and (c) any joint venture in which Exxon Mobil Corporation, any parent of Exxon Mobil Corporation, or an Affiliated Company has day to day operational control.

2 "Official" means any agent, officer, or employee (elected, appointed, or career) of (1) a government or any department or agency of a government at the federal, regional or local level; (2) a political party or candidate for political office; (3) any company in which a government holds a substantial ownership interest, including a national oil company; or (4) a public international organization such as the World Bank, the United Nations or the International Monetary Fund.

34

Page 37: Pre-Qualification Questionnaire Templateportaldecomert.ro/Files/Long Form1._20101129340597.doc  · Web viewProvide an example of a typical Inspection & Test Plan (ITP) ... (NDT)

Iraq WQ1 Project ExxonMobil Iraq LimitedPre-Qualification Questionnaire Proprietary

A3.A CONTRACTOR EXPERIENCE FORM – PROCESS UNIT AREAS

LegendYour Typical Involvement

Please enter SP or SC as appropriatePrimary

orSecondaryBusiness

Target(p or s)

Greatest Single

Project $ or Capacity

or Quantities Units in last

5 yrs.

SP - Self Perform as appropriateSC - Sub Contract as appropriate

Engineering Procurement Fabrication Construction Management

Construction/ Installation P - Procure as

appropriate                 PROCESS UNITS / AREAS              Acid Gas Treatment Unit              Amine Recovery Unit (ARU)              Butamer / Mericat / Thiolex Unit (BMT)              Cryogenics              Helium Plant              Hydrogen Plant              Liquids / Gas Separation              Oil/Tar Sands Extraction              Regeneration              Shale Oil Processing              Sour Water Stripper (SWS)              Sulfur Prilling, Storage & Loading              SRU over 50 LTPD              SRU under 50 LTPD              Tail Gas Treating Unit (TGTU)              Wet Gas Scrubber (WGS)                             POWER GENERATION              Boilers, Steam Generators              Boilers, Steam Generators - Modifications and Repairs              Gas Turbine - Combined Cycle (HRSG)              Gas Turbine - Combined Cycle (WHRU)              Gas Turbine - Single Cycle              Gas Turbine - Modifications and Repairs              Diesel Driven Package Generators              Turbine Driven Package Generators (Solar, etc.)                             STACKS AND FLARES              Flare Installation              Flare Demolition              Guy Wire Tensioning              Lattice Structure Flares                             WATER TREATMENT              Boiler Polished Water Treatment              Desalination              Potable Water Purification              Oily Water Separation              Waste Water Treatment                             GASES              Instrument Air              Utility Air              Inert Gas              

35

Page 38: Pre-Qualification Questionnaire Templateportaldecomert.ro/Files/Long Form1._20101129340597.doc  · Web viewProvide an example of a typical Inspection & Test Plan (ITP) ... (NDT)

Iraq WQ1 Project ExxonMobil Iraq LimitedPre-Qualification Questionnaire Proprietary

               

36

Page 39: Pre-Qualification Questionnaire Templateportaldecomert.ro/Files/Long Form1._20101129340597.doc  · Web viewProvide an example of a typical Inspection & Test Plan (ITP) ... (NDT)

Iraq WQ1 Project ExxonMobil Iraq LimitedPre-Qualification Questionnaire Proprietary

A3.B CONTRACTOR EXPERIENCE FORM – DISCIPLINES

Legend Your Typical InvolvementPlease enter SP or SC as appropriate Primary

orSecondaryBusiness

Target(p or s)

Greatest Single

Project $ or

Capacityor

Quantities Units in

last 5 yrs.

SP - Self Perform as appropriateSC - Sub Contract as appropriate

EngineeringProcurementFabrication Construction Management

Construction/ Installation

P - Procure as appropriate

 Civil                             SITE CLEARING AND DEMOLITION              Demolition - Concrete Recycling              Demolition - General Facilities              Demolition - Plant Dismantling              Hauling - Dirt, Debris etc.              Site Clearing & Grubbing                             EARTHWORK, SITE IMPROVEMENTS              Soil Remediation              Soil Stabilization              Soil Stabilization - Lime Injection              Soil Stabilization - Dynamic Compaction              Earth Moving, Excavation, Backfill, Grading  Earth Hauling and Dumping              Erosion Control              Pond Liners              Dewatering              Hydrotrenching              Road Boring              Directional Drilling              Asphalt Paving              Railroad Construction              Wharves & Piers              Water Wells              Fencing, Permanent              Seeding, Hydromulch              Bridges                             PILING              Drilled Piers              Augercast Piles              Driven Piles - Timber, Sheet, Pipe, H-Pile              Driven Piles – Pre-stressed Concrete Piles              Driven Piles - Steel Casing / Hel-Cor Type Piles              DeWaal Piles              Caissons                             Concrete                             CONCRETE              Concrete Construction – Super Structures (above grade structures)              Concrete Paving              Concrete – Floor Slabs              Concrete – Super Flat Floor Slabs              Concrete Pumping              Concrete Cutting & Core Drilling              Precast Concrete – Design and Manufacture              Precast Concrete – Field Installation              Pre & Post Tensioning Concrete              Pressure Grouting                             MASONRY, REFRACTORY              

37

Page 40: Pre-Qualification Questionnaire Templateportaldecomert.ro/Files/Long Form1._20101129340597.doc  · Web viewProvide an example of a typical Inspection & Test Plan (ITP) ... (NDT)

Iraq WQ1 Project ExxonMobil Iraq LimitedPre-Qualification Questionnaire Proprietary

Masonry Work              Acid Brick              Refractory                             Structural Steel                             STRUCTURAL STEEL              Structural Steel Erection <600mm depth              Structural Steel Erection >600mm depth              Structural Steel Fabrication <600mm depth              Structural Steel Fabrication >600mm depth              Bolt Tensioning                             Buildings                             BUILDING TYPES              Low Rise - Less than 6 stories              Mid Rise - Less than 12 stories              High Rise - Greater than 12 stories              Pre-Engineered Buildings              Masonry Buildings              Panelized Precast Buildings              Cast-in-Place Concrete Buildings (Blast-proof)              Tilt-Wall Construction              Industrial Explosion Proof (i.e. Control Room Buildings)                             BUILDING SPECIALTIES              Architectural Interior Build-out              Reflective / Suspended Ceilings              Blast-Proof Doors              Furniture              Case Work              Laboratory Built Ins & Hoods, etc.                             STRUCTURAL SYSTEMS              Concrete              Steel A-36              Steel High Strength              Combined              Other                             BUILDING ENVELOPE (Exterior Wall Systems)              Masonry - Load Bearing              Masonry - Veneer              Thin Stone - Panels              Precast Concrete              Tilt Up Walls              Glass Curtain Wall              Metallic Clad              Panelized - Other Materials              Corrugated Siding & Decking                             BUILDING ROOF SYSTEMS              Built Up              Upside Down              Membrane              Metal Roofing & Siding              Other                             FLOOR SYSTEMS              Cast In-Situ - (various form systems)              Stay-in-place foam forms              Concrete on steel deck (compound or single)              Concrete on steel joists              Concrete on fiber glass joists              

38

Page 41: Pre-Qualification Questionnaire Templateportaldecomert.ro/Files/Long Form1._20101129340597.doc  · Web viewProvide an example of a typical Inspection & Test Plan (ITP) ... (NDT)

Iraq WQ1 Project ExxonMobil Iraq LimitedPre-Qualification Questionnaire Proprietary

Composite Slab              Precast hollow-core plank              Autoclaved aerated concrete              Radiant Heating              Ceramic Tile              Computer Access Floor Systems                             VERTICAL TRANSPORTATION SYSTEMS              Elevators - Personnel and Freight w/TopHat              Escalators                             PLUMBING SYSTEMS              Potable Water              DHW - Calorifier Based Hot Water Systems              DHW - Solar Heater Systems              DHW - Tankless Hot Water Systems              Domestic Waste Water Collection Systems              Domestic Waste Water Treatment Systems                             BUILDING AUTOMATION & OPERATIONS SYSTEMS              Integrated              Separate                             LIFE SAFETY SYSTEMS              Fire Sprinkler Systems              Deluge Systems              Fire Stand Pipe System              Smoke Detection              Building Evacuation              Building Security Systems              Fireman's Command Center & Control Stations                             ELECTRICAL SYSTEMS              Power Distribution              Power Generation - Primary              Power Generation - Back-up              Surge Protection              Emergency Lighting              UPS Circuits              Lighting Fixtures                             LIGHTNING PROTECTION SYSTEM              Franklin System                             HVAC SYSTEMS              Chiller VAV Duct Based Systems              Chiller Fan Coil Systems              DX / Split Systems              Radiant Floor Heating Systems              Architectural / Commercial Grade Ductwork Systems                             SOLID WASTE HANDLING SYSTEMS              Chutes              Compactors              Incinerators                             PROJECT DEVELOPMENT              Residential campus              Resort                             SPECIALTIES              Access control devices              A/V facilities              CCTV Systems              

39

Page 42: Pre-Qualification Questionnaire Templateportaldecomert.ro/Files/Long Form1._20101129340597.doc  · Web viewProvide an example of a typical Inspection & Test Plan (ITP) ... (NDT)

Iraq WQ1 Project ExxonMobil Iraq LimitedPre-Qualification Questionnaire Proprietary

Digital Cable TV Distribution Systems              I/T (Cat. 6 or newer) Systems              Satellite Network Links              Telephone Voice/Data Systems              Millwork              Raised flooring              Security Systems                             Mechanical Equipment                             COLUMNS (PROCESS TOWERS & INTERNALS)              Columns              Tray Installation              Field Modifications              Weld Overlay                             CONVEYORS              Belt Drive Conveyors              Screw Drive Conveyors                             EXCHANGERS              Shell and Tube              Plate Fin              Air Coolers              Cooling Towers              Exchanger Field Repair Services                             FIELD ERECTED/INSTALLED PRESSURE VESSELS              ASME Sphere Tanks              Drums                             FIRED HEATERS AND INTERNALS              Furnace & Heater                             HOISTS, CRANES & ELEVATORS              Bridge Crane              Freight Elevator              Personnel Elevator              Hoists                             REACTORS AND INTERNALS              Reactor              Reactor Modifications & Repairs                             REFRIGERATION UNITS, WATER CHILLERS              Process Refrigeration                             RECIPROCATING EQUIPMENT              Pump Installation              Compressor Installation (new)              Compressor Repair (field)              Millwright Work                             ROTATING EQUIPMENT              Pump Installation              Compressor Installation (new)              Compressor Repair (field)              Millwright Work                             SCREW EQUIPMENT              Pump Installation              Compressor Installation (new)              Compressor Repair (field)              Millwright Work              

40

Page 43: Pre-Qualification Questionnaire Templateportaldecomert.ro/Files/Long Form1._20101129340597.doc  · Web viewProvide an example of a typical Inspection & Test Plan (ITP) ... (NDT)

Iraq WQ1 Project ExxonMobil Iraq LimitedPre-Qualification Questionnaire Proprietary

               CRYOGENIC PUMPS              Non-submersed Motor and Single or Multi-stage pump              Submersed Motor and Single or Multi-stage pump                             SCALES              Truck Scales – Design and Fabrication              Truck Scales – Field Installation              Railroad Scales – Design and Fabrication              Railroad Scales – Field Installation                             STORAGE BINS, HOPPERS AND SILOS              Design and Fabricate Bins, Hoppers and Silos              Field Erected Bins, Hoppers and Silos                             TANKS & ATMOSPHERIC VESSELS              Field Erected Steel Tanks              Field Erected FRP Tanks              Tank Repair and Maintenance              Tank Cleaning Services              Tile Chest              LNG Tanks - single containment              LNG Tanks - double containment              LNG Tanks - full containment              LNG Tanks - membrane type                             DUCTWORK              Industrial Grade Ductwork Systems– Paper Mill, Industrial Ventilation/Compression Inlet                             CATALYST              Installation              Removal              Pyrophorics                             Piping                             Piping – Industrial Process, Utility and other ASME Piping - Carbon Steel Small Bore              Piping – Industrial Process, Utility and other ASME Piping - Low Temp CS Small Bore              Piping – Industrial Process, Utility and other ASME Piping - Stainless Steel Small Bore              Piping – Industrial Process, Utility and other ASME Piping - Alloy Small Bore              Piping – Industrial Process, Utility and other ASME Piping - Carbon Steel Large Bore              Piping – Industrial Process, Utility and other ASME Piping - Low Temp CS Large Bore              Piping – Industrial Process, Utility and other ASME Piping - Stainless Steel Large Bore              Piping – Industrial Process, Utility and other ASME Piping - Alloy Large Bore              Piping Hangers & Supports              Piping - Underground Storm Sewer              Piping - Underground FRP              Piping - Underground PVC              High Purity Piping (Orbital welding Only)              Electro-polished Pipe              HDPE - High Density Polyethylene Pipe              Underground Mechanical Pipe              Induction Bending                             Electrical                             

41

Page 44: Pre-Qualification Questionnaire Templateportaldecomert.ro/Files/Long Form1._20101129340597.doc  · Web viewProvide an example of a typical Inspection & Test Plan (ITP) ... (NDT)

Iraq WQ1 Project ExxonMobil Iraq LimitedPre-Qualification Questionnaire Proprietary

Electrical Grounding              Underground Electrical Ductbanks              High Voltage Electrical Substation / Switch Yard              High Voltage Testing              Cathodic Protection              Cable Tray              Electrical Heat Tracing              Pole Line Installation              Fiber Optic Cable Installation              Lightening Protection              Electric Tracing                             Instrumentation                             Instrument Installation              Instrument Loop Checks              Field Bus              Instrument Cabling              Cable Tray              Steam Tracing              DCS System              Analyzer House Installation                             Coatings                             FIREPROOFING              Fireproofing – Pre-applied              Fireproofing – Industrial Cast-In-Place Concrete (Field Applied)              Fireproofing – Industrial Lightweight (Field Applied)              Fireproofing – Architectural              Fireproofing - Intumescant Coatings                             INSULATION              Insulation – Industrial Piping and Equipment              Insulation – Acoustical              Insulation - Cryo Tanks              Insulation - Perlite              Asbestos Abatement                             PAINTING & PROTECTIVE COATINGS              Industrial Painting              Sandblasting              Sponge Blasting              Lead Abatement              Tank Linings              Acid Proofing              Concrete Coatings and Toppings – including acid proofing              Epoxy Flooring                             Temporary Facilities                             TEMPORARY FACILITIES              Site Surveying - BenchMarks              Site Securing Demarcation Fence Installation              Temporary Construction Fencing              Temporary Construction Facilities (Job Site)              Temporary Construction Facilities (Man-Camps)              Temporary Utilities Systems - Power              Temporary Utilities Systems - Potable Water              Temporary Utilities Systems - Waste Water              Temporary Camp Maintenance & Operations              Temporary Camp Catering              

42

Page 45: Pre-Qualification Questionnaire Templateportaldecomert.ro/Files/Long Form1._20101129340597.doc  · Web viewProvide an example of a typical Inspection & Test Plan (ITP) ... (NDT)

Iraq WQ1 Project ExxonMobil Iraq LimitedPre-Qualification Questionnaire Proprietary

Temporary Communications              Temporary Lighting              Temporary CCTV              Construction Phase Medical Services                             Logistics, Heavy Haul & Lifting                             LOGISTICS              Site Access - air (rotary or fixed wing)              Site Access - land (roads & bridges)              Site Access - marine (MOF)                             HEAVY HAUL & LIFT              Heavy Equipment Hauling - Prime Movers & Trailers              Heavy Equipment Hauling - SPMT              Heavy Equipment Hauling - SPT              Heavy Equipment Hauling - Transporter Girder Frame              Heavy Rigging/Lifts - Gantry              Heavy Rigging/Lifts - Gin Poles              Heavy Rigging/Lifts - Jack up              Heavy Rigging/Lifts - Skids              Heavy Rigging/Lifts - Strand Jack              Heavy Rigging/Lifts - Tower gantry              Heavy Rigging/Lifts - Tower cranes              Heavy Rigging/Crane Lifts - 100 - 500 Tons              Heavy Rigging/Crane Lifts - 500 - 2000 Tons              Heavy Rigging/Crane Lifts - Above 2000 Tons              Specialty Lifting Machine Lifts              

43

Page 46: Pre-Qualification Questionnaire Templateportaldecomert.ro/Files/Long Form1._20101129340597.doc  · Web viewProvide an example of a typical Inspection & Test Plan (ITP) ... (NDT)

Iraq WQ1 Project ExxonMobil Iraq LimitedPre-Qualification Questionnaire Proprietary

A3.C CONTRACTOR EXPERIENCE FORM – SPECIALTIES

LegendYour Typical Involvement

Please enter SP or SC as appropriatePrimary

orSecondaryBusiness

Target(p or s)

Greatest Single

Project $ or Capacity

or Quantities Units in last

5 yrs.

SP - Self Perform as appropriateSC - Sub Contract as appropriate

Engineering Procurement Fabrication Construction Management

Construction/ Installation P - Procure as

appropriate                 SPECIALTIES              Bolt Torquing              Chemical Cleaning              Cleaning Services              Crane Supply              Field Machining              Cold Cutting              Fire Protection Systems -Detection              Fire Suppression Systems              Guard Service              Heat Treatment Services              Hot Taps & Stopple Plugging              Hydro-Blasting              Hydro-Cutting              Hydro-Jacking              Leak Detection Services              Lube Oil Flushing              Optical Alignment              Pile Line Pigging – Cleaning              Pipe Line Pigging – Smart              Pipe Line Pigging – Video              Scaffolding              Shot Peening              Steam Blowing              Steam Tracing              Un-eXploded Ordinance Identification & Disposal

            

Vacuum Truck              Valve Repair – CVs              Valve Repair – MOVs              Valve Repair - PSVs (Relief Valves)

            

Wire Saw Cutting              Automatic Welding                             CONSULTING SERVICES              General Inspection Services              Non Destructive Testing               Dye Penetrate               Magnetic Particle               Radiography               SCAR (Small Containment Area Radiography)

            

Ultrasonic Thickness Testing

            

Video Inspection – General              Surveying, Mapping and Scanning

            

Topographic Surveying & Mapping

            

Surveying & Layout              Photogrammetry              Photography              Laser Imaging              

44

Page 47: Pre-Qualification Questionnaire Templateportaldecomert.ro/Files/Long Form1._20101129340597.doc  · Web viewProvide an example of a typical Inspection & Test Plan (ITP) ... (NDT)

Iraq WQ1 Project ExxonMobil Iraq LimitedPre-Qualification Questionnaire Proprietary

Infrared Scanning              Ground Radar Services              Geotechnical Services (Soils Investigation)

            

Concrete Testing              Soil Testing              Asbestos Testing Laboratories

            

Air Quality Monitoring              Mold Testing & Removal              Antiquities & Fauna Relocation

            

Acoustic Emission              Vibration Detection Analysis              

45

Page 48: Pre-Qualification Questionnaire Templateportaldecomert.ro/Files/Long Form1._20101129340597.doc  · Web viewProvide an example of a typical Inspection & Test Plan (ITP) ... (NDT)

Iraq WQ1 Project ExxonMobil Iraq LimitedPre-Qualification Questionnaire Proprietary

A3.D CONTRACTOR EXPERIENCE FORM – ONSHORE PIPELINES

Onshore PipelinesLegend

Your Typical InvolvementPlease enter SP or SC as appropriate

Primaryor

Secondary

BusinessTarget(p or s)

Greatest Single

Project $ or

Capacityor

Quantities Units in last 5

yrs.

SP - Self Perform as appropriateSC - Sub Contract as appropriate

Engineering

Procurement

Fabrication

Construction

Management

Construction/

Installation

P - Procure as appropriate

 ONSHORE PIPELINES              Pig/Slug Catchers              Waterway Crossings              Compression Stations              Pump Stations              Meter Stations              Storage Tanks              Construction Line Camps                             PIPELINE (ROW)              ROW Survey & Staking              ROW Clearing              ROW Property Services (Land Agents)              Engineering Services (Permits, As-builts, etc.)              Geotechnical Data Collection              Environmental Compliance Services              Explosive Excavation              Line Pipe Stringing              Welding Equipment & Technicians              NDE Equipment & Technicians               Radiography & Ultrasonic Inspection              Weld Field Joint Coating Equip. & Techs              Cathodic Protection              Horizontal Directional Drilling (HDD)              Road Boring              Micro-Tunneling              Telecommunication (FOC, Microwave Towers)              Security Services              Medical Services              Catering Services              Pipeline Cleaning & Testing               Filling, Hydrotesting, Cleaning, Dewatering              Pipeline Drying & Purging               Vacuum, Air and/or Nitrogen              Pipeline Pigging               Caliper Pig and/or Intelligent Pig                             PUMP/COMPRESSOR/MAINLINE VALVE STATIONS              Property Survey & Lay-out              Clearing              Engineering Services (Permits,              

46

Page 49: Pre-Qualification Questionnaire Templateportaldecomert.ro/Files/Long Form1._20101129340597.doc  · Web viewProvide an example of a typical Inspection & Test Plan (ITP) ... (NDT)

Iraq WQ1 Project ExxonMobil Iraq LimitedPre-Qualification Questionnaire Proprietary

As-builts, etc.)Geotechnical Data Collection              Environmental Compliance Services              Civil Construction               Grading, Concrete, Piles, Paving, Fencing               Buildings, Process Equipment & Piping              Mechanical Construction              I&E Construction               Meter Installation, UPS / Emergency Power              Storage Tank Erection              Piping Insulation/Heat Tracing              Cathodic Protection Construction              Telecommunication Construction               FOC & Microwave Towers              Security Services              Medical Services              Catering Services              Piping Cleaning, Testing & Drying/Purging              

47