Guyana Water IncorporatedWater Supply and Sanitation Infrastructure Improvement Program
GY-L1040Pre Bid Meeting with Contractors
7th July, 2015
WELCOME!
Pre Bid Meetingfor
Procurement of Water Treatment Facilities and Upgrade of Reticulation at Uitvlugt, Diamond and Sheet Anchor
OUTLINE OF PRESENTATION Purpose of Presentation Background Program Areas (General) Project Details Project Areas Design Parameters for New WTPS Project Scope Responsibilities (General) Bidding Instructions Bid Evaluation General Advice End of Presentation Questions, Concerns, Queries……!
Purpose of Pre-Bid Meeting
1. To provide background information2. Opportunity for clarifications from bidders3. Dissemination of any important information regarding the project
Background
Water Supply and Sanitation Infrastructure Improvement Program (WSSIIP)
Objective: The program aims to improve efficiency, quality and sustainability of the potable water services and improve sanitation in GT and other area along the coast.
Aging infrastructure assets
Poor water quality (raw
water)
Poor access to adequate sanitation
Low Level of Service + no continuity of
supply
Rapid development in program
areas
Increase in NRW-losses
Background Cont.
Water Supply and Sanitation Infrastructure Improvement Program -
ComponentsReduce the level of NRW in program areas
Improve access to sanitation in program areas
Improve pressure, quality and continuity of the water supply service in program areas
Strengthen GWI performance in its operational and management practice
Program Areas (General)
Project Details
Title: Procurement of Plant: Design, Supply and Installation Water Treatment Facilities and Upgrade of Reticulation at Uitvlugt, Diamond and Goed Banana Land
Procurement Method: International Competitive BiddingContract type: TurnkeyDonor: Inter-American Development Bank & European UnionObjective: Improved water service in program areas Expected Outcome: Improved water quality (treated water), continuity of
supply, increase LOS, better quality of life!
Project (Contract) Area # 1Cornelia Ida to De Kinderen – Uitvlugt WTP
Project (Contract) Area # 2Diamond to Herstelling – Diamond WTP
Project (Contract) Area # 3Sheet Anchor to No. 19 to Goed Banana Land – Sheet Anchor WTP
Design Parameters for New Water Treatment Plants - Summary
Water Treatment Plant
Serving Areas Capacity Source - Boreholes
Population Served
1. Uitvlugt Hague back, Cornelia Ida, Anna Catherina, Leonora, Stewartville, Uitvlugt, Zeeburg, De William, Met En Meerzerg, De Kinderen
10MLD Uitvlugt & Leonora 21,550
2. Diamond Arcadia, Mocha, Herstelling, Providence, Farm, Covent Garden, Prospect, Diamond, Kaneville
12MLD Diamond – (Lamaha Canal for future expansion)
23,266
3. Sheet Anchor Sheet Anchor (Borlam or No. 37 to Sheet Anchor), Cumberland, Canfield, RoseHall
8MLD Sheet Anchor & Cumberland
15,953
The design uses a 200l/hd/day which is based upon the reduction of NRW- it is expected that this demand falls towards 175l/hd/day dependent upon GWI introducing demand management
Design Parameters for New WTP Cont.
Pressure at the edge of the service area = 10 to 14m of head (pressure). Storage has been catered for 24hrs of treated water storage to be provided in
each service area.Water quality baseline The WHO standard has been established as the
target for the treated water quality - (pH, turbidity, iron content).Process Guarantee WHO Standards for Potable Water 100% of the time. Production capacity Able to produce the required design capacity 100% of
the time.
Project Scope- General for new WTPsChemical building completeComplete lime dosing system with necessary accessoriesBlending and chemical mixing tank Circular clarifierRapid sand filtersBaffled storage reservoir(s)Sludge holding ponds or sludge thickeners On site process pipingOnsite chlorine generator Emergency generator, electrical supply and systems and control systems as needed to operate the plant Installation of transmission mains to and from the WTPsAll works as detailed in Employer’s Requirements, Specifications, Bills of Quantities and Drawings; and as approved by the Employer’s Representative.
Important to Note: Duration of contract = 39 months 27 months execution 12 months defects liability
period
Scope of Works - Facilities
Responsibilities - General
The Contractor is required to: mobilize the specified resources required (construction materials facilities, plant, water,
fuel…etc ) to the site and deploy sufficient manpower for works execution.manage all technical issues in relation with the works.undertake overall planning and execution of the construction works.The Employer will have the role of:overall supervision of the construction works. overseeing quality of works.monitoring and controlling work targets/progress as approved on contractor’s program
of works.approving the completion of scheduled tasks or work packages.
Bidding Instructions
Deadline for Bid submission: July 28, 2015 (time 09:00hrs)Request for clarification: 2 weeks prior to closing of bidBid Validity: 120 daysBid Security: GY$57,960,000.00 or freely convertible currency acceptable to
the Employer. Bid Closing: July 28, 2015Submittal: Three copies of Bid plus (1) soft copy of the bid document (Cd)Note:Further details can be found in the ITB and Bid Data Sheet!
Bid Evaluation
Technical Evaluation Economic Evaluation
1. Energy efficiency 2. Operational costs
3. Ability to meet treated water quality & quantity
General Advice!Bidders need to understand fully the strategy and the scope of the works
involved in this project and submit reasonable offer.Contract will be administered in accordance with the conditions of contract. Make sure that all evaluation criteria are adequately addressed as outlined in
the bidding document. No late submission of bid will be accepted. If you have any queries or concerns do not hesitate to make contact with
GWI.
End of Presentation