DOWNTOWN UTILITY RELOCATION SEWER PROJECTPRESENTATION TO CITY COUNCIL2019-03-11

Page 2: PPT-Downtown Utility Relocation Sewer Project.ppt

PRESENTATION OVERVIEW

• PROJECT CONTEXT• DESIGN CONSIDERATIONS• CONSTRUCTION• 7TH AVE SURFACE UPGRADES

Page 3: PPT-Downtown Utility Relocation Sewer Project.ppt

PROJECT CONTEXT

Page 4: PPT-Downtown Utility Relocation Sewer Project.ppt

FALL 2018 PUBLIC COMMUNICATION VIDEO

Page 5: PPT-Downtown Utility Relocation Sewer Project.ppt

SANITARY SEWER WORKS:

• Re-routing and upgrading of the sanitary sewer

• Installation of a new sewer line across Queensway and along Lower Patricia

RELATED CITY UTILITY WORKS:

• Replacement and re-routing of the storm water system

• Replacement of the old watermain on 7th Avenue in front of City Hall

• New extension of the Downtown Renewable Energy System to the parkade

Page 6: PPT-Downtown Utility Relocation Sewer Project.ppt

WATERMAIN REPLACEMENT PROGRAM

WATERMAIN

• Existing 7th Ave. watermain was rated “very high risk” for failure• Opportunity to replace this pipe alongside utility relocation work

(as part of the City’s Watermain Replacement Programme)

Page 7: PPT-Downtown Utility Relocation Sewer Project.ppt

DESIGN CONSIDERATIONS

Page 8: PPT-Downtown Utility Relocation Sewer Project.ppt

INITIAL SEWER RELOCATION CONCEPT – REROUTE THROUGH LANEWAY

CityHall

Parkade

++

OLD SEWER

PROPOSED SEWER (5% longer than old sewer)

Page 9: PPT-Downtown Utility Relocation Sewer Project.ppt

SEWER SLOPES:

• Old sewer had deficient slope• Longer distance with same elevation drop = flatter pipe• Flatter pipe = slower fluid movement• Solids settle to bottom when minimum fluid velocity not met• Tendency for pipe blockages

Page 10: PPT-Downtown Utility Relocation Sewer Project.ppt

VIEW OF LANEWAY FROM QUEENSWAY

Page 11: PPT-Downtown Utility Relocation Sewer Project.ppt

SEWER CAPACITY LIMITING DOWNTOWN GROWTH

UNDERSIZED PIPE(downstream of new developments)

Page 12: PPT-Downtown Utility Relocation Sewer Project.ppt

LIMITED SEWER CAPACITY (highlighted in yellow)

Page 13: PPT-Downtown Utility Relocation Sewer Project.ppt

GRAVITY & FORCE SEWER MAINS

Image Credit: City of Northglenn

Page 14: PPT-Downtown Utility Relocation Sewer Project.ppt

PW104 SEWER LIFT STATION

CityHall

Parkade

PROPOSED NEW POOL

OLD FIRE HALL(to be demolished)

PW104 LIFT STATION

OLD SEWER

Page 15: PPT-Downtown Utility Relocation Sewer Project.ppt

MAP OF NEW SEWER

CityHall

PW104 LIFT STATION

PW102 LIFT STATION

NEW SEWER

Page 16: PPT-Downtown Utility Relocation Sewer Project.ppt

CONSTRUCTION

Page 17: PPT-Downtown Utility Relocation Sewer Project.ppt

DESIGN DRAWINGS SHOWING COMPLEXITY OF EXISTING & NEW UTILITIES

Page 18: PPT-Downtown Utility Relocation Sewer Project.ppt

EXISTING INFRASTRUCTURE

Page 19: PPT-Downtown Utility Relocation Sewer Project.ppt

EXISTING INFRASTRUCTURE

Page 20: PPT-Downtown Utility Relocation Sewer Project.ppt

EXISTING INFRASTRUCTURE

Page 21: PPT-Downtown Utility Relocation Sewer Project.ppt

EXISTING INFRASTRUCTURE – TEMPORARY STORM/SANITARY CROSSING FOR CONSTRUCTION STAGING

Page 22: PPT-Downtown Utility Relocation Sewer Project.ppt

GROUNDWATER

Page 23: PPT-Downtown Utility Relocation Sewer Project.ppt

TRENCHLESS INSTALLATION

Page 24: PPT-Downtown Utility Relocation Sewer Project.ppt

EXCAVATION OF QUEENSWAY

Page 25: PPT-Downtown Utility Relocation Sewer Project.ppt

NIGHT WORK

Page 26: PPT-Downtown Utility Relocation Sewer Project.ppt

INTERIM LIGHTING IMPROVEMENTS

Page 27: PPT-Downtown Utility Relocation Sewer Project.ppt

FREE DOWNTOWN PARKING

Page 28: PPT-Downtown Utility Relocation Sewer Project.ppt

7TH AVE SURFACE UPGRADES

Page 29: PPT-Downtown Utility Relocation Sewer Project.ppt

DRAFT 7TH AVE SURFACE DESIGN

Page 30: PPT-Downtown Utility Relocation Sewer Project.ppt

BASALT SLAB BENCH FEATURESCAN BE USED AS BASE FOR SEASONAL PLANTERS

SURFACE DESIGN DETAILS

TREE CELL SUPPORT STRUCTURE

DECORATIVE FIXED IN PLACE BOLLARDS

BASALT RAISED PLANTER EDGES