powerpoint presentation. new icao panel... · proposal canso global atm operations conference chris...

15
CANSO 07/03/2014

Upload: ledan

Post on 13-Mar-2019

216 views

Category:

Documents


1 download

TRANSCRIPT

CANSO 07/03/2014

ICAO EXPERT GROUPS

PROPOSAL

CANSO Global ATM Operations Conference

Chris Dalton

Chief, ATM Section, Air Navigation Bureau

CANSO 07/03/2014

ATMR WG

Communications Navigation Surveillance ENABLERS System Wide Information

Management Meteorology

INTEGRATION

ATM Operations Trajectory Based

Operations

Airspace Capacity and Efficiency

Operations

Aerodrome Operations OPERATIONS Flight Operations

FLIREC WG

Flight Operations

SAS WG

RPAS Operations

Ops WG

Design WG

Aerodrome Design & Operations

Freq. Spec. Mgt . WG

Voice Com WG Data Com Infra WG

Op. Data Link WG

Communications

ASTAF

Surveillance Navigation

AIS-AIMSG

System Wide Information

Management

IAVWOPSG

IVATF WAFSOPSG

SADISOPSG

Meteorology

March-12-14 3

WTSG

ATM Operations

Dangerous Goods

Cargo Safety

ANB Proposal

PBN WG

Instrument Flight Procedures

Airworthiness Safety

Management SPECIALTY

AIMSG

Accident Investigation

FRMSTF

ICSG

MPSG NGAP

HPSG

CFCG

CANSO 07/03/2014

Airworthiness Dangerous Goods Safety

Management SPECIALTY

Frequency Spectrum

Management Communications Navigation Surveillance ENABLERS

System Wide Information

Management Meteorology

Air Navigation System Integration

Remotely Piloted Aircraft Systems

Integration INTEGRATION

ATM Operations Trajectory Based

Operations

Airspace Capacity and Efficiency

Operations

Aerodrome Operations OPERATIONS Flight Operations

FLIREC WG

Flight Operations

WTSG

ATM Operations

IFP WG

Trajectory Based Operations

SAS WG

Net. Ops. WG

Airspace Capacity and Efficiency

Operations

Ops WG

Design WG

Aerodrome Design & Operations

Voice Com WG

Data Com Infra WG

Op. Data Link WG

Communications

ASTAF

Surveillance

PBN WG

Navigation

AIS-AIMSG

System Wide Information

Management

IAVWOPSG

IVATF WAFSOPSG

SADISOPSG

Meteorology

March-12-14 4

ANC Proposal FRMSTF

ICSG

MPSG NGAP

HPSG

CFCG

CANSO 07/03/2014

ANB Proposal (Appendix D of AN-WP/8849)

12 March 2014 5

PANEL WORKING GROUP

Aerodrome Design and Operations Panel (ADOP)

• Design Working Group (DESIGN WG) • Operations Working Group (OPS WG)

Accident Investigation Panel (AIP) • Accident Investigation Panel-Accident Investigation Methodology Group (AIMSG)

Airworthiness Panel (AIRP)

Air Traffic Management Operations Panel (ATMOPSP)

• Air Traffic Management Requirements and Performance Working Group (ATMRP WG) • Separation and Assurance Working Group (SAS WG) • Wake Turbulence Study Group (WTSG)

Communications Panel (CP)

• Data Communication Infrastructure Working Group (CDI WG) • Frequency Spectrum Management Working Group (FSM WG) • Operational Data Link Working Group (OPDL WG) • Voice Communication Working Group (VOICECOM WG)

Cargo Safety Panel (CSP) • Dangerous Goods Working Group (DG WG)

Flight Operations Panel (FLTOPSP) • Flight Recorder Working Group (FLIREC WG)

Instrument Flight Procedures Panel (IFPP)

• Performance-based Navigation Working Group (PBN WG)

Meteorology Panel (METP) • International Airways Volcano Watch Operations Group (IAVWOPSG) • Meteorological Aeronautical Requirements & Info. Exchange Project Team (MARIE-PT) • Satellite Distribution System Operations Group (SADISOPSG) • World Area Forecast System Operations Group (WAFOPSG) CANSO

07/03/2014

ANB Proposal (Appendix D of AN-WP/8849)

12 March 2014 6

PANEL WORKING GROUP

Navigation Panel (NP)

Remotely Piloted Aircraft Operations Panel (RPAOP)

Safety Management Panel (SMP)

Surveillance Panel (SP) • Airborne Surveillance Task Force (ASTAF)

System wide Information Management Panel (IMP)

• Aeronautical Information Systems – Aeronautical Information Management Study Group (AIS-AIMSG)

CANSO 07/03/2014

2014

COMMUNICATIONS: STATES

For Affected & New Groups

Specific State Letters

for Panels

COMMUNICATIONS: EXPERTS

P/ANC Letters to Current Panel

Members (Mid March)

General Letter to Panels for Advisers

& Observers (Mid March)

Generic State Letter on Panels

(Mid March)

Proposed Expert Groups Transition Plan

Update of the new

restructured Safety and

Air Navigation

Work Programme

(31 Dec)

DEVELOPMENT

ANC Working Paper on Safety and Air Navigation

work programme (Mar 11)

PREVIOUS ACTIVITIES

Comprehensive briefing on proposed Safety & Air

Navigation work programme to the ANC

(Jan 23)

ANC/ANB Council Safety Informal Briefing

(Jan 20)

For Affected & New Groups

Progressive implementation of new Panel Structure, ToR and

deliverables (Continuing)

Completion of Panel Modernization and Work Programme Restructure

(June 30)

Council Comprehensive briefing on Panel

Modernization and Work Programme Restructure

(May 2)

CANSO 07/03/2014

8

Annex 1 Annex 3 Annex 4 Annex 6 Annex 8 Annex 10 Annex 11 Annex 13 Annex 14 Annex 15 Annex 18 Annex 19

DOC 9284 DOC 9365 DOC 9379 DOC 9481 DOC 9766 DOC 9859 DOC 9992 DOC 9993 DOC 9995 DOC 9997 DOC 9998

Deliverables during the last Triennium (2013)

12 March 2014

CANSO 07/03/2014

March-12-14 DRAFT - FOR DISCUSSION PURPOSE ONLY 9

CANSO 07/03/2014

March-12-14 DRAFT - FOR DISCUSSION PURPOSE ONLY 10

CANSO 07/03/2014

CANSO 07/03/2014

iKit Deliverable Breakdown Example

• ROI-4: Improve safety performance at or in the vicinity of

aerodromes

– iKit 2016: Enhancing Safety at Aerodromes

• ROI-4-2016-8: Reduction of runway excursions through the use of a global

reporting format for effective runway surface condition assessment and

friction reporting – Phase 1

Annex 3: Provisions for accommodating new global reporting format in relation to METAR/SPECI

Annex 6, Part I: Technology for runway safety (on-board equipment) provisions

Annex 8: Aircraft performance SARPs for new global reporting format

Annex 14, Volume I: Harmonization of runway surface condition assessment and reporting

Annex 15: Provisions for promulgating runway surface conditions using new global reporting format

PANS-ATM: Procedures and phraseologies to address transmittal of runway surface conditions

12-Mar-14 12

Training elements

iKIT

07/03/2014

Benefits

• Transparency

• Tool for prioritization

• Plain language

• Clear message in terms of ROI

• Easy for implementation

12-Mar-14 13

CANSO 07/03/2014

CANSO 07/03/2014

07/03/2014 CANSO 07/03/2014