www.jumbomaritime.nl Offshore Wind Farm Installation with a Heavy Lift Vessel on DP

Upload: powerlift-events

Post on 29-Nov-2014

503 views

Category:

Business


2 download

DESCRIPTION

Introduction to projects performed using HLV ships as transport & installation vessels in Offshore Wind Farm projects. Introduction of new design concept of future deep-sea foundations for Offshore Wind Farm projects, installed by HLV ships.

TRANSCRIPT

Page 1: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping

www.jumbomaritime.nl

Offshore Wind Farm Installation with a Heavy Lift Vessel on DP

Page 2: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping

www.jumbomaritime.nl

• Facts & Figures

• Jumbo’s Hardware & Track record

• Offshore Wind Scope for DP2 HLVs

1. Offshore supply (feedering)

2. Installation of Transition Pieces

3. Installation of Pre-piles

4. Installation of Jackets + Tripods

• Software requirements

• Questions & Answers

Content

Page 3: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping

www.jumbomaritime.nl www.jumbomaritime.nl

Facts & Figures

www.jumbomaritime.nl

• Privately owned, independent company

• Founded in 1968

• Personnel: 500 (130 in office)

• Head Office: Schiedam, The Netherlands

Page 4: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping

www.jumbomaritime.nl

Jumbo’s Hardware The excisting fleet

Page 5: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping

www.jumbomaritime.nl www.jumbomaritime.nl

Project : Walney Monopile Transport

Client : DONG Energy

Object : Monopiles up to 805t and 65m long

Transport : Rostock (DE) to Barrow-in-Furness (UK)

Comment : Transport of 8 monopiles per voyage

Track record

www.jumbomaritime.nl

Page 6: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping

www.jumbomaritime.nl

Jumbo’s Hardware DP2 J-1800 class HLVs

Jumbo Javelin & Fairplayer

• DP2

• 2 x 900t mast cranes

• Large box-shaped hold, with multi-level adjustable tween decks (19,800m3)

• Transit speed of max. 17 knots

• Large flush deck (3,100m2)

• Versatile: expandable with project specific tools and systems

Page 7: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping

www.jumbomaritime.nl www.jumbomaritime.nl

Track record

www.jumbomaritime.nl

Project : Greater Gabbard

Client : Fluor Ltd. / GGOWL

Object : 131 Transition Pieces of 280t each

Location : Southern North Sea, UK

Comment : Installation on pre-installed monopiles

Page 8: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping

www.jumbomaritime.nl www.jumbomaritime.nl

Track record

www.jumbomaritime.nl

Project : Anholt

Client : MT Hojgaard / DONG Energy

Object : 111 Transition Pieces of 170t each

Location : Anholt, Denmark

Comment : Installation on pre-installed monopiles

Page 9: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping

www.jumbomaritime.nl

Supporting the offshore wind market with

DP2 heavy lift vessels:

1. Offshore supply (feedering)

2. Installation of Transition Pieces

3. Installation of Pre-piles

4. Installation of Jackets + Tripods

5. Installation of WTGs (not addressed in this presentation)

Jumbo’s Offshore Wind Scope

Page 10: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping

www.jumbomaritime.nl www.jumbomaritime.nl

1. Offshore supply (feedering)

• Optimize installation schedule

• Utilize cargo capacity of a HLV

• Employ economic sailing capacity of a HLV

• Minimize weather delays

Jumbo’s Offshore Wind Scope

www.jumbomaritime.nl

Page 11: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping

www.jumbomaritime.nl www.jumbomaritime.nl

Jumbo’s Offshore Wind Scope

www.jumbomaritime.nl

2. Installation of Transition Pieces

• Optimize installation schedule

• Utilize cargo capacity of a HLV

• Employ economic sailing capacity of a HLV

• Minimize weather delays

Page 12: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping

www.jumbomaritime.nl www.jumbomaritime.nl

3. Installation of Pre-piles:

• Utilize cargo capacity of a HLV

• Efficient sailing and in field shifts

• Robust and precise installation method

Jumbo’s Offshore Wind Scope

www.jumbomaritime.nl

Page 13: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping

www.jumbomaritime.nl

Installation of Pre-piles: Vessel Lay-out

30 Piles 2,5 m. OD

Page 14: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping

www.jumbomaritime.nl

Installation of Pre-piles: Template installation

Page 15: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping

www.jumbomaritime.nl

Installation of Pre-piles: Pile upending

Page 16: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping

www.jumbomaritime.nl

Installation of Pre-piles: Pile stabbing and vibrating

Page 17: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping

www.jumbomaritime.nl

Installation of Pre-piles: Pile driving

Page 18: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping

www.jumbomaritime.nl www.jumbomaritime.nl

4. Installation of Jackets / Tripods:

• Offer complete foundation transport and installation package (incl. pre-piling)

• Utilize cargo capacity of a HLV

• Efficient sailing and in field shifts

Jumbo’s Offshore Wind Scope

www.jumbomaritime.nl

Page 19: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping

www.jumbomaritime.nl

Installation of Jackets / Tripods: Jumbo’s Hardware

Design criteria for the floating installation

vessel concept (XL-1800):

• Economic sailing at a transit high speed

• Feasible to carry multiple fully assembled jackets

• Shallow draught in port

• Fast and robust installation method

• High workability

• DP2 to avoid anchoring and/or jacking up/down

Page 20: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping

www.jumbomaritime.nl

Installation of Jackets / Tripods: Jumbo's “XL-1800” Particulars

• Loa 183.00m (excl. Helideck)

• Boa 43.00m

• D 13.00m

• Deadweight 15,000t @ T = 7.00m

• Accomm. 135 PoB

• Main crane 1,800t @ 26m

• Free deck space 5,980 m2

Page 21: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping

www.jumbomaritime.nl

Installation of Jackets / Tripods: Soil plug removal & pile cleaning

Page 22: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping

www.jumbomaritime.nl

Page 23: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping

www.jumbomaritime.nl

Page 24: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping

www.jumbomaritime.nl

Page 25: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping

www.jumbomaritime.nl

Page 26: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping

www.jumbomaritime.nl

Market Approach

• Maintain high HSE & QA/QC standards in

all disciplines

• Add value to projects with knowhow, equipment and efficiency

• Take full project responsibility for transport and installation

• Strive to contract for T&I scope on LS basis

(to have same project incentive as the Client)

Jumbo’s Software

Page 27: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping

www.jumbomaritime.nl

Knowhow

• In-depth knowledge of offshore lifting operations and heavy lift transport

• In-depth knowledge of offshore surface and subsea installation

• Highly experienced engineering and project management department

• Highly skilled and qualified crew

• Working conform the HSE & QA/QC standards in the offshore O&G industry

Jumbo’s Software

Page 28: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping

www.jumbomaritime.nl

Jumbo’s Software

HSE & QA/QC

Page 29: PowerLogistics Asia 2013- "Using HLV ships in Offshore Wind Farm Project Installation - Present and Future."- Borge Fogh, Jumbo Shipping

www.jumbomaritime.nl

Thank you for your attention Any questions?

Jumbo Shipping (Singapore) Pte. Ltd

Borge Fogh

Regional Manager, South East Asia