Page 1: Porous Pavement – SR 234 Park and Ride Lot

Porous Pavement – SR 234 Park and Ride Lot

Fall Asphalt Conference Richmond, VA

David Shiells, P.E. Virginia Department of Transportation

David Branscome Branscome Paving Company

Michael Fitch, Ph.D. Virginia Center for Transportation Innovation and Research (VCTIR)

October 8, 2013

Page 2: Porous Pavement – SR 234 Park and Ride Lot

2

Pilot Project

Route 234 Park and Ride Lot

Page 3: Porous Pavement – SR 234 Park and Ride Lot

3

Parking Lot Layout

Parking Lot #1

Page 4: Porous Pavement – SR 234 Park and Ride Lot

4

Permeable Pavement Porous Asphalt • Highly permeable asphalt layers • Large reservoir of #2/#3 aggregate • Water infiltrates into soil • Water slowly discharges to storm drainage system

Page 5: Porous Pavement – SR 234 Park and Ride Lot

5

Typical Section

Page 6: Porous Pavement – SR 234 Park and Ride Lot

6

Parking Lot Layout

Page 7: Porous Pavement – SR 234 Park and Ride Lot

7

Pilot Project Objectives

Design Considerations • Soil types/infiltration rates • Depth of aggregate reservoir • Thickness of porous asphalt layers Cost • Right-of-Way • SWM facilities • Construction costs • Life cycle

Page 8: Porous Pavement – SR 234 Park and Ride Lot

8

Pilot Project Objectives

Material Properties • Permeability of mixes • Compaction in the field • Field tests for permeability Constructability • Base aggregate type • Installation of electrical conduit • Concrete curb and planter islands • Sequence of construction • Type/thickness of pavement markings

Page 9: Porous Pavement – SR 234 Park and Ride Lot

9

Pilot Project Objectives

Maintenance • Snow and ice treatment • Removal of sand/salt/leaves, etc. • Special vacuum trucks for cleaning/grit removal • Disposal of debris in a sanitary landfill • Future mill/overlay ?

Page 10: Porous Pavement – SR 234 Park and Ride Lot

10

Permeable Pavement Construction

Subgrade

Page 11: Porous Pavement – SR 234 Park and Ride Lot

Base Aggregate Course

11

Permeable Pavement Construction

Page 12: Porous Pavement – SR 234 Park and Ride Lot

12

Base Aggregate Course

Permeable Pavement Construction

Page 13: Porous Pavement – SR 234 Park and Ride Lot

13

Permeable Pavement Construction

Monitoring Well

Page 14: Porous Pavement – SR 234 Park and Ride Lot

14

PAM-19.0 Placement

Permeable Pavement Construction

Page 15: Porous Pavement – SR 234 Park and Ride Lot

15

PAM-19.0 Placement

Permeable Pavement Construction

Page 16: Porous Pavement – SR 234 Park and Ride Lot

16

PAM-19.0 Placement

Permeable Pavement Construction

Page 17: Porous Pavement – SR 234 Park and Ride Lot

17

PAM-19.0 Placement

Permeable Pavement Construction

Page 18: Porous Pavement – SR 234 Park and Ride Lot

18

PAM-9.5 Placement

Permeable Pavement Construction

Page 19: Porous Pavement – SR 234 Park and Ride Lot

19

PAM-9.5 Placement

Permeable Pavement Construction

Page 20: Porous Pavement – SR 234 Park and Ride Lot

20

PAM-9.5 Placement

Permeable Pavement Construction

Page 21: Porous Pavement – SR 234 Park and Ride Lot

Research Study

Get VDOT-specific information on:

Long-term hydraulic performance

Maintenance requirements (associated costs)

Acceptable rehabilitation methods

Costs (as compared to more traditional stormwater BMPs)

Page 22: Porous Pavement – SR 234 Park and Ride Lot

Methods

Different maintenance treatments: 1. Vacuum Type 1 (6 months) 2. Vacuum Type 2 (6 months) 3. Vacuum Type 1 (12 months) 4. Control * Additional methods if

necessary

Measure permeability over time

Page 23: Porous Pavement – SR 234 Park and Ride Lot

Permeability Measurements Laboratory

Page 24: Porous Pavement – SR 234 Park and Ride Lot

Permeability Measurements Field

Page 25: Porous Pavement – SR 234 Park and Ride Lot

Permeability Measurements Field (Supplemental)

Page 26: Porous Pavement – SR 234 Park and Ride Lot

Permeability Values: Field

0.00

0.05

0.10

0.15

0.20

0.25

0.30

0.35

0.40

0.45

0.50

1 2 3 4 5 6

Perm

eabi

lity

(cm

/sec

)

Location Number

Average: 0.28 cm/sec.

Page 27: Porous Pavement – SR 234 Park and Ride Lot

Permeability Values: Laboratory

0.00

0.05

0.10

0.15

0.20

0.25

0.30

0.35

0.40

0.45

0.50

1 2 3 4 5 6

Perm

eabi

lity

(cm

/sec

)

Core Number

Average: 0.29 cm/sec.

Page 28: Porous Pavement – SR 234 Park and Ride Lot

Changes in Permeability

-

5,000

10,000

15,000

20,000

25,000

30,000

35,000

40,000

45,000

50,000

T2A T0A T2B T3A T1A T1B

Perm

eabi

lity

(10-

5 cm

/sec

)

Location Number

May-13 Jul-13

Page 29: Porous Pavement – SR 234 Park and Ride Lot

Finished Pavement

29

Page 30: Porous Pavement – SR 234 Park and Ride Lot

Questions ?