porous pavement and model municipal operations center demonstration project phase ii

56
1 Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II Photo Document Project County of San Diego DEPARTMENT OF GENERAL SERVICES August 1, 2008 1

Upload: amir-cooper

Post on 31-Dec-2015

40 views

Category:

Documents


2 download

DESCRIPTION

Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II. 1. Photo Document Project County of San Diego DEPARTMENT OF GENERAL SERVICES August 1, 2008. Order of Review. 2. Overview of Phase I Results Treatment Train Site Preparation Construction - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

1

Porous Pavement and Model Municipal Operations Center

Demonstration Project Phase II

Photo Document Project

County of San DiegoDEPARTMENT OF GENERAL

SERVICESAugust 1, 2008

1

Page 2: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

2

Order of Review

• Overview of Phase I Results• Treatment Train

• Site Preparation• Construction• Post Construction

• Porous Pavement• Site Preparation• Construction• Post Construction• Rain Event

• Results to Date

2

Page 3: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

3

Overview of Phase I

3

Page 4: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

4

N

11

M12A

Porous Concrete

14,936 s.f.Porous Asphalt

40,126 s.f.

Pavers

7,896 s.f.

Reference Area.

7

Porous Pavement Center COC 62,958 s.f.

4

Page 5: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

5

Cost Summary – Porous Pavement7

Page 6: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

6

PHASE I PAVEMENT REPLACEMENT SQUARE FOOT COSTS

  Demolition &

Excavation Installation of Sub Base

Pavement Costs

Square Foot Costs*

Annual Est. Square Foot Maintenance

Costs Comments

Porous Asphalt $ 2.75 $ 1.88

$ 1.87

$ 6.50

$ 0.04

18" excavation/backfill. 3" porous asphalt.

Standard Asphalt $ 2.13 $ 1.04

$ 1.32

$ 4.49

$ 0.06

6"-Excavation/Backfill. 6"-Asphalt.

Porous Concrete $ 3.19 $ 1.88

$ 6.34

$ 11.41

$ 0.02

18"-Excavation/Backfill. 5-1/2" pervious concrete.

Standard Concrete $ 1.51

$ -

$ 3.42

$ 4.93

$ 0.01

No new base material. 6"-Reinforced Concrete

Porous Pavers $ 2.75 $ 1.88

$ 9.63

$ 14.26 TBD

18"-Excavation/Backfill. 3"-Paver.

*Square foot cost are based on actual cost received by the County of San Diego.

8

Page 7: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

7

Phase I Treatment Train Schematic

5

Page 8: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

8

Targeted Pollutants of Concern

•Suspended Solids

• Oil/Grease

• Metals (Copper, Zinc, Chromium, Cadmium)

• Organics

• Nitrogen

Note: These are consistent between Phase I and Phase II.

6

Page 9: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

9

Phase II

9

Page 10: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

10Current and Proposed Porous Pavement and Treatment Train Locations

10

Page 11: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

11

Phase II Expansion

• Three additional media filtration units• Three additional porous paving test plots (54,000 sf)

• One additional porous concrete test plot• Two additional porous asphalt test plots• Geogrid stabilization under 1/2 of each new porous asphalt test plot• 26,000 sf of roof runoff diverted to porous asphalt test beds

• Enhanced monitoring to evaluate current/expanded BMP effectiveness

11

Page 12: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

12Phase II Treatment Train Schematic

12

Page 13: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

13

PHASE 2 PAVEMENT

REPLACEMENT SQUARE FOOT

COSTS

18"-30" excavation/backfill. 3" porous asphalt.Porous Asphalt 3.39$ 3.40$ 2.01$ 8.80$ 0.04$

Standard Asphalt 2.13$ 1.04$ 1.32$ 4.49$ 0.06$

Porous Concrete 3.64$ 3.40$ 7.10$ 14.14$ 0.02$

Standard Concrete 1.51$ -$ 3.42$ 4.93$ 0.01$

18"-30" excavation/backfill. 3" porous asphalt.

6"-Excavation/Backfill. 6"-Asphalt.

18"-30" Excavation/Backfill. 5-1/2" pervious concrete.

No new base material. 6"-Reinforced Concrete

PHASE 1 PAVEMENT

REPLACEMENT SQUARE FOOT

COSTS

18"-Excavation/Backfill. 3"-PaverPorous Asphalt 2.75$ 1.88$ 1.87$ 6.50$ 0.02$

Porous Concrete 3.19$ 1.88$ 6.34$ 11.41$ 0.04$

18"-Excavation/Backfill. 3"-Paver

*Square foot cost are based on actual cost received by the County of San Diego.

13

Page 14: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

14

TREATMENT TRAIN

Site Preparation14

Page 15: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

15

TREATMENT TRAIN

Site Preparation and Excavation

15

Page 16: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

16

TREATMENT TRAIN

Excavation Around Phase 1 Treatment Train

16

Page 17: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

17

TREATMENT TRAIN

CONSTRUCTION

17

Page 18: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

18

TREATMENT TRAIN

Installation of MFS and Storm Filter Chambers

20

Page 19: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

19

TREATMENT TRAIN

Installation of MFS and Storm Filter Chambers

21

Page 20: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

20

TREATMENT TRAIN

Installation of Diversion Pipe and Monitoring Boxes

26

Page 21: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

21

TREATMENT TRAIN

Backfilling Treatment Train

28

Page 22: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

22

TREATMENT TRAIN

Maintenance

30

Page 23: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

23

TREATMENT TRAIN

CONSTRUCTION

29

Page 24: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

24

TREATMENT TRAIN

MSF Unit Replacement Filter

31

Page 25: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

25

TREATMENT TRAIN

Filter Replacement of Phase 1 MSF Unit

32

Page 26: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

26

CDS PRE-TREATMENT CLEAN-OUT

After Three Rain Events33

Page 27: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

27

POROUS PAVEMENT

Site Preparation

34

Page 28: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

28

POROUS PAVEMENT

Excavation Engraving

35

Page 29: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

29

POROUS PAVEMENT

CONSTRUCTION

37

Page 30: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

30

POROUS PAVEMENT

Installation of Subsurface Overflow Drainage and Monitoring System

38

Page 31: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

31

POROUS PAVEMENT

CONSTRUCTION

39

Page 32: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

32

POROUS ASPHALT PROFILE 41

Page 33: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

33

POROUS PAVEMENT

Installation of Geotech Style Fabric and Aggregate

44

Page 34: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

34

POROUS PAVEMENT

Installation of Geogrip Re-enforcement

45

Page 35: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

35

POROUS PAVEMENT

Porous Asphalt Overlain Aggregate Bed

52

Page 36: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

36

POROUS PAVEMENT

Installation of Porous Asphalt

50

Page 37: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

37

POROUS ASPHALT PROFILE

46

Page 38: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

38

POROUS PAVEMENT

Installation of Porous Concrete

47

Page 39: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

39

POROUS PAVEMENT

Porous Concert Curing Process

48

Page 40: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

40

POROUS PAVEMENT

POST CONSTRUCTION

54

Page 41: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

41

POROUS PAVEMENT

Asphalt concrete Interface

55

Page 42: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

42

POROUS PAVEMENT

POST-CONSTRUCTION

56

Page 43: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

43

POROUS PAVEMENT

Porous Concrete Infiltration

57

Page 44: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

44

POROUS PAVEMENT

Porous Asphalt Infiltration

58

Page 45: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

45

POROUS PAVEMENT

Rain EventNovember 30, 2007

59

Page 46: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

46

POROUS PAVEMENT

RAIN EVENT (11/30/2007)

60

Page 47: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

47

POROUS PAVEMENT

RAIN EVENT (11/30/2007)

61

Page 48: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

48

POROUS PAVEMENT

RAIN EVENT (11/30/2007)

62

Page 49: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

49

POROUS PAVEMENT

RAIN EVENT (11/30/2007)

63

Page 50: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

50

Results to Date

64

Page 51: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

51

Porous Paving Treatments

• Rainfall and Runoff measured during 11 events during the 2005-2006 wet season.

• Events ranged from 0.23 inches to 1.07 inches during Phase I monitoring.

• All Three Porous Paving Treatments eliminated 100 percent of the runoff and associated contaminants.

65

Page 52: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

52

Infiltration Works!Porous Asphalt

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

Infil

trat

ion

Bas

in W

ater

Lev

el (f

t)

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

Rai

nfal

l Int

ensi

ty (I

nche

s/ho

ur)

Infiltration Basin Water Level

Rainfall Intensity

OVERFLOW LEVEL

66

Page 53: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

53

67

Page 54: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

54

68

Page 55: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

55

MFS Performance (Phase I)

• Perlite used as Media• Initial data based upon only 3 events• Effective at further removal of sediment

• Coarse sediments (>63 µ) to <1.8 mg/L.• Fine sediments (<63 µ) to <14 mg/L

• Effective at further removal of contaminants strongly associated with particulate contaminants• e.g. Total Lead concentrations reduced 27-60

percent

69

Page 56: Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II

56

70