playground project. sloping ground provides drainage problems all slides need replaced (cracked) ...
TRANSCRIPT
playground repairs
Sloping ground provides drainage problems All slides need replaced (cracked) Several gaping holes in play structure Steps in need of repair Hazardous wood chips Not ADA compliant
Any repairs to the current structure would be a band-aid fix. The PTO is looking forward to future-proof the playground to replace current structure that will last for many years to come.
Proposed costs
Structural/Landscape Engineering
Dirt work and playground removal
Playground structures and installation
Creale, Clarke & Siefert Proposal
Topographic survey Prepare preliminary playground layout
with sidewalks, retaining walls and ramps Meet with committee to address concerns Finalize plans with complete design and
details for site grading, site drainage, sidewalks, ramps and large block retaining walls.
$4,200
Wright Construction
Removal of current playground structure (PTO will recycle steel)
Leveling ground/correcting drainage issues
Concrete installation
$180,000**Estimation based on assumption of work
Future Playground
Level ground with appropriate drainage handicap accessible play structure with
slides and play panels Swing replacement with sturdy
undermats (inserted under the pour-n-place surface) to prevent tire mat degradation
Exercise equipment Basketball (nonofficial) equipment
Aggressive pursuit of funding through grants
The PTO has applied for the following grants: Lowe’s (with district assistance) Home Depot Department of Natural Resources KaBoom! Harry and Helena Messick Charitable
Trust 25-30 other granting entities to submit
funding info