peb presentation

32
PROJECT REPORT PROJECT REPORT On On PRE-ENGINEERED PRE-ENGINEERED BUILDINGS BUILDINGS By- DEVWRAT YADAV By- DEVWRAT YADAV

Upload: devwrat-yadav

Post on 13-Aug-2015

197 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: PEB Presentation

PROJECT REPORTPROJECT REPORTOnOn

PRE-ENGINEERED BUILDINGSPRE-ENGINEERED BUILDINGS

By- DEVWRAT YADAVBy- DEVWRAT YADAV

Page 2: PEB Presentation

PRE ENGINEEREDPRE ENGINEEREDSTEEL BUILDINGSSTEEL BUILDINGS

STRENGTH, SPEED STRENGTH, SPEED & SAFETY& SAFETY

Page 3: PEB Presentation

PRE-ENGINEERED BUILDINGSPRE-ENGINEERED BUILDINGS PEBs are Steel Buildings that have been

Fabricated & Manufactured at the factories and shipped at the construction sites, ready for Assembly.

A combination of Built Up Section, Hot Rolled Section, Cold Formed Elements and Profiled Sheets.

Designing and Casting is done in Factory. Building Components are brought to

site. Then fixed/jointed at the site. All Connections are Bolted.

Page 4: PEB Presentation

Self weight- 30% lighter.Self weight- 30% lighter.

Primary Member is Primary Member is tapered section.tapered section.

Secondary members are Secondary members are light weight rolled light weight rolled framed “Z” and “C” framed “Z” and “C” section.section.

Self weight- More heavy.Self weight- More heavy.

Primary members are Primary members are Hot rolled “I” section.Hot rolled “I” section.

Secondary members are Secondary members are “I” or “C” section which “I” or “C” section which are heavy in weight.are heavy in weight.

Page 5: PEB Presentation

Delivery –Average 6 to 8 Delivery –Average 6 to 8 weeks.weeks.

Foundation-Simple Design, Foundation-Simple Design, easy to construct & light easy to construct & light wt.wt.

Erection cost and time- Erection cost and time- accurately known.accurately known.

Erection process is easy, Erection process is easy, fast, step by step.fast, step by step.

Delivery- Average 20 to 26 Delivery- Average 20 to 26 weeks.weeks.

Foundation- Expensive, Foundation- Expensive, heavy foundation required.heavy foundation required.

Erection cost and time- 20% Erection cost and time- 20% more than PEB.more than PEB.

Erection process is slow and Erection process is slow and extensive field labor is extensive field labor is required.required.

Page 6: PEB Presentation

Seismic Resistance- low Seismic Resistance- low weight flexible frames weight flexible frames offer higher resistance to offer higher resistance to seismic forces.seismic forces.

Overall price- 30%lower.Overall price- 30%lower.

Architecture- Achieved at Architecture- Achieved at low cost.low cost.

Seismic Resistance- rigid Seismic Resistance- rigid heavy weight structures do heavy weight structures do not perform well in seismic not perform well in seismic zones.zones.

Overall price - Higher Price Overall price - Higher Price per square meter.per square meter.

Architecture- Achieved at Architecture- Achieved at higher cost.higher cost.

Page 7: PEB Presentation

ADVANTAGESADVANTAGES

Aesthetic AppealAesthetic Appeal Faster CompletionFaster Completion EconomicalEconomical Seismic ResistanceSeismic Resistance Ease of ExpansionEase of Expansion Maintenance FreeMaintenance Free Large Clear SpansLarge Clear Spans Controlled QualityControlled Quality Hassle FreeHassle Free

Page 8: PEB Presentation

APPLICATIONSAPPLICATIONS Industrial BuildingsIndustrial Buildings WarehousesWarehouses Commercial ComplexesCommercial Complexes Institutional BuildingsInstitutional Buildings ShowroomsShowrooms OfficesOffices SchoolsSchools Indoor StadiumsIndoor Stadiums AirCraft HangerAirCraft Hanger Outdoor Stadiums with canopiesOutdoor Stadiums with canopies Gas StationsGas Stations Metro Stations, Bus Terminals, Parking LotsMetro Stations, Bus Terminals, Parking Lots Primary Health Centers, Angan Wadi’sPrimary Health Centers, Angan Wadi’s And many more…And many more…

Page 9: PEB Presentation

CONT….CONT….

Industrial BuildingIndustrial Building

Parking lotsParking lots

Indoor StadiumsIndoor Stadiums

Railway StationRailway Station

Page 10: PEB Presentation

Aircraft HangarsAircraft Hangars Metro StationMetro Station

WareHouseWareHouse High Rise BuildingHigh Rise Building

Page 11: PEB Presentation

FactoriesFactories Trade CentersTrade Centers

Warehouses/ Distribution Warehouses/ Distribution CentersCenters

Sports StadiumsSports Stadiums

Page 12: PEB Presentation

ShipyardsShipyards Animal Feed ShedsAnimal Feed Sheds

Waste Treatment Waste Treatment FactoriesFactories

Processing MillsProcessing Mills

Page 13: PEB Presentation

COMPONENTS of PEBCOMPONENTS of PEB

Main FrameMain Frame Primary MembersPrimary Members

ColumnsColumns RaftersRafters

Secondary MembersSecondary Members PurlinsPurlins GirtsGirts

SheetingSheeting RoofRoof WallWall Fascias etcFascias etc

AccessoriesAccessories VentilatorsVentilators Sky LightsSky Lights Misc.Misc.

Page 14: PEB Presentation
Page 15: PEB Presentation

Building AdditionsBuilding Additions Roof MonitorRoof Monitor

Mezzanine Floor Mezzanine Floor

CanopiesCanopies

Crane Systems Crane Systems

Page 16: PEB Presentation

Roof Monitor Roof Monitor Mezzanine Floor Mezzanine Floor

Canopies Canopies Crane Systems Crane Systems

Page 17: PEB Presentation

Building AccessoriesBuilding Accessories LouversLouvers WindowsWindows Personal Doors Personal Doors Sky Lights and Wall Lights Sky Lights and Wall Lights Ridge Ventilators Ridge Ventilators Turbine Ventilator Turbine Ventilator False Ceiling False Ceiling Partition Walls Partition Walls FlashingsFlashings Gutter & DownpipesGutter & Downpipes

Page 18: PEB Presentation

LouversLouvers

WindowsWindows

Personal Doors Personal Doors

Sky Lights and Wall LightsSky Lights and Wall Lights

Ridge Ventilators Ridge Ventilators

Turbine Ventilator Turbine Ventilator

Page 19: PEB Presentation

False Ceiling False Ceiling

Partition Walls Partition Walls

FlashingsFlashings

Gutter & Downpipes Gutter & Downpipes

Page 20: PEB Presentation

PEB Erection ProceduresPEB Erection Procedures

Preparation for ErectionPreparation for Erection1.1. Pre Erection checksPre Erection checks2.2. Receiving Materials at siteReceiving Materials at site3.3. Unloading ContainersUnloading Containers

Erection of the FramingErection of the Framing1.1. Preparation of the First BayPreparation of the First Bay2.2. Main framesMain frames3.3. Mezzanine floorsMezzanine floors4.4. Crane BeamsCrane Beams

Page 21: PEB Presentation

CONTD….CONTD….

Sheeting & TrimmingSheeting & Trimming1.1. Sheeting preparationSheeting preparation2.2. Sheeting the wallsSheeting the walls3.3. Sheeting the roofsSheeting the roofs4.4. Miscellaneous trimmingsMiscellaneous trimmings5.5. FasciaFascia

Page 22: PEB Presentation

PEB Erection ProceduresPEB Erection Procedures

Page 23: PEB Presentation

Work Done by Me at Different SitesWork Done by Me at Different Sites J-726 SHAHI EXPORTS PVT LTD, FARIDABADJ-726 SHAHI EXPORTS PVT LTD, FARIDABAD J-684 KJS CONCRETE, GHAZIABADJ-684 KJS CONCRETE, GHAZIABAD

J-741 MKG FOODS, GREATER NOIDAJ-741 MKG FOODS, GREATER NOIDA J-716 SURYA CARPETS, GREATER NOIDAJ-716 SURYA CARPETS, GREATER NOIDA J-751 KIWI COMMODITIES, GHAZIABADJ-751 KIWI COMMODITIES, GHAZIABAD J-775 HONDA SIEL POWER PRODUCTS LTD, GREATER NOIDAJ-775 HONDA SIEL POWER PRODUCTS LTD, GREATER NOIDA ROORKEE PLANT VISITROORKEE PLANT VISIT

Page 24: PEB Presentation

J-726 SHAHI EXPORTS PVT LTD, FARIDABADJ-726 SHAHI EXPORTS PVT LTD, FARIDABAD

Page 25: PEB Presentation

J-684 KJS CONCRETE, GHAZIABADJ-684 KJS CONCRETE, GHAZIABAD

Page 26: PEB Presentation

J-741 MKG FOODS, GREATER NOIDAJ-741 MKG FOODS, GREATER NOIDA

Page 27: PEB Presentation

J-716 SURYA CARPETS, GREATER NOIDAJ-716 SURYA CARPETS, GREATER NOIDA

Page 28: PEB Presentation

J-751 KIWI COMMODITIES, GHAZIABADJ-751 KIWI COMMODITIES, GHAZIABAD

Page 29: PEB Presentation

J-775 HONDA SIEL POWER PRODUCTS LTD, GREATER NOIDAJ-775 HONDA SIEL POWER PRODUCTS LTD, GREATER NOIDA

Page 30: PEB Presentation

ROORKEE PLANT VISITROORKEE PLANT VISIT

Page 31: PEB Presentation

Processes At Manufacturing Plant, ROORKEEProcesses At Manufacturing Plant, ROORKEE

PEB

BUILT UP LINE COLD FORM LINE SHEETING

PRIMARY MEMBERS

CKD

C & Z PURLINS LINE

HR SECTIONS &

MISCELLANEOUS PARTS

ROOF & WALL SHEETING

GUTTER, FLASHINGS, TRIMS, ETC

CKD CKD CKD ACCESSORIES

SHIPMENT

Page 32: PEB Presentation