PRE-ENGINEERED BUILDINGSPRE-ENGINEERED BUILDINGS PEBs are Steel Buildings that have been
Fabricated & Manufactured at the factories and shipped at the construction sites, ready for Assembly.
A combination of Built Up Section, Hot Rolled Section, Cold Formed Elements and Profiled Sheets.
Designing and Casting is done in Factory. Building Components are brought to
site. Then fixed/jointed at the site. All Connections are Bolted.
Self weight- 30% lighter.Self weight- 30% lighter.
Primary Member is Primary Member is tapered section.tapered section.
Secondary members are Secondary members are light weight rolled light weight rolled framed “Z” and “C” framed “Z” and “C” section.section.
Self weight- More heavy.Self weight- More heavy.
Primary members are Primary members are Hot rolled “I” section.Hot rolled “I” section.
Secondary members are Secondary members are “I” or “C” section which “I” or “C” section which are heavy in weight.are heavy in weight.
Delivery –Average 6 to 8 Delivery –Average 6 to 8 weeks.weeks.
Foundation-Simple Design, Foundation-Simple Design, easy to construct & light easy to construct & light wt.wt.
Erection cost and time- Erection cost and time- accurately known.accurately known.
Erection process is easy, Erection process is easy, fast, step by step.fast, step by step.
Delivery- Average 20 to 26 Delivery- Average 20 to 26 weeks.weeks.
Foundation- Expensive, Foundation- Expensive, heavy foundation required.heavy foundation required.
Erection cost and time- 20% Erection cost and time- 20% more than PEB.more than PEB.
Erection process is slow and Erection process is slow and extensive field labor is extensive field labor is required.required.
Seismic Resistance- low Seismic Resistance- low weight flexible frames weight flexible frames offer higher resistance to offer higher resistance to seismic forces.seismic forces.
Overall price- 30%lower.Overall price- 30%lower.
Architecture- Achieved at Architecture- Achieved at low cost.low cost.
Seismic Resistance- rigid Seismic Resistance- rigid heavy weight structures do heavy weight structures do not perform well in seismic not perform well in seismic zones.zones.
Overall price - Higher Price Overall price - Higher Price per square meter.per square meter.
Architecture- Achieved at Architecture- Achieved at higher cost.higher cost.
ADVANTAGESADVANTAGES
Aesthetic AppealAesthetic Appeal Faster CompletionFaster Completion EconomicalEconomical Seismic ResistanceSeismic Resistance Ease of ExpansionEase of Expansion Maintenance FreeMaintenance Free Large Clear SpansLarge Clear Spans Controlled QualityControlled Quality Hassle FreeHassle Free
APPLICATIONSAPPLICATIONS Industrial BuildingsIndustrial Buildings WarehousesWarehouses Commercial ComplexesCommercial Complexes Institutional BuildingsInstitutional Buildings ShowroomsShowrooms OfficesOffices SchoolsSchools Indoor StadiumsIndoor Stadiums AirCraft HangerAirCraft Hanger Outdoor Stadiums with canopiesOutdoor Stadiums with canopies Gas StationsGas Stations Metro Stations, Bus Terminals, Parking LotsMetro Stations, Bus Terminals, Parking Lots Primary Health Centers, Angan Wadi’sPrimary Health Centers, Angan Wadi’s And many more…And many more…
CONT….CONT….
Industrial BuildingIndustrial Building
Parking lotsParking lots
Indoor StadiumsIndoor Stadiums
Railway StationRailway Station
Aircraft HangarsAircraft Hangars Metro StationMetro Station
WareHouseWareHouse High Rise BuildingHigh Rise Building
FactoriesFactories Trade CentersTrade Centers
Warehouses/ Distribution Warehouses/ Distribution CentersCenters
Sports StadiumsSports Stadiums
ShipyardsShipyards Animal Feed ShedsAnimal Feed Sheds
Waste Treatment Waste Treatment FactoriesFactories
Processing MillsProcessing Mills
COMPONENTS of PEBCOMPONENTS of PEB
Main FrameMain Frame Primary MembersPrimary Members
ColumnsColumns RaftersRafters
Secondary MembersSecondary Members PurlinsPurlins GirtsGirts
SheetingSheeting RoofRoof WallWall Fascias etcFascias etc
AccessoriesAccessories VentilatorsVentilators Sky LightsSky Lights Misc.Misc.
Building AdditionsBuilding Additions Roof MonitorRoof Monitor
Mezzanine Floor Mezzanine Floor
CanopiesCanopies
Crane Systems Crane Systems
Roof Monitor Roof Monitor Mezzanine Floor Mezzanine Floor
Canopies Canopies Crane Systems Crane Systems
Building AccessoriesBuilding Accessories LouversLouvers WindowsWindows Personal Doors Personal Doors Sky Lights and Wall Lights Sky Lights and Wall Lights Ridge Ventilators Ridge Ventilators Turbine Ventilator Turbine Ventilator False Ceiling False Ceiling Partition Walls Partition Walls FlashingsFlashings Gutter & DownpipesGutter & Downpipes
LouversLouvers
WindowsWindows
Personal Doors Personal Doors
Sky Lights and Wall LightsSky Lights and Wall Lights
Ridge Ventilators Ridge Ventilators
Turbine Ventilator Turbine Ventilator
False Ceiling False Ceiling
Partition Walls Partition Walls
FlashingsFlashings
Gutter & Downpipes Gutter & Downpipes
PEB Erection ProceduresPEB Erection Procedures
Preparation for ErectionPreparation for Erection1.1. Pre Erection checksPre Erection checks2.2. Receiving Materials at siteReceiving Materials at site3.3. Unloading ContainersUnloading Containers
Erection of the FramingErection of the Framing1.1. Preparation of the First BayPreparation of the First Bay2.2. Main framesMain frames3.3. Mezzanine floorsMezzanine floors4.4. Crane BeamsCrane Beams
CONTD….CONTD….
Sheeting & TrimmingSheeting & Trimming1.1. Sheeting preparationSheeting preparation2.2. Sheeting the wallsSheeting the walls3.3. Sheeting the roofsSheeting the roofs4.4. Miscellaneous trimmingsMiscellaneous trimmings5.5. FasciaFascia
PEB Erection ProceduresPEB Erection Procedures
Work Done by Me at Different SitesWork Done by Me at Different Sites J-726 SHAHI EXPORTS PVT LTD, FARIDABADJ-726 SHAHI EXPORTS PVT LTD, FARIDABAD J-684 KJS CONCRETE, GHAZIABADJ-684 KJS CONCRETE, GHAZIABAD
J-741 MKG FOODS, GREATER NOIDAJ-741 MKG FOODS, GREATER NOIDA J-716 SURYA CARPETS, GREATER NOIDAJ-716 SURYA CARPETS, GREATER NOIDA J-751 KIWI COMMODITIES, GHAZIABADJ-751 KIWI COMMODITIES, GHAZIABAD J-775 HONDA SIEL POWER PRODUCTS LTD, GREATER NOIDAJ-775 HONDA SIEL POWER PRODUCTS LTD, GREATER NOIDA ROORKEE PLANT VISITROORKEE PLANT VISIT
J-726 SHAHI EXPORTS PVT LTD, FARIDABADJ-726 SHAHI EXPORTS PVT LTD, FARIDABAD
J-684 KJS CONCRETE, GHAZIABADJ-684 KJS CONCRETE, GHAZIABAD
J-741 MKG FOODS, GREATER NOIDAJ-741 MKG FOODS, GREATER NOIDA
J-716 SURYA CARPETS, GREATER NOIDAJ-716 SURYA CARPETS, GREATER NOIDA
J-751 KIWI COMMODITIES, GHAZIABADJ-751 KIWI COMMODITIES, GHAZIABAD
J-775 HONDA SIEL POWER PRODUCTS LTD, GREATER NOIDAJ-775 HONDA SIEL POWER PRODUCTS LTD, GREATER NOIDA
ROORKEE PLANT VISITROORKEE PLANT VISIT
Processes At Manufacturing Plant, ROORKEEProcesses At Manufacturing Plant, ROORKEE
PEB
BUILT UP LINE COLD FORM LINE SHEETING
PRIMARY MEMBERS
CKD
C & Z PURLINS LINE
HR SECTIONS &
MISCELLANEOUS PARTS
ROOF & WALL SHEETING
GUTTER, FLASHINGS, TRIMS, ETC
CKD CKD CKD ACCESSORIES
SHIPMENT