partnerships and collaboration yield success in watershed adaptive management pilot...

19
Partnerships and Collaboration Yield Success in Watershed Adaptive Management Pilot at NEW Water September 13, 2017 Jeff Smudde NEW Water Watershed Programs Manager

Upload: others

Post on 11-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Partnerships and Collaboration Yield Success in Watershed Adaptive Management Pilot …dairyfieldrep.org/presentations/Silver Creek Pilot... · 2017-09-18 · Silver Creek Pilot Project

Partnerships and Collaboration Yield Success in Watershed Adaptive

Management Pilot at NEW Water

September 13, 2017

Jeff Smudde – NEW Water

Watershed Programs Manager

Page 2: Partnerships and Collaboration Yield Success in Watershed Adaptive Management Pilot …dairyfieldrep.org/presentations/Silver Creek Pilot... · 2017-09-18 · Silver Creek Pilot Project

NEW Water: Green Bay Metropolitan Sewerage District

• Third largest wastewater treatment facility in Wisconsin

• Vision: Protecting our most valuable resource, water.

• 14 years continuous compliance at Green Bay facility.

• WPDES Permit, Issued July 1, 2014• Projected future TP and TSS limits

NEW Water Effluent

Page 3: Partnerships and Collaboration Yield Success in Watershed Adaptive Management Pilot …dairyfieldrep.org/presentations/Silver Creek Pilot... · 2017-09-18 · Silver Creek Pilot Project

Silver Creek Pilot Project

NEW Water

- Watershed Size: 4,800 Acres

- Land Use: 48%Agriculture

- Stream Length: 15 Miles

Page 5: Partnerships and Collaboration Yield Success in Watershed Adaptive Management Pilot …dairyfieldrep.org/presentations/Silver Creek Pilot... · 2017-09-18 · Silver Creek Pilot Project

Silver Creek Pilot Project – From the Beginning

2014 – Project Kickoff• Developed project partners

• Water quality sampling

• Soil sampling

• Stream surveys

2015 – Watershed Inventory• Comprehensive field evaluations

• Arc GIS tablet application

• Conservation planning meetings

• Developed conservation and enhanced nutrient mgmt. plans

Page 6: Partnerships and Collaboration Yield Success in Watershed Adaptive Management Pilot …dairyfieldrep.org/presentations/Silver Creek Pilot... · 2017-09-18 · Silver Creek Pilot Project

Silver Creek Pilot Project – 2016

• Water quality monitoring

• Field planning

• Cost share agreements

• Best Management Practices (BMPs) installation• Filter strips (buffers)• Critical area plantings• Grassed waterways• Cover Crops• Residue Management• Etc.

• Coordination, coordination, coordination….

Page 7: Partnerships and Collaboration Yield Success in Watershed Adaptive Management Pilot …dairyfieldrep.org/presentations/Silver Creek Pilot... · 2017-09-18 · Silver Creek Pilot Project

2016 …. By The Numbers• Water Quality Sampling

• 2016 in-stream samples have shown a decrease in event TP & TSS

• Structural Best Management Practices• 5 Grassed waterways

• 14 Critical area plantings

• 3 Filter strips (buffers)

• 3 WASCOBs

• 1 Manure pit upgrade and another abandonment

• 1 Heavy use area

• 1 Vegetated treatment area

• 97 acres of grazing established

• Operational Best Management Practices• 740 acres of cover crops

• 70% of land covered by either alfalfa, cover crops, winter wheat, forage, or pasture during winter of 2016-2017

• 352 acres contracted for residue management

Page 8: Partnerships and Collaboration Yield Success in Watershed Adaptive Management Pilot …dairyfieldrep.org/presentations/Silver Creek Pilot... · 2017-09-18 · Silver Creek Pilot Project

0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

SL - 172 SL - FLD grab SL - FLD Event SL - COU SL - CKR SL - FCR

Tota

l Ph

osp

ho

rus

(mg/

L)

Sample Sites

Silver Creek Median Total Phosphorus

2014 2015 2016 WQ Std

Downstream

Upstream

Page 9: Partnerships and Collaboration Yield Success in Watershed Adaptive Management Pilot …dairyfieldrep.org/presentations/Silver Creek Pilot... · 2017-09-18 · Silver Creek Pilot Project

0

5

10

15

20

25

30

SL - 172 SL - FLD grab SL - FLD Event SL - COU SL - CKR SL - FCR

Tota

l Su

spe

nd

ed

So

lids

(mg/

L)

Sample Sites

Silver Creek Median Total Suspended Solids

2014 2015 2016 WQ Std

Upstream

Downstream

Page 10: Partnerships and Collaboration Yield Success in Watershed Adaptive Management Pilot …dairyfieldrep.org/presentations/Silver Creek Pilot... · 2017-09-18 · Silver Creek Pilot Project

Stream Sediment and Drain Tile Sampling

Page 11: Partnerships and Collaboration Yield Success in Watershed Adaptive Management Pilot …dairyfieldrep.org/presentations/Silver Creek Pilot... · 2017-09-18 · Silver Creek Pilot Project

Timeline of Grassed Waterway Project

Aug. 16, 2016

Aug 31, 2016

Page 12: Partnerships and Collaboration Yield Success in Watershed Adaptive Management Pilot …dairyfieldrep.org/presentations/Silver Creek Pilot... · 2017-09-18 · Silver Creek Pilot Project

Timeline of Grassed Waterway Project

Oct. 4, 2016

Nov. 29, 2016

Page 13: Partnerships and Collaboration Yield Success in Watershed Adaptive Management Pilot …dairyfieldrep.org/presentations/Silver Creek Pilot... · 2017-09-18 · Silver Creek Pilot Project

Grazing Establishment and Monitoring

Page 14: Partnerships and Collaboration Yield Success in Watershed Adaptive Management Pilot …dairyfieldrep.org/presentations/Silver Creek Pilot... · 2017-09-18 · Silver Creek Pilot Project

Cover Crops

Page 15: Partnerships and Collaboration Yield Success in Watershed Adaptive Management Pilot …dairyfieldrep.org/presentations/Silver Creek Pilot... · 2017-09-18 · Silver Creek Pilot Project

Equipment Demonstrations

Low Disturbance Manure Injector

Cover Crop Interseeder

Page 16: Partnerships and Collaboration Yield Success in Watershed Adaptive Management Pilot …dairyfieldrep.org/presentations/Silver Creek Pilot... · 2017-09-18 · Silver Creek Pilot Project

Reflecting on the Past Supports the Future

• One page

• Share lessons learned and challenges with other growers

• Ideas for other Reflections sheets• Manure injector

• Use of Interseeder

• Cover crops

• Critical area planting

• Improved Drainage and Buffer Installation

• Conservation and Enhanced Nutrient Management Plans

Page 17: Partnerships and Collaboration Yield Success in Watershed Adaptive Management Pilot …dairyfieldrep.org/presentations/Silver Creek Pilot... · 2017-09-18 · Silver Creek Pilot Project

Work in Progress in 2017

• Updated conservation plans

• Meetings with growers

• Continue installation of BMPs

• Wetland restoration

• Continue water quality monitoring

• Assess results for DNR –Preliminary Compliance Alternatives Plan – Due March 2018

Page 18: Partnerships and Collaboration Yield Success in Watershed Adaptive Management Pilot …dairyfieldrep.org/presentations/Silver Creek Pilot... · 2017-09-18 · Silver Creek Pilot Project

Observations from the Pilot Provides Insight into Full Scale

• Every field has an opportunity for improvement.

• Grower trust is critical, but can vary.

• It takes time to establish good working relationships with landowners and growers.

• Agronomists are a critical asset in opening lines of communication with landowners and growers.

• Diverse field teams yield new perspectives for conservation opportunities.

• Simple conservation plans with maps are needed for successful implementation.

• Success of the pilot project to date is due to the participation by landowners, growers, the Oneida Tribe, and project partners.

Page 19: Partnerships and Collaboration Yield Success in Watershed Adaptive Management Pilot …dairyfieldrep.org/presentations/Silver Creek Pilot... · 2017-09-18 · Silver Creek Pilot Project

Questions?

Jeff Smudde, NEW WaterWatershed Programs Manager

T: (920) 438-1071

E: [email protected]