Tendering phaseThe NZ Transport Agency is using a competitive alliance model to select the contractor to undertake the construction of the Hamilton section.Two consortia have been selected to bid for the work via a shortlisting process. The two consortia are currently engaged in an interactive tendering phase with the Transport Agency and its expert advisors. During this phase the consortia develop and cost their concept designs for the expressway. Although their concept designs may differ from the specimen design already prepared, they must be consistent with the designation and resource consent conditions and meet the high alignment, safety and environmental standards the Transport Agency requires for new sections of expressway.The selection of the preferred tenderer is based on a combination of the tender price and the quality of their
team, their construction methodology and their concept design. Once the contract is formally awarded the successful consortium forms an alliance with the Transport Agency to undertake the detailed design and construction work. This contract model is similar to that used for the construction of the Te Rapa section of the expressway, but different to the design and construct model used for the construction of the Ngaruawahia and Cambridge sections. A key advantage of the alliance model is that it allows more flexibility to amend design details as the works progress. The Transport Agency and the consortium then share any cost over-runs, or savings that result from the amendments.
Project updateHamilton SectionPART OF THE WAIKATO EXPRESSWAY
Horsham Downs open dayAn open day was held at the Horsham Downs Community Hall on 23 April 2015 to present the proposed connections of Resolution Drive and Horsham Downs Road to the Hamilton section of the Waikato Expressway, and the subsequent changes to the wider road network. The open day was well attended by the wider community and 74 written feedback responses were received, which the Transport Agency is currently reviewing. The Transport Agency will request that the designation process for the proposed changes be publicly notified, which means anyone can make a submission on the proposal. The relevant public notifications will be made through the council websites and in public notices. A hearing will occur in early 2016 where submitters can speak in support of their submission. The Transport Agency would like to thank the community for their attendance at the open day and for the feedback provided.
Horsham Downs open day.
June 2015
2 | Waikato Expressway Hamilton section | Project update | June 2015
The archaeologists are being assisted on-site by representatives from local iwi to investigate and record the history of this site.Iwi from Ngati Wairere, Ngati Hauaa and kaumatua and kuia from Turangawaewae and Taupiri Marae held a karakia (blessing) on 11 May to recognise the start of archaeological works on the Hamilton section.The karakia was held at the outset of the works to ask for an uncomplicated excavation for the team and to ask for the area, the team and anyone going on site to be protected and kept safe while the works are underway and into the future.
The blessing concluded with a Paimarire, a prayer recital performed by Tainui people, and kai (food) was shared with all attendees. The site at Horotiu is one of up to four known sites the team will be investigating along the 21.8km section. The project team attempts to minimise the expressway’s footprint on areas of archaeological interest, but in some cases this is unavoidable. The Transport Agency undertakes this work at the outset of the project to ensure anything of cultural or historical value is investigated and recorded. Any artefacts discovered that are of significance to local iwi will be returned to them and recorded for historical purposes.
The Hamilton section of the Waikato Expressway has reached another significant milestone. Following a public hearing in December 2014, the Transport Agency obtained an alteration to their designation for the Hamilton section to construct an interchange at Ruakura that will provide a direct link to the inland port development and surrounding road network. No appeals were received following the decision and the Transport Agency has also obtained the necessary resource consents from the Waikato Regional Council. The Ruakura Interchange will be constructed as part of the overall works for the Hamilton section. The designation alteration and resource consents are subject to a number of conditions that the Transport Agency must comply with. The conditions are comprehensive and provide the standards which the detailed design of the project must adhere to.
Archaeological investigations have started on the Hamilton section near Horotiu with Opus archaeologists leading the on-site investigations in accordance with the archaeological authority obtained from Heritage New Zealand.
Karakia for the Archaeological Investigations
RUAKURA INTERCHANGE
Karakia held on 11 May 2015 near Horotiu.
TRISTRAM ST
LAKE RD
OSB
ORN
E RD
KAY RD
HORSHAM DOWNS RD
GO
RDO
NTO
N RD
PUKETAHA RD
GREENHILL RD
PERCIVAL RD
RUAKURA RD
GA
LLOW
AY STW
AIRERE D
R
BOUNDARY RD
TRAM
WAY RD
WA
IRERE DR
FIFTH AVE
HOLLAND RD
TELEPHONE RD
WAIRERE DR
RIVER RD
RESOLU
TION
DR
TE RAPA
RD
POWELLS RD
MATANGI RD
MILL ST
HUKANUI RD
N.I.M
.T.R
E.C.M.T.R
GOORRNBROEDV TIODNG ERD
0km 2km 4km
NOTEOverbridges carry traffic over the ExpresswayUnderbridges carry traffic under the Expressway
HAMILTON NORTHERN INTERCHANGE
WAIKATO EXPRESSWAY
HAMILTONSOUTHERN
INTERCHANGE
EXISTINGTAMAHERE
INTERCHANGE
HORSHAM DOWNS RD OVERBRIDGE
GORDONTON RD OVERBRIDGE
PUKETAHA RD UNDERBRIDGE
KAY RD OVERBRIDGE
MANGAONESTREAM BRIDGE
EAST WESTLINK
TE RAPA SECTION
MATANGI RDOVERBRIDGE
RUAKURA INTERCHANGE
Ruakura Rd over or under the Waikato
Expressway
ECMT BRIDGE
SUBJECT TO OBTAINING RMA APPROVAL
EXISTING STATE HIGHWAYS
NEW ROADS (HAMILTON SECTION)
PROPOSED BRIDGE
RAILWAY
RING ROAD
EXISTING ROADS
ROAD TO BE CLOSED
POTENTIAL FUTURE DEVELOPMENT (RUAKURA STRUCTURE PLAN)
RESOLUTION DR INTERCHANGE
NGARUAWAHIA SECTION
BORMAN RD
SH26 OVERBRIDGE
MANGAONUASTREAM BRIDGE
Waikato Expressway | 3Hamilton section | Project update | June 2015
Hamilton Section
TRISTRAM ST
OSB
ORN
E RD
KAY RD
HORSHAM DOWNS RD
GO
RDO
NTO
N RD
PUKETAHA RD
GREENHILL RD
PERCIVAL RD
RUAKURA RD
RUAKURA RD
GA
LLOW
AY STW
AIRERE D
R
BOUNDARY RD
TRAM
WAY RD
WA
IRERE DR
FIFTH AVE
HOLLAND RD
TELEPHONE RD
WAIRERE DR
RIVER RD
RESOLU
TION
DR
TE RAPA
RDPOWELLS RD
MATANGI RD
MILL ST
HUKANUI RD
N.I.M
.T.R
E.C.M.T.R
GOOR RNBROEDV TIODNG ERD
0km 2km 4km
NOTEOverbridges carry traffic over the Expressway
HAMILTON NORTHERN INTERCHANGE
GREENHILLINTERCHANGE
HAMILTONSOUTHERN
INTERCHANGE
EXISTINGTAMAHERE
INTERCHANGE
HORSHAM DOWNS RD OVERBRIDGE
GORDONTON RD OVERBRIDGE
PUKETAHA RD BRIDGE
KAY RD OVERBRIDGE
MANGAONUASTREAM BRIDGE
MANGAONESTREAM BRIDGE
EAST WESTLINK
TE RAPA SECTION
MATANGI RDOVERBRIDGE
RUAKURA INTERCHANGE
ECMT BRIDGE
SH26 OVERBRIDGE
SUBJECT TO OBTAINING RMA APPROVAL
EXISTING STATE HIGHWAYS
NEW ROADS (HAMILTON SECTION)
PROPOSED BRIDGE
RAILWAY
RING ROAD
EXISTING ROADS
ROAD TO BE CLOSED
POTENTIAL FUTURE DEVELOPMENT (RUAKURA STRUCTURE PLAN)
RESOLUTION DR INTERCHANGE
SH26 ROUNDABOUT
NGARUAWAHIA SECTION
BORMAN RD
4 | Waikato Expressway Hamilton section | Project update | June 2015
Expressway overviewThe Hamilton section is part of the larger Waikato Expressway programme of work. The Waikato Expressway is one of seven Roads of National Significance for New Zealand.
Sections update• Longswamp - Construction 2016-
2018• Rangiriri - Under construction,
opens late 2016 or 2017• Huntly - Construction 2015-2019• Ngaruawahia - Opened December
2013• Te Rapa - Opened December 2012• Hamilton - Construction 2016-2020• Cambridge - Under construction
opens 2016.
Thames
Pukekohe
Tuakau
Meremere
Te Kauwhata
Rangiriri
Huntly
Taupiri
Ngaruawahia Morrinsville
Hamilton
Cambridge
Ohaupo
Pirongia
Raglan
Te Awamutu
WAIKATO RIVER
POKENO11.6km
HUNTLY15.2km
NGARUAWAHIA12.3km
HAMILTON21.8km
CAMBRIDGE16km
MERCER11.0km
OHINEWAI7.0km
TE RAPA7.3km
LONGSWAMP5.9km
RANGIRIRI4.8km
1
2
2
27
26
23
39
3
1
25
22
25
Hamilton urban area
Completed sectionsTerritorial authority boundary Existing state highwayOther roads
1B
TAMAHERE INTERCHANGE2.4km
Opened December 2013
Construction 2015-2019
Construction 2016-2020
Under construction Opens early 2016
Opened December 2012
Under construction Opens late 2016 or 2017
Construction 2016-2018
14-009 timeline
WHAT’S HAPPENING NEXT?The current programme for the development and implementation of the Hamilton section is as follows:• June 2015: Notice of
Requirement submitted for the SH26/Ruakura Rd Roundabout
• July 2015: Consortia tender proposals due for the construction of the Hamilton section
• October 2015: Construction contract awarded
• Late 2015: Notice of
Requirement submitted for Resolution Drive connection to the Expressway and Horsham Downs Link
• October 2015 – March 2016: Preparation of detailed design and various management plans required as part of the designation and consent conditions, and to enable works to commence.
• Full construction due to commence late 2016, with completion targeted for 2020.
STATE HIGHWAY 26/RUAKURA ROAD ROUNDABOUTThe Transport Agency is currently preparing a Notice of Requirement for a proposed roundabout at the intersection of State Highway 26, Ruakura and Lissette roads. The intersection has been the site of two fatalities and a number of crashes. Installing a roundabout will significantly improve safety at this intersection. Whilst the proposed roundabout is a separate project to the expressway, it is anticipated that its construction will take place as part of the Hamilton section. The Notice of Requirement will be lodged in June 2015 and the Transport Agency will request that the designation process be publicly notified, which means
anyone can make a submission on the proposal and speak in support of their submission at a hearing.
TRISTRAM ST
LAKE RD
OSB
ORN
E RD
KAY RD
HORSHAM DOWNS RD
GO
RDO
NTO
N RD
PUKETAHA RD
GREENHILL RD
RUAKURA RD
RUAKURA RD
GA
LLOW
AY STW
AIRERE D
R
BOUNDARY RD
TRAM
WAY RD
WA
IRERE DR
FIFTH AVE
HOLLAND RDTELEPHONE RD
WAIRERE DR
RIVER RD
RESOLU
TION
DR
TE RAPA
RD
POWELLS RD
MATANGI RD
MILL ST
HUKANUI RD
N.I.M
.T.R
E.C.M.T.R
GOOR RNBROEDV TIODNG ERD
0km 2km 4km
NOTEOverbridges carry traffic over the ExpresswayUnderbridges carry traffic under the Expressway
HAMILTON NORTHERN INTERCHANGE
WAIKATO EXPRESSWAY
GREENHILLINTERCHANGE
HAMILTONSOUTHERN
INTERCHANGE
EXISTINGTAMAHERE
INTERCHANGE
HORSHAM DOWNS RD OVERBRIDGE
GORDONTON RD OVERBRIDGE
PUKETAHA RD UNDERBRIDGE
KAY RD OVERBRIDGE
MANGAONUASTREAM BRIDGE
MANGAONESTREAM BRIDGE
EAST WESTLINK
TE RAPA SECTION
MATANGI RDOVERBRIDGE
RUAKURA INTERCHANGE
SUBJECT TO OBTAINING RMA APPROVAL
EXISTING STATE HIGHWAYS
NEW ROADS (HAMILTON SECTION)
PROPOSED BRIDGE
RAILWAY
RING ROAD
EXISTING ROADS
ROAD TO BE CLOSED
POTENTIAL FUTURE DEVELOPMENT (RUAKURA STRUCTURE PLAN)
RESOLUTION DR INTERCHANGE
SH26 ROUNDABOUT
NGARUAWAHIA SECTION
BORMAN RD
Follow us on facebookwww.facebook.com/waikatoexpressway
www.nzta.govt.nz/Hamilton
NICOLA MARTIN Communications and Stakeholder Liaison NZ Transport Agency Telephone: 07 958 7260 Mobile: 027 292 8076 Email: [email protected]
OUR CONTACT DETAILS
This document is printed on environmentally-responsible paper manufactured using FSC-certified, mixed-source pulp harvested from sustainable well-managed forests and bleached using an elemental chlorine-free process.
DANA MCDONALD Hamilton Section Relationship Manager NZ Transport Agency Telephone: 079587246 Mobile: 0274738769 Email: [email protected]