padsite inspection summary report

53
5100 THOMPSON TERRACE, COLLEYVILLE TEXAS 76034 | F 682.223.1593 | P 682.223.1322 © 2021 MODERN GEOSCIENCES. ALL RIGHTS RESERVED. WWW.MODERNGEOSCIENCES.COM DATE February 2021 PROJECT 20002 PADSITE INSPECTION SUMMARY REPORT CALENDAR YEAR 2020 PREPARED FOR City of Denton 215 East McKinney Street Denton, Texas 76201 PREPARED BY ______________________________________________ Zachary Tondre, MS, GIT PROJECT MANAGER REVIEWED BY ______________________________________________ Kenneth S. Tramm, PhD, PG, CHMM SENIOR PROGRAM MANAGER

Upload: others

Post on 05-Apr-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

5100 THOMPSON TERRACE, COLLEYVILLE TEXAS 76034 | F 682.223.1593 | P 682.223.1322 

© 2021 MODERN GEOSCIENCES. ALL RIGHTS RESERVED.  

WWW.MODERNGEOSCIENCES.COM 

DATE 

February 2021 

PROJECT 

20002 

PADSITE INSPECTION  

SUMMARY REPORT 

CALENDAR YEAR 2020

PREPARED FOR 

City of Denton 

215 East McKinney Street 

Denton, Texas 76201 

PREPARED BY 

 ______________________________________________   

Zachary Tondre, MS, GIT 

PROJECT MANAGER 

REVIEWED BY 

______________________________________________  

Kenneth S. Tramm, PhD, PG, CHMM 

SENIOR PROGRAM MANAGER 

PROJECT 20002 | FEBRUARY 2021 | PAGE 2 

WWW.MODERNGEOSCIENCES.COM 

TABLE OF CONTENTS   

1.  INTRODUCTION ......................................................................................................................................... 5 

1.1.  Project Background ................................................................................................................................. 5 

1.2.  Program Design ....................................................................................................................................... 5 

2.  INSPECTION APPROACH ............................................................................................................................. 7 

2.1.  Ordinance and City Inspection Items ...................................................................................................... 7 

2.2.  Near‐Equipment Inspection .................................................................................................................... 7 

2.3.  Fencline Monitoring ................................................................................................................................ 9 

2.4.  Contingency Sampling ........................................................................................................................... 10 

2.5.  Pre and Post‐Inspection Activities ........................................................................................................ 12 

3.  INFRASTRUCTURE SUMMARY ...................................................................................................................13 

3.1.  City of Denton Padsites (Total in City Limits) ........................................................................................ 13 

3.2.  First Half 2020 (High, Moderate, and Selected Low Priority) ............................................................... 14 

3.3.  Second Half 2020 (High Prioirty) ........................................................................................................... 15 

4.  INSPECTION RESULTS ................................................................................................................................17 

4.1.  Identified Action Items ......................................................................................................................... 18 

4.1.1.  First Half 2020 ....................................................................................................................................... 18 

4.1.2.  Second Half 2020 .................................................................................................................................. 19 

4.2.  Addressed Action Items ........................................................................................................................ 21 

4.2.1.  First Half 2020 ....................................................................................................................................... 21 

4.2.2.  Second Half 2020 .................................................................................................................................. 22 

4.3.  Outstanding Action Items ..................................................................................................................... 24 

4.3.1.  First Half 2020 ....................................................................................................................................... 24 

4.3.2.  Second Half 2020 .................................................................................................................................. 25 

5.  ACTION ITEM RESULTS (DETAIL) ................................................................................................................27 

5.1.  Leaks (Methane) ................................................................................................................................... 27 

5.1.1.  First Half 2020 ....................................................................................................................................... 27 

5.1.2.  Second Half 2020 .................................................................................................................................. 28 

5.2.  NORM .................................................................................................................................................... 30 

5.2.1.  Total NORM Exceedances ..................................................................................................................... 30 

5.2.1.1. First Half 2020 ....................................................................................................................................... 30 

PROJECT 20002 | FEBRUARY 2021 | PAGE 3 

WWW.MODERNGEOSCIENCES.COM 

5.2.1.2. Second Half 2020 .................................................................................................................................. 31 

5.2.2.  Unlabeled NORM Exceedances ............................................................................................................. 32 

5.2.2.1. First Half 2020 ....................................................................................................................................... 32 

5.2.2.2. Second Half 2020 .................................................................................................................................. 33 

5.3.  Fenceline Monitoring ............................................................................................................................ 34 

5.3.1.  First Half 2020 ....................................................................................................................................... 34 

5.3.2.  Second Half 2020 .................................................................................................................................. 34 

5.4.  Compliance Monitoring ........................................................................................................................ 35 

5.4.1.  First Half 2020 ....................................................................................................................................... 35 

5.4.2.  Second Half 2020 .................................................................................................................................. 35 

6.  INSPECTION RESULTS (COMPREHENSIVE COMPARATIVE ANALYSIS) ..........................................................37 

6.1.  Leaks per Well (All Data) ....................................................................................................................... 37 

6.2.  NORM per Well (All Data) ..................................................................................................................... 38 

6.2.1.  Total NORM per Well ............................................................................................................................ 38 

6.2.2.  Unlabeled NORM per Well .................................................................................................................... 38 

6.3.  Action Items per Well (All Data) ........................................................................................................... 39 

6.3.1.  Identified Action Items per Well ........................................................................................................... 39 

6.3.2.  Addressed Action Items per Well ......................................................................................................... 39 

6.3.3.  Outstanding Action Items per Well....................................................................................................... 40 

7.  YEAR TO YEAR TRENDING .........................................................................................................................41 

7.1.  Identified Action Items Per Well ........................................................................................................... 41 

7.2.  Leaks per Well ....................................................................................................................................... 42 

7.1.  Unlabeled NORM per Well .................................................................................................................... 43 

8.  CONCLUSIONS AND RECOMMENDATIONS ................................................................................................44 

8.1.  Near‐Equipment Inspection .................................................................................................................. 44 

8.2.  Fenceline Monitoring ............................................................................................................................ 44 

8.3.  Outstanding Action Items ..................................................................................................................... 44 

8.4.  Operator Performance .......................................................................................................................... 46 

8.5.  Program Updates .................................................................................................................................. 46 

9.  IMPORTANT ACRONYMS...........................................................................................................................48 

10.  LIMITATIONS AND EXCEPTIONS ................................................................................................................50 

PROJECT 20002 | FEBRUARY 2021 | PAGE 4 

WWW.MODERNGEOSCIENCES.COM 

 

TABLES 

TABLE 1:  PROGRAM DESIGN 

TABLE 2:  NEAR‐EQUIPMENT CRITERIA 

TABLE 3:  FENCELINE CRITERIA 

TABLE 4:  PADSITE DATA SUMMARY 

TABLE 5:  FIRST HALF OF 2020 PADSITE DATA SUMMARY 

TABLE 6:  FIRST HALF 2020 – OUTSTANDING ACTION ITEM SUMMARY 

TABLE 7: SECOND HALF 2020 – OUTSTANDING ACTION ITEM SUMMARY 

 

FIGURES 

FIGURE 1:  PADSITE LOCATION MAP 

FIGURE 2:  PADSITE INSPECTION SUMMARY MAP 

 

 

PROJECT 20002 | FEBRUARY 2021 | PAGE 5 

WWW.MODERNGEOSCIENCES.COM 

1. INTRODUCTION 

Modern Geosciences (Modern)  is pleased to provide this report as a summary of our  inspection results for the 

City of Denton (City) concerning gas well padsites within the city limits during 2020.   

 

1.1. PROJECT BACKGROUND Modern’s staff has been providing technical support and inspection services to municipalities addressing urban 

oil and gas concerns for over a decade. As part of these efforts, our staff has contributed to numerous ordinance 

revisions,  gas  drilling  task  forces,  technical  presentations  and  papers,  performed  continuous  air monitoring 

events,  inspected thousands of wells across Texas, and aided  in the  identification of hazardous site conditions 

that would have otherwise been left unaddressed. 

 

As  part  of  the  City’s  desire  to  enhance  its  inspection  efforts, Modern was  asked  to  provide  programmatic 

support in 2018 that would ensure enough high‐resolution data was available to the community, operators, and 

city staff for prioritization of any repairs or corrective action needed.   

1.2.  PROGRAM DESIGN 

Our inspection program was tailored to meet the City’s project goals of: 

 

Maintaining  a  comprehensive  GIS‐based  tracking  program  for  each  padsite  inclusive  of  existing 

infrastructure (e.g., wells, separators, compressors); 

Identifying  leaks  associated with  each  padsite  in  a manner  that  can  be  tracked  and  communicated 

efficiently; 

Identifying non‐compliance concerns associated with each padsite (e.g., corrosion issues, spills/releases, 

unmarked equipment with excessive radiation); 

Collection of air monitoring data at padsite fencelines when near sensitive receptors; 

Contingency  sampling  when  fenceline  data  suggested  significant  environmental  impact  may  affect 

neighboring areas; and 

A succinct reporting format that provides a clear summary of our findings, highlights outstanding action 

items, and allowed integration with the City’s online access to the reports. 

 

To ensure the padsites were adequately evaluated, the City prioritized  inspections as  low, moderate, and high 

based on proximity to sensitive receptors (e.g., schools, residential areas). Padsite inspection efforts include the 

performance  of  a  compliance  evaluation  (e.g.,  signage,  equipment  maintenance,  fire  department  access, 

landscaping,  safety  requirements) with  additional  leak  detection  efforts  to  better  identify  and  communicate 

potential leaks and/or fugitive emission concerns. A summary of the program design is provided below in Table 

1. 

 

 

 

PROJECT 20002 | FEBRUARY 2021 | PAGE 6 

WWW.MODERNGEOSCIENCES.COM 

TABLE 1 – PROGRAM DESIGN 

Inspection Item  High  Mod.  Low  Comment 

Inspection Schedule 

Twice each year  x      <300’ from sensitive receptor 

Once every year    x    >300’; <1,000’ from sensitive receptor 

Once every 2 years      x  >1,000’ from sensitive receptor 

Compliance Inspection 

Multiple item checklist  x  x  x  Verify existing ordinance requirements are being met 

Near‐Equipment Inspection 

Leak evaluation  x  x  x  Use of Optical Gas Imaging (OGI) per Quad Oa Methodology 

Naturally Occurring Radioactive Material 

(NORM) evaluation and signage x  x  x 

Radiation Meter (uR/hr ‐ RRC req.); Exceedances noted per RRC 

Guidance 

Fenceline Inspection 

Meteorological data  x  x    Wind Direction, Speed, Barometric Pressure 

Total Volatile Organic Compounds (tVOCs)  x  x    Use of PID (ppbv resolution) 

Radiation  x  x    Use of Radiation Meter (uR/hr resolution ‐ RRC req.) 

Hydrogen Sulfide (H2S)  x  x    Use of H2S Meter (ppbv resolution ‐ CAA req.) 

Methane   x  x    Use of DP‐IR Meter (ppmv resolution) 

Particulate matter (PM)  x      PM2.5 & PM10 (ug/m3 resolution; ~10‐minute dataset) 

Noise  x      Use of Class 1 Microphone with 3 Octave Band (Leq dBA) 

Contingency Sampling/ Monitoring Support (*as needed) 

Real‐time continuous air monitoring   *  *  *  Includes Methane, H2S, Met Data, tVOCs, PM, Ozone 

H2S (30‐minute sample)  *  *  *  Discrete samples per ASTM to confirm CAA exceedance 

Discrete VOC sampling (50+ compounds)  *  *  *  Discrete samples per EPA TO‐17M to determine VOC of interest 

 

 

 

 

PROJECT 20002 | FEBRUARY 2021 | PAGE 7 

WWW.MODERNGEOSCIENCES.COM 

2. INSPECTION APPROACH 

2.1. ORDINANCE AND CITY INSPECTION ITEMS 

Prior  to project  initiation, Modern performs  a  review of  current ordinance  and  city  inspection  requirements 

(e.g.,  signage,  equipment  maintenance,  fire  department  access,  landscaping,  safety  requirements)  to  be 

included in each inspection effort in the form of a city‐approved checklist.  

 

2.2. NEAR‐EQUIPMENT INSPECTION 

During each  inspection, Modern performed an Audio, Visual, and Olfactory  (AVO)  field  inspection, as well as 

recording monitoring  results with  the use of optical gas  imaging systems  (e.g., FLIR cameras)  to  identify  leaks 

and  radiation meters  to confirm conditions at accessible equipment. During oil and gas production, scale can 

collect within  equipment  and  concentrate until  radiation  levels  exceed  applicable  regulatory  criteria.    This  is 

generally referred to as Technologically‐Enhanced Naturally Occurring Radioactive Material (NORM). 

 

A  goal  of  near‐equipment  inspection  activities  is  to  evaluate  the  operational  condition  of well  heads, well 

connections, flanges, valves, pumps, well head fluids (i.e., corrosion inhibitors), production piping, visible system 

pressure  gauges,  separator  systems,  secondary  containment  integrity,  above‐ground  storage  tanks  (i.e.,  thief 

hatch,  ventilation),  fluid  disposal  transfer points,  compressor  systems,  chemical  storage  areas,  and note  any 

obvious signs of staining, spills, or releases. 

 

View of OGI efforts during a padsite  inspection event. 

  Example of  leaking pressure  control  valve  (e.g., Enardo) from a tank battery system.     

PROJECT 20002 | FEBRUARY 2021 | PAGE 8 

WWW.MODERNGEOSCIENCES.COM 

Example of discrete NORM evaluation.    Example of  tagged equipment  in need of  repair 

or replacement.   

 

Our leak definitions are set at either positive visual observation with the OGI equipment, or if applicable, direct 

measurement for quantification.  A summary of near‐equipment criteria is provided below. 

 

 

 

 

 

 Notes: 

1‐ Utilizes  the  Interstate Natural Gas Association of America  (INGAA)  recommended  leak definition within  their December 4, 2015 response  to  EPA Docket No.  EPA‐HQ‐OAR‐2010‐0505  –  “Oil  and Natural Gas  Sector:  Emission  Standards  for New  and Modified Sources,” dated September 18, 2015 (80 FR 56593).  Also represents 20% of the Lower Explosive Limit.  A lower leak definition and additional  inspection and reporting may be required at  facilities subject to 40 CFR §60 Subpart OOOOa.   Documented continuous low‐bleed components (<6 scf/hr) and intermittent emissions from properly functioning pneumatic devices are not considered leaks for the purposes of this inspection. 

 

2‐ The  Texas  Railroad  Commission  (RRC)  regulates NORM  under  16  TAC  §4  (Environmental  Protection,  Subchapter  F, Oil  and Gas NORM). Subchapter F establishes the requirements for oil and gas NORM waste disposal for the purpose of protecting public health and  the  environment. NORM‐contaminated  equipment  is  defined  in  Subchapter  F  as  “equipment  that,  at  any  accessible  point, exhibits a minimum  radiation exposure  level greater  than 50 µR/hr  including background  radiation  level.”   When  identified,  the equipment suspected of being NORM‐containing will be communicated to the City and operator(s) to allow further inspection and where appropriate, compliance with RRC signage and management requirements. 

 

The  leak/exceedance  references  represent  non‐ambient  conditions  that would  typically  indicate  a  significant 

contribution  of  COC  emissions  from  the  inspected  equipment.   Normal  intermittent  operation  of  pneumatic 

equipment would not be considered a leak.  If a continuous leak is identified, and operator granted permission, 

leaks are tagged to allow easy  identification after the field event.   When a  leak  is associated with a  low‐bleed 

device, we will request manufacturer documentation so this is recorded in the report and not reported as a leak. 

 

TABLE 2 – NEAR EQUIPMENT CRITERIA 

Constituent:  Methane  NORM 

At Release:  10,000 ppmv 1  50 µR/hr 2 

Equipment:  OGI Camera  Radiation Meter 

Resolution:  3,000‐10,000 ppmv  1 µR/hr 

PROJECT 20002 | FEBRUARY 2021 | PAGE 9 

WWW.MODERNGEOSCIENCES.COM 

The OGI  system  is  verified  in  the  field  prior  to  leak  detection  screening  using  a  known  standard  to  confirm 

methane  leak detection goals are met.    In general, this  includes verification at both three (3) and 10 meters  if 

screening will be performed within these distances.  Additionally, all other equipment used for near‐equipment 

is calibrated per manufacturer specifications and verified daily prior to inspections. 

 

2.3. FENCLINE MONITORING 

During  the  inspection  events  for moderate  and  high  priority  sites Modern  evaluated  both  apparent  up  and 

downwind conditions at the padsite fenceline to allow record of site conditions  in our final report.    Inspection 

efforts  include  an  evaluation  of  methane  concentrations,  radiation,  hydrogen  sulfide,  and  total  VOCs  for 

moderate and high priority sites.  For high priority sites, noise and particulate matter monitoring is also included. 

Equipment is calibrated per manufacturer specifications and verified daily prior to inspections.  

 

View of fenceline screening for hydrogen sulfide.    Example  of  noise  monitoring  during  fenceline screening activities.     

View  of  particulate  sampling  during  fenceline screening. 

  View  of  tVOC  monitoring  during  fenceline screening activities.   

PROJECT 20002 | FEBRUARY 2021 | PAGE 10 

WWW.MODERNGEOSCIENCES.COM 

 

A summary of fenceline monitoring criteria is provided below. 

 

Notes: 

1‐ Represents half of  the American Conference of Governmental  Industrial Hygienists  (ACGIH) 8‐hour  threshold  limit value  (TLV) of 1,000 ppmv (0.1% by volume) set for potential cardiac sensitization and central nervous system depression. 

 

2‐ Consistent fenceline concentrations of 0.1 ppmv or more could indicate a potential off‐site air quality exceedance of applicable TCEQ Air Monitoring  Comparison  Values  (AMCVs)  or  Effect  Screening  Levels  (ESLs).    Further  sampling will  be  needed  to  confirm  the individual compounds present and direct regulatory comparison. 

 

3‐ Indicative of possible 30 TAC §112.31 (30‐min avg.) exceedance of 0.08 ppmv.  Further sampling will be needed to confirm the 30‐minute average and allow direct regulatory comparison. 

 

4‐ EPA average background criteria established under Document No. 402‐R‐08‐005; April 2008.  Reported background ranged from 10 µR/hr  to  85  µR/hr.    Elevated  fenceline  observations may  require  further  screening  to  confirm  attenuated  levels  near  sensitive receptors. 

 

5‐ National Ambient Air Quality Standard (NAAQS) for Particulate Matter (PM) PM2.5.  Further monitoring will be needed to confirm if a continuous average  (24‐hr, 3yr) exceedance  is  indicated.   Elevated PM2.5  can also be  indicative of elevated  semi‐volatile organic compounds or other emission products  that may be present.    Individual COC monitoring required  for comparison with AMCVs or ESLs. 

 

6‐ NAAQS for PM10.  Further monitoring will be needed to confirm if a continuous average (24‐hr, 3yr) exceedance is indicated.  

7‐ A‐weighted  Leq  criteria  consistent with  the  Federal  Interagency  Committee  on Urban Noise  (FICUN)  “Guidelines  for  Considering Noise  in Land‐Use Planning and Control” maximum  level  for “acceptable” uses.   Other permit‐specific criteria may be applicable.  Modern’s sound sampling event represents only a short period at the boundary nearest an enclosed structure.  Further attenuation may be present if the sampling point is adjusted.  Completed using a Class 1 microphone with 3‐octave bands allowing further detail if needed.  Further monitoring will be needed to confirm if average sound conditions exceed applicable criteria. 

 

2.4. CONTINGENCY SAMPLING 

In addition to the  items above, Modern  is able to provide contingency sampling for  individual VOCs, hydrogen 

sulfide, and deploy real‐time monitoring stations for multiple constituents when fenceline screening suggests a 

concern  or when  directed  by  the  City.  If  field monitoring with  discrete  sampling  at  the  fenceline  identifies 

conditions indicative of elevated COCs, Modern will collect a time‐weighted sample for evaluation of VOCs using 

EPA Method TO‐17, hydrogen sulfide using ASTM Method D5504, and/or deploy real‐time air monitors.   

 

For  discrete  VOC  sampling, Modern  uses  conditioned  thermal  desorption  tubes  to  collect  an  upwind  and 

downwind air sample. A calibrated pump connected to the tube  is used to allow collection of a representative 

sample. The air is sampled at a rate of 100 ml/min for up to 20 minutes.  The sampling tube is affixed to a static 

sample point  to allow collection of air  from approximately  five  feet  six  inches  (5.5’) above ground  (breathing 

zone). The sampling systems  (e.g., pumps, tubing, attachments) are evaluated before and after each sampling 

TABLE 3 – FENCELINE CRITERIA   

  Methane  tVOCs  H2S  NORM  PM2.5  PM10  Noise 

Fenceline:  500 ppmv 1  0.1 ppmv 2  0.08 ppmv 3  20 µR/hr 4  35 µg/m3  (5)  150 µg/m3   (6)  65 dBA  7 

Equipment:  DPIR Meter  PID  H2S Meter Radiation Meter 

Particulate Meter 

Particulate Meter 

Sound Meter 

Resolution:  1 ppmv  0.001 ppmv  0.003 ppmv  1 µR/hr  1 µg/m3  1 µg/m3  1 dBA 

PROJECT 20002 | FEBRUARY 2021 | PAGE 11 

WWW.MODERNGEOSCIENCES.COM 

event to ensure sample integrity is maintained. Upon completion of the sampling event, the tubes are placed in 

a sealed inert container and placed on ice and sampling information (e.g., tube serial number, sample ID, time, 

flow  rate)  is  recorded  on  the  chain  of  custody.    The  sampling  and  monitoring  efforts  are  performed  in 

accordance with applicable elements of EPA Method TO‐17.   

 

Following  sample  collection,  the  thermal  desorption  tubes  are  analyzed  by  Modern  using  a  gas 

chromatograph/mass spectrometer (GC/MS) and thermal desorber to allow identification and quantification of 

individual  chemicals  of  concern.  All  analyses  are  performed  in  accordance  with  Modern’s  internal  Quality 

Assurance Project Plan (QAPP) governing sample analysis procedure. 

 

Additionally, Modern reviews the resulting chromatograms of each sample using both the National Institute of 

Standards  (NIST) Library and the Automated Mass Spectral De‐covolution and  Identification Software  (AMDIS) 

library to further evaluate any Tentatively Identified Compounds (TICs) not within the current calibration library.   

 

 

Example  air  sampling  using  TD  tubes  for  VOC analysis 

  Example chromatogram with upwind  (blue) and downwind (red) samples.     

View  of  air  quality  monitors  being  calibrated prior to field deployment. 

  Example  view  real‐time  air  quality  monitoring data.  H2S, Ozone, PID result shown in ppmv. 

PROJECT 20002 | FEBRUARY 2021 | PAGE 12 

WWW.MODERNGEOSCIENCES.COM 

 

2.5. PRE AND POST‐INSPECTION ACTIVITIES Modern coordinates with each operator prior to the inspection so a representative can be available to address 

leaks and allow immediate re‐inspection when they are present. Additionally, Modern communicates the results 

of  the  inspection  with  the  operators  so  any  corrective  action  completed  after  the  inspection,  within 

approximately two (2) weeks, can be recorded in the final report.  

 

An individual padsite inspection report was prepared for each padsite with the results of the inspection, figure 

with equipment  inspected (unique  identifiers), photographs of  leaking equipment (e.g., OGI pictures), graph of 

noise  (sound  pressure)  results  and  pure‐tone  evaluation  (spectral  analysis),  and  notation  of  Action  Items 

requiring  further  attention.  Any  outstanding  issues  identified,  including  ordinance  deficiencies,  leaks  still 

requiring attention, required NORM labels, etc., are summarized in Modern’s inspection reports as “Outstanding 

Action Items.” 

 

View of leak repairs being confirmed during field inspection efforts. 

  Example report figure depicting equipment, wind direction, and fenceline monitoring points.   

Example Noise monitoring  summary graph with threshold  limit  (red)  and  average  level  (solid black line). 

  Example particulate matter summary chart from a padsite inspection report.   

 

PROJECT 20002 | FEBRUARY 2021 | PAGE 13 

WWW.MODERNGEOSCIENCES.COM 

3. INFRASTRUCTURE SUMMARY 

Modern was selected to perform inspections on 276 wells and associated production equipment located on 147 

individual padsites in Denton, Texas. The nine (9) operators in Denton’s city limits include: 

 

Atmos Energy Corporation (Atmos); 

Devon Energy Corporation (Devon); 

EagleRidge Operating LLC (EagleRidge); 

Endeavor Energy Resources LP (Endeavor); 

Bedrock Energy Partners, LLC (Bedrock; Formerly EnerVest Operating, LLC; EnerVest); 

Hillwood Energy (Hillwood); 

Krocan Energy Corporation (Krocan); 

Sage Natural Resources (Sage); and 

XTO Energy Inc. (XTO).  

 

A  summary  of  padsite  information  is  provided  below  (Table  4)  and  presented  on  Figure  1  (attached). 

Additionally, Modern has provided  individual Padsite Inspection Reports for each padsite with details from 

the  near‐equipment  inspection  results,  fenceline monitoring  results,  and  supporting  optical  gas  imaging 

photos, figures, and Identified Action Items.  These are available through the City website directly. 

 

3.1. CITY OF DENTON PADSITES (TOTAL IN CITY LIMITS) 

 

TABLE 4 – PADSITE DATA SUMMARY 

Operator  Number of padsites Number of natural 

gas wells 

Number of 

separators Number of ASTs 

Atmos  6  8  0*  0* 

Devon  28  61  61  58 

EagleRidge  55  92  105  123 

Endeavor  6  10  14  25 

Bedrock  23  50  60  67 

Hillwood  5  14  15  18 

Krocan  3  3  3  4 

Sage  19  36  25  38 

XTO  2  2  2  4 

Total:  147**  276  285  337 

*Atmos wells  are  not  technically  production wells  as  they  are  utilized  for  storage  only  and  do  not  need 

extensive separators and AST systems. 

**The  summary  presented  above  represents  Modern’s  most  updated  estimates  following  second  half 

inspections.  

 

PROJECT 20002 | FEBRUARY 2021 | PAGE 14 

WWW.MODERNGEOSCIENCES.COM 

  

3.2. FIRST HALF 2020 (HIGH, MODERATE, AND SELECTED LOW PRIORITY) 

This  report  provides  a  summary  of Modern’s  findings  for  the  first  half  of  2020.  Padsite  inspections  were 

performed between March and April 2020. 

 

TABLE 5 – FIRST HALF OF 2020 PADSITE DATA SUMMARY 

Operator  Number of padsites Number of natural 

gas wells 

Number of 

separators Number of ASTs 

Atmos  6  8  0  0 

Devon  15  33  33  22 

EagleRidge  45  66  74  92 

Endeavor  6  10  14  25 

Bedrock  23  50  60  67 

Hillwood  5  14  15  18 

Krocan  3  3  3  4 

Sage  19  36  25  38 

XTO  2  2  2  4 

Total:  124*  222  226  270 

*Does not include low priority padsites to be inspected in 2021. 

 

3%

22%

33%

4%

18%

5%

1% 13%

1%

Wells by Operator (Total)

Atmos (8)

Devon (61)

EagleRidge (92)

Endeavor (10)

Bedrock (50)

Hillwood (14)

Krocan (3)

Sage (36)

XTO (2)

PROJECT 20002 | FEBRUARY 2021 | PAGE 15 

WWW.MODERNGEOSCIENCES.COM 

  

3.3. SECOND HALF 2020 (HIGH PRIOIRTY) This  report  provides  a  summary  of Modern’s  findings  for  the  second  half  of  2020.  Padsite  inspections were 

performed in October 2020. 

 

TABLE 5 – SECOND HALF OF 2020 PADSITE DATA SUMMARY 

Operator  Number of padsites Number of natural 

gas wells 

Number of 

separators Number of ASTs 

Atmos  0  0  0  0 

Devon  0  0  0  0 

EagleRidge  18  34  39  43 

Endeavor  4  5  6  11 

Bedrock  9  29  35  45 

Hillwood  0  0  0  0 

Krocan  0  0  0  0 

Sage  2  2  2  1 

XTO  0  0  0  0 

Total:  33*  70  82  100 

*Only includes high priority padsites. 

 

4%

15%

30%

4%

23%

6%

1%16%

1%

Wells by Operator (1st Half)

Atmos (8)

Devon (33)

EagleRidge (66)

Endeavor (10)

Bedrock (50)

Hillwood (14)

Krocan (3)

Sage (36)

XTO (2)

PROJECT 20002 | FEBRUARY 2021 | PAGE 16 

WWW.MODERNGEOSCIENCES.COM 

 

49%

7%

41%

3%

Wells by Operator (2nd Half)

Atmos (NA)

Devon (NA)

EagleRidge (34)

Endeavor (5)

Bedrock (29)

Hillwood (NA)

Krocan (NA)

Sage (2)

XTO (NA)

PROJECT 20002 | FEBRUARY 2021 | PAGE 17 

WWW.MODERNGEOSCIENCES.COM 

4. INSPECTION RESULTS 

The following presents a summary of Modern’s inspection results for 2020.  Any item requiring corrective action by the operator is referred to as an Action Item.  This may include signage for compliance, fencing issues, leaks, fenceline data exceeding applicable air quality criteria, etc.  There are three categories of Action Items:   Identified Action Items – These are any compliance item or inspection/monitoring exceedance noted in 

the  field by Modern.    Includes all  leaks, NORM exceedances, or other  issues  that  requires  corrective 

action by the operator; 

 

Addressed Action Items – These are the Identified Action Items that were either addressed during our 

field  inspection  by  the  operator when  found  or  reported  to Modern  by  the  operator  to  have  been 

addressed after the inspection and before reporting; and  

 

Outstanding Action Items – These are  items that remained unaddressed by an operator as of the time 

of our reporting to the City in our padsite‐specific reports. 

 

Completed  Action  Items  –  Outstanding  Action  Items  that  were  addressed  by  the  operator  to  the 

satisfaction of the City Inspector following Modern’s inspection are noted for this report. 

 

Addressed and Outstanding Items receive follow up  inspections by City staff and/or Modern until each  item 

has been addressed to the satisfaction of the City.   

 

   

PROJECT 20002 | FEBRUARY 2021 | PAGE 18 

WWW.MODERNGEOSCIENCES.COM 

4.1. IDENTIFIED ACTION ITEMS 

4.1.1. FIRST HALF 2020 

A total of 157 Identified Action Items were noted. 

 

 Identified Action Items per Type by Operator 

The above graphic provides a summary of the number of Identified Action Items per type for each operator.   

11%

40%

1%

23%

3%

4%

13%

5%

Identified Action Items by Operator

Atmos (0)

Devon (17)

EagleRidge (63)

Endeavor (2)

Bedrock (36)

Hillwood (5)

Krocan (6)

Sage (21)

XTO (7)

0 20 40 60 80

Atmos (0)

Devon (17)

EagleRidge (63)

Endeavor (2)

Bedrock (36)

Hillwood (5)

Krocan (6)

Sage (21)

XTO (7)

4

31

1

33

1

17

2

1

2

11

29

1

3

4

6

1

5

1

1

1

2

Number of Identified Action Items per Type by Operator

Leaks (89)

NORM (3)

Corrosion (60)

Secondary Containment (2)

Fencing (1)

Lanscaping (2)

PROJECT 20002 | FEBRUARY 2021 | PAGE 19 

WWW.MODERNGEOSCIENCES.COM 

  

4.1.2. SECOND HALF 2020 

A total of 37 Identified Action Items were noted.  

 

57%

2%

38%

1%1%1%

Identified Action Items by Type

Leaks (89)

NORM (3)

Corrosion (60)

SecondaryContainment (2)

Fencing (1)

Lanscaping (2)

43%

46%

11%

Identified Action Items by Operator

Atmos (NA)

Devon (NA)

EagleRidge (16)

Endeavor (0)

Bedrock (17)

Hillwood (NA)

Krocan (NA)

Sage (4)

XTO (NA)

PROJECT 20002 | FEBRUARY 2021 | PAGE 20 

WWW.MODERNGEOSCIENCES.COM 

 Identified Action Items per Type by Operator 

The above graphic provides a summary of the number of Identified Action Items per type for each operator.   

  

   

0 5 10 15 20

Atmos (NA)

Devon (NA)

EagleRidge (16)

Endeavor (0)

Bedrock (17)

Hillwood (NA)

Krocan (NA)

Sage (4)

XTO (NA)

9

15

4

2

7

Number of Identified Action Items per Type by Operator

Leaks (28)

NORM (2)

Corrosion (7)

Secondary Containment (0)

Fencing (0)

Lanscaping (0)

76%

5%

19%

Identified Action Items by Type

Leaks (28)

NORM (2)

Corrosion (7)

SecondaryContainment (0)

Fencing (0)

Lanscaping (0)

PROJECT 20002 | FEBRUARY 2021 | PAGE 21 

WWW.MODERNGEOSCIENCES.COM 

4.2. ADDRESSED ACTION ITEMS 

4.2.1. FIRST HALF 2020 

Of  the 157  Identified Action  Items noted, a  total of 87 were noted as Addressed Action  Items once corrected during our field inspection or reported as corrected prior to our reporting.   

 

 Addressed Action Items per Type by Operator 

The above graphic provides a summary of the number of Addressed Action Items per type for each operator.   

20%

2%

39%6%

7%

18%

8%

Addressed Action Items by Operator

Atmos (0)

Devon (17)

EagleRidge (0)

Endeavor (2)

Bedrock (34)

Hillwood (5)

Krocan (6)

Sage (16)

XTO (7)

0 10 20 30 40

Atmos (0)

Devon (17)

EagleRidge (0)

Endeavor (2)

Bedrock (34)

Hillwood (5)

Krocan (6)

Sage (16)

XTO (7)

4

1

32

1

13

2

1

2

11

1

2

4

6

5

1

1

Number of Addressed Action Items per Type by Operator

Leaks (53)

NORM (3)

Corrosion (29)

Secondary Containment (1)

Fencing (1)

Lanscaping (0)

PROJECT 20002 | FEBRUARY 2021 | PAGE 22 

WWW.MODERNGEOSCIENCES.COM 

  

4.2.2. SECOND HALF 2020 

Of  the 37  Identified Action  Items noted, a  total of 30 were noted as Addressed Action  Items once  corrected during our field inspection or reported as corrected prior to our reporting.  

 

61%

4%

33%

1% 1%

Addressed Action Items by Type

Leaks (53)

NORM (3)

Corrosion (29)

SecondaryContainment (1)

Fencing (1)

Lanscaping (0)

30%

57%

13%

Addressed Action Items by Operator

Atmos (NA)

Devon (NA)

EagleRidge (9)

Endeavor (0)

Bedrock (17)

Hillwood (NA)

Krocan (NA)

Sage (4)

XTO (NA)

PROJECT 20002 | FEBRUARY 2021 | PAGE 23 

WWW.MODERNGEOSCIENCES.COM 

 Addressed Action Items per Type by Operator 

The above graphic provides a summary of the number of Addressed Action Items per type for each operator.   

  

   

0 5 10 15 20

Atmos (NA)

Devon (NA)

EagleRidge (9)

Endeavor (0)

Bedrock (17)

Hillwood (NA)

Krocan (NA)

Sage (4)

XTO (NA)

9

15

4

2

Number of Addressed Action Items per Type by Operator

Leaks (28)

NORM (2)

Corrosion (0)

Secondary Containment (0)

Fencing (0)

Lanscaping (0)

93%

7%

Addressed Action Items by Type

Leaks (28)

NORM (2)

Corrosion (0)

SecondaryContainment (0)

Fencing (0)

Lanscaping (0)

PROJECT 20002 | FEBRUARY 2021 | PAGE 24 

WWW.MODERNGEOSCIENCES.COM 

4.3. OUTSTANDING ACTION ITEMS 

4.3.1. FIRST HALF 2020 

Of  the 157  Identified Action  Items,  a  total of 70  remained  as Outstanding Action  Items  since  they were not corrected during our field inspection or reported as corrected prior to our reporting.  

 

 Outstanding Action Items per Type by Operator 

The above graphic provides a summary of the number of Outstanding Action Items per type for each operator.   

90%

3%7%

Outstanding Action Items by Operator

Atmos (0)

Devon (0)

EagleRidge (63)

Endeavor (0)

Bedrock (2)

Hillwood (0)

Krocan (0)

Sage (5)

XTO (0)

0 20 40 60 80

Atmos (0)

Devon (0)

EagleRidge (63)

Endeavor (0)

Bedrock (2)

Hillwood (0)

Krocan (0)

Sage (5)

XTO (0)

31

1

4

29

1

1

12

Number of Outstanding Action Items per Type by Operator

Leaks (36)

NORM (0)

Corrosion (31)

Secondary Containment (1)

Fencing (0)

Lanscaping (2)

PROJECT 20002 | FEBRUARY 2021 | PAGE 25 

WWW.MODERNGEOSCIENCES.COM 

  

4.3.2. SECOND HALF 2020 

Of the 37 Identified Action Items noted, a total of 7 remained as Outstanding Action Items since they were not corrected during our field inspection or reported as corrected prior to our reporting.  

 

52%44%

1% 3%

Outstanding Action Items by Type

Leaks (36)

NORM (0)

Corrosion (31)

SecondaryContainment (1)

Fencing (0)

Lanscaping (2)

100%

Outstanding Action Items by Operator

Atmos (NA)

Devon (NA)

EagleRidge (7)

Endeavor (0)

Bedrock (0)

Hillwood (NA)

Krocan (NA)

Sage (0)

XTO (NA)

PROJECT 20002 | FEBRUARY 2021 | PAGE 26 

WWW.MODERNGEOSCIENCES.COM 

 Outstanding Action Items per Type by Operator 

The above graphic provides a summary of the number of Outstanding Action Items per type for each operator.   

  

0 2 4 6 8

Atmos (NA)

Devon (NA)

EagleRidge (7)

Endeavor (0)

Bedrock (0)

Hillwood (NA)

Krocan (NA)

Sage (0)

XTO (NA)

7

Number of Outstanding Action Items per Type by Operator

Leaks (0)

NORM (0)

Corrosion (7)

Secondary Containment (0)

Fencing (0)

Lanscaping (0)

100%

Outstanding Action Items by Type

Leaks (0)

NORM (0)

Corrosion (7)

SecondaryContainment (0)

Fencing (0)

Lanscaping (0)

PROJECT 20002 | FEBRUARY 2021 | PAGE 27 

WWW.MODERNGEOSCIENCES.COM 

5. ACTION ITEM RESULTS (DETAIL) 

5.1. LEAKS (METHANE) 

5.1.1. FIRST HALF 2020 

A total of 89 individual leaks (methane) were identified during Modern’s padsite inspection activities. 

 Leaks per Equipment by Operator 

The  above  graphic  provides  a  summary  of  the  number  of  leaks  (methane)  identified  for  typical  padsite equipment  for  each  operator.  Total  leaks  identified  for  each  operator  are  provided  in  the  legend.  Leaks identified at operational  low bleed components or  related  to normal equipment  function are not  included  in leak  totals. “Other”  indicates ancillary pieces of equipment  including additional sales piping and compressors.  Please see individual padsite inspection reports for the specific equipment noted with a leak and corresponding OGI images.   Any  leaks  not  addressed  during  field  inspections  or  noted  as  repaired  by  the  operator  (Addressed Action Items) are individually noted in the Outstanding Action Items (Table 7). 

0 10 20 30 40 50

Wells

Separators

ASTs

Other

1

2

1

2

10

16

3

1

2

9

22

1

2

5

10

1

1

Number of Leaks per Equipment by Operator

Atmos (0)

Devon (4)

EagleRidge (31)

Endeavor (1)

Bedrock (33)

Hillwood (1)

Krocan (0)

Sage (17)

XTO (2)

PROJECT 20002 | FEBRUARY 2021 | PAGE 28 

WWW.MODERNGEOSCIENCES.COM 

  

5.1.2. SECOND HALF 2020 

A total of 28 individual leaks (methane) were identified during Modern’s padsite inspection activities. 

 Leaks per Equipment by Operator 

The  above  graphic  provides  a  summary  of  the  number  of  leaks  (methane)  identified  for  typical  padsite equipment  for  each  operator.  Total  leaks  identified  for  each  operator  are  provided  in  the  legend.  Leaks identified at operational  low bleed components or  related  to normal equipment  function are not  included  in leak  totals. “Other”  indicates ancillary pieces of equipment  including additional sales piping and compressors.  Please see individual padsite inspection reports for the specific equipment noted with a leak and corresponding OGI images.  

5%

35%

1%

37%

1%

19%

2%

Leaks by Operator

Atmos (0)

Devon (4)

EagleRidge (31)

Endeavor (1)

Bedrock (33)

Hillwood (1)

Krocan (0)

Sage (17)

XTO (2)

0 2 4 6 8 10 12 14

Wells

Separators

ASTs

Other

1

8

4

7

4

1

2

1

Number of Leaks per Equipment by Operator

Atmos (NA)

Devon (NA)

EagleRidge (9)

Endeavor (0)

Bedrock (15)

Hillwood (NA)

Krocan (NA)

Sage (4)

XTO (NA)

PROJECT 20002 | FEBRUARY 2021 | PAGE 29 

WWW.MODERNGEOSCIENCES.COM 

Any  leaks  not  addressed  during  field  inspections  or  noted  as  repaired  by  the  operator  (Addressed Action Items) are individually noted in the Outstanding Action Items (Table 7).  

  

   

32%

54%

14%

Leaks by Operator

Atmos (NA)

Devon (NA)

EagleRidge (9)

Endeavor (0)

Bedrock (15)

Hillwood (NA)

Krocan (NA)

Sage (4)

XTO (NA)

PROJECT 20002 | FEBRUARY 2021 | PAGE 30 

WWW.MODERNGEOSCIENCES.COM 

5.2. NORM 

5.2.1. TOTAL NORM EXCEEDANCES 

5.2.1.1. FIRST HALF 2020 

A total of 63 individual pieces of equipment (e.g., well, separator, AST) were identified during Modern’s padsite 

inspection activities that exceeded the RRC criteria for additional management and controls.  When operational, 

this can be addressed through proper labeling and/or signage.  

 Total Norm Exceedances per Equipment by Operator 

The  above  graphic  provides  a  summary  of  the  number  of  NORM  exceedances  observed,  both  labeled  and 

unlabeled,  for  typical  padsite  equipment  for  each  operator.  “Other”  indicates  ancillary  pieces  of  equipment 

including additional sales piping and compressors. 

 

0 5 10 15 20 25 30

Labeled Wells

Unlabeled Wells

Labeled Separators

Unlabeled Separators

Labeled ASTs

Unlabeled ASTs

Labeled Other

Unlabeled Other

1

1

1

2

3

7

16

3

10

7

2

1 2

1

3

1

1

1

Number of Total NORM Exceedances per Equipment by Operator

Atmos (0)

Devon (2)

EagleRidge (3)

Endeavor (26)

Bedrock (22)

Hillwood (1)

Krocan (2)

Sage (7)

XTO (0)

3%

5%

41%

35%

2%3% 11%

Total NORM Exceedances by Operator

Atmos (0)

Devon (2)

EagleRidge (3)

Endeavor (26)

Bedrock (22)

Hillwood (1)

Krocan (2)

Sage (7)

XTO (0)

PROJECT 20002 | FEBRUARY 2021 | PAGE 31 

WWW.MODERNGEOSCIENCES.COM 

 

5.2.1.2. SECOND HALF 2020 

A total of 40 individual pieces of equipment (e.g., well, separator, AST) were identified during Modern’s padsite 

inspection activities that exceeded the RRC criteria for additional management and controls.  When operational, 

this can be addressed through proper labeling and/or signage.  

 Total Norm Exceedances per Equipment by Operator 

The  above  graphic  provides  a  summary  of  the  number  of  NORM  exceedances  observed,  both  labeled  and 

unlabeled,  for  typical  padsite  equipment  for  each  operator.  “Other”  indicates  ancillary  pieces  of  equipment 

including additional sales piping and compressors. 

 

 

0 5 10 15 20

Labeled Wells

Unlabeled Wells

Labeled Separators

Unlabeled Separators

Labeled ASTs

Unlabeled ASTs

Labeled Other

Unlabeled Other

1

1

3

9

5

1

9

1

7

1

2

Number of Total NORM Exceedances per Equipment by Operator

Atmos (NA)

Devon (NA)

EagleRidge (1)

Endeavor (13)

Bedrock (26)

Hillwood (NA)

Krocan (NA)

Sage (0)

XTO (NA)

2%

33%

65%

Total NORM Exceedances by Operator

Atmos (NA)

Devon (NA)

EagleRidge (1)

Endeavor (13)

Bedrock (26)

Hillwood (NA)

Krocan (NA)

Sage (0)

XTO (NA)

PROJECT 20002 | FEBRUARY 2021 | PAGE 32 

WWW.MODERNGEOSCIENCES.COM 

5.2.2. UNLABELED NORM EXCEEDANCES 

5.2.2.1. FIRST HALF 2020 

A total of three (3) NORM exceedances were not properly labeled when identified during Modern’s inspection. 

   Unlabeled Norm Exceedances per Equipment by Operator 

The above graphic provides a  summary of  the number of unlabeled NORM exceedances observed  for  typical 

padsite equipment for each operator. “Other” indicates ancillary pieces of equipment including additional sales 

piping and compressors.  

 

All NORM exceedances were noted as Addressed Action Items and confirmed during  inspection,  if corrected during our field efforts, or reported as corrected by the operator prior to our final report. 

 

0 0.5 1 1.5 2

Unlabeled Wells

Unlabeled Separators

Unlabeled ASTs

Unlabeled Other

1 1

1

Number of Unlabeled NORM Exceedances per Equipment by Operator

Atmos (0)

Devon (1)

EagleRidge (0)

Endeavor (0)

Bedrock (0)

Hillwood (0)

Krocan (0)

Sage (2)

XTO (0)

33%

67%

Unlabeled NORM Exceedances by Operator

Atmos (0)

Devon (1)

EagleRidge (0)

Endeavor (0)

Bedrock (0)

Hillwood (0)

Krocan (0)

Sage (2)

XTO (0)

PROJECT 20002 | FEBRUARY 2021 | PAGE 33 

WWW.MODERNGEOSCIENCES.COM 

5.2.2.2. SECOND HALF 2020 

A total of two (2) NORM exceedances were not properly labeled when identified during Modern’s inspection.  

 Unlabeled Norm Exceedances per Equipment by Operator 

The above graphic provides a  summary of  the number of unlabeled NORM exceedances observed  for  typical 

padsite equipment for each operator. “Other” indicates ancillary pieces of equipment including additional sales 

piping and compressors.  

 

All NORM exceedances were noted as Addressed Action Items and confirmed during  inspection,  if corrected 

during our field efforts, or reported as corrected by the operator prior to our final report. 

 

 

0 0.2 0.4 0.6 0.8 1

Unlabeled Wells

Unlabeled Separators

Unlabeled ASTs

Unlabeled Other

1

1

1

Number of Unlabeled NORM Exceedances per Equipment by Operator

Atmos (NA)

Devon (NA)

EagleRidge (0)

Endeavor (0)

Bedrock (3)

Hillwood (NA)

Krocan (NA)

Sage (0)

XTO (NA)

100%

Unlabeled NORM Exceedances by Operator

Atmos (NA)

Devon (NA)

EagleRidge (0)

Endeavor (0)

Bedrock (3)

Hillwood (NA)

Krocan (NA)

Sage (0)

XTO (NA)

PROJECT 20002 | FEBRUARY 2021 | PAGE 34 

WWW.MODERNGEOSCIENCES.COM 

5.3. FENCELINE MONITORING 

5.3.1. FIRST HALF 2020 

Modern’s fenceline monitoring  included the evaluation of multiple parameters.   The results of each are noted 

below for the first half of 2020. 

 

Total  Volatile  Organic  Compounds  (tVOCs)  –  None  of  the  up  or  downwind  fenceline  monitoring 

exhibited exceedances of the tVOCs screening criteria. 

 

Hydrogen Sulfide (H2S) – None of the up or downwind fenceline monitoring exhibited exceedances of 

the H2S screening criteria.   

 

Radiation  –  None  of  the  up  or  downwind  fenceline monitoring  exhibited  exceedances  of  radiation 

screening criteria. 

 

Methane  –  None  of  the  up  or  downwind  fenceline monitoring  exhibited  exceedances  of methane 

screening criteria. 

 

Particulate Matter (PM) – None of the up or downwind fenceline monitoring exhibited exceedances of 

PM screening criteria. 

 

Noise – One (1) of the fenceline noise monitoring results exceeded screening criteria.   

 

o Padsite  No.  138  –  Elevated  compressor  noise  (67.1  dBA)  noted  at  padsite  boundary  above 

screening criteria (65 dBA). As a result, an additional noise screening sample was collected off the 

padsite and closer to occupied structures (52.4 dBA). At the City’s direction, this exceedance will 

be re‐evaluated during the next monitoring event. 

 

5.3.2. SECOND HALF 2020 

Modern’s fenceline monitoring  included the evaluation of multiple parameters.   The results of each are noted 

below for the second half of 2020. 

 

Total  Volatile  Organic  Compounds  (tVOCs)  –  None  of  the  up  or  downwind  fenceline  monitoring 

exhibited exceedances of the tVOCs screening criteria. 

 

Hydrogen Sulfide (H2S) – None of the up or downwind fenceline monitoring exhibited exceedances of 

the H2S screening criteria.   

 

PROJECT 20002 | FEBRUARY 2021 | PAGE 35 

WWW.MODERNGEOSCIENCES.COM 

Radiation  –  None  of  the  up  or  downwind  fenceline monitoring  exhibited  exceedances  of  radiation 

screening criteria. 

 

Methane  –  None  of  the  up  or  downwind  fenceline monitoring  exhibited  exceedances  of methane 

screening criteria. 

 

Particulate Matter (PM) – None of the up or downwind fenceline monitoring exhibited exceedances of 

PM screening criteria. 

 

Noise – One (1) of the fenceline noise monitoring results exceeded screening criteria.   

 

o Padsite No. 138 – Elevated compressor noise noted at padsite boundary above screening criteria 

(66.0 dBA). As a  result, an additional noise screening sample was collected off  the padsite and 

closer  to occupied structures  (62.6 dBA). The City was advised of  the observations and  further 

coordination with  the operator was planned by  the City.   This exceedance will be  re‐evaluated 

during the next monitoring event. 

 

5.4. COMPLIANCE MONITORING 

5.4.1. FIRST HALF 2020 

Modern’s compliance monitoring for the first half of 2020 identified Action Items related to the following: 

 

Excessive Corrosion;  

NORM;  

Landscaping;  

Secondary Containment; and  

Fencing. 

 

Any  of  the  above  items  not  addressed  during  field  inspections  or  noted  as  repaired  by  the  operator 

(Addressed Action Items) are individually noted in the Outstanding Action Items (Table 7). 

 

5.4.2. SECOND HALF 2020 

Modern’s compliance monitoring for the second half of 2020 identified Action Items related to the following: 

 

Excessive Corrosion; and 

PROJECT 20002 | FEBRUARY 2021 | PAGE 36 

WWW.MODERNGEOSCIENCES.COM 

 

NORM. 

 

Any  of  the  above  items  not  addressed  during  field  inspections  or  noted  as  repaired  by  the  operator 

(Addressed Action Items) are individually noted in the Outstanding Action Items (Table 7). 

 

PROJECT 20002 | FEBRUARY 2021 | PAGE 37 

WWW.MODERNGEOSCIENCES.COM 

6. INSPECTION RESULTS (COMPREHENSIVE COMPARATIVE ANALYSIS) 

To better estimate the occurrence of individual Action Items across multiple operators with various amounts of 

equipment,  this  section offers  comparative  analysis  to normalize  the observations  from Modern’s  inspection 

over the entire year.  The data below offers comprehensive results on a “per well” basis for both the first (222 

wells inspected) and second half (70 wells inspected) of 2020 inspections. 

 

6.1. LEAKS PER WELL (ALL DATA) 

The data below provides a summary of all leaks (117; methane) observed on a per well (292) basis. 

  

   

0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40

Atmos (0.00)

Devon (0.12)

EagleRidge (0.40)

Endeavor (0.07)

Bedrock (0.61)

Hillwood (0.07)

Krocan (0.00)

Sage (0.55)

XTO (1.00)

Number of Leaks per Well by Operator

PROJECT 20002 | FEBRUARY 2021 | PAGE 38 

WWW.MODERNGEOSCIENCES.COM 

6.2. NORM PER WELL (ALL DATA) 

6.2.1. TOTAL NORM PER WELL 

The data below provides a summary of all recorded NORM observations that exceeded RRC criteria  (103; >50 

µR/hr) on a per well (292) basis. 

  

6.2.2. UNLABELED NORM PER WELL 

The data below provides a summary of all recorded NORM observations without proper labeling/signage, during 

field inspection, that exceeded RRC criteria (5; >50 µR/hr) on a per well (292) basis. 

  

   

0.00 0.50 1.00 1.50 2.00 2.50 3.00

Atmos (0.00)

Devon (0.06)

EagleRidge (0.04)

Endeavor (2.60)

Bedrock (0.61)

Hillwood (0.07)

Krocan (0.67)

Sage (0.18)

XTO (0.00)

Number of Total NORM per Well by Operator

0.00 0.01 0.02 0.03 0.04 0.05 0.06

Atmos (0.00)

Devon (0.03)

EagleRidge (0.00)

Endeavor (0.00)

Bedrock (0.04)

Hillwood (0.00)

Krocan (0.00)

Sage (0.05)

XTO (0.00)

Number of Unlabeled NORM per Well by Operator

PROJECT 20002 | FEBRUARY 2021 | PAGE 39 

WWW.MODERNGEOSCIENCES.COM 

6.3. ACTION ITEMS PER WELL (ALL DATA) 

6.3.1. IDENTIFIED ACTION ITEMS PER WELL 

The data below provides a summary of all Identified Action Items (194) on a per well (292) basis by operator. 

  

6.3.2. ADDRESSED ACTION ITEMS PER WELL 

The data below provides a summary of all Addressed Action Items (117) on a per well (292) basis by operator. 

  

   

0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00

Atmos (0.00)

Devon (0.52)

EagleRidge (0.79)

Endeavor (0.13)

Bedrock (0.67)

Hillwood (0.36)

Krocan (2.00)

Sage (0.66)

XTO (3.50)

Number of Identified Action Items per Well by Operator

0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00

Atmos (0.00)

Devon (0.52)

EagleRidge (0.09)

Endeavor (0.13)

Bedrock (0.65)

Hillwood (0.36)

Krocan (2.00)

Sage (0.53)

XTO (3.50)

Number of Addressed Action Items per Well by Operator

PROJECT 20002 | FEBRUARY 2021 | PAGE 40 

WWW.MODERNGEOSCIENCES.COM 

6.3.3. OUTSTANDING ACTION ITEMS PER WELL 

The data below provides a summary of all Addressed Action Items (77) on a per well (292) basis by operator. 

  

 

0.00 0.20 0.40 0.60 0.80 1.00

Atmos (0.00)

Devon (0.00)

EagleRidge (0.70)

Endeavor (0.00)

Bedrock (0.03)

Hillwood (0.00)

Krocan (0.00)

Sage (0.13)

XTO (0.00)

Number of Outstanding Action Items per Well by Operator

PROJECT 20002 | FEBRUARY 2021 | PAGE 41 

WWW.MODERNGEOSCIENCES.COM 

7. YEAR TO YEAR TRENDING 

7.1. IDENTIFIED ACTION ITEMS PER WELL 

The data below provides a comparative summary of all Identified Action Items on a per well basis by operator 

per year for each year of the inspection program to date. 

  

   

0.00 1.00 2.00 3.00 4.00 5.00

Atmos

Devon

EagleRidge

Endeavor

Bedrock

Hillwood

Krocan

Sage

XTO

AtmosDevonEagleRidgeEndeavorBedrockHillwoodKrocanSageXTO2018 0.000.361.572.500.950.361.331.214.50

2019 0.000.671.380.650.670.400.000.644.50

2020 0.000.520.790.130.670.362.000.663.50

Number of Action Items per Well per Year by Operator

PROJECT 20002 | FEBRUARY 2021 | PAGE 42 

WWW.MODERNGEOSCIENCES.COM 

7.2. LEAKS PER WELL 

The data below provides a comparative summary of all  leaks on a per well basis by operator per year for each 

year of the inspection program to date. 

  

   

0.00 1.00 2.00 3.00

Atmos

Devon

EagleRidge

Endeavor

Bedrock

Hillwood

Krocan

Sage

XTO

AtmosDevonEagleRidgeEndeavorBedrockHillwoodKrocanSageXTO2018 0.000.271.060.500.860.070.000.842.00

2019 0.000.270.980.100.560.000.000.572.00

2020 0.000.120.400.070.610.070.000.551.00

Number of Leaks per Well per Year by Operator

PROJECT 20002 | FEBRUARY 2021 | PAGE 43 

WWW.MODERNGEOSCIENCES.COM 

7.1. UNLABELED NORM PER WELL 

The data below provides a comparative summary of total unlabeled NORM exceedances on a per well basis by 

operator per year for each year of the inspection program to date. 

 

0.00 1.00 2.00

Atmos

Devon

EagleRidge

Endeavor

Bedrock

Hillwood

Krocan

Sage

XTO

AtmosDevonEagleRidgeEndeavorBedrockHillwoodKrocanSageXTO2018 0.000.000.001.350.060.210.000.050.00

2019 0.000.000.020.300.070.200.000.000.00

2020 0.000.030.000.000.040.000.000.050.00

Number of Unlabeled NORM per Well per Year by Operator

PROJECT 20002 | FEBRUARY 2021 | PAGE 44 

WWW.MODERNGEOSCIENCES.COM 

8. CONCLUSIONS AND RECOMMENDATIONS 

8.1. NEAR‐EQUIPMENT INSPECTION 

Modern identified the following during near‐equipment inspection efforts: 

 

Modern identified a total of 117 leaks (methane) using an Optical Gas Imaging (OGI) camera during our 

padsite inspection activities.  No leaks were identified at Atmos and Krocan padsites.  

 

Modern  identified  a  total of  5  exceedances of  Texas Railroad Commission  (RRC) NORM  criteria  (>50 

µR/hr) requiring signage and proper management. 

 

8.2. FENCELINE MONITORING 

Modern identified the following fenceline exceedances during this inspection period concerning noise (including 

Pure‐Tone Levels), particulate matter, hydrogen sulfide, VOCs, or methane: 

 

Padsite No. 138 – Elevated  compressor noise  (67.1 dBA) noted at padsite boundary above  screening 

criteria (65 dBA) during first half 2020 inspection. As a result, an additional noise screening sample was 

collected off the padsite and closer to occupied structures  (52.4 dBA). Elevated compressor noise was 

also noted at padsite boundary above screening criteria (66.0 dBA) during second half 2020 inspection. 

As a result, an additional noise screening sample was collected off  the padsite and closer  to occupied 

structures (62.6 dBA). Modern understands further discussions with the operator on compliance needs 

was planned by the City.  This exceedance will be re‐evaluated during the next monitoring event. 

 

8.3. OUTSTANDING ACTION ITEMS 

Modern  identified a total of 194 Action  Items requiring operator attention during our 2020 padsite  inspection 

activities. Of the 157 Identified Action Items noted during the first half 2020 inspection activities, 70 remain as 

Outstanding Action Items as of our reporting.   

 

TABLE 6 – FIRST HALF 2020 – OUTSTANDING ACTION ITEM SUMMARY 

Padsite 

No. 

Operator  Outstanding Action Items 

6  Bedrock  Corrosion (1) – Well A 

15  EagleRidge Leaks (1) – AST C thief hatch 

Corrosion (1) – separator piping 

16  EagleRidge  Leaks (1) – AST A thief hatch 

33  EagleRidge Leaks (1) – AST B thief hatch 

Corrosion (1) – AST piping 

34  EagleRidge  Corrosion (1) – separator piping 

37  EagleRidge  Leaks (1) – Separator A DV controller 

39  EagleRidge  Corrosion (1) – Ancillary A piping 

PROJECT 20002 | FEBRUARY 2021 | PAGE 45 

WWW.MODERNGEOSCIENCES.COM 

TABLE 6 – FIRST HALF 2020 – OUTSTANDING ACTION ITEM SUMMARY 

Padsite 

No. 

Operator  Outstanding Action Items 

41  EagleRidge  Leaks (2) – Well A kimray valve and Separator A DV controller 

42  EagleRidge 

Leaks (1) – AST B thief hatch 

Corrosion (2) – separator piping and AST piping 

Secondary Containment (1) – sheen on standing water (no leak visible) 

47  EagleRidge  Leaks (2) – AST A enardo valve and DV controller 

48  EagleRidge Leaks (3) – Separator A DV controller, Separator B DV controller, and AST E enardo valve 

Corrosion (2) – separator piping and AST piping 

64  EagleRidge Leaks (1) – AST A thief hatch 

Corrosion (1) – separator piping 

65  EagleRidge 

Leaks (4) – Separator B DV controller, AST A enardo valve, AST E enardo valve, and 

Compressor A pneumatic liquid level controller 

Corrosion (1) – AST piping 

66  EagleRidge  Corrosion (1) – AST piping 

67  EagleRidge Leaks (1) – Separator A DV controller 

Corrosion (2) – Separator A and AST piping 

68  EagleRidge 

Leaks (5) – Separator A DV controller, Separator B DV controller, AST B thief hatch, AST C 

enardo valve, and Compressor A pinhole leaks on hose  

Corrosion (3) – Well A, Well B, and AST piping 

69  EagleRidge  Leaks (1) – AST A enardo valve 

73  EagleRidge  Overgrown vegetation (1) – Well A 

74  EagleRidge  Corrosion (3) – separator piping, AST piping, and Ancillary A 

75  EagleRidge 

Leaks (5) – Separator B DV controller, Separator C DV controller, AST A enardo valve, AST B 

thief hatch, and Compressor A kimray valve 

Corrosion (2) – separator piping and AST piping 

77  EagleRidge  Leaks (1) – AST B enardo valve 

81  EagleRidge  Corrosion (1) – AST piping 

107  EagleRidge  Corrosion (2) – separator piping and AST piping 

109  EagleRidge  Overgrown vegetation (1) – Well A 

117  EagleRidge  Corrosion (3) –  separator piping, AST A, and AST piping 

124  EagleRidge  Leaks (1) –  Well A B‐section 

144  EagleRidge  Corrosion (2) –  AST A and B 

150  Bedrock  Leaks (1) – Separator F actuator 

157  Sage 

Leaks (4) – Separator C actuator, AST C enardo valve, AST D enardo valve, and AST E enardo 

valve 

Corrosion (1) – AST piping 

   

PROJECT 20002 | FEBRUARY 2021 | PAGE 46 

WWW.MODERNGEOSCIENCES.COM 

Of  the  37  Identified  Action  Items  noted  during  the  second  half  2020  inspection  activities,  7  remain  as 

Outstanding  Action  Items  as  of  our  reporting.  This  is  detailed  in  the  table  below  and  within  each  Padsite 

Inspection Report. 

 

TABLE 7 – SECOND HALF 2020 – OUTSTANDING ACTION ITEM SUMMARY 

Padsite 

No. 

Operator  Outstanding Action Items 

039  EagleRidge  Corrosion (1) – Ancillary A piping 

065  EagleRidge  Corrosion (1) – AST piping 

075  EagleRidge  Corrosion (2) – separator piping and AST piping 

081  EagleRidge  Corrosion (1) – AST piping 

144  EagleRidge  Corrosion (2) – ASTs A and B 

 

8.4. OPERATOR PERFORMANCE 

As continued data  is collected, the City can gain an understanding of how operator performance has changed 

year over year.   The following presents a summary of annual trending data observed to date (see Section 7 of 

this report). 

 

Action Items – The overall per well Action Items has decreased from 2018 (Operator average of 0.82) to 

2020 (Operator average of 0.66). 

 

Leaks – The overall per well  Leak Rate has decreased  from 2018  (Operator average of 0.77)  to 2020 

(Operator average of 0.40). 

 

Unlabeled NORM Exceedances – The overall per well Unlabeled NORM Exceedance rate has decreased 

from 2018 (Operator average of 0.12) to 2020 (Operator average of 0.02). 

 

8.5. PROGRAM UPDATES 

During  the course of  inspection activities,  the padsite operations,  surrounding  receptor conditions, and other 

observations  may  necessitate  an  update  to  the  current  program  approach.    Based  on  the  first  half  2020 

inspection  results, Modern  recommended  the  following updates  to be  considered by  the City  as part of  the 

ongoing monitoring program: 

 

Updating the following padsite inspection status conditions. 

 

o Padsite No. 150 – updating from Moderate to High due to nearby receptors. 

 

Completing  a  final  post‐production  inspection  and  summarizing  in  a  report  with  all  RRC  plugging 

documentation  so  this will  be  available when  future  development  on  or  near  this  padsite  is  being 

PROJECT 20002 | FEBRUARY 2021 | PAGE 47 

WWW.MODERNGEOSCIENCES.COM 

considered.   This  should  include a  surface NORM  survey,  subgrade  leak evaluation, and  confirmation 

ordinance requirements have all been met. 

 

o Padsite Nos. 032, 086, 114, 116, 121, 128, 129, 136, 137, and 145 – Once all  infrastructure  is 

properly plugged and removed. 

 

 

PROJECT 20002 | FEBRUARY 2021 | PAGE 48 

WWW.MODERNGEOSCIENCES.COM 

9. IMPORTANT ACRONYMS 

 

AMCV  Air Monitoring Comparison Value (Short or Long Term Criteria) 

AST  Aboveground storage tank 

ASTM  ASTM International 

BACT  Best Available Control Technology 

BMP  Best Management Practice 

CAA  Clean Air Act 

COC  Chemicals of Concern 

EPA   United States Environmental Protection Agency 

ESL  Effect Screening Level (Short or Long Term Criteria) 

ETJ  Extra Territorial Jurisdiction 

FID  Flame Ionization Detector 

FRP  Fiberglass Reinforced Plastic 

GC/MS  Gas Chromatograph/Mass Spectrometer 

HAP  Hazardous Air Pollutant 

HASP  Health and Safety Plan 

HQ  Hazard Quotient 

IDLH  Immediately Dangerous to Life and Health 

IHW  TCEQ Industrial & Hazardous Waste Program 

LDAR  Leak Detection and Repair 

LDCP  Leak Detection and Compliance Plan 

MACT  Maximum Achievable Control Technology 

MSDS  Material Safety Data Sheet 

NAAQS  National Ambient Air Quality Standard 

NESHAP  National Emissions Standards for Hazardous Air Pollutants 

NORM  (Technologically Enhanced) Naturally Occurring Radioactive Material 

NSPS  New Source Performance Standard 

OPM  Open Path Monitoring 

OSHA  Occupational Safety & Health Administration 

PEL  OSHA Permissible Exposure Limit 

PID  Photo Ionization Detector 

PM  Particulate Matter 

PROJECT 20002 | FEBRUARY 2021 | PAGE 49 

WWW.MODERNGEOSCIENCES.COM 

PPB  Parts Per Billion (PPBV – by volume) 

PPM  Parts Per Million (PPMV – by volume) 

RBEL  Risk Based Exposure Limit 

RCRA  Resource Conservation and Recovery Act  

RfC  Reference Concentration 

ROD  Record of Decision 

RRC  Texas Railroad Commission 

RSC  Reduced Sulfur Compounds 

SVOCs  Semi‐volatile Organic Compounds 

TCEQ  Texas Commission on Environmental Quality 

TD  Thermal Desorption 

TOX  Total Organic Halides 

TPH  Total Petroleum Hydrocarbons 

TPWD  Texas Parks and Wildlife Department 

TRRP  Texas Risk Reduction Program 

tVOCs  Total Volatile Organic Compounds 

TVA  Total Vapor Analyzer (Typically in the form of a Flame Ionization Detector or FID) 

TWDB  Texas Water Development Board 

TXU  Texas Utilities 

URF  Unit Risk Factor 

USC  United States Code 

USGS  United States Geological Survey 

UST  Underground Storage Tank 

UV  Ultraviolet 

VOCs  Volatile Organic Compounds 

 

 

   

   

PROJECT 20002 | FEBRUARY 2021 | PAGE 50 

WWW.MODERNGEOSCIENCES.COM 

10. LIMITATIONS AND EXCEPTIONS 

Modern’s services were performed  in a manner consistent with a  level of care and skill ordinarily exercised by 

other members of our profession practicing  in the same  locality, under similar conditions and at the  time  the 

services were  performed.    Laws,  regulations  and  professional  standards  applicable  to Modern's  services  are 

continually evolving.   Techniques are, by necessity, often new and  relatively untried.   Different professionals 

may reasonably adopt different approaches to similar problems.  As such, our services are intended to provide 

our client with a source of professional advice, opinions and recommendations based on a  limited number of 

field observations and tests, collected and performed  in accordance with the generally accepted practice that 

exists  at  the  time,  and may depend on,  and be qualified by,  information  gathered previously by others  and 

provided to Modern by our Client.   

 

The monitoring  results  collected  as  part  of  these  services  represent  conditions  at  the  time  of  inspection  or 

monitoring  only.    Samples  or monitoring  data  collected  at  other  times may  reveal  different  results  that  are 

representative of site conditions during other periods of time.  The use of monitoring efforts is not intended to 

replace  laboratory methodology.   Modern’s air sampling has been consistent with current regulatory guidance 

and manufacturer specification.   For a higher  level of certainty our monitoring methods can be expanded over 

longer periods of time and/or supplemented by use of a state‐accredited laboratory when evaluation of specific 

COCs is desired or further verification is needed. 

 

Our conclusions, opinions and recommendations are based only on the  information available for review at the 

time of reporting.  This included a limited number of observations and data points.  It is likely that conditions will 

vary between or beyond the specific points evaluated.  Environmental conditions at areas or portions of the Site 

where  sampling was  not  conducted may  vary  from  those  encountered  at  actual  sample  locations.    Further, 

certain  indicators  for  the  presence  of  hazardous  materials  or  other  constituents  may  have  been  latent, 

inaccessible, unobservable, or not present during Modern’s performance of  its  services,  and Modern  cannot 

represent  that  the Site contains no hazardous materials or other  latent conditions beyond  those  identified  in 

connection with  this  effort.    There  is  no  investigation  that  is  thorough  enough  to  identify  the  presence  or 

absence of all materials at a site which is currently, or at some point in the future, may be considered hazardous.   

 

Modern  offers  various  levels  of  investigative  services  to  suit  the  varying  needs  of  our  clients.    It  should  be 

recognized  that definition and evaluation of geologic and environmental conditions are a difficult and  inexact 

science.    Judgments  leading  to  conclusions  and  recommendations  are  generally  made  with  incomplete 

knowledge of the atmospheric or subsurface conditions present due to the limitations of data from field studies.  

Although  risk  can never be eliminated, more exhaustive  studies will produce additional data, which  can help 

understand  and manage  the  level of  risk present.    Since more detailed  studies  require  greater expense, our 

clients participate in the determination of acceptable risk for their purposes.  

 

 

WWW.MODERNGEOSCIENCES.COM 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FIGURES  

 

 

 

 

 

 

 

 

 

 

")

")

") ")")

")")

")

")")")

")

")")")

")") ")

")")")

")")

")

")")")")")")

")")

")")")

")

")")")

")")

")")

")")

") ")")

") ")")")")")

")

")

")")")")

")

")

")")")")")

")

")

")

")

")")

")

")

")

")")

")

")

")")

")

")

")

")

")

")

")

")

")

")

")

")

")

") ")

")

")")

")

")

")

")

")")

")

")

")

")

")

")

") ")

")")

")")") ")

")

")

")

")

")")")")")")")")

")")

")

")

")")

")")

")

")

")

")

")

")

")

")

")")

")")

")

")

")

")

")

157

65 7

2

8

4

9

13

8663

4762

75

9497

45

48

84

44

78

16

88

65

91

18

80

61

51

59

55

7970

35

40

81

21

67

9896

11

7487

6672

4313

20

17

99

92

95

34

19

3649

14

4254

68

69

15

3850

41

64

39

89

90

33

73

32

93

83

10

717677

46

28

3130

2922

2523

2624

8285

57

585253

12

60

156

155

150

153152

148

151

149

133

146

104

147

138

140

102

100105

154

145

103139

136137

117118

144

128

110

126

112

142

121113

143

120

108

122

141

129

111

124

115

109

106107

127

119

116

123

125

114

132

101

130

134135

131

56

27 37

PADSITE LOCATION MAP

Denton, Texas1

2000201.11.21

CS/DWKT

K

PROJECT NO.DRAWN:DRAWN BY:CHECKED BY:FILE NAME:

FIGURE

0 1 2 3Miles

Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, MapmyIndia, © OpenStreetMap contributors, and the GIS User Community

This figure was prepared using data from a variety of sources.No warranty is made as to the accuracy or completeness of dataprovided through third parties. All data contained herein issubject to change without notice. This figure is not intendedfor use as a legal survey or construction design document.

Denton_PadsiteLocation_210111.mxd

LegendPadsites by Operator (No. of Wells):") Eagleridge (92)") Devon (61)") Bedrock (50)") Sage (36)") Endeavor (10)

") Hillwood (14)") Atmos (8)") Krocan (3)") XTO (2)") Plugged and Abandoned

Denton City Limit

")

")

") ")")

")")

")

")")")

")

")")")

")") ")

")")")")")

")")")")

")")

")")")

")")")

")")

")")

") ")")

") ")")")")")

")

")

")")")

")")")")")

")

")

")

")

")")

")

")

")

")")

")

")")")

")

")

")

")

")

")

")

")

")

")

") ")

")")

")

")

")")

")")

")

")

")

")

")

")

")")") ")

")

")

")

")

")")")")")")

")")

")

")

")")

") ")

")

")

")

")

")")

")")

")

")

")

")

")

D)D)

D)

D)

D)D)

D)

D)

D)

D)

D)D)

D)

D)

D)

D)D)

D)

D)

D)

D)

D)

D)

3727

56131

135134

130

101

132

114

125

123

116

119

127

107106

109

115

124

111

129

141

122

108

120

143

113121

142

112

126

110

128

144

118117

137136

139103

145

154

105100

102

140

138

147

104

146

133

149

151

148152

153

150

155

156

60

12

5352

58

57

8582

2426

2325

22 293031

28

46

7776

71

10

83

93

32

73

33

90

89

39

64

41

5038

15

69

68

54 42

14

4936

19

34

95

92

99

17

20

1343

7266

87 74

11

9698

67

21

81

40

35

7079

55

59

51

61

80

18

91

65

88

16

78

44

84

48

45

9794

75

6247

6386

31

9

4

8

2

75 6

157

PADSITE INSPECTIONSUMMARY MAP

Denton, Texas2

2000201.11.20

CS/DWKT

K

PROJECT NO.DRAWN:DRAWN BY:CHECKED BY:FILE NAME:

FIGURE

0 1 2 3Miles

This figure was prepared using data from a variety of sources.No warranty is made as to the accuracy or completeness of dataprovided through third parties. All data contained herein issubject to change without notice. This figure is not intendedfor use as a legal survey or construction design document.

Service Layer Credits: Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO,USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI,Esri China (Hong Kong), (c) OpenStreetMap contributors, and the GIS User Community

Denton_Summary_210111.mxd

Legend") No Action Item(s) Identified") Operator Addressed Action Item(s) (COD Confirmed/Further Verification Planned)") Outstanding Action Item(s)D) Padsite Not Scheduled for Inspection in 2020") Padsite Closed (All Wells Plugged)

Denton City Limit