braidwood station, unit1 inservice inspection summary report · unit 1 inservice inspection summary...
TRANSCRIPT
Comm- ooi ( latdisgon (t(,i;
Braidot o (1 e Bo rating 8 t4 U
Route 1, BLox 84
Braceville, IL, 60407-9619 Tel 815-458-2801
CorEd June 28, 2000 BWO00072
U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington. D. C. 20555 - 0001
Braidwood Station, Unit 1 Facility Operating License Nos. NPF-72 NRC Docket No. STN 50-456
Subject: Braidwood Station, Unit 1 Inservice Inspection Summary Report
Enclosed please find the Post-Outage (90 day) Summary Report for Inservice Inspection examinations conducted during the eight refueling outage of Braidwood Station Unit 1 (i.e., Al R08). This report is submitted in accordance with the requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section XI, "Rules for the Inservice Inspection of Nuclear Power Plant Components."
Based on a Braidwood Unit 1 return to service date of April 5, 2000 and the submittal requirements of ASME Section XI Subarticle IWA-6230, "Summary Report Submittal," this report is to be provided to the U. S. NRC and the State of Illinois, Department of Nuclear Safety by July 4, 2000.
Please direct any questions you may have regarding this submittal to Mr. Terry Simpkin, Regulatory Assurance Manager, at (815) 458-2801, x2980.
Respectfully,
G. Keith Schwartz Station Manager Braidwood Station
Enclosure: Braidwood Station ISI Outage Report for Al R08
cc: Regional Administrator - NRC Region III NRC Senior Resident Inspector - Braidwood Station (w/o enclosure) Office of Nuclear Facility Safety - Illinois Department of Nuclear Safety
A Unicom Company
Braidwood Station ISI Outage Report for AIR08
BRAIDWOOD NUCLEAR POWER STATION
UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR:
Interval 2, Period 1, Outage 2
STATION ADDRESS:
Braidwood Station 35100 S. Rt. 53 Suite 84 Braceville, Illinois 60407
UNIT 1 COMMERCIAL SERVICE DATE:
July 29, 1988
OWNER'S ADDRESS:
Commonwealth Edison Company P.O. Box 767 Chicago, Illinois 60690
TABLE OF CONTENTS
DESCRIPTION:
COVER PAGE
TITLE PAGE
TABLE OF CONTENTS
1.0 - INSPECTION INFORMATION
2.0 - INSERVICE EXAMINATION SUMMARY
3.0 - INSERVICE COMPONENT DETAILED EXAMINATION TABLES
4.0 - NIS-1 FORM (OWNER'S REPORT FOR INSERVICE INSPECTION)
5.0 - REPORT OF CONTAINMENT DEGRADATION (IWE/IWL)
6.0 - NIS-2 FORMS, Cover page plus 83 pages of Attachments (OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS)
iii
PAGE:
ii
iii
1-1 to 1-2
2-1 to 2-3
3-1 to 3-59
4-1 to 4-5
5-1 to 5-8
6-1 to END
i
CornEd Braidwood Station Unit 1 A1R08 ISI Outage Report
1.0 INSPECTION INFORMATION
1.1 Summary
Second Interval Inservice Inspections (ISI) of ASME Class 1, 2, and 3 components were conducted at Braidwood Station Unit 1 from November 15, 1998 through April 5, 2000. This outage is reflected in the Braidwood ISI schedule by the code 212 (Interval 2, Period 1, Outage 2), with a majority of these inspections being performed during Braidwood Station's Unit 1 eight refueling outage (A 1R08). The Unit 1, Period l ISI Program is scheduled to end on July 28, 2001 but will be extended to include the Unit I ninth refueling outage (A1R09) in Fall 2001 as allowed by IWB-2412(c).
The examinations were performed in compliance with the rules and regulations of Section XI, Division 1, "Rules for Inservice Inspection of Nuclear Power Plant Components", of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, 1989 Edition, No Addenda, pursuant to the requirements of Title 10, Part 50.55a of the Code of Federal Regulations (10CFR50.55a). The Containment Inspection Program was developed and implemented in accordance with the requirements and intent of Subsections IWE and IWL of ASME Section XI, 1992 Edition through the 1992 Addenda, pursuant to the requirements of Title 10, Part 50.55a of the Code of Federal Regulations (10CFR50.55a). This summary report will address inspection results of Class 1 and 2 components and piping, as required by the ASME Code, IWA-6000.
In addition to the ASME Section XI requirements of examination, certain Nuclear Regulatory Commission augmented ISI inspections were required during A1R08. The Braidwood Unit 1 Augmented ISI examination requirements include:
a) Class 1 pressure boundary for leakage at nominal operating pressure, in accordance with NRC Bulletin 88-05.
b) Class 2 and 3 pressure boundary for leakage at nominal operating pressure, in accordance with NUREG 0737.
c) NRC Regulatory Guide 1.14, "Reactor Coolant Pump Flywheel Integrity".
d) NRC Bulletin 88-08, "Thermal Stresses in Piping Connected to Reactor Coolant Systems".
e) NRC commitment to examine 7.5% sampling of Class 2 ECCS circumferential welds on > 4" diameter pipe not currently subject to code volumetric exams which contain stagnant borated water.
f) NRC commitment to volumetrically examine welds in High Energy Line Break areas.
g) Augmented examinations to satisfy NRC commitments contained in Relief Requests 12R-01. 12R-02, 12R-07, and 12R-08.
1.2 Identification of Examination Requirements
The Second Interval IST Program contains the Component Selection Tables. These tables are presented in a tabular format consistent with the Tables found in subsections IWB, IWC, IWD, IWE, IWF, and IWL-2500 of the ASME code. The NDE tables include the corresponding code category, item number, and component/weld population selection in conformance with examination
Page 1-1
CornEd Braidwood Station Unit 1 A1R08 ISI Outage Report
requirements and intent of Subsection IWA, IWB, IWC, IWD, IWE, IWF, and IWL of Section XI of the ASME Code. Program notes and relief requests and additional information are identified in the basis column.
1.3 Exempted Components
ASME Class 1, 2, and 3 components (or parts of components) that are not included in the Component inspection tables and that are exempt from examination, as specified in Section XI Subsection IWB, IWC, IWD, and IWF are identified in the Braidwood Station Boundary Basis document, along with reference to the justification(s) for exempting the component/system.
1.4 ISI Program Implementation
CornEd, or their designee, visually examined (VT-1, VT-2, VT-3/4, VT-iC, and VT-3C) and/or NDE examined (UT, PT, MT) ASME components. The components examined comply with the ISI Program Schedule, Braidwood Technical Specifications, and/or compliance with the ASME Section XI Repair/Replacement Program. All ISI NDE, including evaluation of flaw indications, were performed in accordance with the requirements stipulated under Section XI, Sub-article IWA-2200: "Examination Methods".
Certified personnel performed and evaluated all NDE. Personnel were certified to the requirements of the American Society for Non-destructive Testing SNT-TC-1A, 1984 Edition. The NDE procedures were developed and certified in conformance with ASME Section V and XI, 1989 Edition, as applicable.
Certified personnel performed and evaluated visual examinations (VT-1, VT-2, and VT-3/4) of class 1, 2, and 3 components and supports. Personnel were certified to the requirements of the American Society for Non-destructive Testing SNT-TC-1A, 1984 Edition and/or ASME Section XI 1989, as applicable.
Certified personnel performed and evaluated visual examinations (VT-1, VT-3/4, VT-iC and VT3C) of Containment Structures. Personnel were certified to the requirements of the ANSI/ANST CP-189, 1991 revision, and/or ASME Section XI 1992 through 1992 Addenda, as applicable.
1.5 Witness and Verification of Examination
The inservice inspections were witnessed and/or verified by the Authorized Nuclear Inservice Inspectors (ANII), L. Malabanan and R. Spuhl. The inspectors are associated with Hartford Steam Boiler Inspection and Insurance Company of Hartford Connecticut, Chicago Branch, at 2443 Warrenville Rd., Suite 500, Lisle, Illinois 60532.
Page 1-2
CornEd Braidwood Station Unit 1 A1R08 ISI Outage Report
2.0 INSERVICE EXAMINATION SUMMARY
The following is a summary of the examinations performed during the Braidwood Unit 1 Eight refueling outage (AlR08). Refer to the component detailed examination tabulations of Section 3.0 for additional information on specific welds, components, supports, snubbers and pressure test examinations and their respective results.
2.1 Inservice Weld/Component Summary
Number of Welds or SYSTEM EXAMINED Components COMMENTS Components
Containment Spray 3
Feedwater 3
Main Steam 3
Reactor Coolant Count includes eddy 26 current exams of 4 steam
generators. Reactor Coolant (RY) 8
Safety Injection 20 6 baseline exams
TOTALS 63
2.2 Inservice Component Support Summary
SYSTEM EXAMINED Number of Component COMMENTS Supports
Chemical & Volume Control 2
Feedwater 1
Main Steam 1
Reactor Coolant 19
Residual Heat Removal 3
Safety Injection 46
Essential Service Water 12
TOTALS 84
Page 2-1
ComrEd Braidwood Station Unit I AlR08 ISI Outage Report
2.3 Inservice Snubber Summary
SYSTEM EXAMINED Number of Number of Snubbers Snubbers VT-3/4 Functionally Tested
Containment Spray 3 2
Chemical & Volume Control 8 4
Feedwater 3 3
Main Steam 5 3
Reactor Coolant 14 7
Residual Heat Removal 5 4
Reactor Coolant (RY) 5 3
Steam Generator Blowdown 2 1
Safety Injection 27 6
TOTALS 72 33
2.4 Inservice Pressure Test Summary
2.4.1 Pressure Test Test-Block Inspection Summary
Summary of components contained in this Table are those Pressure Test Test-Blocks which were examined for Section XI Inservice Inspection credit.
System Class Number of Test Blocks Component Cooling 2 1 Containment Spray 2 3 Chemical & Volume Control 2 2 Fuel Pool Cooling 2 2 Nitrogen System 2 1 Process Sampling 2 5 Residual Heat Removal 2 4 Reactor Coolant (RY) 2 4 Safety Injection 2 12 Essential Service Water 2 4 Containment Chilled Water 2 2 Plant Systems Pressurized During Mode 3 (ZZ) 1,2 2
TOTALS 42
Page 2-2
Comrnd Braidwood Station Unit 1 AIR08 ISI Outage Report
2.4.2 Borated Bolting Inservice Inspection Summary
Summary of components contained in this Table are those Insulated Borated Bolted connections which were examined for Section XI Inservice Inspection credit. Inspections on these connections are performed per the commitments in Relief Request 12R-12, 12R-13, and 12R-30, as applicable, of the ISI Program Plan.
Number of Number of SYSTEM EXAMINED Nmeofubrof COMMENTS Connections VT-2 Connections VT-1
Chemical & Volume Control 40 10
Pressurizer 1 0
Reactor Coolant 25 5
Residual Heat Removal 22 4
Reactor Coolant (RY) 4 2
Safety Injection 2 0
TOTALS 94 21
2.5 Inservice Steam Generator Eddy Current Testing Summary
During A1R08 refueling outage, which began March 18, 2000, eddy current inspection of the Steam Generator tubes was conducted. Scope of the inspection included 100% full length bobbin coil inspection of all 4 Steam Generators. Plus Point inspection was conducted on any bobbin coil indications classified as requiring additional diagnostic testing.
The Steam Generator tube inspections were completed on March 28, 2000. One tube was plugged in Steam Generator A. The table below summarizes the tube plugging results from A1R08 and preservice inspection of the steam generators. No Steam Generator tubes were repaired by sleeving during the A1R08 Refueling outage.
2.5.1 Braidwood Unit 1 Replacement Steam Generator Tube Plugging Summary
Steam Steam Steam Steam Steam Generator Tubes Generator Generator Generator Generator Total
Plugged 1RC01BA 1RC01BB 1RC01BC IRC01BD "A" "B" "C1 "D"
Steam Generator Tubes Plugged Prior to Service 1 2 0 0 3 Steam Generator Tubes Plugged During A1R08 1 0 0 0 1
Steam Generator Tubes Plugged to Date 2 2 0 0 4
Page 2-3
CornEN Braidwood Station Unit 1 A1RO8 ISI Outage Report
3.0 COMPONENT DETAILED EXAMINATION TABLES
3.1 Detailed Inservice Weld/Component Table(s):
The table (Pages 3-4 to 3-) for this section list the examinations performed for Section XI Inservice Inspection requirements for welds and components. The general format of how the table is set-up is shown below. A description of the information contained in each column can be found in Section 3.6.
Section XI ISI Identifier Cat. Item I Description
Line NumberIEPN Relief IProgram Code I IActual Resul I I Request I Notes I Coverage I Summary I Exam I
Inspection Comments (A) (B) (C) (D) (E) (F) (G) (H) (I)
(K) (J)
3.2 Detailed Inservice Component Support Table:
The table (Pages 3- to 3-) for this section list the examinations performed for Section XI Inservice Inspection requirements for component supports. The general format of how the table is set-up is shown below. A description of the information contained in each column can be found in Section 3.6.
Section XI ISI Identifier Line Number/EPN Relief I Program Exam Results Cat. Item Description I Request I Notes Summary I Inspection Comments
(A) (B) (C) (D) (E) (G) (I) (K)
(J)
3.3 Detailed Inservice Snubber Table:
The table (Pages 6-29 to 6-51) for this section list the examinations performed for Section XI Inservice Inspection requirements for snubbers. The general format of how the table is set-up is shown below. A description of the information contained in each column can be found in Section 3.6.
Section XI ISI Identifier Line Number/EPN Relief Program Exam Results Cat. Item Description Request Notes Summary Inspection Comments
(A) (B) (C) (D) (E) (G) (I) (K)
(J)
Page 3-1
ComrEd Braidwood Station Unit 1 AlR08 ISI Outage Report
3.4 Detailed Inservice Pressure Test Table(s):
3.4.1 System Pressure Tests The table (Page 6-52) for this section list the examinations performed for Section XI Inservice Inspection requirements for pressure testing. The general format of how the table is set-up is shown below. A description of the information contained in each column can be found in Section 3.6.
3.4.2 Borated Bolted Connection Inspections
The table (Pages 6-53 to 6-60) for this section list the examinations performed for Inservice Inspection pressure testing requirements of borated bolted connections. The general format of how the table is set-up is shown below. A description of the information contained in each column can be found in Section 3.6.
ection XI ISIdIentifier Relief Program Exam IResult Cat. Item Description Request Notes Summary Inspection Comments
(A) (B) (D) (E) (G) (1) (K)
(J)
3.5 Detailed Inservice Steam Generator Inspection Table:
The detailed report for the Steam Generator Eddy Current examination is provided in a 12 month summary report submitted in accordance with Technical Specification 5.6.9, "Steam Generator (SG) Tube Inspection Reports."
3.6 General Inservice Report Information
3.6.1 Report Column Descriptions
(A) This column contains the Section XI Category and Item identifiers for the specified component. There are special cases, like snubbers, where an "S" has been added to the end of the Section XI Item identifier. This was done to allow easy sorting of the snubber population by the ISI database.
(B) This column contains the ISI Identifier that the ISI Program uses to distinguish components.
(C) This column contains the line number or equipment piece number (EPN) that the component is associated with.
(D) This column identifies the ISI Program Plan relief request(s) that is associated with that component. A complete copy of the relief request can be found in the ISI Program Plan.
(E) This column identifies the ISI Program Plan note(s) that is associated with that component. A complete copy of the Program note can be found in the ISI Program Plan.
Page 3-2
CornEd Braidwood Station Unit 1 AlR08 ISI Outage Report
(F) This column identifies the percentage of code coverage achieved for the associated exam for that component.
(G) This column summarizes the exams performed during this outage for the associated component.
(H) This column identifies actual exams performed during this outage for the associated component.
(I) This column summarizes the results for exams performed during this outage for the associated component.
(J) This row states inspection comments, when applicable, for the associated
component.
(K) This column specifies the description of the associated component.
3.6.2 Report Abbreviations
FUNCT. - Snubber Functional Test GEOM. - Geometry GE/IND - Geometry/Indication IND. - Indication NRI - No Recordable Indications MT - Magnetic Particle Inspection PT - Liquid Penetrant Inspection SUR - Surface Exam TBD - To Be Developed UT - Ultrasonic Inspection VOL - Volumetric Exam VT - Visual Inspection
Page 3-3
CornEd Braidwood Station Unit 1
AIR08 ISI Outage Report
Section 3.1 Detailed Inservice Inspection Weld / Component Listing (Page 1 of 8)
SYSTEM: Containment Spray System (CS)
Section X, 151 Identifier Line Number! EPN Relief Program Code Exam Actual Results Cat. Item Description Request Notes Coveragel Summary Exam
Inspection Comments
C-C C03.30 1CSP-01-CSP04 1CS01PB 12R-02 NOTE 4 VT-1 VT-1 NRI 1CS01PB PUMP LUG 12R-15 SUR PT NRI
NOTE: PT has heavy background contrast due to weld configuration. Refer to OOBRI-VT-006 for examination of remaining weld length. OBSTRUCTION: VT has areas of inaccessibility. See Relief Request 12R-02.
C-C C03.30 1CSP-01-CSP05 ICS01PB 12R-02 NOTE 4 VT-1 VT-1 NRI
1CS01PB PUMP LUG 12R-15 SUR PT NRI NOTE: PT has heavy background contrast due to weld configuration. Refer to OOBRI-VT-007 for examination of remaining weld length. OBSTRUCTION: VT has areas of inaccessibility. See Relief Request 12R-02.
C-C C03.30 ICSP-01-CSP06 1CS01PB 12R-02 NOTE 4 VT-1 VT-1 NRI
1CS01PB PUMP LUG 12R-15 SUR PT NRI NOTE: PT has heavy background contrast due to weld configuration. Refer to OOBR1-VT-008 for examination of remaining weld length. OBSTRUCTION: VT has areas of inaccessibility. See Relief Request 12R-02.
Page 3-4
ConEd Braidwood Station Unit 1
A1R08 ISI Outage Report
Section 3.1 Detailed Inservice Inspection Weld / Component Listing (Page 2 of 8)
SYSTEM: Feedwater System (FW)
Section XI ISI Identifier Cat. Item Description
Inspection Comments
C-F-2 C05.51 1 FW-02-04
VALVE 1 FW009A - PIPE
1FW03DA-16" NOTE 4 100% SUR MT NRI
NOTE 5 100% VOL UT-45 GEOM
NOTE 7 UT-60 GEOM
OBSTRUCTION: One sided exam due to configuration (valve to pipe).
1 FW-02-05A 1FW03DA-16" PIPE - PENETRATION (1 PC-079)
NOTE 4 100% SUR MT NRI NOTE 5 100% VOL UT-45 GEOM
NOTE 7
C-F-2 C05.51 1FW-11-16
VALVE 1FW039A - PIPE
1 FW81 BA-6" NOTE 4
NOTE 5
NOTE 7
100% SUR MT NRI
100% VOL UT-45 GEOM
OBSTRUCTION: One sided exam due to valve to pipe configuration.
Page 3-5
C-F-2 C05.51
1
ComrEd Braidwood Station Unit 1
A1R08 ISI Outage Report
Section 3.1 Detailed Inservice Inspection Weld / Component Listing (Page 3 of 8)
SYSTEM: Main Steam System (MS)
Section XI ISI Identifier Line N umber I EPN Relief Program Code Exam Actual ýResults Cat. Item Description Request INotes Coveragel SummaryI Exam
Inspection Comments
C-F-2 C05.51 1 MS-04-04 1 MS01 BA-30.25" NOTE 4 100% SUR MT NRI PIPE - TEE NOTE 5 100% VOL UT-45 NRI
NOTE 7 NOTE: MT examined in as-ground condition. UT witnessed by Tom Green ComEd Lill. OBSTRUCTION: UT is a single sided exam.
C-F-2 C05.51 1MS-04-13 1MS143AA-12" NOTE 4 100% SUR MT NRI WELDOLET - PIPE NOTE 5 100% VOL UT-45 NRI
NOTE 7
C-C C03.20 1MS-07-SWO8 1MS01AC-32.75" 12R-15 NOTE 4 97.74% SUR MT IND. (4) LUG ATTACH. FOR 1 MS07002C
NOTE: See OOBRI-INR-001 for disposition of linear indications. Indications were determined to be acceptable. See also 0OBR1-UT-118 for UT verification of MT indication.
Page 3-6
COrnEd Braidwood Station Unit 1
A1R08 ISI Outage Report
Section 3.1 Detailed Inservice Inspection Weld / Component Listing (Page 4 of 8)
SYSTEM: Reactor Coolant System (RC)
Section XI ISl Identifier Line Number I EPN Relief Prograrr Cat. Item Description Request Notes
Inspection Comments
B-J B09.32 1RC-01-13 1RC16AA-2" NOTE 4 2" SWEEPOLET - 31" PIPE
B-J B09.32 IRC-01-14 1 RC09FA-3" NOTE 4 3" NOZZLE BRANCH CONNECTION
B-J B09.32 1RC-01-15 IRC14AA-2" NOTE 4 31" PIPE - 2" SWEEEPOLET
B-J B09.11 1RC-01-16 1RC02AA-31" NOTE 4 PIPE - ELBOW
NOTE: Pipe side stainless / elbow side cast stainless. Root geometry elbow side only.
B-J B09.11 1RC-01-17 1RC02AA-31" NOTE 4 ELBOW - PUMP I RC01 PA NOZZLE
NOTE: Exam was deferred to the next outage. Scaffold was not arranged.
B-J B09.11 1 RC-06-08 1RC21AA-8" NOTE 4 PIPE - PIPE
B-J B09.11 1RC-06-09 IRC21AA-8" NOTE 4 PIPE - ELBOW
B-J B09.11 IRC-06-10 IRC21AA-8" NOTE 4 ELBOW - PIPE
B-J B09.11 1RC-06-11 1 RC21 AA-8" NOTE 4 PIPE - ELBOW
B-J B09.11 1RC-06-12 IRC21AA-8" NOTE 4 ELBOW - PIPE
NOTE: Beam redirection noted on elbow side.
B-G-2 B07.50 1RC-19-B3 1RC22AB-1.5" FLANGED CONNECTION (4 STUDS)
NOTE: Examined during disassembly.
B-G-2 B07.50 1RC-20-B1 IRC22AD-1.5" FLANGED CONNECTION (4 STUDS)
NOTE: Examined during disassembly.
B-G-2 B07.50 1RC-23-B1 1RC22AA-1.5" FLANGED CONNECTION (4 STUDS)
NOTE: Examined during disassembly.
B-G-2 B07.50 1RC-27-B1 1RC22AC-1.5" FLANGED CONNECTION (4 STUDS)
NOTE: Examined during disassembly.
B-J B09.40 1 RC-36-01 1RC14AA-2" NOTE 4 BRANCH CONNECTION - PIPE
B-J B09.40 1RC-41-01AA 1RC16AA-2" NOTE 4 PIPE - BRANCH CONNECTION
100% SUR PT NRI
100% SUR PT NRI
100% SUR PT NRI
100% SUR PT NRI
100% VOL UT-45L GEOM
SUR
VOL
100% SUR PT NRI
100% VOL UT-45 GEOM
100% SUR PT NRI
100% VOL UT-45 GEOM
100% SUR PT NRI
100% VOL UT-45 GEOM
100% SUR PT NRI 100% VOL UT-45 GEOM
100% SUR PT NRI
100% VOL UT-45 GEOM
VT-1 VT-I NRI
VT-1 VT-1 NRI
VT-1 VT-I NRI
VT-1 VT-1 NRI
100%
100%
SUR PT
SUR PT
NRI
NRI
Page 3-7
CoirEd Braidwood Station Unit 1
A1R08 ISI Outage Report
Section 3.1 Detailed Inservice Inspection Weld / Component Listing (Page 5 of 8)
SYSTEM: Reactor Coolant System (RC)
Section XI 151 Identifier "Line Number EPN RrResults C .Ite m e Description Request _Notes __ Coverage Summaryl Exam
Inspection Comments
B-G-2 B07.60 1RCP-01-PSB-PA-B1 1RC01PA NOTE 3 VT-1 VT-1 NRI PUMP SHAFT SEALS (36 BOLTS)
NOTE: Examination was performed with bolting in place.
B-G-1 B06.40 1RV-02-038-01 TO 54 IRC01R 100% VOL UT-0 NRI THREADS IN RX FLANGE (54 TL)
NOTE: A1RO8 exam include area around all 54 stud holes.
B-G-1 B06.10 1RV-03-NUTS (01 TO 54) 1RC01R 12R-19 VT-1 VT-1 NRI CLOSURE HEAD NUTS (54 TOTAL)
NOTE: Nuts examined in AiR08 were 89-1-4014-51-02, 03, 04,41,42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54 and 89-1-4012-5101.
B-G-1 B06.20 1RV-03-STUDS(01 TO 54) 1RC01R 100% SUR MT NRI B06.30 CLOSURE HEAD STUDS (54 TOTAL) VOL
NOTE: Studs examined in A1R08 were: 89-1-4014-51-(1, 2, 3, 4, 41, 42, 44, 45, 46, 47, 48, 49, 50, 51, 52, 54, 55, and 56).
B-G-1 B06.50 1RV-03-WASHERS 1RC01R VT-I VT-1 NRI CLOSURE WASHERS (01 TO 54)
NOTE: Washers examined in A1R08 were: 89-1-4014-51-03, 04, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54, 55, and 56.
B-Q B16.20 1 SG-05-1RC01BA TUBING 1RC01BA VOL VOL N/A STEAM GENERATOR TUBING
NOTE: One tube plugged during A1R08.
B-G-1 B06.90 1SG-05-SGB-01 IRC01BA VT-1 VT-1 NRI B06.100 PRIMARY MANWAY (20 STUDS and NUTS) -100% VOL UT-60 NRI B06.110 UT-80L NRI
NOTE: Exam was performed in AIR08 after IRC01BA primary manways were removed with primary head diaphrams in place. Exam included flange face and a 1" annular surface around each of the 40 manway stud holes.
B-G-1 B06.90 1SG-05-SGB-02 1RCO1BA VT-1 VT-1 NRI B06.100 PRIMARY MANWAY (20 STUDS and NUTS) 100% VOL UT-60 NRI B06.110 UT-80L NRI
NOTE: Exam was performed in A1RO8 after 1RC01BA primary manways were removed with primary head diaphrams in place. Exam included flange face and a 1" annular surface around each of the 40 manway stud holes.
B-Q B16.20 1SG-06-1RC01BB TUBING1RC01BB VOL VOL N/A STEAM GENERATOR TUBING
B-Q B136.20 1 SG-07-1 RC01 BC TUBING1 RC01 BC VOL VOL N/A STEAM GENERATOR TUBING
B-Q B1i6.20 1 SG-08-1 RC01 BC TUBING1 RC01 BD VOL VOL N/A STEAM GENERATOR TUBING
Page 3-8
CornEd Braidwood Station Unit 1
A1R08 ISI Outage Report
Section 3.1 Detailed Inservice Inspection Weld / Component Listing (Page 6 of 8)
SYSTEM: Reactor Coolant System (RY)
Section XI ISl Identifier Line Number / EPN Cat Item Description
Inspection Comments
B-J B09.40 1CV-02-13 1 RY1 8A-2" VALVE 1CV8377 - PIPE
B-J B09.40 1CV-02-14 1RY18A-2" PIPE - ELBOW
B-J B09.40 1CV-02-15 1RY18A-2" ELBOW - PIPE
B-J B09.40 1 CV-02-16 1RY18A-2" PIPE - ELBOW
B-J B09.40 1CV-02-17 1 RY1 8A-2" ELBOW - PIPE
B-J B09.40 1CV-02-18 1RY18A-2" PIPE - ELBOW
B-J B09.40 1CV-02-19 1 RY1 8A-2" ELBOW - PIPE
B-M-2 B12.50
Relief Program Code Exam Actual Results
Request Notes Coverage Summary Exam
NOTE 4
NOTE 4
NOTE 4
NOTE 4
NOTE 4
NOTE 4
NOTE 4
1RC-32-1RY801OC (INT) 1RY03BC-6" NOTE 3
100%
100%
100%
100%
100%
100%
100%
SUR
SUR
SUR
SUR
SUR
SUR
SUR
PT
PT
PT
PT
PT
PT
PT
NRI
NRI
NRI
NRI
NRI
NRI
NRI
VT-3/4 VT-3/4 NRI
1RY801OC SAFETY RELIEF INTERNALS
NOTE: This exam was not scheduled for Al R08 but because it was disassembled for replacement a VT-3/4 was performed on the valve internal surface. This examination satisfies the Interval 2 requirements for code item B12.50 for the Unit 1 RY8010 valve group (see ISI Program Plan, Note 3).
Page 3-9
CornEd Braidwood Station Unit 1
AIR08 ISI Outage Report
Section 3.1 Detailed Inservice Inspection Weld / Component Listing (Page 7 of 8)
SYSTEM: Safety Injection System (SI)
Section XI ISl Identifier Cat. Item Description
Inspection Comments
C-F-1 C05.11 1SI-04-15
PIPE - ELBOW
iSI05CA-8" NOTE 4 100% SUR PT NRI
NOTE 7 100% VOL UT-45 GEOM
UT-45L GEOM
NOTE: PT examined in as-ground condition.
C-F-1 C05.11 1SI-04-16 ELBOW - PIPE
NOTE: Pt examined in as-ground condition.
C-F-1 C05.11 1SI-04-17 PIPE - ELBOW
lSI05CA-8" NOTE 4 100% SUR PT
NOTE 7 100% VOL UT-45
UT-45L
1S 105CA-8" NOTE 4 100% SUR PT
NOTE 7 100% VOL UT-45
UT-45L
NOTE: PT examined in as-ground condition.
C-F-1 C05.11 1SI-04-18
ELBOW - PIPE
ISl05CA-8"
NOTE: PT examined in as-ground condition.
C-F-1 C05.11 1SI-04-19 PIPE - ELBOW
NOTE: PT examined in as-ground condition.
C-F-1 C05.11 1SI-04-20 1 ELBOW - PIPE
NOTE: PT examined in as-ground condition.
B-J B09.40 ISI-10-26.01 ELBOW - PIPE
B-J B09.40 15-10-27.01
PIPE - ELBOW
B-J B09.40 1S1-10-28.01 VALVE 1S18819C - PIPE
ISI05CA-8"
NOTE 4 100% SUR PT
NOTE 7 100% VOL UT-45
UT-45L
NOTE 4 100% SUR PT
NOTE 7 100% VOL UT-45
UT-45L
SSI05CA-8" NOTE 4 100% SUR PT
NOTE 7 100% VOL UT-45
UT-45L
1SI18FC-2"
NRI GEOM
GEOM
NRI
GEOM
GEOM
NRI
GEOM
GEOM
NRI
GEOM
GEOM
NRI
GEOM
GEOM
NOTE 4 100 SUR PT NRI
NOTE 4 100 SUR PT NRI1SI18FC-2"
1SI18FC-2" NOTE 4
B-G-2 B07.70 1SI-13-1S18948D (BLT) 1SI09BD-10" 1SI8948D CHECK VALVE (18 BLT)
NOTE 3
100 SUR PT NRI
VT-1 VT-1 NRI
NOTE: This exam was not scheduled for Al R08 but because it was disadsembled for maintenance a VT-1 was performed on the bolting.
B-M-2 B12.50 1SI-13-1SI8948D (INT) 1SI09BD-10" NOTE 3 VT-3/4 VT-3/4 NRI
1S18948D CHECK VALVE INTERNALS
NOTE: This exam was not scheduled for Al R08 but because it was disassembled for maintenance a VT-3/4 was performed on the valve intemal surface. This examination satisfies the Interval 2 requirements for code item B12.50 for the Unit I S18948 valve group (see ISI Program Plan, Note 3).
B-G-2 B07.70 1S1-14-1SI8818D (BLT) iSI05DD-6" NOTE 3 VT-1 VT-1 NRI
1SI8818D CHECK VALVE (16 BLT)
NOTE: Exam performed in conjunction with disassembly for NWR.
Page 3-10
CornEd Braidwood Station Unit 1
ALR08 ISI Outage Report
Section 3.1 Detailed Inservice Inspection Weld / Component Listing (Page 8 of 8)
SYSTEM: Safety Injection System (SI)
Section Xl ISI Identifier Cat. Item Description
Inspection Comments
B-M-2 B12.50 1SI-14-1SI8818D (INT) 1SI05DD-6" NOTE 3 VT-3/4 VT-3/4 NRI
1S18818D CHECK VALVE INTERNALS
NOTE: This exam was not scheduled for AIR08 but because it was disassembled for maintenance a VT-3/4 was performed on the valve internal surface. This examination satisfies the Interval 2 requirements for code item B12.50 for the Unit 1 S18818 valve group (see ISIProgram Plan, Note 3).
B-J B09.40 1SI-23-02-FA.01
ELBOW - PIPE
B-J B09.40 1SI-23-03-FA.01 PIPE - ELBOW
B-J B09.40 1SI-23-04-FA.01 VALVE 1S18819A - PIPE
1SI18FA-2" NOTE 4 100 SUR PT
1SI18FA-2"
1SI18FA-2"
NOTE 4 100 SUR PT
NOTE 4 100 SUR PT
C-F-1 C05.11 1SI-34-07 iSIO11B-24" NOTE 4 100% PIPE - ELBOW NOTE 7 100%
NOTES: Pt examined in as-ground condition. UT Indication No. 2 identified by RT as probable seam weld
C-F-1 C05.41 1SI-35-08 1SIO11B-24" NOTE 4 100% 24" PIPE - 12" WELDOLET NOTE 7
NOTE: PT examined in as-ground condition.
C-F-1 C05.11 ISI-35-18 1S153AA-14" NOTE 4 100%
TEE - PIPE NOTE 7 100%
100%
NOTE: PT re-examined on 3/26/00 (Al R08) after further weld crown reduction.
NRI
NRI
NRI
SUR PT NRI
VOL UT-45 GEOM
intersection on pipe side.
SUR PT NRI
SUR PT
SUR PT
VOL UT-45
NRI
NRI
NRI
C-F-1 C05.11 1SI-35-43
WELDOLET - PIPE
1SI82AA-12" NOTE 4 100% SUR PT
NOTE 7 92% VOL UT-45
UT-45L UT-70
UT-70L
NRI
NRI
NRI NRI
NRI
OBSTRUCTION: One sided exam due to weld-o-let pipe configuration. No circ scan on weld-o-let base metal due to configuration.
Page 3-11
CobrEd Braidwood Station Unit 1
A1R08 ISI Outage Report
Section 3.2 Detailed Inservice Inspection Component Support Listing (Page 1 of 11)
SYSTEM: Chemical & Volume Control System (CV)
Section XI ISI Identifier Line Number I EPN Relief Program Exam Results Cat. Item Description Request Notes Summary
Inspection Comments
F-A F01.10 1CV0201OX 1CV10DB-3" NOTE 8 VT-3/4 NRI (1) Strut
Supplemental Due To Recordable Indication Identified On Component Support 1CV06014X (Minor Boron accumulationon strut. No Metal Wastage)
F-A F01.10 ICV06006X 1CVB7A-3" NOTE 8 VT-3/4 NRI (1) Strut
Supplemental Exam Due To Recordable Indication Identified On Component Support 1CV06014X
Page 3-12
CornEd Braidwood Station Unit 1
A1R08 ISI Outage Report
Section 3.2 Detailed Inservice Inspection Component Support Listing (Page 2 of 11)
SYSTEM: Feedwater System (FW)
Section XI ISI Identifier Line Number ! EPN Relief Program Exam Results
Cat. Item Description Request INotes Summary
Inspection Comments
F-A F01.20 1FW05024C IFW03DD-16" NOTE 8 VT-3/4 NRI (1) Constant Spring Can
Page 3-13
Cornifd Braidwood Station Unit 1
A1RO8 ISI Outage Report
Section 3.2 Detailed Inservice Inspection Component Support Listing (Page 3 of 11)
SYSTEM: Main Steam System (MS)
Section Xl Il Identifier Line Number I EPN Relief Program Exam Results Cat. Item Description Request Notes Summary
Inspection Comments
F-A F01.20 1MS07002C 1MS01AC-32.75" NOTE 8 VT-3/4 NRI (2) Constant Spring Cans, IWA to pipe
2 Constant Supports. Constant Support travel settings are at the hot position as specifiedon the component support drawing.Travel lindicator is at the mid piont range (approx.2") . Remote exam performed approx. 4' away.
Page 3-14
CornEd Braidwood Station Unit 1
A1R08 ISI Outage Report
Section 3.2 Detailed Inservice Inspection Component Support Listing
(Page 4 of 11)
SYSTEM: Reactor Coolant System (RC)
Section XI 1ISl Identifier Line Number / EPN Relief Program Exam Results Cat. Item Description Request Notes Summary
Inspection Comments
F-A F01.10 1CV03003X 1RC28A-3" NOTE 8 VT-3/4 NRI (1) Strut
F-A F01.10 1CV06001V 1RC36A-3" NOTE 8 VT-3/4 NRI (1) Variable Spring Can
Supplemental Exam Due To Recordable Indication Identified On Component Support 1CV06014X (This Support 1CV06001V is ajacent to 1CV06014X. Variable spring can setting1 66# in tolerance. System filled and cold.).
F-A F01.10 1CV06003X 1RC36A-3" NOTE 8 VT-3/4 NRI (1) Strut
Supplemental Exam Due To Recordable Indication Identified On Component Support 1CV06014X (This Support is ajacent to 1CV06014X. ). (Minor rust on bolting, no metal wastage.)
F-A F01.10 1CV06014X 1RC36A-3" NOTE 8 VT-3/4 IND. (1) Strut VT-3/4 NRI
Spherical bearing slightly dislodged. Note this exam was perfromed as a result of an RI identified on this support during the previous inspection period. Additional RI identified. Spherical bearing dislodged slightly. Ref. PIF A-2000-01383.
F-A F01.10 1CV06015R 1RC36A-3" NOTE 8 VT-3/4 NRI (1) Strut
Supplemental Exam Due To Recordable Indication Identified On Component Support 1CV06014X (This Support is ajacent to 1CV06014X.(Minor rust on bolting ,no metal wastage).
F-A F01.10 1CV06020C 1 RC36A-3" NOTE 8 VT-3/4 NRI (1) Constant Spring Can
F-A F01.10 1CV24034R 1RC16AB-2" NOTE 8 VT-3/4 NRI (1) Strut
F-A F01.10 IRC16104X 1RC22AA-1.5" NOTE 8 VT-3/4 NRI Box
F-A F01.10 1RC16116R 1RC22AA-1.5" NOTE 8 VT-3/4 NRI Box
F-A F01.10 1RC17053R 1RC22AB-1.5" NOTE 8 VT-3/4 NRI (1) Strut
F-A F01.10 1RC17057X 1RC22AB-1.5" NOTE 8 VT-3/4 NRI (1) Strut
F-A F01.10 1RC18031G 1 RC22AC-1.5" NOTE 8 VT-3/4 NRI Box
F-A F01.10 1RC18032X 1RC22AC-1.5" NOTE 8 VT-3/4 NRI Box
F-A F01.10 1RC19041X 1RC22AD-1.5" NOTE 8 VT-3/4 NRI (1) Strut
F-A F01.10 1RC19044G 1 RC22AD-1.5" NOTE 8 VT-3/4 NRI U-Bolt
F-A F01.10 1RC19056R 1RC22AD-1.5" NOTE 8 VT-3/4 NRI Box
F-A F01.10 1RY06006X 1RC24AB-4" NOTE 8 VT-3/4 NRI (1) Strut
Page 3-15
CornEd Braidwood Station Unit 1
AIR08 ISI Outage Report
Section 3.2 Detailed Inservice Inspection Component Support Listing (Page 5 of 11)
SYSTEM: Reactor Coolant System (RC)
Section XI IS[ Ide Cat. Item Descr
Inspection Comments
ntifier iption
F-A F01.10 1RY06013V (1) Variable Spring Can
1 RC24AA-4" NOTE 8 VT-3/4 NRI
F-A F01.10 1RY06056X 1RC24AA-4" NOTE 8 VT-3/4 NRI
(1) Strut
Page 3-16
1
CornEd Braidwood Station Unit 1
A1R08 ISI Outage Report
Section 3.2 Detailed Inservice Inspection Component Support Listing (Page 6 of 11)
SYSTEM: Residual Heat Removal System (RH)
Section XI ISI Identifier Line Number ! EPN Relief Program Exam Results Cat. Item Description Request Notes Summary
Inspection Comments
F-A F01.20 1CV47044A 1RH12A-8" NOTE 8 VT-3/4 NRI Anchor, integrally attached to pipe
F-A F01.20 1SI18007R 1RH03AB-8" NOTE 8 VT-3/4 NRI Slide Plate
Remote Exam 3' Away (Minor Surface Rust On Lower Component, No Metal Wastage)
F-A F01.20 1SI18009R 1RH03AB-8" NOTE 8 VT-3/4 NRI (1) Strut
Page 3-17
CornEd Braidwood Station Unit 1
A1RO8 ISI Outage Report
Section 3.2 Detailed Inservice Inspection Component Support Listing (Page 7 of 11)
SYSTEM: Safety Injection System (SI)
Section XI I15 Identifier Line Number/ EPN Relief Program Exam Results Cat. Item Description Request Notes Summary
Inspection Comments
F-A F01.10 1RB-064A 1SI03FB-2" NOTE 8 VT-3/4 NRI Anchor, integrally attached to pipe
F-A F01.10 1RH02037R 1SIA4B-8" NOTE 8 VT-3/4 NRI (1) Strut
F-A F01.10 1RH0204OR 1SIA4B-8" NOTE 8 VT-3/4 NRI (2) Struts
F-A F01.10 1RH02064V 1SIA4B-8" NOTE 8 VT-3/4 NRI (1) Variable Spring Can
F-A F01.10 1S101023R 1SI05DA-6" NOTE 8 VT-3/4 NRI Box
F-A F01.10 1S104014V 1SIO5DB-6" NOTE 8 VT-3/4 NRI (1) Variable Spring Can
F-A F01.20 1S106105X 1SIOl B-24" NOTE 8 VT-3/4 NRI (1) Strut
Exam performed due to Recordable Indication identified during previous inspection period.
F-A F01.20 1SI18013X 1SI05AB-8" NOTE 8 VT-3/4 NRI Box
F-A F01.20 1SI18039R 1SI05AB-8" NOTE 8 VT-3/4 NRI (1) Rod
F-A F01.20 -1SI18082R 1SI05AA-8" NOTE 8 VT-3/4 NRI (2) Struts
F-A F01.20 1SI18083A 1SI05AB-8" NOTE 8 VT-3/4 NRI Anchor, integrally attached to pipe
F-A F01.10 1SI19002R 1S108JB-1.5" NOTE 8 VT-3/4 NRI (1) Strut
Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X.
F-A F01.10 1S119013X 1SI08JB-1.5" NOTE 8 VT-3/4 NRI (1) Strut
Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X
F-A F01.10 1S119014R 1SI08JB-1.5" NOTE 8 VT-3/4 NRI (1) Strut
Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X
F-A F01.10 1S119020X 1SI08JB-1.5" NOTE 8 VT-2 NRI (1) Strut
Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X
F-A F01.10 1S119021R 1SI08JB-1.5" NOTE 8 VT-3/4 NRI (1) Strut
Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X
F-A F01.10 1SI19022R ISI08JB-1.5" NOTE 8 VT-3/4 NRI (1) Strut
Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X
Page 3-18
Cornmd Braidwood Station Unit 1
A1R08 ISI Outage Report
Section 3.2 Detailed Inservice Inspection Component Support Listing (Page 8 of 11)
SYSTEM: Safety Injection System (SI)
Section XI IS[ Identifier Line Number ! EPN Relief Program Exam Results Cat. Item Description Request Notes Summary
Inspection Comments
F-A F01.10 1SI19026X 1SI08JB-1.5" NOTE 8 VT-3/4 NRI (1) Strut
Supplemental Exam Due To Recordable Indication Identified On Component Support 1 S120045X
F-A F01.10 1SI20016X 1SI08JC-1.5" NOTE 8 VT-3/4 NRI (1) Strut
Supplemental Exam Due To Recordable Indication Identified On Component Support 1 S120045X
F-A F01.10 1S120020X 1SI08JC-1.5" NOTE 8 VT-3/4 NRI (1) Strut
Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X
F-A F01.10 1S120046R 1SIO8JC-1.5" NOTE 8 VT-3/4 NRI (1) Strut
Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X (This support is ajacent to supportlSI20045X. There are no other supports ajacent to 1S120045X.)
F-A F01.10 1S120049R 1SI08JC-1.5" NOTE 8 VT-3/4 NRI (1) Strut
Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X
F-A F01.10 1S121016X 1SI08JC-1.5" NOTE 8 VT-3/4 NRI (1) Strut
Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X
F-A F01.10 1S121019X 1SI08FA-3" NOTE 8 VT-3/4 NRI (1) Strut
Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X
F-A F01.10 1S121022X 1SI08E-3" NOTE 8 VT-3/4 NRI (1) Strut
Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X
F-A F01.10 1S121043R 1SI08E-3" NOTE 8 VT-3/4 (1) Strut
Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X
F-A F01.10 1S121045X 1SI08GC-1.5" NOTE 8 VT-2 NRI (1) Strut
Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X
F-A F01.10 1S122030R 1SI08JD-1.5" NOTE 8 VT-3/4 NRI (1) Strut
Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X
F-A F01.10 1S123002X 1SI08FA-3" NOTE 8 NRI (1) Strut
Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X
F-A F01.10 1S123004X 1SI08FA-3" NOTE 8 VT-3/4 NRI (1) Strut
Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X
F-A F01.10 1S123007R SIl08FA-3" NOTE 8 VT-3/4 NRI Box
Page 3-19
Comrnd Braidwood Station Unit 1
AIR08 ISI Outage Report
Section 3.2 Detailed Inservice Inspection Component Support Listing (Page 9 of 11)
SYSTEM: Safety Injection System (SI)
Section XI tem Identifier Line Number) EPN Relief Program Exam Results Cat Ite Description I I Request INotes SummaryIInspection Comments
F-A F01.10 1SI23009X 1SI08FA-3" NOTE 8 VT-3/4 NRI
(1) Strut
Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X
F-A F01.10 1S123011R 1SI08FA-3" NOTE 8 VT-2 NRI
(2) Struts
Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X
F-A F01.10 1S124003R 1SI08JA-1.5" NOTE 8 VT-3/4 NRI
(1) Strut
Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X
F-A F01.10 1S124008X 1SI08JA-1.5" NOTE 8 VT-2 NRI
(1) Strut
Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X
F-A F01.10 1S124011X 1SI08JA-1.5" NOTE 8 VT-3/4 NRI
(1) Strut
Supplemental Exam Due To Recordable Indication Identified On Component Support 1I 120045X
F-A F01.10 1S125009R 1SI08GB-1.5" NOTE 8 VT-3/4 NRI
(1) Strut
Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X
F-A F01.10 1S125014R 1SI08JD-1.5" NOTE 8 VT-2 NRI
(1) Strut
Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X
F-A F01.10 1S125015R 1SI08HA-2" NOTE 8 VT-3/4 NRI
(1) Strut
Supplemental Exam Due To Recordable Indication Identified On Component Support 1I 120045X
F-A F01.10 1S125016X 1SI08HA-2" NOTE 8 VT-3/4 NRI
(1) Strut
Supplemental Exam Due To Recordable Indication Identified On Component Support 1 S120045X
F-A F01.10 1S125052X 1SI08JB-1.5" NOTE 8 VT-3/4 NRI
(1) Strut
Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X
F-A F01.10 1S125054X 1SI08HB-2" NOTE 8 VT-3/4 NRI
(1) Strut
Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X
F-A F01.10 1S125055G 1SI08GB-1.5" NOTE 8 VT-3/4 NRI
(2) Struts
Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X
F-A F01.10 1SI25056R 1SI08GB-1.5" NOTE 8 VT-3/4 NRI
(1) Strut
Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X
F-A F01.10 1S125059X 1SI08FA-3" NOTE 8 VT-3/4 NRI
(1) Strut
Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X
Page 3-20
ComrEd Braidwood Station Unit 1
A1R08 ISI Outage Report
Section 3.2 Detailed Inservice Inspection Component Support Listing (Page 10 of 11)
SYSTEM: Safety Injection System (SI)
Section XI ISI Identifier Line Number / EPN Relief Program Exam Results Cat. Item Description Request Notes Summary
Inspection Comments
F-A F01.10 1S125060X 1SI08FA-3" NOTE 8 VT-3/4 NRI
(1) Strut
Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X
Page 3-21
CornEd Braidwood Station Unit 1
AIR08 ISI Outage Report
Section 3.2 Detailed Inservice Inspection Component Support Listing (Page 11 of 11)
SYSTEM: Essential Service Water System (SX)
Section Xl ISI Identifier Line Number I EPN Relief Program Exam Results Cat. Item Description Request Notes Summary
Inspection Comments
F-A F01.20 1PC-015A 1SX06BA-16" NOTE 8 VT-3/4 NRI Anchor, integrally attached to pipe
F-A F01.20 1SX06002G 1SX06BA-16" NOTE 8 VT-3/4 NRI Box
F-A F01.20 1SX06007R 1SX06CA-14" NOTE 8 VT-3/4 NRI Box
F-A F01.20 1SX06022X ISX06DC-10" NOTE 8 VT-2 NRI (1) Strut
F-A F01.20 1SX07007G 1SX06CB-14" NOTE 8 VT-3/4 NRI (1) Strut
F-A F01.20 1 SX07012R 1SX06EB-10" NOTE 8 VT-3/4 NRI Box
F-A F01.20 1SX07034X 1SX06CB-14" NOTE 8 VT-2 NRI (1) Strut
F-A F01.20 1SX08001R 1SX07FA-16" NOTE 8 VT-3/4 NRI (1) Strut
F-A F01.20 1SX0801OG 1SX07EA-14" NOTE 8 VT-3/4 NRI Strut and U-Bolt
F-A F01.20 1SX08097X 1SX09CA-10" NOTE 8 VT-3/4 NRI (1) Strut
F-A F01.20 1SX09001R 1SX07FB-16" NOTE 8 VT-3/4 NRI (1) Strut
F-A F01.20 1SX09046R 1SX07FB-16" NOTE 8 VT-3/4 NRI (1) Strut
Page 3-22
Cornfid Braidwood Station Unit 1
AIR08 ISI Outage Report
Section 3.3 Detailed Inservice Inspection Snubber Listing (Page 1 of 12)
SYSTEM: Containment Spray System (CS)
Section Xl ISlI Identifier Cat. Item Description
Inspection Comments
F-A F01.20 1CS03012S
Snubber1CS02AA-10" 12R-14 VT-3/4 NRI
Functional NRI
VT-2 NRI
S.N. 24407
NA NA 1CS04002S 1CS02AA-10" 12R-14 VT-3/4 NRI
Snubber
S.N. 5180
NA NA 1CS0401OS 1CS02AA-10" 12R-14 VT-3/4 NRI
Snubber Functional NRI
VT-3/4 NRI
S.N. 27680
Page 3-23
CornEd Braidwood Station Unit 1
A1R08 ISI Outage Report
Section 3.3 Detailed Inservice Inspection Snubber Listing (Page 2 of 12)
SYSTEM: Chemical & Volume Control System (CV)
Section Xl ISl Identifier Line Number EPN Relief Program Exam Results
Cat. Item Description Request Notes Summary
Inspection Comments
F-A F01.20 1CV01006S 1CV08BA-4" 12R-14 VT-3/4 NRI Snubber
S.N. 16668
NA NA 1CV01040S 1CV12AB-3" 12R-14 VT-3/4 NRI Snubber
S.N. 10673
NA NA 1CV13054S ICV43BC-2" 12R-14 VT-3/4 NRI Snubber Functional NRI
VT-3/4 S.N. 14985
NA NA 1CV31007S 1CV15DA-.75" 12R-14 VT-3/4 N/A Snubber
S.N. 20116
NA NA 1CV31020S 1CV15E-.75" 12R-14 VT-3/4 NRI Snubber Functional NRI
VT-3/4 NRI
S.N. 14668
NA NA 1CV34008S 1CV14EA-2" 12R-14 VT-3/4 NRI Snubber Functional NRI
Functional NRI VT-3/4 NRI
SNUBBER S.N. 14440 WAS MARGINAL, REPLACED WITH S.N. 21593,TEST INFO. IS FOR REPLACEMENT
NA NA 1CV41025S 1CV14ED-2" 12R-14 VT-3/4 NRI Snubber Functional NRI
VT-3/4 NRI
S.N. 10353
NA NA 1CV41026S 1CV14ED-2" 12R-14 VT-3/4 NRI Snubber
S.N. 10353
Page 3-24
CornEd Braidwood Station Unit 1
A1R08 ISI Outage Report
Section 3.3 Detailed Inservice Inspection Snubber Listing (Page 3 of 12)
SYSTEM: Feedwater System (FW)
NA NA 1FW10001S 1FW87BC-3" 12R-14 VT-3/4 NRI Snubber Functional NRI
VT-3/4 NRI
1FW87BB-3"1 FW1 2025S
Snubber12R-14 VT-3/4
Functional
VT-3/4
NRI NRI
N/AS.N. 2394
NA NA 1 FW14002S 1FW87BA-3" 12R-14 VT-3/4 NRI Snubber Functional NRI
VT-3/4 NRI S.N. 12220
Page 3-25
S.N. 12428
NA NA
CornEd Braidwood Station Unit 1
A1R08 ISI Outage Report
Section 3.3 Detailed Inservice Inspection Snubber Listing (Page 4 of 12)
SYSTEM: Main Steam System (MS)
Section XI ISI Identifier Cat. Item Description
Inspection Comments
F-A F01.20 1MS01079S Snubber, integrally attached to pipe
1MS07AA-28" 12R-14 VT-3/4 NRI Functional NRI
VT-3/4 NRIS.N. 16148
F-A F01.20 1MS06007AS 1MS01AB-32.75" 12R-14 VT-2 NRI Snubber, integrally attached to pipe Functional NRI
VT-3/4 NRI
S.N. 11093
F-A F01.20 1MS06007BS 1MS01AB-32.75" 12R-14 VT-3/4 NRI Snubber, integrally attached to pipe Functional NRI
VT-3/4 NRI
S.N. 11094
F-A F01.20 1MS07006AS 1MS01AC-32.75" 12R-14 VT-3/4 NRI Snubber, integrally attached to pipe
S.N. 11153
F-A F01.20 1MS07006BS IMS01AC-32.75" 12R-14 VT-3/4 NRI Snubber, integrally attached to pipe
S.N. 11154
Page 3-26
CornEd Braidwood Station Unit 1
A1R08 ISI Outage Report
Section 3.3 Detailed Inservice Inspection Snubber Listing (Page 5 of 12)
SYSTEM: Reactor Coolant System (RC) L Section X, ISI Identifier Line Number EPN Relief Program Exam Results Cat. Item C Description Request Notes Summary
Inspection Comments
F-A F01.10 1CV11023S 1RC14AA-2" 12R-14 VT-3/4 NRI Snubber Functional NRI
VT-3/4 NRI S.N. 14783
F-A F01.40 1RCO1BA-A S.G A 12R-14 VT-3/4 NRI Snubber
S. N. 13
F-A F01.40 IRC01BA-B S.G A 12R-14 VT-3/4 NRI Snubber
S. N. 18
F-A F01.40 1RC01BB-A S.G B 12R-14 VT-3/4 NRI Snubber
S.N. 23
F-A F01.40 1RC01BB-B S.G B 12R-14 VT-3/4 NRI Snubber
S. N. 14
F-A F01.40 1RC01BC-A S.G C 12R-14 VT-3/4 NRI Snubber
S.N. 12
F-A F01.40 1RC01BC-B S.G C 12R-14 VT-3/4 NRI Snubber
S.N. 21
F-A F01.40 1RC01BD-A Snubber
S.N. 25
F-A F01.40 1RC01BD-B
Snubber
S.N. 32
F-A F01.10 1RC03006S Snubber
S.N. 11886
NA NA
S.N. 3135
F-A F01.10
S.N. 20882
S.G D
S.G D
1 RC21AC-8"
1 RC20AA-.75"IRC16115S
Snubber
1 RY06017S
Snubber
1 RC24AA-4"
12R-14
12R-14
VT-3/4 NRI
VT-3/4
Functional
VT-3/4
12R-14 VT-314 Functional
VT-3/4
12R-14 VT-3/4
Functional
VT-3/4
VT-3/4
Functional
VT-3/4
12R-14
NRI NRI
NRI
NRI
NRI
NRI
NRI
NRI
NRI
NRI
NRI
NRI
Page 3-27
CoinEd Braidwood Station Unit 1
AIR08 ISI Outage Report
Section 3.3 Detailed Inservice Inspection Snubber Listing (Page 6 of 12)
SYSTEM: Reactor Coolant System (RC)
Section XI ISI Identifier Line Number!I EPN Relief Program Exam Results Cat. Item Description Request Notes Summary
Inspection Comments
F-A F01.10 1RY06096S 1RC24AA-4" 12R-14 VT-3/4 NRI Snubber Functional NRI
VT-3/4 NRI
S.N. 15332
F-A F01.10 1RY06154S 1RC24AA-4" 12R-14 VT-3/4 NRI Snubber Functional NRI
VT-3/4 NRI S.N. 9720
Page 3-28
ComrnEd Braidwood Station Unit 1
A1R08 ISI Outage Report
Section 3.3 Detailed Inservice Inspection Snubber Listing (Page 7 of 12)
SYSTEM: Residual Heat Removal System (RH)
Section Xl ISl Identifier Line Number I EPN Relief Program Exam Results
Cat. Item Description Request Notes Summary
Inspection Comments
F-A F01.10 1RHO2012S 1RH01AB-12" 12R-14 VT-3/4 NRI Snubber Functional NRI
VT-3/4 NRI S.N. 8774
F-A F01.10 1RH02205AS 1RH01AA-12" 12R-14 VT-3/4 NRI Snubber Functional NRI
VT-3/4 NRI S.N. 6290
F-A F01.10 1RH02205BS 1RHOIAA-12" 12R-14 VT-3/4 NRI Snubber Functional NRI
VT-3/4 NRI S.N. 4672
F-A F01.20
S.N. 1327
F-A F01.20
1 RH03AB-8"1 RH04012S
Snubber
1 RH08015S
Snubber
1 RH02AB-8"
12R-14
12R-14
VT-314 NRI
VT-3/4 Functional
VT-3/4
NRI NRI
NRI
S.N. 9863
Page 3-29
CoinEd Braidwood Station Unit 1
AIR08 ISI Outage Report
Section 3.3 Detailed Inservice Inspection Snubber Listing
(Page 8 of 12)
SYSTEM: Reactor Coolant System (RY)
NA NA 1RC93AS01S 1RY34BB-.5" 12R-14 VT-3/4 NRI
Snubber Functional NRI
VT-3/4 NRI
S.N. 22590
F-A F01.10 1RY06121S Snubber
1RY01AA-4" 12R-14 VT-3/4 Functional
VT-3/4
NRI NRI
NRI
S.N. 25610
F-A F01.10 1RY06124S 1RY18A-2" 12R-14 VT-3/4 NRI
Snubber
S.N. 5646
F-A F01.10
S.N. 25435
F-A F01.10
1 RY09012S
Snubber
1RY091 OOS Snubber
1RY06A-3"
1 RY02B-3"
12R-14 VT-3/4
Functional
VT-3/4
12R-14
NRI
NRI
NRI
VT-3/4 N/A
S.N. 25405
Page 3-30
CornEd Braidwood Station Unit 1
A1R08 ISI Outage Report
Section 3.3 Detailed Inservice Inspection Snubber Listing (Page 9 of 12)
SYSTEM: Steam Generator Blowdown System (SD)
Section Xl ISI Identifier Line Number / EPN Relief Program Exam Results Cat. Item Description Request Notes Summary
Inspection Comments
NA NA 1SD23093S 1SD01CG-2" 12R-14 VT-3/4 NRI Snubber
S.N. 12511
NA NA lSD23095S 1SD01CH-2" 12R-14 VT-3/4 NRI Snubber Functional NRI
VT-3/4 NRI
SN 12283
Page 3-31
ConmEd Braidwood Station Unit 1
A1R08 ISI Outage Report
Section 3.3 Detailed Inservice Inspection Snubber Listing (Page 10 of 12)
SYSTEM: Safety Injection System (SI)
Section XI ISl Identifier Line Number EPN Relief Program Exam Results Cat. Item Description Request Notes Summary
Inspection Comments
F-A F01.10 1RH02067S 1SI04D-8" 12R-14 VT-3/4 NRI Snubber
S.N. 10571
F-A F01.10 1RH02069S 1SI04D-8" 12R-14 VT-3/4 NRI Snubber Functional NRI
VT-3/4 NRI S.N. 11555
F-A F01.10 1RH02081S 1SI04B-8" 12R-14 VT-3/4 NRI Snubber
S.N. 29330
F01.10 1SIO1003S 1SI09BA-10" 12R-14 VT-3/4 NRI Snubber
S.N. 2543. Supplemental Section Xl Exam performed due to Recordable Indication Identified On Snubber 1S109013S.
F-A F01.10 1SIO1018S 1SI05DA-6" 12R-14 VT-3/4 NRI Snubber
S.N. 16621
F-A F01.10 1SIO1020S 1SI05DA-6" 12R-14 VT-3/4 NRI Snubber
S.N. 16656
F-A F01.20 1SIO1025S 1SI05CA-8" 12R-14 VT-3/4 NRI Snubber
SERIAL NUMBER 20095. Supplemental Section XI Exam performed due to Recordable Indication Identified On Snubber 1S109013S.
F-A F01.10 1SI01029S 1SI05DA-6" 12R-14 VT-3/4 NRI Snubber
S.N. 16729
NA NA 1SI01031S 1SI09BA-10" 12R-14 VT-3/4 NRI Snubber
SERIAL NUMBER 16654. Supplemental Section XI Exam performed due to Recordable Indication Identified On Snubber 1S109013S.
F-A F01.20 1S102003S 1S105CA-8" 12R-14 VT-3/4 NRI Snubber
SERIAL NUMBER 20665. Supplemental Section XI Exam performed due to Recordable Indication Identified On Snubber 1SI09013S.
F-A F01.20 1S103003S ISI05CA-8" 12R-14 VT-3/4 NRI Snubber
S.N. 7391. Supplemental Section XI Exam performed due to Recordable Indication Identified On Snubber 1S109013S.
F-A F01.10 1S103016S 1SI05DD-6" 12R-14 VT-3/4 NRI Snubber Functional NRI
VT-3/4 NRI SERIAL NUMBER 30168.
F-A F01.10 1S103020S 1SI05DD-6" 12R-14 VT-3/4 NRI Snubber Functional NRI
VT-3/4 NRI SERIAL NUMBER 9728. Supplemental Section XI Exam performed due to Recordable Indication Identified On Snubber 1S109013S. Snubber was also scheduled for functional testing.
Page 3-32
CornEd Braidwood Station Unit 1
A1R08 ISl Outage Report
Section 3.3 Detailed Inservice Inspection Snubber Listing (Page 11 of 12)
SYSTEM: Safety Injection System (SI)
Section Xl ISl Identifier Cat. Item Description
Inspection Comments
F-A F01.10 1S103023S 1SI09BD-10" 12R-14 VT-3/4 NRI
Snubber Functional NRI VT-3/4 NRI
SERIAL NUMBER 8809. Supplemental Section XI Exam performed due to Recordable Indication Identified On Snubber 1S109013S. Snubber was also scheduled for functional testing.
F-A F01.10 1S104003S 1SI09BB-10" 12R-14 VT-3/4 NRI
Snubber
S. N. 20020
F-A F01.10 1S104016S
Snubber
1 Sl05DB-6" 12R-14
S. N. 16732
F-A F01.10 1S104020S
Snubber S. N. 16582
F-A F01.10 1S104022S Snubber
S. N. 10235
F-A F01.20 1S104024S Snubber
SN 11988
F-A F01.20 1S104026S Snubber
1SI05DB-6"
1SI05DB-6"
1SI05CB-8"
1SI05CB-8"
12R-14
12R-14
12R-14
VT-3/4 N/A
VT-3/4 NRI
VT-3/4 NRI
VT-3/4
Functional
VT-3/4
VT-3/4
Functional
VT-3/4
12R-14
NRI
NRI
NRI
NRI
NRI
NRI
SN 6416
F-A F01.20 1SI09006S 1SI05CB-8" 12R-14 VT-3/4 NRI
Snubber
S. N. 2088. Supplemental Section Xl Exam performed due to Recordable Indication Identified On Snubber 1S109013S.
F-A F01.10 1SI09013S 1SI05DC-6" 12R-14 VT-3/4 IND.
Snubber VT-3/4 NRI
S. N.. 4014. R.I. Identified. Load pin assy installed at clamp end instead of load stud assy. Snubber assembly was operable / functional with pin installed. No functional test required. Load stud installed / acceptable. Ref. PIF A-2000-01385. Supplemental exams on other snubbers performed.
F-A F01.10 1S109015AS 1SI05DC-6" 12R-14 V-I Snubber
S. N. 15511. Supplemental Section Xl Exam performed due to Recordable Indication Identified On Snubber 1S109013S.
F-A F01.10 1S109015BS 1SI05DC-6" 12R-14 VT.
Snubber
S. N. 15517. Supplemental Section XI Exam performed due to Recordable Indication Identified On Snubber 1SIO9013S.
F-A F01.10 1S109021S 1SI09BC-10" 12R-14 VT
Snubber
r-2 NRI
-3/4 N/A
-3/4 NRI
S. N. 8781
Page 3-33
Conrnfd Braidwood Station Unit 1
A1R08 ISI Outage Report
Section 3.3 Detailed Inservice Inspection Snubber Listing (Page 12 of 12)
SYSTEM: Safety Injection System (SI)
Section XI ISI Identifier Line Number/ EPN Relief Program Exam Results Cat. Item Description Request Notes Summary
Inspection Comments
F-A F01.10 1S116029S 1SI18FC-2" 12R-14 VT-3/4 NRI Snubber
S. N. 14789
F-A F01.10 1SI24012S 1SI08JA-1.5" 12R-14 VT-3/4 N/A Snubber
S. N. 14827
Page 3-34
CornEd Braidwood Station Unit 1
A1R08 ISI Outage Report
Section 3.4.1 Detailed Inservice Inspection Pressure Test Test-Block Listing (Page 1 of 12)
SYSTEM: Component Cooling System (CC)
Section XI ISI Identifier Relief Program Exam Results
Cat. Item Description Request Notes Summary
Inspection Comments
C-H C07.30 A01CC-000002-M04-01A 12R-05 VT-2 C07.70 40 Month Period ASME Section XI Pressure Test. 12R-13
Page 3-35
CornEd Braidwood Station Unit 1
A1R08 ISI Outage Report
Section 3.4.1 Detailed Inservice Inspection Pressure Test Test-Block Listing (Page 2 of 12)
SYSTEM: Containment Spray System (CS)
Section XI ISI Identifier Relief Program Exam Results
Cat. Item Description Request Notes Summary
Inspection Comments
C-H C07.10 A01CS-000003-M04-01A 12R-05 NOTE13 VT-2 C07.30 40 Month Period ASME Section Xl pressure Test. 12R-13 C07.50 C07.70
C-H C07.10 A01CS-000003-M04-01B 12R-05 VT-2 C07.30 40 Month Period ASME Section Xl pressure Test. 12R-1 3 C07.50 C07.70
C-H C07.10 A01CS-000003-M04-01C 12R-05 VT-2 C07.30 40 Month Period ASME Section Xl Pressure Test. The Test Pressure 12R-13 C07.70 shall be those pressures developed when the Spray Additive Tank is
pressurized with the nitrogen blanket. Use SNOOP or Ultraprobe to inspect nitrogen filled piping, valves and upper portion of Spray Additive Tank containing nitrogen blanket.
Page 3-36
Braidwood Station Unit 1 AIR08 ISI Outage Report
Section 3.4.1 Detailed Inservice Inspection Pressure Test Test-Block Listing (Page 3 of 12)
SYSTEM: Chemical & Volume Control System (CV)
Section Xl ISl Ide Cat. Item Descri
Inspection Comments
ntifier ption
C-H C07.10 A01CV-000004-M04-01A
C07.30 40 Month Period ASME Section XA Pressure Test.
C07.50
C07.70
12R-05 NOTE12 VT-2
12R-12 NOTE15
12R-13 NOTE17
C-H C07.30 A01CV-000004-M04-011B 12R-05 NOTE12 VT-2
C07.50 40 Month Period ASME Section XA Pressure Test. 12R-12 NOTE15 C07.70 12R-13 NOTE17
Page 3-37
ComrEd Braidwood Station Unit 1
A1R08 ISI Outage Report
Section 3.4.1 Detailed Inservice Inspection Pressure Test Test-Block Listing (Page 4 of 12)
SYSTEM: Fuel Pool Cooling System (AF)
Section Xl ISl Identifier Relief Program Exam Results
Cat. Item Description Request Notes Summary
Inspection Comments
C-H C07.30 A01FC-000001-M04-01C 12R-05 NOTE13 C07.70 40 Month Period ASME Section XI Pressure Test. 12R-12
12R-1 3
C-H C07.30 A01FC-000001-M04-01D 12R-05 NOTE13 VT-2 C07.70 40 Month Period ASME Section X1 Pressure Test. 12R-12
12R-13
Page 3-38
CornEd Braidwood Station Unit 1
A1R08 ISI Outage Report
Section 3.4.1 Detailed Inservice Inspection Pressure Test Test-Block Listing (Page 5 of 12)
SYSTEM: Nitrogen System (NT)
Section XI 151 Identifier Relief Program Ex~am Results
Ca.Ie Description Request Notes Sumary
Inspection Comments
C-H C07.30 AO1NT-000004-M04-01A 12R-05 VT-2 C07.70 40 Month Period ASME Section Xl Pressure Test. Perform SNOOP or 12R-13
Ultraprobe examination after electrical penetrations have been pressurized with nitrogen for at least four hours.
Page 3-39
CornEd Braidwood Station Unit 1
A1R08 ISI Outage Report
Section 3.4.1 Detailed Inservice Inspection Pressure Test Test-Block Listing (Page 6 of 12)
SYSTEM: Process Sampling System (PS)
Section XI ISI Identifier Cat. Item Description
Inspection Comments
C-H C07.30 A01PS-000009-M04-01A C07.70 40 Month Period ASME Section Xl Pressure Test. OPEN valve
1PS9356A and one of the following valves: 1PS9358AB,C,D or 1 PS9351A,B.
12R-05 NOTE13 VT-2
12R-13
C-H C07.30 A01PS-000009-M04-01B 12R-05 NOTE13 VT-2
C07.70 40 Month Period ASME Section XI Pressure Test. OPEN valves 12R-1 3 1 PS9350A and 1 PS9354A.
C-H C07.30 A01PS-000009-M04-01C 12R-05 NOTE13 VT-2
C07.70 40 Month Period ASME Section Xl Pressure Test. OPEN valves 12R-13 1 PS9350B and 1 PS9355A.
C-H C07.30 A01PS-000009-M04-01D 12R-05 NOTE13 VT-2C07.70 40 Month Period ASME Section Xl Pressure Test. OPEN valve
1PS9357A and one of the following valves: 1PS9352A,B,C,D.
C-H C07.30
C07.70
A01PS-000009-M04-01E
40 Month Period ASME Section Xl Pressure Test.
12R-13
12R-05
12R-13
NOTE13 VT-2
Page 3-40
ComrEd Braidwood Station Unit 1
A1R08 ISI Outage Report
Section 3.4.1 Detailed Inservice Inspection Pressure Test Test-Block Listing (Page 7 of 12)
SYSTEM: Residual Heat Removal System (RH)
Section XI ISI Identifier Relief Program Exam Results Cat. Item Description Request Notes Summary
Inspection Comments
C-H C07.10 A01RH-000003-M04-01A 12R-05 NOTE13 VT-2 C07.30 40 Month Period ASME Section XA Pressure Test. VERIFY loop "A" in 12R-12 C07.50 service. 12R-13 C07.70
C-H C07.10 A01RH-000003-M04-01B 12R-05 NOTE13 VT-2 C07.30 40 Month Period ASME Section XI Pressure Test. VERIFY loop "B" in 12R-12 C07.50 service. 12R-13 C07.70
C-H C07.30 A01RRH-000003-M04-011D 12R-05 NOTE13 VT-2
C07.70 40 Month Period ASME Section XI Pressure Test. 12R-12
12R-13
C-H C07.30 A01RH-000003-M04-01E 12R-05 NOTE13 VT-2
C07.70 40 Month Period ASME Section XI Pressure Test. 12R-12
12R-13
Page 3-41
Corn•Fd Braidwood Station Unit 1
A1R08 ISI Outage Report
Section 3.4.1 Detailed Inservice Inspection Pressure Test Test-Block Listing (Page 8 of 12)
SYSTEM: Reactor Coolant System (RY)
Section Xl ISI Identifier Cat. Item Description
Inspection Comments
C-H C07.30 A01RY-000004-M04-01A C07.70 40 Month Period ASME Section XI Pressure Test. SNOOP or
Ultraprobe piping during performance of Local Leak Rate Test.
12R-05 NOTE13 VT-2 N/A
12R-12
12R-13
C-H C07.30 A01RY-000004-M04-011B 12R-05 NOTE13 VT-2 N/A
C07.70 40 Month Period ASME Section X1 Pressure Test. SNOOP or 12R-12 Ultraprobe piping during performance of Local Leak Rate Test. 12R-1 3
C-H C07.30 A01RY-000004-M04-01C 12R-05 NOTE13 VT-2 N/A
C07.70 40 Month Period ASME Section XA Pressure Test. SNOOP or 12R-12 Ultraprobe piping during performance of Local Leak Rate Test. 12R-1 3
A01RY-000004-M04-01 E
40 Month Period ASME Section XA Pressure Test. SNOOP or Ultraprobe piping during performance of Local Leak Rate Test.
12R-05 NOTE13
12R-12
12R-13
Page 3-42
C-H C07.30
C07.70
VT-2 N/A
CarnEd Braidwood Station Unit 1
A1R08 ISI Outage Report
Section 3.4.1 Detailed Inservice Inspection Pressure Test Test-Block Listing (Page 9 of 12)
SYSTEM: Safety Injection System (SI)
Section Xl ISI Identifier Cat. Item Description
Inspection Comments
C-H C07.30 A01SI-00001lC07.50
C07.70
40 Month Per
0-M04-01A
riod ASME Section XI Pressure Test.
12R-05 NOTE13 VT-2
12R-12
12R-13
C-H C07.30 A01SI-000010-M04-01B 12R-05 NOTE13 VT-2 C07.50 40 Month Period ASME Section XI Pressure Test. 12R-12
C07.70 12R-13
C-H C07.30 A01SI-000010-M04-01C 12R-05 NOTE13 VT-2
C07.70 40 Month Period ASME Section XI Pressure Test. 12R-12
12R-13
C-H C07.30 A01SI-000010-M04-01D 12R-05 NOTE13 VT-2
C07.70 40 Month Period ASME Section Xl Pressure Test. 12R-12
12R-13
C-H C07.30 A01SI-000010-M04-01F 12R-05 NOTE13 VT-2 C07.70 40 Month Period ASME Section XI Pressure Test. 12R-12
12R-13
C-H C07.30 A01SI-000010-M04-01G 12R-05 NOTE13 VT-2
C07.70 40 Month Period ASME Section XA Pressure Test. 12R-12
12R-13
C-H C07.10 A01SI-000010-M04-01J 12R-05 NOTE13 VT-2
C07.30 40 Month Period ASME Section XI Pressure Test. 12R-12
C07.70 12R-13
C-H C07.10
C07.30 C07.70
C-H C07.10
C07.30 C07.70
C-H C07.10
C07.30
C07.70
A01SI-000010-M04-01K
40 Month Period ASME Section XI Pressure Test.
A01SI-000010-M04-01L
40 Month Period ASME Section XI Pressure Test.
A01Sl-000010-M04-01M
40 Month Period ASME Section XI Pressure Test.
12R-05
12R-12 12R-13
12R-05
12R-12 12R-13
12R-05
12R-12
12R-13
C-H C07.30 A01SI-000010-M04-01N
C07.70 40 Month Period ASME Section Xl Pressure Test.
C-H C07.30 A01SI-000010-M04-01P
C07.70 40 Month Period ASME Section XI Pressure Test.
12R-05
12R-12
12R-13
12R-05
12R-12
12R-13
NOTE13
NOTE13
NOTE13
NOTE13
NOTE13
VT-2
VT-2
VT-2
VT-2
VT-2
Page 3-43
Cornid Braidwood Station Unit 1
AIR08 ISI Outage Report
Section 3.4.1 Detailed Inservice Inspection Pressure Test Test-Block Listing (Page 10 of 12)
SYSTEM: Essential.Service Water System (SX)
Section XI ISI Identifier Relief Program Exam Results
Cat. Item Description Request Notes Summary
Inspection Comments
C-H C07.30 A01SX-000011-M04-01N 12R-05 VT-2 C07.70 40 Month Period ASME Section Xl Pressure Test. 12R-13
C-H C07.30 A01SX-000011-M04-01P 12R-05 VT-2 C07.70 40 Month Period ASME Section XI Pressure Test. 12R-13
C-H C07.30 A01SX-000011-M04-01T 12R-05 VT-2 C07.70 40 Month Period ASME Section XI Pressure Test. 12R-13
C-H C07.30 A01SX-000011-M04-01U 12R-05 VT-2 C07.70 40 Month Period ASME Section XI Pressure Test. 12R-13
Page 3-44
ConmEd Braidwood Station Unit 1
AIR08 ISI Outage Report
Section 3.4.1 Detailed Inservice Inspection Pressure Test Test-Block Listing (Page 11 of 12)
SYSTEM: Containment Chilled Water System (WO)
Section XI ISI Identifier Relief Program Exam Results
Cat. Item Description Request Notes Summary
Inspection Comments
C-H C07.30 A00WO-000001-M04-01C 12R-05 VT-2 C07.70 40 Month Period ASME Section XI Pressure Test. Verify applicable 12R-13
Train operability prior to performing VT-2 Visual Examination of test boundary.
C-H C07.30 A00WO-000001-M04-011D 12R-05 VT-2
C07.70 40 Month Period ASME Section XA Pressure Test. Verify applicable 12R-13 Train operability prior to performing VT-2 Visual Examination of test boundary.
Page 3-45
ConriEd Braidwood Station Unit 1
A1R08 ISI Outage Report
Section 3.4.1 Detailed Inservice Inspection Pressure Test Test-Block Listing (Page 12 of 12)
SYSTEM: Plant Systems Pressurized During Mode 3 (ZZ)
Section XI ISlIdentifier Relief Program Exam Results
Cat. Item Description Request Notes Summary
Inspection Comments
B-P B15.10 A01ZZ-000005-M04-01A 12R-05 NOTE13 VT-2 NRI B15.20 Periodic (each refueling outage) ASME Section XI Pressure Test. 12R-12 NOTE14 B15.30 12R-13 NOTE17 B15.50 12R-30
B 15.60/70 12R-31 VT- 2 exam performed during mode 3 (NOP/NOT) AIR08. Reference WR# 990132907-01. Systems inservice for 4 hours prior to performing VT-2 exam.
C-H C07.10 A01ZZ-000078-M04-03A 12R-05 NOTE13 VT-2 NRI C07.30 40 Month Period ASME Section Xl Pressure Test. All Code Class 2 12R-12 C07.70 components inside containment. VT-2 Visual Inspection of 12R-13
components outside Missle Barrier may be performed during Mode 1 if conditions permit.
VT- 2 exam performed during mode 3 (NOP/NOT) Al R08. Reference WR# 990132032-01. Systems inservice for 4 hours prior to performing VT-2 exam.
Page 3-46
CormEd Braidwood Station Unit 1
A1R08 ISI Outage Report
Section 3.4.2 Detailed Inservice Inspection Borated Bolting Listing (Page 1 of 13)
SYSTEM: Chemical & Volume Control System (CV)
Section XI IS15 Identifier Relief Program Exam Results Cat. Item Description Request Notes Summary
Inspection Comments
B-P B15.50 1CV-06-B1 (B-P) 12R-12 VT-2 NRI B15.51 FLANGE BOLTING (4 STUDS) 12R-13
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
C-H C07.70 1CV123 (C-H) 12R-12 C07.80 1CV123VLV (6 STUDS) 12R-13
Insulation not removed for inspection. (Al R08)
B-P B15.70 1CV459 (B-P) 12R-12 VT-2 NRI B15.71 1CV459 GLOBE VLV (6 STUDS) 12R-13
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
B-P B15.70 1CV460 (B-P) 12R-12 VT-2 NRI B15.71 1CV460 GLOBE VLV (6 STUDS) 12R-13
No evidence of leakage (boric acid residue) noted. VT-2 acceptable. Component was examined by using a ladder.
C-H C07.70 1CV8112 (C-H) 12R-12 VT-2 IND. C07.80 1CV8112 VLV (8 STUDS) 12R-13 VT-2 NRI
VT-1 NRI Boric acid residue on body to bonnet bolting, caused by packing leak. Component was deconned, bolting material not affected. (Post VT2) no active leakage NRI. (VT-I) no degradation of studs, nuts, or components affected by the boric acid leakage. AR 990090144 generated to adjust packing.
C-H C07.70 1CV8117 (C-H) 12R-12 C07.80 1CV8117 VLV (6 STUDS) 12R-13
Component not insulated in the area of interest.
C-H C07.70 1CV8121 (C-H) 12R-12 VT-2 NRI C07.80 1CV8121 VLV (4 STUDS) 12R-13
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
C-H C07.70 1CV8142 (C-H) 12R-12 VT-2 NRI C07.80 1CV8142 VLV (6 STUDS) 12R-13
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
C-H C07.70 1CV8143 (C-H) 12R-12 C07.80 1CV8143VLV (4 STUDS) 12R-13
Not insulated in the area of interest, body to bonnet interface, bonnet bolting. (Al R08)
B-P B15.70 1CV8145 (B-P) 12R-12 VT-2 NRI B15.71 1CV8145 GLOBE VLV (6 STUDS) 12R-13
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
C-H C07.70 1CV8146 (C-H) 12R-12 VT-2 NRI C07.80 1CV8146VLV (6 STUDS) 12R-13
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
C-H C07.70 1CV8147 (C-H) 12R-12 VT-2 NRI C07.80 1CV8147 VLV (6 STUDS) 12R-13
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
C-H C07.70 1CV8149A (C-H) 12R-12 VT-2 NRI C07.80 1CV8149A VLV (6 STUDS) 12R-13
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
Page 3-47
CornEd Braidwood Station Unit 1
A1R08 ISI Outage Report
Section 3.4.2 Detailed Inservice Inspection Borated Bolting Listing (Page 2 of 13)
SYSTEM: Chemical & Volume Control System (CV)
Section XI ISI Identifier Cat. Item Description
Inspection Comments
C-H C07.70 1CV8149B (C-H)
C07.80 1CV8149B VLV (6 STUDS)
12R-12 VT-2 NRI
12R-13
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
C-H C07.70 1CV8149C (C-H) 12R-12 VT-2 NRI C07.80 1CV8149C VLV (6 STUDS) 12R-13
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
B-P B15.70 1CV8153A (B-P) 12R-12 VT-2 NRI B15.71 1CV8153AVLV (6 STUDS) 12R-13
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
B-P B15.70 1CV8153B (B-P) 12R-12 VT-2 IND.
B15.71 1CV8153B VLV (6 STUDS) 12R-13 VT-2 NRI
VT-1 NRI Body to Bonnet dry boric acid residue around valve 1CV8153B. Component was deconned. Bolting material not affected. (Post VT-2) no active leakage NRI. (VT-I) no degradation of studs, nuts or components affected by boric acid leakage. AR 990080720 generated to check bolt torque.
C-H C07.70 1CV8160 (C-H) 12R-12 VT-2 NRI
C07.80 ICV8160 VLV (6 STUDS) 12R-13 No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
C-H C07.70 1CV8320A (C-H) 12R-12 VT-2 IND. C07.80 1CV8320A VLV (16 STUDS) 12R-13 VT-1 NRI
Minor evidence of boric acid leakage noted. Component was deconned. (VT-i) Bolting material not affected by leakage.
C-H C07.70 1CV8320B (C-H) 12R-12 VT-2 IND. C07.80 1CV8320B VLV (16 STUDS) 12R-13 VT-1 NRI
Minor evidence of boric acid leakage noted. Component was deconned. ( VT-1) Bolting material not affected by leakage.
C-H C07.70 1CV8321A (0-H) 12R-12 VT-2 NRI C07.80 1CV8321AVLV (10 STUDS) 12R-13
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
0-H C07.70 1CV8321B (C-H) 12R-12 VT-2 NRI C07.80 1CV8321BVLV (10 STUDS) 12R-13
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
C-H C07.70 1 CV8322A (C-H) 12R-12 VT-2 IND. C07.80 1CV8322AVLV (10 STUDS) 12R-13 VT-2 NRI
VT-1 NRI
Dry boron nonactive packing leak found on 1CV8322A. Component was deconned. Bolting material not affected. (Post VT-2) no active leakage NRI. (VT-1) no degradation of studs,nuts,or components affected by the boric acid leakage. AR 990081584 generated to replace gasket during Al R09.
C-H C07.70 1CV8322B (C-H) 12R-12 VT-2 NRI C07.80 1CV8322B VLV (10 STUDS) 12R-13
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
Page 3-48
Comrnd Braidwood Station Unit 1
A1R08 ISI Outage Report
Section 3.4.2 Detailed Inservice Inspection Borated Bolting Listing (Page 3 of 13)
SYSTEM: Chemical & Volume Control System (CV)
Section Xl ISI Identifier Relief Program Exam Results
Cat. Item Description Request Notes Summary
Inspection Comments
C-H C07.70 1CV8323A (C-H) 12R-12 VT-2 IND. C07.80 1CV8323A VLV (16 STUDS) 12R-13 VT-2 NRI
VT-1 NRI Boric acid residue found around flange area. Component was deconned. Bolting material not affected. (Post VT-2) no active leakage NRI. (VT-1) no degradation of studs,nuts,or components affected by the boric acid leakage. AR 990081584 generated to replace gasket during Al R09.
C-H C07.70 1CV8323B (C-H) 12R-12 VT-2 NRI C07.80 ICV8323B VLV (16 STUDS) 12R-13
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
C-H C07.70 1 CV8374 (C-H) 12R-12 VT-2 NRI
C07.80 ICV8374VLV (4 STUDS) 12R-13
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
B-P B15.70 1CV8378A (B-P) 12R-12 VT-2 NRI
B15.71 1CV8378A CHECK VLV (16 STUDS) 12R-13
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
B-P B15.70 1CV8378B (B-P) 12R-12 VT-2 NRI
B15.71 ICV8378B CHECK VLV (16 STUDS) 12R-13
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
B-P B15.70 1CV8379A (B-P) 12R-12 VT-2 NRI
B15.71 ICV8379A CHECK VLV (16 STUDS) 12R-13
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
B-P B15.70 1CV8379B (B-P) 12R-12 VT-2 NRI
B15.71 1CV8379B CHECK VLV (16 STUDS) 12R-13
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
C-H C07.70 1CV8389A (C-H) 12R-12 VT-2 NRI
C07.80 ICV8389A VLV (6 STUDS) 12R-1 3 No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
C-H C07.70 ICV8389B (C-H) 12R-12 VT-2 IND.
C07.80 ICV8389B VLV (6 STUDS) 12R-13 VT-2 NRI VT-1 NRI
Packing leak (dry boron) found on 1CV8389B. Component was deconned. Bolting material not affected by packing leak. (Post VT-2) no active leakage NRI. (VT-1) no degradation of studs, nuts,or components affected by boric acid leak.
B-P B15.50 PG-2546C-014 F-2-2 (B-P) 12R-12 VT-2 NRI
B15.51 FLANGED CONNECTION (4 STUDS) 12R-13
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
C-H C07.30 PG-2546C-018 F-1-5 (C-H) 12R-12 VT-2 NRI
C07.40 FLANGED CONNECTION (4 STUDS) 12R-13
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
C-H C07.30 PG-2546C-020 F-1-1 (C-H) 12R-12 VT-2 IND.
C07.40 FLANGED CONNECTION (4 STUDS) 12R-13 VT-2 NRI VT-I NRI
Boric acid residue found around flange area. Component was deconned. Bolting material not affected. (Post VT-2) no active leakage NRI. (VT-1) no degradation of studs,nuts,or components affected by the boric acid leakage. AR 990079961 generated to retorque bolting.
Page 3-49
Braidwood Station Unit 1
A1R08 IS Outage Report
Section 3.4.2 Detailed Inservice Inspection Borated Bolting Listing (Page 4 of 13)
SYSTEM: Chemical & Volume Control System (CV)
Section XI ISI Identifier Relief Program Exam Results
Cat. Item Description Request Notes Summary
Inspection Comments
C-H C07.30 PG-2546C-041 F-1-1 (C-H) 12R-12 VT-2 IND. C07.40 FLANGED CONNECTION (4 STUDS) 12R-13 VT-2 NRI
VT-i NRI Boric acid residue found around flange area. Component was deconned. Bolting material not affected. (Post VT-2) no active leakage NRI. (VT-1) no degradation of studs,nuts,or components affected by the boric acid leakage. AR 990081339 generated to retorque bolting.
C-H C07.30 PG-2546C-063 F-1-1 (C-H) 12R-12 VT-2 IND. C07.40 FLANGED CONNECTION (4 STUDS) 12R-13 VT-2 NRI
VT-1 NRI
Boric acid residue found around flange area. Component was deconned. Bolting material not affected. (Post VT-2) no active leakage NRI. (VT-i) no degradation of studs,nuts,or components affected by the boric acid leakage. AR 990081332 generated to retorque bolting.
C-H C07.30 PG-2546C-066 F-1-1 (C-H) 12R-12 C07.40 FLANGED CONNECTION (8 STUDS) 12R-13
Component not insulated. Located in the excess letdown HX pit.
C-H C07.30 PG-2546C-068 F-1 (C-H) 12R-12 C07.40 FLANGED CONNECTION (4 STUDS) 12R-13
Insulation not removed for inspection. (Al R08)
B-P B15.50 PG-2546C-071 F-2-3 (B-P) 12R-12 B15.51 FLANGED CONNECTION (4 STUDS) 12R-13
Component not insulated in the area of interest.
C-H C07.30 PG-2546C-073 F-1-1 (C-H) 12R-12 C07.40 FLANGED CONNECTION (8 STUDS) 12R-13
Component un-insulated and examined during AiR07. Insulation permanently removed during AlR07 reference ER 9900979.
C-H C07.30 PG-2546C-076 F-1-3 (C-H) 12R-12
C07.40 FLANGED CONNECTION (8 STUDS) 12R-13
Component not insulated in the area of interest.
C-H C07.30 PG-2546C-081 FL-1-2 (C-H) 12R-12
C07.40 FLANGED CONNECTION (8 STUDS) 12R-13
Component un-insulated and examined during Al R07. Insulation permanently removed during Al R07 reference ER 9900979.
C-H C07.30 PG-2546C-083 FL-1-2 (C-H) 12R-12 VT-2 NRI
C07.40 FLANGED CONNECTION (8 STUDS) 12R-13
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
C-H C07.30 PG-2546C-089 FL-i-1 (C-H) 12R-12 VT-2 NRI C07.40 FLANGED CONNECTION (8 STUDS) 12R-13
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
C-H C07.30 PG-2546C-090 F-1-1 (C-H) 12R-12 VT-2 NRI
C07.40 FLANGED CONNECTION (8 STUDS) 12R-13
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
B-P B15.50 PG-2546C-091 F-2-3 (B-P) 12R-12 VT-2 NRI
B15.51 FLANGED CONNECTION (4 STUDS) 12R-13
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
Page 3-50
CornEd Braidwood Station Unit 1
A1R08 ISI Outage Report
Section 3.4.2 Detailed Inservice Inspection Borated Bolting Listing (Page 5 of 13)
SYSTEM: Chemical & Volume Control System (CV)
Section XI ISI Identifier Relief Program Exam Results
Cat. Item Description Request Notes Summary
Inspection Comments
C-H C07.30 PG-2546C-093 F-1 (C-H) 12R-12 C07.40 FLANGED CONNECTION (4 STUDS) 12R-13
Insulation not removed for inspection. (Al R08)
B-P B15.50 PG-2546C-101 F-2-3 (B-P) 12R-12 VT-2 NRI B15.51 FLANGED CONNECTION (4 STUDS) 12R-13
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
C-H C07.30 PG-2546C-108 F-1-1 (C-H) 12R-1 2 C07.40 FLANGED CONNECTION (8 STUDS) 12R-13
Component un-insulated and examined during Al R07. Insulation permanently removed during AI R07 reference ER 9900979.
C-H C07.30 PG-2546C-119 F-1-1 (C-H) 12R-12 C07.40 FLANGED CONNECTION (4 STUDS) 12R-13
Component un-insulated and examined during A1R07. Insulation permanently removed during AIR07 reference ER 9900979.
C-H C07.30 PG-2546C-119 F-2-1 (C-H) 12R-12 C07.40 FLANGED CONNECTION (4 STUDS) 12R-13
Component un-insulated and examined during Al R07. Insulation permanently removed during Ai R07 reference ER 9900979.
C-H C07.30 PG-2546C-122 F-1-1 (C-H) 12R-12 C07.40 FLANGED CONNECTION (4 STUDS) 12R-13
Component un-insulated and examined during Ai R07. Insulation permanently removed during Al R07 reference ER 9900979.
C-H C07.30 PG-2546C-122 F-2 (C-H) 12R-12 C07.40 FLANGED CONNECTION (4 STUDS) 12R-13
Component un-insulated and examined during A1 R07. Insulation permanently removed during Ai R07 reference ER 9900979.
Page 3-51
CornEd Braidwood Station Unit 1
A1R08 ISI Outage Report
Section 3.4.2 Detailed Inservice Inspection Borated Bolting Listing (Page 6 of 13)
SYSTEM: Pressurizer (PZR)
Section XI ISI Identifier Relief Program Exam Results
Cat. Item Description Request Notes Summary
Inspection Comments
B-P B15.20 1PZR-01-B1 (B-P) 12R-12 VT-2 NRI B15.21 MANWAY BOLTING (16 TOTAL) 12R-13
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
Page 3-52
ConmEd Braidwood Station Unit 1
A1R08 ISI Outage Report
Section 3.4.2 Detailed Inservice Inspection Borated Bolting Listing (Page 7 of 13)
SYSTEM: Reactor Coolant System (RC)
Section XI ISI Identifier Cat. Item Description
Inspection Comments
B-P B15.50 1RC-19-B3 (B-P) 12R-12 VT-2 IND.
B15.51 FLANGED CONNECTION (4 STUDS) 12R-13
Heavy boron accumulation around flange noted. Bolting material and gasket being replaced during A1R08, reference WR 980118188.
B-P B15.50 1RC-20-B1 (B-P) 12R-12 VT-2 IND. B15.51 FLANGED CONNECTION (4 STUDS) 12R-13
Heavy boron accumulation around flange noted. Bolting material and gasket being replaced during A1R08, reference WR 980120215.
B-P B15.50 1RC-23-B1 (B-P) 12R-12 VT-2 IND.
B15.51 FLANGED CONNECTION (4 STUDS) 12R-13
Heavy boron accumulation around flange noted. Gasket, studs, and nuts are being replaced during Al R08, reference WR 980120187.
B-P B15.50 1RC-27-Bl (B-P) 12R-12 VT-2 IND.
B15.51 FLANGED CONNECTION (4 STUDS) 12R-13
Heavy boron accumulation around flange noted. Bolting material and gasket being replaced during A1 R08, reference WR 980120201.
B-P B15.70 1RC8001A (B-P) 12R-13 VT-2 NRI
B15.71 1RC8001A VALVE BOLTING (24 TL) 12R-30
No evidence of leakage (bodc acid residue) noted. VT-2 acceptable.
B-P B15.70 1RC8002A (B-P) 12R-13 B15.71 1RC8002A VALVE BOLTING (24 TL) 12R-30
Minor evidence of boric acid leakage noted. Component was deconned. Bolting material not affected by leakage.
B-P B15.70 1RC8003A (B-P)
B15.71 1RC8003A ANGLE GLOBE(12 STUDS)
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
12R-13
12R-30
VT-2
VT-2
IND.
NRI
B-P B15.70 1RC8036A (B-P) 12R-12 VT-2 IND.
B15.71 1RC8036A GLOBE VLV (6 STUDS) 12R-13 VT-2 NRI
VT-1 NRI
Packing leak (dry boron) found on 1IRC8036A. Component was deconned. Bolting material not affected by packing leak. (Post VT-2) no active leakage NRI. (VT-1) no degradation of studs, nuts,or components affected by boric acid leak.
B-P B15.70 1RC8036B (B-P) 12R-12 VT-2 NRI
B15.71 1RC8036B GLOBE VLV (6 STUDS) 12R-13
No evidence of leakage (bodc acid residue) noted. VT-2 acceptable.
B-P B15.70 1RC8036C (B-P) 12R-12 VT-2 IND. B15.71 1RC8036C GLOBE VLV (6 STUDS) 12R-13 VT-2 NRI
VT-i NRI
Packing leak (dry boron) found on I RC8036C. Component was deconned. Bolting material not affected by packing leak. (Post VT-2) no active leakage NRI. (VT-i) no degradation of studs, nuts,or components affected by bodc acid leak. AR 990081752 generated to adjust packing.
B-P B15.70 1RC8036D (B-P) 12R-12 VT-2 IND.
B15.71 1RC8036D GLOBE VLV (6 STUDS) 12R-13 VT-2 NRI VT-1 NRI
Dry boron non-active seeping up through component bolting. Component was deconned. Bolting material not affected by the boron leak. (Post VT-2) no active leakage NRI. (VT-1) no degradation of studs,nuts,or components affected by the boric acid leakage. AR 990081583 generated to replace gasket during Al R09.
B-P B15.70 1RC8037A (B-P) 12R-12 VT-2 NRI
B15.71 IRC8037A GLOBE VLV (6 STUDS) 12R-13
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
Page 3-53
CornBd Braidwood Station Unit 1
A1R08 ISI Outage Report
Section 3.4.2 Detailed Inservice Inspection Borated Bolting Listing (Page 8 of 13)
SYSTEM: Reactor Coolant System (RC)
Section XI ISI Identifier Relief Program Exam Results
Cat. Item Description Request Notes Summary
Inspection Comments
B-P B15.70 1RC8037B (B-P) 12R-12 VT-2 IND. B15.71 1RC8037B GLOBE VLV (6 STUDS) 12R-13 VT-2 NRI
VT-1 NRI
Packing leak (dry boron) found on 1RC8037B. Component was deconned. Bolting material not affected by packing leak. (Post VT-2) no active leakage NRI. (VT-1) no degradation of studs, nuts,or components affected by boric acid leak. AR 990081813 generated to adjust packing.
B-P B15.70 1RC8037C (B-P) 12R-12 VT-2 IND. B15.71 1RC8037C GLOBE VLV (6 STUDS) 12R-13 VT-2 NRI
VT-1 NRI Packing leak (dry boron) found on 1RC8037C. Component was deconned. Bolting material not affected by packing leak. (Post VT-2) no active leakage NRI. (VT-1) no degradation of studs, nuts,or components affected by boric acid leak. AR 990081759 generated to adjust packing.
B-P B15.70 1RC8037D (B-P) 12R-12 VT-2 NRI B15.71 1RC8037D GLOBE VLV (6 STUDS) 12R-13
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
B-P B15.70 1RC8085 (B-P) 12R-12 VT-2 NRI B15.71 1RC8085 GATE VLV (16 STUDS) 12R-13
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
B-P B15.10 1RV-03-STUDS (01 TO 54, B-P) 12R-13 VT-2 NRI B15.11 CLOSURE HEAD STUDS (54 TOTAL) 12R-31
No evidence of boric acid leakage. Insulation removed for inspection.
B-P B15.30 1SG-05-SGB-01 (B-P) 12R-13 VT-2 NRI B15.31 PRIMARY MANWAY (20 STUDS) 12R-31
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
B-P B15.30 1SG-05-SGB-02 (B-P) 12R-13 VT-2 NRI
B15.31 PRIMARY MANWAY (20 STUDS) 12R-31
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
B-P B15.30 1SG-06-SGB-01 (B-P) 12R-13 VT-2 NRI
B15.31 PRIMARY MANWAY (20 STUDS) 12R-31
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
B-P B15.30 ISG-06-SGB-02 (B-P) 12R-13 VT-2 N/A
B15.31 PRIMARY MANWAY (20 STUDS) 12R-31
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
B-P B15.30 1SG-07-SGB-01 (B-P) 12R-13 VT-2 NRI
B15.31 PRIMARY MANWAY (20 STUDS) 12R-31
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
B-P B15.30 1SG-07-SGB-02 (B-P) 12R-13 VT-2 NRI
B15.31 PRIMARY MANWAY (20 STUDS) 12R-31
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
B-P B15.30 1SG-08-SGB-01 (B-P) 12R-13 VT-2 NRI
B15.31 PRIMARY MANWAY (20 STUDS) 12R-31
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
Page 3-54
CornEd Braidwood Station Unit 1
AIR08 ISI Outage Report
Section 3.4.2 Detailed Inservice Inspection Borated Bolting Listing (Page 9 of 13)
SYSTEM: Reactor Coolant System (RC)
Section Xl ISI Identifier Relief Program Exam Results
Cat. Item Description Request Notes ummary
Inspection Comments
B-P B15.30 1SG-08-SGB-02 (B-P) 12R-13 VT-2 NRI B15.31 PRIMARY MANWAY (20 STUDS) 12R-31
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
Page 3-55
ComrEd Braidwood Station Unit 1
A1R08 ISI Outage Report
Section 3.4.2 Detailed Inservice Inspection Borated Bolting Listing (Page 10 of 13)
SYSTEM: Residual Heat Removal System (RH)
Section XI ISI Identifier Relief Program Exam Results
Cat. Item Description Request Notes Summary
Inspection Comments
C-H C07.30 1RH-02 F-1-1 (C-H) 12R-12 VT-2 NRI C07.40 FLANGED CONNECTION (20 STUDS) 12R-13 VT-1 NRI
No evidence of leakage (boric acid residue) noted, VT-2 acceptable. Signs of past leakage noted, minor corrosion on bolting. VT-1 exam performed on bolting, no degradation noted on bolting material.
C-H C07.30 1 RH-02 F-2-1 (C-H) 12R-12 VT-2 NRI C07.40 FLANGED CONNECTION (20 STUDS) 12R-13 VT-1 NRI
No evidence of leakage (boric acid residue) noted, VT-2 acceptable. Signs of past leakage noted, minor corrosion on bolting. VT-1 exam performed on bolting, no degradation noted on bolting material.
C-H C07.30 1RH-02 F-4 (C-H) 12R-12 VT-2 NRI C07.40 FLANGED CONNECTION (8 STUDS) 12R-13
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
C-H C07.30 1RH-03 F-2 (C-H) 12R-12 VT-2 NRI C07.40 FLANGED CONNECTION (24 STUDS) 12R-13
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
C-H C07.30 IRH-05 F-1 (C-H) 12R-12 VT-2 NRI C07.40 FLANGED CONNECTION (24 STUDS) 12R-13
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
C-H C07.30 1RH-05 F-2 (C-H) 12R-12 VT-2 NRI C07.40 FLANGED CONNECTION (24 STUDS) 12R-13
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
C-H C07.30 1RH-05 F-3-1 (C-H) 12R-12 VT-2 IND. C07.40 FLANGED CONNECTION (12 STUDS) 12R-13 VT-1 IND.
Boron accumulation around entire flange connection (gasket leak), component was deconned and re-examined. (VT-1) results, thread wastage observed on bolting material. AR 990080608 generated to replace flange gasket and bolting. PIF #A2000-01149 Component 1 FE-0619
C-H C07.30 1RH-06 F-1-1 (C-H) 12R-12 VT-2 IND. C07.40 FLANGED CONNECTION (12 STUDS) 12R-13 VT-2 NRI
VT-1 NRI Boron accumulation around entire flange connection. Component was deconned. Bolting material not affected. (Post VT-2) no active leakage NRI. (VT-1) no degradation of studs or nuts affected by the boric acid leakage. AR 990080395 generated to change flange gasket. Component 1 FE-061 1
C-H C07.30 1RH-07 F-2-1 (C-H) 12R-12 VT-2 NRI C07.40 FLANGED CONNECTION (20 STUDS) 12R-13
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
C-H C07.30 1RH-07 F-3-1 (C-H) 12R-12 VT-2 NRI C07.40 FLANGED CONNECTION (20 STUDS) 12R-13
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
C-H C07.30 1RH01MB (C-H) 12R-12 C07.40 FLANGED CONNECTION (12 STUDS) 12R-13
Component no longer exists, strainer replaced with spool piece.
C-H C07.70 1RH606 (C-H) 12R-12 VT-2 NRI C07.80 1RH606 VLV (4 STUDS) 12R-13
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
Page 3-56
CornEd Braidwood Station Unit 1
A1R08 ISI Outage Report
Section 3.4.2 Detailed Inservice Inspection Borated Bolting Listing (Page 11 of 13)
SYSTEM: Residual Heat Removal System (RH)
Section XI ISI Identifier Relief Program Exam Results
Cat. Item Description Request Notes Summary
Inspection Comments
C-H C07.70 1 RH607 (C-H) 12R-12 VT-2 NRI C07.80 1RH607 VLV (4 STUDS) 12R-13
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
C-H C07.70 1RH610 (C-H) 12R-12 VT-2 NRI C07.80 1RH610 VLV (16 STUDS) 12R-13
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
C-H C07.70 1RH611 (C-H) 12R-12 VT-2 NRI C07.80 1RH611 VLV (16 STUDS) 12R-13
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
C-H C07.70 1RH618 (C-H) 12R-12 VT-2 NRI C07.80 1RH618VLV (4 STUDS) 12R-13
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
C-H C07.70 1RH619 (C-H) 12R-12 VT-2 NRI C07.80 1RH619VLV (4 STUDS) 12R-13
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
B-P B15.70 1RH8701B (B-P) 12R-13 VT-2 NRI B15.71 1RH8701B GATE VALVE (18 STUDS) 12R-30
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
C-H C07.70 1RH8708B (C-H) 12R-12 VT-2 NRI C07.80 1RH8708B VLV (6 STUDS) 12R-13
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
C-H C07.70 1RH8724A (C-H) 12R-12 VT-2 NRI C07.80 1RH8724A VLV (16 STUDS) 12R-13
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
C-H C07.70 1RH8724B (C-H) 12R-12 VT-2 NRI C07.80 1RH8724B VLV (16 STUDS) 12R-13
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
C-H C07.70 1RH8730A (C-H) 12R-12 VT-2 NRI C07.80 1RH8730A VLV (16 STUDS) 12R-13
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
C-H C07.70 1RH8730B (C-H) 12R-12 VT-2 NRI C07.80 1RH8730B VLV (16 STUDS) 12R-13
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
Page 3-57
CornEd Braidwood Station Unit 1
A1R08 ISI Outage Report
Section 3.4.2 Detailed Inservice Inspection Borated Bolting Listing (Page 12 of 13)
SYSTEM: Reactor Coolant System (RY)
Section Xl ISI Identifier Relief stProgram Exa Results C m Description Reque Notes Summary
Inspection Comments
B-P B15.70 1RY455B (B-P) 12R-12 VT-2 NRI B15.71 1RY455B GLOBE VALVE (8 STUDS) 12R-13
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
B-P B15.70 1RY455C (B-P) 12R-12 VT-2 NRI B15.71 1RY455C GLOBE VALVE (8 STUDS) 12R-13
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
B-P B15.70 1RY8000A (B-P) 12R-12 VT-2 NRI B15.71 1RY8000A GATE VALVE (16 STUDS) 12R-13 VT-1 NRI
Minor boron residue around body to bonnet connection. Component deconned and re-examined, VT-2 NRI. VT-1 performed on bolting NRI.
B-P B15.70 1RY8000B (B-P) 12R-12 VT-2 NRI B15.71 1RY8000B GATE VALVE (16 STUDS) 12R-13 VT-1 NRI
Minor boron residue around body to bonnet connection. Component deconned and re-examined, VT-2 NRI. VT-1 performed on bolting NRI.
Page 3-58
CornEd Braidwood Station Unit 1
AIR08 ISI Outage Report
Section 3.4.2 Detailed Inservice Inspection Borated Bolting Listing (Page 13 of 13)
SYSTEM: Safety Injection System (SI)
Section XI ISI Identifier Relief Program Exam Results
Cat. Item Description Request Notes Summary
Inspection Comments
B-P B15.70 1S18948A (B-P) 12R-13 VT-2 NRI B135.71 1S18948A CHECK VALVE (18 STUDS) 12R-30
No evidence of leakage (boric acid residue) noted. VT-2 acceptable.
B-P B15.70 1S18949A (B-P) 12R-13 VT-2 NRI B15.71 1S18949A VLV (16 STUDS) 12R-30
No evidence of leakage (boric acid residue) noted. VT-2 acceptable. Component not insulated in the area of interest.
Page 3-59
CornEd Braidwood Station Unit 1 AlR08 ISI Outage Report
4.0 NIS-1 FORM (OWNER'S REPORT FOR INSERVICE INSPECTION)
As required by IWA-6000 of Section XI, this section contains the Owner's Report for Inservice Inspections, Form NIS-1, for the preservice and inservice examination of Class 1 and Class 2 pressure retaining components and their supports.
Page 4-1
ComnEd Braidwood Station Unit 1
A1R08 ISI Outage Report
FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONS As required by the Provisions of the ASME Code Rules
(Page 1 of 4)
1. Owner CornEd, P.O. Box 767, Chicago, Illinois 60690 (Name and Address of Owner)
2. Plant Braidwood Nuclear Power Station, 35100 S. Rt 53 Suite 84, Braceville, Illinois 60407 (Name and Address of Plant)
3. Plant Unit 1 4. Owner Certificate Of Autherization (if required) N/A
5. Commercial Service Date 7/29/88 6. National Board Number for Unit N-195
7. Components Inspected See Section 3 of this report.
Manufacturer Component or Manufacturer or Installer State or National Appurtenance or Installer Serial No. Province No. Board No.
Component Cooling N/A N/A N/A N/A System (CC)
Containment Spray N/A N/A N/A N/A System (CS)
Chemical & Volume N/A N/A N/A N/A Control System (CV)
Fuel Pool Cooling N/A N/A N/A N/A System (AF)
Feedwater System N/A N/A N/A N/A (FW)
Main Steam System N/A N/A N/A N/A (MS)
Nitrogen System (NT) N/A N/A N/A N/A
Process Sampling N/A N/A N/A N/A System (PS)
Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in., (2) information in items 1 through 6 of this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
Page 4-2
Con-Ed Braidwood Station Unit 1
ALR08 ISI Outage Report
FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONS As required by the Provisions of the ASME Code Rules
(Page 2 of 4)
1. Owner ComEd, P.O. Box 767, Chicago, Illinois 60690 (Name and Address of Owner)
2. Plant Braidwood Nuclear Power Station, 35100 S. Rt 53 Suite 84, Braceville, Illinois 60407 (Name and Address of Plant)
3. Plant Unit- 1 4. Owner Certificate Of Autherization (if required) N/A.
5. Commercial Service Date 7/29/88 6. National Board Number for Unit N-195
7. Components Inspected See Section 3 of this report.
Manufacturer Component or Manufacturer or Installer State or National Appurtenance or Installer Serial No. Province No. Board No.
Pressurizer (PZR) N/A N/A N/A N/A
Reactor Coolant N/A N/A N/A N/A System (RC)
Residual Heat N/A N/A N/A N/A Removal System (RH)
Reactor Coolant N/A N/A N/A N/A System (RY)
Steam Generator N/A N/A N/A N/A Blowdown System (SD)
Safety Injection N/A N/A N/A N/A System (SI)
Essential Service N/A N/A N/A N/A Water System (SX)
Containment Chilled N/A N/A N/A N/A Water System (WO)
Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in., (2) information in items 1 through 6 of this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
Page 4-3
CornEd Braidwood Station Unit 1
A1R08 ISI Outage Report
FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONS As required by the Provisions of the ASME Code Rules
(Page 3 of 4)
1. Owner ComEd, P.O. Box 767, Chicago, Illinois 60690 (Name and Address of Owner)
2. Plant Braidwood Nuclear Power Station, 35100 S. Rt 53 Suite 84, Braceville, Illinois 60407 (Name and Address of Plant)
3. Plant Unit 1 4. Owner Certificate Of Autherization (if required) N/A
5. Commercial Service Date 7/29/88 6. National Board Number for Unit N-195
7. Components Inspected See Section 3 of this report._
Manufacturer Component or Manufacturer or Installer State or National Appurtenance or Installer Serial No. Province No. Board No.
Plant Systems N/A N/A N/A N/A Pressurized During Mode 3 (ZZ)
Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in., (2) information in items 1 through 6 of this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
Page 4-4
Cor-Ed Braidwood Station Unit 1
AIR08 ISI Outage Report
FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONS As required by the Provisions of the ASME Code Rules
(Page 4 of 4)
(BACK)
8. Examination Dates November 15, 1998 to April 5, 2000
9. Inspection Period Identification: First Inspection Period
10. Inspection Interval Identification: Second Inspection Interval
11. Applicable Edition of Section XI 1989 Addenda No Addenda
12. Date/Revision of Inspection Plan: Second Interval ISI Program Plan, Revision 2, submitted on September 2, 1998
13. Abstract of Examinations and Tests. Include a list of examinations and tests and a statement concerning status of work required for the Inspection Plan.
A summary of examinations is discussed in Section 2, with a detailed listing of examinations contained in Section 3.
14. Abstract of Results of Examination and Tests.
A summary and discussion of examination results are contained with the detailed listing of examinations provided in Section 3.
15. Abstract of Corrective Measures.
A summary of corrective measures are contained with the detailed listing of examinations provided in Section 3.
We certify that a) the statements made in this report are correct, b) the examination and tests meet the Inspection Plan as required by the ASME Code, Section XI, and c) corrective measures taken conform to the rules of the ASME Code, Section XI.
Certificate of Authorization No. (if applicable) Date 4,,7 . 20 0o Signed
N/A Expiration Date
ComEdOwner
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding a valid commision issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of L-' - o ' and employed by Y\ n - " , - -. of kA--,N--T-r- r7--. c. C•K- have inspected the components described in this Owner's Report during the period
VL- ' s- to -4- 16 - " . , and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described in this Owner's Report in accordance with the Inspection Plan and as required by the ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, and corrective measures described in this Owner's Report. Futhermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
_ _ _-,Commisions ,--- . " tozJ Inspector's Signature National Board, State, Province, and Endorsements
Date Le "-2--1. 20
Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in.,
(2) information in items 1 through 6 of this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
Page 4-5
CornEd Braidwood Station Unit 1 AlR08 ISI Outage Report
5.0 REPORT OF CONTAINMENT DEGRADATION
The Nuclear Regulatory Commission (NRC) has amended its Code of Federal Regulations (10CFR 50.55a) to incorporate by reference the 1992 Edition with the 1992 Addenda of Subsection IWE (Requirements for Class MC and Metallic Liners of Class CC Components of Light-Water Cooled Power Plants) and Subsection IWL (Requirements for Class CC Components of Light-Water Cooled Power Plants) of ASME Section XI, Division 1, with specified modifications and a limitation noted. This segment is included in the Inservice Inspection Summary report required by IWA-6000 of ASME Section XI to meet the reporting conditions specified in 10CFR 50.55a(b)(2)(viii)(A)-(E) and 10CFR 50.55a(b)(2)(ix)(A)-(E).
5.1 Containment Tendon Water Surveillance
Braidwood Station performs an annual surveillance of a random sample of the containment anchorage components that are located below grade. Grade elevation at Braidwood is 401'. The purpose of the surveillance is to monitor the post tensioning systems for evidence of free water and identify any adverse affects the free water may have on the tendon anchorage components. The Surveillance Procedure employed to perform this inspection is ComEd Procedure BwVSR 5.5.6-2 "Containment Tendon Water Inspection Surveillance". A summary of the required Unit 1 data is attached (Pages 5-2 to 5-3). The NRC Code Of Federal Regulations, 1OCFR 50.55a Codes and Standards (ix) Examination of Concrete Containments (D) requires that the licensee report the following conditions, if they occur, in the ISI Summary Report required by ASME Section XI, IWA-6000:
* The sampled sheathing filler grease contains chemically combined water exceeding 10 percent by weight or the presence of free water.
* The absolute difference between the amount of sheathing filler grease removed and
that replaced exceeds 10 percent of the tendon net duct volume.
Leakage is detected during general visual examination of the containment surface.
In accordance with the Braidwood Technical Requirements Manual (TRM) and ASME Section XI, IWL -3300, items which do not meet the acceptance standards shall be evaluated. An Engineering Evaluation Report stating the following shall be prepared:
"* Description of the condition of the tendon.
"* The condition of the concrete (especially at tendon anchorage locations).
"* The tolerance on concrete cracking.
"* The cause of the condition that does not meet the acceptance standards.
"* The acceptability of the concrete containment without repair of the item.
"* Whether or not repair or replacement is required and if required, the extent, method, and completion date for the repair or replacement.
"* The corrective actions taken.
"* The extent, nature, and frequency of additional examinations.
Page 5-1
CornEd Braidwood Station Unit 1 AlR08 ISI Outage Report
References: NRC Code of Federal Regulations, l0CFR 50.55a Codes and Standards ASME Section XI Boiler and Pressure Vessel Code, Subsection 1WL, 1992 Edition with the 1992 Addenda. Braidwood Station Technical Requirements Manual (TRM)
Description of Surveillance:
Braidwoocd Station performs an annual surveillance of a random sample of containment tendon anchorage components located below grade. Grade elevation at Braidwood is 401'. The purpose of the surveillance is to monitor the post tensioning systems for evidence of free water and identify any adverse affects the free water may have on the post tensioning system and concrete. The procedure employed to perform this inspection is ComEd Procedure BwVSR 5.6.6-2 "Containment Tendon Water Inspection Surveillance". Braidwood has the 170 wire "INRYCO" 0.25" diameter wire tendon system installed in both units.
Description Of Conditions Which Exceeded Acceptance Standards:
A small quantity of free water was collected from five anchorage locations. The acceptance standard for the quantity of free water collected from any location is zero. Free water was not collected in sufficient quantities to perform a chemical analysis.
The following tables provide a summation of the free water that was collected and the results of the chemical analysis that was performed on the grease samples. No free water was included in the grease samples. All grease samples were obtained from areas immediately adjacent to the tendon anchorage components. Tendons with an "H" prefix are in a horizontal configuration. Tendons with a "V" prefix are in a vertical configuration. Conditions where the acceptance criteria was exceeded are in bold print.
Page 5-2
CrnmEd Braidwood Station Unit 1 AlR08 ISI Outage Report
TABLE 1
Braidwood Unit 1 1999 Surveillance Free Water Ouantification and Chemical Analysis Results
Tendon Anchorage Elevation Quantity Of pH Level Comments EPN End Of Free Water Laboratory
Anchorage Collected
HlAC-A Shop 378'-8" zero N/A No Free Water Collected.
H1AC-C Field 378'-8" 1 ounce N/A Free water not collected in sufficient quantity for laboratory analysis.
H1BA-A Field 378'-8" 1 ounce N/A Free water not collected in sufficient quantity for laboratory analysis.
H1BA-B Shop 378'-8" 1 ounce N/A Free water not collected in sufficient quantity for laboratory analysis.
H1CB-C Shop 378'-8" zero N/A No Free Water Collected.
HlCB-B Field 378'-8" 2 ounces N/A Free water not collected in sufficient quantity for laboratory analysis.
H2AC-A Shop 381 '-3" zero N/A No Free Water Collected.
H2CA-C Field 381 '-3" 3 ounces N/A Free water not collected in sufficient quantity for laboratory analysis.
V41-B Field 362'-0" zero N/A No Free Water Collected.
V42-B Field 362'-0" zero N/A No Free Water Collected.
Page 5-3
CornEd Braidwood Station Unit 1 AlRO8 ISI Outage Report
TABLE 2
Braidwood Unit 1 1999 Surveillance Free Water Sheathing Filler Grease Chemical Analysis Results
Tendon Anchorage Quantity Moisture Water Water Water Neutralization No. EPN End Of Free Content Soluble Soluble Soluble Reserve Alkalinity
Water (% by Chlorides Nitrate Sulfide (Base No.) Collected wt.) (ppm) (ppm) (ppm) mg/KOH/g
Note 6 Note 1 Note 2 Note 3 Note 4 Note 5
H1AC-A Shop zero <0.10% <.0.50 1.25 ppm <.0.50 61.7 mg KOH/g ppm ppm
H1AC-C Field 1 ounce <0.10% <.0.50 0.62 ppm <.0.50 53.1 mg KOH/g ppm ppm
H1BA-A Field 1 ounce <0.10% <.0.50 <.0.50 <.0.50 35.9 mg KOH/g ppm ppm ppm
H1BA-B Shop 1 ounce <0.10% <.0.50 1.25 ppm <.0.50 53.4 mg KOH/g ppm ppm
H1CB-C Shop zero 0.88% <.0.50 1.87 ppm <.0.50 49.4 mg KOH/g ppm ppm
HlCB-B Field 2 ounces 0.56% <.0.50 <.0.50 <.0.50 51.8 mg KOH/g ppm ppm ppm
H2AC-A Shop zero <0.10% <.0.50 0.94 ppm <.0.50 27.3 mg KOH/g ppm ppm
H2CA-C Field 3 ounces <0.10% <.0.50 2.18 ppm <.0.50 55.7 mg KOH/g ppm ppm
V41-B Field zero 0.13% <.0.50 <.0.50 <.0.50 30. lmg KOH/g ppm ppm ppm
V42-B Field zero <0.10% <.0.50 <.0.50 <.0.50 45.6 mg KOH/g ppm ppm ppm
Note 1: Acceptance Standard for Free Water is zero.
Note 2: Acceptance Standard for Moisture Content: Moisture Content shall not exceed 10% by wt.
Note 3: Acceptance Standard for Water Soluble Chlorides: 10 ppm max.
Page 5-4
CornEd Braidwood Station Unit 1
A1R08 ISI Outage Report
Note 4: Acceptance Standard for Water Soluble Nitrates: 10 ppm max.
Note 5: Acceptance Standard for Water Soluble Sulfides: 10 ppm max.
Note 6: Acceptance Standard for Reserve Alkalinity (Base No.): The base no. shall be at least 50% of the installed value, unless the value is 5 or less, in which case the as installed value shall be no less than zero. If the tendon duct is filled with a mixture of materials having various installed numbers, the lowest numbers shall govern acceptance. The containment tendon ducts at Braidwood are filled with "Visconorust 2090P-4" Casing Filler For Tendon Sheathing. The neutralization base no. as published by the manufacturer is a minimum of 35. Therefore the acceptance criteria as applied to the tendon surveillance inspections at Braidwood is a minimum of 50% of the installed value or a minimum of 17.5 mg KOH/g.
Evaluation Of Conditions and Corrective Actions
Description Of The Condition Of The Tendons:
The tendon anchorage components including the anchor heads, shims, bearing plates, button heads, bushings, and button heads were cleaned of all grease using approved solvents. A visual examination (VT-1) was performed on all tendon anchorage components. The exams resulted in the identification of no condition where significant degradation was identified. No active corrosion exists on the anchor heads, shims, button heads, or bushings. No active corrosion exists on the portion of the bearing plates that is covered by the grease can. Some minor active corrosion (surface rust) exists on the portion of the bearing plates that is outside the sealing surface of the grease can and gasket. This corrosion is minor and does not adversely affect the structural integrity of the bearing plate.
Description Of The Condition Of The Concrete (Tendon Anchorage Locations):
The concrete extending 24" beyond each bearing plate was visually examined using the VT-iC method. The tolerance for cracking is "no crack width shall exceed a width of 0.010". No crack widths exceeded the acceptance standards. The concrete surrounding all bearing plates is sound and not structurally degraded. Some discoloration and moist areas were identified in small areas around tendons V41-B and V42-B. The grease cans were removed from these locations. No free water was collected. The grease and anchorage components are in good condition.
Root Cause of The Condition That Did Not Meet The Acceptance Standards:
The source of the free water is indeterminate. The free water may be a result of condensation forming in the grease can or the intrusion of very small quantities of free water from external sources.
Acceptability Of The Containment Without Repair:
The containment is acceptable as is without repair. The existence of the free water in the tendon grease can does not affect the structural integrity of the containment. The following provides justification for this conclusion:
* The chemical analysis results for the grease samples indicated no conditions where the acceptance standards were exceeded.
* A visual examination (VT-1) was performed on the tendon anchorage components.
Page 5-5
COMEd Braidwood Station Unit 1 AIR08 ISI Outage Report
No conditions that indicate structural degradation were identified. The anchorage components are in good condition. With the exception of that identified on the outer portions of the bearing plates, no active corrosion was identified. No cracks were identified. The quantity of effective wires (not unseated or protruding) matched that recorded during previous inspections.
* A visual examination (VT-iC) was performed on the concrete extending 24" out from each tendon anchorage location. The acceptance standard on cracking is no crack width shall exceed 0.010" in width. No cracks exceeded 0.010" in width. The concrete is in good condition. No conditions indicative of structural degradation were identified.
0 The quantity of sheathing filler grease that was replaced versus that removed was within 10% of the tendon net duct volume in all cases.
* The grease cans for all tendon locations located below grade were examined. 162 vertical tendon grease cans and 66 horizontal tendon grease cans were examined. Each can was examined for corrosion, grease leakage, and deformation. One tendon location (V146) was identified to have minor grease leakage from the gasket connection. The grease can was removed and the gasket was replaced. V146 was not scheduled to be included in the free water surveillance exam scope. No free water was collected when the grease can was removed. The grease condition is normal. No actions beyond replacement of the gasket were performed. Minor surface rust was identified on the grease cans and bolting. No corrosion that challenges the structural integrity or leak tightness of the grease cans was identified. No deformation or additional grease leakage was identified.
* The issue of the effect free water has on the corrosion protection properties of the grease has been previously discussed with the manufacturer of the sheathing filler grease. The corrosion protection medium "Viscosity 2090P-4 Casing Filler" will continue to provide protection provided the components are coated, regardless of the presence of moisture. All anchorage components were verified as completely coated with sheathing filler grease in the as found condition.
* The quantity of free water collected from the Unit 1 Tendon locations is insignificant.
Corrective Actions Taken:
The grease was removed from the tendon anchorage locations and replaced. Grease sample chemical analysis was completed in accordance with ASME Section XI, IWL -2525.2. No deficiencies were identified as a result of the corrective actions.
Extent, Nature, and Frequency Of Additional Examinations:
The Unit 1 containment is acceptable as is and repair or replacement of the tendon components is not required as a result of the identification of the small quantity of water collected during the 1999 surveillance. The Unit 1 post tensioning system will continue to be monitored on an annual basis. Free water has not been collected from the vertical tendon locations. No free water was collected from the vertical tendons that were disturbed during the steam generator replacement project in 1998. Although the vertical tendons will continue to be monitored, more focus will be placed on the horizontal tendons during the 2000 surveillance. The inspection scope will include a minimum of 15 % of the horizontal tendons located below grade or 20 anchorage locations.
Page 5-6
ComrEd Braidwood Station Unit 1 AIR08 ISI Outage Report
5.2 IWE General Visual Exam and VT-3
A Section XI IWE general visual examination was performed on the Unit 1 containment liner plate area directly below the Moisture Barrier (MB) and adjacent to the 3" thick Cerablanket during A1R08. The entire length of MB (approximately 400' in length), between the containment liner and the basemat floor, located inside containment at elevation 377'-0", was removed to perform this examination.
A Section XI IWE general visual examination of the Class CC liner was performed on Unit 1 prior to the containment integrated leak rate test (CILRT) conducted during refueling outage AlR07 in October of 1998. The liner area below the MB was not accessible during AlR07. The Unit 1 examination was expanded into this inaccessible area below MB as a result of localized areas of corrosion found beneath the MB sealing surface observed on the Unit 2 liner plate surface during A2R07. Also, in order to complete corrective action #5 from Braidwood, Unit 2 Engineering Evaluation No. 99-IWE-01, the entire unit 1 MB, including the Cerablanket, was removed. CoinEd Procedure SPP GV-2 was used to perform this general visual examination. Exam Data Form No. GV-2-1 was generated to characterize the extent of corrosion on the Class CC liner.
The IWE examination beneath the MB found approximately thirty small indications on the Class CC liner (total length < 1% of length examined), which were determined to be recordable per the General Visual acceptance criteria.
The worst case corrosion caused a reduction of 32% of the liner's nominal thickness. The degraded areas of the Class CC liner were accepted by analysis. The degraded surface area was hand scraped and cleaned to sound surface per the instructions of a level III coatings specialist. After surface preparation, the liner was solvent wiped to prepare the surface for recoating with service level I qualified coatings. Informational Ultrasonic Tests (UT's) were performed in the vicinity of liner degradations prior to the recoating of the liner to obtain nominal linear thicknesses. These UTs indicate, in areas in the vicinity of the degradation the liner plate thickness varies from .23" to .27". The UTs also show that the degradation appears to be only on the front side of the liner that is being examined. The MB was restored in accordance with the design detail in all areas, and to improve performance, it was enhanced by addition of a sloping profile to drain water away.
The degradation of the liner is suspected to be result of breaches in the moisture barrier resulting from aging and mechanical damage from impact of tools, barrels and scaffolding from maintenance activities. This combined with impingement of water, possibly the result of fan cooler condensate leakage, established the conditions for liner degradation. Water had a path to flow between the MB and the liner. Water was entrapped below the Tremco epoxy sealant and absorbed into the Cerablanket material. The surface of the liner remained wet at the elevation of the Cerablanket, and with the presence of oxygen, the liner began to degrade. The localized maximum loss of material was measured to be 5/64 of an inch, which is 32 % of the liners nominal thickness of 8/32 inch. Much of the degraded areas had reductions of 1/64 - 2/64 of an inch, or a little over 10% reduction.
There was also a VT-3 examination of the newly installed moisture barrier. There were three surface tears found. The apparent cause of these tears was the dragging of air hoses over the still uncured MB. These areas were repaired and reexamined and found acceptable. There is no further action required at this time. The MB will remain on its regular IWE examination frequency.
Page 5-7
ComrEd Braidwood Station Unit 1 A1R08 ISI Outage Report
Engineering Evaluation
Engineering Evaluation No. 00-IWE-01 Rev. 0 was performed and corroded areas were shown by analysis to be acceptable.
Local defects on the Braidwood containment liner plate up to 1/8 inch in depth are acceptable per Calculation 5.2.6-BRW-98-1090 Revision 2. The reduction of plate thickness in all areas of degradation is less than 1/8 inch. The maximum of 1/8 inch reduced thickness of the liner plate has been shown by analysis to satisfy the requirements of the design specifications.
Additional Examinations
Approximately twenty localized areas of the degraded liner surfaces below the MB (< 1% of surface area) on the class CC liner will be categorized as an augmented examination area per IWE Table 2500-1. The augmented examination will be scheduled into the IWE Program requiring VT-I and volumetric examinations of the areas with minimum wall thickness for the next 3 consecutive examination periods.
Corrective Actions
1. The liner area directly below the MB approximately 4" in width, around the entire perimeter of the containment was scraped, cleaned, and solvent wiped.
2. The degradation (rust) was removed from the liner under the direction of the level 3 coatings specialist. This allowed for liner examination, preparation for application of a Service Level 1 coating and MB installation.
3. A Service Level 1 qualified coating was applied to the portion of the liner where the MB and Cerablanket was installed
4. New dry Cerablanket material was installed below the MB. 5. The MB removed was restored per existing design details except for enhanced profile which will
facilitate runoff of moisture from the MB and per work order 990058824. 6. Approximately twenty areas of the Class CC liner below the MB will be categorized as Category
E-C in the Braidwood Unit 1 IWE Program Plan. 7. An engineering evaluation 00-IWE-01, Rev. 0, was completed on the degraded liner.
Page 5-8
CornEd Braidwood Station Unit 1
A1R08 ISI Outage Report
6.0 NIS-2 FORM (OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS)
SUMMARY OF NIS-2 FORMS
SYSTEMS NIS-2 TOTALS
AUXILIARY FEED WATER
COMPONENT COOLING
CHEMICAL & VOLUME CONTROL
CONTAINMENT SPRAY
MAIN STEAM
REACTOR COOLANT
REACTOR BUILDING
REACTOR EQUIPMENT DRAIN
RESIDUAL HEAT REMOVAL
REACTOR PRESSURIZER
STEAM GENERATOR BLOWDOWN
SAFETY INJECTION
ESSENTIAL SERVICE WATER
TOTAL NIS-2 (TOTAL - 44)
(AF)
(CC)
(CV)
(CS)
(MS)
(RC)
(RB)
(RE)
(RH)
(RY)
(SD)
(SI)
(SX)
CLASS 1 CLASS 2 CONTAINMENT 2
2
1 5
1
8
6
5
1
1
2
6
2
1
1
15 + 24 + 5
93 TOTAL ATTACHED PAGES
Page 6-1
BwAP 1600-5A1 Revision 4 Information Use
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI
1. Owner Commonwealth Edison Name
One First National Bank Plaza, Chicago, IL 60690 Address
2. Plant Braidwood Nuclear Power Station Name
RR 1 Box 84, Braceville, IL 60407 Address
3. Work Performed by N-P/S&W;Braidwood NPS Name
RR'I Box 80, Braceville, IL 60407
Date 10/16/98
Sheet 1 of 4
Unit One
WR# 980003860, 980003862, 980003863, 980003864Repair Organization, P.O. No., Job No., etc.
Type Code Symbol Stamp Not Applicable Authorization No. Not Applicable Expiration Date Not Applicable
Address 4. Identification of System Unit One Auxiliary Feedwater
PL 5. (a) Applicable Construction Code Section 11ii 1974 Edition, S'74Addenda, N/A Code Case
(b) Applicable Edition of Section XI Utilized for Repairs or Replacement Components 1989 / No Addenda
6. Identification of Components Repaired or Replaced and Replacement Components
(2)
8.
Description of Work Installed, modified and deleted supports per ECN 000847M
Test Conducted: Hydrostatic F] Pneumatic [] Nominal Operating Pressure [] Exempt [
VT 3/L Other-l] Pressure psi Test Temp. OF
Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8-1/2 in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12/82) This Form (e00030) may be obtained from the Order Dept., ASME, 345 E. 47" St. New York, N.Y. 10017 I
0[847M-1H]
(6/23/97)
1
20A 20B 20C 20D 20E 20F 20G 20H Name of Name of Manufacturer National Other Year Repaired, ASME Component Manufacturer Serial No. board Identification Built Replaced, Code; Stamped
No. ' or Replacement (Yes or No) IAF04071R ITT Grinnell N/A N./A Existing Rod 140N 1986 Replaced No
1AF04071R ITT Grinnell N/A N./A Existing Turnbuckle 230 1986 Replaced No
IAF0407IR ITT Grinnell N/A N.IA Existing Hex Nut 1986 Replaced No
IAF04071R ITT Grinnell N/A N./A Existing Rod 253N 1986 Replaced No
BwAP 1600-5A1 Revision 4 Information Use
FORM NIS-2 (Back)
9. Remarks See N-5 Code Data Report # 1C-AF-lH Applicable Manufacturer's Data Reports to be attached
A 4 DcA q --/4o'zl R eA.s o -4•,,,,/ I. Z
-I4F660c371? e./d. ,4>4,, _., a e4ac eL.2 L2(.i"
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this Replacement conforms to the rules of the ASME Code, Section XI. mi,,nzm
Type Code Symbol Stamp Not Applicable
Certificate of Authorization No. Not Applicable Expiration Date Not Applicable
Signgd Date //",2 ,19 • OeoeO dsDeag TMtt
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois and employed by The HSB I&I Co., Inc. of Hartford, CT have inspected the components described in this Owner's Report during the period • • '- , IS to %.\- L • -9 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in the Owner's Report in accordance with the requirements of the ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or co nectqdwt hs npcin
- -Commissions- -f t = r-6
Date •,L •- 19 ce. • •,
(12/82)
2
(6/23/97)
2
BwAP 1600-5A1 Revision 4 Information Use
FORM NIS-2 SUPPLEMENTAL SHEET
1. Owner: Commonwealth Edison Company One First National Plaza Chicago, Illinois 60690
2. Plant Braidwood Nuclear Power Station R. R. #1, Box 84 Braceville, Illinois 60407
3. Work Performed by: N-P/S&W; Braidwood NPS Name
RR 1. Box 80 Braceville. IL 60407 Address
Sheet 3 of 4 Date 10/16/98
Unit One
WR# 980003860, 980003862, 980003863, 980003864 P.O. No., WR No., etc.
Type Code Symbol Stamp Not Applicable Authorization No. Not Applicable Expiration Date Not Applicable
4. Identification of System Unit One Auxiliary Feedwater
5a. Applicable Construction Code Section III Code Cases N/A
19 74 Edition o'74 Addenda
5.b Applicable Edition of Section XI utilized ______________19 89 Edition No Addenda
6. Identification of Components Repaired or Replaced and Replacement Components.
National Repaired, ASME Name of Name of Manufacturer Board Other Year Replaced, Code; Stamped
Component Manufacturer Serial No. No. Identification Built or Replacement (Yea or No)
1AF04071R ITT Grinnell N/A N./A Existing Eyenut 290 1986 Replaced No
IAF04071R ITT Grinnell N/A N./A Existing Beam Lug 66 1986 Replaced No
1AF0407 IR ITT Grinnell N/A N./A M97-08975 N/A Replacement No Strut 640N IAF0407 1R ITr Grinnell N/A N./A MRR# 12624 [from N/A Replacement No
SPipe Clamp 1FW09020S] 1AF0407 1 R ITT Grinnell N/A N./A M98-00347 N/A Replacement No
'• Load Stud [A89-01934] IAF0407I" R -ITT Grinnell N/A N./A M96-09325 N/A Replacement No I/"- Hex Nuts _____ _ _ _ __Ht# CKZ ___
1AF04072R FIT Grinnell N/A N./A Existing Strut 420N N/A Replaced No
1AF04072R FI'T Grinnell N/A N./A M97-00232 N/A Replacement No Strut 21 IN IAF04033V ITT Grinnell N/A N/A 1AF04033V 1986 Replaced No
IAF04082R FIT Grinnell N/A N/A M97-08979 N/A Replacement No Pipe Clamp I IAF04082R ITT Grinnell N/A N/A M97-08027 N/A Replacement No Strut 21 IN IAF04003V ITT Grinnell N/A N/A IAF04003V 1986 Replaced No
IAF04083R IT" Grinnell N/A N/A M97-00232 N/A Replacement No Strut 211 N IAF06037R ITT Grinnell N/A N/A 1AF06037R 1986 Replaced No
1AF06037R ITT Grinnell N/A NIA M97-08034 N/A Replacement No Strut 211 N
No IAF06038R ITGrinnell NZA N/A IAF06038R 1986 Replaced N
"A'Wli a r' rVý(Final)
'.,'- 3ce I -Lt-
(6/23/97)3
BwAP 1600-5Al Revision 4 Information Use
FORM NIS-2 SUPPLEMENTAL SHEET
1. Owner: Commonwealth Edison Company One First National Plaza Chicago, Illinois 60690
2. Plant Braidwood Nuclear Power Station R. R. #1, Box 84 Braceville, Illinois 60407
3. Work Performed by: N-P/S&W; Braidwood NPS Name
RR 1. Box 80 Braceville. IL 60407Address
Sheet 4 of 4 Date 10/16/98
Unit One
WR# 980003860, 980003862, 980003863, 980003864P.O. No., WR No., etc.
Type Code Symbol Stamp Not Applicable Authorization No. Not Applicable Expiration Date Not Applicable
4. Identification of System Unit One Auxiliary Feedwater
5a. Applicable Construction Code Section III Code Cases N/A
19 74 Edition S'74 Addenda
5.b Applicable Edition of Section XI utilizedi 19 89 Edition No Addenda
6. Identification of Components Repaired or Replaced and Replacement Components.
(Final)
WL '11A"11 REVIEW
"- 4
(6/23/97)4
National Repaired, ASME Name of Name of Manufacturer Board Other Year Replaced, Code; Stamped
Component Manufacturer Serial No. No. Identification Built or Replacement (Yes or No)
1AF06038R FTT Grinnell N/A N/A M98-05952 NIA Replacement No Rod 140N 1AF06038R ITT Grinnell N/A N/A M98-05951 N/A Replacement No Eyenut 290N 1AF06038R Nova N/A N/A M96-10991 N/A Replacement No Hex Nut Ht. BKU IAF06038R I17 Grinnell N/A N/A M97-08419 N/A Replacement No Beam Lug 66N IAF06038R ITT Grinnell N/A N/A M97-08736 N/A Replacement No
Clamp 295N I I I IIII_ I IAF06044G FIT Ginnell N/A NIA 1AF06044G 1986 Replaced No
IAF05005X ITT Ginnell N/A N/A IAF05005X 1986 Replaced No
1AF05073G IT Ginnell N/A N/A IAF05073G 1986 Replaced No
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI
Owner Commonwealth Edison Company Date ;-f Z) 6_)
One First National Plaze. Chicago. IL 60690 Sheet / of "2.
2. Plant Braidwood Nuclear Power Station Unit 01'
R R 1 Box 84. Braceville. IL 60407 __ ___/__ _- __ AO'r* Rep-t Organmiatn P o. No.. job No.. etc.
3. Work Performed by Mechanical Maintenance Type Code Symbol Stamp Not Applicable Braidwood Nuclear Power Station Authorization Number Not Appable R.R. 1 Box 84. Braceviile. IL 60407 Expiration Date NotApplicable A00m"15
4 Identification of System C.- *•*Aa•t), n er'T" C-ooI0116
5. (a) Applicaoie Construction Code .c. c , 9- /• Edition. L) 1i., Addenda. Al/A Code Case (b) Appiicaote Edition of Section XI Utilizea for Repairs :-Replacement 1989
-. Identification of Components Repairea or Replaced ano Peoiacement Components
Nlram nf Num& nf F Mnnufacturpr National Other Year I Renaired. ASME
7. Description of Work Ppl/Aee ý_~ ~ s d~ 8. Test Conducted: 0 Hydrostatic 0 Pneumajc )&Nominal Operating Pressure
VTZ PcA71mea 0 Other: Pressure /JAI psi Test Temp. AmAwj' IF "1- a-oo
Note: Supplemental sheets in form of lists, sketches, or drawings may be used. provided (1) size is 8-1/2 in. x 11 in., (2) information in items 6 on this report is included on eacn sheet, and (3) eacr. sneet is numbered and the number of sheets is recorded at the top of this forrr
(12/82) This Form (e00030) may be obta:reo from the Order Dept.. ASME, 345 E. 47th St. New York. N.Y. 10017
5
1
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 (Back)
9. RemarKs Aopticaote VJ.anuacturer s Data ReoOfls to be attacned
CERTIFICATE OF COMPLIANCE
We certify that the statements mace in the reoort are corre,- and this R1&cm&L conforms to the rules of the ASME Code. Sectic (Repait or ii
Type Code Symbol Stamp
Certificate of Authorization No.
Signed
A)OlL App~ahine-
~/~M t40 Ida !
Expiration Date A.)1 an 31,'l' 1.
Date
CERTIFICATE OF INSERVICE INSPECTION
I. the undersigned, holding a valid commission issuea cy the National Board of Boiler and Pressure Vessel Inspectors and the State Province of .-.. , o and employed by ' A-' t ' C , of ,)'L--d
have inspected the components described in this Owners Report during the penod t \• I '. of - : o
and state that to the best of my knowledge and belief. the Owner has oerformed examinations and taken corrective measures described in this Ow: Report in accordance with the requirements of the ASME Code. Section Xl.
By signing this certificate. neitner the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinE and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any mar any personal injury or property damage or a loss of any kira ansing from or connected with this inspection.
J- Commissions 0 k '0"einsoea"or s S s.atu-e NMtnai Board. State. Provwi. aid Enorsamen
Date__ _ _ _ _ _ _ _ ' -
(12/82)
"- 6
2
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section Xi
Owner Commonwealth Edison Company
One First National Plaze. Chicaoo. IL 60690
2. Plant Braidwood Nuclear Power Station_____________
RR. I Box 8.4. Braceville. IL 60407
3. Work Performed by Mechanical Maintenance Braidwood Nuclear Power Station RR 1 Box 84. Braceville. IL 60407
Date -.7 -/I /_-&c/
Sheet /
Unit
of 2
0/
Reoay Orgmianman P 0. No.. Jm No.. w
Type Code Symbol Stamp Not Applicable Authorization Number Not Applicable
Expiration Date Not Applicable
4 Identification of System - O~4,-~~Y1-rCool I re-
5. (a) Applicable Construction Code . ,rc,7..2. L.. "-.= -Y / Edition. We 72 Addenda, (b) Appiicaoie Edition of Section XI Utilized for Repairs =- Replacement 1989
A -!• Code Case
5- Identification of Components Reoaireo or Reolaced ano Reolacement Components
Name of Name of Manufacturer National Other Year Repaired. ASME Component Manufacturer Serial No. board Identification Built Replaced. Code:
No. or Staffe I____ I____ Replaerenei (Yes or 11
4I V A,0 I' • d-~f'• AJ/A e,/ ce
I ~ ~ ~ , t510 X-Y oIr~~CieP7. 3Z7-60 IA~ e 7__________________________ ________________________________ ____________________________________________________________
I r_________________________ _________________________________ ___________________________________ ________________________ ________________
7. Description of Work 141-- L
8. Test Conouczed:
4-?,-oo
C3 Hydrostatic
0 Other:
O Pneuma:c QL Nomir
Pressure 1141' -5 psi
nal Operating Pressure
Test Temp. Ar1keuIML IF
Note: Supplemental sheets in form of lists, sketches, or drawr.ngs may be used. provided (1) size is 8-1/2 in. x 11 in.. (2) information in items
6 on tnis report is included on eacrn sheet, and (3) eacr. sneet is numbered and the number of sheets is recorded at the top of this fotr.
(12/82) This Form (e00030) may be obta:-eo from the Order Dept.. ASME. 345 E. 47th St. New York. N.Y. 10017
'77
1
0) 4 P* OQ 90'? 3 4') in
-- @G-- - -
411ýa jZALýle-
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 (Back)
Apo~b=* n.e dwu.aa r s Data Reports to Do ataaiea
CERTIFICATE OF COMPLIANCE
We certify that the statements maoe in the reoort are corre,' and this conforms to the rules of the ASME Code. Sectic i Repair -eý
Type Code Symool Stamp
Certificate of Authonzation No. Expiration Date (L-/,,ricle /II* -i-i--.
Si
Signed
-wwIoie -D*w.T1Date
CERTIFICATE OF INSERVICE INSPECTION
I. the undersigned. holding a valid commission issueo Cy the National Board of Boiler and Pressure Vessel Inspectors and the State Province of •'-•--•- -0 " \s and employed by 7 C- . of P • Lj.. have inspected the components described in this Owners Report during the penod \ 's- - of -4-. "-, and state that to the best of my knowledge and belief. the Owner has oerformed examinations and taken corrective measures described in this Ow Report in accordance with the reouarements of the ASME Code. Section Xl.
By signing this certificate. neitner the Inspector nor his employer makes any warranty, expressed or implied. concerning the exammi and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any mat any personal injury or property damage or a loss of any kira0 ansing from or connected with this inspection.
- L-..-..~...----------Commissions 2 i In lvecior I i gtiatI e Natglrm Op raO. Siate. P , ow -10 11rW
Date 4%• -
(12182)
-8
2
0. Remaris
A30i- 412121IC-101-160 if
A )A P A e%,nl it jo
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI
Owner Cc-.":Tonwealth Edison Comoany_ N•ame
One =rst National Plaze. Chicaao, IL 60690 Accress
Plant Bra.z-ood Nuclear Power Station Name
R R Box 84. Braceville. IL 60407 Address
3. Work Perfonred Dy Mechanical Maintenance Braidwood Nuclear Power Station R R. 1 Box 84 Braceville. IL 60407
A4iwessd• 4, Identification -:' System /lesoe')I1
Date -7 -1 -V V
Sheet 1 of
Uni Ot
A•,i&j ??C0ooo/ -01 Repar Organ.ation P 0 No. Joo No.. etc.
Type Code Symbol Stamp Not Applicable Authorization Number Not Applicable
Expiration Date Not Applicable
204r sAeY AOR 6 IA /-,doAA4 eo,,I-T C/'46c%'
5. (a) Applicac e Construction Code ,..2L., "..` 7 Edition. 57 5"- Addenda. / Code Case
tb) Aoplica..e Edition of Section Xl Utihzea or Repars c, Replacement *".-9
6. Identification c. Components Repaired or Replaced and Replacement Components
7 Description oi0 .OrK
a ETest Conduc-e=:
,�-'4/ rAC
C- Hydrostatic 0 Pneuma::c .,0-Nominal Operating Pressure
Pressure _ psi Test Temp. _ IF
X( OPE#J Flow. PR#$. resk 13wV5AR 9C. A~fae fe~O * eA VIZRaqej*6e00 Note: Supplemer:ai sheets in form of lists, sketches, or drawings may be used. provided (1) size is 8-1/12..: .11 in., (2) information in items 1 thfoUW
6 on this re.ort is included on eacn sheet. and (3) eacn sneet is numbered and the number of sheets is recorded at the top of this form.
"-2/82) This Form (e00030) may be obtaired from the Order Dept.. ASME. 345 E. 47th St. New York. N.Y. 10017
1
2.
Name of Name of Manufacturer National Other Year Repaired. ASME Component Manufacturer Serial No. board Identification Built Replaced. Code.
No. or Stamped Replacement (Yes or No)
444 /0"OEA MT/A e v /Ol 7-A• LA)•o, ' 7 ' // ~ #t./,• <1 fTp t s,•.• •
0 Other:
,-.-,d/ ,ý,C &- E:.& " %- C-i 16 7ý.
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 (Back)
9. Remarks ,,,,Aohlei Manulactto.r s Data Reoorls to De attacaeO
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the report are correct and this 9 lcrem,,,2,L. conforms to the rules of the ASME Code. Section Xl.
Type Code Symbol Stamp A/O /1,.. *,/ l•k
Certificate of Authorization No. /t? Expiration Date ,cb ble
Signed n____ Date _f_
Lrow•. or uwner s oftw-,e. i tne
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned. holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of
Province of - .- " and employed by A - - k. ' of
have inspected the components described in this Owner s Report during the eriod F- - of z '-&- = ,
and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's
Report in accordance with the requirements of the ASME Code. Section X1.
By signing this certificate. neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations
and corrective measures described in this Owner s Report. Furthermore. neither the Inspector nor his employer shall be liable in any manner for
any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
SL Commissions Is. S"• •
-wec-or s S-gnatw Natooai Boaai. State. Provmce. am Endoe.•wem
Date 44'- -
(12/82)
10
2
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI
Owner Commonwealth Edison Company_ Na&e
One First National Plaze. Chicaao. IL 60690
2. Plant Braidwood Nuclear Power Station Nalme
R R 1 Box 84. Braceville. IL 60407
3. Work Performed by Mechanical Maintenance Braidwood Nuclear Power Station R.R. 1 Box 84. Braceville. It 60407
4 Identification of System r V - 1
Date '.A , - 6_1 (._
Sheet__.L. of
Unit 01
Rmewa Orn~atuon P 0. Nao.. jfo No.. W
Type Code Symbol Stamp Not Applicable Authorizaton Number Not Apipicable
Expiration Date Not Applicable
eK- C" reý(CtA-o5. (a) Applicable Construction Code.S;T. -rtI/..-- Z. . t :21 Edition. {4) '- ;2- Addenda. _ ..it__ Code Case
(b) Appicaoie Edition of Section Xl Utilized fo!r Repairs =-Replacement 1989
5 Identification of Components Reoaired or Reolaced ano Reolacement Components
Name of Name of Manufacturer National Other Year Repaired, ASME
Component Manufacturer Senal No. board Identification Built Replaced. Code: No. or Stowpe
/)a V_ I C-L) 91;1-3 A1W Replamnenw (Yea or I'
4/ . IA 16,,nM AIL // .e_ _ _ _ __ _ __ _ t1/A k- " l/kf b.4-q q &6
"IIe Alh'79'i0-019 iLuL ,r .e 02g3 & & 10 PA/If "r e-1 -le be q-,4Ai 101,4_ J _AlD
7. Description oftWorkc Ahs/eed " ~el bA y~e.. -46 t Wd4 0W ./' it
8. Test Conducted:
vTZ -estfoaovia +Z-00O
O3 Hydrostatic
O Other:
-1 Pneuma-c RK Nomir
Pressure 21.1 psi
hal Operating Pressure
Test Temp. Aml ep'l IF
Note: Supplemental sheets in form of lists. sketches. or draw-.ns may be used, provided (1) size is 8-1/2 in. x 11 in.. (2) information in items 6 on this reoort is included on eacn sheet, and (3) eac'. sneet is numbered and the number of sheets is recorded at the top of this formi
(12/82) This Form (eOO030) may be obta:.ea from the Order Dept.. ASME. 345 E. 47th St. New York. N.Y. 10017
1
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 SUPPLEMENTAL SHEET
I Owner: Commonwealth Edison Company One First National Plaza Chicago. Illinois 60690
2. Plant: Braidwood Nuclear Power Station R.R. #1. Box 84 Braceviwle. Illinois 60407
3. Work Performed by ___,______-____
Nwne
AP4A,,vA. Alii,' e~4- P-ue-r S-,4c"
Sheet S of 3 Date __;k_________
Unit 0 f
Unit 0 t
UJ-W' qqoO93 8'7 -o/ P 0. No.. WR NO.. etc
Type Code Symbol Stamp Authorization No. )IA Expiration Date ,01A
4. Identification of System CLV- cA - Uo.,,. C--A-c--,-o.
5. (a) Applicable Construction Code ,ect. i / 6-!- .
Code Cases /J/ý4
ib) Applicable Edition of Section XI Utilized _ _ _ _ _ _ _ _ 19
6. Identification of Components Repaired or Replaced and Reolacement Comoonents.
19 "7/ Edition
Edition
W0 '7, Adde,
Addenda
Name of Name of Manufacturer National Other Year Repaired. ASME
Component Manufacturer Serial No. Board Identification Built Repa•d• Code; No. or Stamp
I Replmmunwit (Yes or hi
A~~a1OVA Z9 6,i IfaIi~e 1oT/)31M-P1-q/e A~)14 _____________
Ajj_ DTAfl Agl' b le, -MQ7-b-7'/3* q- ~ I A "_________________
_____ ____ _____ _____________ I ________
___________ I___________ __________I __________________________ ~1*_________
____ ___ ___ _ _ ____ ___ ___C _ ____ ___ ___ ___ ____ ___ ___ _______ ___ ___ ___ ___
____ ____ I I _ __ _
_______________I _,______
12(Final)
3
Addenda
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 (Back)
Aoptwa"~ vdw~nacturer S Data Re~onS to Do ansaerW
CERTIFICATE OF COMPLIANCE
We cenrty trhat the statements maoe in the reoort are corre-- and this P conforms to the rules of the ASME Code. Sectic (Reo rL=-
Type Code Symbol Stamp
Certificate of Authorization No. 00t 4p12[oin4LdgII -
Expiration Date A
Signed Date 413126_
CERTIFICATE OF INSERVICE INSPECTION
I. the undersigned. holding a valid commission issueo ty the National Board of Boiler and Pressure Vessel inspetors and the State Province of -- - and employed by - of - C.. have inspected the components descnbed in this Owners Report during the period .c) - -z :ZN of . and state that to the best of my knowledge ano oelief. the Owner has oerformed examinations and taken corrective measures described in this Ow Report in accordance with the reoutrements of the ASME Code. Section X L
By signing this certificate. neitner the Inspector nor hzs employer makes any warranty, expressed or implied, concerning the examin;
and corrective measures oescnrbe in this Owners Report. Furthermore. neither the Inspector nor his employer shall be liable in any mai any personal injury or property damage ora loss of any kiro arising from or connected with this insoection.
CommissionsN~nali oarad State. Piri. WW B~noosmmn
Date J g-
(12182)
13
2
9. Remarxs
Date
•r -- '• - 19 z.=.._..•= o
tJ Aonli cA4te Is
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI
Owner Cc,.--onwealth Edison Company Name
One =irst National Plaze. Chicago, IL 60690 A iorm
Plant Bra.cwood Nuclear Power Station Nam.
RR R Box 84. Braceville. IL 60407 Aoems
3. Work Perforn-reo oy Mechanical Maintenance =raidwood Nuclear Power Station R R. 1 Box 84 Braceville. IL 60407
Date /0ý
Sheet 1
Unit I
of /
P-ui 9 9 0o3f316-41 Repai Organtzation P 0 No Job No. M.
Type Code Symbol Stamp Not Applicable Authionzation Number Not Applicable
Expiration Date Not Applicable
4. Identification :' System r t/ A O* 8.' ? • -•P1d-e ll' /,/- f6.L5
5. (a) Applicac e Constru ction Code 7 / Edition.5~'2 Addenda. ______Code Case (b) Applicac.e Edition of Section Xl Utilized f6r Repairs c" Replacement "---._9
6. Identification c4 Components Repaired or Replaced ano Reolacement Components
Name of Name of Manufacturer National Other Year Repaired. ASME
Component Manufacturer Serial No. board Identification Built Replaced. Code:
No. or Stamped Replacement (Yes or No)
A.b,4L ,0., " 6- -/n ,4s p. I, ) /9, 4/ t 2 , , s I'
______VI-_Vf -/ /-A, __ _ __ ___ _
.s -7& okrgL *1",4 e-" Is4 M1__ __ _ 4J' -?e V Ye AA4dr,
0 6vll & . _______ ___ ___4 AF __1A
7 . D escnption o ; .' ork &f, 1-:.- V S C_..C E s 0-JI-., ,,-•'J( / ,',-, h,,. _S L
8. Test Conduc:e-: 13 Hydrostatic 0 Pneuma::c C3 Nominal Operating Pressure
SOther: / Pressure psi Test Temp. ,,j--,, -F 11"1 g/ - 4 - J
-e- r', 7 A1%'d44, SS/~
Note: Supplemenrai sheets in form of lists. sketches. or drawings may be used. provided (1) size is 8-1/2 n. x I I in.. (2) imfirmaon in I thrn
6 on this re~ort is included on each sheet, and (3) eacn sheet is numbered and the number of sheets is recorded at the top of this form.
'2/82) This Form (e00030) may be obtaired from the Order Dept.. ASME. 345 E. 47th St. New York. N.Y. 10017
14L:
1
2.
-& ,4
Ad-
BwAP 1600-5A1 Revision 5
Information Use
FORM NIS-2 (Back)
9. RemarKs $'6' ' f77iC) / -" (t d/','- C'rJ' ji,/ 3 ' /i -p•,A /J•',rA
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the report are correct and this /i?6PR/SC conforms to the rules of the ASME Code. Section Xl.
Type Code Symbol Stamp _ /pf oA /6,C4!m'
Certificate of Authorization No. 6,r" d'" '#!-/ A6'4 Expiration Date e / /,
Signed__________________________________
Date 19~
CERTIFICATE OF INSERVICE INSPECTION
I. the undersigned. holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the Stats of
Province
of Of-'--
'E. and employed by Y-V'5 t \ \
have inspected the components described in this Owners Report during the period -, - of - -. _- C, ,%C'-
that tO the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's
Report in accordance with the requirements of the ASME Code, Section X1.
By signing this certificate. neither the Inspector nor his employer makes any warranty. expressed or implied. concering the examination
and corrective measures described in this Owner's Report. Furthermore. neither the Inspector nor his employer shall be liable in any manner
any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions • i
irs-aa6t S Sqnatuge NailfaWl Boara Sat. Proveoa. ami bxwsndmfli
Date _____________. 19•.
(12182)
15
2
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 OWNER'S REPORT-FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI
Owner C.t-'onwealth Edison Comoany Namiw
One girst National Plaze. Chicago, IL 60690
2. Plant Bra.cwood Nuclear Power Station Nam
R R ' Box 84. Braceville. IL 60407 Aoegss
3. Work Perforrre, oy Mechanical Maintenance 3raidwood Nuclear Power Station R R I Box 84 Braceville. IL 60407
4 Idpnt,ficaton :"System C-- &
Date /0, - &
Sheet 1 of /
Unit 00
iLJPOJ 990a 3 F316 -1 Repw OrguniaOn P 0 NO Job No. W-.
Type Code Symbol Stamp Not Atglicasile Autltonzation Number Not Applicable
Expiration Date Not Applicable
5. (a) Applicac e Construction Code " "9 71L ,, Edition. . Addenda. __,_/ _
(b) Applicac.e Edition of Section XI Utilized f6r Repairs c" Replacement • --=_
Code Case
6. Identification c Components Repaired or Replaced and Reolacement Components
Name of Name of Manufacturer National Other Year Repaired. ASdE
Component Manufacturer Serial No. board Identification Built Replaced. Code:
No. or Stalped Replacement (Yes or NO)
TEAL 19)"$ ,.16 6 - -- •1 D '
______46 ~f' -A4 Ass___ V- 6e_____
7-/-/,e vsI-_-H -/_-__,
________ PVA -,4..4 'V A M1240e Yes;
L-7-9,1eus r /AtdwOR __-a__A
7. Description& a ork S6 1tl S/'4A6. SVaafw&Ls 09'./Ai6 AEKS-i--,~,'sM&
8. Test Conducted: 0 Hydrostatic [3 Pneuma::c 03 Nominal Ooerating Pressure
O Other Pressure W psi Test Temp. l,,, -F
'~/~f ' y• rem %-/5iwi I A#...f/44e S~c,44-4 Note: Supplemen'ai sheets in form of lists. skefches. or drawings may be used. provided (1) size is 8-112 ,r x 11 in.. (2) information min 1 thfr
6 on this re-ort is included on eacn sheet, and (3) eacn sneet is numbered and the number of sheets is recorded at th top of this form.
-2182) This Form (e00030) may be obtairned from the Order Dept.. ASME. 345 E. 47th St. New York. N.Y. 10017
1a-'.
<PAA6 A'6e//. f6$LS• f l
•
I
PAA *s 'Woe //. X4"1-5
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 (Back)
9. RemarKs $5'6C ,fjýtef ý~1 if" e V i~C f ~
CERTIFICATE OF COMPLIANCE
We cenify that the statements made in the report are correct and this A, om'/-e- conforms to the rules of the ASME Code. Section XL
(Roegar or Reote=lblcM I
Type Code Symbol Stamp AA /,Q 0470-4C ei C
Certificate of Authorization No h.4 CA't.- Expiration Date 46/ A ',,,I
SOwem or L,,h~m s Uesro hi--,, 'le
CERTIFICATE OF INSERVICE INSPECTION
I. the undersigned. holding a valid commission issued by the National Board of Boiler and Pressure Vessel InspectorS and th State of
Province of '~---~ "- vs,. andi employe yN~ ~ o .1
have inspected the components described in this Owner s Report during the period k 0 - , - of - "V5-.-- L.
and state that to the best of my knowiedge and belief, the Owner has performed examinations and taken corrective measures described in this Owners
Report in accordance with the requirements of the ASME Code. Section XI.
By signing this certificate. neither the Inspector nor his employer makes any warranty. expressed or implied. concerning the examination
and corrective measures aescribed in this Owner's Report. Furthermore. neither the Inspector nor his employer shall be liable in any manme
any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
-~~~Commissions ~ ',~
Date ___--_-_.____ _ .
(12182)
17
2
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT
As Required by the Provisions of the ASME Code Section XI
Owner Cc,--onwealth Edison Company Name
Ore =;rst National Plaze. Chicaao. IL 60690 AItBSSS
Plant Bra. .ood Nuclear Power Station .Name
R R Box 84. Braceville. IL 60407
3. Work Perforrrm, e y Mechanical Maintenance Braidwooc Nuclear Power Station
R R. 1 Box 84 Bracevi'ie. IL 60407
4 Identification :4 System
Date 3 a S
Sheet of
Unit I
(teorZ 1O'g7anao Oo . Repair Organizaion P~ 0 No. .10 No. air.
Type Code Symbol Stamp Authorization Number
Expiration Date
Not Applicable Not Applicable Not Applicable
0\1- iM .Aotviss
5. a) Applicac e Construction Code Z- 13 "-It Edition. ,Adenoa. ,I/A Code Case
bi) Applicac e Edition of Section Xi Utilized for Repairs c- Replacement • .9
6. Identification :r Components Renaireo or Replaceo ana Reolacement Components
I Name of Name of Manufacturer I National Other Year Repaired. ASME
Component Manufacturer Senal No. board Identification Built Replaced. Code: No. or Stamped
Replacement (Yes or Nol
7Q A O e c 2. r -oo , a so 6 y , "4 7.d
o(. - F cJv aia
7 Description co.'Jork -uqs-roL5.gi Rgug-V \jak3V
8 Test Conducted:
-4".M.OOo
C3 Hydrostatic
O Other:
0 Pneuma::c
Pressure 1 oL31 psi
SNominal Operating Pressure
Test Temp. 56- 'F
Note: Supplemer.:ai sheets in form of lists, sketches, or drawings may be used. provided (1) size is 8-1/2 in. x 11 in.. (2) information in items 1 through
6 on this reoort is included on eacn sheet, and (3) eacn sheet is numbered and the number of sheets is recorded at the top of this form.
"2182) This Form (e00030) may be ootair-ed from the Order Dept.. ASME, 345 E. 47th St. New York. N.Y. 10017
S18
1
2.
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 (Back)
9. RemarKs Aopuc•aoe Manufacturer s Oata Reoons to oe attacneo
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the report are correct and this 0 conforms to the rules of the ASME Code. Section XI. I Repak or ( ýe
Type Code Symool Stamp A)AC Ji r- A'O\e
Certificate of Authorization No. t-L Expiration Date & •o ,'7nA, ibile
Signed .O0weges e Date We1_ to
CERTIFICATE OF INSERVICE INSPECTION
I. the undersigned. holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of
Province of "n "--- and employed by r ' - . of - C. .
have inspected the components described in this Owner s Report during the period ---.- •-_ of and state that to the oest of my knowieage and belief. the Owner has performed examinations and taken corrective measures described in this Owner's
Report in accordance with the requirements of the ASME Code. Section XI.
By signing this certificate, neither the Inspector nor his employer makes any warranty. expressed or implied. concerning the examinations
and corrective measures Oescnbed in this Owner s Report. Furthermore. neither the Inspector nor his employer shall be liable in any manner for
any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
- Commissions
i triIc•or s Sinattwr Naiaonai SoarG. State. Provmca. ard Er am$
Date 1- 1)
(12/82)
19
2
0 'ý I to
1 Owner C,--ronwealth Edison Comoany Nare
2. Plant Bra.wvood Nuclear Power Station Name.
R R ° Box 84. Braceville. IL 60407 Aaams
3. Work Perforrreo oy Mechanical Maintenance Braidwood Nuclear Power Station R R. 1 Box 84. Bracevile. IL 60407
Date /=2 - 7 - 9 9
Sheet I of __
Unit _
Reppw Organizatic P 0 No. Job N,. O.
Type Code Symbol Stamp Not Applicable Authonzation Number Not Applicable
Expiration Date Not ApplicableA4at8
4Identification :"System I 6• A.-7A•"/P/d6$L. C,,Ad4//'e,
5. (a) Applicac e Construction Code 7LUZ la -9 '7/ Edition. U. 7,2 Addenda. 2J./.. CodeCase
0b Applicac.e Edition of Section XI Utilizea for Repairs c, Replacement ;F__ _
6 Identification v Components Repaireo or Replacea and Reolacement Components
Name of Name of Manufacturer National Other Year Repaired. ASME
Component Manufacturer Senal No. board Identification Built Replaced. Code: No. or Stomped
Replacement (Yes or No)
_____ t/o &,.s 1^& ,/ - 3_ _ ___5
OZ~biAL PAC IFIC- e3-(,-7 -,A4 /-A_ __ _ _ _
'f'EAL 71gie -sr y_ __ __ 45 16 17 tca
ThEA 1/tA$*E1
Y7 Description o4 .,ork
a. Test Conducmen:
V1-r ?e(0
r.eAt ' A I I.�!,,AAA A�JA?/ IC � f/7ocfw#'fc��Iw, ) �,' .- '-. ,-. , ,. .-. - -
O Hydrostatic
O Other:
O Pneuma::c 0 Nominal Operating Pressure
Pressure Z001/,50 psi Test Temp. A rnbwu'I _F
Note: Supplemer•:al sheets in form of lists, sketches, or drawings may be used. provided (1) size is 8-1/2 ,: x 11 in., (2) information in items I thrc
6 on this re.ort is included on eacn sheet, and (3) eacn sneet is numbered and the number of sheets is recorded at te top of this form.
'2/82) This Form (e00030) may be obtai.ed from the Order Dept.. ASME. 345 E. 47th St. New York. N.Y. 10017
20
1
,/c-,/"-/=-.,¢O ,/''•,-'PF"•'•''/r C- j ,^•" - A" ' ) / •,- . -A ,!,--.P110
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 SUPPLEMENTAL SHEET
Sheet Date Unit
Owner: Commonwealth Edison Company One First National Plaza Chicago. Illinois 60690
Plant: Bfraidwood Nuclear Power Station R.R. #1. Box 84 Braceville. Illinois 60407
Sof /1 -,-97
Unit _ _/
P a No.. ,R No. etc
3. WorkPerformedby C)Mdt,voFAL,7T EDI,,oat NarM
4 Identification of System / 0.e &7rf a,4,L C 11,44 I,
5. (a) Applicale Construction Code 45 AfL/
Type Code Symoot Stamp Authonzation No. Expiration Date
'40,"', /C014f/
19 7 ( Edition "4,7.2 Addenda
Code Cases f-I �7
th) Applicaole Edition of Section XI Utilized19 Ft? , Edition
6. Identification of Components Repaired or Replaced and Reolacement Components.
Name of Name of Manufacturer National Other Year Repaired. ASME
Component Manufacturer Senal No. 3oard Identification Built Replaced. Code:
No. or Stmnped Replacemenlt (Yes or No)
e% - -7sc, ~ 1~4 Yif
_______ ^z z AL10&.~4
S _ _ _ _ _ _______
_____ K-yI
______________ 1~~~I
2i�(Final)
3
1 Addenda
BwAP 1600-5A1 Revision 5
Information Use
FORM NIS-2 (Back)
-9. Remarks A.mon,,i Manulacturef s Oata Revons to Do attaced
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the report are correct and this re0/iie,"PL'i conforms to the rules of the ASME Code. Section X1 iRep~a or Rlemalivnlefnt)
Type Code Symbol Stamp A•o6 iQOpI1 L.,b/,
Certificate of Authonzation No. fL rI_ le Expiration Date
SignedDae9
2
_ _4 ý "00. o Oos~qfle. Ni~e
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned. holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province
.- P"--F "
of .'_t ,J ,5 and employed by V 7 -.: of Z I- 2-t
have inspected the components descrbed in this Owner s Report during the periodtl -"---3--t'• of 2.. o L, ."'j
and state
that to the best of my knowiedge and belief. the Owner has performed examinations and taken corrective measures described in this Owner!
Report in accordance with the requirements of the ASME Code. Section XI.
By signing this certificate, neither the Inspector nor his employer makes any warranty. expressed or implied, concerning the examinatioi
and corrective measures described in this Owner's Report. Furthermore. neither the Inspector nor his employer shall be liable in any manne,
any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
J L - - - - Commissions I.- s.
ý-soelor s Sqiaiwm NatflU 8 0o . State. Prov,, N. NiO E• 'ktU i=f,,,
Date k -2- - LD- L.
(12/82)
22
2
BwAP 1600-5A1 Revision 5
Information Use
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by-the Provisions of the ASME Code Section XI
Owner --'mmonweaitn Edison Comoanv_______________'da"fi
One First National Plaze. Chicaon. IL 60690
2. Plant Sramawooo Nuclear Power Station 4emI
R R I Box 84 BraP•eville. IL 60407
3. Work Performed by Mechianical Maintenance Braidw~ood Nuclear Power Station R.R. 1 BOX 84. Bracevite. IL 60407
Date /3//o Sheet L of
Unit 0 t
IA/k '77 'Y 3// Repin OrmW1121W P 0. tft. Job lift S
Type Code Symbol Starm " Apolicable Authorizaton Number Not Apgbelw
Expiraton Date Not Aoolicable
1 Identification of System
tai AoplicaoieConstrucon Code 2 t -'I -= -7 L-1 Edition. N Addenda. v1 _ Code Case .o) Aoplicaoie Edition or Section Xl Utilizea tor Repairs : Reolacement (to9
daentification or Comoonents Reoaireo or Replaceo ano Reoiacement Components
Name of Name of Manufacturer National Other Year Repalrel. ASME
Component Manufacturer Serial No. board Identification Built Replaced. Code: No. of S1
__________ ______________Reglummtt (Yes or t4
h~cpr~I/rT C~r,4eLLj /AILC 1i____ _________0/A__ 1A0
TF'PF SL~preer 17-r T6.4~fAM'CL 1 ;L /,- 13 Al/l,+P,~~~f. ~v
I _k_ _ _ _ 7 DescnouonofWork -7".ST "• h,flT4LL A/'e/Wt •,,,wISRE'
3 Test Conoucteo: [3 Hydrostatic
V"JT*'/ C--0 04• r- Other:
003 Memo .I u Lttl iil
SPneuma:cr3 Nominal Operating Pressure
Pressure _ AVA psi Test Temp.
Note: Suoplemental sheets in form of lists. sk~etches. ordraw.noS may oe used. provided (1) size is 8-1/2 in. x 11 in.. (2) infolrmation in items
6 on this reoort is included on each sheet. and (3) eac. sneet is numbered and the number of sheets is recorded at the top of this form
112/82) This Form ieOO030) may be obta:.-eo from the Order Dept.. ASME. 345 E. 47th St. New York. N.Y. 10017
23
1
Aawe" <2w V
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 (Back)
AmeacO4 -Aamiews~ s Uaza uioocntoa*m attacaa
VT L, " Q gReJAI/AL,,
CERTIFICATE OF COMPLIANCE
We certivy mat the statements maoe in ine reoort are corre- and this conforms to the rules of the ASME Code. Seazo ROM ý
Type Code Svmool Staio
Certificate of Authorization No.
Signed
6 1 112.,), rA'loI-&
Expirationate JlIa
L L.o,.,. =Lg~wo=•.rue Da"
CERTIFICATE OF INSERVICE INSPECTION
I. the undersigned, holding a valid commissin issued cy the National Board of Boiler and Pressure Vessel Inspecors and the Stat. Province of ~ - 'and employed by '\ Of have insoecd the components oescribed in this Owners Report dunng the penod :-- --'2.,== of of -'3 . and state that to the best of my knowledge ano oelief. the Owner has oerformed examinations and taken corrective measures desF'iaed in this Owr Report in accoroance witn the reouirements of the ASME C,-e. Section X.L
By signing this certficate. neiner the Insoector nor f:s employer makes any warranty, expressed or implied. concmrning the eaana and corrective measures aescrioed in this Owners Report. Furthermore. neiter the Inspector nor nis employer shai be liable in any man any personal injury or property damage or a loss of any kiro arming from or connected with this insoection.
L- •L- , ý l 'nwpeaw a ~mwe
Conmmssons "-.. t •Naiu~ 6Olw. sia. dnWa& WOM SWum
Date -5 -%
(12/82)
24
2
- . emarKs
khý Agnbe-able
8wAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT
As Required by the Provisions of the ASME Code Section Xl
1. Owner Commonwealth Edison CompanyName0
___ one First National Plaza, Chicaao IL 60690
2. PlantBraidwood CoinEd PlantAddress
Name
35100 S. Rt. 53 Suite 84. Braceyile, IL 60407AddreSs
3. Work Performed by MECHANICAL MAINTENANCE Name
Braidwood CornEd Plant. 35100 S. Rt. 53 Suite 84, Braceviile. IL 60407
Daa /'/ /Co~
Sheet - of
Unit I
c�c�tc5O1O9�.S�Ol Peosir Org5flIz5iIO4� P 0. No.. Job No.. etc.
• r FReoar O.rganization P.O. No.. Job NW., etc.
Type Code Symbol Stamp N/A Authonzation Number N/A
Expiration Date N/A
Description of Work Rr,&ULT 'J-AIJf
Test Conaucted: 0 Hydrostatic
v7Z PCeI;6a-er 0 Other: ,.++lZooo
0 Pneumatic R( Nominal Operating Pressure
Pressure w4±{L..7 psi Test Temp. 55 2) -F
4. Identification of System -, ddreM A? rTA
5. (a) Applicable Construction Code Ser-Tl -14 9 Edition. t4/' Addenda. P0/1 Code Case
tb) Applicable Edition of Section XI Utilized for Repairs or Reolacement 19 S9
6. Identification of Components Repaired or Replaced and Reolacement Components
Name of Name of Manufacturer National Other Year Repaired, ASME
Component Manufacturer Serial No. board Identification Built Replaced, Code; Stamped
No. or Reolacement (Yes or No)
, / I1 .5t /,A , _ _,_.,_ _ _ I
'D I 5 Ir , 5R, 64AM &P 1-/A KHT' 41 a2.4 __9__9
__ _ _ __ __ _ t4OF N01\/A t4 A M____s__k rj/A __ _ ___ __ _
~~P~t~ULrr 70,.~R fc o3532, "
__D"__ 55__ _ ____17__ N/A Q~r-Agc> -oagcgtoc __ _ NO
Note: Supplemental sheets in form of lists, sketches, or drawings may be used. provided (1) size is 8-1/2 in. x 11 in., (2) information in items 1 through 6 on
this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12/82) This Form (e00030) may be obtained from the Order Dept., ASME. 345 E. 47th St. New York. N.Y. 10017
25
1
7.
8.
Unit
!
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 (Back)
9. RemarxsV,4,,fAe-r,"Z,- -37Z-) , ,t/. 2 "S Aroo, PJ' ,,•S-F b~•- J,,e. t .k Aicanle MantacturerS Data Redns to Oe anfled
=to
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the report are correct and this e Ake1,4•'Jconforms to the rules of the ASME Code, Section Xl. imepair or Reolacemeni i
Type Code Symbol Stamp ,Rpa" , eo acmen"
________________________. _______ Expiration Date dr •4P"1d Cd Jd" Certificate of Authorization No. ExpirationDate
Signed , zor imn ee Date
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned. holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province
of I3'--). -,>I a and employed by - -'6 k *' ." - - Of '5;V-ý
have inspected the components descnbed in this Owner's Report during the penod ' -2-1 - C - of k-t - .- , and
state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in
accordance with the requirements of the ASME Code. Section XI.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and
corrective measures descnbed in this Owner s Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any
personal injury or property damage or a loss of any Kind ansing from or connected with this inspection.
Inspectors Signature
Date , -- S - , 1 _- _ .
Commissions 7-•- I. " National Board. State, Province. and Endorsements
(12/82)
26
2
I
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI
1. Owner Commonwealth Edison Company Nane
One First National Plaza. C hcago, IL 60690
2. PlantBraidwooc CoinEd PlantAddress
Name 35100 S. Rt. 53 Suite 84. Brace..ile, IL 60407
Address
3. Work Performed by MECHANICAL MAINTENANCE Name
Braidwood CornEd Plant. 35100 S. Rt. 53 Suite 84, Braceville, IL 60407
Date --//'//cr_ Sheet __ of
Unit I
Reoair Organization P.O. No.. Job No., etc.
Type Code Symbol Stamp N/A Authorization Number N/A
Expiration Date N/AAddress
4 Identification of System i 5 - MA jN 1 )-,
5. (a) Applicable Construction Code 5,61=1-= 2- 19 -14 Edition, /A Addenda. A/AA Code Case ýb) Applicable Edition of Section XI Utilized for Repairs or Replacement 19 69
6. ýdentification of Components Repaired or Replaced and Replacement Components
Name of Name of Manufacturer National Other Year Repaired, ASME
Component Manufacturer Senal No. board Identification Built Replaced, Code: Stamped No. or Replacement (Yes or No)
D~isc: OEM _ f/A .4/4 1 " '4 /A PAO
D3SC ~ ~ ~ ~ ~ ~ 'rZ 4~S~ ACZ.5 CHl ' 4r81 SO 9
.S 91-,o LE _______ 4-/A - 3/-- P4*0 iM-ZS-2- aA ________
S.? ___ vLF (XEOp SIV49Z. V4/4 JKT0-' ACPSIZ. I~ ______ PAO_
Description of Work 94 Ut-T \,ft'V1
Test Conducted: 0 Hydrostatic
\T~Z Pe.aj;OBId 0 Other:
S - 4 - Zoo0
0 Pneumatic E(Nominal Operating Pressure
Pressure 10,. / psi Test Temp. 55.3 ýF
Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8-1/2 in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12/82) This Form (e00030) may be obtained from the Order Dept., ASME, 345 E. 47th St. New York, N.Y. 10017
27
1
7.
8.
BwAP 1600-5A1 Revision 5
Information Use
FORM NIS-2 (Back)
9. Remarks 01-ff,,,rPn ,4eV /. , ,A rd rn , ,, ,,'rd. , , . ADi•ICanie Manufacturers Data Reoor to,~e anlaCtied I
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the report are correct and this conforms to the rules of the ASME Code. Section Xl. .ReOar Or Reolacemenhi
Type Code Symbol Stamp Al4r
Certificate of Authorization No. ,,v.-r oW//1. 4W44-'- Expiration Date ,_________________,___- _
Signed a,0 D ne toi0 Date 4A5-,ooo . _
\, Owner or Qwn~drs Designee. Title
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province
of ---Lc.m-. > N- 1 and employed by " of .-
have inspected the components descnbed in this Owner's Report during the period k- "--4 Z of a-n--- -"--d- = ,
state
that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in
accordance with the requirements of the ASME Code, Section XI.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and
corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any
personal injury or property damage or a loss of any kind arising from or connected with this inspection.
L ----_. . Commissions • I ,
inspectors Signature National Board. State. Province. and Endorsements
Date --- '
(12/82)
28
2
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI
1. owner Commonwealth Edison Como~anv Date Y//0Name
•n Flr~t INdtinn~l PI~l~ Chireaoo. IL 60690
2. PlantBraidwood CornEd PlantAddress
Name � Pt R� Siiiti� 64 Rrace�ilIe. IL 60407
Address
3. Work Performed by MECHANICAL MAINTENANCE Name
Braidwood CornEd P!ant, 35100 S. Rt. 53 Suite 84. Braceville. IL 60407
Sheet _ of
UnitJ�
4 � qqoo-io9�-c�IReoajr Organzanion P.O. No.. JOD No.. etc.
Type Code Symbol Stamp NIA Authorization Number N/A
Expiration Date N/AAddress
4. Identification of System /%AW/5 S N S-T"WAMi
5. (a) Applicable Construction Code 7- 1 'Z. 19 "1"LA Edition. t/A Addenda. -qN/A Code Case
(b) Applicable Edition of Section Xl Utilized for Repairs or Replacement 19 89
6. Identification of Components Repaired or Replaced and Replacement Components
Name of Name of Manufacturer National Other Year Repaired, ASME
Component Manufacturer Serial No. board Identification Built Replaced, Code- Stamped
No. or Replacement (Yes or No)
i rA6> t 513 Pg.RPL4P-rt:>
T-)Isc.. C) F^A N/A tA-S5- I N/A _____
54SC- DR•SLR <, EAL- /A N1/A M-S•"__ ___ __ I qq No
SP1,4 Le-- t>P, • ' I5K •H-T GoI• 17- tj /A, 111.,•51 8Y yO/ Al I • . A0
Description of Work
Test Conducted:
VTZ Pe~oarned /4 -4-oo
0 Hydrostatic
[3 Other:
o Pneumatic E"Nominal Operating Pressure
Pressure IoL.• . psi Test Temp. .-65- !F
Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8-1/2 in. x 11 in., (2) information in items 1 through 6 on
this report is included on each sheet, and (3) each sheet is numbered and the numoer of sheets is recorded at the top of this form.
(12/82) This Form (e00030) may be obtained from the Order Dept., ASME. 345 E. 47th St. New York, N.Y. 10017
29
1
7.
8.
On First Nnti-' Pl- Chiging IL 6M90
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 (Back)
9. Remarks iQrC F) e"4• A/ 2V ~ ~ 4 1E AIo/ caoie Manulacture's Data Reoons to be attc/ed
S,,5o,
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the reoort are correct and thisvA 4 6•acOnforms to the rules of the ASME Code, Section XI. (Repair or Reoiacement
Type Code Symbol Stamp (A-f ,4 f C. ,
Certificate of Authorization No. A, I L/ C 6 L6' Expiration Date X j- 'Ae, n&
Signed (a4QA tQQ Dae I Ckwrneor Owners Ms,gnee. nTae
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province
of C--I L-,- and employed by Irt: .-) - of -- k C-o have inspected the components descnbed in this Owner's Report during the period '-2-1 , -Jý of 1r;- - 2- ,and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and
corrective measures described in this Owner's Reoort. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any
ponal inury or property damage or a loss of any kind arising from or connected with this inspection.
__ Commissions - . . inspector's Signature National Board, State, Provnce, and Endornsemens
Date -- - , 1"•-, -=
(12/82)
30
2
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI
1. Owner Commonwealth Edison Company Name
One First National Plaza. Chicaao. IL 60690
2. PlantBraidwood ComEd PlantAddress
Name .'RA R. Rt 5• Sjit• R4 RBr;e"vlle. IL 6040.7
Address
3. Work Performed by MECHANICAL MAINTENANCEName
Braidwood CornEd Plant. 35100 S. Rt. 53 Suite 84. Braceville. IL 60407
Date L '
Sheet _ of
Unit 1 AWPo -
Authorization Number Expiration Date
Repair Organization P.O. No.. Job No., etc.
T cme= Q•n= -- jnhn Starn MI•A
N/A N/A
Address
4. Identification of System M S - M A)1-4 S•• ••AAA
5. (a) Applicable Construction Code SC>zr" = 'F. 7- 19 -1 4 Edition, i'4 l Addenda, -.- 1/A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacement 19 89
6. Identification of Components Repaired or Replaced and Replacement Components
Name of Name of Manufacturer National Other Year Repaired, ASME
Component Manufacturer Serial No. board Identification Built Replaced, Code; Stamped No. or Replacement (Yes or No)
I f^.5 C>' 1->
QI'C.0 * r4 /A _ _ _ A,% - 25s- I r4)^ar P-C P___ _
Ure74,OI41 I S3
0Isc-. r)K-5 Ac-z 30 ~ -/A mexr wj,8t.'4 I"9' P~ewScMOAr ,~l
Description of Work R?4k Vr V,' IJ1-.
Test Conducted: r' Hydrostatic 0
VTZ P0eRa.e 0 Other: Pre )A -Li-'Zooo
Pneumatic I'Nominal Operating Pressure
ssure 10,1411 psi Test Temp. 5.3 0F
Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8-1/2 in. x 11 in., (2) information in items 1 through 6 on
this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12/82) This Form (e00030) may be obtained from the Order Dept., ASME, 345 E. 47th St. New York, N.Y. 10017
"31
1
7.
8.
3rlnnq Rt -9;'A-1;"jtPAA . Ile IL 60407
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 (Back)
9. Remarks m , ~ ~ d% d2,~e. ~ ~ ~ ~ L.d .~S~ Applicabe Manufacturer's Data Reports to be attached A)7-,Ac)4•' -'•
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the report are correct and this/'-ft,4e' conforms to the rules of the ASME Code, Section XI. (Repair orReplacement)
Type Code Symbol Stamp AJo , _4d,, f"
Certificate of Authorization No. , ' e- 'd/Id , '. Expiration Date ,0," L ,Ai ,d tWoe
Signed dlTtýmI e0 Date ______oo • -Owner or Own-er's DCsignee, Ti3tle
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province of '- '. -, ý I and employed by %N i % % k c . of . C_.
have inspected the components described in this Owner's Report during the period '---2-'=t' of .,'-- - -_ . ,and
state that to the best of my knowledge and belief, the Owner has iperformed examinations and taken corrective measures described in this Owner's Report in
accordance with the requirements of the ASME Code, Section XI.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and
corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any
personal injury or property damage or a loss of any kind arising from or connected with this inspection.
S- ..- - Commissions ": - I c, Inspector's Signature National Board, State. Province, and Endorsements
Date '4--
(12/82)
32
2
I
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section X1
Name
On First Nfati n• PIa- Trhirnnn IL 6M6R0
2. PfantBraidwood CornEd PlantAddress
Name 35100 S. Rt. 53 Suite 84, Bracevle, IL 60407
AddreSS
3. Work Performed by MECHANICAL MAINTENANCE Name
Braidwood CornEd Plant. 35100 S. Rt. 53 Suite 84, Bracevile, IL 60407
Date 9- /- 00
Sheet I of
Unit I
Reoar Organizauon P.O. No.. Job No., etc.
Type Code Symbol Stamp N/A Authoonzation Number N/A
Expiration Date N/A
AddreSS
4. Identification of System A S - /A.i ̂ ),4.S'/'
5. (a) Applicable Construction Code -,rf-r = 'ý2. 19 "1 . Edition. _,_/ _
(b) Applicable Edition of Section XI Utilized for Repairs or Replacement 19 "0
6. Identification of Components Repaired or Replaced and Reolacement Components
Addenda. -. 4/,4 Code Case
Descnption of Work V ,1.-T ',J ALJ .
Test Conducted: 0 Hydrostatic 0
VTZ. Pe49,.•o,- 0 Other: Pr A/f/oo
Pneumatic 0IV Nominal Operating Pressure
ressure 114 7 psi Test Temp. J..5 'F
Name of Name of Manufacturer National Other Year Repaired, ASME
Component Manufacturer Serial No. board Identification Built Replaced, Code; Stamped No. or Replacement (Yes or No)
MTEO.. Z4 "11
OI5PV. ORF-.$3 f- 5ktAr-Z S& A /A t~r 94- _8Z______1
Note: Supplemental sheets in form of lists, sketches, or drawvings may b0e used, provided ( 1) size is 8-1/2 in. x 11 in., (2) information in itemns 1 through 6 on
this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12/82) This Form (e00030) may be obtained from the Order Dept.. ASME, 345 E. 47th St. New York, N.Y. 10017
33
1
1 . oWIneI
7.
8.
-- I.k ; r, Ucwnm W ý:.M 2S.--
Unit Iwgý q-k0C>-1(D9SZ-0I
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 (Back)
9. Remars ,d• dlf~-=,i,.I A'4e ,/' Z dIalftf, , , ,,, -, ' ,ks -d4 -e*$c Aoplicablie Manutacturers Data Reoorts to oe aitacied
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the report are correct and this , ., 4 conforms to the rules of the ASME Code. Section XI. (RepaJr or Repiacementi
T yp e C od e S ym b o l S tam p ,M & ,"' ,4-/ 4 V L &.-4 E =
Certificate of Authonzation No. A,1',- ,"•-10' C'eeL" Expiration Date t.A.#
Signed a4I 4 rileff Date 411 b6 • wner or O3$iners oesý'gnee. Title- I I
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Pronce
of C•,-'-- V-3 5 and employed by I of ..- • -
have inspected the components descnbed in this Owner's Report during the period ' "-- ,- of 4- :.,.- ,and
state
that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in
accordance with the requirements of the ASME Code. Section XI.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and
corrective measures described in this Owner's Report. Furthermore. neither the Inspector nor his employer shall be liable in any manner for any
personal injury or property damage or a loss of any kind arising from or connected with this inspection.
L- L-- Commissions - L "
inspectors Signature Nationat Board. State. Province. ari Enidom•eism
Date - , -'
(12/82)
-, 34
2
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI
1. Owner Commonwealth Edison Companv flataName
O3np Ffint NAtional Plaza. Chino. IL 60690
2. PlantBraidwood CornEd Plant
3.
Address
Name
35100 S. Rt. 53 Suite 84. Braceville. IL.60407 Address
Work Performed by MECHANICAL MAINTENANCE Name
Braidwood CormEd Plant. 35100 S. Rt. 53 Suite 84. Braceville. IL 60407
7. Description of Work L)AL' •- J•ec,-• /eg•pA/
8. Test Conducted: 03 Hydrostatic 0 Pneumatic R(N
VTZ Sekc."o C e• 0 Other: Pressure 1041 A4/14/0
Sheet of
Unit of__
wp# q oo10 qqLq-b1Repair Orgaization P.O. No.. Job No., etc.
T (Cnm4 Sw hnl Sa N/A
Authorization Number Expiration Date
N/A N/A
Address 4. Identification of System A4!S- M !SCcA fL
5. (a) Applicable Construction CodeSee-r al, /(l2 '1 9 '74 Edition, // Addenda, WAJI Code Case (b) Applicable Edition of Section XI Utilized ftr Repairs or Replacement 19 89
6. Identification of Components Repaired or Replaced and Replacement Components
Name of Name of Manufacturer National Other Year Repaired, ASME Component Manufacturer Senal No. board Identification Built Replaced, Code; Stamped
No. or Replacement (Yes or No)
ý,C 44__ __ _ Al/A __ _ _ _ _ qq 3 5-I 1cej"/
_M.___AIMS0__ 5__ _ _ _ A14/A ~ / C
A]bb5Z l/A R 'or c'o- 033-s q5- c,, AM
Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8-1/2 in. x 11 in., (g) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12/82) This Form (e00030) may be obtained from the Order Dept., ASME, 345 E. 47th St. New York, N.Y. 10017
35
1
ominal Operating Pressure
psi Test Temp. 553 'F
Data
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 (Back)
9. Remarks Applica"e Manufacturer's Data Reports to be attached
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the report are correct and this AeR lt tmeULtconforms to the rules of the ASME Code, Section XI. (Rdpairorfttý)
Type Code Symbol Stamp KOet Apl'cA61&
Certificate of Authorization No. .i Expiration Date 4616Aopi rileL .
Signed I, Dade 'qDate IA Crerv Owners Desl=nee, Title
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province
of and employed by of
have inspected the components described in this Owner's Report during the period cC- - - of 4>-, - - ,and
state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in
accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and
corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any
personal injury or property damage or a loss of any kind arising from or connected with this inspection.
L .. , Commissions \"-'q Inspector's Signature National Board. State. Promwince. and Endoresermnt
Date , 1 __
(12/82)
~3 6
2
I
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI
1. Owner Commonwealth Edison Company Name
One First National Plaza. Chicao IL 60690 Address
2. PlantBrajdwood CornEd Plant Name
35100 S. Rt. 53 Suite 84. Braceville. IL.60407 Address
3. Work Performed by MECHANICAL MAINTENANCE Name
Braidwood ComEd Plant. 35100 S. Rt. 53 Suite 84. Braceville. It 60407
Date ý-2-"
Sheet / of 7
Unit
Repair Orgarezation P.O. No.. Job No.. etc.
Type Code Symbol Stamp _ Authorization Number
Expiration Date
N/AW/A N/A
4. Identification ofAddress
5. (a) Applicable Construction Code.,e. f&. o f 7" 19 V2j Edition, J/A Addenda, L//I Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacement 19 89
6. Identification of Components Repaired or Replaced and Replacement Components
Name of Name of Manufacturer National Other Year Repaired, ASME Component Manufacturer Serial No. board Identification Built Replaced, Code; Stamped
No. or Replacement (Yes or No)
,dT Wr/ $5of36 y
VAIue M -5 - i 7.desc p reSfrk uo%3•o s / M,/•,9'_ - Z- 77 lgce i " C
7 ..oesc, ptionof Wr iol. t A j :D/33 A L0W,4- MS03c
Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8-1/2 in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12182) This Form (e00030) may be obtained from the Order Dept., ASME, 345 E. 47th St. New York, N.Y. 10017
8. Test Conducted:
"V T? Pete VAeo Hydrostatic
o Other:
0 Pneumatic (09 Nominal Operating Pressure
Pressure (O0'4 psi Test Temp. 553 -F
7i 37
1
S tern
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 (Back)
9. Remarks Appl"cabWe Mantlacturis's Data Reports to be attached
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the report are correct and this hAa& conforms to the rules of the ASME Code. Section XI.
Type Code Symbol Stamp tot RpOL eQ1,
Certificate of Authorization No. AJ1of 9C20r,14t Expiration Date Aa.nh e
Signed ne ( 00 Date ___, 0 . I•wner'eOwner's Desigrnitle Ti t
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province
of ý ý-' , - 1-ý% andemployedby IT t %, \ - - Of C:-have inspected the components described in this Owner's Report during the period O - of .4- -- • --- and
state that to the best of my knowledge and belief, the Owner has pierformed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any peponaJ injury or property damage or a loss of any kind arising from or connected with this inspection.
P77 Commissions J _ kispectoi Signature National Board, State. Province, and Endoierrnwts
Date , _ -_
(12/82)
I- 38
2
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI
1. Owner Commonwealth Edison Company Name
One Frst Nationa Plaza. ChicaRoo IL 60690
2. PlantBra dwood ComEd PlantAddress
UnitName
offV r1 Q 4. At A ~R-r.-iIle 11 AAlfl7Address
3. Work Performed by MECHANICAL MAINTENANCE Name
Braidwood CornEd Plant. 35100 S. Rt. 53 Suite 84. Braceville. IL 60407Address
4. Identification of System A '1s ms- MAI"tsj , A, K
5. (a) Applicable Construction Code,; ,a-V/eZ 2 19 'Zh Edition, A)/A (b) Applicable Edition of Section Xl Utilized for Repairs or Replacement 19 89
6. Identification of Components Repaired or Replaced and Replacement Components
Date I.. -. "U L j
Sheet _ of 2 ol
woe 1 qq01655gIo 1Repair Orgaruzation P.O. No.. Job No.. etc.
Type Code Symbol Stamp N/A Authorization Number N/A
Expiration Date N/A
Addenda, Code Case
Name of Name of Manufacturer National Other Year Repaired, ASME Component Manufacturer Serial No. board Identification Built Replaced, Code; Stamped
No. or Replacement (Yes or No)
VAXVe- P(50V?>JA5OI3C. •o~r. o~3 ,p~.r . M-3•,•l _/,_ ____, _ __ _ _
A oki . i ,n S 0 , 1- " kil;A *Aj0 '0h, A 6o1eicA-35- -' & JIeepei (I 1e,-S
7. Desoniptionof Work kemwe4J- &u5,4 1fiv5 irPsio/I30-. Anld- 9i1Pea-cehn44 I~tCL
8. Test Conducted: [3 Hydrostatic 0 Pneumatic DU'Nominal Operating Pressure
[]TZ era¶... 5 ~l 0 Other: Pressure 16'A7 psi Test Temp. .-.. 'F
Note: Supplemental sheets in form of lists, sketches, or drawings maybe used, provided (1) size is 8-1/2 in. x 11 in., (2) information in Items 1 through 6 on
this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12182) This Form (e00030) may be obtained from the Order Dept., ASME, 345 E. 47th St. New York, N.Y. 10017
39
I
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 (Back)
9. Remarks 4fr4C14-6;Q /&C TA(r IW-4c-rc6'Z J1,WIA/' ~~ '~ Applicable Manufacturers Data Reports to be attacfed
,, ,,4c•7I K,, ' YAv ,.6' ,A ,O ,-?6 . ,e&f.' -',:Dvd .r•-"
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the report are correct and this j__ 6#' f4•f~ fontorrns to the rules of the ASME Code, Section XI. (Repair or Replacement)
Type Code Symbol Stamp A•'" / -,.
Certificate of Authorization No. Ar4' Expiration Date • • ,f4 .d/ddi-(•
Signed 44NorwC ,, D I_ nror owner's Design"e, Title
(12/82)
40li.
2
CERTIFICATE OF INSERVICE INSPECTION
I the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province
of 4-•&A •-, .. 5 and employed by k -. ýt c . _ of - - r-, have inspected the components described in this Owner's Report durng the period > 2-- -o of an. d - .
state that to the best of my knowledge and belief, the Owner has ;erformed examinations and taken corrective measures described in this Owner's Report in
accordance with the requirements of the ASME Code, Section XI.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and
corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any
persona] injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions % - -= " "•. -National Boald, State. Province. and EndorsementsInspector's Signature
Date 4- --!g:- I
Date • .-•--
, 11•='-°- i[L-
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI
1. Owner Commonwealth Edison Company Name
rN Crslt*a~s, a r: IdLC S.,, e flk; 4U L. lahJ..
Address Plant Braidwood Nuclear Power Station
Name
R.R. 1 Box 84. Braceville, IL 60407 Address
3. Work Performed by Mechanical Maintenance Braidwood Nuclear Power Station R.R. 1 Box 84. Braceville, IL 60407
Add"ss
4. Identification of System Re--.-C>.. ,
Date P'ý,-'\ -Ž. 1 "ý.C • )
Sheet 1 of
Unit (a-)"E- C.O N'o
v 'b2 B A8& Roper Organization P.0. No.. Job NO.. eOM
Type Code Symbol Stamp Authorization Number
Expiration Date
Not Applicable Not Applicable Not Applicable
5. (a) Applicable Construction Code ( e,'"9 B(O Edition, ___I_____ Addenda. i-( Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacement 19B9
6. Identification of Components Repaired or Replaced ana Replacement Components
Name of Name of Manufacturer National Other Year Repaired, ASME Component Manufacturer Serial No. board Identification Built Replaced, Code;
No. or Stamped Replacement (Yes or No)
7. D o k- k4 g " 1 -4- -:a-
8. Test Conducted: C3 Hydrostatic 0 Pneumatic E3 Nominal Operating Pressure
) k Other:( D g) Pressure psi Test Temp. -F rF Sefc,'4,e•u'r •'.. A•4*/•l-y 6v/S e•~ •€'•'P P" )iev•,•T
Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8-1/2 in. x 11 in., (2) information in items 1 throug 6 on this report is included on each sheet, and (3) eacn sheet is numbered and the number of sheets is recorded at the top of this form.
Ale This 7-1e6/13.4 fa botn f de, ASME, e34 ZE th-/ Sox lew
(12182) This Form (e00030) may be obtained from the Order Dept., ASME, 345 E. 47th St. New York, N.Y. 10017
41
1
2.
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 (Back)
9. Remarks ~ -feTL jZ,,4r ~-iAAppitocm Mantiacturai a Data Reports to bie attactled
,4A-�iO dgj�ra•�'d?3
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the report are conreC and this ReA_•t;nJ-conforms to the rules of the ASME Code, Section XI. (Repair or Replacement)
Type Code Symbol Stamp A'rAV',/'e 44d64k;
Certificate of Authorization No. AZZ /7 A,, 4'tc4,eztC
a Ownw or Owner's Oesignee. Tite
Expiration Date A,' -, , uC,461 Z&."
Date .:- /-
CERTIFICATE OF INSERVICE INSPECTION
I. the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province of c '-4 V -z and employed by - -. t , \ 0--- of '
have inspected the components described in this Owners Report during the period - - of .4.-'- L - , and state that to the best of my knowledge and belief, the Owner nas performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore. neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any Kind arising from or connected with this inspection.
L. \X Commissions -kInspeactrs Signature National Board. State. Province. and
Date -4-
(12/82)
42
2
Signed 5ý:ý 4-Z000-
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI
1. Owner Commonwealth Edison Company Name
One First National Plaza, Chicago, IL 60690 Address
2. Plant Braidwood CornEd Plant Name
35100 S. Rt. 53 Suite 84, Braceville, IL 60407 Address
3. Work Performed by Newberq/Perini/Stone & Webster Name
Braidwood ComEd Plant, 35100 S. Rt. 53 Suite 84, Braceville, IL 60407
Date 04/01/00
Sheet 1 of 2
Unit 02
WR #980120187-01 Repair Organization P.O. No., Job No., etc.
Type Code Symbol Stamp Authorization Number Expiration Date
N/AN/AN/A
Address
4. Identification of System RC
5. (a) Applicable Construction Code Sec. III , - 19 74 Edition, S '75 Addenda, n/a Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacement 19 89
6. Identification of Components Repaired or Replaced and Replacement Components
Name of Name of Manufacturer National Other Year Repaired, ASME Component Manufacturer Serial No. board Identification Built Replaced, Code; Stamped
No. or Replacement (Yes or No)
HEX NUT NOVA HT.#6019432 N/A Cat #0000037034 N/A Replacement NA THREADED ROD NOVA HT #RAK N/A Cat #0000039990 N/A Replacement N/A
7. Description of Work Performed REPLACED FLANGE GASKET
8. Test Conducted: 0 Hydrostatic
VT I Cominfesko[ 0 Other:
E] Pneumatic 0 Nominal Operating Pressure
Pressure ,A . psi TestTemp. &yA -F
VU .P,+ R PeA eX4e.Qg X Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8-1/2 in. x 11 in., (2) information in items 1 through 6 on
this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12/82) This Form (e00030) may be obtained from the Order Dept., ASME, 345 E. 47th St. New York, N.Y. 10017
DO NOT DUPLICATE
43
1
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 (Back)
9. Remarks Applicable Manufacturer's Data Reports to be attached
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the report are correct and this R..• m$_enforms to the rules of the ASME Code, Section XI. (Repair o(2pLacemaent
Type Code Symbol Stamp "tc.AA We
Certificate of Authorization No. UvA' AppliIcthi ly Expiration Date A,'b Ao11 I_ e
Signed (?wncer ons~ Date es2 06ne O0wner or Owner's Designali Title
(12/82)
DO NOT DUPLICATE
44
2
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province of • -- and employed by _"- "--- i :•. -I- of \-k AlVV•--- I , , have inspected the components described in this Owner's Report during the period -A -' ,- 4C2ý. of l--" - --Z, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, conceming the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
L --- • Commissions I -,•=. Inspector's Signature National Board, State, Province, and Endorsements
Date 4 - ,l..._
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI
1. Owner Commonwealth Edison Company Name
One First National Plaza, Chicaqo, IL 60690
Date April 1, 2000
Sheet 1 ofAddress
Plant Braidwood ComEd Plant Name
35100 S. Rt. 53 Suite 84, Braceville, IL 60407 Address
2
Unit 1
WR#980118188-01 Repair Organization P.O. No., Job No., etc.
3. Work Performed by Mor.1,r 4 r.� 1 M� 4 ,, I- on�nn a
Name
35100 S. Rt. 53 Suite 84, Braceville, IL 60407
Type Code Symbol Stamp Authorization Number Expiration Date
Not Applicable
Not Applicable Not Applicable
Address 4. Identification of System REACTOR COOLANT (RC) 1RC22AB-l 5"
5. (a) Applicable Construction Code III 19 74 Edition, S75 Addenda, NA
(b) Applicable Edition of Section XI Utilized for Repairs or Replacement 19 89/No Addenda
Code Case
6. Identification of Components Repaired or Replaced and Replacement Components
Name of Name of Manufacturer National Other Year Repaired, ASME Component Manufacturer Serial No. board Identification Built Replaced, Code; Stamped
No. or Replacement (Yes or No) HEAT NO.
HEX NUT NOVA 110 & LCP NA CAT ID 0037034 NA REPLACEMENT NO
HEAT NO. THREADED ROD NOVA RAK NA CAT ID 0039990 NA REPLACEMENT NO
7. Description of Work REPLACE FLANGE GASKET AND BOLTING MATERIAL
8. Test Conducted: 0 Hydrostatic
fTr IA 0 Other:
0 Pneumatic 0 Nominal Operating Pressure
Pressure W.A/. psi Test Temp. A,0 *F
Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8-1/2 in. x 1I in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12/82) This Form (e00030) may be obtained from the Order Dept., ASME, 345 E. 47th St. New York, and N.Y. 10017
DO NOT DUPLICATE
451
2.
M 1-1 1 '1 M 4 +- -
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 (Back)
9. Remarks Applicable Manufacturer's Data Reports to be attached
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the report are correct and this Replacement conforms to the rules of the ASME Code, Section Xl. (Repair or Replacement)
Type Code Symbol Stamp Not Applicable
Certificate of Authorization No. Not Applicable
Signed K1 a AN , 0
Expiration Date Not Applicable
Date •/1/200 0 $a ---- er or Owne'gs-Designee, Title
(12/82)
DO NOT DUPLICATE 4G
2
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province of =L.I---%. --5 - % and employed by k--% t \ C- I. of )A-. v,----- ,I have inspected the components described in this Owner's Report during the period F- \k. - I of -A- 2- 2 - • and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
L Commissions t
Inspector's Signature National Board. State, Province, and Endorsements
Date -1-'-- , 1_-=
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI
1 Owner Commonwealth Edison Company ame
One First National Plaze. Chicago. IL 60690
2. Plant Braidwood Nuclear Power Station Nm
R R. I Box 84 Braceville. IL 60407
Date ::0 /C Sheet IJ_. of
Unit 0/
3. Work Performed by Mechanical Maintenance Type Code Braidwooa Nuclear Power Station Authonzatt R.R. I Box 84. Braceville. IL 60407 Expiration Date
4 Identification of System /0'cz =-* J.V , tSr(4 / f(; & IZ- Pr
5. (a) AoPltCable Construction Code 7uit.,• ( ') L I Edition. .3? Lb) Applicable Edition of Section Xl Utilizes for Repairs or Replacement g.as
6. Identification of Components Reoairea or Replaced ana Reolacement Components
Kw" MrqnuAhn Pm O ff. JOfS. NOW
Symbol Stamp Not Abicable on Number NotAppliceble
Addenda. 11 Code Case
Name of Name of Manufacturer National Other Year Repaired. ASME Component Manufacturer Serial No. board Identification Built Replaced. Code:
No. or Stamlped Replacermet (Yes or No)
_-zi ;4tt m e ,_,_
Description of Work Qe-LC,, ,ej iVOZZ,,eS aj ,1 , a.. 4g,,,0-,p -a.
Test Conducted: C Hydrostatic 0 Pneumatic 0 Nominal Ooeratino Pressure
[1•Other. Pressure - - psi Test Temo. S -S--1 -F
Note: Supplemental sheets in form of lists. sketches, or drawinms may be used. provided (1) size is 8-1/2 in. x 11 in., (2) Infomatmon in items I thrc 6 on this report is included on eacn sheet and (3) eacn sheet is numbered and the number of sheets is recorded at the top of this form.
See ?0.1e- .03.
(12182) This Form seOO030) may be obtainea from the Order Dept., ASME. 345 E. 47th St. New York. N.Y. 10017
47
7
8.
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 (Back)
�w�a.inw U UU ***��* '* -
CERTIFICATE OF COMPLIANCE
We certify that the statements mace in the report are corre-t and this / conforms to the rules of the ASME Code. Sedln Xl. (ROW0dR!T!
Type Code Symbol Stamp
Certificate of Authorization t•
Signed
A) ILA,
'I
E-xpiration Oats ~lwýb(
Data -
CERTIFICATE OF INSERVICE INSPECTION
I. the unoersigned. holding a valid commission issuea -v the National Board of Boiler and Pressure Vessel Inspecors and the State of
Province of "-'--'. -"" and employed by -%.- \ of ' have MSMOea the Components Cescribed in this Owners Reoor dunng the penod O- 1 4-. • Of i -.C4
and state that to the best of my knowtedge ano belief. the Owner nas Derformed examinations and taken corrective measures described in this Owners
Report in accordance with the requirements of the ASME Cz•e. Section X1.
By signing this certificate. nermer the Inspector nor his employer makes any warranty. expressed or imolied. concerning the examnamtion!
and corrective measures described in this Owner s Report. Furthermore, neither the inspector nor his employer shal be liable m any manner
any personal injury or property damage or a loss of any kina- arising from or connected with this inspection.
L Commissions 10 - t ý •UsinWI $bniI Nammm Doo Siaa Provo=a.m Endarsi.rm,
Oate g -a.- -
(12/82)
4182
9. RemarnsA0P0=D0 V.VMWSCMXW 8 OWN HOMM 10 00
tO A
BwAP 1 600-5Al Revision 5 Information Use
FORM NIS-2 SUPPLEMENTAL SHEET
1. Owner: Commonwealth Edison Company One First National Plaza Chicago, Illinois 60690
Sheet -.. Daib
Unit
2. Plant Braidwood Nuclear Power Station R.R. #1, Box 84 Braceville. Illinois 60407
3. Work Performed by ALye'h an,&4dA
Unit 0________
zo/? g99oogp009-0/ P.O. No.. WR No.. etc
Type Code Symbol Stamp Authorization No. ____7_____
Expiration Date/V1
35Sioo 5. kT Is 4. Identification of System Re
5. (a) Applicable Construction Code
Address *1, LW61ugi, li i I/I
19 9..2L..... Edition
Code Cases SA'(b) Applicable Edition of Section XI Utilized 19 [?q...... Edition ,W Addenda
6. Identification of Components Repaired or Replaced and Replacement Components.
Nmof Name of Manufacturer National Other Year Repaired. ASME Component Manufacturer Serial No. Board Identification Built Replaced. Code; Stamnped
_____________No. ___________or Replacement (Yes or No)
&, iJ-+866sg.. CO/MSOO3 O4ITC 0.,c 0 /7 /If &;' e eem,"e +..~i........ 9"L( ~ ~ CO'f I8 cft-st c/s6V orc±Lz mzQ~sJ o ±~ .1 i ii ý;Jee.J q
9"t&_1_C__ _______0 -VCO OY~'r /7 g #.I * r.5
Laof 6'cýg qnC Q o.~h'# t a 0s f 7 /fm!. ~211yLe
DO NOT DUPLICATE
(Finai) 3
49
g�e¾A TEU A73Addenda
f'' ý'10 C-1
3 of. -2%/,oj /ov
61 1
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI
1. Owner Commonwealth Edison CompanyName
One First National Plaza, Chicago, IL 60690 Address
Plant Braidwood CornEd Plant Name
35100 S. Rt. 53 Suite 84, Braceville, IL 60407
3. Work Performed by
Date April
Sheet 1 of
Unit 1
Address
Mechanical Maintenance
Name
35100 S. Rt. 53 Suite 84, Braceville, IL 60407
1, 2000
2
WR#980120215-01Repair Organization P.O. No., Job No., etc.
Type Code Symbol Stamp Not Applicable
Authorization Number Not Applicable
Expiration Date Not ApplicableAddress
4. Identification of System REACTOR COOLANT (RC) 1RC22AD-1.5"
5. (a) Applicable Construction Code III C019 74 Edition, S75 Addenda, NA Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacement 19 89/No Addenda
6. Identification of Components Repaired or Replaced and Replacement Components
Name of Name of Manufacturer National Other Year Repaired, ASME Component Manufacturer Serial No. board Identification Built Replaced, Code; Stamped
No. or Replacement (Yes or No) HEAT NO.
HEX NUT NOVA HDF NA CAT ID 0037034 NA REPLACEMENT NO
HEAT NO. THREADED ROD NOVA RAK NA CAT ID 0039990 NA REPLACEMENT NO
7. Description of Work REPLACE FLANGE GASKET AND BOLTING MATERIAL
8. Test Conducted: 0 Hydrostatic 0 Pneumatic 0 Nominal Operating Pressure
We.sef-sea "yt [ 0 Other: Pressure W.. psi Test Temp. -/ -- °F
VTZ.t N*+ Ae~v%1 AeA I e CC4IL)4e A XT-q -(6 Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8-1/2 in. x 11 in., (2) information in items 1 through
6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12/82) This Form (e00030) may be obtained from the Order Dept., ASME, 345 E. 47th St. New York, and N.Y. 10017
DO NOT DUPLICATE 50
1
2.
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 (Back)
Applicable Manufacturer's Data Reports to be attached
DO NOT DUPLICATE
2
9. Remarks
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the report are correct and this Replacement conforms to the rules of the ASME Code, Section XI. (Repair or Replacement)
Type Code Symbol Stamp Not Applicable
Certificate of Authorization No. Not Applicable Expiration Date Not Applicable
Signed 6$ bo AL a& Date / o , __ t- ' Owner or Owner's Designee, Title
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province of 5:6-L. % ..b % S and employed by k- V -b, '- ' C- of 1-A----T•=-., C=i .have inspected the components described in this Owner's Report during the period .- t O I of 4 a- 2 •--- - , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
I .• Commissions "'--=L-* '.L-3 lsý Inspector's Signature National Board, State, Province, and Endorsements
Date -n- ". - , l - ..
(12/82)
51
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI
1. Owner Commonwealth Edison Company Name
One First National Plaza, Chicago, IL 60690Address
2. Plant Braidwood ComEd Plant Name
35100 S. Rt. 53 Suite 84, Braceville, IL 60407 Address
Date April 1, 2000
Sheet 1 of 2
Unit 1
WR#980120201-01 Repair Organization P.O. No.. Job No., etc.
3. Work Performed by Mechanical Maintenance
Name
35100 S. Rt. 53 Suite 84, Braceville, IL 60407
Type Code Symbol Stamp
Authorization Number Expiration Date
Not Applicable
Not Applicable Not Applicable
Address 4. Identification of System REACTOR COOLANT (RC) IRC22AC-1.5"
5. (a) Applicable Construction Code III C~ 119 74 Edition, S75 Addenda, NA Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacement 19 89/No Addenda
6. Identification of Components Repaired or Replaced and Replacement Components
Name of Name of Manufacturer National Other Year Repaired, ASME Component Manufacturer Serial No. board Identification Built Replaced, Code; Stamped
No. or Replacement (Yes or No) HEAT NO.
HEX NUT NOVA HDF NA CAT ID 0037034 NA REPLACEMENT NO
HEAT NO. THREADED ROD NOVA RA, NA CAT ID 0039990 NA REPLACEMENT NO
7. Description of Work REPLACE FLANGE GASKET AND BOLTING MATERIAL
8. Test Conducted:
rt1 Pewa mv"o Hydrostatic
"O Other:
0 Pneumatic E3 Nominal Operating Pressure
Pressure -/l. psi Test Temp. f./4 -F
Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8-1/2 in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12/82) This Form (e00030) may be obtained from the Order Dept., ASME, 345 E. 47th St. New York, and N.Y. 10017
DO NOT DUPLICATE
52
1
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 (Back)
9. Remarks Applicable Manufacturer's Data Reports to be attached
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the report are correct and this Replacement conforms to the rules of the ASME Code, Section Xl. (Repair or Replacement)
Type Code Symbol Stamp Not Applicable
Certificate of Authorization No. Not Applicable
Sianed (?Z)I,• (2 to )
Expiration Date Not Applicable
Date _/00__,IL. owner or owe'~eineei Ilte
DO NOT DUPLICATE 53
2
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province of - and employed by VA - . \ C-3 of C5iF-- ---- ' -have inspected the components described in this Owner's Report during the period c - G-, ? I of . - . and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
t - _Commissions "---'-, L t Inspector's Signature National Board, State. Province, and Endorsements
Date -4--(--'4- , 1 _-= 3
(12/82)
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI
1 Owner Co.nnmnnmt----lfh It- ' r',nrnns,
Name
Address Plant Braidwood ComEd Plant
Name 35100 S. Rt. 53 Suite 84, Braceville. IL 60407
3. Work Performed by
Address
Mechanical MaintenanceName
35100 S. Rt. 53 Suite 84. Braceville. IL •O4O7
Date March 30, 2000
Sheet 1 of 3
Unit 1
WR#980003831-01 Repair Organization P.O. No.. Job No., etc.
Type Code Symbol Stamp Not Applicable Authorization Number Not Applicable Expiration Date Not Annlicab]e r
Address Identification of System 1RE04C-3" PIPE
(a) Applicable Construction Code III C'i 9 74 Edition, S75 Addenda, NA Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacement 19 89 / No Addenda
Identification of Components Repaired or Replaced and Replacement Components
Name of Name of Manufacturer National Other Year Repaired, ASME Component Manufacturer Serial No. board Identification Built Replaced, Code; Stamped
No. NO. or Replacement (Yes or No) HEAT NO.
ELBOW CONSILIDATED LSUM-2 NA CAT ID 0038377 NA REPLACEMENT NO HEAT NO.
WELDROD WELDSTAR PS 980 NA ST# 611A13 NA REPLACEMENT NO HEAT NO.
WELDROD WELDSTAR CT 7030 NA SI# 611A13 NA REPLACEMENT NO HEAT NO. RED. CONC. WFI 862ZNA NA CAT ID 0015612 NA REPLACEMENT NO
7. Description of Work INSTALL RELIEF VALVE ON 1RE04C-3" LINE
8. Test Conducted: 0 Hydrostatic 0 Pneumatic 0 Nominal Operating Pressure
SOther: Pressure 49-1o psi Test Temp. AM,13i•j'B F V r-2-izes •l 4ee -re-, r- c.- , 1>,F.-; a-''- r-%Z;\ <. - " .
Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8-1/2 in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is-rumbered and the number of sheets is recorded at the top of this form.
(12/82) This Form (e00030) may be obtained from the Order Dept., ASME, 345 E. 47th St. New York, and N.Y. 10017
DO NOT DUPLICATE 54
2.
4.
5.
6.
- -E..y
35100 S. Rt. 53 Suite 84 Braceville IL 60407 r
.
...
t
..
.....
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 SUPPLEMENTAL SHEET
1. Owner: Commonwealth Edison Company One First National Plaza Chicago, Illinois 60690
2. Plant: Braidwood ComEd Plant 35100 S. Rt. 53 Suite 84 Braceville, Illinois 60407
3. Work Performed by Mechanical Maintenace Name
35100 S. Rt. 53 Suite 84, Braceville, IL 640407
Sheet Date Unit
Unit
Address
Identification of System 1RE04C- 3" PIPE
(a) Applicable Construction Code III
Code Cases MIA
(b) Applicable Edition of Section Xl Utilized
Identification of Components Repaired or Replaced and Replacement Components.
3 of 3 March 30, 2000
1
WR# 980003831-01 P.O. No., WR No., etc
Type Code Symbol Stamp Not Applicable Authorization No. Not Applicable Expiration Date Not Applicable
19 74 Edition
19 89 Edition
S75 Addenda
No Addenda
55DO NOT DUPLICATE
(Final)
4.
5.
6.
Name of Name of Manufacturer National Other Year Repaired, ASME Component Manufacturer Serial No. Board Identification Built Replaced, Code; Stamped
No. or Replacement (Yes or No) HEAT NO.
WELD ROD WELDSTAR PK 177 NA SI# 611A38 NA Replacement NO
HEAT NO. WELDOLET CONSOLIDATED 428ZNA NA Cat ID # 1026197 NA Replacement NO
--... _._
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 (Back)
9. Remarks CA41 ,4..,vo"odr, ,, ,,j ,V•' ;,- ,3 "• u.O ,o,, x,.---"od evrZApplicable Manufacturer's Data Reports to be attached
!r *)c3 £w'Z~oa &12; e,*-0 ~ GZ4&,' u Z-l~~~'? C~' ~
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the report are correct and this Replacement conforms to the rules of the ASME Code, Section Xl. (Repair or Replacement)
Type Code Symbol Stamp Not Applicable
Certificate of Authorization No. Not ApplicableExiaonDt Nt plcbeExpirDat e Not Ap2plicable Date 04 zOwner or Owner's Designee, Title
Signed
(12/82)
56DO NOT DUPLICATE
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province of - --- 0 k and employed by , k \ C-_.. of -. .-have inspected the components described in this Owner's Report during the period " K -- S-- C, of • - - -, . and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code. Section Xl.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. ". Commissions I W.
Inspector's Signature National Board. State. Province. and Endorsements
Date • , 1___
%J
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI
1. Ownert Commonwealth Edison Comnanv Name
One First National Plaza. Chicano. IL 60690 Address
2. Plant: Braidwood ComEd Plant Name
35100 S. Rt. 53 Suite 84. Braceville. IL 60407Address
3. Work Performed by Mechanical Maintenance Name
Braidwood CornEd Plant. 35100 S. Rt. 53 Suite 84. Braceville. IL 60407
4.
5.
Date:
Sheet
Unit
MARCH 27. 2000
1 of
01
WR 990061508-01Repair Organization P.O. No., Job No., etc.
Type Code Symbol Stamp: NIA Authorization Number: N/A Expiration Date: N/A
Address
Identification of System RH - RESIDUAL HEAT
(a) Applicable Construction Code ASME SECT.Ill Z'•, 19 71 Edition, W Addenda,
(b) Applicable Edition of Section Xl Utilized for Repairs or Replacement 19 89
; -f tr, # 0 - 0 1 Conio a, alaa +n tolo.,nf 4.rnaa
N/A Code Case
U. lUCilIIIIU UI I 'SI, *dcJI on I iJ l i i * -I,1 U. i IOiJ l iU i i i lUI' I.I ý,i l - wI =
Name of Name of Manufacturer National Other Year Repaired, ASME Component Manufacturer Serial No. board Identification Built Replaced, Code; Stamped
No. or Replacement (Yes or No) CROSBY VALVE
RELIEF VALVE COMPANY N-56902-00-0015 N/A N/A 1976 REMOVED YES CROSBY VALVE UTC# 2049085
RIELIEF VALVE COMPANY N-56902-00-0005 N/A MRI #288219 1976 REPLACEMNT YES
7. Description of Work REPLACED EXISITNG VALVE WITH THIS ONE.
8. Test Conducted: 0 Hydrostatic 0 Pneumatic eBNominal Operating Pressure
1r "•'-27-, Other: Pressure Z.j( psi TestTemp. Av bt~ouL IF
VT7a Pe~t,ýad I.4-1-00
Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8-1/2 in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12182) This Form (e00030) may be obtained from the Order Dept., ASME, 345 E. 47th St. New York, N.Y. 10017
DO NOT DUPLICATE
57
1
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 (Back)
9. Remarks i#QACr•'rc,:•.CE(i. Frsi #4V-1-. AflA•;-, 1 Za RLPL V4 -.1J. 460•-O-0-o00,-o Applicable Manulacturer's Data Reports to be attached
(12/82)
DO NOT DUPLICATE
58
2
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the report are correct and this RAL AC8h14aconforms to the rules of the ASME Code, Section XI. (Repair or Replacement)
Type Code Symbol Stamp LIOr APfI4 -, C8L.
Certificate of Authorization No. DAer AfePL4cA •'L Expiration Date Jor A0•LPUC,4Ud'
Signed itle i- rimto0 Date Desigee /ZeO 0
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province of •--'---,. O. and employed by •-- ( !:- of cr,,- .
have inspected the components described in this Owner's Report during the period - - '- - ft, of 4-'--2-- L - ,and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
-- Commissions -X L, Inspectors Signature National Board, State, Province, and Endorsements
Date 4-,-- , --.
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI
1. Owner Commonwealth Edison CompanyName
One First National Plaza, Chicago, IL0690 Address
2. Plant Braidwood CornEd Plant Name
35100 S. Rt. 53 Suite 84, Braceville, IL 60407 Address
3. Work Performed by MECHANICAL MAINTENANCEName
Braidwood ComEd Plant. 35100 S. Rt. 53 Suite 84. Braceville, IL 60407
Date APRIL 1 , 2000
Sheet 1 of 3
Unit 1
WR #990008938-01 Repair Organization P.O. No., Job No., etc.
Type Code Symbol Stamp NOT APPLICABLE Authorization Number NOT APPLICABLE Expiration Date NOT APPLICABLE
Address
4. Identification of System PRESSURE SAFETY RELIEF VALVE #1 RY8010A - "RY" PRESSURIZER SYSTEM
5. (a) Applicable Construction Code SECT.1ll, CL. 1 19 71 Edition, W72 Addenda, NA Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacement 1989 / NO ADDENDA
6. Identification of Components Repaired or Replaced and Replacement Components
7. Description of Work REPLACE VALVE.
8. Test Conducted: VTZ PtA404meJ
"O Hydrostatic
"O Other:
0 Pneumatic
Pressure -ZZ2"5 psi
il Nominal Operating Pressure
Test Temp. g57 OF
Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8-1/2 in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12/82) This Form (e00030) may be obtained from the Order Dept., ASME, 345 E. 47th St. New York, N.Y. 10017
DO NOT DUPLICATE
59
I
Name of Name of Manufacturer National Other Year Repaired, ASME Component Manufacturer Serial No. board Identification Built Replaced, Code;
No. or Replacement Stamped (Yes or No)
SAFETY VALVE O.E.M. S/N NA IRY801OA NA REPLACED YES I N56964000053 I P&ID M60-5 I I I
SAFETY VALVE CROSBY S/N NA CAT #032724 NA REPLACEMENT YES IN56964000072 I UTC #2045282 1
.4. .4. 4 * 4
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 (Back)
9. Remarks Applicable Manufacturer's Data Reports to be attached
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section Xl. (Repair or Replacement)
Type Code Symbol Stamp NOT APPLICABLE
Certificate of Authorization No. NOT APPLICABLE
Signed 6 4 \Ow~w or owner's C"esigne
Expiration Date NOT APPLICABLE
Date 416__0 , __%ee. Title
(12/82)
DO NOT DUPLICATE
60
2
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province of -A-. ,...'.• and employed by ý N 1 ' _- , of - C . have inspected the components described in this Owner's Report during the period it\ - 14 4R_• of z4-.- - b , , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
I-_, Commissions - I ,-: F. Inspector's Signature National Board, State, Province, and Endorsements
Date 4x--'-- - -
)0
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI
Owner Cc--"onwealth Edison Company Name
One ýirst National Plaze. Chicaco. IL 60690
Plant Bra.cwood Nuclear Power Station Name
R R Box 84. Braceville. IL 60407 AdeeSI
3. Work Performea oy Mechanical Maintenance Braidwood Nuclear Power Station RR. 1 Box 84. Braceviile. IL 60407
4 Identification :4 System y / A ?,"L 0 2Cor- A'--- 40 1 /-• Y"
5. (a) Applicac e Construction Code -L/! "7 I Edition. W 7..7 ,b) Applicac.e Edition of Section XI Utilized f r Repairs c- Replacement - _=?
6. Identification cý Components Repaireo or Replaced and Reolacement Components
Date -f -/-U
Sheet 1 of ....
Unit 0.I
Repai Organization P 0 No. Joo No etc.
Type Code Symbol Stamp Not Applicable Authorization Number Not Applicable
Expiration Date Not Applicable
Addenda, A' Code Case
Description o4 'Jork
Test Conduct3=:
'/rz P./oeA Atfi4/oo
AEPLAc - ) 6Ei.L16- -VALl-
- Hydrostatic
0 Other:
o Pneuma::c Ok Nominal Operating Pressure
Pressure 7__.___ psi Test Temp. 567
Note: Supplemer.ai sheets in form of lists. sketches. or drawings may be used. provided (1) size is 8-1/2 ..: x 11 in., (2) information in items 1 thfouW
6 on this re-ort is included on eacn sheet, and (3) eacn sneet is numbered and the number of sheets is recorded at the top of this form.
'2/82) This Form (eOO030) may be ootair.ed from the Order Dept.. ASME. 345 E. 47th St. New York. N.Y. 10017
61
2.
Name of Name of Manufacturer National Other Year Repaired, ASME
Component Manufacturer Serial No. board Identification Built Replaced. Code:
No. or Stamped Replacement (Yes or No)
_ _ _ _ L I F /A y /2 4144CS Yo ,.o
7
a.
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 (Back)
9. Remarks , e OnS to ve ar-a, ,,
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the report are correct and this e conforms to the rules of the ASME Code. Section Xl.
Type Code Symbol Stamp N ) r
Certificate of Authorization No. ik.o Expiration Date A•Oi Agokc-/(C
Signed • 0 Date
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned. holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of
Province of ",- --•, - = and employed by •-\ of "4" \ 1'..S.
have inspected the components descnbed in this Owners Report during the period k - of =
and state
that to the best of my knowiedge ano belief, the Owner has performed examinations and taken corrective measures described in this Owner's
Report in accordance with the requirements of the ASME Code. Section XI.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations
and corrective measures described in this Owner's Report. Furthermore. neither the Inspector nor his employer shall be liable in any manner for
any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
__ -e __ Commissions 2Z ..• t .
Date-.wor s Sqnaiurs Nati*nal soard. Siate. ProvFw. . and E,,orsa-- i,,t,
Date -. .1•'--'
(12/82)
62
2
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI
1. Owner: Commonwealth Edison Company Name
One First National Plaza, Chicago. IL 60690 Addresa
2. Plant: Braidwood ComEd Plant Name
35100 S. Rt. 53 Suite 84. Braceville, IL 60407Address
3. Work Performed by Mechanical Maintenance Name
Braidwood ComEd Plant, 35100 S. Rt. 53 Suite 84, Braceville, IL 60407
Date:
Sheet
Unit
MARCH 27. 2000
1 of
01
WR 980113386-01 Repair Organization P.O. No., Job No., etc.
Type Code Symbol Stamp: N/A Authorization Number: N/A Exiration Date: N/A
Address 4. Identification of System SD - STEAM GENERATOR BLOWDOWN EPN: 1SD04030X
5. (a) Applicable Construction Code ASME SECT.Ill 19 74 Edition, S74 Addenda, (b) Applicable Edition of Section Xl Utilized for Repairs or Replacement 19 89
6 Idrentifircation nf Conmnnnenta Renair•d nr R•rlIaced ann Pnla'n,,.nt R1-n-,n-G- nt-.
N-249 Code Case
7. Description of Work REPLACED EXISITNG STRUT. ATTACH END BY WELDING.
8. Test Conducted: 0 Hydrostatic 0 Pneumatic 0 Nominal Opera
VT 31/A P4-96asmsd Other: Pressure ,. psi Te
ting Pressure
st Temp. 0L... °F
Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8-1/2 in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12182) This Form (e00030) may be obtained from the Order Dept., ASME, 345 E. 47th St. New York, N.Y. 10017
DO NOT DUPLICATE
63
1
Name of Name of Manufacturer National Other Year Repaired, ASME Component Manufacturer Serial No. board Identification Built Replaced, Code; Stamped
No. or Replacement (Yes or No) STRUT UTC #2039532 FIG.640N SIZE B GRINNELL N/A N-2802 MRI #A-99-01427 1999 REPLACEMNT YES
HT # 107489 WELD ROD WELDSTAR N/A N/A QRI# M97-05699 2000 REPLACEMNT NO
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 (Back)
a 0 L,'t
Applicable Manufacturer's Data Reports to be attached
(12/82)
DO NOT DUPLICATE
64
2
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the report are correct and this A conforms to the rules of the ASME Code, Section X1. Replacement)
Type Code Symbol Stamp rs . 00 A Aih 1,e
Certificate of Authorization No. vo) " pl!edA. Expiration Date A -Ilhf1 giaW
Signed a V Date __/_/__ -L ý-ni'-O r •wnee rlý,e-i••g i-ee'Ti tIe
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province of "-3--,- o'. and employed by 6-•sr. %. , ...C-, of - 'P'- t' have inspected the components described in this Owner's Report during the period "1 - "-- L. of a-•--\ .-. = , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
I . • Commissions L 4M, I )S Inspector's Signature National Board, State, Province, and Endorsements
Date •% - -'a, , l9_--_.1
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI
1. Owner Commonwealth Edison Company Name
One First National Plaza, Chicaqo, IL 60690
Date April 1, 2000
Sheet 1 ofAddress
Plant Braidwood ComEd Plant Name
35100 S. Rt. 53 Suite 84, Braceville, IL 60407 Address
2
Unit 1
WR4990155947-01Repair Organization P.O. No., Job No., etc.
3. Work Performed by Mechanical MaintenanceName
35100 S. Rt. 53 Suite 84, Braceville, IL 60407
Type Code Symbol Stamp
Authorization Number Expiration Date
Not Applicable
Not Applicable Not Applicable
Address
4. Identification of System STEAM GENERATOR BLOWDOW (SG) 1SD002G
5. (a) Applicable Construction Code III (.?1"%9 74 Edition, S75 Addenda, NA Code Case
(b) Applicable Edition of Section XI Utilized for Repairs or Replacement 19 89/No Addenda
6. Identification of Components Repaired or Replaced and Replacement Components
DISASSEMBLE/INSPECT/REPAIR VALVE lSDO02G
O Hydrostatic
0 Other:
0] Pneumatic IVNominal Operating Pressure
Pressure /040 psi Test Temp. 52 F
Name of Name of Manufacturer National Other Year Repaired, ASME Component Manufacturer Serial No. board Identification Built Replaced, Code; Stamped
No. or Replacement (Yes or No) HEAT NO.
WELD ROD WELDSTAR 107489 NA CAT ID 008491 NA REPAIR NO
Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8-1/2 in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12/82) This Form (e00030) may be obtained from the Order Dept., ASME, 345 E. 47th St. New York, and N.Y. 10017
7. Description of Work
8. Test Conducted:
V-t Z P*4e4uwei A A.~j- Oa
DO NOT DUPLICATE
1
2.
05
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 (Back)
Applicable Manufacturer's Data Reports to be attached
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the report are correct and this R e......,,.;t conforms to the rules of the ASME Code, Section XI. D Replacement)
Type Code Symbol Stamp Not Applicable
Certificate of Authorization No. Not Applicable
Signed a 4L (•lA t 0 0 )
Expiration Date Not Applicable
Date 5/ Zoo a_ ,0_I- Owner or Owner's"Designee,'tllle
(12/82)
66DO NOT DUPLICATE
2
9. Remarks
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province of UL.-,.4.-,,.S and employed by \A15-% k I k --- j-, of -. --ý'. '•- _ have inspected the components described in this Owner's Report dudng the period f- e -- - of G -.- - - . and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
L K Commissions : IL Inspector's Signature National Board, State, Province, and Endorsements
Date 4- _ _ g- -_, __ _
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI
Owner Commonwealth Edison Comoany Name
One First National Plaze. Chicaoo. IL 60690 ý,aamss
Plant Braidwood Nuclear Power Station Name
R R. 1 Box 84 Braceviile. IL 60407 -.jdress
3. Work Performed by Mechanical Maintenance Braidwooc Nuclear Power Station R R. I Box 84. Braceviile. IL 60407
4 Identification of System S- IAcores$
Pt Piq
Date ///0
Sheet
Unit 0/
of ý-
A Repaw Organization P) 0 No. JOo NO.. etc. - .
Type Code Symrboftamp Not Applicable Authonzation Number Not Applicable
Expiration Date Not Applicable
5 (a) Aoplicable Construction Code 5CL'T "- d • 9 -7 Edition. .'75" Addenda. A,1A Code Case ,b) AppicaDie Edition of Section XI Utilizeo for Repairs or Replacement -99
5 Identification of Components Reoaired or Replaced and Replacement Components
Name of Name of Manufacturer National Other Year Repaired. ASME
Component Manufacturer Senal No. board Identification Built Replaced. Code. No. or Stamped
Replacement (Yes or No)
Description of Work Ch-%ýe biiA Pre!;ea4 ,-t c,.-i 6T j~-
3 Test Conoucted: C3 Hydrostatic 0 Pneumatic C] Nominal Operating Pressure
Pressure psi Test Temo. _ _ F
Note: Supplemental sheets in form of lists. sketches, or drawings may be used. provided (1) size is 8-1/2 in. x 11 in., (2) information in items 1 throw 6 on this report is included on eacn sheet, and (3) eacn sheet is numbered and the number of sheets is recorded at the top of this form.
(12/82) This Form Ie00030) may be obtained from the Order Dept., ASME. 345 E. 47th St. New York. N.Y. 10017
67
1
03 Other:
S................... # ......
BwAP 1600-5Al Revision 5 Information Use
FORM NIS-2 (Back)
RemarKsAoptcame 'Janufacisurer s Oata Reoons 10 De atiacilea
CERTIFICATE OF COMPLIANCE
we certify that the statements mace in me report are correa ano this conforms to the rules of the ASME Code. Section XI. Reoar or Reciacemen li
Type Code Symbol Stampo M " '-p I'• L
Certificate of Authonzation No. , CC- 3 e - . _ Expiration Date
Signed _ QC . Date '19 0welor Owners Designee. File
CERTIFICATE OF INSERVICE INSPECTION
I. the unoersigned. holding a valid commission issuen :v the National Board of Boiler and Pressure Vessel Inspectors and the State of
Province of W-.-A . -'5 ¶ and employed by --. . e. -.. . of -ewI•l. C. have inspected the components oescribed in this Owner s Report during the period k- Z) -Ž ,'- of ':5- % S.- 2 ,
and state ,hat to the best of my Knowledge and belief. the Owner has oerformed examinations and taken corrective measures descnbed in this Owners
Report in accorcance with the reouirements of the ASME C ý,e. Section Xl.
By signing this certificate. nenner the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations
and corrective measures described in this Owners Report. Furthermore. neither the Inspector nor his employer shall be liable in any manner for
any personal injury or property damage or a loss of any kin= arising from or connected with this inspection.
L . •'-"• "-- Commissions sin__ _ ___. M_ _ __ _ _
insoewor s 5 aiaibe Natcnai Board. Staie. Province. and Endorisemens
Date "-.- ___
(12/82)
68
2
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI
1. Owner Commonwealth Edison Company_ Name
One First National Plaze. Chicaoo. IL 60690
2.AddresS
Plant Braidwood Nuclear Power Station Name
R.R. 1 Box 84. Braceville. IL 60407 Addess
3. Work Performed by Mechanical Maintenance Braidwood Nuclear Power Station R.R. 1 Box 84. Braceville. IL 60407 E
4. Identification of System ("40Z"74-.1 72 Oa
Date I - C- c .-'c
Sheet 1
U it 0
of I-
%-T 1913 ý/ 3 3- C) /Repair Organization P.O. No.. Job No.. ew-.
Type Code Symbol Stamp Authorization Number
xpiration Date
5. (a) Applicable Construction Code - Jr 19 74' Edition, '5 7" Addenda, , (b) Applicable Edition of Section XI Utilized for Repairs or Repl-acement Z '?9 --
.Nut Apalcbue Not Applicable Not Applicable
Code Case
6. Identification of Components Repaired or Replaced ano Replacement Components
Name of Name of Manufacturer National Other Year Repaired, ASME Component Manufacturer Serial No. board Identification Built Replaced. Code;
No. or Stamped Replacement (Yes or No)
v wa *s k/ ' j2-A2 _ _ _
7. Description of Work 4,)64A~eo 7>r-ý- At 4,,, 48. Test Conducted: 0 Hydrostatic
VaT I Co • • 0 Other.
VT 3A4 Comf lef"t %%.% VTZ- &t patwkgi~ -
C3 Pneumatic
Pressure 4A psi
)(Nominal Operating Pressure
Test Temp. a/ A -F
Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8-1/2 in. x 11 in., (2) information in items I througi 6 on this report is included on each sheet, and (3) eacn sheet is numbered and the number of sheets is recorded at the top of this form.
(12182) This Form (e00030) may be obtained from the Order Dept., ASME, 345 E. 47th St. New York, N.Y. 10017
69
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 (Back)
9. Remarks goI/3g/33-51 C W5 P 4' Marugaciws Data Repiorts to be at010
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the report are correct and this " conforms to the rules of the ASME Code, Section Xl. Repak OQe0I-nen
Type Code Symbol Stamp
Certificate of Authorization No.
Signed
kAfAat bIII~kliI I
riot± Api~c-Aklt
ý- *- Oiwaw Desvkae. Noi
Expiration Date A)df Agphcl'
Date 4// It , o
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province of •-'-- o ' and employed by . . C-. of - -- •have inspected the components described in this Owners Report during the penod ,_-; ý of d.l. '-.- - -.
and state that to the best of my knowledge and belief, the Owner nas performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
".•--' • '~ Commissions • \ -Dtpeews Signaure Naional Board. State. Proance. and En
Date -4-& *
(12/82)
70
2
1ýdA ,44 (0 -I
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI
Owner Commonwealth Edison Company Nam
One First National Plaze. Chicago, IL 60690
2. Plant Braidwood Nuclear Power Station_ Name
R.R. 1 Box 84. Braceville. IL 60407 AdeS&
3. Work Performed by Mechanical Maintenance Braidwooo Nuclear Power Station R.R. 1 Box 84. Braceviile. IL 60407
4 Identification of System 4, .- &7:: 2Lc • ,
Date '-i,/ --
Sheet I of __. ........... .. ..... ..
Reoaw Organiiarme P 0. No.. job No.. sm
Type Code Symbol Stamp Not Applicable Authorization Number Not Applcable
Expiration Date Not Applicable
(•2)
5. (a) Applicable Construction Code ... T"7 2Z L, 19 g .". Edition. CL 7 Addenda. (b) Applicable Edition of Section Xl Utilized for Repairs or Replacement / 1,79
Code Case
6. Identification of Components Repaired or Replaced and Replacement Components
Name of Name of Manufacturer National Other Year Repaired. ASME Component Manufacturer Senal No. board Identification Built Replaced. Code;
No. or Stamped Replacement (Yes or No)
A,,,AJJJ /_ / 5 ,. , /3_V
~~// -AA ,J _ __ _ /4 9090/ /, Al ______ ______ PC____? A/ jj1 4
7 Description of Work A Aýorx Z4Z6WA*0 /4{~ "1 14774 Zj..O M2
8. Test Conducted: 0 Hydrostatic
VT~A bl#, 0' Other:
0 Pneumatic
Pressure 0/j, psi
0 Nominal Operating Pressure
Test Temp. A/& -F
Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8-1/2 in. x 11 in.. (2) information in item 1 throug 6 on this report is included on each sheet, and (3) eacn sheet is numbered and the number of sheets is recorded at the top of this foim.
(12182) This Form (e00030) may be obtained from the Order Dept.. ASME. 345 E. 47th St. New York. N.Y. 10017
71
1
L
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 (Back)
Amo•ace MImuwac s Daa Rta M to Do ataANG I
AZtr57S ý Z:Z ~'oV0 03:703 / - /
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the report are correct and this rconforms to the rules of the ASME Code. Secion X.
Type Code Symbol Stamp
Certificate of Authorization Nc
Signed
K,)A 1pfri'A~eI I
04
(.7% J
Expiration Date • A oAl1C.A16le
Date /=- I 0VWor OwnWrS'QGSWgn rao
CERTIFICATE OF INSERVICE INSPECTION
I. the undersigned. holding a valid commission issued by the National Board of Boiler and Pressure Vessel InspectorS and the State of Province of --. andemployedby \ c_•. of V- 7 .'q2.I-,,r--'. C , have inspected the components descnbed in this Owners Report during the period " -• ,-k- •--'=' of e-k- 2-- --- • ,
and state that to the best of my knowledge and belief, the Owner nas oerformea examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code. Section XI.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind ansing from or connected with this inspection.
L. - __.- __ __Commissions k-- '"-- ,Daiep-ors SwwIga -.e N1OWn- B•one, Stat. Provnce. Se
Date £4-1.-~ - I's.-- -
(12/82)
722
9. Remarks
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI
Name
One First National Plaza. Chicaaoo IL 60690
Name
Address
351008S. Rt. 53 Suite 84. Braceville. IL 60407Address
3. Work Performed by NEWBERG/PERINI/STONE & WEBSTER Name
Braidwood ComEd Plant. 35100 S. Rt. 53 Suite 84. Braceville, IL 60407
Date 03/28/00
Sheet 1 of 2
Unit 01
WR 990108015-01Repair Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization Number N/A Expiration Date N/A
Address
4. Identification of System SI
5. (a) Applicable Construction Code SEC.IIl - 19 71 Edition, W'72 Addenda, N/A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacement 19 89
6. Identification of Components Repaired or Replaced and Replacement Components
Name of Name of Manufacturer National Other Year Repaired, ASME Component Manufacturer Serial No. board Identification Built Replaced, Code; Stamped
No. or Replacement (Yes or No) Check Valve Flowserve Corp. E-532P-2-1 N/A Sl# 24010 N/A Replacement Yes
7. Description of Work
8. Test Conducted:
q/6fzooo
Replaced Check Valve
0 Hydrostatic
0 Other:
o- Pneumatic 03 Nominal Operating Pressure
Pressure Xti s psi Test Temp. -1
Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8-1/2 in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12182) This Form (e00030) may be obtained from the Order Dept., ASME, 345 E. 47th St. New York, N.Y. 10017
DO NOT DUPLICATE
73
1
2.
ommonWeML u son omnanv
F am-rajuwý ýVllluu v9WIL
I r% I- k = : 11wrUVier:•
M! 10 :A..- ý--MA nl-
Name
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 (Back)
Applicable Manufacturer's Data Reports to be attached
(12/82)
DO NOT DUPLICATE
74
2
9. Remarks
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the report are correct and this 2CLAa.Mei" conforms to the rules of the ASME Code, Section XI. (Rbpair or•ý
Type Code Symbol Stamp 10Ab Aicable
Certificate of Authorization No. t Q90 tcA INIe Expiration Date ,lo AwIkIle
SignedOrr o ners DasIn-, _tle Date 06 1016 Signedwnr' Desione2Ib e, Title
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province of • -- 'a, % and employed by -k-k'->Vk ,;. \ C--.•. of .--- have inspected the components described in this Owner's Report during the period o - . ef- . - I -2-..- , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
L• .•Commissions "cL--,u , Inspector's Signature National Board, State, Province, and Endorsements
Date -• -'- "- , 1-._
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI
1. Owner Commonwealth Edison Comoanv Name
One First National Plaza, Chicago. IL 60690
2.Address
HatocuM1 II~dUV UU MiIu r-IdILName
35100 S. Rt. 53 Suite 84. Braceville. IL 60407
Address
3. Work Performed by NEWBERG/PERINI/STONE & WEBSTER Name
Braidwood CornEd Plant. 35100 S. Rt. 53 Suite 84. Braceville, IL 60407
Date 03/28/00
Sheet 1 of 3
Unit 01
WR 990108015-01Repair Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization Number N/A Expiration Date N/A
Address 4. Identification of System SI
5. (a) Applicable Construction Code SEC.lII iA 19 74 Edition, S '75 Addenda, N/A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacement 19 89
6. Identification of Components Repaired or Replaced and Replacement Components
Name of Name of Manufacturer National Other Year Repaired, ASME Component Manufacturer Serial No. board Identification Built Replaced, Code; Stamped
No. or Replacement (Yes or No) 45 Degree El ASP RA N/A SI #800F38 N/A Replacement N/A
Pipe CPS HT.#8126J N/A SI #786B67 N/A Replacement N/A
Weld Electrode ARCOS LOT/Alloy #7404 N/A SI #611A13 N/A Replacement N/A
Weld Electrode ESBA HT.#PK177 N/A SI #611A38 N/A Peplacement N/A
7. Description of Work
8. Test Conducted:
vrZ Pearoanwd At/$/Go
Replaced 45 Dggree El. And Pipe
13'Hydrostatic
0 Other:
O3 Pneumatic 03 Nominal Operating Pressure
Pressure .u .. psi Test Temp. 55 7 -F
Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8-1/2 in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12/82) This Form (e00030) may be obtained from the Order Dept., ASME, 345 E. 47th St. New York, N.Y. 10017
DO NOT DUPLICATE "75
1
Name
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 SUPPLEMENTAL SHEET
1. Owner: Commonwealth Edison Company One First National Plaza Chicago, Illinois 60690
2. Plant: Braidwood CoinEd Plant 35100 S. Rt. 53 Suite 84 Braceville, Illinois 60407
3. Work Performed by NEWBERG/PERINI/STONE &WEBSTER Name
Braidwood ComEd Plant, 35100 S. Rt. 53 Suite 84, Braceville. IL. 60407 Address
Sheet Date Unit
3 of 3 03/28/00
01
WR 990108015-01 P.O. No., WR No., etc
Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A
4. Identification of System SI
5. (a) Applicable Construction Code SEC.IIl , 19 74 Edition S' 75 Addenda N/A Code Cases N/A
(b) Applicable Edition of Section XI Utilized for Repairs or Replacements, 19 89 Edition N/A Addenda
6. Identification of Components Repaired or Replaced and Replacement Components.
A. A. .1. .1.
*** PARTS EVALUATION NO. A 94-0070-02 DATE: 10/08/94
DO NOT DUPLICATE
(Final)
3
Name of Name of Manufacturer National Other Year Repaired, ASME Component Manufacturer Serial No. Board Identification Built Replaced, Code; Stamped
___________ ~No. ____ ____ ___or Replacement (Yes or No) Flange Various HT.# D2283 N/A SI #781 C37 N/A Replacement N/A
_ _ _ _ I _ _ _ I _ _ _ I -_ _ I _ _ _ I I __ It * 4 4 + 4
76
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 (Back)
9. Remarks Applicable Manufaclurer's Data Reports to be attached
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the report are correct and this conforms to the rules of the ASME Code, Section Xl. (Rpair otelae
Type Code Symbol Stamp A)O6 Ag ,hI.R le I I
Certificate of Authorization No. 1I- Expiration Date ion,,a1te)
Signed &r(0 Date On112e,1 ýwno rownes Nsgnee!2 ufe
(12/82)
DO NOT DUPLICATE
77
2
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province of D3.- -' and employed by V--T" \ 'z \ -.- , of %-., v-z'-.. have inspected the components described in this Owner's Report during the period Vz-- --,, O -4- t -- - - , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
--. Commissions 1-' Ic, Inspector's Signature National Board, State, Province, and Endorsements
Date 4-t• % , 1._
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI
1 Owner Commonwealth Edison Company Name
One First National Plaza, Chicago, IL 60690 Address
2. Plant Braidwood ComEd Plant Name
35100 S. Rt. 53 Suite 84, Braceville, IL 60407 Address
3. Work Performed by Newbera/Perini/Stone & Webster Name
Braidwood CornEd Plant. 35100 S. Rt. 53 Suite 84. Braceville. IL 60407
Date 03/28/00
Sheet 1 of 2
Unit 01
WR #990108017-01 Repair Organization P.O. No., Job No., etc.
Type Code Symbol Stamp Authorization Number Expiration Date
N/AN/AN/A
Address 4. Identification of System SI
5. (a) Applicable Construction Code Sec. Il1 l -1 19 71 Edition, W '72 Addenda, n/a Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacement 19 89
6. Identification of Components Repaired or Replaced and Replacement Components
Name of Name of Manufacturer National Other Year Repaired, ASME Component Manufacturer Serial No. board Identification Built Replaced, Code; Stamped
No. or Replacement (Yes or No)
Check valve Flowserve corp. E-532P-2-1 N/A SI #24010/ f' N/A -splaGW.4U-" YES
7. Description of Work Performed -Replaced valve
8. Test Conducted:
VT !. D4/6/010
0 Hydrostatic
0 Other:
0 Pneumatic 0 Nominal Operating Pressure
Pressure ZZ1 psi Test Temp. _567 0 F
Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8-1/2 in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12/82) This Form (e00030) may be obtained from the Order Dept., ASME, 345 E. 47th St. New York, N.Y. 10017
DO NOT DUPLICATE
78
1
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 (Back)
Applicable Manufacturers Data Reports to be attached
(12/82)
DO NOT DUPLICATE
79
2
9. Remarks
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the report are correct and this Reiact~eLe" conforms to the rules of the ASME Code, Section Xl. (R~pair or m
Type Code Symbol Stamp K1,ti ACpbLir..be
Certificate of Authorization No. ot Apo.l.••A,L. Expiration Date A34 LAp, hc.D4e
Signed rOwner o eres Date "1 .tl
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province of 2D-'.- • . - k-t' and employed by V--•- T5 1 . .k -- . of - Q-. have inspected the components described in this Owner's Report during the period 4 - - of A-4--' o - , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, conceming the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
- ~~Commissions =L-:p '~ Inspector's Signature National Board, State, Province, and Endorsements
Date A- ' "3- , 1-_-.
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI
1. Owner Commonwealth Edison Company Name
One First National Plaza, Chicaqo. IL 60690
2. Plant Braidwood ComEd PlantAddress
Name 35100 S. Rt. 53 Suite 84. Braceville, IL 60407
Address
3. Work Performed by Newbera/Perini/Stone & Webster Name
Braidwood CoinEd Plant, 35100 S. Rt. 53 Suite 84, Braceville, IL 60407
Date 03/28/00
Sheet 1 of
Unit 01
WR 4.9~n1n(Rn 17-n31
2
Repair Organization P.O. No., Job No., etc.
Type Cede Symbol Stamp N/A Authorization Number N/A Expiration Date N/A
Address 4. Identification of System SI
5. (a) Applicable Construction Code Sec. III CIA 19 74 Edition, S '75 Addenda, n/a Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacement 19 89
6. Identification of Components Repaired or Replaced and Replacement Components
Name of Name of Manufacturer National Other Year Repaired, ASME Component Manufacturer Serial No. board Identification Built Replaced, Code; Stamped
No. or Replacement (Yes or No)
90 DEGREE EL ASP AJ1 N/A SI #800B39 N/A Replacement N/A
Weld electrode The ESAB Group Ht #PK 177 N/A SI #611A38 N/A Replacement N/A
Pipe CPS Ht. #8126J N/A SI #786B67 N/A Replacement N/A
Flange CPS Ht #86OXNE N/A SI #781 C37 N/A Replacement N/A
Description of Work Performed REP
Test Conducted: 0 Hydrostatic
0 Other:
LACED 90 DEGREE EL. PIPE. AND FLANGE
o Pneumatic 0 Nominal Operating Pressure
Pressure ,L psi Test Temp. 57 -F
Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8-1/2 in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12/82) This Form (e00030) may be obtained from the Order Dept., ASME, 345 E. 47th St. New York, N.Y. 10017
DO NOT DUPLICATE
80
1
7.
8.
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 (Back)
Applicable Manufacturers Data Reports to be attached
LIOC (Aoi(e 0AG- A 4U im,oik'A.
(12/82)
DO NOT DUPLICATE
81
2
9. Remarks
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the report are correct and this gtJewi cnforms to the rules of the ASME Code, Section XI. (RelSair or placemen
Type Code Symbol Stamp I0) oht A pot •Able
Certificate of Authorization No. t.) t .o_•_l-L•bL Expiration Date LAJ. i c f & .Ith hle
Signed r-, 4% lA Date o1,o, 1_ _ dlvne~ror Owner's Obs-ignee, Tit~e -
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province of -'--• ft--5 and employed by T-" \ \ of ,-,-, --. have inspected the components described in this Owner's Report during the period \ , - , -c of 4. i - - , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
L L- ."' Commissions -5.A-..., '. Inspectors Signature National Board, State, Province, and Endorsements
Date -b.\ , 1-_
D. 0121 /oBwAP 1600-5A1 Revision 5Information Use
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI
Owner Commonwealth Edison Company Name
One First National Plaze. Chicago. IL 60690
2. Plant Braidwood Nuclear Power Station_ Nare
R.R. 1 Box 84. Braceville. IL 60407 AJ"re"
3. Work Performed by Mechanical Maintenance Braidwood Nuclear Power Station R.R. 1 Box 84. Braceville, IL 60407
4. Identification of System _Y . e 16iI /.
Date o I Z
Sheet _ of
Unit O
Reow Onganimi•n P 0 No.. Job No.. eti.
Type Code Symbol Stamp Not Applicable Authonzation Number Not Applicable
Expiration Date Not Applicable
5. (a) Applicable Construction Code •$1.T 1i .i '2.tl *11• Edition. "/- Addenda, 1-3 Code Case
(b) Applicable Edition of Section XI Utilized for Repairs or Replacement 1989
6. Identification of Components Repaireo or Replaced ana Replacement Components 15,Ul46/!
j,*%j F- Ai, o a-PLA..C1E P., ALL.7. Description of Work
, -.- �
8 Test Conducted: 3 Hydrostatic U P'neumatic C Nominal Operating Pressure
06L ¢_o;e C3 Other: Pressure __psi Test Temp. _F
Note: Supplemental sheets in form of lists, sketches, or drawings may be used. provided (1) size is 8-1/2 in. x 11 in., (2) information in items 1 throu
6 on this report is included on eaci sheet, and (3) eacri sheet is numbered and the number of sheets is recorded at the top of this form.
(12/82) This Form (e00030) may be obtained from the Order Dept., ASME. 345 E. 47th St. New York, N.Y. 10017
82
1
Name of Name of Manufacturer National Other Year Repaimd. ASME
Component Manufacturer Serial No. board Identification Built Replaced. Code; No. or Stamped
Replacement (Yes or No)
&AL-A nam t4/A _____)A rA-4 4 I.J/A RLIEPLACF-a 14 0
CAjlrg Wgile'e
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 (Back)
9. Remarks C-L-7?71 r
AIA r1;;PJA,(-
(rcA 7-C £/ C'/~Z''Qi t"A Mr ,r %AWI i8rtuN q _ Oats Reaons to mac
7;;5 7'"T
ct�rgr;P,� £2 I
CERTIFICATE OF COMPLIANCE
We certify that the statements mace in the report are correa and this P conforms to the rules of the ASME Code. Section XI. (Row br Reomacemnt I•
Type Code Symbol Stamp
Certificate of Authorization No.
K3oý apl'jiIILIAlo
Signed n 0 ý1- ~~Ok w C r w s Des ga .Ttle
Expiration Date /b i c le
Date 9-30 .19 j
CERTIFICATE OF INSERVICE INSPECTION
I. the unoersigned, holding a valid commission issuea :v the National Board of Boiler and Pressure Vessel Inspectors and the State of
Province of -- ,- andemployed by '----" t. C_4•. of ' have inspected the components described in this Owner s Report during the penod - -,: c of q -".-- ,
and state that to the best of my knowledge ana belief, the Owner has oerformed examinations and taken corrective measures described in this Owner's
Report in accordance with the requirements of the ASME C=e. Section XI.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied. concerning the examinations
and corrective measures described in this Owner's Report. Furthermore. neither the Inspector nor his employer shall be liable in any manner for
any personal injury or property damage or a loss of any kin. arising from or connected with this inspection.
Inspe=ca s Sgnature
Date 9 1 9 eje.
Commissions t -1-----•- L &': Namino Board. State. Provvlw. an Endo••anwrts
(12/82)
,832
I I
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI
1. Owner Commonwealth Edison ComoanvName
Address Plant: Braidwood CornEd Plant
Name
35100 S. Rt. 53 Suite 84, Braceville, IL 60407 Address
3. Work Performed by Mechanical Maintenance Name
Braidwood CornEd Plant, 35100 S. Rt. 53 Suite 84. Braceville. IL 60407
Date April 2. 2000
Sheet 1 of
Unit 01
WR 980119784-01 Repair Organization P.O. No.. Job No.. etc.
Type Code Symbol Stamp N/A Authorization Number N/A E nirafinn D-~t K;^
Address
Identification of System Reactor Building
(a) Applicable Construction Code: ASME SECT.Ill / DIV.2 19 * Edition, * Addenda, N/A Code Case. * 1973 Proposed Standard Code of Concrete reactor vessels & Containments as addressed in the UFSAR, Appx.B.
(b) Applicable Edition of Section Xl Utilized for Repairs or Replacement 19 92.92 Addenda.
Identification of Components Repaired or Replaced and Replacement Components:
Description of Work: Repair of 6"x12" area of spalled concrete at the constr. ioint between tendon Buttress A & B, - 10' above Aux.Bldq roof.
8. Test Conducted: 0 Hydrostatic 0 Pneumatic 0 Nominal Operating Pressure
SOther: Pressure M ,7 psi Test Temp.AEMCAB A-F
FVCr$G=PeeAB CA. GXOS 4%&MPO2C.. J Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8-1/2 in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
AeOFt AA Ai.-#i LA~ Lt
(12/82) This Form (e00030) may be obtained from the Order Dept., ASME, 345 E. 47th St. New York, N.Y. 10017
DO NOT DUPLICATE 84
1
2.
4.
5.
6.
Name of Name of Manufacturer National Other Year Repaired, ASME Component Manufacturer Serial No. board Identification Built Replaced, Code; No. or Stamped
Replacement (Yes or No) Ul Containment UTC # 2045911 Exterior Wall Master Builders Lot #M1665011X9 N/A RIN 27798 N/A Repaired No
7.
BwAP 1600-5A1 Revision 5 Information Use
gw4 �9o//97�?�ol9. Remarks CETfIIr,. oF~ Ca.>sraA-.JhA&&,ce mA~~A-rqaALimcr v'aoidLt rt,
Applicable Manufacturer's Data 'Reports to be attached J ----- �
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the report are correct and thisR6ldhi e conforms to the rules of the ASME Code, Section XA. (Repairor Replacement)
,T-ype Code Symbol Stamp -tda AP ICdLr
Certificate of Authorization No. MdT" Ajmt -,cA L" Expiration Date J6t/ C.A* SL
Signed OJQ4 L -ý Date 06 / -7 4' 0 % Owner or Owner's Designee. Title
(12/82)
DO NOT DUPLICATE
:85
2
AA Aqri m A•I
FORM NIS-2 (Back)
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of
Province of "- t - 5 and employed by k-ý ' - --- \ 1 . of , . .• have inspected the components described in this Owner's Report during the period 2-- 2 -. = e . -and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
L Commissions 7L -A-. I Inspector's Signature National Board. State. Province. and Endorsements
Date C; _ . _ ,
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI
1. Owner Commnnwealth Jtiinn _nName
I1 ý a n.a, rl za, C•llt.di . IL / OUOtU Address
Plant: Braidwood CornEd Plant Name
35100 S. Rt. 53 Suite 84. Braceville, IL 60407 Address
3. Work Performed by Mechanical MaintenanceName
Braidwood CorEd Plant, 35100 S. Rt. 53 Suite 84, Braceville, IL 60407Address
4. Identification of System Reac~tor RmIldeinn
Date
Sheet I of __
Unit 01
WR 980119784-02 Repair Organization P.O. No.. Job No.. etc.
Type Code Symbol Stamp N/A Authorization Number N/A Expiration Date N/A
5. (a) Applicable Constwction Code: ASME SECT.Ill I DIV.2 19_* Edition, _______ Addenda, NIA Code Case.
5. (a) Applicable Construction Code: ASME SECT.Ill / DIV.2 19 * Edition, * Addenda, N/A Code Case. • 1973 Proposed Standard Code of Concrete reactor ves-sels & Containments as addressed in the UFSAR, Appx.B.
"- (b) Applicable Edition of Section XI Utilized for Repairs or Replacement 19 92, 92 Addenda.
6. Identification of Components Repaired or Replaced and Replacement Components:
I _______ L ________ J _________ I __ I. ______ I ______
7. Description of Work: Repair of 6"x12" area of spalled concrete at the constr. ioint between tendon Buttress A & B. - 10' above Aux.Bldq roof.
o. i es, Conducted: U Hydrostatic 0 Pneumatic 0 Nominal Operating Pressure
ILOther: Pressure -Mwaft" ipsi Test Temp. -F ?M~P& C 4p~.Vg'.(~ o~ gyoeD RcrA4t. M s-ui~wAcsa Ve1ssteu -ro iBe' r A ej*A't,9
Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8-1/2 in. xl1 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12/82) This Form (e00030) may be obtained from the Order Dept., ASME, 345 E. 47th St. New York, N.Y. 10017
DO NOT DUPLICATE 36
1
2.
Name of Name of Manufacturer National Other Year Repaired, ASME Component Manufacturer Serial No. board Identification Built Replaced, Code; No. or Stamped
Replacement -(Yes or No) U1 Containment UTC # 2045911
Exterior Wall Master Builders Lot #M1665011X9 N/A RIN 27798 N/A Repaired No
rI i 4- 4- i I
t:! Z
. I
A-1~ 3 ')nnn
.. ý
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 (Back)
9. Remarks ArTTcoez A4e0(b AiAA)QF:AC.1ra4.WL lý11IC4r-60 OF~ e ApplicbLe Manufacturer Data ReorS to be attached .. MA f4 AL,4-rýs-r otl _P Fi- 11-Y A., MiA ,ý04.Ai4. (
5-44 10A.o)_' 34eZAaIIqC4 &our c c_____tes._
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the report are correct and this-'Ft- conforms to the rules of the ASME Code, Section Xl. (Repair or Replacement)
Type Code Symbol Stamp Il" - Ap P•L4 (.A X W5, '• Certificate of Authorization No. &)ýz' A e#,i C 1 , Expiration Date rJl APPtpsaw u,
Signed ± Date 0 6 OZ 07 0 00, Owner or Owner's Designee. Title
(12/82)
DO NOT DUPLICATE
87
;9<2
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of
Province of " . and employed by TL -"h\ \ - of \,,- 'J -,. C have inspected the components described in this Owner's Report during the period 2 - - a - C . C --3, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
J - commissions k "•" '. Inspector's Signature National Board. State. Province. and Endorsements
Date G -9 ,-
I
AXWW_ M41 // ?;74? 3/- 0 ?-
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI
1. Owner CoMmonwealth Edison Company ,ame
One First National Plaza. Chicao. iL 60690 Aadmsa
.ame �510O S. Rt � Sititp P4 Rr�r�vjii� II �fl�in7
3. Work Performed by MECHANICAL MAINTENANCE
Name Braidwooo CornEd P!ant, 35100 S. Rt. 53 Suite 84, Bracevile. IL C-0407
i. dentification of System P-EA,..', fo(bt4(,
Date - '
Sheet of I
Unit
=.eoaer Organization P.O. No.. Joo No.. etc.
Type Code Symbool Stamp Authonzation Numoer
Expiration Date
N/A NIAN/A
(a) Applicable Construction Code _re'T.1t bw. l 19_ _ 19 Edition. x Addenda. N/Ps Code Case .b) Amolicable Edition ot Section XI Utilized for Reoajrs or Replacement 19 - o . -I Z ^OD•'-DA
.. 'dentification of Components Reoairea or Replaced ana Reolacement Components
Name of Name of Manufacturer National Other Year Reoaired, ASME Component Manufacturer Serial No. board Identification Built Replaced, Code: Stamped
No. or Reolacement (Yes or No) %4-1 E okE-l4,-T m i-ri, goT f ___"_ '| 4/A LOT 0
7. Description of Work -fA4A S•, .LL' ,,e, A .-A , .-. I r.o.,l4Ag.3,A4V'4* •l" Xr,--, ,
S. Test Conducted: 0 Hydrostatic 0 Pneumatic [3 Nominal Operating Pressure
"- Other: Pressure g)eWli CA4 B6pts 1 Test Tern
Ptsox- -c & vOL.4ceaA X> r-WSI (ZrjvAjZ Ir 3-C- ey-A . 0 .aLc~o~
Note: Supplemental shit n mforrn of list . sketches, or drawings may be used, provided (1) size is 8-1/2 in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the too of this form.
(12/82) This Form (e00030) mav oe obtained from the Order Deot.. ASME. 345 E. 47th St. New York, N.Y. 10017
88
1
I PI t'Rrnjdwoocjr'-P,'P1 +
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 (Back) / , 4o//i?2Y-a3
9. Re(awsl. A A -4 -, ii-- tce Tr .o ,C Cc .AA,,, c . t..), M ATE ZIA Araolisl mamnuacturersaw ataRoon Iob~nce
ATtu~oArMA~rL-)1elAL (q,2OVrr) Ct.i'6- cov~g S I .')7imr
CERTIFICATE OF COMPLIANCE
We certify that thre statements maae in the report are correct and this R PAI (2 conforms to the rules of the ASME Code. Section X1. Repair elr Aeoiacemenri
"Type Code Symbol Stamo LJOr ke,4 cA 9 Le' Certificate of Authorization No. 16,T ( I0 C S Expiration DateJa-1 Aep(cA i
Signet " Date ____________G____
Owner or Owners Oesgnee. i-1e
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned. holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province of •--- - M 5' and employed by V -7. k " k C:-• of -have inspected the components described in this Owner's Report dunng the period _-2- " ,. - 1
- -,,1 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.
By signing tnis certificate, neither the Inspector nor his emoloyer makes any warranty, exDressed or imonied, concerning the examinations and corrective measures oescrioed in this Owners Reoort. Furthermore, neither the Inspector nor nis employer snail be liable in any manner for any personal injury or property damage or a loss of any Kina arising from or connecteo with this inspection.
__ __ __ __ _ __ __C Comm issions -' ns'oectors Signature Natlonal Boaro. State. Provnce, and EnOomeariefts
Date LOt -9
(12/82)
39
2
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI
Owner Commonwealth Edison Company Naom
One First National Plaze. Chicago, IL 60690 Address
2. Plant Braidwood Nuclear Power Station Nanm
R.R. 1 Box 84. Braceville. IL 60407 Acdess
3. Work Performed by Mechanical Maintenance Braidwooo Nuclear Power Station R.R. 1 Box 84. Braceville. IL 60407
Add,*"s 4 Identification of System io, y4
Date- :
Sheet I
I -o uif AF
of 1
f 4 do/O 7'q84-- o4-ROWe Organmizton P.O0 No.. Job No.. emc
Type Code Symbol Stamp Authorization Number
Expiration Date
Not Applicable Not Applicable Not Applicable
5 ýa) Applicable Construction COdeJ-r A 19 Edition. X- Addenda. / CodeCase b) Applicable Edition of Section I Utilized for R pairs or Replacment /'? "Z 19 A .. enuncation oC Components Repaired or Replaced ano Replacement Components " ;T/ / ;L 730-64&40
7 Description of Work Ak,,alll
8. Test Conducted:
Note:
V
1" Hydrostatic UPneumatic 0 Nominal Operating Pressure
SOther: Pressure ! psi Test Temp. * 0F
AVC*4DA( ILL L Z . k / $ L 7-'51 0.:4Lo:a"Yezc' Supplemental sheets in form of lists, skefches. or drawings may be used, provided (1) size is 8-112 in. x 11 in.. (2) information in items 1 througt 6 on this report is included on each sheet, and (3) eact1 sheet is numbered and the number of sheets is recorded at the top of this form.
(12/82) This Form (e00030) may be obtained from the Order Dept., ASME, 345 E. 47th St. New York, N.Y. 10017
1
Name of Name of Manufacturer National Other Year Repaired, ASME Component Manufacturer Serial No. board Identification Built Replaced. Code; No. or Stamped
Replacement (Yes or No) 75U TJ7
of
2-'-
.....
-- iQ - - - - I - ---eýe-' -77'.ý'; - 4,7WeIDMCAý7-
VM FJJý* T-6 J%97 Tk,0jP(,&tLj 10,ee'4'et.0 T'kii-60. -re, FLOCiule."r (2&YA ',a OAo4l TaW 4 6-1-00
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 (Back)
A mo Manuraare.r s Oati Rons to ce atlacea
�aJI� Co 6'R'i�PAjL s.LAr�riAI, r
CERTIFICATE OF COMPLIANCE
We certify that the statements maae in the report are correct and this . conforms to the rules of the ASME Code, Section XI. Repair or Reolacement)
Type Code Symbol Stamp
Certificate of Authorization No. Atlo-i Af CL.A &LC
SignedU Owner or Owners Oestgnee. Tn.
Expiration Date &ieu" A f , L ,
Date o L 740--
CERTIFICATE OF INSERVICE INSPECTION
I. the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province of " -, %,m and employed by -'T' \ • \ '-"• of -'-',' .have inspected the components descnred in this Owners Report curing the period 2 -2-5- "a- co . and state that to the best of my knowledge and belief. the Owner nas oerformea examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
ý I---, ý Commissions - c. oDrdoeors Signatue. National SBoa. State. Provinc. and En nm
Date (- -- 9 Z
(12/82)
Ž9<
2
'e..+
C MIE11 Ir r C 'Jf=A........ ....
*4 .....l-1 68 ir AAAT-x -tdi
I =0, . - A A f JC-
AvrA ciditio 551ax& aN, 6- 0-7- db
."-.•.•, /P.• | •.,•t.,#el.=,,,,m..,
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI
Owner Ccr-'onwealth Edison Comoany Name
O'e ýýrst National Plaze. Chicaao. IL 60690;'Caress
2. P!ant Bra.•zvooa Nuclear Power Station_ Name
R R 'Box 84 Bfracevifie IL 60407.A0emss
3. Work Perforr,--o oy Mechanicai Maintenance --raidwooo Nuclear Power Station :R R 1 Box 84 Bracevile. IL 50407
4 Identification :- System -
Date
Sheet of
Type Code Symbol Stamp Authonzation Number
Expiration Date
5 a) Aoolica: e Construction Code ! ], -/'VIVZ. I 9 -* Edition. * Addenda. fJ A Code Case :oi Aopiocac.e Edition of Section XI Utilizea tor Reoairs c- Replacement .ýg ij9z ie4, -. _ m '3 '.•--. •-.b,,, O•o •',- ,uc~ •- -t• #•',••.~i,-L • •'s • ,&• t•A•. L 4• '
--.. Identification Components Reoaireo or Reolacea ana Reoiacement ComPonents
Name of Name of Manufacturer I National Other Year Repaired. ASME Comoonent Manufacturer Senal No. board Identification Built Replaced. Code:
No. or Stamped Replacement (Yes or Nol
S,-4A _______________ il 0A t(.Tc iz.4
7 Description cý Work ,ý 0<n oAJ0"wu LL-( IXu'6p, 0r 0.40 M .,-cT l 1-//I
8 Test Concluc-en: 03 Hydrostatic "3 Pneumat - 0 Nominal Ooerating Pressure
S. Other: Pressuu #•Oe-4 ,psi Test Temp l•6 ýF
fotfe: 'uelger•'r/.:A sleel/s Kin forrm of hists. Netcnes, or -5r0gs may be use. provaea (1) size is 8-112 in. x 11 in., (2) information in items 1 through
6 on this reonr is included on each sheet. and (3) each. sneet is numoered and the number of sheets is recorded at the top of this form.
"2182) This Form (e00030) may be ootairea from the Order Dept.. ASME. 345 E. 47th St. New York. N.Y. 10017
Regaw Organzati~on P 0 No. JoC No. *cI.
Not Applicable Not Applicable Not Applicable
6Unit.
RetR 9'organTza• ON. -057.et
BwAP 1600-5A1 Revision 5 Information Use
FORM NIS-2 (Back)
9. RemarKS c$),/,4e der ,f, -d e7W4x& lk- O4- 6 ?o4.X1*e1WAfC ~ ,,,~ Au I 1Mnuau,er S i fiprt o.aate ASL dddV 4~ffe~4, ~ Ai.@J we/9-4e2w xs
CERTIFICATE OF COMPLIANCE
We certityriat thn statements mace in the reoort are correct anr this -ý :Xl A conforms to the rules of the ASME Code. Section XI. Reoair or rreomacemetli
Type Code Svmool Stamp 4.4 l4'l1 " 6' 4 eS Certificate of Authorization No. 060P PJC/fte
SignedSOwner or uwner s L)esty"ne (ime
-Expiration Date A1-0T-0104,44dte0<
Date d7Z V 1 __ _
CERTIFICATE OF INSERVICE INSPECTION
I. the undersigned. holcing a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province of - , and employedby A ' \ L of __-__ --_.-_.._-______ have insoected the components described in this Owners Report during the oeriod 2 - - C -- ., , and state that to the best of my knowledge ano belief, the Owner nas performed examinations and taken corrective measures described in this Owner's Report in accoroance win the reautrements of the ASME Code. Section XI.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied. concerning the examinations and corrective measures described in this Owners Report. Furthermore. neither the Inspector nor nis employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
i1r400eO s S9natureCommissions % %0---• '[ ,o
I Natona* oaea. State. Pro.ce aW Endarlemwue
I Date Lo C- 9z~odo-
(12/82)
S32
I