Comm- ooi ( latdisgon (t(,i; Braidot o (1 e Bo rating 8 t4 U Route 1, BLox 84 Braceville, IL, 60407-9619 Tel 815-458-2801 CorEd June 28, 2000 BWO00072 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington. D. C. 20555 - 0001 Braidwood Station, Unit 1 Facility Operating License Nos. NPF-72 NRC Docket No. STN 50-456 Subject: Braidwood Station, Unit 1 Inservice Inspection Summary Report Enclosed please find the Post-Outage (90 day) Summary Report for Inservice Inspection examinations conducted during the eight refueling outage of Braidwood Station Unit 1 (i.e., Al R08). This report is submitted in accordance with the requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section XI, "Rules for the Inservice Inspection of Nuclear Power Plant Components." Based on a Braidwood Unit 1 return to service date of April 5, 2000 and the submittal requirements of ASME Section XI Subarticle IWA-6230, "Summary Report Submittal," this report is to be provided to the U. S. NRC and the State of Illinois, Department of Nuclear Safety by July 4, 2000. Please direct any questions you may have regarding this submittal to Mr. Terry Simpkin, Regulatory Assurance Manager, at (815) 458-2801, x2980. Respectfully, G. Keith Schwartz Station Manager Braidwood Station Enclosure: Braidwood Station ISI Outage Report for Al R08 cc: Regional Administrator - NRC Region III NRC Senior Resident Inspector - Braidwood Station (w/o enclosure) Office of Nuclear Facility Safety - Illinois Department of Nuclear Safety A Unicom Company

Upload: others

Post on 11-Aug-2020

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

Comm- ooi ( latdisgon (t(,i;

Braidot o (1 e Bo rating 8 t4 U

Route 1, BLox 84

Braceville, IL, 60407-9619 Tel 815-458-2801

CorEd June 28, 2000 BWO00072

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington. D. C. 20555 - 0001

Braidwood Station, Unit 1 Facility Operating License Nos. NPF-72 NRC Docket No. STN 50-456

Subject: Braidwood Station, Unit 1 Inservice Inspection Summary Report

Enclosed please find the Post-Outage (90 day) Summary Report for Inservice Inspection examinations conducted during the eight refueling outage of Braidwood Station Unit 1 (i.e., Al R08). This report is submitted in accordance with the requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section XI, "Rules for the Inservice Inspection of Nuclear Power Plant Components."

Based on a Braidwood Unit 1 return to service date of April 5, 2000 and the submittal requirements of ASME Section XI Subarticle IWA-6230, "Summary Report Submittal," this report is to be provided to the U. S. NRC and the State of Illinois, Department of Nuclear Safety by July 4, 2000.

Please direct any questions you may have regarding this submittal to Mr. Terry Simpkin, Regulatory Assurance Manager, at (815) 458-2801, x2980.

Respectfully,

G. Keith Schwartz Station Manager Braidwood Station

Enclosure: Braidwood Station ISI Outage Report for Al R08

cc: Regional Administrator - NRC Region III NRC Senior Resident Inspector - Braidwood Station (w/o enclosure) Office of Nuclear Facility Safety - Illinois Department of Nuclear Safety

A Unicom Company

Page 2: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

Braidwood Station ISI Outage Report for AIR08

Page 3: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BRAIDWOOD NUCLEAR POWER STATION

UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR:

Interval 2, Period 1, Outage 2

STATION ADDRESS:

Braidwood Station 35100 S. Rt. 53 Suite 84 Braceville, Illinois 60407

UNIT 1 COMMERCIAL SERVICE DATE:

July 29, 1988

OWNER'S ADDRESS:

Commonwealth Edison Company P.O. Box 767 Chicago, Illinois 60690

Page 4: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

TABLE OF CONTENTS

DESCRIPTION:

COVER PAGE

TITLE PAGE

TABLE OF CONTENTS

1.0 - INSPECTION INFORMATION

2.0 - INSERVICE EXAMINATION SUMMARY

3.0 - INSERVICE COMPONENT DETAILED EXAMINATION TABLES

4.0 - NIS-1 FORM (OWNER'S REPORT FOR INSERVICE INSPECTION)

5.0 - REPORT OF CONTAINMENT DEGRADATION (IWE/IWL)

6.0 - NIS-2 FORMS, Cover page plus 83 pages of Attachments (OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS)

iii

PAGE:

ii

iii

1-1 to 1-2

2-1 to 2-3

3-1 to 3-59

4-1 to 4-5

5-1 to 5-8

6-1 to END

i

Page 5: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

CornEd Braidwood Station Unit 1 A1R08 ISI Outage Report

1.0 INSPECTION INFORMATION

1.1 Summary

Second Interval Inservice Inspections (ISI) of ASME Class 1, 2, and 3 components were conducted at Braidwood Station Unit 1 from November 15, 1998 through April 5, 2000. This outage is reflected in the Braidwood ISI schedule by the code 212 (Interval 2, Period 1, Outage 2), with a majority of these inspections being performed during Braidwood Station's Unit 1 eight refueling outage (A 1R08). The Unit 1, Period l ISI Program is scheduled to end on July 28, 2001 but will be extended to include the Unit I ninth refueling outage (A1R09) in Fall 2001 as allowed by IWB-2412(c).

The examinations were performed in compliance with the rules and regulations of Section XI, Division 1, "Rules for Inservice Inspection of Nuclear Power Plant Components", of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, 1989 Edition, No Addenda, pursuant to the requirements of Title 10, Part 50.55a of the Code of Federal Regulations (10CFR50.55a). The Containment Inspection Program was developed and implemented in accordance with the requirements and intent of Subsections IWE and IWL of ASME Section XI, 1992 Edition through the 1992 Addenda, pursuant to the requirements of Title 10, Part 50.55a of the Code of Federal Regulations (10CFR50.55a). This summary report will address inspection results of Class 1 and 2 components and piping, as required by the ASME Code, IWA-6000.

In addition to the ASME Section XI requirements of examination, certain Nuclear Regulatory Commission augmented ISI inspections were required during A1R08. The Braidwood Unit 1 Augmented ISI examination requirements include:

a) Class 1 pressure boundary for leakage at nominal operating pressure, in accordance with NRC Bulletin 88-05.

b) Class 2 and 3 pressure boundary for leakage at nominal operating pressure, in accordance with NUREG 0737.

c) NRC Regulatory Guide 1.14, "Reactor Coolant Pump Flywheel Integrity".

d) NRC Bulletin 88-08, "Thermal Stresses in Piping Connected to Reactor Coolant Systems".

e) NRC commitment to examine 7.5% sampling of Class 2 ECCS circumferential welds on > 4" diameter pipe not currently subject to code volumetric exams which contain stagnant borated water.

f) NRC commitment to volumetrically examine welds in High Energy Line Break areas.

g) Augmented examinations to satisfy NRC commitments contained in Relief Requests 12R-01. 12R-02, 12R-07, and 12R-08.

1.2 Identification of Examination Requirements

The Second Interval IST Program contains the Component Selection Tables. These tables are presented in a tabular format consistent with the Tables found in subsections IWB, IWC, IWD, IWE, IWF, and IWL-2500 of the ASME code. The NDE tables include the corresponding code category, item number, and component/weld population selection in conformance with examination

Page 1-1

Page 6: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

CornEd Braidwood Station Unit 1 A1R08 ISI Outage Report

requirements and intent of Subsection IWA, IWB, IWC, IWD, IWE, IWF, and IWL of Section XI of the ASME Code. Program notes and relief requests and additional information are identified in the basis column.

1.3 Exempted Components

ASME Class 1, 2, and 3 components (or parts of components) that are not included in the Component inspection tables and that are exempt from examination, as specified in Section XI Subsection IWB, IWC, IWD, and IWF are identified in the Braidwood Station Boundary Basis document, along with reference to the justification(s) for exempting the component/system.

1.4 ISI Program Implementation

CornEd, or their designee, visually examined (VT-1, VT-2, VT-3/4, VT-iC, and VT-3C) and/or NDE examined (UT, PT, MT) ASME components. The components examined comply with the ISI Program Schedule, Braidwood Technical Specifications, and/or compliance with the ASME Section XI Repair/Replacement Program. All ISI NDE, including evaluation of flaw indications, were performed in accordance with the requirements stipulated under Section XI, Sub-article IWA-2200: "Examination Methods".

Certified personnel performed and evaluated all NDE. Personnel were certified to the requirements of the American Society for Non-destructive Testing SNT-TC-1A, 1984 Edition. The NDE procedures were developed and certified in conformance with ASME Section V and XI, 1989 Edition, as applicable.

Certified personnel performed and evaluated visual examinations (VT-1, VT-2, and VT-3/4) of class 1, 2, and 3 components and supports. Personnel were certified to the requirements of the American Society for Non-destructive Testing SNT-TC-1A, 1984 Edition and/or ASME Section XI 1989, as applicable.

Certified personnel performed and evaluated visual examinations (VT-1, VT-3/4, VT-iC and VT3C) of Containment Structures. Personnel were certified to the requirements of the ANSI/ANST CP-189, 1991 revision, and/or ASME Section XI 1992 through 1992 Addenda, as applicable.

1.5 Witness and Verification of Examination

The inservice inspections were witnessed and/or verified by the Authorized Nuclear Inservice Inspectors (ANII), L. Malabanan and R. Spuhl. The inspectors are associated with Hartford Steam Boiler Inspection and Insurance Company of Hartford Connecticut, Chicago Branch, at 2443 Warrenville Rd., Suite 500, Lisle, Illinois 60532.

Page 1-2

Page 7: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

CornEd Braidwood Station Unit 1 A1R08 ISI Outage Report

2.0 INSERVICE EXAMINATION SUMMARY

The following is a summary of the examinations performed during the Braidwood Unit 1 Eight refueling outage (AlR08). Refer to the component detailed examination tabulations of Section 3.0 for additional information on specific welds, components, supports, snubbers and pressure test examinations and their respective results.

2.1 Inservice Weld/Component Summary

Number of Welds or SYSTEM EXAMINED Components COMMENTS Components

Containment Spray 3

Feedwater 3

Main Steam 3

Reactor Coolant Count includes eddy 26 current exams of 4 steam

generators. Reactor Coolant (RY) 8

Safety Injection 20 6 baseline exams

TOTALS 63

2.2 Inservice Component Support Summary

SYSTEM EXAMINED Number of Component COMMENTS Supports

Chemical & Volume Control 2

Feedwater 1

Main Steam 1

Reactor Coolant 19

Residual Heat Removal 3

Safety Injection 46

Essential Service Water 12

TOTALS 84

Page 2-1

Page 8: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

ComrEd Braidwood Station Unit I AlR08 ISI Outage Report

2.3 Inservice Snubber Summary

SYSTEM EXAMINED Number of Number of Snubbers Snubbers VT-3/4 Functionally Tested

Containment Spray 3 2

Chemical & Volume Control 8 4

Feedwater 3 3

Main Steam 5 3

Reactor Coolant 14 7

Residual Heat Removal 5 4

Reactor Coolant (RY) 5 3

Steam Generator Blowdown 2 1

Safety Injection 27 6

TOTALS 72 33

2.4 Inservice Pressure Test Summary

2.4.1 Pressure Test Test-Block Inspection Summary

Summary of components contained in this Table are those Pressure Test Test-Blocks which were examined for Section XI Inservice Inspection credit.

System Class Number of Test Blocks Component Cooling 2 1 Containment Spray 2 3 Chemical & Volume Control 2 2 Fuel Pool Cooling 2 2 Nitrogen System 2 1 Process Sampling 2 5 Residual Heat Removal 2 4 Reactor Coolant (RY) 2 4 Safety Injection 2 12 Essential Service Water 2 4 Containment Chilled Water 2 2 Plant Systems Pressurized During Mode 3 (ZZ) 1,2 2

TOTALS 42

Page 2-2

Page 9: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

Comrnd Braidwood Station Unit 1 AIR08 ISI Outage Report

2.4.2 Borated Bolting Inservice Inspection Summary

Summary of components contained in this Table are those Insulated Borated Bolted connections which were examined for Section XI Inservice Inspection credit. Inspections on these connections are performed per the commitments in Relief Request 12R-12, 12R-13, and 12R-30, as applicable, of the ISI Program Plan.

Number of Number of SYSTEM EXAMINED Nmeofubrof COMMENTS Connections VT-2 Connections VT-1

Chemical & Volume Control 40 10

Pressurizer 1 0

Reactor Coolant 25 5

Residual Heat Removal 22 4

Reactor Coolant (RY) 4 2

Safety Injection 2 0

TOTALS 94 21

2.5 Inservice Steam Generator Eddy Current Testing Summary

During A1R08 refueling outage, which began March 18, 2000, eddy current inspection of the Steam Generator tubes was conducted. Scope of the inspection included 100% full length bobbin coil inspection of all 4 Steam Generators. Plus Point inspection was conducted on any bobbin coil indications classified as requiring additional diagnostic testing.

The Steam Generator tube inspections were completed on March 28, 2000. One tube was plugged in Steam Generator A. The table below summarizes the tube plugging results from A1R08 and preservice inspection of the steam generators. No Steam Generator tubes were repaired by sleeving during the A1R08 Refueling outage.

2.5.1 Braidwood Unit 1 Replacement Steam Generator Tube Plugging Summary

Steam Steam Steam Steam Steam Generator Tubes Generator Generator Generator Generator Total

Plugged 1RC01BA 1RC01BB 1RC01BC IRC01BD "A" "B" "C1 "D"

Steam Generator Tubes Plugged Prior to Service 1 2 0 0 3 Steam Generator Tubes Plugged During A1R08 1 0 0 0 1

Steam Generator Tubes Plugged to Date 2 2 0 0 4

Page 2-3

Page 10: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

CornEN Braidwood Station Unit 1 A1RO8 ISI Outage Report

3.0 COMPONENT DETAILED EXAMINATION TABLES

3.1 Detailed Inservice Weld/Component Table(s):

The table (Pages 3-4 to 3-) for this section list the examinations performed for Section XI Inservice Inspection requirements for welds and components. The general format of how the table is set-up is shown below. A description of the information contained in each column can be found in Section 3.6.

Section XI ISI Identifier Cat. Item I Description

Line NumberIEPN Relief IProgram Code I IActual Resul I I Request I Notes I Coverage I Summary I Exam I

Inspection Comments (A) (B) (C) (D) (E) (F) (G) (H) (I)

(K) (J)

3.2 Detailed Inservice Component Support Table:

The table (Pages 3- to 3-) for this section list the examinations performed for Section XI Inservice Inspection requirements for component supports. The general format of how the table is set-up is shown below. A description of the information contained in each column can be found in Section 3.6.

Section XI ISI Identifier Line Number/EPN Relief I Program Exam Results Cat. Item Description I Request I Notes Summary I Inspection Comments

(A) (B) (C) (D) (E) (G) (I) (K)

(J)

3.3 Detailed Inservice Snubber Table:

The table (Pages 6-29 to 6-51) for this section list the examinations performed for Section XI Inservice Inspection requirements for snubbers. The general format of how the table is set-up is shown below. A description of the information contained in each column can be found in Section 3.6.

Section XI ISI Identifier Line Number/EPN Relief Program Exam Results Cat. Item Description Request Notes Summary Inspection Comments

(A) (B) (C) (D) (E) (G) (I) (K)

(J)

Page 3-1

Page 11: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

ComrEd Braidwood Station Unit 1 AlR08 ISI Outage Report

3.4 Detailed Inservice Pressure Test Table(s):

3.4.1 System Pressure Tests The table (Page 6-52) for this section list the examinations performed for Section XI Inservice Inspection requirements for pressure testing. The general format of how the table is set-up is shown below. A description of the information contained in each column can be found in Section 3.6.

3.4.2 Borated Bolted Connection Inspections

The table (Pages 6-53 to 6-60) for this section list the examinations performed for Inservice Inspection pressure testing requirements of borated bolted connections. The general format of how the table is set-up is shown below. A description of the information contained in each column can be found in Section 3.6.

ection XI ISIdIentifier Relief Program Exam IResult Cat. Item Description Request Notes Summary Inspection Comments

(A) (B) (D) (E) (G) (1) (K)

(J)

3.5 Detailed Inservice Steam Generator Inspection Table:

The detailed report for the Steam Generator Eddy Current examination is provided in a 12 month summary report submitted in accordance with Technical Specification 5.6.9, "Steam Generator (SG) Tube Inspection Reports."

3.6 General Inservice Report Information

3.6.1 Report Column Descriptions

(A) This column contains the Section XI Category and Item identifiers for the specified component. There are special cases, like snubbers, where an "S" has been added to the end of the Section XI Item identifier. This was done to allow easy sorting of the snubber population by the ISI database.

(B) This column contains the ISI Identifier that the ISI Program uses to distinguish components.

(C) This column contains the line number or equipment piece number (EPN) that the component is associated with.

(D) This column identifies the ISI Program Plan relief request(s) that is associated with that component. A complete copy of the relief request can be found in the ISI Program Plan.

(E) This column identifies the ISI Program Plan note(s) that is associated with that component. A complete copy of the Program note can be found in the ISI Program Plan.

Page 3-2

Page 12: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

CornEd Braidwood Station Unit 1 AlR08 ISI Outage Report

(F) This column identifies the percentage of code coverage achieved for the associated exam for that component.

(G) This column summarizes the exams performed during this outage for the associated component.

(H) This column identifies actual exams performed during this outage for the associated component.

(I) This column summarizes the results for exams performed during this outage for the associated component.

(J) This row states inspection comments, when applicable, for the associated

component.

(K) This column specifies the description of the associated component.

3.6.2 Report Abbreviations

FUNCT. - Snubber Functional Test GEOM. - Geometry GE/IND - Geometry/Indication IND. - Indication NRI - No Recordable Indications MT - Magnetic Particle Inspection PT - Liquid Penetrant Inspection SUR - Surface Exam TBD - To Be Developed UT - Ultrasonic Inspection VOL - Volumetric Exam VT - Visual Inspection

Page 3-3

Page 13: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

CornEd Braidwood Station Unit 1

AIR08 ISI Outage Report

Section 3.1 Detailed Inservice Inspection Weld / Component Listing (Page 1 of 8)

SYSTEM: Containment Spray System (CS)

Section X, 151 Identifier Line Number! EPN Relief Program Code Exam Actual Results Cat. Item Description Request Notes Coveragel Summary Exam

Inspection Comments

C-C C03.30 1CSP-01-CSP04 1CS01PB 12R-02 NOTE 4 VT-1 VT-1 NRI 1CS01PB PUMP LUG 12R-15 SUR PT NRI

NOTE: PT has heavy background contrast due to weld configuration. Refer to OOBRI-VT-006 for examination of remaining weld length. OBSTRUCTION: VT has areas of inaccessibility. See Relief Request 12R-02.

C-C C03.30 1CSP-01-CSP05 ICS01PB 12R-02 NOTE 4 VT-1 VT-1 NRI

1CS01PB PUMP LUG 12R-15 SUR PT NRI NOTE: PT has heavy background contrast due to weld configuration. Refer to OOBRI-VT-007 for examination of remaining weld length. OBSTRUCTION: VT has areas of inaccessibility. See Relief Request 12R-02.

C-C C03.30 ICSP-01-CSP06 1CS01PB 12R-02 NOTE 4 VT-1 VT-1 NRI

1CS01PB PUMP LUG 12R-15 SUR PT NRI NOTE: PT has heavy background contrast due to weld configuration. Refer to OOBR1-VT-008 for examination of remaining weld length. OBSTRUCTION: VT has areas of inaccessibility. See Relief Request 12R-02.

Page 3-4

Page 14: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

ConEd Braidwood Station Unit 1

A1R08 ISI Outage Report

Section 3.1 Detailed Inservice Inspection Weld / Component Listing (Page 2 of 8)

SYSTEM: Feedwater System (FW)

Section XI ISI Identifier Cat. Item Description

Inspection Comments

C-F-2 C05.51 1 FW-02-04

VALVE 1 FW009A - PIPE

1FW03DA-16" NOTE 4 100% SUR MT NRI

NOTE 5 100% VOL UT-45 GEOM

NOTE 7 UT-60 GEOM

OBSTRUCTION: One sided exam due to configuration (valve to pipe).

1 FW-02-05A 1FW03DA-16" PIPE - PENETRATION (1 PC-079)

NOTE 4 100% SUR MT NRI NOTE 5 100% VOL UT-45 GEOM

NOTE 7

C-F-2 C05.51 1FW-11-16

VALVE 1FW039A - PIPE

1 FW81 BA-6" NOTE 4

NOTE 5

NOTE 7

100% SUR MT NRI

100% VOL UT-45 GEOM

OBSTRUCTION: One sided exam due to valve to pipe configuration.

Page 3-5

C-F-2 C05.51

1

Page 15: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

ComrEd Braidwood Station Unit 1

A1R08 ISI Outage Report

Section 3.1 Detailed Inservice Inspection Weld / Component Listing (Page 3 of 8)

SYSTEM: Main Steam System (MS)

Section XI ISI Identifier Line N umber I EPN Relief Program Code Exam Actual ýResults Cat. Item Description Request INotes Coveragel SummaryI Exam

Inspection Comments

C-F-2 C05.51 1 MS-04-04 1 MS01 BA-30.25" NOTE 4 100% SUR MT NRI PIPE - TEE NOTE 5 100% VOL UT-45 NRI

NOTE 7 NOTE: MT examined in as-ground condition. UT witnessed by Tom Green ComEd Lill. OBSTRUCTION: UT is a single sided exam.

C-F-2 C05.51 1MS-04-13 1MS143AA-12" NOTE 4 100% SUR MT NRI WELDOLET - PIPE NOTE 5 100% VOL UT-45 NRI

NOTE 7

C-C C03.20 1MS-07-SWO8 1MS01AC-32.75" 12R-15 NOTE 4 97.74% SUR MT IND. (4) LUG ATTACH. FOR 1 MS07002C

NOTE: See OOBRI-INR-001 for disposition of linear indications. Indications were determined to be acceptable. See also 0OBR1-UT-118 for UT verification of MT indication.

Page 3-6

Page 16: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

COrnEd Braidwood Station Unit 1

A1R08 ISI Outage Report

Section 3.1 Detailed Inservice Inspection Weld / Component Listing (Page 4 of 8)

SYSTEM: Reactor Coolant System (RC)

Section XI ISl Identifier Line Number I EPN Relief Prograrr Cat. Item Description Request Notes

Inspection Comments

B-J B09.32 1RC-01-13 1RC16AA-2" NOTE 4 2" SWEEPOLET - 31" PIPE

B-J B09.32 IRC-01-14 1 RC09FA-3" NOTE 4 3" NOZZLE BRANCH CONNECTION

B-J B09.32 1RC-01-15 IRC14AA-2" NOTE 4 31" PIPE - 2" SWEEEPOLET

B-J B09.11 1RC-01-16 1RC02AA-31" NOTE 4 PIPE - ELBOW

NOTE: Pipe side stainless / elbow side cast stainless. Root geometry elbow side only.

B-J B09.11 1RC-01-17 1RC02AA-31" NOTE 4 ELBOW - PUMP I RC01 PA NOZZLE

NOTE: Exam was deferred to the next outage. Scaffold was not arranged.

B-J B09.11 1 RC-06-08 1RC21AA-8" NOTE 4 PIPE - PIPE

B-J B09.11 1RC-06-09 IRC21AA-8" NOTE 4 PIPE - ELBOW

B-J B09.11 IRC-06-10 IRC21AA-8" NOTE 4 ELBOW - PIPE

B-J B09.11 1RC-06-11 1 RC21 AA-8" NOTE 4 PIPE - ELBOW

B-J B09.11 1RC-06-12 IRC21AA-8" NOTE 4 ELBOW - PIPE

NOTE: Beam redirection noted on elbow side.

B-G-2 B07.50 1RC-19-B3 1RC22AB-1.5" FLANGED CONNECTION (4 STUDS)

NOTE: Examined during disassembly.

B-G-2 B07.50 1RC-20-B1 IRC22AD-1.5" FLANGED CONNECTION (4 STUDS)

NOTE: Examined during disassembly.

B-G-2 B07.50 1RC-23-B1 1RC22AA-1.5" FLANGED CONNECTION (4 STUDS)

NOTE: Examined during disassembly.

B-G-2 B07.50 1RC-27-B1 1RC22AC-1.5" FLANGED CONNECTION (4 STUDS)

NOTE: Examined during disassembly.

B-J B09.40 1 RC-36-01 1RC14AA-2" NOTE 4 BRANCH CONNECTION - PIPE

B-J B09.40 1RC-41-01AA 1RC16AA-2" NOTE 4 PIPE - BRANCH CONNECTION

100% SUR PT NRI

100% SUR PT NRI

100% SUR PT NRI

100% SUR PT NRI

100% VOL UT-45L GEOM

SUR

VOL

100% SUR PT NRI

100% VOL UT-45 GEOM

100% SUR PT NRI

100% VOL UT-45 GEOM

100% SUR PT NRI

100% VOL UT-45 GEOM

100% SUR PT NRI 100% VOL UT-45 GEOM

100% SUR PT NRI

100% VOL UT-45 GEOM

VT-1 VT-I NRI

VT-1 VT-1 NRI

VT-1 VT-I NRI

VT-1 VT-1 NRI

100%

100%

SUR PT

SUR PT

NRI

NRI

Page 3-7

Page 17: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

CoirEd Braidwood Station Unit 1

A1R08 ISI Outage Report

Section 3.1 Detailed Inservice Inspection Weld / Component Listing (Page 5 of 8)

SYSTEM: Reactor Coolant System (RC)

Section XI 151 Identifier "Line Number EPN RrResults C .Ite m e Description Request _Notes __ Coverage Summaryl Exam

Inspection Comments

B-G-2 B07.60 1RCP-01-PSB-PA-B1 1RC01PA NOTE 3 VT-1 VT-1 NRI PUMP SHAFT SEALS (36 BOLTS)

NOTE: Examination was performed with bolting in place.

B-G-1 B06.40 1RV-02-038-01 TO 54 IRC01R 100% VOL UT-0 NRI THREADS IN RX FLANGE (54 TL)

NOTE: A1RO8 exam include area around all 54 stud holes.

B-G-1 B06.10 1RV-03-NUTS (01 TO 54) 1RC01R 12R-19 VT-1 VT-1 NRI CLOSURE HEAD NUTS (54 TOTAL)

NOTE: Nuts examined in AiR08 were 89-1-4014-51-02, 03, 04,41,42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54 and 89-1-4012-5101.

B-G-1 B06.20 1RV-03-STUDS(01 TO 54) 1RC01R 100% SUR MT NRI B06.30 CLOSURE HEAD STUDS (54 TOTAL) VOL

NOTE: Studs examined in A1R08 were: 89-1-4014-51-(1, 2, 3, 4, 41, 42, 44, 45, 46, 47, 48, 49, 50, 51, 52, 54, 55, and 56).

B-G-1 B06.50 1RV-03-WASHERS 1RC01R VT-I VT-1 NRI CLOSURE WASHERS (01 TO 54)

NOTE: Washers examined in A1R08 were: 89-1-4014-51-03, 04, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54, 55, and 56.

B-Q B16.20 1 SG-05-1RC01BA TUBING 1RC01BA VOL VOL N/A STEAM GENERATOR TUBING

NOTE: One tube plugged during A1R08.

B-G-1 B06.90 1SG-05-SGB-01 IRC01BA VT-1 VT-1 NRI B06.100 PRIMARY MANWAY (20 STUDS and NUTS) -100% VOL UT-60 NRI B06.110 UT-80L NRI

NOTE: Exam was performed in AIR08 after IRC01BA primary manways were removed with primary head diaphrams in place. Exam included flange face and a 1" annular surface around each of the 40 manway stud holes.

B-G-1 B06.90 1SG-05-SGB-02 1RCO1BA VT-1 VT-1 NRI B06.100 PRIMARY MANWAY (20 STUDS and NUTS) 100% VOL UT-60 NRI B06.110 UT-80L NRI

NOTE: Exam was performed in A1RO8 after 1RC01BA primary manways were removed with primary head diaphrams in place. Exam included flange face and a 1" annular surface around each of the 40 manway stud holes.

B-Q B16.20 1SG-06-1RC01BB TUBING1RC01BB VOL VOL N/A STEAM GENERATOR TUBING

B-Q B136.20 1 SG-07-1 RC01 BC TUBING1 RC01 BC VOL VOL N/A STEAM GENERATOR TUBING

B-Q B1i6.20 1 SG-08-1 RC01 BC TUBING1 RC01 BD VOL VOL N/A STEAM GENERATOR TUBING

Page 3-8

Page 18: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

CornEd Braidwood Station Unit 1

A1R08 ISI Outage Report

Section 3.1 Detailed Inservice Inspection Weld / Component Listing (Page 6 of 8)

SYSTEM: Reactor Coolant System (RY)

Section XI ISl Identifier Line Number / EPN Cat Item Description

Inspection Comments

B-J B09.40 1CV-02-13 1 RY1 8A-2" VALVE 1CV8377 - PIPE

B-J B09.40 1CV-02-14 1RY18A-2" PIPE - ELBOW

B-J B09.40 1CV-02-15 1RY18A-2" ELBOW - PIPE

B-J B09.40 1 CV-02-16 1RY18A-2" PIPE - ELBOW

B-J B09.40 1CV-02-17 1 RY1 8A-2" ELBOW - PIPE

B-J B09.40 1CV-02-18 1RY18A-2" PIPE - ELBOW

B-J B09.40 1CV-02-19 1 RY1 8A-2" ELBOW - PIPE

B-M-2 B12.50

Relief Program Code Exam Actual Results

Request Notes Coverage Summary Exam

NOTE 4

NOTE 4

NOTE 4

NOTE 4

NOTE 4

NOTE 4

NOTE 4

1RC-32-1RY801OC (INT) 1RY03BC-6" NOTE 3

100%

100%

100%

100%

100%

100%

100%

SUR

SUR

SUR

SUR

SUR

SUR

SUR

PT

PT

PT

PT

PT

PT

PT

NRI

NRI

NRI

NRI

NRI

NRI

NRI

VT-3/4 VT-3/4 NRI

1RY801OC SAFETY RELIEF INTERNALS

NOTE: This exam was not scheduled for Al R08 but because it was disassembled for replacement a VT-3/4 was performed on the valve internal surface. This examination satisfies the Interval 2 requirements for code item B12.50 for the Unit 1 RY8010 valve group (see ISI Program Plan, Note 3).

Page 3-9

Page 19: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

CornEd Braidwood Station Unit 1

AIR08 ISI Outage Report

Section 3.1 Detailed Inservice Inspection Weld / Component Listing (Page 7 of 8)

SYSTEM: Safety Injection System (SI)

Section XI ISl Identifier Cat. Item Description

Inspection Comments

C-F-1 C05.11 1SI-04-15

PIPE - ELBOW

iSI05CA-8" NOTE 4 100% SUR PT NRI

NOTE 7 100% VOL UT-45 GEOM

UT-45L GEOM

NOTE: PT examined in as-ground condition.

C-F-1 C05.11 1SI-04-16 ELBOW - PIPE

NOTE: Pt examined in as-ground condition.

C-F-1 C05.11 1SI-04-17 PIPE - ELBOW

lSI05CA-8" NOTE 4 100% SUR PT

NOTE 7 100% VOL UT-45

UT-45L

1S 105CA-8" NOTE 4 100% SUR PT

NOTE 7 100% VOL UT-45

UT-45L

NOTE: PT examined in as-ground condition.

C-F-1 C05.11 1SI-04-18

ELBOW - PIPE

ISl05CA-8"

NOTE: PT examined in as-ground condition.

C-F-1 C05.11 1SI-04-19 PIPE - ELBOW

NOTE: PT examined in as-ground condition.

C-F-1 C05.11 1SI-04-20 1 ELBOW - PIPE

NOTE: PT examined in as-ground condition.

B-J B09.40 ISI-10-26.01 ELBOW - PIPE

B-J B09.40 15-10-27.01

PIPE - ELBOW

B-J B09.40 1S1-10-28.01 VALVE 1S18819C - PIPE

ISI05CA-8"

NOTE 4 100% SUR PT

NOTE 7 100% VOL UT-45

UT-45L

NOTE 4 100% SUR PT

NOTE 7 100% VOL UT-45

UT-45L

SSI05CA-8" NOTE 4 100% SUR PT

NOTE 7 100% VOL UT-45

UT-45L

1SI18FC-2"

NRI GEOM

GEOM

NRI

GEOM

GEOM

NRI

GEOM

GEOM

NRI

GEOM

GEOM

NRI

GEOM

GEOM

NOTE 4 100 SUR PT NRI

NOTE 4 100 SUR PT NRI1SI18FC-2"

1SI18FC-2" NOTE 4

B-G-2 B07.70 1SI-13-1S18948D (BLT) 1SI09BD-10" 1SI8948D CHECK VALVE (18 BLT)

NOTE 3

100 SUR PT NRI

VT-1 VT-1 NRI

NOTE: This exam was not scheduled for Al R08 but because it was disadsembled for maintenance a VT-1 was performed on the bolting.

B-M-2 B12.50 1SI-13-1SI8948D (INT) 1SI09BD-10" NOTE 3 VT-3/4 VT-3/4 NRI

1S18948D CHECK VALVE INTERNALS

NOTE: This exam was not scheduled for Al R08 but because it was disassembled for maintenance a VT-3/4 was performed on the valve intemal surface. This examination satisfies the Interval 2 requirements for code item B12.50 for the Unit I S18948 valve group (see ISI Program Plan, Note 3).

B-G-2 B07.70 1S1-14-1SI8818D (BLT) iSI05DD-6" NOTE 3 VT-1 VT-1 NRI

1SI8818D CHECK VALVE (16 BLT)

NOTE: Exam performed in conjunction with disassembly for NWR.

Page 3-10

Page 20: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

CornEd Braidwood Station Unit 1

ALR08 ISI Outage Report

Section 3.1 Detailed Inservice Inspection Weld / Component Listing (Page 8 of 8)

SYSTEM: Safety Injection System (SI)

Section Xl ISI Identifier Cat. Item Description

Inspection Comments

B-M-2 B12.50 1SI-14-1SI8818D (INT) 1SI05DD-6" NOTE 3 VT-3/4 VT-3/4 NRI

1S18818D CHECK VALVE INTERNALS

NOTE: This exam was not scheduled for AIR08 but because it was disassembled for maintenance a VT-3/4 was performed on the valve internal surface. This examination satisfies the Interval 2 requirements for code item B12.50 for the Unit 1 S18818 valve group (see ISIProgram Plan, Note 3).

B-J B09.40 1SI-23-02-FA.01

ELBOW - PIPE

B-J B09.40 1SI-23-03-FA.01 PIPE - ELBOW

B-J B09.40 1SI-23-04-FA.01 VALVE 1S18819A - PIPE

1SI18FA-2" NOTE 4 100 SUR PT

1SI18FA-2"

1SI18FA-2"

NOTE 4 100 SUR PT

NOTE 4 100 SUR PT

C-F-1 C05.11 1SI-34-07 iSIO11B-24" NOTE 4 100% PIPE - ELBOW NOTE 7 100%

NOTES: Pt examined in as-ground condition. UT Indication No. 2 identified by RT as probable seam weld

C-F-1 C05.41 1SI-35-08 1SIO11B-24" NOTE 4 100% 24" PIPE - 12" WELDOLET NOTE 7

NOTE: PT examined in as-ground condition.

C-F-1 C05.11 ISI-35-18 1S153AA-14" NOTE 4 100%

TEE - PIPE NOTE 7 100%

100%

NOTE: PT re-examined on 3/26/00 (Al R08) after further weld crown reduction.

NRI

NRI

NRI

SUR PT NRI

VOL UT-45 GEOM

intersection on pipe side.

SUR PT NRI

SUR PT

SUR PT

VOL UT-45

NRI

NRI

NRI

C-F-1 C05.11 1SI-35-43

WELDOLET - PIPE

1SI82AA-12" NOTE 4 100% SUR PT

NOTE 7 92% VOL UT-45

UT-45L UT-70

UT-70L

NRI

NRI

NRI NRI

NRI

OBSTRUCTION: One sided exam due to weld-o-let pipe configuration. No circ scan on weld-o-let base metal due to configuration.

Page 3-11

Page 21: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

CobrEd Braidwood Station Unit 1

A1R08 ISI Outage Report

Section 3.2 Detailed Inservice Inspection Component Support Listing (Page 1 of 11)

SYSTEM: Chemical & Volume Control System (CV)

Section XI ISI Identifier Line Number I EPN Relief Program Exam Results Cat. Item Description Request Notes Summary

Inspection Comments

F-A F01.10 1CV0201OX 1CV10DB-3" NOTE 8 VT-3/4 NRI (1) Strut

Supplemental Due To Recordable Indication Identified On Component Support 1CV06014X (Minor Boron accumulationon strut. No Metal Wastage)

F-A F01.10 ICV06006X 1CVB7A-3" NOTE 8 VT-3/4 NRI (1) Strut

Supplemental Exam Due To Recordable Indication Identified On Component Support 1CV06014X

Page 3-12

Page 22: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

CornEd Braidwood Station Unit 1

A1R08 ISI Outage Report

Section 3.2 Detailed Inservice Inspection Component Support Listing (Page 2 of 11)

SYSTEM: Feedwater System (FW)

Section XI ISI Identifier Line Number ! EPN Relief Program Exam Results

Cat. Item Description Request INotes Summary

Inspection Comments

F-A F01.20 1FW05024C IFW03DD-16" NOTE 8 VT-3/4 NRI (1) Constant Spring Can

Page 3-13

Page 23: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

Cornifd Braidwood Station Unit 1

A1RO8 ISI Outage Report

Section 3.2 Detailed Inservice Inspection Component Support Listing (Page 3 of 11)

SYSTEM: Main Steam System (MS)

Section Xl Il Identifier Line Number I EPN Relief Program Exam Results Cat. Item Description Request Notes Summary

Inspection Comments

F-A F01.20 1MS07002C 1MS01AC-32.75" NOTE 8 VT-3/4 NRI (2) Constant Spring Cans, IWA to pipe

2 Constant Supports. Constant Support travel settings are at the hot position as specifiedon the component support drawing.Travel lindicator is at the mid piont range (approx.2") . Remote exam performed approx. 4' away.

Page 3-14

Page 24: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

CornEd Braidwood Station Unit 1

A1R08 ISI Outage Report

Section 3.2 Detailed Inservice Inspection Component Support Listing

(Page 4 of 11)

SYSTEM: Reactor Coolant System (RC)

Section XI 1ISl Identifier Line Number / EPN Relief Program Exam Results Cat. Item Description Request Notes Summary

Inspection Comments

F-A F01.10 1CV03003X 1RC28A-3" NOTE 8 VT-3/4 NRI (1) Strut

F-A F01.10 1CV06001V 1RC36A-3" NOTE 8 VT-3/4 NRI (1) Variable Spring Can

Supplemental Exam Due To Recordable Indication Identified On Component Support 1CV06014X (This Support 1CV06001V is ajacent to 1CV06014X. Variable spring can setting1 66# in tolerance. System filled and cold.).

F-A F01.10 1CV06003X 1RC36A-3" NOTE 8 VT-3/4 NRI (1) Strut

Supplemental Exam Due To Recordable Indication Identified On Component Support 1CV06014X (This Support is ajacent to 1CV06014X. ). (Minor rust on bolting, no metal wastage.)

F-A F01.10 1CV06014X 1RC36A-3" NOTE 8 VT-3/4 IND. (1) Strut VT-3/4 NRI

Spherical bearing slightly dislodged. Note this exam was perfromed as a result of an RI identified on this support during the previous inspection period. Additional RI identified. Spherical bearing dislodged slightly. Ref. PIF A-2000-01383.

F-A F01.10 1CV06015R 1RC36A-3" NOTE 8 VT-3/4 NRI (1) Strut

Supplemental Exam Due To Recordable Indication Identified On Component Support 1CV06014X (This Support is ajacent to 1CV06014X.(Minor rust on bolting ,no metal wastage).

F-A F01.10 1CV06020C 1 RC36A-3" NOTE 8 VT-3/4 NRI (1) Constant Spring Can

F-A F01.10 1CV24034R 1RC16AB-2" NOTE 8 VT-3/4 NRI (1) Strut

F-A F01.10 IRC16104X 1RC22AA-1.5" NOTE 8 VT-3/4 NRI Box

F-A F01.10 1RC16116R 1RC22AA-1.5" NOTE 8 VT-3/4 NRI Box

F-A F01.10 1RC17053R 1RC22AB-1.5" NOTE 8 VT-3/4 NRI (1) Strut

F-A F01.10 1RC17057X 1RC22AB-1.5" NOTE 8 VT-3/4 NRI (1) Strut

F-A F01.10 1RC18031G 1 RC22AC-1.5" NOTE 8 VT-3/4 NRI Box

F-A F01.10 1RC18032X 1RC22AC-1.5" NOTE 8 VT-3/4 NRI Box

F-A F01.10 1RC19041X 1RC22AD-1.5" NOTE 8 VT-3/4 NRI (1) Strut

F-A F01.10 1RC19044G 1 RC22AD-1.5" NOTE 8 VT-3/4 NRI U-Bolt

F-A F01.10 1RC19056R 1RC22AD-1.5" NOTE 8 VT-3/4 NRI Box

F-A F01.10 1RY06006X 1RC24AB-4" NOTE 8 VT-3/4 NRI (1) Strut

Page 3-15

Page 25: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

CornEd Braidwood Station Unit 1

AIR08 ISI Outage Report

Section 3.2 Detailed Inservice Inspection Component Support Listing (Page 5 of 11)

SYSTEM: Reactor Coolant System (RC)

Section XI IS[ Ide Cat. Item Descr

Inspection Comments

ntifier iption

F-A F01.10 1RY06013V (1) Variable Spring Can

1 RC24AA-4" NOTE 8 VT-3/4 NRI

F-A F01.10 1RY06056X 1RC24AA-4" NOTE 8 VT-3/4 NRI

(1) Strut

Page 3-16

1

Page 26: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

CornEd Braidwood Station Unit 1

A1R08 ISI Outage Report

Section 3.2 Detailed Inservice Inspection Component Support Listing (Page 6 of 11)

SYSTEM: Residual Heat Removal System (RH)

Section XI ISI Identifier Line Number ! EPN Relief Program Exam Results Cat. Item Description Request Notes Summary

Inspection Comments

F-A F01.20 1CV47044A 1RH12A-8" NOTE 8 VT-3/4 NRI Anchor, integrally attached to pipe

F-A F01.20 1SI18007R 1RH03AB-8" NOTE 8 VT-3/4 NRI Slide Plate

Remote Exam 3' Away (Minor Surface Rust On Lower Component, No Metal Wastage)

F-A F01.20 1SI18009R 1RH03AB-8" NOTE 8 VT-3/4 NRI (1) Strut

Page 3-17

Page 27: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

CornEd Braidwood Station Unit 1

A1RO8 ISI Outage Report

Section 3.2 Detailed Inservice Inspection Component Support Listing (Page 7 of 11)

SYSTEM: Safety Injection System (SI)

Section XI I15 Identifier Line Number/ EPN Relief Program Exam Results Cat. Item Description Request Notes Summary

Inspection Comments

F-A F01.10 1RB-064A 1SI03FB-2" NOTE 8 VT-3/4 NRI Anchor, integrally attached to pipe

F-A F01.10 1RH02037R 1SIA4B-8" NOTE 8 VT-3/4 NRI (1) Strut

F-A F01.10 1RH0204OR 1SIA4B-8" NOTE 8 VT-3/4 NRI (2) Struts

F-A F01.10 1RH02064V 1SIA4B-8" NOTE 8 VT-3/4 NRI (1) Variable Spring Can

F-A F01.10 1S101023R 1SI05DA-6" NOTE 8 VT-3/4 NRI Box

F-A F01.10 1S104014V 1SIO5DB-6" NOTE 8 VT-3/4 NRI (1) Variable Spring Can

F-A F01.20 1S106105X 1SIOl B-24" NOTE 8 VT-3/4 NRI (1) Strut

Exam performed due to Recordable Indication identified during previous inspection period.

F-A F01.20 1SI18013X 1SI05AB-8" NOTE 8 VT-3/4 NRI Box

F-A F01.20 1SI18039R 1SI05AB-8" NOTE 8 VT-3/4 NRI (1) Rod

F-A F01.20 -1SI18082R 1SI05AA-8" NOTE 8 VT-3/4 NRI (2) Struts

F-A F01.20 1SI18083A 1SI05AB-8" NOTE 8 VT-3/4 NRI Anchor, integrally attached to pipe

F-A F01.10 1SI19002R 1S108JB-1.5" NOTE 8 VT-3/4 NRI (1) Strut

Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X.

F-A F01.10 1S119013X 1SI08JB-1.5" NOTE 8 VT-3/4 NRI (1) Strut

Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X

F-A F01.10 1S119014R 1SI08JB-1.5" NOTE 8 VT-3/4 NRI (1) Strut

Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X

F-A F01.10 1S119020X 1SI08JB-1.5" NOTE 8 VT-2 NRI (1) Strut

Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X

F-A F01.10 1S119021R 1SI08JB-1.5" NOTE 8 VT-3/4 NRI (1) Strut

Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X

F-A F01.10 1SI19022R ISI08JB-1.5" NOTE 8 VT-3/4 NRI (1) Strut

Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X

Page 3-18

Page 28: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

Cornmd Braidwood Station Unit 1

A1R08 ISI Outage Report

Section 3.2 Detailed Inservice Inspection Component Support Listing (Page 8 of 11)

SYSTEM: Safety Injection System (SI)

Section XI IS[ Identifier Line Number ! EPN Relief Program Exam Results Cat. Item Description Request Notes Summary

Inspection Comments

F-A F01.10 1SI19026X 1SI08JB-1.5" NOTE 8 VT-3/4 NRI (1) Strut

Supplemental Exam Due To Recordable Indication Identified On Component Support 1 S120045X

F-A F01.10 1SI20016X 1SI08JC-1.5" NOTE 8 VT-3/4 NRI (1) Strut

Supplemental Exam Due To Recordable Indication Identified On Component Support 1 S120045X

F-A F01.10 1S120020X 1SI08JC-1.5" NOTE 8 VT-3/4 NRI (1) Strut

Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X

F-A F01.10 1S120046R 1SIO8JC-1.5" NOTE 8 VT-3/4 NRI (1) Strut

Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X (This support is ajacent to supportlSI20045X. There are no other supports ajacent to 1S120045X.)

F-A F01.10 1S120049R 1SI08JC-1.5" NOTE 8 VT-3/4 NRI (1) Strut

Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X

F-A F01.10 1S121016X 1SI08JC-1.5" NOTE 8 VT-3/4 NRI (1) Strut

Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X

F-A F01.10 1S121019X 1SI08FA-3" NOTE 8 VT-3/4 NRI (1) Strut

Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X

F-A F01.10 1S121022X 1SI08E-3" NOTE 8 VT-3/4 NRI (1) Strut

Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X

F-A F01.10 1S121043R 1SI08E-3" NOTE 8 VT-3/4 (1) Strut

Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X

F-A F01.10 1S121045X 1SI08GC-1.5" NOTE 8 VT-2 NRI (1) Strut

Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X

F-A F01.10 1S122030R 1SI08JD-1.5" NOTE 8 VT-3/4 NRI (1) Strut

Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X

F-A F01.10 1S123002X 1SI08FA-3" NOTE 8 NRI (1) Strut

Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X

F-A F01.10 1S123004X 1SI08FA-3" NOTE 8 VT-3/4 NRI (1) Strut

Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X

F-A F01.10 1S123007R SIl08FA-3" NOTE 8 VT-3/4 NRI Box

Page 3-19

Page 29: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

Comrnd Braidwood Station Unit 1

AIR08 ISI Outage Report

Section 3.2 Detailed Inservice Inspection Component Support Listing (Page 9 of 11)

SYSTEM: Safety Injection System (SI)

Section XI tem Identifier Line Number) EPN Relief Program Exam Results Cat Ite Description I I Request INotes SummaryIInspection Comments

F-A F01.10 1SI23009X 1SI08FA-3" NOTE 8 VT-3/4 NRI

(1) Strut

Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X

F-A F01.10 1S123011R 1SI08FA-3" NOTE 8 VT-2 NRI

(2) Struts

Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X

F-A F01.10 1S124003R 1SI08JA-1.5" NOTE 8 VT-3/4 NRI

(1) Strut

Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X

F-A F01.10 1S124008X 1SI08JA-1.5" NOTE 8 VT-2 NRI

(1) Strut

Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X

F-A F01.10 1S124011X 1SI08JA-1.5" NOTE 8 VT-3/4 NRI

(1) Strut

Supplemental Exam Due To Recordable Indication Identified On Component Support 1I 120045X

F-A F01.10 1S125009R 1SI08GB-1.5" NOTE 8 VT-3/4 NRI

(1) Strut

Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X

F-A F01.10 1S125014R 1SI08JD-1.5" NOTE 8 VT-2 NRI

(1) Strut

Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X

F-A F01.10 1S125015R 1SI08HA-2" NOTE 8 VT-3/4 NRI

(1) Strut

Supplemental Exam Due To Recordable Indication Identified On Component Support 1I 120045X

F-A F01.10 1S125016X 1SI08HA-2" NOTE 8 VT-3/4 NRI

(1) Strut

Supplemental Exam Due To Recordable Indication Identified On Component Support 1 S120045X

F-A F01.10 1S125052X 1SI08JB-1.5" NOTE 8 VT-3/4 NRI

(1) Strut

Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X

F-A F01.10 1S125054X 1SI08HB-2" NOTE 8 VT-3/4 NRI

(1) Strut

Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X

F-A F01.10 1S125055G 1SI08GB-1.5" NOTE 8 VT-3/4 NRI

(2) Struts

Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X

F-A F01.10 1SI25056R 1SI08GB-1.5" NOTE 8 VT-3/4 NRI

(1) Strut

Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X

F-A F01.10 1S125059X 1SI08FA-3" NOTE 8 VT-3/4 NRI

(1) Strut

Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X

Page 3-20

Page 30: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

ComrEd Braidwood Station Unit 1

A1R08 ISI Outage Report

Section 3.2 Detailed Inservice Inspection Component Support Listing (Page 10 of 11)

SYSTEM: Safety Injection System (SI)

Section XI ISI Identifier Line Number / EPN Relief Program Exam Results Cat. Item Description Request Notes Summary

Inspection Comments

F-A F01.10 1S125060X 1SI08FA-3" NOTE 8 VT-3/4 NRI

(1) Strut

Supplemental Exam Due To Recordable Indication Identified On Component Support 1S120045X

Page 3-21

Page 31: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

CornEd Braidwood Station Unit 1

AIR08 ISI Outage Report

Section 3.2 Detailed Inservice Inspection Component Support Listing (Page 11 of 11)

SYSTEM: Essential Service Water System (SX)

Section Xl ISI Identifier Line Number I EPN Relief Program Exam Results Cat. Item Description Request Notes Summary

Inspection Comments

F-A F01.20 1PC-015A 1SX06BA-16" NOTE 8 VT-3/4 NRI Anchor, integrally attached to pipe

F-A F01.20 1SX06002G 1SX06BA-16" NOTE 8 VT-3/4 NRI Box

F-A F01.20 1SX06007R 1SX06CA-14" NOTE 8 VT-3/4 NRI Box

F-A F01.20 1SX06022X ISX06DC-10" NOTE 8 VT-2 NRI (1) Strut

F-A F01.20 1SX07007G 1SX06CB-14" NOTE 8 VT-3/4 NRI (1) Strut

F-A F01.20 1 SX07012R 1SX06EB-10" NOTE 8 VT-3/4 NRI Box

F-A F01.20 1SX07034X 1SX06CB-14" NOTE 8 VT-2 NRI (1) Strut

F-A F01.20 1SX08001R 1SX07FA-16" NOTE 8 VT-3/4 NRI (1) Strut

F-A F01.20 1SX0801OG 1SX07EA-14" NOTE 8 VT-3/4 NRI Strut and U-Bolt

F-A F01.20 1SX08097X 1SX09CA-10" NOTE 8 VT-3/4 NRI (1) Strut

F-A F01.20 1SX09001R 1SX07FB-16" NOTE 8 VT-3/4 NRI (1) Strut

F-A F01.20 1SX09046R 1SX07FB-16" NOTE 8 VT-3/4 NRI (1) Strut

Page 3-22

Page 32: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

Cornfid Braidwood Station Unit 1

AIR08 ISI Outage Report

Section 3.3 Detailed Inservice Inspection Snubber Listing (Page 1 of 12)

SYSTEM: Containment Spray System (CS)

Section Xl ISlI Identifier Cat. Item Description

Inspection Comments

F-A F01.20 1CS03012S

Snubber1CS02AA-10" 12R-14 VT-3/4 NRI

Functional NRI

VT-2 NRI

S.N. 24407

NA NA 1CS04002S 1CS02AA-10" 12R-14 VT-3/4 NRI

Snubber

S.N. 5180

NA NA 1CS0401OS 1CS02AA-10" 12R-14 VT-3/4 NRI

Snubber Functional NRI

VT-3/4 NRI

S.N. 27680

Page 3-23

Page 33: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

CornEd Braidwood Station Unit 1

A1R08 ISI Outage Report

Section 3.3 Detailed Inservice Inspection Snubber Listing (Page 2 of 12)

SYSTEM: Chemical & Volume Control System (CV)

Section Xl ISl Identifier Line Number EPN Relief Program Exam Results

Cat. Item Description Request Notes Summary

Inspection Comments

F-A F01.20 1CV01006S 1CV08BA-4" 12R-14 VT-3/4 NRI Snubber

S.N. 16668

NA NA 1CV01040S 1CV12AB-3" 12R-14 VT-3/4 NRI Snubber

S.N. 10673

NA NA 1CV13054S ICV43BC-2" 12R-14 VT-3/4 NRI Snubber Functional NRI

VT-3/4 S.N. 14985

NA NA 1CV31007S 1CV15DA-.75" 12R-14 VT-3/4 N/A Snubber

S.N. 20116

NA NA 1CV31020S 1CV15E-.75" 12R-14 VT-3/4 NRI Snubber Functional NRI

VT-3/4 NRI

S.N. 14668

NA NA 1CV34008S 1CV14EA-2" 12R-14 VT-3/4 NRI Snubber Functional NRI

Functional NRI VT-3/4 NRI

SNUBBER S.N. 14440 WAS MARGINAL, REPLACED WITH S.N. 21593,TEST INFO. IS FOR REPLACEMENT

NA NA 1CV41025S 1CV14ED-2" 12R-14 VT-3/4 NRI Snubber Functional NRI

VT-3/4 NRI

S.N. 10353

NA NA 1CV41026S 1CV14ED-2" 12R-14 VT-3/4 NRI Snubber

S.N. 10353

Page 3-24

Page 34: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

CornEd Braidwood Station Unit 1

A1R08 ISI Outage Report

Section 3.3 Detailed Inservice Inspection Snubber Listing (Page 3 of 12)

SYSTEM: Feedwater System (FW)

NA NA 1FW10001S 1FW87BC-3" 12R-14 VT-3/4 NRI Snubber Functional NRI

VT-3/4 NRI

1FW87BB-3"1 FW1 2025S

Snubber12R-14 VT-3/4

Functional

VT-3/4

NRI NRI

N/AS.N. 2394

NA NA 1 FW14002S 1FW87BA-3" 12R-14 VT-3/4 NRI Snubber Functional NRI

VT-3/4 NRI S.N. 12220

Page 3-25

S.N. 12428

NA NA

Page 35: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

CornEd Braidwood Station Unit 1

A1R08 ISI Outage Report

Section 3.3 Detailed Inservice Inspection Snubber Listing (Page 4 of 12)

SYSTEM: Main Steam System (MS)

Section XI ISI Identifier Cat. Item Description

Inspection Comments

F-A F01.20 1MS01079S Snubber, integrally attached to pipe

1MS07AA-28" 12R-14 VT-3/4 NRI Functional NRI

VT-3/4 NRIS.N. 16148

F-A F01.20 1MS06007AS 1MS01AB-32.75" 12R-14 VT-2 NRI Snubber, integrally attached to pipe Functional NRI

VT-3/4 NRI

S.N. 11093

F-A F01.20 1MS06007BS 1MS01AB-32.75" 12R-14 VT-3/4 NRI Snubber, integrally attached to pipe Functional NRI

VT-3/4 NRI

S.N. 11094

F-A F01.20 1MS07006AS 1MS01AC-32.75" 12R-14 VT-3/4 NRI Snubber, integrally attached to pipe

S.N. 11153

F-A F01.20 1MS07006BS IMS01AC-32.75" 12R-14 VT-3/4 NRI Snubber, integrally attached to pipe

S.N. 11154

Page 3-26

Page 36: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

CornEd Braidwood Station Unit 1

A1R08 ISI Outage Report

Section 3.3 Detailed Inservice Inspection Snubber Listing (Page 5 of 12)

SYSTEM: Reactor Coolant System (RC) L Section X, ISI Identifier Line Number EPN Relief Program Exam Results Cat. Item C Description Request Notes Summary

Inspection Comments

F-A F01.10 1CV11023S 1RC14AA-2" 12R-14 VT-3/4 NRI Snubber Functional NRI

VT-3/4 NRI S.N. 14783

F-A F01.40 1RCO1BA-A S.G A 12R-14 VT-3/4 NRI Snubber

S. N. 13

F-A F01.40 IRC01BA-B S.G A 12R-14 VT-3/4 NRI Snubber

S. N. 18

F-A F01.40 1RC01BB-A S.G B 12R-14 VT-3/4 NRI Snubber

S.N. 23

F-A F01.40 1RC01BB-B S.G B 12R-14 VT-3/4 NRI Snubber

S. N. 14

F-A F01.40 1RC01BC-A S.G C 12R-14 VT-3/4 NRI Snubber

S.N. 12

F-A F01.40 1RC01BC-B S.G C 12R-14 VT-3/4 NRI Snubber

S.N. 21

F-A F01.40 1RC01BD-A Snubber

S.N. 25

F-A F01.40 1RC01BD-B

Snubber

S.N. 32

F-A F01.10 1RC03006S Snubber

S.N. 11886

NA NA

S.N. 3135

F-A F01.10

S.N. 20882

S.G D

S.G D

1 RC21AC-8"

1 RC20AA-.75"IRC16115S

Snubber

1 RY06017S

Snubber

1 RC24AA-4"

12R-14

12R-14

VT-3/4 NRI

VT-3/4

Functional

VT-3/4

12R-14 VT-314 Functional

VT-3/4

12R-14 VT-3/4

Functional

VT-3/4

VT-3/4

Functional

VT-3/4

12R-14

NRI NRI

NRI

NRI

NRI

NRI

NRI

NRI

NRI

NRI

NRI

NRI

Page 3-27

Page 37: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

CoinEd Braidwood Station Unit 1

AIR08 ISI Outage Report

Section 3.3 Detailed Inservice Inspection Snubber Listing (Page 6 of 12)

SYSTEM: Reactor Coolant System (RC)

Section XI ISI Identifier Line Number!I EPN Relief Program Exam Results Cat. Item Description Request Notes Summary

Inspection Comments

F-A F01.10 1RY06096S 1RC24AA-4" 12R-14 VT-3/4 NRI Snubber Functional NRI

VT-3/4 NRI

S.N. 15332

F-A F01.10 1RY06154S 1RC24AA-4" 12R-14 VT-3/4 NRI Snubber Functional NRI

VT-3/4 NRI S.N. 9720

Page 3-28

Page 38: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

ComrnEd Braidwood Station Unit 1

A1R08 ISI Outage Report

Section 3.3 Detailed Inservice Inspection Snubber Listing (Page 7 of 12)

SYSTEM: Residual Heat Removal System (RH)

Section Xl ISl Identifier Line Number I EPN Relief Program Exam Results

Cat. Item Description Request Notes Summary

Inspection Comments

F-A F01.10 1RHO2012S 1RH01AB-12" 12R-14 VT-3/4 NRI Snubber Functional NRI

VT-3/4 NRI S.N. 8774

F-A F01.10 1RH02205AS 1RH01AA-12" 12R-14 VT-3/4 NRI Snubber Functional NRI

VT-3/4 NRI S.N. 6290

F-A F01.10 1RH02205BS 1RHOIAA-12" 12R-14 VT-3/4 NRI Snubber Functional NRI

VT-3/4 NRI S.N. 4672

F-A F01.20

S.N. 1327

F-A F01.20

1 RH03AB-8"1 RH04012S

Snubber

1 RH08015S

Snubber

1 RH02AB-8"

12R-14

12R-14

VT-314 NRI

VT-3/4 Functional

VT-3/4

NRI NRI

NRI

S.N. 9863

Page 3-29

Page 39: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

CoinEd Braidwood Station Unit 1

AIR08 ISI Outage Report

Section 3.3 Detailed Inservice Inspection Snubber Listing

(Page 8 of 12)

SYSTEM: Reactor Coolant System (RY)

NA NA 1RC93AS01S 1RY34BB-.5" 12R-14 VT-3/4 NRI

Snubber Functional NRI

VT-3/4 NRI

S.N. 22590

F-A F01.10 1RY06121S Snubber

1RY01AA-4" 12R-14 VT-3/4 Functional

VT-3/4

NRI NRI

NRI

S.N. 25610

F-A F01.10 1RY06124S 1RY18A-2" 12R-14 VT-3/4 NRI

Snubber

S.N. 5646

F-A F01.10

S.N. 25435

F-A F01.10

1 RY09012S

Snubber

1RY091 OOS Snubber

1RY06A-3"

1 RY02B-3"

12R-14 VT-3/4

Functional

VT-3/4

12R-14

NRI

NRI

NRI

VT-3/4 N/A

S.N. 25405

Page 3-30

Page 40: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

CornEd Braidwood Station Unit 1

A1R08 ISI Outage Report

Section 3.3 Detailed Inservice Inspection Snubber Listing (Page 9 of 12)

SYSTEM: Steam Generator Blowdown System (SD)

Section Xl ISI Identifier Line Number / EPN Relief Program Exam Results Cat. Item Description Request Notes Summary

Inspection Comments

NA NA 1SD23093S 1SD01CG-2" 12R-14 VT-3/4 NRI Snubber

S.N. 12511

NA NA lSD23095S 1SD01CH-2" 12R-14 VT-3/4 NRI Snubber Functional NRI

VT-3/4 NRI

SN 12283

Page 3-31

Page 41: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

ConmEd Braidwood Station Unit 1

A1R08 ISI Outage Report

Section 3.3 Detailed Inservice Inspection Snubber Listing (Page 10 of 12)

SYSTEM: Safety Injection System (SI)

Section XI ISl Identifier Line Number EPN Relief Program Exam Results Cat. Item Description Request Notes Summary

Inspection Comments

F-A F01.10 1RH02067S 1SI04D-8" 12R-14 VT-3/4 NRI Snubber

S.N. 10571

F-A F01.10 1RH02069S 1SI04D-8" 12R-14 VT-3/4 NRI Snubber Functional NRI

VT-3/4 NRI S.N. 11555

F-A F01.10 1RH02081S 1SI04B-8" 12R-14 VT-3/4 NRI Snubber

S.N. 29330

F01.10 1SIO1003S 1SI09BA-10" 12R-14 VT-3/4 NRI Snubber

S.N. 2543. Supplemental Section Xl Exam performed due to Recordable Indication Identified On Snubber 1S109013S.

F-A F01.10 1SIO1018S 1SI05DA-6" 12R-14 VT-3/4 NRI Snubber

S.N. 16621

F-A F01.10 1SIO1020S 1SI05DA-6" 12R-14 VT-3/4 NRI Snubber

S.N. 16656

F-A F01.20 1SIO1025S 1SI05CA-8" 12R-14 VT-3/4 NRI Snubber

SERIAL NUMBER 20095. Supplemental Section XI Exam performed due to Recordable Indication Identified On Snubber 1S109013S.

F-A F01.10 1SI01029S 1SI05DA-6" 12R-14 VT-3/4 NRI Snubber

S.N. 16729

NA NA 1SI01031S 1SI09BA-10" 12R-14 VT-3/4 NRI Snubber

SERIAL NUMBER 16654. Supplemental Section XI Exam performed due to Recordable Indication Identified On Snubber 1S109013S.

F-A F01.20 1S102003S 1S105CA-8" 12R-14 VT-3/4 NRI Snubber

SERIAL NUMBER 20665. Supplemental Section XI Exam performed due to Recordable Indication Identified On Snubber 1SI09013S.

F-A F01.20 1S103003S ISI05CA-8" 12R-14 VT-3/4 NRI Snubber

S.N. 7391. Supplemental Section XI Exam performed due to Recordable Indication Identified On Snubber 1S109013S.

F-A F01.10 1S103016S 1SI05DD-6" 12R-14 VT-3/4 NRI Snubber Functional NRI

VT-3/4 NRI SERIAL NUMBER 30168.

F-A F01.10 1S103020S 1SI05DD-6" 12R-14 VT-3/4 NRI Snubber Functional NRI

VT-3/4 NRI SERIAL NUMBER 9728. Supplemental Section XI Exam performed due to Recordable Indication Identified On Snubber 1S109013S. Snubber was also scheduled for functional testing.

Page 3-32

Page 42: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

CornEd Braidwood Station Unit 1

A1R08 ISl Outage Report

Section 3.3 Detailed Inservice Inspection Snubber Listing (Page 11 of 12)

SYSTEM: Safety Injection System (SI)

Section Xl ISl Identifier Cat. Item Description

Inspection Comments

F-A F01.10 1S103023S 1SI09BD-10" 12R-14 VT-3/4 NRI

Snubber Functional NRI VT-3/4 NRI

SERIAL NUMBER 8809. Supplemental Section XI Exam performed due to Recordable Indication Identified On Snubber 1S109013S. Snubber was also scheduled for functional testing.

F-A F01.10 1S104003S 1SI09BB-10" 12R-14 VT-3/4 NRI

Snubber

S. N. 20020

F-A F01.10 1S104016S

Snubber

1 Sl05DB-6" 12R-14

S. N. 16732

F-A F01.10 1S104020S

Snubber S. N. 16582

F-A F01.10 1S104022S Snubber

S. N. 10235

F-A F01.20 1S104024S Snubber

SN 11988

F-A F01.20 1S104026S Snubber

1SI05DB-6"

1SI05DB-6"

1SI05CB-8"

1SI05CB-8"

12R-14

12R-14

12R-14

VT-3/4 N/A

VT-3/4 NRI

VT-3/4 NRI

VT-3/4

Functional

VT-3/4

VT-3/4

Functional

VT-3/4

12R-14

NRI

NRI

NRI

NRI

NRI

NRI

SN 6416

F-A F01.20 1SI09006S 1SI05CB-8" 12R-14 VT-3/4 NRI

Snubber

S. N. 2088. Supplemental Section Xl Exam performed due to Recordable Indication Identified On Snubber 1S109013S.

F-A F01.10 1SI09013S 1SI05DC-6" 12R-14 VT-3/4 IND.

Snubber VT-3/4 NRI

S. N.. 4014. R.I. Identified. Load pin assy installed at clamp end instead of load stud assy. Snubber assembly was operable / functional with pin installed. No functional test required. Load stud installed / acceptable. Ref. PIF A-2000-01385. Supplemental exams on other snubbers performed.

F-A F01.10 1S109015AS 1SI05DC-6" 12R-14 V-I Snubber

S. N. 15511. Supplemental Section Xl Exam performed due to Recordable Indication Identified On Snubber 1S109013S.

F-A F01.10 1S109015BS 1SI05DC-6" 12R-14 VT.

Snubber

S. N. 15517. Supplemental Section XI Exam performed due to Recordable Indication Identified On Snubber 1SIO9013S.

F-A F01.10 1S109021S 1SI09BC-10" 12R-14 VT

Snubber

r-2 NRI

-3/4 N/A

-3/4 NRI

S. N. 8781

Page 3-33

Page 43: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

Conrnfd Braidwood Station Unit 1

A1R08 ISI Outage Report

Section 3.3 Detailed Inservice Inspection Snubber Listing (Page 12 of 12)

SYSTEM: Safety Injection System (SI)

Section XI ISI Identifier Line Number/ EPN Relief Program Exam Results Cat. Item Description Request Notes Summary

Inspection Comments

F-A F01.10 1S116029S 1SI18FC-2" 12R-14 VT-3/4 NRI Snubber

S. N. 14789

F-A F01.10 1SI24012S 1SI08JA-1.5" 12R-14 VT-3/4 N/A Snubber

S. N. 14827

Page 3-34

Page 44: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

CornEd Braidwood Station Unit 1

A1R08 ISI Outage Report

Section 3.4.1 Detailed Inservice Inspection Pressure Test Test-Block Listing (Page 1 of 12)

SYSTEM: Component Cooling System (CC)

Section XI ISI Identifier Relief Program Exam Results

Cat. Item Description Request Notes Summary

Inspection Comments

C-H C07.30 A01CC-000002-M04-01A 12R-05 VT-2 C07.70 40 Month Period ASME Section XI Pressure Test. 12R-13

Page 3-35

Page 45: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

CornEd Braidwood Station Unit 1

A1R08 ISI Outage Report

Section 3.4.1 Detailed Inservice Inspection Pressure Test Test-Block Listing (Page 2 of 12)

SYSTEM: Containment Spray System (CS)

Section XI ISI Identifier Relief Program Exam Results

Cat. Item Description Request Notes Summary

Inspection Comments

C-H C07.10 A01CS-000003-M04-01A 12R-05 NOTE13 VT-2 C07.30 40 Month Period ASME Section Xl pressure Test. 12R-13 C07.50 C07.70

C-H C07.10 A01CS-000003-M04-01B 12R-05 VT-2 C07.30 40 Month Period ASME Section Xl pressure Test. 12R-1 3 C07.50 C07.70

C-H C07.10 A01CS-000003-M04-01C 12R-05 VT-2 C07.30 40 Month Period ASME Section Xl Pressure Test. The Test Pressure 12R-13 C07.70 shall be those pressures developed when the Spray Additive Tank is

pressurized with the nitrogen blanket. Use SNOOP or Ultraprobe to inspect nitrogen filled piping, valves and upper portion of Spray Additive Tank containing nitrogen blanket.

Page 3-36

Page 46: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

Braidwood Station Unit 1 AIR08 ISI Outage Report

Section 3.4.1 Detailed Inservice Inspection Pressure Test Test-Block Listing (Page 3 of 12)

SYSTEM: Chemical & Volume Control System (CV)

Section Xl ISl Ide Cat. Item Descri

Inspection Comments

ntifier ption

C-H C07.10 A01CV-000004-M04-01A

C07.30 40 Month Period ASME Section XA Pressure Test.

C07.50

C07.70

12R-05 NOTE12 VT-2

12R-12 NOTE15

12R-13 NOTE17

C-H C07.30 A01CV-000004-M04-011B 12R-05 NOTE12 VT-2

C07.50 40 Month Period ASME Section XA Pressure Test. 12R-12 NOTE15 C07.70 12R-13 NOTE17

Page 3-37

Page 47: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

ComrEd Braidwood Station Unit 1

A1R08 ISI Outage Report

Section 3.4.1 Detailed Inservice Inspection Pressure Test Test-Block Listing (Page 4 of 12)

SYSTEM: Fuel Pool Cooling System (AF)

Section Xl ISl Identifier Relief Program Exam Results

Cat. Item Description Request Notes Summary

Inspection Comments

C-H C07.30 A01FC-000001-M04-01C 12R-05 NOTE13 C07.70 40 Month Period ASME Section XI Pressure Test. 12R-12

12R-1 3

C-H C07.30 A01FC-000001-M04-01D 12R-05 NOTE13 VT-2 C07.70 40 Month Period ASME Section X1 Pressure Test. 12R-12

12R-13

Page 3-38

Page 48: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

CornEd Braidwood Station Unit 1

A1R08 ISI Outage Report

Section 3.4.1 Detailed Inservice Inspection Pressure Test Test-Block Listing (Page 5 of 12)

SYSTEM: Nitrogen System (NT)

Section XI 151 Identifier Relief Program Ex~am Results

Ca.Ie Description Request Notes Sumary

Inspection Comments

C-H C07.30 AO1NT-000004-M04-01A 12R-05 VT-2 C07.70 40 Month Period ASME Section Xl Pressure Test. Perform SNOOP or 12R-13

Ultraprobe examination after electrical penetrations have been pressurized with nitrogen for at least four hours.

Page 3-39

Page 49: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

CornEd Braidwood Station Unit 1

A1R08 ISI Outage Report

Section 3.4.1 Detailed Inservice Inspection Pressure Test Test-Block Listing (Page 6 of 12)

SYSTEM: Process Sampling System (PS)

Section XI ISI Identifier Cat. Item Description

Inspection Comments

C-H C07.30 A01PS-000009-M04-01A C07.70 40 Month Period ASME Section Xl Pressure Test. OPEN valve

1PS9356A and one of the following valves: 1PS9358AB,C,D or 1 PS9351A,B.

12R-05 NOTE13 VT-2

12R-13

C-H C07.30 A01PS-000009-M04-01B 12R-05 NOTE13 VT-2

C07.70 40 Month Period ASME Section XI Pressure Test. OPEN valves 12R-1 3 1 PS9350A and 1 PS9354A.

C-H C07.30 A01PS-000009-M04-01C 12R-05 NOTE13 VT-2

C07.70 40 Month Period ASME Section Xl Pressure Test. OPEN valves 12R-13 1 PS9350B and 1 PS9355A.

C-H C07.30 A01PS-000009-M04-01D 12R-05 NOTE13 VT-2C07.70 40 Month Period ASME Section Xl Pressure Test. OPEN valve

1PS9357A and one of the following valves: 1PS9352A,B,C,D.

C-H C07.30

C07.70

A01PS-000009-M04-01E

40 Month Period ASME Section Xl Pressure Test.

12R-13

12R-05

12R-13

NOTE13 VT-2

Page 3-40

Page 50: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

ComrEd Braidwood Station Unit 1

A1R08 ISI Outage Report

Section 3.4.1 Detailed Inservice Inspection Pressure Test Test-Block Listing (Page 7 of 12)

SYSTEM: Residual Heat Removal System (RH)

Section XI ISI Identifier Relief Program Exam Results Cat. Item Description Request Notes Summary

Inspection Comments

C-H C07.10 A01RH-000003-M04-01A 12R-05 NOTE13 VT-2 C07.30 40 Month Period ASME Section XA Pressure Test. VERIFY loop "A" in 12R-12 C07.50 service. 12R-13 C07.70

C-H C07.10 A01RH-000003-M04-01B 12R-05 NOTE13 VT-2 C07.30 40 Month Period ASME Section XI Pressure Test. VERIFY loop "B" in 12R-12 C07.50 service. 12R-13 C07.70

C-H C07.30 A01RRH-000003-M04-011D 12R-05 NOTE13 VT-2

C07.70 40 Month Period ASME Section XI Pressure Test. 12R-12

12R-13

C-H C07.30 A01RH-000003-M04-01E 12R-05 NOTE13 VT-2

C07.70 40 Month Period ASME Section XI Pressure Test. 12R-12

12R-13

Page 3-41

Page 51: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

Corn•Fd Braidwood Station Unit 1

A1R08 ISI Outage Report

Section 3.4.1 Detailed Inservice Inspection Pressure Test Test-Block Listing (Page 8 of 12)

SYSTEM: Reactor Coolant System (RY)

Section Xl ISI Identifier Cat. Item Description

Inspection Comments

C-H C07.30 A01RY-000004-M04-01A C07.70 40 Month Period ASME Section XI Pressure Test. SNOOP or

Ultraprobe piping during performance of Local Leak Rate Test.

12R-05 NOTE13 VT-2 N/A

12R-12

12R-13

C-H C07.30 A01RY-000004-M04-011B 12R-05 NOTE13 VT-2 N/A

C07.70 40 Month Period ASME Section X1 Pressure Test. SNOOP or 12R-12 Ultraprobe piping during performance of Local Leak Rate Test. 12R-1 3

C-H C07.30 A01RY-000004-M04-01C 12R-05 NOTE13 VT-2 N/A

C07.70 40 Month Period ASME Section XA Pressure Test. SNOOP or 12R-12 Ultraprobe piping during performance of Local Leak Rate Test. 12R-1 3

A01RY-000004-M04-01 E

40 Month Period ASME Section XA Pressure Test. SNOOP or Ultraprobe piping during performance of Local Leak Rate Test.

12R-05 NOTE13

12R-12

12R-13

Page 3-42

C-H C07.30

C07.70

VT-2 N/A

Page 52: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

CarnEd Braidwood Station Unit 1

A1R08 ISI Outage Report

Section 3.4.1 Detailed Inservice Inspection Pressure Test Test-Block Listing (Page 9 of 12)

SYSTEM: Safety Injection System (SI)

Section Xl ISI Identifier Cat. Item Description

Inspection Comments

C-H C07.30 A01SI-00001lC07.50

C07.70

40 Month Per

0-M04-01A

riod ASME Section XI Pressure Test.

12R-05 NOTE13 VT-2

12R-12

12R-13

C-H C07.30 A01SI-000010-M04-01B 12R-05 NOTE13 VT-2 C07.50 40 Month Period ASME Section XI Pressure Test. 12R-12

C07.70 12R-13

C-H C07.30 A01SI-000010-M04-01C 12R-05 NOTE13 VT-2

C07.70 40 Month Period ASME Section XI Pressure Test. 12R-12

12R-13

C-H C07.30 A01SI-000010-M04-01D 12R-05 NOTE13 VT-2

C07.70 40 Month Period ASME Section Xl Pressure Test. 12R-12

12R-13

C-H C07.30 A01SI-000010-M04-01F 12R-05 NOTE13 VT-2 C07.70 40 Month Period ASME Section XI Pressure Test. 12R-12

12R-13

C-H C07.30 A01SI-000010-M04-01G 12R-05 NOTE13 VT-2

C07.70 40 Month Period ASME Section XA Pressure Test. 12R-12

12R-13

C-H C07.10 A01SI-000010-M04-01J 12R-05 NOTE13 VT-2

C07.30 40 Month Period ASME Section XI Pressure Test. 12R-12

C07.70 12R-13

C-H C07.10

C07.30 C07.70

C-H C07.10

C07.30 C07.70

C-H C07.10

C07.30

C07.70

A01SI-000010-M04-01K

40 Month Period ASME Section XI Pressure Test.

A01SI-000010-M04-01L

40 Month Period ASME Section XI Pressure Test.

A01Sl-000010-M04-01M

40 Month Period ASME Section XI Pressure Test.

12R-05

12R-12 12R-13

12R-05

12R-12 12R-13

12R-05

12R-12

12R-13

C-H C07.30 A01SI-000010-M04-01N

C07.70 40 Month Period ASME Section Xl Pressure Test.

C-H C07.30 A01SI-000010-M04-01P

C07.70 40 Month Period ASME Section XI Pressure Test.

12R-05

12R-12

12R-13

12R-05

12R-12

12R-13

NOTE13

NOTE13

NOTE13

NOTE13

NOTE13

VT-2

VT-2

VT-2

VT-2

VT-2

Page 3-43

Page 53: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

Cornid Braidwood Station Unit 1

AIR08 ISI Outage Report

Section 3.4.1 Detailed Inservice Inspection Pressure Test Test-Block Listing (Page 10 of 12)

SYSTEM: Essential.Service Water System (SX)

Section XI ISI Identifier Relief Program Exam Results

Cat. Item Description Request Notes Summary

Inspection Comments

C-H C07.30 A01SX-000011-M04-01N 12R-05 VT-2 C07.70 40 Month Period ASME Section Xl Pressure Test. 12R-13

C-H C07.30 A01SX-000011-M04-01P 12R-05 VT-2 C07.70 40 Month Period ASME Section XI Pressure Test. 12R-13

C-H C07.30 A01SX-000011-M04-01T 12R-05 VT-2 C07.70 40 Month Period ASME Section XI Pressure Test. 12R-13

C-H C07.30 A01SX-000011-M04-01U 12R-05 VT-2 C07.70 40 Month Period ASME Section XI Pressure Test. 12R-13

Page 3-44

Page 54: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

ConmEd Braidwood Station Unit 1

AIR08 ISI Outage Report

Section 3.4.1 Detailed Inservice Inspection Pressure Test Test-Block Listing (Page 11 of 12)

SYSTEM: Containment Chilled Water System (WO)

Section XI ISI Identifier Relief Program Exam Results

Cat. Item Description Request Notes Summary

Inspection Comments

C-H C07.30 A00WO-000001-M04-01C 12R-05 VT-2 C07.70 40 Month Period ASME Section XI Pressure Test. Verify applicable 12R-13

Train operability prior to performing VT-2 Visual Examination of test boundary.

C-H C07.30 A00WO-000001-M04-011D 12R-05 VT-2

C07.70 40 Month Period ASME Section XA Pressure Test. Verify applicable 12R-13 Train operability prior to performing VT-2 Visual Examination of test boundary.

Page 3-45

Page 55: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

ConriEd Braidwood Station Unit 1

A1R08 ISI Outage Report

Section 3.4.1 Detailed Inservice Inspection Pressure Test Test-Block Listing (Page 12 of 12)

SYSTEM: Plant Systems Pressurized During Mode 3 (ZZ)

Section XI ISlIdentifier Relief Program Exam Results

Cat. Item Description Request Notes Summary

Inspection Comments

B-P B15.10 A01ZZ-000005-M04-01A 12R-05 NOTE13 VT-2 NRI B15.20 Periodic (each refueling outage) ASME Section XI Pressure Test. 12R-12 NOTE14 B15.30 12R-13 NOTE17 B15.50 12R-30

B 15.60/70 12R-31 VT- 2 exam performed during mode 3 (NOP/NOT) AIR08. Reference WR# 990132907-01. Systems inservice for 4 hours prior to performing VT-2 exam.

C-H C07.10 A01ZZ-000078-M04-03A 12R-05 NOTE13 VT-2 NRI C07.30 40 Month Period ASME Section Xl Pressure Test. All Code Class 2 12R-12 C07.70 components inside containment. VT-2 Visual Inspection of 12R-13

components outside Missle Barrier may be performed during Mode 1 if conditions permit.

VT- 2 exam performed during mode 3 (NOP/NOT) Al R08. Reference WR# 990132032-01. Systems inservice for 4 hours prior to performing VT-2 exam.

Page 3-46

Page 56: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

CormEd Braidwood Station Unit 1

A1R08 ISI Outage Report

Section 3.4.2 Detailed Inservice Inspection Borated Bolting Listing (Page 1 of 13)

SYSTEM: Chemical & Volume Control System (CV)

Section XI IS15 Identifier Relief Program Exam Results Cat. Item Description Request Notes Summary

Inspection Comments

B-P B15.50 1CV-06-B1 (B-P) 12R-12 VT-2 NRI B15.51 FLANGE BOLTING (4 STUDS) 12R-13

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

C-H C07.70 1CV123 (C-H) 12R-12 C07.80 1CV123VLV (6 STUDS) 12R-13

Insulation not removed for inspection. (Al R08)

B-P B15.70 1CV459 (B-P) 12R-12 VT-2 NRI B15.71 1CV459 GLOBE VLV (6 STUDS) 12R-13

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

B-P B15.70 1CV460 (B-P) 12R-12 VT-2 NRI B15.71 1CV460 GLOBE VLV (6 STUDS) 12R-13

No evidence of leakage (boric acid residue) noted. VT-2 acceptable. Component was examined by using a ladder.

C-H C07.70 1CV8112 (C-H) 12R-12 VT-2 IND. C07.80 1CV8112 VLV (8 STUDS) 12R-13 VT-2 NRI

VT-1 NRI Boric acid residue on body to bonnet bolting, caused by packing leak. Component was deconned, bolting material not affected. (Post VT2) no active leakage NRI. (VT-I) no degradation of studs, nuts, or components affected by the boric acid leakage. AR 990090144 generated to adjust packing.

C-H C07.70 1CV8117 (C-H) 12R-12 C07.80 1CV8117 VLV (6 STUDS) 12R-13

Component not insulated in the area of interest.

C-H C07.70 1CV8121 (C-H) 12R-12 VT-2 NRI C07.80 1CV8121 VLV (4 STUDS) 12R-13

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

C-H C07.70 1CV8142 (C-H) 12R-12 VT-2 NRI C07.80 1CV8142 VLV (6 STUDS) 12R-13

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

C-H C07.70 1CV8143 (C-H) 12R-12 C07.80 1CV8143VLV (4 STUDS) 12R-13

Not insulated in the area of interest, body to bonnet interface, bonnet bolting. (Al R08)

B-P B15.70 1CV8145 (B-P) 12R-12 VT-2 NRI B15.71 1CV8145 GLOBE VLV (6 STUDS) 12R-13

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

C-H C07.70 1CV8146 (C-H) 12R-12 VT-2 NRI C07.80 1CV8146VLV (6 STUDS) 12R-13

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

C-H C07.70 1CV8147 (C-H) 12R-12 VT-2 NRI C07.80 1CV8147 VLV (6 STUDS) 12R-13

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

C-H C07.70 1CV8149A (C-H) 12R-12 VT-2 NRI C07.80 1CV8149A VLV (6 STUDS) 12R-13

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

Page 3-47

Page 57: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

CornEd Braidwood Station Unit 1

A1R08 ISI Outage Report

Section 3.4.2 Detailed Inservice Inspection Borated Bolting Listing (Page 2 of 13)

SYSTEM: Chemical & Volume Control System (CV)

Section XI ISI Identifier Cat. Item Description

Inspection Comments

C-H C07.70 1CV8149B (C-H)

C07.80 1CV8149B VLV (6 STUDS)

12R-12 VT-2 NRI

12R-13

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

C-H C07.70 1CV8149C (C-H) 12R-12 VT-2 NRI C07.80 1CV8149C VLV (6 STUDS) 12R-13

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

B-P B15.70 1CV8153A (B-P) 12R-12 VT-2 NRI B15.71 1CV8153AVLV (6 STUDS) 12R-13

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

B-P B15.70 1CV8153B (B-P) 12R-12 VT-2 IND.

B15.71 1CV8153B VLV (6 STUDS) 12R-13 VT-2 NRI

VT-1 NRI Body to Bonnet dry boric acid residue around valve 1CV8153B. Component was deconned. Bolting material not affected. (Post VT-2) no active leakage NRI. (VT-I) no degradation of studs, nuts or components affected by boric acid leakage. AR 990080720 generated to check bolt torque.

C-H C07.70 1CV8160 (C-H) 12R-12 VT-2 NRI

C07.80 ICV8160 VLV (6 STUDS) 12R-13 No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

C-H C07.70 1CV8320A (C-H) 12R-12 VT-2 IND. C07.80 1CV8320A VLV (16 STUDS) 12R-13 VT-1 NRI

Minor evidence of boric acid leakage noted. Component was deconned. (VT-i) Bolting material not affected by leakage.

C-H C07.70 1CV8320B (C-H) 12R-12 VT-2 IND. C07.80 1CV8320B VLV (16 STUDS) 12R-13 VT-1 NRI

Minor evidence of boric acid leakage noted. Component was deconned. ( VT-1) Bolting material not affected by leakage.

C-H C07.70 1CV8321A (0-H) 12R-12 VT-2 NRI C07.80 1CV8321AVLV (10 STUDS) 12R-13

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

0-H C07.70 1CV8321B (C-H) 12R-12 VT-2 NRI C07.80 1CV8321BVLV (10 STUDS) 12R-13

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

C-H C07.70 1 CV8322A (C-H) 12R-12 VT-2 IND. C07.80 1CV8322AVLV (10 STUDS) 12R-13 VT-2 NRI

VT-1 NRI

Dry boron nonactive packing leak found on 1CV8322A. Component was deconned. Bolting material not affected. (Post VT-2) no active leakage NRI. (VT-1) no degradation of studs,nuts,or components affected by the boric acid leakage. AR 990081584 generated to replace gasket during Al R09.

C-H C07.70 1CV8322B (C-H) 12R-12 VT-2 NRI C07.80 1CV8322B VLV (10 STUDS) 12R-13

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

Page 3-48

Page 58: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

Comrnd Braidwood Station Unit 1

A1R08 ISI Outage Report

Section 3.4.2 Detailed Inservice Inspection Borated Bolting Listing (Page 3 of 13)

SYSTEM: Chemical & Volume Control System (CV)

Section Xl ISI Identifier Relief Program Exam Results

Cat. Item Description Request Notes Summary

Inspection Comments

C-H C07.70 1CV8323A (C-H) 12R-12 VT-2 IND. C07.80 1CV8323A VLV (16 STUDS) 12R-13 VT-2 NRI

VT-1 NRI Boric acid residue found around flange area. Component was deconned. Bolting material not affected. (Post VT-2) no active leakage NRI. (VT-1) no degradation of studs,nuts,or components affected by the boric acid leakage. AR 990081584 generated to replace gasket during Al R09.

C-H C07.70 1CV8323B (C-H) 12R-12 VT-2 NRI C07.80 ICV8323B VLV (16 STUDS) 12R-13

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

C-H C07.70 1 CV8374 (C-H) 12R-12 VT-2 NRI

C07.80 ICV8374VLV (4 STUDS) 12R-13

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

B-P B15.70 1CV8378A (B-P) 12R-12 VT-2 NRI

B15.71 1CV8378A CHECK VLV (16 STUDS) 12R-13

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

B-P B15.70 1CV8378B (B-P) 12R-12 VT-2 NRI

B15.71 ICV8378B CHECK VLV (16 STUDS) 12R-13

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

B-P B15.70 1CV8379A (B-P) 12R-12 VT-2 NRI

B15.71 ICV8379A CHECK VLV (16 STUDS) 12R-13

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

B-P B15.70 1CV8379B (B-P) 12R-12 VT-2 NRI

B15.71 1CV8379B CHECK VLV (16 STUDS) 12R-13

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

C-H C07.70 1CV8389A (C-H) 12R-12 VT-2 NRI

C07.80 ICV8389A VLV (6 STUDS) 12R-1 3 No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

C-H C07.70 ICV8389B (C-H) 12R-12 VT-2 IND.

C07.80 ICV8389B VLV (6 STUDS) 12R-13 VT-2 NRI VT-1 NRI

Packing leak (dry boron) found on 1CV8389B. Component was deconned. Bolting material not affected by packing leak. (Post VT-2) no active leakage NRI. (VT-1) no degradation of studs, nuts,or components affected by boric acid leak.

B-P B15.50 PG-2546C-014 F-2-2 (B-P) 12R-12 VT-2 NRI

B15.51 FLANGED CONNECTION (4 STUDS) 12R-13

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

C-H C07.30 PG-2546C-018 F-1-5 (C-H) 12R-12 VT-2 NRI

C07.40 FLANGED CONNECTION (4 STUDS) 12R-13

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

C-H C07.30 PG-2546C-020 F-1-1 (C-H) 12R-12 VT-2 IND.

C07.40 FLANGED CONNECTION (4 STUDS) 12R-13 VT-2 NRI VT-I NRI

Boric acid residue found around flange area. Component was deconned. Bolting material not affected. (Post VT-2) no active leakage NRI. (VT-1) no degradation of studs,nuts,or components affected by the boric acid leakage. AR 990079961 generated to retorque bolting.

Page 3-49

Page 59: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

Braidwood Station Unit 1

A1R08 IS Outage Report

Section 3.4.2 Detailed Inservice Inspection Borated Bolting Listing (Page 4 of 13)

SYSTEM: Chemical & Volume Control System (CV)

Section XI ISI Identifier Relief Program Exam Results

Cat. Item Description Request Notes Summary

Inspection Comments

C-H C07.30 PG-2546C-041 F-1-1 (C-H) 12R-12 VT-2 IND. C07.40 FLANGED CONNECTION (4 STUDS) 12R-13 VT-2 NRI

VT-i NRI Boric acid residue found around flange area. Component was deconned. Bolting material not affected. (Post VT-2) no active leakage NRI. (VT-1) no degradation of studs,nuts,or components affected by the boric acid leakage. AR 990081339 generated to retorque bolting.

C-H C07.30 PG-2546C-063 F-1-1 (C-H) 12R-12 VT-2 IND. C07.40 FLANGED CONNECTION (4 STUDS) 12R-13 VT-2 NRI

VT-1 NRI

Boric acid residue found around flange area. Component was deconned. Bolting material not affected. (Post VT-2) no active leakage NRI. (VT-i) no degradation of studs,nuts,or components affected by the boric acid leakage. AR 990081332 generated to retorque bolting.

C-H C07.30 PG-2546C-066 F-1-1 (C-H) 12R-12 C07.40 FLANGED CONNECTION (8 STUDS) 12R-13

Component not insulated. Located in the excess letdown HX pit.

C-H C07.30 PG-2546C-068 F-1 (C-H) 12R-12 C07.40 FLANGED CONNECTION (4 STUDS) 12R-13

Insulation not removed for inspection. (Al R08)

B-P B15.50 PG-2546C-071 F-2-3 (B-P) 12R-12 B15.51 FLANGED CONNECTION (4 STUDS) 12R-13

Component not insulated in the area of interest.

C-H C07.30 PG-2546C-073 F-1-1 (C-H) 12R-12 C07.40 FLANGED CONNECTION (8 STUDS) 12R-13

Component un-insulated and examined during AiR07. Insulation permanently removed during AlR07 reference ER 9900979.

C-H C07.30 PG-2546C-076 F-1-3 (C-H) 12R-12

C07.40 FLANGED CONNECTION (8 STUDS) 12R-13

Component not insulated in the area of interest.

C-H C07.30 PG-2546C-081 FL-1-2 (C-H) 12R-12

C07.40 FLANGED CONNECTION (8 STUDS) 12R-13

Component un-insulated and examined during Al R07. Insulation permanently removed during Al R07 reference ER 9900979.

C-H C07.30 PG-2546C-083 FL-1-2 (C-H) 12R-12 VT-2 NRI

C07.40 FLANGED CONNECTION (8 STUDS) 12R-13

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

C-H C07.30 PG-2546C-089 FL-i-1 (C-H) 12R-12 VT-2 NRI C07.40 FLANGED CONNECTION (8 STUDS) 12R-13

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

C-H C07.30 PG-2546C-090 F-1-1 (C-H) 12R-12 VT-2 NRI

C07.40 FLANGED CONNECTION (8 STUDS) 12R-13

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

B-P B15.50 PG-2546C-091 F-2-3 (B-P) 12R-12 VT-2 NRI

B15.51 FLANGED CONNECTION (4 STUDS) 12R-13

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

Page 3-50

Page 60: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

CornEd Braidwood Station Unit 1

A1R08 ISI Outage Report

Section 3.4.2 Detailed Inservice Inspection Borated Bolting Listing (Page 5 of 13)

SYSTEM: Chemical & Volume Control System (CV)

Section XI ISI Identifier Relief Program Exam Results

Cat. Item Description Request Notes Summary

Inspection Comments

C-H C07.30 PG-2546C-093 F-1 (C-H) 12R-12 C07.40 FLANGED CONNECTION (4 STUDS) 12R-13

Insulation not removed for inspection. (Al R08)

B-P B15.50 PG-2546C-101 F-2-3 (B-P) 12R-12 VT-2 NRI B15.51 FLANGED CONNECTION (4 STUDS) 12R-13

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

C-H C07.30 PG-2546C-108 F-1-1 (C-H) 12R-1 2 C07.40 FLANGED CONNECTION (8 STUDS) 12R-13

Component un-insulated and examined during Al R07. Insulation permanently removed during AI R07 reference ER 9900979.

C-H C07.30 PG-2546C-119 F-1-1 (C-H) 12R-12 C07.40 FLANGED CONNECTION (4 STUDS) 12R-13

Component un-insulated and examined during A1R07. Insulation permanently removed during AIR07 reference ER 9900979.

C-H C07.30 PG-2546C-119 F-2-1 (C-H) 12R-12 C07.40 FLANGED CONNECTION (4 STUDS) 12R-13

Component un-insulated and examined during Al R07. Insulation permanently removed during Ai R07 reference ER 9900979.

C-H C07.30 PG-2546C-122 F-1-1 (C-H) 12R-12 C07.40 FLANGED CONNECTION (4 STUDS) 12R-13

Component un-insulated and examined during Ai R07. Insulation permanently removed during Al R07 reference ER 9900979.

C-H C07.30 PG-2546C-122 F-2 (C-H) 12R-12 C07.40 FLANGED CONNECTION (4 STUDS) 12R-13

Component un-insulated and examined during A1 R07. Insulation permanently removed during Ai R07 reference ER 9900979.

Page 3-51

Page 61: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

CornEd Braidwood Station Unit 1

A1R08 ISI Outage Report

Section 3.4.2 Detailed Inservice Inspection Borated Bolting Listing (Page 6 of 13)

SYSTEM: Pressurizer (PZR)

Section XI ISI Identifier Relief Program Exam Results

Cat. Item Description Request Notes Summary

Inspection Comments

B-P B15.20 1PZR-01-B1 (B-P) 12R-12 VT-2 NRI B15.21 MANWAY BOLTING (16 TOTAL) 12R-13

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

Page 3-52

Page 62: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

ConmEd Braidwood Station Unit 1

A1R08 ISI Outage Report

Section 3.4.2 Detailed Inservice Inspection Borated Bolting Listing (Page 7 of 13)

SYSTEM: Reactor Coolant System (RC)

Section XI ISI Identifier Cat. Item Description

Inspection Comments

B-P B15.50 1RC-19-B3 (B-P) 12R-12 VT-2 IND.

B15.51 FLANGED CONNECTION (4 STUDS) 12R-13

Heavy boron accumulation around flange noted. Bolting material and gasket being replaced during A1R08, reference WR 980118188.

B-P B15.50 1RC-20-B1 (B-P) 12R-12 VT-2 IND. B15.51 FLANGED CONNECTION (4 STUDS) 12R-13

Heavy boron accumulation around flange noted. Bolting material and gasket being replaced during A1R08, reference WR 980120215.

B-P B15.50 1RC-23-B1 (B-P) 12R-12 VT-2 IND.

B15.51 FLANGED CONNECTION (4 STUDS) 12R-13

Heavy boron accumulation around flange noted. Gasket, studs, and nuts are being replaced during Al R08, reference WR 980120187.

B-P B15.50 1RC-27-Bl (B-P) 12R-12 VT-2 IND.

B15.51 FLANGED CONNECTION (4 STUDS) 12R-13

Heavy boron accumulation around flange noted. Bolting material and gasket being replaced during A1 R08, reference WR 980120201.

B-P B15.70 1RC8001A (B-P) 12R-13 VT-2 NRI

B15.71 1RC8001A VALVE BOLTING (24 TL) 12R-30

No evidence of leakage (bodc acid residue) noted. VT-2 acceptable.

B-P B15.70 1RC8002A (B-P) 12R-13 B15.71 1RC8002A VALVE BOLTING (24 TL) 12R-30

Minor evidence of boric acid leakage noted. Component was deconned. Bolting material not affected by leakage.

B-P B15.70 1RC8003A (B-P)

B15.71 1RC8003A ANGLE GLOBE(12 STUDS)

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

12R-13

12R-30

VT-2

VT-2

IND.

NRI

B-P B15.70 1RC8036A (B-P) 12R-12 VT-2 IND.

B15.71 1RC8036A GLOBE VLV (6 STUDS) 12R-13 VT-2 NRI

VT-1 NRI

Packing leak (dry boron) found on 1IRC8036A. Component was deconned. Bolting material not affected by packing leak. (Post VT-2) no active leakage NRI. (VT-1) no degradation of studs, nuts,or components affected by boric acid leak.

B-P B15.70 1RC8036B (B-P) 12R-12 VT-2 NRI

B15.71 1RC8036B GLOBE VLV (6 STUDS) 12R-13

No evidence of leakage (bodc acid residue) noted. VT-2 acceptable.

B-P B15.70 1RC8036C (B-P) 12R-12 VT-2 IND. B15.71 1RC8036C GLOBE VLV (6 STUDS) 12R-13 VT-2 NRI

VT-i NRI

Packing leak (dry boron) found on I RC8036C. Component was deconned. Bolting material not affected by packing leak. (Post VT-2) no active leakage NRI. (VT-i) no degradation of studs, nuts,or components affected by bodc acid leak. AR 990081752 generated to adjust packing.

B-P B15.70 1RC8036D (B-P) 12R-12 VT-2 IND.

B15.71 1RC8036D GLOBE VLV (6 STUDS) 12R-13 VT-2 NRI VT-1 NRI

Dry boron non-active seeping up through component bolting. Component was deconned. Bolting material not affected by the boron leak. (Post VT-2) no active leakage NRI. (VT-1) no degradation of studs,nuts,or components affected by the boric acid leakage. AR 990081583 generated to replace gasket during Al R09.

B-P B15.70 1RC8037A (B-P) 12R-12 VT-2 NRI

B15.71 IRC8037A GLOBE VLV (6 STUDS) 12R-13

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

Page 3-53

Page 63: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

CornBd Braidwood Station Unit 1

A1R08 ISI Outage Report

Section 3.4.2 Detailed Inservice Inspection Borated Bolting Listing (Page 8 of 13)

SYSTEM: Reactor Coolant System (RC)

Section XI ISI Identifier Relief Program Exam Results

Cat. Item Description Request Notes Summary

Inspection Comments

B-P B15.70 1RC8037B (B-P) 12R-12 VT-2 IND. B15.71 1RC8037B GLOBE VLV (6 STUDS) 12R-13 VT-2 NRI

VT-1 NRI

Packing leak (dry boron) found on 1RC8037B. Component was deconned. Bolting material not affected by packing leak. (Post VT-2) no active leakage NRI. (VT-1) no degradation of studs, nuts,or components affected by boric acid leak. AR 990081813 generated to adjust packing.

B-P B15.70 1RC8037C (B-P) 12R-12 VT-2 IND. B15.71 1RC8037C GLOBE VLV (6 STUDS) 12R-13 VT-2 NRI

VT-1 NRI Packing leak (dry boron) found on 1RC8037C. Component was deconned. Bolting material not affected by packing leak. (Post VT-2) no active leakage NRI. (VT-1) no degradation of studs, nuts,or components affected by boric acid leak. AR 990081759 generated to adjust packing.

B-P B15.70 1RC8037D (B-P) 12R-12 VT-2 NRI B15.71 1RC8037D GLOBE VLV (6 STUDS) 12R-13

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

B-P B15.70 1RC8085 (B-P) 12R-12 VT-2 NRI B15.71 1RC8085 GATE VLV (16 STUDS) 12R-13

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

B-P B15.10 1RV-03-STUDS (01 TO 54, B-P) 12R-13 VT-2 NRI B15.11 CLOSURE HEAD STUDS (54 TOTAL) 12R-31

No evidence of boric acid leakage. Insulation removed for inspection.

B-P B15.30 1SG-05-SGB-01 (B-P) 12R-13 VT-2 NRI B15.31 PRIMARY MANWAY (20 STUDS) 12R-31

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

B-P B15.30 1SG-05-SGB-02 (B-P) 12R-13 VT-2 NRI

B15.31 PRIMARY MANWAY (20 STUDS) 12R-31

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

B-P B15.30 1SG-06-SGB-01 (B-P) 12R-13 VT-2 NRI

B15.31 PRIMARY MANWAY (20 STUDS) 12R-31

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

B-P B15.30 ISG-06-SGB-02 (B-P) 12R-13 VT-2 N/A

B15.31 PRIMARY MANWAY (20 STUDS) 12R-31

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

B-P B15.30 1SG-07-SGB-01 (B-P) 12R-13 VT-2 NRI

B15.31 PRIMARY MANWAY (20 STUDS) 12R-31

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

B-P B15.30 1SG-07-SGB-02 (B-P) 12R-13 VT-2 NRI

B15.31 PRIMARY MANWAY (20 STUDS) 12R-31

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

B-P B15.30 1SG-08-SGB-01 (B-P) 12R-13 VT-2 NRI

B15.31 PRIMARY MANWAY (20 STUDS) 12R-31

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

Page 3-54

Page 64: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

CornEd Braidwood Station Unit 1

AIR08 ISI Outage Report

Section 3.4.2 Detailed Inservice Inspection Borated Bolting Listing (Page 9 of 13)

SYSTEM: Reactor Coolant System (RC)

Section Xl ISI Identifier Relief Program Exam Results

Cat. Item Description Request Notes ummary

Inspection Comments

B-P B15.30 1SG-08-SGB-02 (B-P) 12R-13 VT-2 NRI B15.31 PRIMARY MANWAY (20 STUDS) 12R-31

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

Page 3-55

Page 65: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

ComrEd Braidwood Station Unit 1

A1R08 ISI Outage Report

Section 3.4.2 Detailed Inservice Inspection Borated Bolting Listing (Page 10 of 13)

SYSTEM: Residual Heat Removal System (RH)

Section XI ISI Identifier Relief Program Exam Results

Cat. Item Description Request Notes Summary

Inspection Comments

C-H C07.30 1RH-02 F-1-1 (C-H) 12R-12 VT-2 NRI C07.40 FLANGED CONNECTION (20 STUDS) 12R-13 VT-1 NRI

No evidence of leakage (boric acid residue) noted, VT-2 acceptable. Signs of past leakage noted, minor corrosion on bolting. VT-1 exam performed on bolting, no degradation noted on bolting material.

C-H C07.30 1 RH-02 F-2-1 (C-H) 12R-12 VT-2 NRI C07.40 FLANGED CONNECTION (20 STUDS) 12R-13 VT-1 NRI

No evidence of leakage (boric acid residue) noted, VT-2 acceptable. Signs of past leakage noted, minor corrosion on bolting. VT-1 exam performed on bolting, no degradation noted on bolting material.

C-H C07.30 1RH-02 F-4 (C-H) 12R-12 VT-2 NRI C07.40 FLANGED CONNECTION (8 STUDS) 12R-13

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

C-H C07.30 1RH-03 F-2 (C-H) 12R-12 VT-2 NRI C07.40 FLANGED CONNECTION (24 STUDS) 12R-13

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

C-H C07.30 IRH-05 F-1 (C-H) 12R-12 VT-2 NRI C07.40 FLANGED CONNECTION (24 STUDS) 12R-13

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

C-H C07.30 1RH-05 F-2 (C-H) 12R-12 VT-2 NRI C07.40 FLANGED CONNECTION (24 STUDS) 12R-13

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

C-H C07.30 1RH-05 F-3-1 (C-H) 12R-12 VT-2 IND. C07.40 FLANGED CONNECTION (12 STUDS) 12R-13 VT-1 IND.

Boron accumulation around entire flange connection (gasket leak), component was deconned and re-examined. (VT-1) results, thread wastage observed on bolting material. AR 990080608 generated to replace flange gasket and bolting. PIF #A2000-01149 Component 1 FE-0619

C-H C07.30 1RH-06 F-1-1 (C-H) 12R-12 VT-2 IND. C07.40 FLANGED CONNECTION (12 STUDS) 12R-13 VT-2 NRI

VT-1 NRI Boron accumulation around entire flange connection. Component was deconned. Bolting material not affected. (Post VT-2) no active leakage NRI. (VT-1) no degradation of studs or nuts affected by the boric acid leakage. AR 990080395 generated to change flange gasket. Component 1 FE-061 1

C-H C07.30 1RH-07 F-2-1 (C-H) 12R-12 VT-2 NRI C07.40 FLANGED CONNECTION (20 STUDS) 12R-13

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

C-H C07.30 1RH-07 F-3-1 (C-H) 12R-12 VT-2 NRI C07.40 FLANGED CONNECTION (20 STUDS) 12R-13

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

C-H C07.30 1RH01MB (C-H) 12R-12 C07.40 FLANGED CONNECTION (12 STUDS) 12R-13

Component no longer exists, strainer replaced with spool piece.

C-H C07.70 1RH606 (C-H) 12R-12 VT-2 NRI C07.80 1RH606 VLV (4 STUDS) 12R-13

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

Page 3-56

Page 66: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

CornEd Braidwood Station Unit 1

A1R08 ISI Outage Report

Section 3.4.2 Detailed Inservice Inspection Borated Bolting Listing (Page 11 of 13)

SYSTEM: Residual Heat Removal System (RH)

Section XI ISI Identifier Relief Program Exam Results

Cat. Item Description Request Notes Summary

Inspection Comments

C-H C07.70 1 RH607 (C-H) 12R-12 VT-2 NRI C07.80 1RH607 VLV (4 STUDS) 12R-13

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

C-H C07.70 1RH610 (C-H) 12R-12 VT-2 NRI C07.80 1RH610 VLV (16 STUDS) 12R-13

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

C-H C07.70 1RH611 (C-H) 12R-12 VT-2 NRI C07.80 1RH611 VLV (16 STUDS) 12R-13

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

C-H C07.70 1RH618 (C-H) 12R-12 VT-2 NRI C07.80 1RH618VLV (4 STUDS) 12R-13

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

C-H C07.70 1RH619 (C-H) 12R-12 VT-2 NRI C07.80 1RH619VLV (4 STUDS) 12R-13

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

B-P B15.70 1RH8701B (B-P) 12R-13 VT-2 NRI B15.71 1RH8701B GATE VALVE (18 STUDS) 12R-30

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

C-H C07.70 1RH8708B (C-H) 12R-12 VT-2 NRI C07.80 1RH8708B VLV (6 STUDS) 12R-13

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

C-H C07.70 1RH8724A (C-H) 12R-12 VT-2 NRI C07.80 1RH8724A VLV (16 STUDS) 12R-13

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

C-H C07.70 1RH8724B (C-H) 12R-12 VT-2 NRI C07.80 1RH8724B VLV (16 STUDS) 12R-13

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

C-H C07.70 1RH8730A (C-H) 12R-12 VT-2 NRI C07.80 1RH8730A VLV (16 STUDS) 12R-13

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

C-H C07.70 1RH8730B (C-H) 12R-12 VT-2 NRI C07.80 1RH8730B VLV (16 STUDS) 12R-13

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

Page 3-57

Page 67: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

CornEd Braidwood Station Unit 1

A1R08 ISI Outage Report

Section 3.4.2 Detailed Inservice Inspection Borated Bolting Listing (Page 12 of 13)

SYSTEM: Reactor Coolant System (RY)

Section Xl ISI Identifier Relief stProgram Exa Results C m Description Reque Notes Summary

Inspection Comments

B-P B15.70 1RY455B (B-P) 12R-12 VT-2 NRI B15.71 1RY455B GLOBE VALVE (8 STUDS) 12R-13

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

B-P B15.70 1RY455C (B-P) 12R-12 VT-2 NRI B15.71 1RY455C GLOBE VALVE (8 STUDS) 12R-13

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

B-P B15.70 1RY8000A (B-P) 12R-12 VT-2 NRI B15.71 1RY8000A GATE VALVE (16 STUDS) 12R-13 VT-1 NRI

Minor boron residue around body to bonnet connection. Component deconned and re-examined, VT-2 NRI. VT-1 performed on bolting NRI.

B-P B15.70 1RY8000B (B-P) 12R-12 VT-2 NRI B15.71 1RY8000B GATE VALVE (16 STUDS) 12R-13 VT-1 NRI

Minor boron residue around body to bonnet connection. Component deconned and re-examined, VT-2 NRI. VT-1 performed on bolting NRI.

Page 3-58

Page 68: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

CornEd Braidwood Station Unit 1

AIR08 ISI Outage Report

Section 3.4.2 Detailed Inservice Inspection Borated Bolting Listing (Page 13 of 13)

SYSTEM: Safety Injection System (SI)

Section XI ISI Identifier Relief Program Exam Results

Cat. Item Description Request Notes Summary

Inspection Comments

B-P B15.70 1S18948A (B-P) 12R-13 VT-2 NRI B135.71 1S18948A CHECK VALVE (18 STUDS) 12R-30

No evidence of leakage (boric acid residue) noted. VT-2 acceptable.

B-P B15.70 1S18949A (B-P) 12R-13 VT-2 NRI B15.71 1S18949A VLV (16 STUDS) 12R-30

No evidence of leakage (boric acid residue) noted. VT-2 acceptable. Component not insulated in the area of interest.

Page 3-59

Page 69: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

CornEd Braidwood Station Unit 1 AlR08 ISI Outage Report

4.0 NIS-1 FORM (OWNER'S REPORT FOR INSERVICE INSPECTION)

As required by IWA-6000 of Section XI, this section contains the Owner's Report for Inservice Inspections, Form NIS-1, for the preservice and inservice examination of Class 1 and Class 2 pressure retaining components and their supports.

Page 4-1

Page 70: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

ComnEd Braidwood Station Unit 1

A1R08 ISI Outage Report

FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONS As required by the Provisions of the ASME Code Rules

(Page 1 of 4)

1. Owner CornEd, P.O. Box 767, Chicago, Illinois 60690 (Name and Address of Owner)

2. Plant Braidwood Nuclear Power Station, 35100 S. Rt 53 Suite 84, Braceville, Illinois 60407 (Name and Address of Plant)

3. Plant Unit 1 4. Owner Certificate Of Autherization (if required) N/A

5. Commercial Service Date 7/29/88 6. National Board Number for Unit N-195

7. Components Inspected See Section 3 of this report.

Manufacturer Component or Manufacturer or Installer State or National Appurtenance or Installer Serial No. Province No. Board No.

Component Cooling N/A N/A N/A N/A System (CC)

Containment Spray N/A N/A N/A N/A System (CS)

Chemical & Volume N/A N/A N/A N/A Control System (CV)

Fuel Pool Cooling N/A N/A N/A N/A System (AF)

Feedwater System N/A N/A N/A N/A (FW)

Main Steam System N/A N/A N/A N/A (MS)

Nitrogen System (NT) N/A N/A N/A N/A

Process Sampling N/A N/A N/A N/A System (PS)

Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in., (2) information in items 1 through 6 of this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

Page 4-2

Page 71: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

Con-Ed Braidwood Station Unit 1

ALR08 ISI Outage Report

FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONS As required by the Provisions of the ASME Code Rules

(Page 2 of 4)

1. Owner ComEd, P.O. Box 767, Chicago, Illinois 60690 (Name and Address of Owner)

2. Plant Braidwood Nuclear Power Station, 35100 S. Rt 53 Suite 84, Braceville, Illinois 60407 (Name and Address of Plant)

3. Plant Unit- 1 4. Owner Certificate Of Autherization (if required) N/A.

5. Commercial Service Date 7/29/88 6. National Board Number for Unit N-195

7. Components Inspected See Section 3 of this report.

Manufacturer Component or Manufacturer or Installer State or National Appurtenance or Installer Serial No. Province No. Board No.

Pressurizer (PZR) N/A N/A N/A N/A

Reactor Coolant N/A N/A N/A N/A System (RC)

Residual Heat N/A N/A N/A N/A Removal System (RH)

Reactor Coolant N/A N/A N/A N/A System (RY)

Steam Generator N/A N/A N/A N/A Blowdown System (SD)

Safety Injection N/A N/A N/A N/A System (SI)

Essential Service N/A N/A N/A N/A Water System (SX)

Containment Chilled N/A N/A N/A N/A Water System (WO)

Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in., (2) information in items 1 through 6 of this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

Page 4-3

Page 72: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

CornEd Braidwood Station Unit 1

A1R08 ISI Outage Report

FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONS As required by the Provisions of the ASME Code Rules

(Page 3 of 4)

1. Owner ComEd, P.O. Box 767, Chicago, Illinois 60690 (Name and Address of Owner)

2. Plant Braidwood Nuclear Power Station, 35100 S. Rt 53 Suite 84, Braceville, Illinois 60407 (Name and Address of Plant)

3. Plant Unit 1 4. Owner Certificate Of Autherization (if required) N/A

5. Commercial Service Date 7/29/88 6. National Board Number for Unit N-195

7. Components Inspected See Section 3 of this report._

Manufacturer Component or Manufacturer or Installer State or National Appurtenance or Installer Serial No. Province No. Board No.

Plant Systems N/A N/A N/A N/A Pressurized During Mode 3 (ZZ)

Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in., (2) information in items 1 through 6 of this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

Page 4-4

Page 73: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

Cor-Ed Braidwood Station Unit 1

AIR08 ISI Outage Report

FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONS As required by the Provisions of the ASME Code Rules

(Page 4 of 4)

(BACK)

8. Examination Dates November 15, 1998 to April 5, 2000

9. Inspection Period Identification: First Inspection Period

10. Inspection Interval Identification: Second Inspection Interval

11. Applicable Edition of Section XI 1989 Addenda No Addenda

12. Date/Revision of Inspection Plan: Second Interval ISI Program Plan, Revision 2, submitted on September 2, 1998

13. Abstract of Examinations and Tests. Include a list of examinations and tests and a statement concerning status of work required for the Inspection Plan.

A summary of examinations is discussed in Section 2, with a detailed listing of examinations contained in Section 3.

14. Abstract of Results of Examination and Tests.

A summary and discussion of examination results are contained with the detailed listing of examinations provided in Section 3.

15. Abstract of Corrective Measures.

A summary of corrective measures are contained with the detailed listing of examinations provided in Section 3.

We certify that a) the statements made in this report are correct, b) the examination and tests meet the Inspection Plan as required by the ASME Code, Section XI, and c) corrective measures taken conform to the rules of the ASME Code, Section XI.

Certificate of Authorization No. (if applicable) Date 4,,7 . 20 0o Signed

N/A Expiration Date

ComEdOwner

CERTIFICATE OF INSERVICE INSPECTION

I, the undersigned, holding a valid commision issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of L-' - o ' and employed by Y\ n - " , - -. of kA--,N--T-r- r7--. c. C•K- have inspected the components described in this Owner's Report during the period

VL- ' s- to -4- 16 - " . , and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described in this Owner's Report in accordance with the Inspection Plan and as required by the ASME Code, Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, and corrective measures described in this Owner's Report. Futhermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

_ _ _-,Commisions ,--- . " tozJ Inspector's Signature National Board, State, Province, and Endorsements

Date Le "-2--1. 20

Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/2 in. x 11 in.,

(2) information in items 1 through 6 of this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

Page 4-5

Page 74: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

CornEd Braidwood Station Unit 1 AlR08 ISI Outage Report

5.0 REPORT OF CONTAINMENT DEGRADATION

The Nuclear Regulatory Commission (NRC) has amended its Code of Federal Regulations (10CFR 50.55a) to incorporate by reference the 1992 Edition with the 1992 Addenda of Subsection IWE (Requirements for Class MC and Metallic Liners of Class CC Components of Light-Water Cooled Power Plants) and Subsection IWL (Requirements for Class CC Components of Light-Water Cooled Power Plants) of ASME Section XI, Division 1, with specified modifications and a limitation noted. This segment is included in the Inservice Inspection Summary report required by IWA-6000 of ASME Section XI to meet the reporting conditions specified in 10CFR 50.55a(b)(2)(viii)(A)-(E) and 10CFR 50.55a(b)(2)(ix)(A)-(E).

5.1 Containment Tendon Water Surveillance

Braidwood Station performs an annual surveillance of a random sample of the containment anchorage components that are located below grade. Grade elevation at Braidwood is 401'. The purpose of the surveillance is to monitor the post tensioning systems for evidence of free water and identify any adverse affects the free water may have on the tendon anchorage components. The Surveillance Procedure employed to perform this inspection is ComEd Procedure BwVSR 5.5.6-2 "Containment Tendon Water Inspection Surveillance". A summary of the required Unit 1 data is attached (Pages 5-2 to 5-3). The NRC Code Of Federal Regulations, 1OCFR 50.55a Codes and Standards (ix) Examination of Concrete Containments (D) requires that the licensee report the following conditions, if they occur, in the ISI Summary Report required by ASME Section XI, IWA-6000:

* The sampled sheathing filler grease contains chemically combined water exceeding 10 percent by weight or the presence of free water.

* The absolute difference between the amount of sheathing filler grease removed and

that replaced exceeds 10 percent of the tendon net duct volume.

Leakage is detected during general visual examination of the containment surface.

In accordance with the Braidwood Technical Requirements Manual (TRM) and ASME Section XI, IWL -3300, items which do not meet the acceptance standards shall be evaluated. An Engineering Evaluation Report stating the following shall be prepared:

"* Description of the condition of the tendon.

"* The condition of the concrete (especially at tendon anchorage locations).

"* The tolerance on concrete cracking.

"* The cause of the condition that does not meet the acceptance standards.

"* The acceptability of the concrete containment without repair of the item.

"* Whether or not repair or replacement is required and if required, the extent, method, and completion date for the repair or replacement.

"* The corrective actions taken.

"* The extent, nature, and frequency of additional examinations.

Page 5-1

Page 75: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

CornEd Braidwood Station Unit 1 AlR08 ISI Outage Report

References: NRC Code of Federal Regulations, l0CFR 50.55a Codes and Standards ASME Section XI Boiler and Pressure Vessel Code, Subsection 1WL, 1992 Edition with the 1992 Addenda. Braidwood Station Technical Requirements Manual (TRM)

Description of Surveillance:

Braidwoocd Station performs an annual surveillance of a random sample of containment tendon anchorage components located below grade. Grade elevation at Braidwood is 401'. The purpose of the surveillance is to monitor the post tensioning systems for evidence of free water and identify any adverse affects the free water may have on the post tensioning system and concrete. The procedure employed to perform this inspection is ComEd Procedure BwVSR 5.6.6-2 "Containment Tendon Water Inspection Surveillance". Braidwood has the 170 wire "INRYCO" 0.25" diameter wire tendon system installed in both units.

Description Of Conditions Which Exceeded Acceptance Standards:

A small quantity of free water was collected from five anchorage locations. The acceptance standard for the quantity of free water collected from any location is zero. Free water was not collected in sufficient quantities to perform a chemical analysis.

The following tables provide a summation of the free water that was collected and the results of the chemical analysis that was performed on the grease samples. No free water was included in the grease samples. All grease samples were obtained from areas immediately adjacent to the tendon anchorage components. Tendons with an "H" prefix are in a horizontal configuration. Tendons with a "V" prefix are in a vertical configuration. Conditions where the acceptance criteria was exceeded are in bold print.

Page 5-2

Page 76: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

CrnmEd Braidwood Station Unit 1 AlR08 ISI Outage Report

TABLE 1

Braidwood Unit 1 1999 Surveillance Free Water Ouantification and Chemical Analysis Results

Tendon Anchorage Elevation Quantity Of pH Level Comments EPN End Of Free Water Laboratory

Anchorage Collected

HlAC-A Shop 378'-8" zero N/A No Free Water Collected.

H1AC-C Field 378'-8" 1 ounce N/A Free water not collected in sufficient quantity for laboratory analysis.

H1BA-A Field 378'-8" 1 ounce N/A Free water not collected in sufficient quantity for laboratory analysis.

H1BA-B Shop 378'-8" 1 ounce N/A Free water not collected in sufficient quantity for laboratory analysis.

H1CB-C Shop 378'-8" zero N/A No Free Water Collected.

HlCB-B Field 378'-8" 2 ounces N/A Free water not collected in sufficient quantity for laboratory analysis.

H2AC-A Shop 381 '-3" zero N/A No Free Water Collected.

H2CA-C Field 381 '-3" 3 ounces N/A Free water not collected in sufficient quantity for laboratory analysis.

V41-B Field 362'-0" zero N/A No Free Water Collected.

V42-B Field 362'-0" zero N/A No Free Water Collected.

Page 5-3

Page 77: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

CornEd Braidwood Station Unit 1 AlRO8 ISI Outage Report

TABLE 2

Braidwood Unit 1 1999 Surveillance Free Water Sheathing Filler Grease Chemical Analysis Results

Tendon Anchorage Quantity Moisture Water Water Water Neutralization No. EPN End Of Free Content Soluble Soluble Soluble Reserve Alkalinity

Water (% by Chlorides Nitrate Sulfide (Base No.) Collected wt.) (ppm) (ppm) (ppm) mg/KOH/g

Note 6 Note 1 Note 2 Note 3 Note 4 Note 5

H1AC-A Shop zero <0.10% <.0.50 1.25 ppm <.0.50 61.7 mg KOH/g ppm ppm

H1AC-C Field 1 ounce <0.10% <.0.50 0.62 ppm <.0.50 53.1 mg KOH/g ppm ppm

H1BA-A Field 1 ounce <0.10% <.0.50 <.0.50 <.0.50 35.9 mg KOH/g ppm ppm ppm

H1BA-B Shop 1 ounce <0.10% <.0.50 1.25 ppm <.0.50 53.4 mg KOH/g ppm ppm

H1CB-C Shop zero 0.88% <.0.50 1.87 ppm <.0.50 49.4 mg KOH/g ppm ppm

HlCB-B Field 2 ounces 0.56% <.0.50 <.0.50 <.0.50 51.8 mg KOH/g ppm ppm ppm

H2AC-A Shop zero <0.10% <.0.50 0.94 ppm <.0.50 27.3 mg KOH/g ppm ppm

H2CA-C Field 3 ounces <0.10% <.0.50 2.18 ppm <.0.50 55.7 mg KOH/g ppm ppm

V41-B Field zero 0.13% <.0.50 <.0.50 <.0.50 30. lmg KOH/g ppm ppm ppm

V42-B Field zero <0.10% <.0.50 <.0.50 <.0.50 45.6 mg KOH/g ppm ppm ppm

Note 1: Acceptance Standard for Free Water is zero.

Note 2: Acceptance Standard for Moisture Content: Moisture Content shall not exceed 10% by wt.

Note 3: Acceptance Standard for Water Soluble Chlorides: 10 ppm max.

Page 5-4

Page 78: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

CornEd Braidwood Station Unit 1

A1R08 ISI Outage Report

Note 4: Acceptance Standard for Water Soluble Nitrates: 10 ppm max.

Note 5: Acceptance Standard for Water Soluble Sulfides: 10 ppm max.

Note 6: Acceptance Standard for Reserve Alkalinity (Base No.): The base no. shall be at least 50% of the installed value, unless the value is 5 or less, in which case the as installed value shall be no less than zero. If the tendon duct is filled with a mixture of materials having various installed numbers, the lowest numbers shall govern acceptance. The containment tendon ducts at Braidwood are filled with "Visconorust 2090P-4" Casing Filler For Tendon Sheathing. The neutralization base no. as published by the manufacturer is a minimum of 35. Therefore the acceptance criteria as applied to the tendon surveillance inspections at Braidwood is a minimum of 50% of the installed value or a minimum of 17.5 mg KOH/g.

Evaluation Of Conditions and Corrective Actions

Description Of The Condition Of The Tendons:

The tendon anchorage components including the anchor heads, shims, bearing plates, button heads, bushings, and button heads were cleaned of all grease using approved solvents. A visual examination (VT-1) was performed on all tendon anchorage components. The exams resulted in the identification of no condition where significant degradation was identified. No active corrosion exists on the anchor heads, shims, button heads, or bushings. No active corrosion exists on the portion of the bearing plates that is covered by the grease can. Some minor active corrosion (surface rust) exists on the portion of the bearing plates that is outside the sealing surface of the grease can and gasket. This corrosion is minor and does not adversely affect the structural integrity of the bearing plate.

Description Of The Condition Of The Concrete (Tendon Anchorage Locations):

The concrete extending 24" beyond each bearing plate was visually examined using the VT-iC method. The tolerance for cracking is "no crack width shall exceed a width of 0.010". No crack widths exceeded the acceptance standards. The concrete surrounding all bearing plates is sound and not structurally degraded. Some discoloration and moist areas were identified in small areas around tendons V41-B and V42-B. The grease cans were removed from these locations. No free water was collected. The grease and anchorage components are in good condition.

Root Cause of The Condition That Did Not Meet The Acceptance Standards:

The source of the free water is indeterminate. The free water may be a result of condensation forming in the grease can or the intrusion of very small quantities of free water from external sources.

Acceptability Of The Containment Without Repair:

The containment is acceptable as is without repair. The existence of the free water in the tendon grease can does not affect the structural integrity of the containment. The following provides justification for this conclusion:

* The chemical analysis results for the grease samples indicated no conditions where the acceptance standards were exceeded.

* A visual examination (VT-1) was performed on the tendon anchorage components.

Page 5-5

Page 79: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

COMEd Braidwood Station Unit 1 AIR08 ISI Outage Report

No conditions that indicate structural degradation were identified. The anchorage components are in good condition. With the exception of that identified on the outer portions of the bearing plates, no active corrosion was identified. No cracks were identified. The quantity of effective wires (not unseated or protruding) matched that recorded during previous inspections.

* A visual examination (VT-iC) was performed on the concrete extending 24" out from each tendon anchorage location. The acceptance standard on cracking is no crack width shall exceed 0.010" in width. No cracks exceeded 0.010" in width. The concrete is in good condition. No conditions indicative of structural degradation were identified.

0 The quantity of sheathing filler grease that was replaced versus that removed was within 10% of the tendon net duct volume in all cases.

* The grease cans for all tendon locations located below grade were examined. 162 vertical tendon grease cans and 66 horizontal tendon grease cans were examined. Each can was examined for corrosion, grease leakage, and deformation. One tendon location (V146) was identified to have minor grease leakage from the gasket connection. The grease can was removed and the gasket was replaced. V146 was not scheduled to be included in the free water surveillance exam scope. No free water was collected when the grease can was removed. The grease condition is normal. No actions beyond replacement of the gasket were performed. Minor surface rust was identified on the grease cans and bolting. No corrosion that challenges the structural integrity or leak tightness of the grease cans was identified. No deformation or additional grease leakage was identified.

* The issue of the effect free water has on the corrosion protection properties of the grease has been previously discussed with the manufacturer of the sheathing filler grease. The corrosion protection medium "Viscosity 2090P-4 Casing Filler" will continue to provide protection provided the components are coated, regardless of the presence of moisture. All anchorage components were verified as completely coated with sheathing filler grease in the as found condition.

* The quantity of free water collected from the Unit 1 Tendon locations is insignificant.

Corrective Actions Taken:

The grease was removed from the tendon anchorage locations and replaced. Grease sample chemical analysis was completed in accordance with ASME Section XI, IWL -2525.2. No deficiencies were identified as a result of the corrective actions.

Extent, Nature, and Frequency Of Additional Examinations:

The Unit 1 containment is acceptable as is and repair or replacement of the tendon components is not required as a result of the identification of the small quantity of water collected during the 1999 surveillance. The Unit 1 post tensioning system will continue to be monitored on an annual basis. Free water has not been collected from the vertical tendon locations. No free water was collected from the vertical tendons that were disturbed during the steam generator replacement project in 1998. Although the vertical tendons will continue to be monitored, more focus will be placed on the horizontal tendons during the 2000 surveillance. The inspection scope will include a minimum of 15 % of the horizontal tendons located below grade or 20 anchorage locations.

Page 5-6

Page 80: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

ComrEd Braidwood Station Unit 1 AIR08 ISI Outage Report

5.2 IWE General Visual Exam and VT-3

A Section XI IWE general visual examination was performed on the Unit 1 containment liner plate area directly below the Moisture Barrier (MB) and adjacent to the 3" thick Cerablanket during A1R08. The entire length of MB (approximately 400' in length), between the containment liner and the basemat floor, located inside containment at elevation 377'-0", was removed to perform this examination.

A Section XI IWE general visual examination of the Class CC liner was performed on Unit 1 prior to the containment integrated leak rate test (CILRT) conducted during refueling outage AlR07 in October of 1998. The liner area below the MB was not accessible during AlR07. The Unit 1 examination was expanded into this inaccessible area below MB as a result of localized areas of corrosion found beneath the MB sealing surface observed on the Unit 2 liner plate surface during A2R07. Also, in order to complete corrective action #5 from Braidwood, Unit 2 Engineering Evaluation No. 99-IWE-01, the entire unit 1 MB, including the Cerablanket, was removed. CoinEd Procedure SPP GV-2 was used to perform this general visual examination. Exam Data Form No. GV-2-1 was generated to characterize the extent of corrosion on the Class CC liner.

The IWE examination beneath the MB found approximately thirty small indications on the Class CC liner (total length < 1% of length examined), which were determined to be recordable per the General Visual acceptance criteria.

The worst case corrosion caused a reduction of 32% of the liner's nominal thickness. The degraded areas of the Class CC liner were accepted by analysis. The degraded surface area was hand scraped and cleaned to sound surface per the instructions of a level III coatings specialist. After surface preparation, the liner was solvent wiped to prepare the surface for recoating with service level I qualified coatings. Informational Ultrasonic Tests (UT's) were performed in the vicinity of liner degradations prior to the recoating of the liner to obtain nominal linear thicknesses. These UTs indicate, in areas in the vicinity of the degradation the liner plate thickness varies from .23" to .27". The UTs also show that the degradation appears to be only on the front side of the liner that is being examined. The MB was restored in accordance with the design detail in all areas, and to improve performance, it was enhanced by addition of a sloping profile to drain water away.

The degradation of the liner is suspected to be result of breaches in the moisture barrier resulting from aging and mechanical damage from impact of tools, barrels and scaffolding from maintenance activities. This combined with impingement of water, possibly the result of fan cooler condensate leakage, established the conditions for liner degradation. Water had a path to flow between the MB and the liner. Water was entrapped below the Tremco epoxy sealant and absorbed into the Cerablanket material. The surface of the liner remained wet at the elevation of the Cerablanket, and with the presence of oxygen, the liner began to degrade. The localized maximum loss of material was measured to be 5/64 of an inch, which is 32 % of the liners nominal thickness of 8/32 inch. Much of the degraded areas had reductions of 1/64 - 2/64 of an inch, or a little over 10% reduction.

There was also a VT-3 examination of the newly installed moisture barrier. There were three surface tears found. The apparent cause of these tears was the dragging of air hoses over the still uncured MB. These areas were repaired and reexamined and found acceptable. There is no further action required at this time. The MB will remain on its regular IWE examination frequency.

Page 5-7

Page 81: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

ComrEd Braidwood Station Unit 1 A1R08 ISI Outage Report

Engineering Evaluation

Engineering Evaluation No. 00-IWE-01 Rev. 0 was performed and corroded areas were shown by analysis to be acceptable.

Local defects on the Braidwood containment liner plate up to 1/8 inch in depth are acceptable per Calculation 5.2.6-BRW-98-1090 Revision 2. The reduction of plate thickness in all areas of degradation is less than 1/8 inch. The maximum of 1/8 inch reduced thickness of the liner plate has been shown by analysis to satisfy the requirements of the design specifications.

Additional Examinations

Approximately twenty localized areas of the degraded liner surfaces below the MB (< 1% of surface area) on the class CC liner will be categorized as an augmented examination area per IWE Table 2500-1. The augmented examination will be scheduled into the IWE Program requiring VT-I and volumetric examinations of the areas with minimum wall thickness for the next 3 consecutive examination periods.

Corrective Actions

1. The liner area directly below the MB approximately 4" in width, around the entire perimeter of the containment was scraped, cleaned, and solvent wiped.

2. The degradation (rust) was removed from the liner under the direction of the level 3 coatings specialist. This allowed for liner examination, preparation for application of a Service Level 1 coating and MB installation.

3. A Service Level 1 qualified coating was applied to the portion of the liner where the MB and Cerablanket was installed

4. New dry Cerablanket material was installed below the MB. 5. The MB removed was restored per existing design details except for enhanced profile which will

facilitate runoff of moisture from the MB and per work order 990058824. 6. Approximately twenty areas of the Class CC liner below the MB will be categorized as Category

E-C in the Braidwood Unit 1 IWE Program Plan. 7. An engineering evaluation 00-IWE-01, Rev. 0, was completed on the degraded liner.

Page 5-8

Page 82: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

CornEd Braidwood Station Unit 1

A1R08 ISI Outage Report

6.0 NIS-2 FORM (OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS)

SUMMARY OF NIS-2 FORMS

SYSTEMS NIS-2 TOTALS

AUXILIARY FEED WATER

COMPONENT COOLING

CHEMICAL & VOLUME CONTROL

CONTAINMENT SPRAY

MAIN STEAM

REACTOR COOLANT

REACTOR BUILDING

REACTOR EQUIPMENT DRAIN

RESIDUAL HEAT REMOVAL

REACTOR PRESSURIZER

STEAM GENERATOR BLOWDOWN

SAFETY INJECTION

ESSENTIAL SERVICE WATER

TOTAL NIS-2 (TOTAL - 44)

(AF)

(CC)

(CV)

(CS)

(MS)

(RC)

(RB)

(RE)

(RH)

(RY)

(SD)

(SI)

(SX)

CLASS 1 CLASS 2 CONTAINMENT 2

2

1 5

1

8

6

5

1

1

2

6

2

1

1

15 + 24 + 5

93 TOTAL ATTACHED PAGES

Page 6-1

Page 83: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 4 Information Use

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI

1. Owner Commonwealth Edison Name

One First National Bank Plaza, Chicago, IL 60690 Address

2. Plant Braidwood Nuclear Power Station Name

RR 1 Box 84, Braceville, IL 60407 Address

3. Work Performed by N-P/S&W;Braidwood NPS Name

RR'I Box 80, Braceville, IL 60407

Date 10/16/98

Sheet 1 of 4

Unit One

WR# 980003860, 980003862, 980003863, 980003864Repair Organization, P.O. No., Job No., etc.

Type Code Symbol Stamp Not Applicable Authorization No. Not Applicable Expiration Date Not Applicable

Address 4. Identification of System Unit One Auxiliary Feedwater

PL 5. (a) Applicable Construction Code Section 11ii 1974 Edition, S'74Addenda, N/A Code Case

(b) Applicable Edition of Section XI Utilized for Repairs or Replacement Components 1989 / No Addenda

6. Identification of Components Repaired or Replaced and Replacement Components

(2)

8.

Description of Work Installed, modified and deleted supports per ECN 000847M

Test Conducted: Hydrostatic F] Pneumatic [] Nominal Operating Pressure [] Exempt [

VT 3/L Other-l] Pressure psi Test Temp. OF

Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8-1/2 in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82) This Form (e00030) may be obtained from the Order Dept., ASME, 345 E. 47" St. New York, N.Y. 10017 I

0[847M-1H]

(6/23/97)

1

20A 20B 20C 20D 20E 20F 20G 20H Name of Name of Manufacturer National Other Year Repaired, ASME Component Manufacturer Serial No. board Identification Built Replaced, Code; Stamped

No. ' or Replacement (Yes or No) IAF04071R ITT Grinnell N/A N./A Existing Rod 140N 1986 Replaced No

1AF04071R ITT Grinnell N/A N./A Existing Turnbuckle 230 1986 Replaced No

IAF0407IR ITT Grinnell N/A N.IA Existing Hex Nut 1986 Replaced No

IAF04071R ITT Grinnell N/A N./A Existing Rod 253N 1986 Replaced No

Page 84: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 4 Information Use

FORM NIS-2 (Back)

9. Remarks See N-5 Code Data Report # 1C-AF-lH Applicable Manufacturer's Data Reports to be attached

A 4 DcA q --/4o'zl R eA.s o -4•,,,,/ I. Z

-I4F660c371? e./d. ,4>4,, _., a e4ac eL.2 L2(.i"

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this Replacement conforms to the rules of the ASME Code, Section XI. mi,,nzm

Type Code Symbol Stamp Not Applicable

Certificate of Authorization No. Not Applicable Expiration Date Not Applicable

Signgd Date //",2 ,19 • OeoeO dsDeag TMtt

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois and employed by The HSB I&I Co., Inc. of Hartford, CT have inspected the components described in this Owner's Report during the period • • '- , IS to %.\- L • -9 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in the Owner's Report in accordance with the requirements of the ASME Code, Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or co nectqdwt hs npcin

- -Commissions- -f t = r-6

Date •,L •- 19 ce. • •,

(12/82)

2

(6/23/97)

2

Page 85: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 4 Information Use

FORM NIS-2 SUPPLEMENTAL SHEET

1. Owner: Commonwealth Edison Company One First National Plaza Chicago, Illinois 60690

2. Plant Braidwood Nuclear Power Station R. R. #1, Box 84 Braceville, Illinois 60407

3. Work Performed by: N-P/S&W; Braidwood NPS Name

RR 1. Box 80 Braceville. IL 60407 Address

Sheet 3 of 4 Date 10/16/98

Unit One

WR# 980003860, 980003862, 980003863, 980003864 P.O. No., WR No., etc.

Type Code Symbol Stamp Not Applicable Authorization No. Not Applicable Expiration Date Not Applicable

4. Identification of System Unit One Auxiliary Feedwater

5a. Applicable Construction Code Section III Code Cases N/A

19 74 Edition o'74 Addenda

5.b Applicable Edition of Section XI utilized ______________19 89 Edition No Addenda

6. Identification of Components Repaired or Replaced and Replacement Components.

National Repaired, ASME Name of Name of Manufacturer Board Other Year Replaced, Code; Stamped

Component Manufacturer Serial No. No. Identification Built or Replacement (Yea or No)

1AF04071R ITT Grinnell N/A N./A Existing Eyenut 290 1986 Replaced No

IAF04071R ITT Grinnell N/A N./A Existing Beam Lug 66 1986 Replaced No

1AF0407 IR ITT Grinnell N/A N./A M97-08975 N/A Replacement No Strut 640N IAF0407 1R ITr Grinnell N/A N./A MRR# 12624 [from N/A Replacement No

SPipe Clamp 1FW09020S] 1AF0407 1 R ITT Grinnell N/A N./A M98-00347 N/A Replacement No

'• Load Stud [A89-01934] IAF0407I" R -ITT Grinnell N/A N./A M96-09325 N/A Replacement No I/"- Hex Nuts _____ _ _ _ __Ht# CKZ ___

1AF04072R FIT Grinnell N/A N./A Existing Strut 420N N/A Replaced No

1AF04072R FI'T Grinnell N/A N./A M97-00232 N/A Replacement No Strut 21 IN IAF04033V ITT Grinnell N/A N/A 1AF04033V 1986 Replaced No

IAF04082R FIT Grinnell N/A N/A M97-08979 N/A Replacement No Pipe Clamp I IAF04082R ITT Grinnell N/A N/A M97-08027 N/A Replacement No Strut 21 IN IAF04003V ITT Grinnell N/A N/A IAF04003V 1986 Replaced No

IAF04083R IT" Grinnell N/A N/A M97-00232 N/A Replacement No Strut 211 N IAF06037R ITT Grinnell N/A N/A 1AF06037R 1986 Replaced No

1AF06037R ITT Grinnell N/A NIA M97-08034 N/A Replacement No Strut 211 N

No IAF06038R ITGrinnell NZA N/A IAF06038R 1986 Replaced N

"A'Wli a r' rVý(Final)

'.,'- 3ce I -Lt-

(6/23/97)3

Page 86: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5Al Revision 4 Information Use

FORM NIS-2 SUPPLEMENTAL SHEET

1. Owner: Commonwealth Edison Company One First National Plaza Chicago, Illinois 60690

2. Plant Braidwood Nuclear Power Station R. R. #1, Box 84 Braceville, Illinois 60407

3. Work Performed by: N-P/S&W; Braidwood NPS Name

RR 1. Box 80 Braceville. IL 60407Address

Sheet 4 of 4 Date 10/16/98

Unit One

WR# 980003860, 980003862, 980003863, 980003864P.O. No., WR No., etc.

Type Code Symbol Stamp Not Applicable Authorization No. Not Applicable Expiration Date Not Applicable

4. Identification of System Unit One Auxiliary Feedwater

5a. Applicable Construction Code Section III Code Cases N/A

19 74 Edition S'74 Addenda

5.b Applicable Edition of Section XI utilizedi 19 89 Edition No Addenda

6. Identification of Components Repaired or Replaced and Replacement Components.

(Final)

WL '11A"11 REVIEW

"- 4

(6/23/97)4

National Repaired, ASME Name of Name of Manufacturer Board Other Year Replaced, Code; Stamped

Component Manufacturer Serial No. No. Identification Built or Replacement (Yes or No)

1AF06038R FTT Grinnell N/A N/A M98-05952 NIA Replacement No Rod 140N 1AF06038R ITT Grinnell N/A N/A M98-05951 N/A Replacement No Eyenut 290N 1AF06038R Nova N/A N/A M96-10991 N/A Replacement No Hex Nut Ht. BKU IAF06038R I17 Grinnell N/A N/A M97-08419 N/A Replacement No Beam Lug 66N IAF06038R ITT Grinnell N/A N/A M97-08736 N/A Replacement No

Clamp 295N I I I IIII_ I IAF06044G FIT Ginnell N/A NIA 1AF06044G 1986 Replaced No

IAF05005X ITT Ginnell N/A N/A IAF05005X 1986 Replaced No

1AF05073G IT Ginnell N/A N/A IAF05073G 1986 Replaced No

Page 87: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI

Owner Commonwealth Edison Company Date ;-f Z) 6_)

One First National Plaze. Chicago. IL 60690 Sheet / of "2.

2. Plant Braidwood Nuclear Power Station Unit 01'

R R 1 Box 84. Braceville. IL 60407 __ ___/__ _- __ AO'r* Rep-t Organmiatn P o. No.. job No.. etc.

3. Work Performed by Mechanical Maintenance Type Code Symbol Stamp Not Applicable Braidwood Nuclear Power Station Authorization Number Not Appable R.R. 1 Box 84. Braceviile. IL 60407 Expiration Date NotApplicable A00m"15

4 Identification of System C.- *•*Aa•t), n er'T" C-ooI0116

5. (a) Applicaoie Construction Code .c. c , 9- /• Edition. L) 1i., Addenda. Al/A Code Case (b) Appiicaote Edition of Section XI Utilizea for Repairs :-Replacement 1989

-. Identification of Components Repairea or Replaced ano Peoiacement Components

Nlram nf Num& nf F Mnnufacturpr National Other Year I Renaired. ASME

7. Description of Work Ppl/Aee ý_~ ~ s d~ 8. Test Conducted: 0 Hydrostatic 0 Pneumajc )&Nominal Operating Pressure

VTZ PcA71mea 0 Other: Pressure /JAI psi Test Temp. AmAwj' IF "1- a-oo

Note: Supplemental sheets in form of lists, sketches, or drawings may be used. provided (1) size is 8-1/2 in. x 11 in., (2) information in items 6 on this report is included on eacn sheet, and (3) eacr. sneet is numbered and the number of sheets is recorded at the top of this forrr

(12/82) This Form (e00030) may be obta:reo from the Order Dept.. ASME, 345 E. 47th St. New York. N.Y. 10017

5

1

Page 88: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 (Back)

9. RemarKs Aopticaote VJ.anuacturer s Data ReoOfls to be attacned

CERTIFICATE OF COMPLIANCE

We certify that the statements mace in the reoort are corre,- and this R1&cm&L conforms to the rules of the ASME Code. Sectic (Repait or ii

Type Code Symbol Stamp

Certificate of Authorization No.

Signed

A)OlL App~ahine-

~/~M t40 Ida !

Expiration Date A.)1 an 31,'l' 1.

Date

CERTIFICATE OF INSERVICE INSPECTION

I. the undersigned, holding a valid commission issuea cy the National Board of Boiler and Pressure Vessel Inspectors and the State Province of .-.. , o and employed by ' A-' t ' C , of ,)'L--d

have inspected the components described in this Owners Report during the penod t \• I '. of - : o

and state that to the best of my knowledge and belief. the Owner has oerformed examinations and taken corrective measures described in this Ow: Report in accordance with the requirements of the ASME Code. Section Xl.

By signing this certificate. neitner the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinE and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any mar any personal injury or property damage or a loss of any kira ansing from or connected with this inspection.

J- Commissions 0 k '0"einsoea"or s S s.atu-e NMtnai Board. State. Provwi. aid Enorsamen

Date__ _ _ _ _ _ _ _ ' -

(12/82)

"- 6

2

Page 89: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section Xi

Owner Commonwealth Edison Company

One First National Plaze. Chicaoo. IL 60690

2. Plant Braidwood Nuclear Power Station_____________

RR. I Box 8.4. Braceville. IL 60407

3. Work Performed by Mechanical Maintenance Braidwood Nuclear Power Station RR 1 Box 84. Braceville. IL 60407

Date -.7 -/I /_-&c/

Sheet /

Unit

of 2

0/

Reoay Orgmianman P 0. No.. Jm No.. w

Type Code Symbol Stamp Not Applicable Authorization Number Not Applicable

Expiration Date Not Applicable

4 Identification of System - O~4,-~~Y1-rCool I re-

5. (a) Applicable Construction Code . ,rc,7..2. L.. "-.= -Y / Edition. We 72 Addenda, (b) Appiicaoie Edition of Section XI Utilized for Repairs =- Replacement 1989

A -!• Code Case

5- Identification of Components Reoaireo or Reolaced ano Reolacement Components

Name of Name of Manufacturer National Other Year Repaired. ASME Component Manufacturer Serial No. board Identification Built Replaced. Code:

No. or Staffe I____ I____ Replaerenei (Yes or 11

4I V A,0 I' • d-~f'• AJ/A e,/ ce

I ~ ~ ~ , t510 X-Y oIr~~CieP7. 3Z7-60 IA~ e 7__________________________ ________________________________ ____________________________________________________________

I r_________________________ _________________________________ ___________________________________ ________________________ ________________

7. Description of Work 141-- L

8. Test Conouczed:

4-?,-oo

C3 Hydrostatic

0 Other:

O Pneuma:c QL Nomir

Pressure 1141' -5 psi

nal Operating Pressure

Test Temp. Ar1keuIML IF

Note: Supplemental sheets in form of lists, sketches, or drawr.ngs may be used. provided (1) size is 8-1/2 in. x 11 in.. (2) information in items

6 on tnis report is included on eacrn sheet, and (3) eacr. sneet is numbered and the number of sheets is recorded at the top of this fotr.

(12/82) This Form (e00030) may be obta:-eo from the Order Dept.. ASME. 345 E. 47th St. New York. N.Y. 10017

'77

1

0) 4 P* OQ 90'? 3 4') in

-- @G-- - -

411ýa jZALýle-

Page 90: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 (Back)

Apo~b=* n.e dwu.aa r s Data Reports to Do ataaiea

CERTIFICATE OF COMPLIANCE

We certify that the statements maoe in the reoort are corre,' and this conforms to the rules of the ASME Code. Sectic i Repair -eý

Type Code Symool Stamp

Certificate of Authonzation No. Expiration Date (L-/,,ricle /II* -i-i--.

Si

Signed

-wwIoie -D*w.T1Date

CERTIFICATE OF INSERVICE INSPECTION

I. the undersigned. holding a valid commission issueo Cy the National Board of Boiler and Pressure Vessel Inspectors and the State Province of •'-•--•- -0 " \s and employed by 7 C- . of P • Lj.. have inspected the components described in this Owners Report during the penod \ 's- - of -4-. "-, and state that to the best of my knowledge and belief. the Owner has oerformed examinations and taken corrective measures described in this Ow Report in accordance with the reouarements of the ASME Code. Section Xl.

By signing this certificate. neitner the Inspector nor his employer makes any warranty, expressed or implied. concerning the exammi and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any mat any personal injury or property damage or a loss of any kira0 ansing from or connected with this inspection.

- L-..-..~...----------Commissions 2 i In lvecior I i gtiatI e Natglrm Op raO. Siate. P , ow -10 11rW

Date 4%• -

(12182)

-8

2

0. Remaris

A30i- 412121IC-101-160 if

A )A P A e%,nl it jo

Page 91: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI

Owner Cc-.":Tonwealth Edison Comoany_ N•ame

One =rst National Plaze. Chicaao, IL 60690 Accress

Plant Bra.z-ood Nuclear Power Station Name

R R Box 84. Braceville. IL 60407 Address

3. Work Perfonred Dy Mechanical Maintenance Braidwood Nuclear Power Station R R. 1 Box 84 Braceville. IL 60407

A4iwessd• 4, Identification -:' System /lesoe')I1

Date -7 -1 -V V

Sheet 1 of

Uni Ot

A•,i&j ??C0ooo/ -01 Repar Organ.ation P 0 No. Joo No.. etc.

Type Code Symbol Stamp Not Applicable Authorization Number Not Applicable

Expiration Date Not Applicable

204r sAeY AOR 6 IA /-,doAA4 eo,,I-T C/'46c%'

5. (a) Applicac e Construction Code ,..2L., "..` 7 Edition. 57 5"- Addenda. / Code Case

tb) Aoplica..e Edition of Section Xl Utihzea or Repars c, Replacement *".-9

6. Identification c. Components Repaired or Replaced and Replacement Components

7 Description oi0 .OrK

a ETest Conduc-e=:

,�-'4/ rAC

C- Hydrostatic 0 Pneuma::c .,0-Nominal Operating Pressure

Pressure _ psi Test Temp. _ IF

X( OPE#J Flow. PR#$. resk 13wV5AR 9C. A~fae fe~O * eA VIZRaqej*6e00 Note: Supplemer:ai sheets in form of lists, sketches, or drawings may be used. provided (1) size is 8-1/12..: .11 in., (2) information in items 1 thfoUW

6 on this re.ort is included on eacn sheet. and (3) eacn sneet is numbered and the number of sheets is recorded at the top of this form.

"-2/82) This Form (e00030) may be obtaired from the Order Dept.. ASME. 345 E. 47th St. New York. N.Y. 10017

1

2.

Name of Name of Manufacturer National Other Year Repaired. ASME Component Manufacturer Serial No. board Identification Built Replaced. Code.

No. or Stamped Replacement (Yes or No)

444 /0"OEA MT/A e v /Ol 7-A• LA)•o, ' 7 ' // ~ #t./,• <1 fTp t s,•.• •

0 Other:

,-.-,d/ ,ý,C &- E:.& " %- C-i 16 7ý.

Page 92: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 (Back)

9. Remarks ,,,,Aohlei Manulactto.r s Data Reoorls to De attacaeO

CERTIFICATE OF COMPLIANCE

We certify that the statements made in the report are correct and this 9 lcrem,,,2,L. conforms to the rules of the ASME Code. Section Xl.

Type Code Symbol Stamp A/O /1,.. *,/ l•k

Certificate of Authorization No. /t? Expiration Date ,cb ble

Signed n____ Date _f_

Lrow•. or uwner s oftw-,e. i tne

CERTIFICATE OF INSERVICE INSPECTION

I, the undersigned. holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of

Province of - .- " and employed by A - - k. ' of

have inspected the components described in this Owner s Report during the eriod F- - of z '-&- = ,

and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's

Report in accordance with the requirements of the ASME Code. Section X1.

By signing this certificate. neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations

and corrective measures described in this Owner s Report. Furthermore. neither the Inspector nor his employer shall be liable in any manner for

any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

SL Commissions Is. S"• •

-wec-or s S-gnatw Natooai Boaai. State. Provmce. am Endoe.•wem

Date 44'- -

(12/82)

10

2

Page 93: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI

Owner Commonwealth Edison Company_ Na&e

One First National Plaze. Chicaao. IL 60690

2. Plant Braidwood Nuclear Power Station Nalme

R R 1 Box 84. Braceville. IL 60407

3. Work Performed by Mechanical Maintenance Braidwood Nuclear Power Station R.R. 1 Box 84. Braceville. It 60407

4 Identification of System r V - 1

Date '.A , - 6_1 (._

Sheet__.L. of

Unit 01

Rmewa Orn~atuon P 0. Nao.. jfo No.. W

Type Code Symbol Stamp Not Applicable Authorizaton Number Not Apipicable

Expiration Date Not Applicable

eK- C" reý(CtA-o5. (a) Applicable Construction Code.S;T. -rtI/..-- Z. . t :21 Edition. {4) '- ;2- Addenda. _ ..it__ Code Case

(b) Appicaoie Edition of Section Xl Utilized fo!r Repairs =-Replacement 1989

5 Identification of Components Reoaired or Reolaced ano Reolacement Components

Name of Name of Manufacturer National Other Year Repaired, ASME

Component Manufacturer Senal No. board Identification Built Replaced. Code: No. or Stowpe

/)a V_ I C-L) 91;1-3 A1W Replamnenw (Yea or I'

4/ . IA 16,,nM AIL // .e_ _ _ _ __ _ __ _ t1/A k- " l/kf b.4-q q &6

"IIe Alh'79'i0-019 iLuL ,r .e 02g3 & & 10 PA/If "r e-1 -le be q-,4Ai 101,4_ J _AlD

7. Description oftWorkc Ahs/eed " ~el bA y~e.. -46 t Wd4 0W ./' it

8. Test Conducted:

vTZ -estfoaovia +Z-00O

O3 Hydrostatic

O Other:

-1 Pneuma-c RK Nomir

Pressure 21.1 psi

hal Operating Pressure

Test Temp. Aml ep'l IF

Note: Supplemental sheets in form of lists. sketches. or draw-.ns may be used, provided (1) size is 8-1/2 in. x 11 in.. (2) information in items 6 on this reoort is included on eacn sheet, and (3) eac'. sneet is numbered and the number of sheets is recorded at the top of this formi

(12/82) This Form (eOO030) may be obta:.ea from the Order Dept.. ASME. 345 E. 47th St. New York. N.Y. 10017

1

Page 94: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 SUPPLEMENTAL SHEET

I Owner: Commonwealth Edison Company One First National Plaza Chicago. Illinois 60690

2. Plant: Braidwood Nuclear Power Station R.R. #1. Box 84 Braceviwle. Illinois 60407

3. Work Performed by ___,______-____

Nwne

AP4A,,vA. Alii,' e~4- P-ue-r S-,4c"

Sheet S of 3 Date __;k_________

Unit 0 f

Unit 0 t

UJ-W' qqoO93 8'7 -o/ P 0. No.. WR NO.. etc

Type Code Symbol Stamp Authorization No. )IA Expiration Date ,01A

4. Identification of System CLV- cA - Uo.,,. C--A-c--,-o.

5. (a) Applicable Construction Code ,ect. i / 6-!- .

Code Cases /J/ý4

ib) Applicable Edition of Section XI Utilized _ _ _ _ _ _ _ _ 19

6. Identification of Components Repaired or Replaced and Reolacement Comoonents.

19 "7/ Edition

Edition

W0 '7, Adde,

Addenda

Name of Name of Manufacturer National Other Year Repaired. ASME

Component Manufacturer Serial No. Board Identification Built Repa•d• Code; No. or Stamp

I Replmmunwit (Yes or hi

A~~a1OVA Z9 6,i IfaIi~e 1oT/)31M-P1-q/e A~)14 _____________

Ajj_ DTAfl Agl' b le, -MQ7-b-7'/3* q- ~ I A "_________________

_____ ____ _____ _____________ I ________

___________ I___________ __________I __________________________ ~1*_________

____ ___ ___ _ _ ____ ___ ___C _ ____ ___ ___ ___ ____ ___ ___ _______ ___ ___ ___ ___

____ ____ I I _ __ _

_______________I _,______

12(Final)

3

Addenda

Page 95: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 (Back)

Aoptwa"~ vdw~nacturer S Data Re~onS to Do ansaerW

CERTIFICATE OF COMPLIANCE

We cenrty trhat the statements maoe in the reoort are corre-- and this P conforms to the rules of the ASME Code. Sectic (Reo rL=-

Type Code Symbol Stamp

Certificate of Authorization No. 00t 4p12[oin4LdgII -

Expiration Date A

Signed Date 413126_

CERTIFICATE OF INSERVICE INSPECTION

I. the undersigned. holding a valid commission issueo ty the National Board of Boiler and Pressure Vessel inspetors and the State Province of -- - and employed by - of - C.. have inspected the components descnbed in this Owners Report during the period .c) - -z :ZN of . and state that to the best of my knowledge ano oelief. the Owner has oerformed examinations and taken corrective measures described in this Ow Report in accordance with the reoutrements of the ASME Code. Section X L

By signing this certificate. neitner the Inspector nor hzs employer makes any warranty, expressed or implied, concerning the examin;

and corrective measures oescnrbe in this Owners Report. Furthermore. neither the Inspector nor his employer shall be liable in any mai any personal injury or property damage ora loss of any kiro arising from or connected with this insoection.

CommissionsN~nali oarad State. Piri. WW B~noosmmn

Date J g-

(12182)

13

2

9. Remarxs

Date

•r -- '• - 19 z.=.._..•= o

tJ Aonli cA4te Is

Page 96: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI

Owner Cc,.--onwealth Edison Company Name

One =irst National Plaze. Chicago, IL 60690 A iorm

Plant Bra.cwood Nuclear Power Station Nam.

RR R Box 84. Braceville. IL 60407 Aoems

3. Work Perforn-reo oy Mechanical Maintenance =raidwood Nuclear Power Station R R. 1 Box 84 Braceville. IL 60407

Date /0ý

Sheet 1

Unit I

of /

P-ui 9 9 0o3f316-41 Repai Organtzation P 0 No Job No. M.

Type Code Symbol Stamp Not Applicable Authionzation Number Not Applicable

Expiration Date Not Applicable

4. Identification :' System r t/ A O* 8.' ? • -•P1d-e ll' /,/- f6.L5

5. (a) Applicac e Constru ction Code 7 / Edition.5~'2 Addenda. ______Code Case (b) Applicac.e Edition of Section Xl Utilized f6r Repairs c" Replacement "---._9

6. Identification c4 Components Repaired or Replaced ano Reolacement Components

Name of Name of Manufacturer National Other Year Repaired. ASME

Component Manufacturer Serial No. board Identification Built Replaced. Code:

No. or Stamped Replacement (Yes or No)

A.b,4L ,0., " 6- -/n ,4s p. I, ) /9, 4/ t 2 , , s I'

______VI-_Vf -/ /-A, __ _ __ ___ _

.s -7& okrgL *1",4 e-" Is4 M1__ __ _ 4J' -?e V Ye AA4dr,

0 6vll & . _______ ___ ___4 AF __1A

7 . D escnption o ; .' ork &f, 1-:.- V S C_..C E s 0-JI-., ,,-•'J( / ,',-, h,,. _S L

8. Test Conduc:e-: 13 Hydrostatic 0 Pneuma::c C3 Nominal Operating Pressure

SOther: / Pressure psi Test Temp. ,,j--,, -F 11"1 g/ - 4 - J

-e- r', 7 A1%'d44, SS/~

Note: Supplemenrai sheets in form of lists. sketches. or drawings may be used. provided (1) size is 8-1/2 n. x I I in.. (2) imfirmaon in I thrn

6 on this re~ort is included on each sheet, and (3) eacn sheet is numbered and the number of sheets is recorded at the top of this form.

'2/82) This Form (e00030) may be obtaired from the Order Dept.. ASME. 345 E. 47th St. New York. N.Y. 10017

14L:

1

2.

-& ,4

Ad-

Page 97: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5

Information Use

FORM NIS-2 (Back)

9. RemarKs $'6' ' f77iC) / -" (t d/','- C'rJ' ji,/ 3 ' /i -p•,A /J•',rA

CERTIFICATE OF COMPLIANCE

We certify that the statements made in the report are correct and this /i?6PR/SC conforms to the rules of the ASME Code. Section Xl.

Type Code Symbol Stamp _ /pf oA /6,C4!m'

Certificate of Authorization No. 6,r" d'" '#!-/ A6'4 Expiration Date e / /,

Signed__________________________________

Date 19~

CERTIFICATE OF INSERVICE INSPECTION

I. the undersigned. holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the Stats of

Province

of Of-'--

'E. and employed by Y-V'5 t \ \

have inspected the components described in this Owners Report during the period -, - of - -. _- C, ,%C'-

that tO the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's

Report in accordance with the requirements of the ASME Code, Section X1.

By signing this certificate. neither the Inspector nor his employer makes any warranty. expressed or implied. concering the examination

and corrective measures described in this Owner's Report. Furthermore. neither the Inspector nor his employer shall be liable in any manner

any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions • i

irs-aa6t S Sqnatuge NailfaWl Boara Sat. Proveoa. ami bxwsndmfli

Date _____________. 19•.

(12182)

15

2

Page 98: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 OWNER'S REPORT-FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI

Owner C.t-'onwealth Edison Comoany Namiw

One girst National Plaze. Chicago, IL 60690

2. Plant Bra.cwood Nuclear Power Station Nam

R R ' Box 84. Braceville. IL 60407 Aoegss

3. Work Perforrre, oy Mechanical Maintenance 3raidwood Nuclear Power Station R R I Box 84 Braceville. IL 60407

4 Idpnt,ficaton :"System C-- &

Date /0, - &

Sheet 1 of /

Unit 00

iLJPOJ 990a 3 F316 -1 Repw OrguniaOn P 0 NO Job No. W-.

Type Code Symbol Stamp Not Atglicasile Autltonzation Number Not Applicable

Expiration Date Not Applicable

5. (a) Applicac e Construction Code " "9 71L ,, Edition. . Addenda. __,_/ _

(b) Applicac.e Edition of Section XI Utilized f6r Repairs c" Replacement • --=_

Code Case

6. Identification c Components Repaired or Replaced and Reolacement Components

Name of Name of Manufacturer National Other Year Repaired. ASdE

Component Manufacturer Serial No. board Identification Built Replaced. Code:

No. or Stalped Replacement (Yes or NO)

TEAL 19)"$ ,.16 6 - -- •1 D '

______46 ~f' -A4 Ass___ V- 6e_____

7-/-/,e vsI-_-H -/_-__,

________ PVA -,4..4 'V A M1240e Yes;

L-7-9,1eus r /AtdwOR __-a__A

7. Description& a ork S6 1tl S/'4A6. SVaafw&Ls 09'./Ai6 AEKS-i--,~,'sM&

8. Test Conducted: 0 Hydrostatic [3 Pneuma::c 03 Nominal Ooerating Pressure

O Other Pressure W psi Test Temp. l,,, -F

'~/~f ' y• rem %-/5iwi I A#...f/44e S~c,44-4 Note: Supplemen'ai sheets in form of lists. skefches. or drawings may be used. provided (1) size is 8-112 ,r x 11 in.. (2) information min 1 thfr

6 on this re-ort is included on eacn sheet, and (3) eacn sneet is numbered and the number of sheets is recorded at th top of this form.

-2182) This Form (e00030) may be obtairned from the Order Dept.. ASME. 345 E. 47th St. New York. N.Y. 10017

1a-'.

<PAA6 A'6e//. f6$LS• f l

I

PAA *s 'Woe //. X4"1-5

Page 99: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 (Back)

9. RemarKs $5'6C ,fjýtef ý~1 if" e V i~C f ~

CERTIFICATE OF COMPLIANCE

We cenify that the statements made in the report are correct and this A, om'/-e- conforms to the rules of the ASME Code. Section XL

(Roegar or Reote=lblcM I

Type Code Symbol Stamp AA /,Q 0470-4C ei C

Certificate of Authorization No h.4 CA't.- Expiration Date 46/ A ',,,I

SOwem or L,,h~m s Uesro hi--,, 'le

CERTIFICATE OF INSERVICE INSPECTION

I. the undersigned. holding a valid commission issued by the National Board of Boiler and Pressure Vessel InspectorS and th State of

Province of '~---~ "- vs,. andi employe yN~ ~ o .1

have inspected the components described in this Owner s Report during the period k 0 - , - of - "V5-.-- L.

and state that to the best of my knowiedge and belief, the Owner has performed examinations and taken corrective measures described in this Owners

Report in accordance with the requirements of the ASME Code. Section XI.

By signing this certificate. neither the Inspector nor his employer makes any warranty. expressed or implied. concerning the examination

and corrective measures aescribed in this Owner's Report. Furthermore. neither the Inspector nor his employer shall be liable in any manme

any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

-~~~Commissions ~ ',~

Date ___--_-_.____ _ .

(12182)

17

2

Page 100: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT

As Required by the Provisions of the ASME Code Section XI

Owner Cc,--onwealth Edison Company Name

Ore =;rst National Plaze. Chicaao. IL 60690 AItBSSS

Plant Bra. .ood Nuclear Power Station .Name

R R Box 84. Braceville. IL 60407

3. Work Perforrrm, e y Mechanical Maintenance Braidwooc Nuclear Power Station

R R. 1 Box 84 Bracevi'ie. IL 60407

4 Identification :4 System

Date 3 a S

Sheet of

Unit I

(teorZ 1O'g7anao Oo . Repair Organizaion P~ 0 No. .10 No. air.

Type Code Symbol Stamp Authorization Number

Expiration Date

Not Applicable Not Applicable Not Applicable

0\1- iM .Aotviss

5. a) Applicac e Construction Code Z- 13 "-It Edition. ,Adenoa. ,I/A Code Case

bi) Applicac e Edition of Section Xi Utilized for Repairs c- Replacement • .9

6. Identification :r Components Renaireo or Replaceo ana Reolacement Components

I Name of Name of Manufacturer I National Other Year Repaired. ASME

Component Manufacturer Senal No. board Identification Built Replaced. Code: No. or Stamped

Replacement (Yes or Nol

7Q A O e c 2. r -oo , a so 6 y , "4 7.d

o(. - F cJv aia

7 Description co.'Jork -uqs-roL5.gi Rgug-V \jak3V

8 Test Conducted:

-4".M.OOo

C3 Hydrostatic

O Other:

0 Pneuma::c

Pressure 1 oL31 psi

SNominal Operating Pressure

Test Temp. 56- 'F

Note: Supplemer.:ai sheets in form of lists, sketches, or drawings may be used. provided (1) size is 8-1/2 in. x 11 in.. (2) information in items 1 through

6 on this reoort is included on eacn sheet, and (3) eacn sheet is numbered and the number of sheets is recorded at the top of this form.

"2182) This Form (e00030) may be ootair-ed from the Order Dept.. ASME, 345 E. 47th St. New York. N.Y. 10017

S18

1

2.

Page 101: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 (Back)

9. RemarKs Aopuc•aoe Manufacturer s Oata Reoons to oe attacneo

CERTIFICATE OF COMPLIANCE

We certify that the statements made in the report are correct and this 0 conforms to the rules of the ASME Code. Section XI. I Repak or ( ýe

Type Code Symool Stamp A)AC Ji r- A'O\e

Certificate of Authorization No. t-L Expiration Date & •o ,'7nA, ibile

Signed .O0weges e Date We1_ to

CERTIFICATE OF INSERVICE INSPECTION

I. the undersigned. holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of

Province of "n "--- and employed by r ' - . of - C. .

have inspected the components described in this Owner s Report during the period ---.- •-_ of and state that to the oest of my knowieage and belief. the Owner has performed examinations and taken corrective measures described in this Owner's

Report in accordance with the requirements of the ASME Code. Section XI.

By signing this certificate, neither the Inspector nor his employer makes any warranty. expressed or implied. concerning the examinations

and corrective measures Oescnbed in this Owner s Report. Furthermore. neither the Inspector nor his employer shall be liable in any manner for

any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

- Commissions

i triIc•or s Sinattwr Naiaonai SoarG. State. Provmca. ard Er am$

Date 1- 1)

(12/82)

19

2

Page 102: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

0 'ý I to

1 Owner C,--ronwealth Edison Comoany Nare

2. Plant Bra.wvood Nuclear Power Station Name.

R R ° Box 84. Braceville. IL 60407 Aaams

3. Work Perforrreo oy Mechanical Maintenance Braidwood Nuclear Power Station R R. 1 Box 84. Bracevile. IL 60407

Date /=2 - 7 - 9 9

Sheet I of __

Unit _

Reppw Organizatic P 0 No. Job N,. O.

Type Code Symbol Stamp Not Applicable Authonzation Number Not Applicable

Expiration Date Not ApplicableA4at8

4Identification :"System I 6• A.-7A•"/P/d6$L. C,,Ad4//'e,

5. (a) Applicac e Construction Code 7LUZ la -9 '7/ Edition. U. 7,2 Addenda. 2J./.. CodeCase

0b Applicac.e Edition of Section XI Utilizea for Repairs c, Replacement ;F__ _

6 Identification v Components Repaireo or Replacea and Reolacement Components

Name of Name of Manufacturer National Other Year Repaired. ASME

Component Manufacturer Senal No. board Identification Built Replaced. Code: No. or Stomped

Replacement (Yes or No)

_____ t/o &,.s 1^& ,/ - 3_ _ ___5

OZ~biAL PAC IFIC- e3-(,-7 -,A4 /-A_ __ _ _ _

'f'EAL 71gie -sr y_ __ __ 45 16 17 tca

ThEA 1/tA$*E1

Y7 Description o4 .,ork

a. Test Conducmen:

V1-r ?e(0

r.eAt ' A I I.�!,,AAA A�JA?/ IC � f/7ocfw#'fc��Iw, ) �,' .- '-. ,-. , ,. .-. - -

O Hydrostatic

O Other:

O Pneuma::c 0 Nominal Operating Pressure

Pressure Z001/,50 psi Test Temp. A rnbwu'I _F

Note: Supplemer•:al sheets in form of lists, sketches, or drawings may be used. provided (1) size is 8-1/2 ,: x 11 in., (2) information in items I thrc

6 on this re.ort is included on eacn sheet, and (3) eacn sneet is numbered and the number of sheets is recorded at te top of this form.

'2/82) This Form (e00030) may be obtai.ed from the Order Dept.. ASME. 345 E. 47th St. New York. N.Y. 10017

20

1

,/c-,/"-/=-.,¢O ,/''•,-'PF"•'•''/r C- j ,^•" - A" ' ) / •,- . -A ,!,--.P110

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI

Page 103: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 SUPPLEMENTAL SHEET

Sheet Date Unit

Owner: Commonwealth Edison Company One First National Plaza Chicago. Illinois 60690

Plant: Bfraidwood Nuclear Power Station R.R. #1. Box 84 Braceville. Illinois 60407

Sof /1 -,-97

Unit _ _/

P a No.. ,R No. etc

3. WorkPerformedby C)Mdt,voFAL,7T EDI,,oat NarM

4 Identification of System / 0.e &7rf a,4,L C 11,44 I,

5. (a) Applicale Construction Code 45 AfL/

Type Code Symoot Stamp Authonzation No. Expiration Date

'40,"', /C014f/

19 7 ( Edition "4,7.2 Addenda

Code Cases f-I �7

th) Applicaole Edition of Section XI Utilized19 Ft? , Edition

6. Identification of Components Repaired or Replaced and Reolacement Components.

Name of Name of Manufacturer National Other Year Repaired. ASME

Component Manufacturer Senal No. 3oard Identification Built Replaced. Code:

No. or Stmnped Replacemenlt (Yes or No)

e% - -7sc, ~ 1~4 Yif

_______ ^z z AL10&.~4

S _ _ _ _ _ _______

_____ K-yI

______________ 1~~~I

2i�(Final)

3

1 Addenda

Page 104: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5

Information Use

FORM NIS-2 (Back)

-9. Remarks A.mon,,i Manulacturef s Oata Revons to Do attaced

CERTIFICATE OF COMPLIANCE

We certify that the statements made in the report are correct and this re0/iie,"PL'i conforms to the rules of the ASME Code. Section X1 iRep~a or Rlemalivnlefnt)

Type Code Symbol Stamp A•o6 iQOpI1 L.,b/,

Certificate of Authonzation No. fL rI_ le Expiration Date

SignedDae9

2

_ _4 ý "00. o Oos~qfle. Ni~e

CERTIFICATE OF INSERVICE INSPECTION

I, the undersigned. holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province

.- P"--F "

of .'_t ,J ,5 and employed by V 7 -.: of Z I- 2-t

have inspected the components descrbed in this Owner s Report during the periodtl -"---3--t'• of 2.. o L, ."'j

and state

that to the best of my knowiedge and belief. the Owner has performed examinations and taken corrective measures described in this Owner!

Report in accordance with the requirements of the ASME Code. Section XI.

By signing this certificate, neither the Inspector nor his employer makes any warranty. expressed or implied, concerning the examinatioi

and corrective measures described in this Owner's Report. Furthermore. neither the Inspector nor his employer shall be liable in any manne,

any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

J L - - - - Commissions I.- s.

ý-soelor s Sqiaiwm NatflU 8 0o . State. Prov,, N. NiO E• 'ktU i=f,,,

Date k -2- - LD- L.

(12/82)

22

2

Page 105: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5

Information Use

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by-the Provisions of the ASME Code Section XI

Owner --'mmonweaitn Edison Comoanv_______________'da"fi

One First National Plaze. Chicaon. IL 60690

2. Plant Sramawooo Nuclear Power Station 4emI

R R I Box 84 BraP•eville. IL 60407

3. Work Performed by Mechianical Maintenance Braidw~ood Nuclear Power Station R.R. 1 BOX 84. Bracevite. IL 60407

Date /3//o Sheet L of

Unit 0 t

IA/k '77 'Y 3// Repin OrmW1121W P 0. tft. Job lift S

Type Code Symbol Starm " Apolicable Authorizaton Number Not Apgbelw

Expiraton Date Not Aoolicable

1 Identification of System

tai AoplicaoieConstrucon Code 2 t -'I -= -7 L-1 Edition. N Addenda. v1 _ Code Case .o) Aoplicaoie Edition or Section Xl Utilizea tor Repairs : Reolacement (to9

daentification or Comoonents Reoaireo or Replaceo ano Reoiacement Components

Name of Name of Manufacturer National Other Year Repalrel. ASME

Component Manufacturer Serial No. board Identification Built Replaced. Code: No. of S1

__________ ______________Reglummtt (Yes or t4

h~cpr~I/rT C~r,4eLLj /AILC 1i____ _________0/A__ 1A0

TF'PF SL~preer 17-r T6.4~fAM'CL 1 ;L /,- 13 Al/l,+P,~~~f. ~v

I _k_ _ _ _ 7 DescnouonofWork -7".ST "• h,flT4LL A/'e/Wt •,,,wISRE'

3 Test Conoucteo: [3 Hydrostatic

V"JT*'/ C--0 04• r- Other:

003 Memo .I u Lttl iil

SPneuma:cr3 Nominal Operating Pressure

Pressure _ AVA psi Test Temp.

Note: Suoplemental sheets in form of lists. sk~etches. ordraw.noS may oe used. provided (1) size is 8-1/2 in. x 11 in.. (2) infolrmation in items

6 on this reoort is included on each sheet. and (3) eac. sneet is numbered and the number of sheets is recorded at the top of this form

112/82) This Form ieOO030) may be obta:.-eo from the Order Dept.. ASME. 345 E. 47th St. New York. N.Y. 10017

23

1

Aawe" <2w V

Page 106: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 (Back)

AmeacO4 -Aamiews~ s Uaza uioocntoa*m attacaa

VT L, " Q gReJAI/AL,,

CERTIFICATE OF COMPLIANCE

We certivy mat the statements maoe in ine reoort are corre- and this conforms to the rules of the ASME Code. Seazo ROM ý

Type Code Svmool Staio

Certificate of Authorization No.

Signed

6 1 112.,), rA'loI-&

Expirationate JlIa

L L.o,.,. =Lg~wo=•.rue Da"

CERTIFICATE OF INSERVICE INSPECTION

I. the undersigned, holding a valid commissin issued cy the National Board of Boiler and Pressure Vessel Inspecors and the Stat. Province of ~ - 'and employed by '\ Of have insoecd the components oescribed in this Owners Report dunng the penod :-- --'2.,== of of -'3 . and state that to the best of my knowledge ano oelief. the Owner has oerformed examinations and taken corrective measures desF'iaed in this Owr Report in accoroance witn the reouirements of the ASME C,-e. Section X.L

By signing this certficate. neiner the Insoector nor f:s employer makes any warranty, expressed or implied. concmrning the eaana and corrective measures aescrioed in this Owners Report. Furthermore. neiter the Inspector nor nis employer shai be liable in any man any personal injury or property damage or a loss of any kiro arming from or connected with this insoection.

L- •L- , ý l 'nwpeaw a ~mwe

Conmmssons "-.. t •Naiu~ 6Olw. sia. dnWa& WOM SWum

Date -5 -%

(12/82)

24

2

- . emarKs

khý Agnbe-able

Page 107: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

8wAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT

As Required by the Provisions of the ASME Code Section Xl

1. Owner Commonwealth Edison CompanyName0

___ one First National Plaza, Chicaao IL 60690

2. PlantBraidwood CoinEd PlantAddress

Name

35100 S. Rt. 53 Suite 84. Braceyile, IL 60407AddreSs

3. Work Performed by MECHANICAL MAINTENANCE Name

Braidwood CornEd Plant. 35100 S. Rt. 53 Suite 84, Braceviile. IL 60407

Daa /'/ /Co~

Sheet - of

Unit I

c�c�tc5O1O9�.S�Ol Peosir Org5flIz5iIO4� P 0. No.. Job No.. etc.

• r FReoar O.rganization P.O. No.. Job NW., etc.

Type Code Symbol Stamp N/A Authonzation Number N/A

Expiration Date N/A

Description of Work Rr,&ULT 'J-AIJf

Test Conaucted: 0 Hydrostatic

v7Z PCeI;6a-er 0 Other: ,.++lZooo

0 Pneumatic R( Nominal Operating Pressure

Pressure w4±{L..7 psi Test Temp. 55 2) -F

4. Identification of System -, ddreM A? rTA

5. (a) Applicable Construction Code Ser-Tl -14 9 Edition. t4/' Addenda. P0/1 Code Case

tb) Applicable Edition of Section XI Utilized for Repairs or Reolacement 19 S9

6. Identification of Components Repaired or Replaced and Reolacement Components

Name of Name of Manufacturer National Other Year Repaired, ASME

Component Manufacturer Serial No. board Identification Built Replaced, Code; Stamped

No. or Reolacement (Yes or No)

, / I1 .5t /,A , _ _,_.,_ _ _ I

'D I 5 Ir , 5R, 64AM &P 1-/A KHT' 41 a2.4 __9__9

__ _ _ __ __ _ t4OF N01\/A t4 A M____s__k rj/A __ _ ___ __ _

~~P~t~ULrr 70,.~R fc o3532, "

__D"__ 55__ _ ____17__ N/A Q~r-Agc> -oagcgtoc __ _ NO

Note: Supplemental sheets in form of lists, sketches, or drawings may be used. provided (1) size is 8-1/2 in. x 11 in., (2) information in items 1 through 6 on

this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82) This Form (e00030) may be obtained from the Order Dept., ASME. 345 E. 47th St. New York. N.Y. 10017

25

1

7.

8.

Unit

!

Page 108: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 (Back)

9. RemarxsV,4,,fAe-r,"Z,- -37Z-) , ,t/. 2 "S Aroo, PJ' ,,•S-F b~•- J,,e. t .k Aicanle MantacturerS Data Redns to Oe anfled

=to

CERTIFICATE OF COMPLIANCE

We certify that the statements made in the report are correct and this e Ake1,4•'Jconforms to the rules of the ASME Code, Section Xl. imepair or Reolacemeni i

Type Code Symbol Stamp ,Rpa" , eo acmen"

________________________. _______ Expiration Date dr •4P"1d Cd Jd" Certificate of Authorization No. ExpirationDate

Signed , zor imn ee Date

CERTIFICATE OF INSERVICE INSPECTION

I, the undersigned. holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province

of I3'--). -,>I a and employed by - -'6 k *' ." - - Of '5;V-ý

have inspected the components descnbed in this Owner's Report during the penod ' -2-1 - C - of k-t - .- , and

state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in

accordance with the requirements of the ASME Code. Section XI.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and

corrective measures descnbed in this Owner s Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any

personal injury or property damage or a loss of any Kind ansing from or connected with this inspection.

Inspectors Signature

Date , -- S - , 1 _- _ .

Commissions 7-•- I. " National Board. State, Province. and Endorsements

(12/82)

26

2

I

Page 109: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI

1. Owner Commonwealth Edison Company Nane

One First National Plaza. C hcago, IL 60690

2. PlantBraidwooc CoinEd PlantAddress

Name 35100 S. Rt. 53 Suite 84. Brace..ile, IL 60407

Address

3. Work Performed by MECHANICAL MAINTENANCE Name

Braidwood CornEd Plant. 35100 S. Rt. 53 Suite 84, Braceville, IL 60407

Date --//'//cr_ Sheet __ of

Unit I

Reoair Organization P.O. No.. Job No., etc.

Type Code Symbol Stamp N/A Authorization Number N/A

Expiration Date N/AAddress

4 Identification of System i 5 - MA jN 1 )-,

5. (a) Applicable Construction Code 5,61=1-= 2- 19 -14 Edition, /A Addenda. A/AA Code Case ýb) Applicable Edition of Section XI Utilized for Repairs or Replacement 19 69

6. ýdentification of Components Repaired or Replaced and Replacement Components

Name of Name of Manufacturer National Other Year Repaired, ASME

Component Manufacturer Senal No. board Identification Built Replaced, Code: Stamped No. or Replacement (Yes or No)

D~isc: OEM _ f/A .4/4 1 " '4 /A PAO

D3SC ~ ~ ~ ~ ~ ~ 'rZ 4~S~ ACZ.5 CHl ' 4r81 SO 9

.S 91-,o LE _______ 4-/A - 3/-- P4*0 iM-ZS-2- aA ________

S.? ___ vLF (XEOp SIV49Z. V4/4 JKT0-' ACPSIZ. I~ ______ PAO_

Description of Work 94 Ut-T \,ft'V1

Test Conducted: 0 Hydrostatic

\T~Z Pe.aj;OBId 0 Other:

S - 4 - Zoo0

0 Pneumatic E(Nominal Operating Pressure

Pressure 10,. / psi Test Temp. 55.3 ýF

Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8-1/2 in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82) This Form (e00030) may be obtained from the Order Dept., ASME, 345 E. 47th St. New York, N.Y. 10017

27

1

7.

8.

Page 110: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5

Information Use

FORM NIS-2 (Back)

9. Remarks 01-ff,,,rPn ,4eV /. , ,A rd rn , ,, ,,'rd. , , . ADi•ICanie Manufacturers Data Reoor to,~e anlaCtied I

CERTIFICATE OF COMPLIANCE

We certify that the statements made in the report are correct and this conforms to the rules of the ASME Code. Section Xl. .ReOar Or Reolacemenhi

Type Code Symbol Stamp Al4r

Certificate of Authorization No. ,,v.-r oW//1. 4W44-'- Expiration Date ,_________________,___- _

Signed a,0 D ne toi0 Date 4A5-,ooo . _

\, Owner or Qwn~drs Designee. Title

CERTIFICATE OF INSERVICE INSPECTION

I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province

of ---Lc.m-. > N- 1 and employed by " of .-

have inspected the components descnbed in this Owner's Report during the period k- "--4 Z of a-n--- -"--d- = ,

state

that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in

accordance with the requirements of the ASME Code, Section XI.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and

corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any

personal injury or property damage or a loss of any kind arising from or connected with this inspection.

L ----_. . Commissions • I ,

inspectors Signature National Board. State. Province. and Endorsements

Date --- '

(12/82)

28

2

Page 111: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI

1. owner Commonwealth Edison Como~anv Date Y//0Name

•n Flr~t INdtinn~l PI~l~ Chireaoo. IL 60690

2. PlantBraidwood CornEd PlantAddress

Name � Pt R� Siiiti� 64 Rrace�ilIe. IL 60407

Address

3. Work Performed by MECHANICAL MAINTENANCE Name

Braidwood CornEd P!ant, 35100 S. Rt. 53 Suite 84. Braceville. IL 60407

Sheet _ of

UnitJ�

4 � qqoo-io9�-c�IReoajr Organzanion P.O. No.. JOD No.. etc.

Type Code Symbol Stamp NIA Authorization Number N/A

Expiration Date N/AAddress

4. Identification of System /%AW/5 S N S-T"WAMi

5. (a) Applicable Construction Code 7- 1 'Z. 19 "1"LA Edition. t/A Addenda. -qN/A Code Case

(b) Applicable Edition of Section Xl Utilized for Repairs or Replacement 19 89

6. Identification of Components Repaired or Replaced and Replacement Components

Name of Name of Manufacturer National Other Year Repaired, ASME

Component Manufacturer Serial No. board Identification Built Replaced, Code- Stamped

No. or Replacement (Yes or No)

i rA6> t 513 Pg.RPL4P-rt:>

T-)Isc.. C) F^A N/A tA-S5- I N/A _____

54SC- DR•SLR <, EAL- /A N1/A M-S•"__ ___ __ I qq No

SP1,4 Le-- t>P, • ' I5K •H-T GoI• 17- tj /A, 111.,•51 8Y yO/ Al I • . A0

Description of Work

Test Conducted:

VTZ Pe~oarned /4 -4-oo

0 Hydrostatic

[3 Other:

o Pneumatic E"Nominal Operating Pressure

Pressure IoL.• . psi Test Temp. .-65- !F

Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8-1/2 in. x 11 in., (2) information in items 1 through 6 on

this report is included on each sheet, and (3) each sheet is numbered and the numoer of sheets is recorded at the top of this form.

(12/82) This Form (e00030) may be obtained from the Order Dept., ASME. 345 E. 47th St. New York, N.Y. 10017

29

1

7.

8.

On First Nnti-' Pl- Chiging IL 6M90

Page 112: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 (Back)

9. Remarks iQrC F) e"4• A/ 2V ~ ~ 4 1E AIo/ caoie Manulacture's Data Reoons to be attc/ed

S,,5o,

CERTIFICATE OF COMPLIANCE

We certify that the statements made in the reoort are correct and thisvA 4 6•acOnforms to the rules of the ASME Code, Section XI. (Repair or Reoiacement

Type Code Symbol Stamp (A-f ,4 f C. ,

Certificate of Authorization No. A, I L/ C 6 L6' Expiration Date X j- 'Ae, n&

Signed (a4QA tQQ Dae I Ckwrneor Owners Ms,gnee. nTae

CERTIFICATE OF INSERVICE INSPECTION

I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province

of C--I L-,- and employed by Irt: .-) - of -- k C-o have inspected the components descnbed in this Owner's Report during the period '-2-1 , -Jý of 1r;- - 2- ,and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and

corrective measures described in this Owner's Reoort. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any

ponal inury or property damage or a loss of any kind arising from or connected with this inspection.

__ Commissions - . . inspector's Signature National Board, State, Provnce, and Endornsemens

Date -- - , 1"•-, -=

(12/82)

30

2

Page 113: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI

1. Owner Commonwealth Edison Company Name

One First National Plaza. Chicaao. IL 60690

2. PlantBraidwood ComEd PlantAddress

Name .'RA R. Rt 5• Sjit• R4 RBr;e"vlle. IL 6040.7

Address

3. Work Performed by MECHANICAL MAINTENANCEName

Braidwood CornEd Plant. 35100 S. Rt. 53 Suite 84. Braceville. IL 60407

Date L '

Sheet _ of

Unit 1 AWPo -

Authorization Number Expiration Date

Repair Organization P.O. No.. Job No., etc.

T cme= Q•n= -- jnhn Starn MI•A

N/A N/A

Address

4. Identification of System M S - M A)1-4 S•• ••AAA

5. (a) Applicable Construction Code SC>zr" = 'F. 7- 19 -1 4 Edition, i'4 l Addenda, -.- 1/A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacement 19 89

6. Identification of Components Repaired or Replaced and Replacement Components

Name of Name of Manufacturer National Other Year Repaired, ASME

Component Manufacturer Serial No. board Identification Built Replaced, Code; Stamped No. or Replacement (Yes or No)

I f^.5 C>' 1->

QI'C.0 * r4 /A _ _ _ A,% - 25s- I r4)^ar P-C P___ _

Ure74,OI41 I S3

0Isc-. r)K-5 Ac-z 30 ~ -/A mexr wj,8t.'4 I"9' P~ewScMOAr ,~l

Description of Work R?4k Vr V,' IJ1-.

Test Conducted: r' Hydrostatic 0

VTZ P0eRa.e 0 Other: Pre )A -Li-'Zooo

Pneumatic I'Nominal Operating Pressure

ssure 10,1411 psi Test Temp. 5.3 0F

Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8-1/2 in. x 11 in., (2) information in items 1 through 6 on

this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82) This Form (e00030) may be obtained from the Order Dept., ASME, 345 E. 47th St. New York, N.Y. 10017

"31

1

7.

8.

3rlnnq Rt -9;'A-1;"jtPAA . Ile IL 60407

Page 114: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 (Back)

9. Remarks m , ~ ~ d% d2,~e. ~ ~ ~ ~ L.d .~S~ Applicabe Manufacturer's Data Reports to be attached A)7-,Ac)4•' -'•

CERTIFICATE OF COMPLIANCE

We certify that the statements made in the report are correct and this/'-ft,4e' conforms to the rules of the ASME Code, Section XI. (Repair orReplacement)

Type Code Symbol Stamp AJo , _4d,, f"

Certificate of Authorization No. , ' e- 'd/Id , '. Expiration Date ,0," L ,Ai ,d tWoe

Signed dlTtýmI e0 Date ______oo • -Owner or Own-er's DCsignee, Ti3tle

CERTIFICATE OF INSERVICE INSPECTION

I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province of '- '. -, ý I and employed by %N i % % k c . of . C_.

have inspected the components described in this Owner's Report during the period '---2-'=t' of .,'-- - -_ . ,and

state that to the best of my knowledge and belief, the Owner has iperformed examinations and taken corrective measures described in this Owner's Report in

accordance with the requirements of the ASME Code, Section XI.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and

corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any

personal injury or property damage or a loss of any kind arising from or connected with this inspection.

S- ..- - Commissions ": - I c, Inspector's Signature National Board, State. Province, and Endorsements

Date '4--

(12/82)

32

2

I

Page 115: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section X1

Name

On First Nfati n• PIa- Trhirnnn IL 6M6R0

2. PfantBraidwood CornEd PlantAddress

Name 35100 S. Rt. 53 Suite 84, Bracevle, IL 60407

AddreSS

3. Work Performed by MECHANICAL MAINTENANCE Name

Braidwood CornEd Plant. 35100 S. Rt. 53 Suite 84, Bracevile, IL 60407

Date 9- /- 00

Sheet I of

Unit I

Reoar Organizauon P.O. No.. Job No., etc.

Type Code Symbol Stamp N/A Authoonzation Number N/A

Expiration Date N/A

AddreSS

4. Identification of System A S - /A.i ̂ ),4.S'/'

5. (a) Applicable Construction Code -,rf-r = 'ý2. 19 "1 . Edition. _,_/ _

(b) Applicable Edition of Section XI Utilized for Repairs or Replacement 19 "0

6. Identification of Components Repaired or Replaced and Reolacement Components

Addenda. -. 4/,4 Code Case

Descnption of Work V ,1.-T ',J ALJ .

Test Conducted: 0 Hydrostatic 0

VTZ. Pe49,.•o,- 0 Other: Pr A/f/oo

Pneumatic 0IV Nominal Operating Pressure

ressure 114 7 psi Test Temp. J..5 'F

Name of Name of Manufacturer National Other Year Repaired, ASME

Component Manufacturer Serial No. board Identification Built Replaced, Code; Stamped No. or Replacement (Yes or No)

MTEO.. Z4 "11

OI5PV. ORF-.$3 f- 5ktAr-Z S& A /A t~r 94- _8Z______1

Note: Supplemental sheets in form of lists, sketches, or drawvings may b0e used, provided ( 1) size is 8-1/2 in. x 11 in., (2) information in itemns 1 through 6 on

this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82) This Form (e00030) may be obtained from the Order Dept.. ASME, 345 E. 47th St. New York, N.Y. 10017

33

1

1 . oWIneI

7.

8.

-- I.k ; r, Ucwnm W ý:.M 2S.--

Unit Iwgý q-k0C>-1(D9SZ-0I

Page 116: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 (Back)

9. Remars ,d• dlf~-=,i,.I A'4e ,/' Z dIalftf, , , ,,, -, ' ,ks -d4 -e*$c Aoplicablie Manutacturers Data Reoorts to oe aitacied

CERTIFICATE OF COMPLIANCE

We certify that the statements made in the report are correct and this , ., 4 conforms to the rules of the ASME Code. Section XI. (RepaJr or Repiacementi

T yp e C od e S ym b o l S tam p ,M & ,"' ,4-/ 4 V L &.-4 E =

Certificate of Authonzation No. A,1',- ,"•-10' C'eeL" Expiration Date t.A.#

Signed a4I 4 rileff Date 411 b6 • wner or O3$iners oesý'gnee. Title- I I

CERTIFICATE OF INSERVICE INSPECTION

I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Pronce

of C•,-'-- V-3 5 and employed by I of ..- • -

have inspected the components descnbed in this Owner's Report during the period ' "-- ,- of 4- :.,.- ,and

state

that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in

accordance with the requirements of the ASME Code. Section XI.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and

corrective measures described in this Owner's Report. Furthermore. neither the Inspector nor his employer shall be liable in any manner for any

personal injury or property damage or a loss of any kind arising from or connected with this inspection.

L- L-- Commissions - L "

inspectors Signature Nationat Board. State. Province. ari Enidom•eism

Date - , -'

(12/82)

-, 34

2

Page 117: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI

1. Owner Commonwealth Edison Companv flataName

O3np Ffint NAtional Plaza. Chino. IL 60690

2. PlantBraidwood CornEd Plant

3.

Address

Name

35100 S. Rt. 53 Suite 84. Braceville. IL.60407 Address

Work Performed by MECHANICAL MAINTENANCE Name

Braidwood CormEd Plant. 35100 S. Rt. 53 Suite 84. Braceville. IL 60407

7. Description of Work L)AL' •- J•ec,-• /eg•pA/

8. Test Conducted: 03 Hydrostatic 0 Pneumatic R(N

VTZ Sekc."o C e• 0 Other: Pressure 1041 A4/14/0

Sheet of

Unit of__

wp# q oo10 qqLq-b1Repair Orgaization P.O. No.. Job No., etc.

T (Cnm4 Sw hnl Sa N/A

Authorization Number Expiration Date

N/A N/A

Address 4. Identification of System A4!S- M !SCcA fL

5. (a) Applicable Construction CodeSee-r al, /(l2 '1 9 '74 Edition, // Addenda, WAJI Code Case (b) Applicable Edition of Section XI Utilized ftr Repairs or Replacement 19 89

6. Identification of Components Repaired or Replaced and Replacement Components

Name of Name of Manufacturer National Other Year Repaired, ASME Component Manufacturer Senal No. board Identification Built Replaced, Code; Stamped

No. or Replacement (Yes or No)

ý,C 44__ __ _ Al/A __ _ _ _ _ qq 3 5-I 1cej"/

_M.___AIMS0__ 5__ _ _ _ A14/A ~ / C

A]bb5Z l/A R 'or c'o- 033-s q5- c,, AM

Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8-1/2 in. x 11 in., (g) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82) This Form (e00030) may be obtained from the Order Dept., ASME, 345 E. 47th St. New York, N.Y. 10017

35

1

ominal Operating Pressure

psi Test Temp. 553 'F

Data

Page 118: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 (Back)

9. Remarks Applica"e Manufacturer's Data Reports to be attached

CERTIFICATE OF COMPLIANCE

We certify that the statements made in the report are correct and this AeR lt tmeULtconforms to the rules of the ASME Code, Section XI. (Rdpairorfttý)

Type Code Symbol Stamp KOet Apl'cA61&

Certificate of Authorization No. .i Expiration Date 4616Aopi rileL .

Signed I, Dade 'qDate IA Crerv Owners Desl=nee, Title

CERTIFICATE OF INSERVICE INSPECTION

I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province

of and employed by of

have inspected the components described in this Owner's Report during the period cC- - - of 4>-, - - ,and

state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in

accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and

corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any

personal injury or property damage or a loss of any kind arising from or connected with this inspection.

L .. , Commissions \"-'q Inspector's Signature National Board. State. Promwince. and Endoresermnt

Date , 1 __

(12/82)

~3 6

2

I

Page 119: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI

1. Owner Commonwealth Edison Company Name

One First National Plaza. Chicao IL 60690 Address

2. PlantBrajdwood CornEd Plant Name

35100 S. Rt. 53 Suite 84. Braceville. IL.60407 Address

3. Work Performed by MECHANICAL MAINTENANCE Name

Braidwood ComEd Plant. 35100 S. Rt. 53 Suite 84. Braceville. It 60407

Date ý-2-"

Sheet / of 7

Unit

Repair Orgarezation P.O. No.. Job No.. etc.

Type Code Symbol Stamp _ Authorization Number

Expiration Date

N/AW/A N/A

4. Identification ofAddress

5. (a) Applicable Construction Code.,e. f&. o f 7" 19 V2j Edition, J/A Addenda, L//I Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacement 19 89

6. Identification of Components Repaired or Replaced and Replacement Components

Name of Name of Manufacturer National Other Year Repaired, ASME Component Manufacturer Serial No. board Identification Built Replaced, Code; Stamped

No. or Replacement (Yes or No)

,dT Wr/ $5of36 y

VAIue M -5 - i 7.desc p reSfrk uo%3•o s / M,/•,9'_ - Z- 77 lgce i " C

7 ..oesc, ptionof Wr iol. t A j :D/33 A L0W,4- MS03c

Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8-1/2 in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12182) This Form (e00030) may be obtained from the Order Dept., ASME, 345 E. 47th St. New York, N.Y. 10017

8. Test Conducted:

"V T? Pete VAeo Hydrostatic

o Other:

0 Pneumatic (09 Nominal Operating Pressure

Pressure (O0'4 psi Test Temp. 553 -F

7i 37

1

S tern

Page 120: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 (Back)

9. Remarks Appl"cabWe Mantlacturis's Data Reports to be attached

CERTIFICATE OF COMPLIANCE

We certify that the statements made in the report are correct and this hAa& conforms to the rules of the ASME Code. Section XI.

Type Code Symbol Stamp tot RpOL eQ1,

Certificate of Authorization No. AJ1of 9C20r,14t Expiration Date Aa.nh e

Signed ne ( 00 Date ___, 0 . I•wner'eOwner's Desigrnitle Ti t

CERTIFICATE OF INSERVICE INSPECTION

I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province

of ý ý-' , - 1-ý% andemployedby IT t %, \ - - Of C:-have inspected the components described in this Owner's Report during the period O - of .4- -- • --- and

state that to the best of my knowledge and belief, the Owner has pierformed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any peponaJ injury or property damage or a loss of any kind arising from or connected with this inspection.

P77 Commissions J _ kispectoi Signature National Board, State. Province, and Endoierrnwts

Date , _ -_

(12/82)

I- 38

2

Page 121: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI

1. Owner Commonwealth Edison Company Name

One Frst Nationa Plaza. ChicaRoo IL 60690

2. PlantBra dwood ComEd PlantAddress

UnitName

offV r1 Q 4. At A ~R-r.-iIle 11 AAlfl7Address

3. Work Performed by MECHANICAL MAINTENANCE Name

Braidwood CornEd Plant. 35100 S. Rt. 53 Suite 84. Braceville. IL 60407Address

4. Identification of System A '1s ms- MAI"tsj , A, K

5. (a) Applicable Construction Code,; ,a-V/eZ 2 19 'Zh Edition, A)/A (b) Applicable Edition of Section Xl Utilized for Repairs or Replacement 19 89

6. Identification of Components Repaired or Replaced and Replacement Components

Date I.. -. "U L j

Sheet _ of 2 ol

woe 1 qq01655gIo 1Repair Orgaruzation P.O. No.. Job No.. etc.

Type Code Symbol Stamp N/A Authorization Number N/A

Expiration Date N/A

Addenda, Code Case

Name of Name of Manufacturer National Other Year Repaired, ASME Component Manufacturer Serial No. board Identification Built Replaced, Code; Stamped

No. or Replacement (Yes or No)

VAXVe- P(50V?>JA5OI3C. •o~r. o~3 ,p~.r . M-3•,•l _/,_ ____, _ __ _ _

A oki . i ,n S 0 , 1- " kil;A *Aj0 '0h, A 6o1eicA-35- -' & JIeepei (I 1e,-S

7. Desoniptionof Work kemwe4J- &u5,4 1fiv5 irPsio/I30-. Anld- 9i1Pea-cehn44 I~tCL

8. Test Conducted: [3 Hydrostatic 0 Pneumatic DU'Nominal Operating Pressure

[]TZ era¶... 5 ~l 0 Other: Pressure 16'A7 psi Test Temp. .-.. 'F

Note: Supplemental sheets in form of lists, sketches, or drawings maybe used, provided (1) size is 8-1/2 in. x 11 in., (2) information in Items 1 through 6 on

this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12182) This Form (e00030) may be obtained from the Order Dept., ASME, 345 E. 47th St. New York, N.Y. 10017

39

I

Page 122: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 (Back)

9. Remarks 4fr4C14-6;Q /&C TA(r IW-4c-rc6'Z J1,WIA/' ~~ '~ Applicable Manufacturers Data Reports to be attacfed

,, ,,4c•7I K,, ' YAv ,.6' ,A ,O ,-?6 . ,e&f.' -',:Dvd .r•-"

CERTIFICATE OF COMPLIANCE

We certify that the statements made in the report are correct and this j__ 6#' f4•f~ fontorrns to the rules of the ASME Code, Section XI. (Repair or Replacement)

Type Code Symbol Stamp A•'" / -,.

Certificate of Authorization No. Ar4' Expiration Date • • ,f4 .d/ddi-(•

Signed 44NorwC ,, D I_ nror owner's Design"e, Title

(12/82)

40li.

2

CERTIFICATE OF INSERVICE INSPECTION

I the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province

of 4-•&A •-, .. 5 and employed by k -. ýt c . _ of - - r-, have inspected the components described in this Owner's Report durng the period > 2-- -o of an. d - .

state that to the best of my knowledge and belief, the Owner has ;erformed examinations and taken corrective measures described in this Owner's Report in

accordance with the requirements of the ASME Code, Section XI.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and

corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any

persona] injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions % - -= " "•. -National Boald, State. Province. and EndorsementsInspector's Signature

Date 4- --!g:- I

Date • .-•--

, 11•='-°- i[L-

Page 123: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI

1. Owner Commonwealth Edison Company Name

rN Crslt*a~s, a r: IdLC S.,, e flk; 4U L. lahJ..

Address Plant Braidwood Nuclear Power Station

Name

R.R. 1 Box 84. Braceville, IL 60407 Address

3. Work Performed by Mechanical Maintenance Braidwood Nuclear Power Station R.R. 1 Box 84. Braceville, IL 60407

Add"ss

4. Identification of System Re--.-C>.. ,

Date P'ý,-'\ -Ž. 1 "ý.C • )

Sheet 1 of

Unit (a-)"E- C.O N'o

v 'b2 B A8& Roper Organization P.0. No.. Job NO.. eOM

Type Code Symbol Stamp Authorization Number

Expiration Date

Not Applicable Not Applicable Not Applicable

5. (a) Applicable Construction Code ( e,'"9 B(O Edition, ___I_____ Addenda. i-( Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacement 19B9

6. Identification of Components Repaired or Replaced ana Replacement Components

Name of Name of Manufacturer National Other Year Repaired, ASME Component Manufacturer Serial No. board Identification Built Replaced, Code;

No. or Stamped Replacement (Yes or No)

7. D o k- k4 g " 1 -4- -:a-

8. Test Conducted: C3 Hydrostatic 0 Pneumatic E3 Nominal Operating Pressure

) k Other:( D g) Pressure psi Test Temp. -F rF Sefc,'4,e•u'r •'.. A•4*/•l-y 6v/S e•~ •€'•'P P" )iev•,•T

Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8-1/2 in. x 11 in., (2) information in items 1 throug 6 on this report is included on each sheet, and (3) eacn sheet is numbered and the number of sheets is recorded at the top of this form.

Ale This 7-1e6/13.4 fa botn f de, ASME, e34 ZE th-/ Sox lew

(12182) This Form (e00030) may be obtained from the Order Dept., ASME, 345 E. 47th St. New York, N.Y. 10017

41

1

2.

Page 124: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 (Back)

9. Remarks ~ -feTL jZ,,4r ~-iAAppitocm Mantiacturai a Data Reports to bie attactled

,4A-�iO dgj�ra•�'d?3

CERTIFICATE OF COMPLIANCE

We certify that the statements made in the report are conreC and this ReA_•t;nJ-conforms to the rules of the ASME Code, Section XI. (Repair or Replacement)

Type Code Symbol Stamp A'rAV',/'e 44d64k;

Certificate of Authorization No. AZZ /7 A,, 4'tc4,eztC

a Ownw or Owner's Oesignee. Tite

Expiration Date A,' -, , uC,461 Z&."

Date .:- /-

CERTIFICATE OF INSERVICE INSPECTION

I. the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province of c '-4 V -z and employed by - -. t , \ 0--- of '

have inspected the components described in this Owners Report during the period - - of .4.-'- L - , and state that to the best of my knowledge and belief, the Owner nas performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore. neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any Kind arising from or connected with this inspection.

L. \X Commissions -kInspeactrs Signature National Board. State. Province. and

Date -4-

(12/82)

42

2

Signed 5ý:ý 4-Z000-

Page 125: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI

1. Owner Commonwealth Edison Company Name

One First National Plaza, Chicago, IL 60690 Address

2. Plant Braidwood CornEd Plant Name

35100 S. Rt. 53 Suite 84, Braceville, IL 60407 Address

3. Work Performed by Newberq/Perini/Stone & Webster Name

Braidwood ComEd Plant, 35100 S. Rt. 53 Suite 84, Braceville, IL 60407

Date 04/01/00

Sheet 1 of 2

Unit 02

WR #980120187-01 Repair Organization P.O. No., Job No., etc.

Type Code Symbol Stamp Authorization Number Expiration Date

N/AN/AN/A

Address

4. Identification of System RC

5. (a) Applicable Construction Code Sec. III , - 19 74 Edition, S '75 Addenda, n/a Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacement 19 89

6. Identification of Components Repaired or Replaced and Replacement Components

Name of Name of Manufacturer National Other Year Repaired, ASME Component Manufacturer Serial No. board Identification Built Replaced, Code; Stamped

No. or Replacement (Yes or No)

HEX NUT NOVA HT.#6019432 N/A Cat #0000037034 N/A Replacement NA THREADED ROD NOVA HT #RAK N/A Cat #0000039990 N/A Replacement N/A

7. Description of Work Performed REPLACED FLANGE GASKET

8. Test Conducted: 0 Hydrostatic

VT I Cominfesko[ 0 Other:

E] Pneumatic 0 Nominal Operating Pressure

Pressure ,A . psi TestTemp. &yA -F

VU .P,+ R PeA eX4e.Qg X Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8-1/2 in. x 11 in., (2) information in items 1 through 6 on

this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82) This Form (e00030) may be obtained from the Order Dept., ASME, 345 E. 47th St. New York, N.Y. 10017

DO NOT DUPLICATE

43

1

Page 126: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 (Back)

9. Remarks Applicable Manufacturer's Data Reports to be attached

CERTIFICATE OF COMPLIANCE

We certify that the statements made in the report are correct and this R..• m$_enforms to the rules of the ASME Code, Section XI. (Repair o(2pLacemaent

Type Code Symbol Stamp "tc.AA We

Certificate of Authorization No. UvA' AppliIcthi ly Expiration Date A,'b Ao11 I_ e

Signed (?wncer ons~ Date es2 06ne O0wner or Owner's Designali Title

(12/82)

DO NOT DUPLICATE

44

2

CERTIFICATE OF INSERVICE INSPECTION

I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province of • -- and employed by _"- "--- i :•. -I- of \-k AlVV•--- I , , have inspected the components described in this Owner's Report during the period -A -' ,- 4C2ý. of l--" - --Z, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, conceming the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

L --- • Commissions I -,•=. Inspector's Signature National Board, State, Province, and Endorsements

Date 4 - ,l..._

Page 127: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI

1. Owner Commonwealth Edison Company Name

One First National Plaza, Chicaqo, IL 60690

Date April 1, 2000

Sheet 1 ofAddress

Plant Braidwood ComEd Plant Name

35100 S. Rt. 53 Suite 84, Braceville, IL 60407 Address

2

Unit 1

WR#980118188-01 Repair Organization P.O. No., Job No., etc.

3. Work Performed by Mor.1,r 4 r.� 1 M� 4 ,, I- on�nn a

Name

35100 S. Rt. 53 Suite 84, Braceville, IL 60407

Type Code Symbol Stamp Authorization Number Expiration Date

Not Applicable

Not Applicable Not Applicable

Address 4. Identification of System REACTOR COOLANT (RC) 1RC22AB-l 5"

5. (a) Applicable Construction Code III 19 74 Edition, S75 Addenda, NA

(b) Applicable Edition of Section XI Utilized for Repairs or Replacement 19 89/No Addenda

Code Case

6. Identification of Components Repaired or Replaced and Replacement Components

Name of Name of Manufacturer National Other Year Repaired, ASME Component Manufacturer Serial No. board Identification Built Replaced, Code; Stamped

No. or Replacement (Yes or No) HEAT NO.

HEX NUT NOVA 110 & LCP NA CAT ID 0037034 NA REPLACEMENT NO

HEAT NO. THREADED ROD NOVA RAK NA CAT ID 0039990 NA REPLACEMENT NO

7. Description of Work REPLACE FLANGE GASKET AND BOLTING MATERIAL

8. Test Conducted: 0 Hydrostatic

fTr IA 0 Other:

0 Pneumatic 0 Nominal Operating Pressure

Pressure W.A/. psi Test Temp. A,0 *F

Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8-1/2 in. x 1I in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82) This Form (e00030) may be obtained from the Order Dept., ASME, 345 E. 47th St. New York, and N.Y. 10017

DO NOT DUPLICATE

451

2.

M 1-1 1 '1 M 4 +- -

Page 128: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 (Back)

9. Remarks Applicable Manufacturer's Data Reports to be attached

CERTIFICATE OF COMPLIANCE

We certify that the statements made in the report are correct and this Replacement conforms to the rules of the ASME Code, Section Xl. (Repair or Replacement)

Type Code Symbol Stamp Not Applicable

Certificate of Authorization No. Not Applicable

Signed K1 a AN , 0

Expiration Date Not Applicable

Date •/1/200 0 $a ---- er or Owne'gs-Designee, Title

(12/82)

DO NOT DUPLICATE 4G

2

CERTIFICATE OF INSERVICE INSPECTION

I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province of =L.I---%. --5 - % and employed by k--% t \ C- I. of )A-. v,----- ,I have inspected the components described in this Owner's Report during the period F- \k. - I of -A- 2- 2 - • and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

L Commissions t

Inspector's Signature National Board. State, Province, and Endorsements

Date -1-'-- , 1_-=

Page 129: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI

1 Owner Commonwealth Edison Company ame

One First National Plaze. Chicago. IL 60690

2. Plant Braidwood Nuclear Power Station Nm

R R. I Box 84 Braceville. IL 60407

Date ::0 /C Sheet IJ_. of

Unit 0/

3. Work Performed by Mechanical Maintenance Type Code Braidwooa Nuclear Power Station Authonzatt R.R. I Box 84. Braceville. IL 60407 Expiration Date

4 Identification of System /0'cz =-* J.V , tSr(4 / f(; & IZ- Pr

5. (a) AoPltCable Construction Code 7uit.,• ( ') L I Edition. .3? Lb) Applicable Edition of Section Xl Utilizes for Repairs or Replacement g.as

6. Identification of Components Reoairea or Replaced ana Reolacement Components

Kw" MrqnuAhn Pm O ff. JOfS. NOW

Symbol Stamp Not Abicable on Number NotAppliceble

Addenda. 11 Code Case

Name of Name of Manufacturer National Other Year Repaired. ASME Component Manufacturer Serial No. board Identification Built Replaced. Code:

No. or Stamlped Replacermet (Yes or No)

_-zi ;4tt m e ,_,_

Description of Work Qe-LC,, ,ej iVOZZ,,eS aj ,1 , a.. 4g,,,0-,p -a.

Test Conducted: C Hydrostatic 0 Pneumatic 0 Nominal Ooeratino Pressure

[1•Other. Pressure - - psi Test Temo. S -S--1 -F

Note: Supplemental sheets in form of lists. sketches, or drawinms may be used. provided (1) size is 8-1/2 in. x 11 in., (2) Infomatmon in items I thrc 6 on this report is included on eacn sheet and (3) eacn sheet is numbered and the number of sheets is recorded at the top of this form.

See ?0.1e- .03.

(12182) This Form seOO030) may be obtainea from the Order Dept., ASME. 345 E. 47th St. New York. N.Y. 10017

47

7

8.

Page 130: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 (Back)

�w�a.inw U UU ***��* '* -

CERTIFICATE OF COMPLIANCE

We certify that the statements mace in the report are corre-t and this / conforms to the rules of the ASME Code. Sedln Xl. (ROW0dR!T!

Type Code Symbol Stamp

Certificate of Authorization t•

Signed

A) ILA,

'I

E-xpiration Oats ~lwýb(

Data -

CERTIFICATE OF INSERVICE INSPECTION

I. the unoersigned. holding a valid commission issuea -v the National Board of Boiler and Pressure Vessel Inspecors and the State of

Province of "-'--'. -"" and employed by -%.- \ of ' have MSMOea the Components Cescribed in this Owners Reoor dunng the penod O- 1 4-. • Of i -.C4

and state that to the best of my knowtedge ano belief. the Owner nas Derformed examinations and taken corrective measures described in this Owners

Report in accordance with the requirements of the ASME Cz•e. Section X1.

By signing this certificate. nermer the Inspector nor his employer makes any warranty. expressed or imolied. concerning the examnamtion!

and corrective measures described in this Owner s Report. Furthermore, neither the inspector nor his employer shal be liable m any manner

any personal injury or property damage or a loss of any kina- arising from or connected with this inspection.

L Commissions 10 - t ý •UsinWI $bniI Nammm Doo Siaa Provo=a.m Endarsi.rm,

Oate g -a.- -

(12/82)

4182

9. RemarnsA0P0=D0 V.VMWSCMXW 8 OWN HOMM 10 00

tO A

Page 131: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1 600-5Al Revision 5 Information Use

FORM NIS-2 SUPPLEMENTAL SHEET

1. Owner: Commonwealth Edison Company One First National Plaza Chicago, Illinois 60690

Sheet -.. Daib

Unit

2. Plant Braidwood Nuclear Power Station R.R. #1, Box 84 Braceville. Illinois 60407

3. Work Performed by ALye'h an,&4dA

Unit 0________

zo/? g99oogp009-0/ P.O. No.. WR No.. etc

Type Code Symbol Stamp Authorization No. ____7_____

Expiration Date/V1

35Sioo 5. kT Is 4. Identification of System Re

5. (a) Applicable Construction Code

Address *1, LW61ugi, li i I/I

19 9..2L..... Edition

Code Cases SA'(b) Applicable Edition of Section XI Utilized 19 [?q...... Edition ,W Addenda

6. Identification of Components Repaired or Replaced and Replacement Components.

Nmof Name of Manufacturer National Other Year Repaired. ASME Component Manufacturer Serial No. Board Identification Built Replaced. Code; Stamnped

_____________No. ___________or Replacement (Yes or No)

&, iJ-+866sg.. CO/MSOO3 O4ITC 0.,c 0 /7 /If &;' e eem,"e +..~i........ 9"L( ~ ~ CO'f I8 cft-st c/s6V orc±Lz mzQ~sJ o ±~ .1 i ii ý;Jee.J q

9"t&_1_C__ _______0 -VCO OY~'r /7 g #.I * r.5

Laof 6'cýg qnC Q o.~h'# t a 0s f 7 /fm!. ~211yLe

DO NOT DUPLICATE

(Finai) 3

49

g�e¾A TEU A73Addenda

f'' ý'10 C-1

3 of. -2%/,oj /ov

61 1

Page 132: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI

1. Owner Commonwealth Edison CompanyName

One First National Plaza, Chicago, IL 60690 Address

Plant Braidwood CornEd Plant Name

35100 S. Rt. 53 Suite 84, Braceville, IL 60407

3. Work Performed by

Date April

Sheet 1 of

Unit 1

Address

Mechanical Maintenance

Name

35100 S. Rt. 53 Suite 84, Braceville, IL 60407

1, 2000

2

WR#980120215-01Repair Organization P.O. No., Job No., etc.

Type Code Symbol Stamp Not Applicable

Authorization Number Not Applicable

Expiration Date Not ApplicableAddress

4. Identification of System REACTOR COOLANT (RC) 1RC22AD-1.5"

5. (a) Applicable Construction Code III C019 74 Edition, S75 Addenda, NA Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacement 19 89/No Addenda

6. Identification of Components Repaired or Replaced and Replacement Components

Name of Name of Manufacturer National Other Year Repaired, ASME Component Manufacturer Serial No. board Identification Built Replaced, Code; Stamped

No. or Replacement (Yes or No) HEAT NO.

HEX NUT NOVA HDF NA CAT ID 0037034 NA REPLACEMENT NO

HEAT NO. THREADED ROD NOVA RAK NA CAT ID 0039990 NA REPLACEMENT NO

7. Description of Work REPLACE FLANGE GASKET AND BOLTING MATERIAL

8. Test Conducted: 0 Hydrostatic 0 Pneumatic 0 Nominal Operating Pressure

We.sef-sea "yt [ 0 Other: Pressure W.. psi Test Temp. -/ -- °F

VTZ.t N*+ Ae~v%1 AeA I e CC4IL)4e A XT-q -(6 Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8-1/2 in. x 11 in., (2) information in items 1 through

6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82) This Form (e00030) may be obtained from the Order Dept., ASME, 345 E. 47th St. New York, and N.Y. 10017

DO NOT DUPLICATE 50

1

2.

Page 133: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 (Back)

Applicable Manufacturer's Data Reports to be attached

DO NOT DUPLICATE

2

9. Remarks

CERTIFICATE OF COMPLIANCE

We certify that the statements made in the report are correct and this Replacement conforms to the rules of the ASME Code, Section XI. (Repair or Replacement)

Type Code Symbol Stamp Not Applicable

Certificate of Authorization No. Not Applicable Expiration Date Not Applicable

Signed 6$ bo AL a& Date / o , __ t- ' Owner or Owner's Designee, Title

CERTIFICATE OF INSERVICE INSPECTION

I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province of 5:6-L. % ..b % S and employed by k- V -b, '- ' C- of 1-A----T•=-., C=i .have inspected the components described in this Owner's Report during the period .- t O I of 4 a- 2 •--- - , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

I .• Commissions "'--=L-* '.L-3 lsý Inspector's Signature National Board, State, Province, and Endorsements

Date -n- ". - , l - ..

(12/82)

51

Page 134: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI

1. Owner Commonwealth Edison Company Name

One First National Plaza, Chicago, IL 60690Address

2. Plant Braidwood ComEd Plant Name

35100 S. Rt. 53 Suite 84, Braceville, IL 60407 Address

Date April 1, 2000

Sheet 1 of 2

Unit 1

WR#980120201-01 Repair Organization P.O. No.. Job No., etc.

3. Work Performed by Mechanical Maintenance

Name

35100 S. Rt. 53 Suite 84, Braceville, IL 60407

Type Code Symbol Stamp

Authorization Number Expiration Date

Not Applicable

Not Applicable Not Applicable

Address 4. Identification of System REACTOR COOLANT (RC) IRC22AC-1.5"

5. (a) Applicable Construction Code III C~ 119 74 Edition, S75 Addenda, NA Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacement 19 89/No Addenda

6. Identification of Components Repaired or Replaced and Replacement Components

Name of Name of Manufacturer National Other Year Repaired, ASME Component Manufacturer Serial No. board Identification Built Replaced, Code; Stamped

No. or Replacement (Yes or No) HEAT NO.

HEX NUT NOVA HDF NA CAT ID 0037034 NA REPLACEMENT NO

HEAT NO. THREADED ROD NOVA RA, NA CAT ID 0039990 NA REPLACEMENT NO

7. Description of Work REPLACE FLANGE GASKET AND BOLTING MATERIAL

8. Test Conducted:

rt1 Pewa mv"o Hydrostatic

"O Other:

0 Pneumatic E3 Nominal Operating Pressure

Pressure -/l. psi Test Temp. f./4 -F

Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8-1/2 in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82) This Form (e00030) may be obtained from the Order Dept., ASME, 345 E. 47th St. New York, and N.Y. 10017

DO NOT DUPLICATE

52

1

Page 135: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 (Back)

9. Remarks Applicable Manufacturer's Data Reports to be attached

CERTIFICATE OF COMPLIANCE

We certify that the statements made in the report are correct and this Replacement conforms to the rules of the ASME Code, Section Xl. (Repair or Replacement)

Type Code Symbol Stamp Not Applicable

Certificate of Authorization No. Not Applicable

Sianed (?Z)I,• (2 to )

Expiration Date Not Applicable

Date _/00__,IL. owner or owe'~eineei Ilte

DO NOT DUPLICATE 53

2

CERTIFICATE OF INSERVICE INSPECTION

I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province of - and employed by VA - . \ C-3 of C5iF-- ---- ' -have inspected the components described in this Owner's Report during the period c - G-, ? I of . - . and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

t - _Commissions "---'-, L t Inspector's Signature National Board, State. Province, and Endorsements

Date -4--(--'4- , 1 _-= 3

(12/82)

Page 136: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI

1 Owner Co.nnmnnmt----lfh It- ' r',nrnns,

Name

Address Plant Braidwood ComEd Plant

Name 35100 S. Rt. 53 Suite 84, Braceville. IL 60407

3. Work Performed by

Address

Mechanical MaintenanceName

35100 S. Rt. 53 Suite 84. Braceville. IL •O4O7

Date March 30, 2000

Sheet 1 of 3

Unit 1

WR#980003831-01 Repair Organization P.O. No.. Job No., etc.

Type Code Symbol Stamp Not Applicable Authorization Number Not Applicable Expiration Date Not Annlicab]e r

Address Identification of System 1RE04C-3" PIPE

(a) Applicable Construction Code III C'i 9 74 Edition, S75 Addenda, NA Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacement 19 89 / No Addenda

Identification of Components Repaired or Replaced and Replacement Components

Name of Name of Manufacturer National Other Year Repaired, ASME Component Manufacturer Serial No. board Identification Built Replaced, Code; Stamped

No. NO. or Replacement (Yes or No) HEAT NO.

ELBOW CONSILIDATED LSUM-2 NA CAT ID 0038377 NA REPLACEMENT NO HEAT NO.

WELDROD WELDSTAR PS 980 NA ST# 611A13 NA REPLACEMENT NO HEAT NO.

WELDROD WELDSTAR CT 7030 NA SI# 611A13 NA REPLACEMENT NO HEAT NO. RED. CONC. WFI 862ZNA NA CAT ID 0015612 NA REPLACEMENT NO

7. Description of Work INSTALL RELIEF VALVE ON 1RE04C-3" LINE

8. Test Conducted: 0 Hydrostatic 0 Pneumatic 0 Nominal Operating Pressure

SOther: Pressure 49-1o psi Test Temp. AM,13i•j'B F V r-2-izes •l 4ee -re-, r- c.- , 1>,F.-; a-''- r-%Z;\ <. - " .

Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8-1/2 in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is-rumbered and the number of sheets is recorded at the top of this form.

(12/82) This Form (e00030) may be obtained from the Order Dept., ASME, 345 E. 47th St. New York, and N.Y. 10017

DO NOT DUPLICATE 54

2.

4.

5.

6.

- -E..y

35100 S. Rt. 53 Suite 84 Braceville IL 60407 r

.

...

t

..

.....

Page 137: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 SUPPLEMENTAL SHEET

1. Owner: Commonwealth Edison Company One First National Plaza Chicago, Illinois 60690

2. Plant: Braidwood ComEd Plant 35100 S. Rt. 53 Suite 84 Braceville, Illinois 60407

3. Work Performed by Mechanical Maintenace Name

35100 S. Rt. 53 Suite 84, Braceville, IL 640407

Sheet Date Unit

Unit

Address

Identification of System 1RE04C- 3" PIPE

(a) Applicable Construction Code III

Code Cases MIA

(b) Applicable Edition of Section Xl Utilized

Identification of Components Repaired or Replaced and Replacement Components.

3 of 3 March 30, 2000

1

WR# 980003831-01 P.O. No., WR No., etc

Type Code Symbol Stamp Not Applicable Authorization No. Not Applicable Expiration Date Not Applicable

19 74 Edition

19 89 Edition

S75 Addenda

No Addenda

55DO NOT DUPLICATE

(Final)

4.

5.

6.

Name of Name of Manufacturer National Other Year Repaired, ASME Component Manufacturer Serial No. Board Identification Built Replaced, Code; Stamped

No. or Replacement (Yes or No) HEAT NO.

WELD ROD WELDSTAR PK 177 NA SI# 611A38 NA Replacement NO

HEAT NO. WELDOLET CONSOLIDATED 428ZNA NA Cat ID # 1026197 NA Replacement NO

--... _._

Page 138: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 (Back)

9. Remarks CA41 ,4..,vo"odr, ,, ,,j ,V•' ;,- ,3 "• u.O ,o,, x,.---"od evrZApplicable Manufacturer's Data Reports to be attached

!r *)c3 £w'Z~oa &12; e,*-0 ~ GZ4&,' u Z-l~~~'? C~' ~

CERTIFICATE OF COMPLIANCE

We certify that the statements made in the report are correct and this Replacement conforms to the rules of the ASME Code, Section Xl. (Repair or Replacement)

Type Code Symbol Stamp Not Applicable

Certificate of Authorization No. Not ApplicableExiaonDt Nt plcbeExpirDat e Not Ap2plicable Date 04 zOwner or Owner's Designee, Title

Signed

(12/82)

56DO NOT DUPLICATE

CERTIFICATE OF INSERVICE INSPECTION

I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province of - --- 0 k and employed by , k \ C-_.. of -. .-have inspected the components described in this Owner's Report during the period " K -- S-- C, of • - - -, . and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code. Section Xl.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. ". Commissions I W.

Inspector's Signature National Board. State. Province. and Endorsements

Date • , 1___

%J

Page 139: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI

1. Ownert Commonwealth Edison Comnanv Name

One First National Plaza. Chicano. IL 60690 Address

2. Plant: Braidwood ComEd Plant Name

35100 S. Rt. 53 Suite 84. Braceville. IL 60407Address

3. Work Performed by Mechanical Maintenance Name

Braidwood CornEd Plant. 35100 S. Rt. 53 Suite 84. Braceville. IL 60407

4.

5.

Date:

Sheet

Unit

MARCH 27. 2000

1 of

01

WR 990061508-01Repair Organization P.O. No., Job No., etc.

Type Code Symbol Stamp: NIA Authorization Number: N/A Expiration Date: N/A

Address

Identification of System RH - RESIDUAL HEAT

(a) Applicable Construction Code ASME SECT.Ill Z'•, 19 71 Edition, W Addenda,

(b) Applicable Edition of Section Xl Utilized for Repairs or Replacement 19 89

; -f tr, # 0 - 0 1 Conio a, alaa +n tolo.,nf 4.rnaa

N/A Code Case

U. lUCilIIIIU UI I 'SI, *dcJI on I iJ l i i * -I,1 U. i IOiJ l iU i i i lUI' I.I ý,i l - wI =

Name of Name of Manufacturer National Other Year Repaired, ASME Component Manufacturer Serial No. board Identification Built Replaced, Code; Stamped

No. or Replacement (Yes or No) CROSBY VALVE

RELIEF VALVE COMPANY N-56902-00-0015 N/A N/A 1976 REMOVED YES CROSBY VALVE UTC# 2049085

RIELIEF VALVE COMPANY N-56902-00-0005 N/A MRI #288219 1976 REPLACEMNT YES

7. Description of Work REPLACED EXISITNG VALVE WITH THIS ONE.

8. Test Conducted: 0 Hydrostatic 0 Pneumatic eBNominal Operating Pressure

1r "•'-27-, Other: Pressure Z.j( psi TestTemp. Av bt~ouL IF

VT7a Pe~t,ýad I.4-1-00

Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8-1/2 in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12182) This Form (e00030) may be obtained from the Order Dept., ASME, 345 E. 47th St. New York, N.Y. 10017

DO NOT DUPLICATE

57

1

Page 140: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 (Back)

9. Remarks i#QACr•'rc,:•.CE(i. Frsi #4V-1-. AflA•;-, 1 Za RLPL V4 -.1J. 460•-O-0-o00,-o Applicable Manulacturer's Data Reports to be attached

(12/82)

DO NOT DUPLICATE

58

2

CERTIFICATE OF COMPLIANCE

We certify that the statements made in the report are correct and this RAL AC8h14aconforms to the rules of the ASME Code, Section XI. (Repair or Replacement)

Type Code Symbol Stamp LIOr APfI4 -, C8L.

Certificate of Authorization No. DAer AfePL4cA •'L Expiration Date Jor A0•LPUC,4Ud'

Signed itle i- rimto0 Date Desigee /ZeO 0

CERTIFICATE OF INSERVICE INSPECTION

I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province of •--'---,. O. and employed by •-- ( !:- of cr,,- .

have inspected the components described in this Owner's Report during the period - - '- - ft, of 4-'--2-- L - ,and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

-- Commissions -X L, Inspectors Signature National Board, State, Province, and Endorsements

Date 4-,-- , --.

Page 141: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI

1. Owner Commonwealth Edison CompanyName

One First National Plaza, Chicago, IL0690 Address

2. Plant Braidwood CornEd Plant Name

35100 S. Rt. 53 Suite 84, Braceville, IL 60407 Address

3. Work Performed by MECHANICAL MAINTENANCEName

Braidwood ComEd Plant. 35100 S. Rt. 53 Suite 84. Braceville, IL 60407

Date APRIL 1 , 2000

Sheet 1 of 3

Unit 1

WR #990008938-01 Repair Organization P.O. No., Job No., etc.

Type Code Symbol Stamp NOT APPLICABLE Authorization Number NOT APPLICABLE Expiration Date NOT APPLICABLE

Address

4. Identification of System PRESSURE SAFETY RELIEF VALVE #1 RY8010A - "RY" PRESSURIZER SYSTEM

5. (a) Applicable Construction Code SECT.1ll, CL. 1 19 71 Edition, W72 Addenda, NA Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacement 1989 / NO ADDENDA

6. Identification of Components Repaired or Replaced and Replacement Components

7. Description of Work REPLACE VALVE.

8. Test Conducted: VTZ PtA404meJ

"O Hydrostatic

"O Other:

0 Pneumatic

Pressure -ZZ2"5 psi

il Nominal Operating Pressure

Test Temp. g57 OF

Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8-1/2 in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82) This Form (e00030) may be obtained from the Order Dept., ASME, 345 E. 47th St. New York, N.Y. 10017

DO NOT DUPLICATE

59

I

Name of Name of Manufacturer National Other Year Repaired, ASME Component Manufacturer Serial No. board Identification Built Replaced, Code;

No. or Replacement Stamped (Yes or No)

SAFETY VALVE O.E.M. S/N NA IRY801OA NA REPLACED YES I N56964000053 I P&ID M60-5 I I I

SAFETY VALVE CROSBY S/N NA CAT #032724 NA REPLACEMENT YES IN56964000072 I UTC #2045282 1

.4. .4. 4 * 4

Page 142: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 (Back)

9. Remarks Applicable Manufacturer's Data Reports to be attached

CERTIFICATE OF COMPLIANCE

We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section Xl. (Repair or Replacement)

Type Code Symbol Stamp NOT APPLICABLE

Certificate of Authorization No. NOT APPLICABLE

Signed 6 4 \Ow~w or owner's C"esigne

Expiration Date NOT APPLICABLE

Date 416__0 , __%ee. Title

(12/82)

DO NOT DUPLICATE

60

2

CERTIFICATE OF INSERVICE INSPECTION

I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province of -A-. ,...'.• and employed by ý N 1 ' _- , of - C . have inspected the components described in this Owner's Report during the period it\ - 14 4R_• of z4-.- - b , , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

I-_, Commissions - I ,-: F. Inspector's Signature National Board, State, Province, and Endorsements

Date 4x--'-- - -

)0

Page 143: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI

Owner Cc--"onwealth Edison Company Name

One ýirst National Plaze. Chicaco. IL 60690

Plant Bra.cwood Nuclear Power Station Name

R R Box 84. Braceville. IL 60407 AdeeSI

3. Work Performea oy Mechanical Maintenance Braidwood Nuclear Power Station RR. 1 Box 84. Braceviile. IL 60407

4 Identification :4 System y / A ?,"L 0 2Cor- A'--- 40 1 /-• Y"

5. (a) Applicac e Construction Code -L/! "7 I Edition. W 7..7 ,b) Applicac.e Edition of Section XI Utilized f r Repairs c- Replacement - _=?

6. Identification cý Components Repaireo or Replaced and Reolacement Components

Date -f -/-U

Sheet 1 of ....

Unit 0.I

Repai Organization P 0 No. Joo No etc.

Type Code Symbol Stamp Not Applicable Authorization Number Not Applicable

Expiration Date Not Applicable

Addenda, A' Code Case

Description o4 'Jork

Test Conduct3=:

'/rz P./oeA Atfi4/oo

AEPLAc - ) 6Ei.L16- -VALl-

- Hydrostatic

0 Other:

o Pneuma::c Ok Nominal Operating Pressure

Pressure 7__.___ psi Test Temp. 567

Note: Supplemer.ai sheets in form of lists. sketches. or drawings may be used. provided (1) size is 8-1/2 ..: x 11 in., (2) information in items 1 thfouW

6 on this re-ort is included on eacn sheet, and (3) eacn sneet is numbered and the number of sheets is recorded at the top of this form.

'2/82) This Form (eOO030) may be ootair.ed from the Order Dept.. ASME. 345 E. 47th St. New York. N.Y. 10017

61

2.

Name of Name of Manufacturer National Other Year Repaired, ASME

Component Manufacturer Serial No. board Identification Built Replaced. Code:

No. or Stamped Replacement (Yes or No)

_ _ _ _ L I F /A y /2 4144CS Yo ,.o

7

a.

Page 144: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 (Back)

9. Remarks , e OnS to ve ar-a, ,,

CERTIFICATE OF COMPLIANCE

We certify that the statements made in the report are correct and this e conforms to the rules of the ASME Code. Section Xl.

Type Code Symbol Stamp N ) r

Certificate of Authorization No. ik.o Expiration Date A•Oi Agokc-/(C

Signed • 0 Date

CERTIFICATE OF INSERVICE INSPECTION

I, the undersigned. holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of

Province of ",- --•, - = and employed by •-\ of "4" \ 1'..S.

have inspected the components descnbed in this Owners Report during the period k - of =

and state

that to the best of my knowiedge ano belief, the Owner has performed examinations and taken corrective measures described in this Owner's

Report in accordance with the requirements of the ASME Code. Section XI.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations

and corrective measures described in this Owner's Report. Furthermore. neither the Inspector nor his employer shall be liable in any manner for

any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

__ -e __ Commissions 2Z ..• t .

Date-.wor s Sqnaiurs Nati*nal soard. Siate. ProvFw. . and E,,orsa-- i,,t,

Date -. .1•'--'

(12/82)

62

2

Page 145: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI

1. Owner: Commonwealth Edison Company Name

One First National Plaza, Chicago. IL 60690 Addresa

2. Plant: Braidwood ComEd Plant Name

35100 S. Rt. 53 Suite 84. Braceville, IL 60407Address

3. Work Performed by Mechanical Maintenance Name

Braidwood ComEd Plant, 35100 S. Rt. 53 Suite 84, Braceville, IL 60407

Date:

Sheet

Unit

MARCH 27. 2000

1 of

01

WR 980113386-01 Repair Organization P.O. No., Job No., etc.

Type Code Symbol Stamp: N/A Authorization Number: N/A Exiration Date: N/A

Address 4. Identification of System SD - STEAM GENERATOR BLOWDOWN EPN: 1SD04030X

5. (a) Applicable Construction Code ASME SECT.Ill 19 74 Edition, S74 Addenda, (b) Applicable Edition of Section Xl Utilized for Repairs or Replacement 19 89

6 Idrentifircation nf Conmnnnenta Renair•d nr R•rlIaced ann Pnla'n,,.nt R1-n-,n-G- nt-.

N-249 Code Case

7. Description of Work REPLACED EXISITNG STRUT. ATTACH END BY WELDING.

8. Test Conducted: 0 Hydrostatic 0 Pneumatic 0 Nominal Opera

VT 31/A P4-96asmsd Other: Pressure ,. psi Te

ting Pressure

st Temp. 0L... °F

Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8-1/2 in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12182) This Form (e00030) may be obtained from the Order Dept., ASME, 345 E. 47th St. New York, N.Y. 10017

DO NOT DUPLICATE

63

1

Name of Name of Manufacturer National Other Year Repaired, ASME Component Manufacturer Serial No. board Identification Built Replaced, Code; Stamped

No. or Replacement (Yes or No) STRUT UTC #2039532 FIG.640N SIZE B GRINNELL N/A N-2802 MRI #A-99-01427 1999 REPLACEMNT YES

HT # 107489 WELD ROD WELDSTAR N/A N/A QRI# M97-05699 2000 REPLACEMNT NO

Page 146: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 (Back)

a 0 L,'t

Applicable Manufacturer's Data Reports to be attached

(12/82)

DO NOT DUPLICATE

64

2

CERTIFICATE OF COMPLIANCE

We certify that the statements made in the report are correct and this A conforms to the rules of the ASME Code, Section X1. Replacement)

Type Code Symbol Stamp rs . 00 A Aih 1,e

Certificate of Authorization No. vo) " pl!edA. Expiration Date A -Ilhf1 giaW

Signed a V Date __/_/__ -L ý-ni'-O r •wnee rlý,e-i••g i-ee'Ti tIe

CERTIFICATE OF INSERVICE INSPECTION

I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province of "-3--,- o'. and employed by 6-•sr. %. , ...C-, of - 'P'- t' have inspected the components described in this Owner's Report during the period "1 - "-- L. of a-•--\ .-. = , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

I . • Commissions L 4M, I )S Inspector's Signature National Board, State, Province, and Endorsements

Date •% - -'a, , l9_--_.1

Page 147: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI

1. Owner Commonwealth Edison Company Name

One First National Plaza, Chicaqo, IL 60690

Date April 1, 2000

Sheet 1 ofAddress

Plant Braidwood ComEd Plant Name

35100 S. Rt. 53 Suite 84, Braceville, IL 60407 Address

2

Unit 1

WR4990155947-01Repair Organization P.O. No., Job No., etc.

3. Work Performed by Mechanical MaintenanceName

35100 S. Rt. 53 Suite 84, Braceville, IL 60407

Type Code Symbol Stamp

Authorization Number Expiration Date

Not Applicable

Not Applicable Not Applicable

Address

4. Identification of System STEAM GENERATOR BLOWDOW (SG) 1SD002G

5. (a) Applicable Construction Code III (.?1"%9 74 Edition, S75 Addenda, NA Code Case

(b) Applicable Edition of Section XI Utilized for Repairs or Replacement 19 89/No Addenda

6. Identification of Components Repaired or Replaced and Replacement Components

DISASSEMBLE/INSPECT/REPAIR VALVE lSDO02G

O Hydrostatic

0 Other:

0] Pneumatic IVNominal Operating Pressure

Pressure /040 psi Test Temp. 52 F

Name of Name of Manufacturer National Other Year Repaired, ASME Component Manufacturer Serial No. board Identification Built Replaced, Code; Stamped

No. or Replacement (Yes or No) HEAT NO.

WELD ROD WELDSTAR 107489 NA CAT ID 008491 NA REPAIR NO

Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8-1/2 in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82) This Form (e00030) may be obtained from the Order Dept., ASME, 345 E. 47th St. New York, and N.Y. 10017

7. Description of Work

8. Test Conducted:

V-t Z P*4e4uwei A A.~j- Oa

DO NOT DUPLICATE

1

2.

05

Page 148: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 (Back)

Applicable Manufacturer's Data Reports to be attached

CERTIFICATE OF COMPLIANCE

We certify that the statements made in the report are correct and this R e......,,.;t conforms to the rules of the ASME Code, Section XI. D Replacement)

Type Code Symbol Stamp Not Applicable

Certificate of Authorization No. Not Applicable

Signed a 4L (•lA t 0 0 )

Expiration Date Not Applicable

Date 5/ Zoo a_ ,0_I- Owner or Owner's"Designee,'tllle

(12/82)

66DO NOT DUPLICATE

2

9. Remarks

CERTIFICATE OF INSERVICE INSPECTION

I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province of UL.-,.4.-,,.S and employed by \A15-% k I k --- j-, of -. --ý'. '•- _ have inspected the components described in this Owner's Report dudng the period f- e -- - of G -.- - - . and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

L K Commissions : IL Inspector's Signature National Board, State, Province, and Endorsements

Date 4- _ _ g- -_, __ _

Page 149: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI

Owner Commonwealth Edison Comoany Name

One First National Plaze. Chicaoo. IL 60690 ý,aamss

Plant Braidwood Nuclear Power Station Name

R R. 1 Box 84 Braceviile. IL 60407 -.jdress

3. Work Performed by Mechanical Maintenance Braidwooc Nuclear Power Station R R. I Box 84. Braceviile. IL 60407

4 Identification of System S- IAcores$

Pt Piq

Date ///0

Sheet

Unit 0/

of ý-

A Repaw Organization P) 0 No. JOo NO.. etc. - .

Type Code Symrboftamp Not Applicable Authonzation Number Not Applicable

Expiration Date Not Applicable

5 (a) Aoplicable Construction Code 5CL'T "- d • 9 -7 Edition. .'75" Addenda. A,1A Code Case ,b) AppicaDie Edition of Section XI Utilizeo for Repairs or Replacement -99

5 Identification of Components Reoaired or Replaced and Replacement Components

Name of Name of Manufacturer National Other Year Repaired. ASME

Component Manufacturer Senal No. board Identification Built Replaced. Code. No. or Stamped

Replacement (Yes or No)

Description of Work Ch-%ýe biiA Pre!;ea4 ,-t c,.-i 6T j~-

3 Test Conoucted: C3 Hydrostatic 0 Pneumatic C] Nominal Operating Pressure

Pressure psi Test Temo. _ _ F

Note: Supplemental sheets in form of lists. sketches, or drawings may be used. provided (1) size is 8-1/2 in. x 11 in., (2) information in items 1 throw 6 on this report is included on eacn sheet, and (3) eacn sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82) This Form Ie00030) may be obtained from the Order Dept., ASME. 345 E. 47th St. New York. N.Y. 10017

67

1

03 Other:

S................... # ......

Page 150: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5Al Revision 5 Information Use

FORM NIS-2 (Back)

RemarKsAoptcame 'Janufacisurer s Oata Reoons 10 De atiacilea

CERTIFICATE OF COMPLIANCE

we certify that the statements mace in me report are correa ano this conforms to the rules of the ASME Code. Section XI. Reoar or Reciacemen li

Type Code Symbol Stampo M " '-p I'• L

Certificate of Authonzation No. , CC- 3 e - . _ Expiration Date

Signed _ QC . Date '19 0welor Owners Designee. File

CERTIFICATE OF INSERVICE INSPECTION

I. the unoersigned. holding a valid commission issuen :v the National Board of Boiler and Pressure Vessel Inspectors and the State of

Province of W-.-A . -'5 ¶ and employed by --. . e. -.. . of -ewI•l. C. have inspected the components oescribed in this Owner s Report during the period k- Z) -Ž ,'- of ':5- % S.- 2 ,

and state ,hat to the best of my Knowledge and belief. the Owner has oerformed examinations and taken corrective measures descnbed in this Owners

Report in accorcance with the reouirements of the ASME C ý,e. Section Xl.

By signing this certificate. nenner the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations

and corrective measures described in this Owners Report. Furthermore. neither the Inspector nor his employer shall be liable in any manner for

any personal injury or property damage or a loss of any kin= arising from or connected with this inspection.

L . •'-"• "-- Commissions sin__ _ ___. M_ _ __ _ _

insoewor s 5 aiaibe Natcnai Board. Staie. Province. and Endorisemens

Date "-.- ___

(12/82)

68

2

Page 151: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI

1. Owner Commonwealth Edison Company_ Name

One First National Plaze. Chicaoo. IL 60690

2.AddresS

Plant Braidwood Nuclear Power Station Name

R.R. 1 Box 84. Braceville. IL 60407 Addess

3. Work Performed by Mechanical Maintenance Braidwood Nuclear Power Station R.R. 1 Box 84. Braceville. IL 60407 E

4. Identification of System ("40Z"74-.1 72 Oa

Date I - C- c .-'c

Sheet 1

U it 0

of I-

%-T 1913 ý/ 3 3- C) /Repair Organization P.O. No.. Job No.. ew-.

Type Code Symbol Stamp Authorization Number

xpiration Date

5. (a) Applicable Construction Code - Jr 19 74' Edition, '5 7" Addenda, , (b) Applicable Edition of Section XI Utilized for Repairs or Repl-acement Z '?9 --

.Nut Apalcbue Not Applicable Not Applicable

Code Case

6. Identification of Components Repaired or Replaced ano Replacement Components

Name of Name of Manufacturer National Other Year Repaired, ASME Component Manufacturer Serial No. board Identification Built Replaced. Code;

No. or Stamped Replacement (Yes or No)

v wa *s k/ ' j2-A2 _ _ _

7. Description of Work 4,)64A~eo 7>r-ý- At 4,,, 48. Test Conducted: 0 Hydrostatic

VaT I Co • • 0 Other.

VT 3A4 Comf lef"t %%.% VTZ- &t patwkgi~ -

C3 Pneumatic

Pressure 4A psi

)(Nominal Operating Pressure

Test Temp. a/ A -F

Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8-1/2 in. x 11 in., (2) information in items I througi 6 on this report is included on each sheet, and (3) eacn sheet is numbered and the number of sheets is recorded at the top of this form.

(12182) This Form (e00030) may be obtained from the Order Dept., ASME, 345 E. 47th St. New York, N.Y. 10017

69

Page 152: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 (Back)

9. Remarks goI/3g/33-51 C W5 P 4' Marugaciws Data Repiorts to be at010

CERTIFICATE OF COMPLIANCE

We certify that the statements made in the report are correct and this " conforms to the rules of the ASME Code, Section Xl. Repak OQe0I-nen

Type Code Symbol Stamp

Certificate of Authorization No.

Signed

kAfAat bIII~kliI I

riot± Api~c-Aklt

ý- *- Oiwaw Desvkae. Noi

Expiration Date A)df Agphcl'

Date 4// It , o

CERTIFICATE OF INSERVICE INSPECTION

I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province of •-'-- o ' and employed by . . C-. of - -- •have inspected the components described in this Owners Report during the penod ,_-; ý of d.l. '-.- - -.

and state that to the best of my knowledge and belief, the Owner nas performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

".•--' • '~ Commissions • \ -Dtpeews Signaure Naional Board. State. Proance. and En

Date -4-& *

(12/82)

70

2

1ýdA ,44 (0 -I

Page 153: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI

Owner Commonwealth Edison Company Nam

One First National Plaze. Chicago, IL 60690

2. Plant Braidwood Nuclear Power Station_ Name

R.R. 1 Box 84. Braceville. IL 60407 AdeS&

3. Work Performed by Mechanical Maintenance Braidwooo Nuclear Power Station R.R. 1 Box 84. Braceviile. IL 60407

4 Identification of System 4, .- &7:: 2Lc • ,

Date '-i,/ --

Sheet I of __. ........... .. ..... ..

Reoaw Organiiarme P 0. No.. job No.. sm

Type Code Symbol Stamp Not Applicable Authorization Number Not Applcable

Expiration Date Not Applicable

(•2)

5. (a) Applicable Construction Code ... T"7 2Z L, 19 g .". Edition. CL 7 Addenda. (b) Applicable Edition of Section Xl Utilized for Repairs or Replacement / 1,79

Code Case

6. Identification of Components Repaired or Replaced and Replacement Components

Name of Name of Manufacturer National Other Year Repaired. ASME Component Manufacturer Senal No. board Identification Built Replaced. Code;

No. or Stamped Replacement (Yes or No)

A,,,AJJJ /_ / 5 ,. , /3_V

~~// -AA ,J _ __ _ /4 9090/ /, Al ______ ______ PC____? A/ jj1 4

7 Description of Work A Aýorx Z4Z6WA*0 /4{~ "1 14774 Zj..O M2

8. Test Conducted: 0 Hydrostatic

VT~A bl#, 0' Other:

0 Pneumatic

Pressure 0/j, psi

0 Nominal Operating Pressure

Test Temp. A/& -F

Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8-1/2 in. x 11 in.. (2) information in item 1 throug 6 on this report is included on each sheet, and (3) eacn sheet is numbered and the number of sheets is recorded at the top of this foim.

(12182) This Form (e00030) may be obtained from the Order Dept.. ASME. 345 E. 47th St. New York. N.Y. 10017

71

1

L

Page 154: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 (Back)

Amo•ace MImuwac s Daa Rta M to Do ataANG I

AZtr57S ý Z:Z ~'oV0 03:703 / - /

CERTIFICATE OF COMPLIANCE

We certify that the statements made in the report are correct and this rconforms to the rules of the ASME Code. Secion X.

Type Code Symbol Stamp

Certificate of Authorization Nc

Signed

K,)A 1pfri'A~eI I

04

(.7% J

Expiration Date • A oAl1C.A16le

Date /=- I 0VWor OwnWrS'QGSWgn rao

CERTIFICATE OF INSERVICE INSPECTION

I. the undersigned. holding a valid commission issued by the National Board of Boiler and Pressure Vessel InspectorS and the State of Province of --. andemployedby \ c_•. of V- 7 .'q2.I-,,r--'. C , have inspected the components descnbed in this Owners Report during the period " -• ,-k- •--'=' of e-k- 2-- --- • ,

and state that to the best of my knowledge and belief, the Owner nas oerformea examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code. Section XI.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind ansing from or connected with this inspection.

L. - __.- __ __Commissions k-- '"-- ,Daiep-ors SwwIga -.e N1OWn- B•one, Stat. Provnce. Se

Date £4-1.-~ - I's.-- -

(12/82)

722

9. Remarks

Page 155: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI

Name

One First National Plaza. Chicaaoo IL 60690

Name

Address

351008S. Rt. 53 Suite 84. Braceville. IL 60407Address

3. Work Performed by NEWBERG/PERINI/STONE & WEBSTER Name

Braidwood ComEd Plant. 35100 S. Rt. 53 Suite 84. Braceville, IL 60407

Date 03/28/00

Sheet 1 of 2

Unit 01

WR 990108015-01Repair Organization P.O. No., Job No., etc.

Type Code Symbol Stamp N/A Authorization Number N/A Expiration Date N/A

Address

4. Identification of System SI

5. (a) Applicable Construction Code SEC.IIl - 19 71 Edition, W'72 Addenda, N/A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacement 19 89

6. Identification of Components Repaired or Replaced and Replacement Components

Name of Name of Manufacturer National Other Year Repaired, ASME Component Manufacturer Serial No. board Identification Built Replaced, Code; Stamped

No. or Replacement (Yes or No) Check Valve Flowserve Corp. E-532P-2-1 N/A Sl# 24010 N/A Replacement Yes

7. Description of Work

8. Test Conducted:

q/6fzooo

Replaced Check Valve

0 Hydrostatic

0 Other:

o- Pneumatic 03 Nominal Operating Pressure

Pressure Xti s psi Test Temp. -1

Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8-1/2 in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12182) This Form (e00030) may be obtained from the Order Dept., ASME, 345 E. 47th St. New York, N.Y. 10017

DO NOT DUPLICATE

73

1

2.

ommonWeML u son omnanv

F am-rajuwý ýVllluu v9WIL

I r% I- k = : 11wrUVier:•

M! 10 :A..- ý--MA nl-

Name

Page 156: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 (Back)

Applicable Manufacturer's Data Reports to be attached

(12/82)

DO NOT DUPLICATE

74

2

9. Remarks

CERTIFICATE OF COMPLIANCE

We certify that the statements made in the report are correct and this 2CLAa.Mei" conforms to the rules of the ASME Code, Section XI. (Rbpair or•ý

Type Code Symbol Stamp 10Ab Aicable

Certificate of Authorization No. t Q90 tcA INIe Expiration Date ,lo AwIkIle

SignedOrr o ners DasIn-, _tle Date 06 1016 Signedwnr' Desione2Ib e, Title

CERTIFICATE OF INSERVICE INSPECTION

I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province of • -- 'a, % and employed by -k-k'->Vk ,;. \ C--.•. of .--- have inspected the components described in this Owner's Report during the period o - . ef- . - I -2-..- , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

L• .•Commissions "cL--,u , Inspector's Signature National Board, State, Province, and Endorsements

Date -• -'- "- , 1-._

Page 157: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI

1. Owner Commonwealth Edison Comoanv Name

One First National Plaza, Chicago. IL 60690

2.Address

HatocuM1 II~dUV UU MiIu r-IdILName

35100 S. Rt. 53 Suite 84. Braceville. IL 60407

Address

3. Work Performed by NEWBERG/PERINI/STONE & WEBSTER Name

Braidwood CornEd Plant. 35100 S. Rt. 53 Suite 84. Braceville, IL 60407

Date 03/28/00

Sheet 1 of 3

Unit 01

WR 990108015-01Repair Organization P.O. No., Job No., etc.

Type Code Symbol Stamp N/A Authorization Number N/A Expiration Date N/A

Address 4. Identification of System SI

5. (a) Applicable Construction Code SEC.lII iA 19 74 Edition, S '75 Addenda, N/A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacement 19 89

6. Identification of Components Repaired or Replaced and Replacement Components

Name of Name of Manufacturer National Other Year Repaired, ASME Component Manufacturer Serial No. board Identification Built Replaced, Code; Stamped

No. or Replacement (Yes or No) 45 Degree El ASP RA N/A SI #800F38 N/A Replacement N/A

Pipe CPS HT.#8126J N/A SI #786B67 N/A Replacement N/A

Weld Electrode ARCOS LOT/Alloy #7404 N/A SI #611A13 N/A Replacement N/A

Weld Electrode ESBA HT.#PK177 N/A SI #611A38 N/A Peplacement N/A

7. Description of Work

8. Test Conducted:

vrZ Pearoanwd At/$/Go

Replaced 45 Dggree El. And Pipe

13'Hydrostatic

0 Other:

O3 Pneumatic 03 Nominal Operating Pressure

Pressure .u .. psi Test Temp. 55 7 -F

Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8-1/2 in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82) This Form (e00030) may be obtained from the Order Dept., ASME, 345 E. 47th St. New York, N.Y. 10017

DO NOT DUPLICATE "75

1

Name

Page 158: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 SUPPLEMENTAL SHEET

1. Owner: Commonwealth Edison Company One First National Plaza Chicago, Illinois 60690

2. Plant: Braidwood CoinEd Plant 35100 S. Rt. 53 Suite 84 Braceville, Illinois 60407

3. Work Performed by NEWBERG/PERINI/STONE &WEBSTER Name

Braidwood ComEd Plant, 35100 S. Rt. 53 Suite 84, Braceville. IL. 60407 Address

Sheet Date Unit

3 of 3 03/28/00

01

WR 990108015-01 P.O. No., WR No., etc

Type Code Symbol Stamp N/A Authorization No. N/A Expiration Date N/A

4. Identification of System SI

5. (a) Applicable Construction Code SEC.IIl , 19 74 Edition S' 75 Addenda N/A Code Cases N/A

(b) Applicable Edition of Section XI Utilized for Repairs or Replacements, 19 89 Edition N/A Addenda

6. Identification of Components Repaired or Replaced and Replacement Components.

A. A. .1. .1.

*** PARTS EVALUATION NO. A 94-0070-02 DATE: 10/08/94

DO NOT DUPLICATE

(Final)

3

Name of Name of Manufacturer National Other Year Repaired, ASME Component Manufacturer Serial No. Board Identification Built Replaced, Code; Stamped

___________ ~No. ____ ____ ___or Replacement (Yes or No) Flange Various HT.# D2283 N/A SI #781 C37 N/A Replacement N/A

_ _ _ _ I _ _ _ I _ _ _ I -_ _ I _ _ _ I I __ It * 4 4 + 4

76

Page 159: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 (Back)

9. Remarks Applicable Manufaclurer's Data Reports to be attached

CERTIFICATE OF COMPLIANCE

We certify that the statements made in the report are correct and this conforms to the rules of the ASME Code, Section Xl. (Rpair otelae

Type Code Symbol Stamp A)O6 Ag ,hI.R le I I

Certificate of Authorization No. 1I- Expiration Date ion,,a1te)

Signed &r(0 Date On112e,1 ýwno rownes Nsgnee!2 ufe

(12/82)

DO NOT DUPLICATE

77

2

CERTIFICATE OF INSERVICE INSPECTION

I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province of D3.- -' and employed by V--T" \ 'z \ -.- , of %-., v-z'-.. have inspected the components described in this Owner's Report during the period Vz-- --,, O -4- t -- - - , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

--. Commissions 1-' Ic, Inspector's Signature National Board, State, Province, and Endorsements

Date 4-t• % , 1._

Page 160: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI

1 Owner Commonwealth Edison Company Name

One First National Plaza, Chicago, IL 60690 Address

2. Plant Braidwood ComEd Plant Name

35100 S. Rt. 53 Suite 84, Braceville, IL 60407 Address

3. Work Performed by Newbera/Perini/Stone & Webster Name

Braidwood CornEd Plant. 35100 S. Rt. 53 Suite 84. Braceville. IL 60407

Date 03/28/00

Sheet 1 of 2

Unit 01

WR #990108017-01 Repair Organization P.O. No., Job No., etc.

Type Code Symbol Stamp Authorization Number Expiration Date

N/AN/AN/A

Address 4. Identification of System SI

5. (a) Applicable Construction Code Sec. Il1 l -1 19 71 Edition, W '72 Addenda, n/a Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacement 19 89

6. Identification of Components Repaired or Replaced and Replacement Components

Name of Name of Manufacturer National Other Year Repaired, ASME Component Manufacturer Serial No. board Identification Built Replaced, Code; Stamped

No. or Replacement (Yes or No)

Check valve Flowserve corp. E-532P-2-1 N/A SI #24010/ f' N/A -splaGW.4U-" YES

7. Description of Work Performed -Replaced valve

8. Test Conducted:

VT !. D4/6/010

0 Hydrostatic

0 Other:

0 Pneumatic 0 Nominal Operating Pressure

Pressure ZZ1 psi Test Temp. _567 0 F

Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8-1/2 in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82) This Form (e00030) may be obtained from the Order Dept., ASME, 345 E. 47th St. New York, N.Y. 10017

DO NOT DUPLICATE

78

1

Page 161: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 (Back)

Applicable Manufacturers Data Reports to be attached

(12/82)

DO NOT DUPLICATE

79

2

9. Remarks

CERTIFICATE OF COMPLIANCE

We certify that the statements made in the report are correct and this Reiact~eLe" conforms to the rules of the ASME Code, Section Xl. (R~pair or m

Type Code Symbol Stamp K1,ti ACpbLir..be

Certificate of Authorization No. ot Apo.l.••A,L. Expiration Date A34 LAp, hc.D4e

Signed rOwner o eres Date "1 .tl

CERTIFICATE OF INSERVICE INSPECTION

I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province of 2D-'.- • . - k-t' and employed by V--•- T5 1 . .k -- . of - Q-. have inspected the components described in this Owner's Report during the period 4 - - of A-4--' o - , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, conceming the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

- ~~Commissions =L-:p '~ Inspector's Signature National Board, State, Province, and Endorsements

Date A- ' "3- , 1-_-.

Page 162: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI

1. Owner Commonwealth Edison Company Name

One First National Plaza, Chicaqo. IL 60690

2. Plant Braidwood ComEd PlantAddress

Name 35100 S. Rt. 53 Suite 84. Braceville, IL 60407

Address

3. Work Performed by Newbera/Perini/Stone & Webster Name

Braidwood CoinEd Plant, 35100 S. Rt. 53 Suite 84, Braceville, IL 60407

Date 03/28/00

Sheet 1 of

Unit 01

WR 4.9~n1n(Rn 17-n31

2

Repair Organization P.O. No., Job No., etc.

Type Cede Symbol Stamp N/A Authorization Number N/A Expiration Date N/A

Address 4. Identification of System SI

5. (a) Applicable Construction Code Sec. III CIA 19 74 Edition, S '75 Addenda, n/a Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacement 19 89

6. Identification of Components Repaired or Replaced and Replacement Components

Name of Name of Manufacturer National Other Year Repaired, ASME Component Manufacturer Serial No. board Identification Built Replaced, Code; Stamped

No. or Replacement (Yes or No)

90 DEGREE EL ASP AJ1 N/A SI #800B39 N/A Replacement N/A

Weld electrode The ESAB Group Ht #PK 177 N/A SI #611A38 N/A Replacement N/A

Pipe CPS Ht. #8126J N/A SI #786B67 N/A Replacement N/A

Flange CPS Ht #86OXNE N/A SI #781 C37 N/A Replacement N/A

Description of Work Performed REP

Test Conducted: 0 Hydrostatic

0 Other:

LACED 90 DEGREE EL. PIPE. AND FLANGE

o Pneumatic 0 Nominal Operating Pressure

Pressure ,L psi Test Temp. 57 -F

Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8-1/2 in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82) This Form (e00030) may be obtained from the Order Dept., ASME, 345 E. 47th St. New York, N.Y. 10017

DO NOT DUPLICATE

80

1

7.

8.

Page 163: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 (Back)

Applicable Manufacturers Data Reports to be attached

LIOC (Aoi(e 0AG- A 4U im,oik'A.

(12/82)

DO NOT DUPLICATE

81

2

9. Remarks

CERTIFICATE OF COMPLIANCE

We certify that the statements made in the report are correct and this gtJewi cnforms to the rules of the ASME Code, Section XI. (RelSair or placemen

Type Code Symbol Stamp I0) oht A pot •Able

Certificate of Authorization No. t.) t .o_•_l-L•bL Expiration Date LAJ. i c f & .Ith hle

Signed r-, 4% lA Date o1,o, 1_ _ dlvne~ror Owner's Obs-ignee, Tit~e -

CERTIFICATE OF INSERVICE INSPECTION

I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province of -'--• ft--5 and employed by T-" \ \ of ,-,-, --. have inspected the components described in this Owner's Report during the period \ , - , -c of 4. i - - , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

L L- ."' Commissions -5.A-..., '. Inspectors Signature National Board, State, Province, and Endorsements

Date -b.\ , 1-_

Page 164: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

D. 0121 /oBwAP 1600-5A1 Revision 5Information Use

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI

Owner Commonwealth Edison Company Name

One First National Plaze. Chicago. IL 60690

2. Plant Braidwood Nuclear Power Station_ Nare

R.R. 1 Box 84. Braceville. IL 60407 AJ"re"

3. Work Performed by Mechanical Maintenance Braidwood Nuclear Power Station R.R. 1 Box 84. Braceville, IL 60407

4. Identification of System _Y . e 16iI /.

Date o I Z

Sheet _ of

Unit O

Reow Onganimi•n P 0 No.. Job No.. eti.

Type Code Symbol Stamp Not Applicable Authonzation Number Not Applicable

Expiration Date Not Applicable

5. (a) Applicable Construction Code •$1.T 1i .i '2.tl *11• Edition. "/- Addenda, 1-3 Code Case

(b) Applicable Edition of Section XI Utilized for Repairs or Replacement 1989

6. Identification of Components Repaireo or Replaced ana Replacement Components 15,Ul46/!

j,*%j F- Ai, o a-PLA..C1E P., ALL.7. Description of Work

, -.- �

8 Test Conducted: 3 Hydrostatic U P'neumatic C Nominal Operating Pressure

06L ¢_o;e C3 Other: Pressure __psi Test Temp. _F

Note: Supplemental sheets in form of lists, sketches, or drawings may be used. provided (1) size is 8-1/2 in. x 11 in., (2) information in items 1 throu

6 on this report is included on eaci sheet, and (3) eacri sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82) This Form (e00030) may be obtained from the Order Dept., ASME. 345 E. 47th St. New York, N.Y. 10017

82

1

Name of Name of Manufacturer National Other Year Repaimd. ASME

Component Manufacturer Serial No. board Identification Built Replaced. Code; No. or Stamped

Replacement (Yes or No)

&AL-A nam t4/A _____)A rA-4 4 I.J/A RLIEPLACF-a 14 0

CAjlrg Wgile'e

Page 165: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 (Back)

9. Remarks C-L-7?71 r

AIA r1;;PJA,(-

(rcA 7-C £/ C'/~Z''Qi t"A Mr ,r %AWI i8rtuN q _ Oats Reaons to mac

7;;5 7'"T

ct�rgr;P,� £2 I

CERTIFICATE OF COMPLIANCE

We certify that the statements mace in the report are correa and this P conforms to the rules of the ASME Code. Section XI. (Row br Reomacemnt I•

Type Code Symbol Stamp

Certificate of Authorization No.

K3oý apl'jiIILIAlo

Signed n 0 ý1- ~~Ok w C r w s Des ga .Ttle

Expiration Date /b i c le

Date 9-30 .19 j

CERTIFICATE OF INSERVICE INSPECTION

I. the unoersigned, holding a valid commission issuea :v the National Board of Boiler and Pressure Vessel Inspectors and the State of

Province of -- ,- andemployed by '----" t. C_4•. of ' have inspected the components described in this Owner s Report during the penod - -,: c of q -".-- ,

and state that to the best of my knowledge ana belief, the Owner has oerformed examinations and taken corrective measures described in this Owner's

Report in accordance with the requirements of the ASME C=e. Section XI.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied. concerning the examinations

and corrective measures described in this Owner's Report. Furthermore. neither the Inspector nor his employer shall be liable in any manner for

any personal injury or property damage or a loss of any kin. arising from or connected with this inspection.

Inspe=ca s Sgnature

Date 9 1 9 eje.

Commissions t -1-----•- L &': Namino Board. State. Provvlw. an Endo••anwrts

(12/82)

,832

I I

Page 166: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI

1. Owner Commonwealth Edison ComoanvName

Address Plant: Braidwood CornEd Plant

Name

35100 S. Rt. 53 Suite 84, Braceville, IL 60407 Address

3. Work Performed by Mechanical Maintenance Name

Braidwood CornEd Plant, 35100 S. Rt. 53 Suite 84. Braceville. IL 60407

Date April 2. 2000

Sheet 1 of

Unit 01

WR 980119784-01 Repair Organization P.O. No.. Job No.. etc.

Type Code Symbol Stamp N/A Authorization Number N/A E nirafinn D-~t K;^

Address

Identification of System Reactor Building

(a) Applicable Construction Code: ASME SECT.Ill / DIV.2 19 * Edition, * Addenda, N/A Code Case. * 1973 Proposed Standard Code of Concrete reactor vessels & Containments as addressed in the UFSAR, Appx.B.

(b) Applicable Edition of Section Xl Utilized for Repairs or Replacement 19 92.92 Addenda.

Identification of Components Repaired or Replaced and Replacement Components:

Description of Work: Repair of 6"x12" area of spalled concrete at the constr. ioint between tendon Buttress A & B, - 10' above Aux.Bldq roof.

8. Test Conducted: 0 Hydrostatic 0 Pneumatic 0 Nominal Operating Pressure

SOther: Pressure M ,7 psi Test Temp.AEMCAB A-F

FVCr$G=PeeAB CA. GXOS 4%&MPO2C.. J Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8-1/2 in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

AeOFt AA Ai.-#i LA~ Lt

(12/82) This Form (e00030) may be obtained from the Order Dept., ASME, 345 E. 47th St. New York, N.Y. 10017

DO NOT DUPLICATE 84

1

2.

4.

5.

6.

Name of Name of Manufacturer National Other Year Repaired, ASME Component Manufacturer Serial No. board Identification Built Replaced, Code; No. or Stamped

Replacement (Yes or No) Ul Containment UTC # 2045911 Exterior Wall Master Builders Lot #M1665011X9 N/A RIN 27798 N/A Repaired No

7.

Page 167: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

gw4 �9o//97�?�ol9. Remarks CETfIIr,. oF~ Ca.>sraA-.JhA&&,ce mA~~A-rqaALimcr v'aoidLt rt,

Applicable Manufacturer's Data 'Reports to be attached J ----- �

CERTIFICATE OF COMPLIANCE

We certify that the statements made in the report are correct and thisR6ldhi e conforms to the rules of the ASME Code, Section XA. (Repairor Replacement)

,T-ype Code Symbol Stamp -tda AP ICdLr

Certificate of Authorization No. MdT" Ajmt -,cA L" Expiration Date J6t/ C.A* SL

Signed OJQ4 L -ý Date 06 / -7 4' 0 % Owner or Owner's Designee. Title

(12/82)

DO NOT DUPLICATE

:85

2

AA Aqri m A•I

FORM NIS-2 (Back)

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of

Province of "- t - 5 and employed by k-ý ' - --- \ 1 . of , . .• have inspected the components described in this Owner's Report during the period 2-- 2 -. = e . -and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

L Commissions 7L -A-. I Inspector's Signature National Board. State. Province. and Endorsements

Date C; _ . _ ,

Page 168: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI

1. Owner Commnnwealth Jtiinn _nName

I1 ý a n.a, rl za, C•llt.di . IL / OUOtU Address

Plant: Braidwood CornEd Plant Name

35100 S. Rt. 53 Suite 84. Braceville, IL 60407 Address

3. Work Performed by Mechanical MaintenanceName

Braidwood CorEd Plant, 35100 S. Rt. 53 Suite 84, Braceville, IL 60407Address

4. Identification of System Reac~tor RmIldeinn

Date

Sheet I of __

Unit 01

WR 980119784-02 Repair Organization P.O. No.. Job No.. etc.

Type Code Symbol Stamp N/A Authorization Number N/A Expiration Date N/A

5. (a) Applicable Constwction Code: ASME SECT.Ill I DIV.2 19_* Edition, _______ Addenda, NIA Code Case.

5. (a) Applicable Construction Code: ASME SECT.Ill / DIV.2 19 * Edition, * Addenda, N/A Code Case. • 1973 Proposed Standard Code of Concrete reactor ves-sels & Containments as addressed in the UFSAR, Appx.B.

"- (b) Applicable Edition of Section XI Utilized for Repairs or Replacement 19 92, 92 Addenda.

6. Identification of Components Repaired or Replaced and Replacement Components:

I _______ L ________ J _________ I __ I. ______ I ______

7. Description of Work: Repair of 6"x12" area of spalled concrete at the constr. ioint between tendon Buttress A & B. - 10' above Aux.Bldq roof.

o. i es, Conducted: U Hydrostatic 0 Pneumatic 0 Nominal Operating Pressure

ILOther: Pressure -Mwaft" ipsi Test Temp. -F ?M~P& C 4p~.Vg'.(~ o~ gyoeD RcrA4t. M s-ui~wAcsa Ve1ssteu -ro iBe' r A ej*A't,9

Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8-1/2 in. xl1 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82) This Form (e00030) may be obtained from the Order Dept., ASME, 345 E. 47th St. New York, N.Y. 10017

DO NOT DUPLICATE 36

1

2.

Name of Name of Manufacturer National Other Year Repaired, ASME Component Manufacturer Serial No. board Identification Built Replaced, Code; No. or Stamped

Replacement -(Yes or No) U1 Containment UTC # 2045911

Exterior Wall Master Builders Lot #M1665011X9 N/A RIN 27798 N/A Repaired No

rI i 4- 4- i I

t:! Z

. I

A-1~ 3 ')nnn

.. ý

Page 169: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 (Back)

9. Remarks ArTTcoez A4e0(b AiAA)QF:AC.1ra4.WL lý11IC4r-60 OF~ e ApplicbLe Manufacturer Data ReorS to be attached .. MA f4 AL,4-rýs-r otl _P Fi- 11-Y A., MiA ,ý04.Ai4. (

5-44 10A.o)_' 34eZAaIIqC4 &our c c_____tes._

CERTIFICATE OF COMPLIANCE

We certify that the statements made in the report are correct and this-'Ft- conforms to the rules of the ASME Code, Section Xl. (Repair or Replacement)

Type Code Symbol Stamp Il" - Ap P•L4 (.A X W5, '• Certificate of Authorization No. &)ýz' A e#,i C 1 , Expiration Date rJl APPtpsaw u,

Signed ± Date 0 6 OZ 07 0 00, Owner or Owner's Designee. Title

(12/82)

DO NOT DUPLICATE

87

;9<2

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of

Province of " . and employed by TL -"h\ \ - of \,,- 'J -,. C have inspected the components described in this Owner's Report during the period 2 - - a - C . C --3, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

J - commissions k "•" '. Inspector's Signature National Board. State. Province. and Endorsements

Date G -9 ,-

I

AXWW_ M41 // ?;74? 3/- 0 ?-

Page 170: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI

1. Owner CoMmonwealth Edison Company ,ame

One First National Plaza. Chicao. iL 60690 Aadmsa

.ame �510O S. Rt � Sititp P4 Rr�r�vjii� II �fl�in7

3. Work Performed by MECHANICAL MAINTENANCE

Name Braidwooo CornEd P!ant, 35100 S. Rt. 53 Suite 84, Bracevile. IL C-0407

i. dentification of System P-EA,..', fo(bt4(,

Date - '

Sheet of I

Unit

=.eoaer Organization P.O. No.. Joo No.. etc.

Type Code Symbool Stamp Authonzation Numoer

Expiration Date

N/A NIAN/A

(a) Applicable Construction Code _re'T.1t bw. l 19_ _ 19 Edition. x Addenda. N/Ps Code Case .b) Amolicable Edition ot Section XI Utilized for Reoajrs or Replacement 19 - o . -I Z ^OD•'-DA

.. 'dentification of Components Reoairea or Replaced ana Reolacement Components

Name of Name of Manufacturer National Other Year Reoaired, ASME Component Manufacturer Serial No. board Identification Built Replaced, Code: Stamped

No. or Reolacement (Yes or No) %4-1 E okE-l4,-T m i-ri, goT f ___"_ '| 4/A LOT 0

7. Description of Work -fA4A S•, .LL' ,,e, A .-A , .-. I r.o.,l4Ag.3,A4V'4* •l" Xr,--, ,

S. Test Conducted: 0 Hydrostatic 0 Pneumatic [3 Nominal Operating Pressure

"- Other: Pressure g)eWli CA4 B6pts 1 Test Tern

Ptsox- -c & vOL.4ceaA X> r-WSI (ZrjvAjZ Ir 3-C- ey-A . 0 .aLc~o~

Note: Supplemental shit n mforrn of list . sketches, or drawings may be used, provided (1) size is 8-1/2 in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the too of this form.

(12/82) This Form (e00030) mav oe obtained from the Order Deot.. ASME. 345 E. 47th St. New York, N.Y. 10017

88

1

I PI t'Rrnjdwoocjr'-P,'P1 +

Page 171: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 (Back) / , 4o//i?2Y-a3

9. Re(awsl. A A -4 -, ii-- tce Tr .o ,C Cc .AA,,, c . t..), M ATE ZIA Araolisl mamnuacturersaw ataRoon Iob~nce

ATtu~oArMA~rL-)1elAL (q,2OVrr) Ct.i'6- cov~g S I .')7imr

CERTIFICATE OF COMPLIANCE

We certify that thre statements maae in the report are correct and this R PAI (2 conforms to the rules of the ASME Code. Section X1. Repair elr Aeoiacemenri

"Type Code Symbol Stamo LJOr ke,4 cA 9 Le' Certificate of Authorization No. 16,T ( I0 C S Expiration DateJa-1 Aep(cA i

Signet " Date ____________G____

Owner or Owners Oesgnee. i-1e

CERTIFICATE OF INSERVICE INSPECTION

I, the undersigned. holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province of •--- - M 5' and employed by V -7. k " k C:-• of -have inspected the components described in this Owner's Report dunng the period _-2- " ,. - 1

- -,,1 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.

By signing tnis certificate, neither the Inspector nor his emoloyer makes any warranty, exDressed or imonied, concerning the examinations and corrective measures oescrioed in this Owners Reoort. Furthermore, neither the Inspector nor nis employer snail be liable in any manner for any personal injury or property damage or a loss of any Kina arising from or connecteo with this inspection.

__ __ __ __ _ __ __C Comm issions -' ns'oectors Signature Natlonal Boaro. State. Provnce, and EnOomeariefts

Date LOt -9

(12/82)

39

2

Page 172: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI

Owner Commonwealth Edison Company Naom

One First National Plaze. Chicago, IL 60690 Address

2. Plant Braidwood Nuclear Power Station Nanm

R.R. 1 Box 84. Braceville. IL 60407 Acdess

3. Work Performed by Mechanical Maintenance Braidwooo Nuclear Power Station R.R. 1 Box 84. Braceville. IL 60407

Add,*"s 4 Identification of System io, y4

Date- :

Sheet I

I -o uif AF

of 1

f 4 do/O 7'q84-- o4-ROWe Organmizton P.O0 No.. Job No.. emc

Type Code Symbol Stamp Authorization Number

Expiration Date

Not Applicable Not Applicable Not Applicable

5 ýa) Applicable Construction COdeJ-r A 19 Edition. X- Addenda. / CodeCase b) Applicable Edition of Section I Utilized for R pairs or Replacment /'? "Z 19 A .. enuncation oC Components Repaired or Replaced ano Replacement Components " ;T/ / ;L 730-64&40

7 Description of Work Ak,,alll

8. Test Conducted:

Note:

V

1" Hydrostatic UPneumatic 0 Nominal Operating Pressure

SOther: Pressure ! psi Test Temp. * 0F

AVC*4DA( ILL L Z . k / $ L 7-'51 0.:4Lo:a"Yezc' Supplemental sheets in form of lists, skefches. or drawings may be used, provided (1) size is 8-112 in. x 11 in.. (2) information in items 1 througt 6 on this report is included on each sheet, and (3) eact1 sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82) This Form (e00030) may be obtained from the Order Dept., ASME, 345 E. 47th St. New York, N.Y. 10017

1

Name of Name of Manufacturer National Other Year Repaired, ASME Component Manufacturer Serial No. board Identification Built Replaced. Code; No. or Stamped

Replacement (Yes or No) 75U TJ7

of

2-'-

.....

-- iQ - - - - I - ---eýe-' -77'.ý'; - 4,7WeIDMCAý7-

VM FJJý* T-6 J%97 Tk,0jP(,&tLj 10,ee'4'et.0 T'kii-60. -re, FLOCiule."r (2&YA ',a OAo4l TaW 4 6-1-00

Page 173: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 (Back)

A mo Manuraare.r s Oati Rons to ce atlacea

�aJI� Co 6'R'i�PAjL s.LAr�riAI, r

CERTIFICATE OF COMPLIANCE

We certify that the statements maae in the report are correct and this . conforms to the rules of the ASME Code, Section XI. Repair or Reolacement)

Type Code Symbol Stamp

Certificate of Authorization No. Atlo-i Af CL.A &LC

SignedU Owner or Owners Oestgnee. Tn.

Expiration Date &ieu" A f , L ,

Date o L 740--

CERTIFICATE OF INSERVICE INSPECTION

I. the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province of " -, %,m and employed by -'T' \ • \ '-"• of -'-',' .have inspected the components descnred in this Owners Report curing the period 2 -2-5- "a- co . and state that to the best of my knowledge and belief. the Owner nas oerformea examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

ý I---, ý Commissions - c. oDrdoeors Signatue. National SBoa. State. Provinc. and En nm

Date (- -- 9 Z

(12/82)

Ž9<

2

'e..+

C MIE11 Ir r C 'Jf=A........ ....

*4 .....l-1 68 ir AAAT-x -tdi

I =0, . - A A f JC-

AvrA ciditio 551ax& aN, 6- 0-7- db

."-.•.•, /P.• | •.,•t.,#el.=,,,,m..,

Page 174: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENT As Required by the Provisions of the ASME Code Section XI

Owner Ccr-'onwealth Edison Comoany Name

O'e ýýrst National Plaze. Chicaao. IL 60690;'Caress

2. P!ant Bra.•zvooa Nuclear Power Station_ Name

R R 'Box 84 Bfracevifie IL 60407.A0emss

3. Work Perforr,--o oy Mechanicai Maintenance --raidwooo Nuclear Power Station :R R 1 Box 84 Bracevile. IL 50407

4 Identification :- System -

Date

Sheet of

Type Code Symbol Stamp Authonzation Number

Expiration Date

5 a) Aoolica: e Construction Code ! ], -/'VIVZ. I 9 -* Edition. * Addenda. fJ A Code Case :oi Aopiocac.e Edition of Section XI Utilizea tor Reoairs c- Replacement .ýg ij9z ie4, -. _ m '3 '.•--. •-.b,,, O•o •',- ,uc~ •- -t• #•',••.~i,-L • •'s • ,&• t•A•. L 4• '

--.. Identification Components Reoaireo or Reolacea ana Reoiacement ComPonents

Name of Name of Manufacturer I National Other Year Repaired. ASME Comoonent Manufacturer Senal No. board Identification Built Replaced. Code:

No. or Stamped Replacement (Yes or Nol

S,-4A _______________ il 0A t(.Tc iz.4

7 Description cý Work ,ý 0<n oAJ0"wu LL-( IXu'6p, 0r 0.40 M .,-cT l 1-//I

8 Test Concluc-en: 03 Hydrostatic "3 Pneumat - 0 Nominal Ooerating Pressure

S. Other: Pressuu #•Oe-4 ,psi Test Temp l•6 ýF

fotfe: 'uelger•'r/.:A sleel/s Kin forrm of hists. Netcnes, or -5r0gs may be use. provaea (1) size is 8-112 in. x 11 in., (2) information in items 1 through

6 on this reonr is included on each sheet. and (3) each. sneet is numoered and the number of sheets is recorded at the top of this form.

"2182) This Form (e00030) may be ootairea from the Order Dept.. ASME. 345 E. 47th St. New York. N.Y. 10017

Regaw Organzati~on P 0 No. JoC No. *cI.

Not Applicable Not Applicable Not Applicable

6Unit.

RetR 9'organTza• ON. -057.et

Page 175: Braidwood Station, Unit1 Inservice Inspection Summary Report · UNIT 1 INSERVICE INSPECTION SUMMARY REPORT FOR: Interval 2, Period 1, Outage 2 STATION ADDRESS: Braidwood Station 35100

BwAP 1600-5A1 Revision 5 Information Use

FORM NIS-2 (Back)

9. RemarKS c$),/,4e der ,f, -d e7W4x& lk- O4- 6 ?o4.X1*e1WAfC ~ ,,,~ Au I 1Mnuau,er S i fiprt o.aate ASL dddV 4~ffe~4, ~ Ai.@J we/9-4e2w xs

CERTIFICATE OF COMPLIANCE

We certityriat thn statements mace in the reoort are correct anr this -ý :Xl A conforms to the rules of the ASME Code. Section XI. Reoair or rreomacemetli

Type Code Svmool Stamp 4.4 l4'l1 " 6' 4 eS Certificate of Authorization No. 060P PJC/fte

SignedSOwner or uwner s L)esty"ne (ime

-Expiration Date A1-0T-0104,44dte0<

Date d7Z V 1 __ _

CERTIFICATE OF INSERVICE INSPECTION

I. the undersigned. holcing a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province of - , and employedby A ' \ L of __-__ --_.-_.._-______ have insoected the components described in this Owners Report during the oeriod 2 - - C -- ., , and state that to the best of my knowledge ano belief, the Owner nas performed examinations and taken corrective measures described in this Owner's Report in accoroance win the reautrements of the ASME Code. Section XI.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied. concerning the examinations and corrective measures described in this Owners Report. Furthermore. neither the Inspector nor nis employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

i1r400eO s S9natureCommissions % %0---• '[ ,o

I Natona* oaea. State. Pro.ce aW Endarlemwue

I Date Lo C- 9z~odo-

(12/82)

S32