Part of Ballast Water Webinar Week 18-22 May 2020 Sponsored by Overcoming bottlenecks on BWMS retrofit installation and operation 20 May 2020 • 09:00-09:45 BST Presentation documents Page 2: Dimitrios Tsoulos, De Nora Water Technologies Page 5: Nitesh Ranvah, 21 Knots Page 12: Jad Mouawad, Mouawad Consulting

Upload: others

Post on 07-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Overcoming bottlenecks on Part of Ballast Water BWMS ... · Industrial Estate, Thane (W) –400604, India info@21-knots.com CORPORATE OFFICE: USA 15 Prospect Lane, Suite 2-AB Colonia,

Part of

Ballast Water

Webinar Week

18-22 May 2020

Sponsored by

Overcoming bottlenecks on

BWMS retrofit installation

and operation

20 May 2020 • 09:00-09:45 BST

Presentation documents

Page 2: Dimitrios Tsoulos, De Nora Water Technologies

Page 5: Nitesh Ranvah, 21 Knots

Page 12: Jad Mouawad, Mouawad Consulting

Page 2: Overcoming bottlenecks on Part of Ballast Water BWMS ... · Industrial Estate, Thane (W) –400604, India info@21-knots.com CORPORATE OFFICE: USA 15 Prospect Lane, Suite 2-AB Colonia,

WATER MADE EASY

INDUSTRIALMUNICIPALENERGYMARINE

Overcoming bottlenecks on BWMS retrofit installation and operationDimitrios Tsoulos

Sales Manager EMEA - BALPURE® BWMS

Page 3: Overcoming bottlenecks on Part of Ballast Water BWMS ... · Industrial Estate, Thane (W) –400604, India info@21-knots.com CORPORATE OFFICE: USA 15 Prospect Lane, Suite 2-AB Colonia,

2WATER MADE EASY

Challenges and Way forward

Regulatory Compliance

Uncertainty on Cost / Time Estimation

Resource Scarcity

COVID-19 Impact

PLANWell in advance!

Reliable BWMS Maker

Experienced Marine

Engineering

Competent Yard

Utilize Experience

Develop Work Groups

- Establish Partnerships

Our CommitmentDedicated PM and Service teamFlexible System DesignSole Core Equipment MakerProcurement OptimizationProcess Water ExpertsGlobal Footprint

Page 4: Overcoming bottlenecks on Part of Ballast Water BWMS ... · Industrial Estate, Thane (W) –400604, India info@21-knots.com CORPORATE OFFICE: USA 15 Prospect Lane, Suite 2-AB Colonia,

[email protected]

www.denora.com

Dimitrios Tsoulos

Regional Sales Manager EMEA

De Nora Water Technologies

Mob: + 30 6947999921

Email: [email protected]

Page 5: Overcoming bottlenecks on Part of Ballast Water BWMS ... · Industrial Estate, Thane (W) –400604, India info@21-knots.com CORPORATE OFFICE: USA 15 Prospect Lane, Suite 2-AB Colonia,

BWTS Retrofits –Working StrategyChallenges and Bottlenecks

May 2020

© 21 Knots Design & Operations Pte. Ltd.

Page 6: Overcoming bottlenecks on Part of Ballast Water BWMS ... · Industrial Estate, Thane (W) –400604, India info@21-knots.com CORPORATE OFFICE: USA 15 Prospect Lane, Suite 2-AB Colonia,

BWTS Retrofit Installation Challenges – A jigsaw puzzle with loose ends…

© 21 Knots Design & Operations Pte. Ltd.2

▪ Plan the retrofit

▪ Finalize OEM and Shipyard

▪ Prepare the vessel for the retrofit

▪ Prepare finances

SHIPOWNER▪ Arrange for docking slot

▪ Arrange labour

▪ Plan fabrication and installation

SHIPYARD

▪ Supply of equipment and spares

▪ Provide after-sales service

OEM / MAKER▪ Test and trials of the system

COMMISSIONING

Page 7: Overcoming bottlenecks on Part of Ballast Water BWMS ... · Industrial Estate, Thane (W) –400604, India info@21-knots.com CORPORATE OFFICE: USA 15 Prospect Lane, Suite 2-AB Colonia,

Installation Challenges

© 21 Knots Design & Operations Pte. Ltd.3

– Is Yard Stay Really Required ?BWTS Installation

THE NEW

2020

Volatile Shipyard Market

▪ Yard availability and

accessibility are posing

continuous challenge.

▪ Eg: a vessel had to wait 14 days

quarantine in Turkey to enter the yard.

▪ Yard schedules are affected

with disruption in labour and

material availability.

▪ Eg: a major yard in Singapore had to

stop operations in middle of retrofit

affecting vessel to be stuck in yards for

more than 3 weeks and ongoing.

1 Delays in Delivery

▪ Lockdowns in Europe / China /

Korea has been continuously

affecting production schedule

of equipment

▪ Many OEMs are gearing to

increase committed lead time of

equipment beyond 6-8 months

▪ Many docking cancelled due at

last moment due to inability to

ship BWTS system to yards

2 Risk of Virus in Yards

▪ Yard stay should be

minimized

▪ Crew Interaction to be

minimised

3

Page 8: Overcoming bottlenecks on Part of Ballast Water BWMS ... · Industrial Estate, Thane (W) –400604, India info@21-knots.com CORPORATE OFFICE: USA 15 Prospect Lane, Suite 2-AB Colonia,

On-Voyage Installation – a viable option ?

© 21 Knots Design & Operations Pte. Ltd.4

– Several catalysts in place …On-Voyage Installation

IMPROVED Engineering

▪ With improved engineering

capabilities – 3D scanning and

Production engineering, on-

voyage installation work can be

planned and executed with least

surprises.

MORE Flexibility

▪ Provides the much-needed

flexibility to retrofit in terms of last

moment change in global

pandemic scenarios

PHASED Installation

▪ Phase Wise Work is Possible –

Unlike yard, on-voyage work can

be done in different phases

allowing vessel to operate with

minimum impacto Prefabrication at globally suitable

site depending on vessel trading

pattern

o Riding Squad to carry out all

installation work

o Commissioning Team for final end

connection and commissioning –

Can be left to yard scope

REDUCED Exposure

▪ Vessel gets exposed to maximum

6-8 workers at a time unlike a

typical yard installation

Page 9: Overcoming bottlenecks on Part of Ballast Water BWMS ... · Industrial Estate, Thane (W) –400604, India info@21-knots.com CORPORATE OFFICE: USA 15 Prospect Lane, Suite 2-AB Colonia,

BWTS Projects Snapshots

© 21 Knots Design & Operations Pte. Ltd.5

BWTS Engine Room components

Page 10: Overcoming bottlenecks on Part of Ballast Water BWMS ... · Industrial Estate, Thane (W) –400604, India info@21-knots.com CORPORATE OFFICE: USA 15 Prospect Lane, Suite 2-AB Colonia,

Service Offerings

© 21 Knots Design & Operations Pte. Ltd.6

Turnkey Solutions

Engineering

Site Services

Marine Inspections & Surveys

Green Ship Recycling

ENGINEERING

Designs and Class approvals for new construction, retrofits and upgradations

Naval Architecture, Structure, Machinery & Piping, Outfit, Electrical

Offshore engineering and consulting services

GREEN SHIP RECYCLING

IMO HKC Compliance in ship breaking and supervision for demolition

IHM surveys

SITE SERVICES

Owner’s Representative for new construction, retrofits and upgradation

Docking planning and management, on site supervision and quality control

Retrofits installation

MARINE INSPECTIONS & SURVEYS

Damage assessment surveys, condition surveys, pre-purchase inspections

TURNKEY SOLUTIONS

Complete Engineering, Installation and Project Management services for

new construction, retrofits and upgradations

Page 11: Overcoming bottlenecks on Part of Ballast Water BWMS ... · Industrial Estate, Thane (W) –400604, India info@21-knots.com CORPORATE OFFICE: USA 15 Prospect Lane, Suite 2-AB Colonia,

Thank You

CORPORATE OFFICE: INDIA

216A, Lodha Supremus 2, Road No. 22, Wagle

Industrial Estate, Thane (W) – 400604, India

[email protected]

CORPORATE OFFICE: USA

15 Prospect Lane, Suite 2-AB

Colonia, NJ 07067, USA

[email protected]

REGD. OFFICE: JV

#05-24, AZ Building

140 Paya Lebar Road, Singapore

[email protected]

Page 12: Overcoming bottlenecks on Part of Ballast Water BWMS ... · Industrial Estate, Thane (W) –400604, India info@21-knots.com CORPORATE OFFICE: USA 15 Prospect Lane, Suite 2-AB Colonia,

MOUAWAD CONSULTING AS © 2020

Overcoming bottlenecks on BWMS retrofit installation and operation

Riviera Maritime Webinar | May, 2020

Jad Mouawad | CEO

Page 13: Overcoming bottlenecks on Part of Ballast Water BWMS ... · Industrial Estate, Thane (W) –400604, India info@21-knots.com CORPORATE OFFICE: USA 15 Prospect Lane, Suite 2-AB Colonia,

2 MOUAWAD CONSULTING AS © 2020

BWM – State of the Market

2019 2020 2021 2022 2023 2024 2025 2026

# uptakes 1450 2650 4000 15000 4000 2750 2000 2000

# in China 1015 1855 2800 10500 2800 1925 1400 1400

# MC contracts 90 160

0

2000

4000

6000

8000

10000

12000

14000

16000

Total BWMS uptake vs China retrofits w/o USCG effect, basedon IOPP Renewal dates

Number of contracted ships in 2019 and 2020 vs expected ballast uptake – multiple BWMS makers2025 & 2026 are New Building numbers, not retrofit

Page 14: Overcoming bottlenecks on Part of Ballast Water BWMS ... · Industrial Estate, Thane (W) –400604, India info@21-knots.com CORPORATE OFFICE: USA 15 Prospect Lane, Suite 2-AB Colonia,

3 MOUAWAD CONSULTING AS © 2020

BWM – State of the Market

2019 2020 2021 2022 2023 2024 2025 2026

# uptakes 1450 2650 6000 7000 7000 5750 2000 2000

0

1000

2000

3000

4000

5000

6000

7000

8000

Expected total BWMS uptake w/o USCG effect

Page 15: Overcoming bottlenecks on Part of Ballast Water BWMS ... · Industrial Estate, Thane (W) –400604, India info@21-knots.com CORPORATE OFFICE: USA 15 Prospect Lane, Suite 2-AB Colonia,

4 MOUAWAD CONSULTING AS © 2020

BWM – Challenges ahead

Upgrades, spare parts, maintenance of BWMS:

Huge ripples from the BWM Convention and BWMS installations?

Sampling for compliance:

An attempt to pass buckets?

Performance of BWMS:

Is it acceptable that the majority of BWMS are not expected to work before at least 2029?

Outside the box

Isn´t it too early to push for hull biofouling Regulations?

Page 16: Overcoming bottlenecks on Part of Ballast Water BWMS ... · Industrial Estate, Thane (W) –400604, India info@21-knots.com CORPORATE OFFICE: USA 15 Prospect Lane, Suite 2-AB Colonia,

MOUAWAD CONSULTING AS © 2020

Mouawad Consulting AS assists customers tackle the challenges of the BWM Convention worldwide.

Contact me to learn more.

Jad [email protected]+47 480 50 902

www.bwm.no