outsourced cmp for accelerated process development · outsourced cmp for accelerated process...

30
Semi Semi - - ECS Technical Symposium ECS Technical Symposium - - March 2005 March 2005 Outsourced CMP for Accelerated Process Development by Robert L. Rhoades, Ph.D. Presented to Semi-ECS Technical Symposium Shanghai, China March 2005

Upload: others

Post on 25-Jun-2020

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Outsourced CMP for Accelerated Process Development · Outsourced CMP for Accelerated Process Development by Robert L. Rhoades, Ph.D. Presented to Semi-ECS Technical Symposium

SemiSemi--ECS Technical Symposium ECS Technical Symposium -- March 2005March 2005

Outsourced CMP for Accelerated Process Development

by

Robert L. Rhoades, Ph.D.

Presented to Semi-ECS Technical SymposiumShanghai, China

March 2005

Page 2: Outsourced CMP for Accelerated Process Development · Outsourced CMP for Accelerated Process Development by Robert L. Rhoades, Ph.D. Presented to Semi-ECS Technical Symposium

SemiSemi--ECS Technical Symposium ECS Technical Symposium -- March 2005March 2005

Outline

• Why Outsource CMP?- Background- Expanding applications- Economic drivers

• CMP Process Development- Internal vs outsourced development- Technology issues and financial impact- Examples

• Comments and conclusions

Page 3: Outsourced CMP for Accelerated Process Development · Outsourced CMP for Accelerated Process Development by Robert L. Rhoades, Ph.D. Presented to Semi-ECS Technical Symposium

SemiSemi--ECS Technical Symposium ECS Technical Symposium -- March 2005March 2005

Background

• CMP is now recognized a necessary process for most advanced IC process flows.

- Initially guarded as trade secret, now a mainstream process- Still high cost and long implementation time- Requires extensive process and integration expertise- Mainstream on oxide, W, STI, Cu … others in development- Critical to achieving acceptable yield on many device flows

• Many other applications are also in development to leverage CMP for applications beyond traditional CMOS integrated circuits.

Page 4: Outsourced CMP for Accelerated Process Development · Outsourced CMP for Accelerated Process Development by Robert L. Rhoades, Ph.D. Presented to Semi-ECS Technical Symposium

SemiSemi--ECS Technical Symposium ECS Technical Symposium -- March 2005March 2005

Who Needs CMP?

CMP

Packaging

ICs

EmergingDevices

Photonics

SpecialtySubstrates

CMPConsumables

MEMS

Page 5: Outsourced CMP for Accelerated Process Development · Outsourced CMP for Accelerated Process Development by Robert L. Rhoades, Ph.D. Presented to Semi-ECS Technical Symposium

SemiSemi--ECS Technical Symposium ECS Technical Symposium -- March 2005March 2005

IC Economics: Yield and Die Output

NOTE: Chart is conservative in estimations as many use CMP at or below 0.5 µm due to dramatic yield improvement

Drive to increase output per wafer device & geometry shrinks more CMP

• Higher device output per wafer result from feature size shrinks utilizing CMP

• CMP also significantly increases electrical device yields per wafer

• Competition compels manufacturers to reduce unit costs by utilizing CMP on an increasing percentage of wafer starts

Page 6: Outsourced CMP for Accelerated Process Development · Outsourced CMP for Accelerated Process Development by Robert L. Rhoades, Ph.D. Presented to Semi-ECS Technical Symposium

SemiSemi--ECS Technical Symposium ECS Technical Symposium -- March 2005March 2005

New Materials Drive Expansion of CMP

Source: Cabot Microelectronics Corporation

• Chip designers are continually exploring the use of new materials to increase performance, lower power consumption, etc.

• Manufacturing chips with these materials requires new complex CMP processing step.

New materials new manufacturing requirements new polish steps more CMP

Page 7: Outsourced CMP for Accelerated Process Development · Outsourced CMP for Accelerated Process Development by Robert L. Rhoades, Ph.D. Presented to Semi-ECS Technical Symposium

SemiSemi--ECS Technical Symposium ECS Technical Symposium -- March 2005March 2005

CMP Process Complexity

• Wafer Parameters- Size / Shape / Flatness- Film Stack Composition

» Metals (Al, Cu, W, Pt, etc.)» Oxide (TEOS, PSG, BPSG, etc.)» Other (polysilicon, low-k polymers, etc.)

- Film Quality Issues» Stress (compressive or tensile)» Inclusions and other defects» Doping or contaminant levels

- Final Surface Requirements» Ultralow surface roughness» Extreme planarization, esp. Copper» Low defectivity at <0.12 um defect size

• Pad Issues- Appropriate materials selection (polyurethane, felt, foam,

etc.)- Conditioning method often not optimal- Lot-to-lot inconsistency from suppliers

• Slurry Issues- Chemistry optimization often required- Mixing and associated inconsistency- Shelf life and pot life sometimes very short- Slurry distribution system (design, cost, upkeep)

» Agglomeration and gel formation» Filtration is often required

- Cleaning method specific to slurry and film- Waste disposal and local regulations

Few companies can afford the luxury of in-house expertise required to address the increasing complexity of CMP processes

• Process Issues- Long list of significant input variables

» Downforce (polish and conditioning)» Platen speed» Carrier speed» Slurry flow» Conditioning method

‧ Disk used (material, diamond size, spacing, etc)‧ Force‧ Speed‧ Sweep profile

- Highly sensitive to local pattern variation- Must maintain consistency at high throughput- Must optimize for variation of incoming films

• Integration Issues- Materials Compatibility

» Electrochemical interactions with two or more metals» Film integrity and delamination, esp. low-k» Film stack compressibility

- Interactions with adjacent process modules» Photolithography» Metal deposition and metal etch» Dielectric deposition and etch

- Electrical design interactions» Feature size constraints» Interactions with local pattern density» Line resistance variation, esp. damascene copper» Dielectric thickness variation » Contact resistance variation

Page 8: Outsourced CMP for Accelerated Process Development · Outsourced CMP for Accelerated Process Development by Robert L. Rhoades, Ph.D. Presented to Semi-ECS Technical Symposium

SemiSemi--ECS Technical Symposium ECS Technical Symposium -- March 2005March 2005

Pieces of the Development Puzzle

Expertise:- Highly trained and experienced

technical staff- Understanding of materials science,

chemistry, tribology, and more- Support staff for infrastructure,

maintenance, etc.

Equipment:- Major capital investment- Process tools: Polisher & Cleaner- Metrology: film thickness, defect

inspection, surface topography, etc.- Ongoing expense to maintain

Cleanroom:- Minimum of Class 100, preferably

Class 10 or Class 1- Required support systems include:

DI water, compressed air, wastewater treatment, nitrogen, etc.

- Substantial overhead cost evenwhen idle or unused

Consumables and Test Wafers:- New materials require new slurries- Pad optimization can be difficult- Requires in-depth expertise- Access to large supply base is

extremely helpful in early testing

Page 9: Outsourced CMP for Accelerated Process Development · Outsourced CMP for Accelerated Process Development by Robert L. Rhoades, Ph.D. Presented to Semi-ECS Technical Symposium

SemiSemi--ECS Technical Symposium ECS Technical Symposium -- March 2005March 2005

Why Outsource CMP?

• Faster Execution- Tap into existing facility, equipment, and process technology- Reduce implementation time by 12 months or more

• Lower Risk- Leverage technical expertise and known baseline processes

• Lower Cost- Zero capital required- Low unit costs even for low to moderate volume production

Page 10: Outsourced CMP for Accelerated Process Development · Outsourced CMP for Accelerated Process Development by Robert L. Rhoades, Ph.D. Presented to Semi-ECS Technical Symposium

SemiSemi--ECS Technical Symposium ECS Technical Symposium -- March 2005March 2005

Typical Internal CMP Development Project

Internal Development:• Project Team:

- Project manager, several members of technical staff from Process, Equipment and Facilities Engineering,

- Most companies then supplement with outside construction contractors- Ongoing staff required for daily operation, maintenance, etc.

• Capital investment:- Equipment:

» CMP, post-CMP Clean, and Metrology- Facilities:

» Site prep, Isolation, Slurry Distribution, DI water, Waste Treatment, Compressed Air, Process Vacuum, and possibly Emissions Control.

• Timing: - Minimum project timing of 12 to 18 months after decision to commit and

funding available- May encounter construction or startup delays if issues with local

permits

Page 11: Outsourced CMP for Accelerated Process Development · Outsourced CMP for Accelerated Process Development by Robert L. Rhoades, Ph.D. Presented to Semi-ECS Technical Symposium

SemiSemi--ECS Technical Symposium ECS Technical Symposium -- March 2005March 2005

Typical Outsourced Development Project

Outsourced Development:• Project Team:

- Typically one technologist (may include more if desired)- Outsource staff provide technical consulting throughout the project- Outsource staff maintain the facility and the equipment- Leverages access to advanced processes and expertise

• Capital investment:- Zero: Eliminates capital investment for equipment and facilities

• Timing: - Available immediately

Page 12: Outsourced CMP for Accelerated Process Development · Outsourced CMP for Accelerated Process Development by Robert L. Rhoades, Ph.D. Presented to Semi-ECS Technical Symposium

SemiSemi--ECS Technical Symposium ECS Technical Symposium -- March 2005March 2005

CMP Development Project Comparison

Typical Internal Development Lab Project:

Begin

Install and Startup

Lab Design & Layout

Typical Development Project with TFS:

Go

3 mos 6 mos 9 mos 12 mos 15 mos 18 mos

Time

Total Time Savings: 12 months or more

Construction & Equipment Purchase

Internal Development:• Capital Invest: $ 1.5 M• Several Engrs + Staff: $ 1.0 M/Yr• Time to Develop: 18-24 mo.• Multiple learning cycles

Outsourced Development:• Capital Invest: $ 0• One Sr. Engineer: $150K/Yr• Time to Develop: 6-9 mo.• Leverage existing processes, staff,

experience, and consulting

Time to Implement:

Page 13: Outsourced CMP for Accelerated Process Development · Outsourced CMP for Accelerated Process Development by Robert L. Rhoades, Ph.D. Presented to Semi-ECS Technical Symposium

SemiSemi--ECS Technical Symposium ECS Technical Symposium -- March 2005March 2005

Bottom Line

As shown in the previous comparisons, outsourcedCMP development accomplishes the following:

1. Simplifies the internal project team (saves headcount)and leverages the expertise of the provider.

2. Substantially shortens the timeline for projectexecution, especially for those who are new to CMPor for fabs that are looking at adding polishers.

3. Zero capital outlay which allows the customer to buyonly tool time necessary to execute each project(avoids adding excess capacity).

Page 14: Outsourced CMP for Accelerated Process Development · Outsourced CMP for Accelerated Process Development by Robert L. Rhoades, Ph.D. Presented to Semi-ECS Technical Symposium

SemiSemi--ECS Technical Symposium ECS Technical Symposium -- March 2005March 2005

Outsourced Development Projects:

• Consumables Development- Technology issues and financial impact- Example customer: psiloQuest, Inc.* (CMP pad supplier)

• Integration and Device Qualification- Technology issues and financial impact- Example customer: Medtronics, Inc.* (Medical device supplier)

* Company names used with permission. All other names of Entrepix customers are withheld.

Page 15: Outsourced CMP for Accelerated Process Development · Outsourced CMP for Accelerated Process Development by Robert L. Rhoades, Ph.D. Presented to Semi-ECS Technical Symposium

SemiSemi--ECS Technical Symposium ECS Technical Symposium -- March 2005March 2005

Consumables Developer:

• psiloQuest, Inc.- CMP pad supplier trying to penetrate mainstream market- Previously invested in their own internal apps lab- Needed additional capability, esp. for cleans and defectivity

• Results- Improved product characterization (verified by customers)- Through joint efforts, pad was qualified for use with 3rd party

mainstream production wafers- Recent decision to shut down internal lab and outsource all

applications work through Entrepix

Page 16: Outsourced CMP for Accelerated Process Development · Outsourced CMP for Accelerated Process Development by Robert L. Rhoades, Ph.D. Presented to Semi-ECS Technical Symposium

SemiSemi--ECS Technical Symposium ECS Technical Symposium -- March 2005March 2005

psiloQuest Tungsten Baseline Data

1000

2000

3000

4000

5000

6000

Start 5 10 15 20 25 30 35 40 45 50

Rem

oval

Rat

e (A

ng/m

in)

0%

5%

10%

15%

20%

25%

Uni

form

ity (%

1-s

igm

a)

Date: March 2004Polisher: IPEC 472Pad: psiloQuestSlurry: Cabot SSW-2000 (diluted 1:1 + 4% H2O2)Conditioning: None

Note: Rate offset due to difference in test wafer lots

Page 17: Outsourced CMP for Accelerated Process Development · Outsourced CMP for Accelerated Process Development by Robert L. Rhoades, Ph.D. Presented to Semi-ECS Technical Symposium

SemiSemi--ECS Technical Symposium ECS Technical Symposium -- March 2005March 2005

CMP Integration and Qual:

• Typical needs for CMP integration and qual:- Technical inputs into composition and thickness of layers- Feedback to design team on CMP module sensitivities- Guidance on consumables choices- Starting point CMP processes- Short process runs for prototype devices- Honest technical feedback from an independent perspective- Optimized CMP processes with ability to ramp when needed

All of these can be obtained from aproperly equipped CMP outsource provider

Page 18: Outsourced CMP for Accelerated Process Development · Outsourced CMP for Accelerated Process Development by Robert L. Rhoades, Ph.D. Presented to Semi-ECS Technical Symposium

SemiSemi--ECS Technical Symposium ECS Technical Symposium -- March 2005March 2005

CMP Integrationand Qual of New Users

Typical Internal Integration Project (first pass):

Typical Integration Project with TFS:

RampQual.

Develop.

3 mos 6 mos 9 mos 12 mos 15 mos 18 mos 21 mos 24 mos 27 mos 30 mos

Qual.Prod. Ramp

Proj

ect P

hase

s

Time

Total Time Savings: 12-24+ months

Equip. PurchaseDelivery & Qual.

Development

Internal:• Capital Investment: $2.2-3.3M• Multiple Engrs + Staff: $ 1.0 M/Yr• Time to Develop: 18-24 mo.• Multiple learning cycles

Outsourced:• Capital Investment: $ 0• One Sr. Engineer: $150K/Yr• Time to Develop: 6-9 mo.• Leverage existing processes, staff,

experience, and consulting to reduce risk and learning cycles.Time to Implement:

Page 19: Outsourced CMP for Accelerated Process Development · Outsourced CMP for Accelerated Process Development by Robert L. Rhoades, Ph.D. Presented to Semi-ECS Technical Symposium

SemiSemi--ECS Technical Symposium ECS Technical Symposium -- March 2005March 2005

CMP Integration and Qual:

• Medtronics, Inc.- Small production fab for medical devices- Unique device integration, including thin CrSi resistor layer- Running 0.6-0.8 um and desires to shrink to 0.35 um- Extreme focus on reliability

• Results- Straight to 3-level CMP integration with both ILD and W CMP- Debugged on existing mask set using < 50 product wafers- Less than 8 months total from concept to first silicon out- First lot to reach probe floor yielded working devices- Design team now working on new masks and qual plans

Page 20: Outsourced CMP for Accelerated Process Development · Outsourced CMP for Accelerated Process Development by Robert L. Rhoades, Ph.D. Presented to Semi-ECS Technical Symposium

SemiSemi--ECS Technical Symposium ECS Technical Symposium -- March 2005March 2005

Integration: Reflow BPSG Contact

• BPSG Reflow- Smooth step but not

planar

• Hot Metal Dep.- Acceptable metal

step coverage at 50%

• SOG Gap Fill- Acceptable planar

surface, but not good enough to shrink

Page 21: Outsourced CMP for Accelerated Process Development · Outsourced CMP for Accelerated Process Development by Robert L. Rhoades, Ph.D. Presented to Semi-ECS Technical Symposium

SemiSemi--ECS Technical Symposium ECS Technical Symposium -- March 2005March 2005

Integration: CMP Planarized Contact

• Good Contact to Substrate

• Ultra Flat BPSG- Photolithography is

improved.- Planarization is

improvedTung sten

Plug

Me tal 1

BPSG

Me tal 1 Co ntact t o Silico n

Titan ium TiWARCL ayer

TEOS T iNBar rier

Page 22: Outsourced CMP for Accelerated Process Development · Outsourced CMP for Accelerated Process Development by Robert L. Rhoades, Ph.D. Presented to Semi-ECS Technical Symposium

SemiSemi--ECS Technical Symposium ECS Technical Symposium -- March 2005March 2005

Integration: Non-planarized M1-M2

• Thinning over step.- Less than 20% coverage

on corners

• Poor ILD Planarization.- Has negative impact for

photolithography.- Limits design flexibility.

Page 23: Outsourced CMP for Accelerated Process Development · Outsourced CMP for Accelerated Process Development by Robert L. Rhoades, Ph.D. Presented to Semi-ECS Technical Symposium

SemiSemi--ECS Technical Symposium ECS Technical Symposium -- March 2005March 2005

Integration: CMP Planarized M1-M2

• Step coverage no longer an issue.

• Ultra flat surface.- Enhances

photolithography.- More flexibility in

design.

Page 24: Outsourced CMP for Accelerated Process Development · Outsourced CMP for Accelerated Process Development by Robert L. Rhoades, Ph.D. Presented to Semi-ECS Technical Symposium

SemiSemi--ECS Technical Symposium ECS Technical Symposium -- March 2005March 2005

Cost Per Wafer comparison:

$-

$500.00

$1,000.00

$1,500.00

$2,000.00

$2,500.00

$3,000.00

$3,500.00

10 15 20 25 35 50 75 100

150

200

250

300

350

400

450

500

550

600

650

700

800

900

1000

1250

1500

1750

2000

Wafers

$ pe

r w

afer

Internal Cost/wfr

TFS Cost/wfr

Total Fab Solutions CONFIDENTIAL Oct. 20

Bottom Line: Low volume cost differential is enormousHigh volume cost differential is minimal

Page 25: Outsourced CMP for Accelerated Process Development · Outsourced CMP for Accelerated Process Development by Robert L. Rhoades, Ph.D. Presented to Semi-ECS Technical Symposium

SemiSemi--ECS Technical Symposium ECS Technical Symposium -- March 2005March 2005

Impact of Development Cycles

• Internal development requires additional investments for each node :- Dedicated development teams for each node- Increasing investment in new equipment and facilites dedicated to

new materials: Oxide, W, STI, Cu…

Or...

• Outsourcing development leverages processes and integration expertise of the outsource provider:- Reduces time to qualify new process by 6-18 months- Eliminates capital investment- Reduces risks by using proven solutions

Page 26: Outsourced CMP for Accelerated Process Development · Outsourced CMP for Accelerated Process Development by Robert L. Rhoades, Ph.D. Presented to Semi-ECS Technical Symposium

SemiSemi--ECS Technical Symposium ECS Technical Symposium -- March 2005March 2005

Impact of Repeated Development Cycles

NodeKey

Technology

45 nm High-K, Ir & Pt,...

65 nm Cu CMP w/UL-k

90 nm Cu CMP w/CDO or Low-k

130 nm Cu w/ FSG

180 nm STI/ PMD/ Cu CMP

0.25 um W-CMP

0.35 um TEOS-CMP

0.5 um Lmt'd Oxide & W-CMP

0.8 um Pre-CMP

Legend:Prototype

DevelopmentQualificationProd. Ramp

Minim

um Fea

ture Size

Time

Potential Time Savings of 3-6 months per Node using

Outsourced CMP Development

Page 27: Outsourced CMP for Accelerated Process Development · Outsourced CMP for Accelerated Process Development by Robert L. Rhoades, Ph.D. Presented to Semi-ECS Technical Symposium

SemiSemi--ECS Technical Symposium ECS Technical Symposium -- March 2005March 2005

Available Outsourced CMP Processes

* Other sizes (2", 3", etc.) and custom shapes can be accommodated with advanced notice

Custom bulk materials

Custom thin films

Backside stress relief polish

N/ASilicon Carbide, Sapphire, DLC

Si, Ge, and various III-V materials

Polysilicon

Copper

Tungsten

Shallow Trench CMP

Doped Oxide (PSG, BPSG, etc.)

Oxide (TEOS, thermal, LTO, etc.)

100 mm125 mm150 mm200 mmProven Processes

Page 28: Outsourced CMP for Accelerated Process Development · Outsourced CMP for Accelerated Process Development by Robert L. Rhoades, Ph.D. Presented to Semi-ECS Technical Symposium

SemiSemi--ECS Technical Symposium ECS Technical Symposium -- March 2005March 2005

Summary: Reasons to outsource CMP

• Lower Risk- Immediate access to proven process technology and expertise- Minimize complexity associated with polishers, cleaners,

chemical delivery, filtration, metrology, consumables, etc.• Faster Execution

- Rapid prototyping, development projects or process qualification

- Reduce implementation time an average of 12 to 18 months• Substantial Cost Benefits

- Reduce or eliminate capital expenditures- Lower unit costs

• Production Impact- Perform engineering trials without taking your polishers off line- Flexible manufacturing capacity when you need it

Page 29: Outsourced CMP for Accelerated Process Development · Outsourced CMP for Accelerated Process Development by Robert L. Rhoades, Ph.D. Presented to Semi-ECS Technical Symposium

SemiSemi--ECS Technical Symposium ECS Technical Symposium -- March 2005March 2005

Acknowledgements

• Entire staff at Entrepix, with specific thanks to the following individuals:- Jeanie Simmons- Patrick Grimes- Donna Grannis- Terry Pfau- Michael Leone- Mike Bowman- Roy McCoy- Jim Dekarske- Tim Knippa

• psiloQuest, Inc.- Tony Clark, Ed Atkinson,

John Bare, and Dan Marks

• Medtronics, Inc.- Ralph Danzl

• Many other customers who, though unnamed here, have helped us prove that CMP outsourcing is a viable and cost-effective business model.

Page 30: Outsourced CMP for Accelerated Process Development · Outsourced CMP for Accelerated Process Development by Robert L. Rhoades, Ph.D. Presented to Semi-ECS Technical Symposium

SemiSemi--ECS Technical Symposium ECS Technical Symposium -- March 2005March 2005

Contact Information

Bob TuckerVice President & General Manager

Tel: 602 426-8675Fax: 602 426-8678

[email protected]

Rob RhoadesChief Technology Officer

Tel: 602 426-8668Fax: 602 426-8678

[email protected]