Page 1: Operations Philip Edwards Head of Science Operations 28 October 2008

Operations

Philip Edwards

Head of Science Operations

28 October 2008

Page 2: Operations Philip Edwards Head of Science Operations 28 October 2008

Telescope OperationsTelescope Operations

& Science Services& Science Services

Computer InfrastructureComputer Infrastructure

Scientific Computing & Scientific Computing & ArchivesArchives

Visitor servicesVisitor services

Receivers, LO & ConversionReceivers, LO & Conversion

Digital & Servo ElectronicsDigital & Servo Electronics

CryogenicsCryogenics

Mechanical, Drives, & Mechanical, Drives, & ElectricalElectrical

Science Science OperationsOperations

Engineering Engineering OperationsOperations

National National Facility Facility

OperationsOperations

ATNF Operations Structure

Page 3: Operations Philip Edwards Head of Science Operations 28 October 2008

Operations: Themes, Streams and Projects Structure

ATNF Operations : Theme, Streams and Projects StructureTheme Leader: Dave McConnell (Assistant Director: Operations)Research Program Leader: Jessica Chapman

Engineering OperationsStream Leader: Brett Dawson

Science OperationsStream Leader: Phil Edwards

Telescope Ops& Sci Services

(TOSS)

ComputingInfrastructure

(CI)

Science Computing & Archives

(SCA)

VisitorsServices

(VS)

Digital, Servo& Electronics

(DSE)

Receivers, LO& Conversion

(RLOC)

Cryogenics(CRYO)

Mechanical, Drives, & Electrical

(MDE)

Project LeaderP. Edwards (N)

K. Brooks (M, 0.5)J. Chapman (M)B. Hiscock* (N)B. Indermuehle (N)S. Mader* (P)C. Phillips (M)J. Reynolds (P)J. Sarkissian (P)A.Tzioumis (M)R. Wark (N)---------------------------System Scientist (P)System Scientist (N)

Project LeaderS. Amy (M)

B. Lennon (N)V. McIntyre* (M)G. Spratt (P, 0.8)----------------------Comp. support (M)

Project LeaderM. Wieringa (N)

D. Brodrick (N, 0.5)M. Calabretta (M)S. Hoyle* (P)A. Kosmynin (M)S. Mader* (P)M. Marquarding (M, 0.2)V. McIntyre* (M)E. Troup (N, 0.5)

Project LeaderV. Drazenovic (M, 0.7)

J. Cole (P)J. Hockings (P)J. Houldsworth (N, 0.6)S. Ingram (P)E. Kachwalla (M, 0.5)M. McFee (N)M. Rees (N)C. Wilson (N, 0.6)

CasualsP. Alexander (N)D. Brennan (N)C. Cummins (Mopra)S.J. Dodd* (N)R. Kelly (N)P. Kelly (N)

CPS supportA. Evans (P)L. Williams (P)B. Wilson (P)

Project LeaderP. Mirtschin* (N)

M. Hill* (N)B. Hiscock* (N)S. Hoyle* (P)A. Hunt* (P)S. Munting* (N)B. Preisig* (P)T. Ruckley (P)--------------Technician (N)Technician (P)

Project LeaderJ. McFee (N)

P. Mirtschin* (N)S. Munting* (N)K. Reeves* (P)M. Smith (P)---------------------Engineering grad (N)RF Systems (P)

Project LeaderJ. Wilson* (N)

K. Reeves (P)B. Tough (N)

Project LeaderT. Wilson (N)

J. Crocker (P)M. Hill* (N)A. Hunt* (P)T. Lees (P, 0.6)C. Leven (N, 0.1)B. Preisig* (P)T. Ruckley* (P)G. Sunderland (N, 0.7)B. Turner (P, 0.6)N. Webster (N)

CasualsS. J. Dodd* (N)--------------------Antennas position (N)

Site Managers &

Technical Coordinators

Parkes

B. Dawson (SM)B. Preisig (TC)

Narrabri and Mopra

B. Hiscock (SM &TC)

Page 4: Operations Philip Edwards Head of Science Operations 28 October 2008

End of an era…

Page 5: Operations Philip Edwards Head of Science Operations 28 October 2008

Science Operations

• Telescope Operations and Science Services• TAC met; schedules for 2008OCTS out; ATS Project Submitted

• Joint TOSS/SCA/CI discussions on (i) use of VNC for remote observing, (ii) Fault Reporting

• Commissioning of new receivers at Parkes

• Discussions of observing support, ATCA calibration

• Appointment of ATCA and Parkes System Scientists

• 8th ATNF Synthesis Imaging School

• Need to raise awareness of NAPAs?

• Science and Computing Archives• Meeting on Parkes computing & software

• Joint Operations/ASKAP meetings held

• Streamlining of Operations Trac/wiki

• On-going software development

Page 6: Operations Philip Edwards Head of Science Operations 28 October 2008

Science Operations

• Computer Infrastructure• Welcoming new members!

• Office changes at Marsfield

• New Marsfield servers and storage

• New servers at Parkes and Narrabri

• Visitors Services• Meeting of all Visitors Services staff

• Purchase of software for bookings management

• Office changes at Marsfield

• Increased lodge security at Narrabri

• Need for additional Quarters support at Parkes

Page 7: Operations Philip Edwards Head of Science Operations 28 October 2008

Engineering Operations

• Receivers, LO & Conversion• Parkes MMB problems

• New Parkes 13mm receiver

• New Parkes 300-900MHz receiver

• New OMTs for ATCA L/S

• Consideration of streamlining the Parkes receiver fleet

• Digital & Servo Electronics• Parkes Equipment Control & Monitor Project

• Parkes Drive Control System Project

• Installation of interim CABB system

• Upgrade of ATCA seeing monitor

Page 8: Operations Philip Edwards Head of Science Operations 28 October 2008

Engineering Operations

• Cryo• Compressor upgrade plans

• Cross-site familiarity & awareness

• Mopra L/S overhaul

• Mechanical, Drives & Electrical• Investigation and improvement of Mopra power

• Parkes focus cabin translator

• Possibilities for Mopra subreflector cycling

• New staff member at Parkes

Page 9: Operations Philip Edwards Head of Science Operations 28 October 2008

Site Managers & Technical Coordinators

• Brett Hiscock (Narrabri Site Manager & Technical Coordinator)• Brett Dawson (Parkes Site Manager)• Brett Preisig (Parkes Technical Coordinator)

• Site Manager• Chair OH&S committee

• Security and other local issues

• Represent local staff

• Technical Coordinator• Liaise with EO and SO for maintenance periods

• Maintain oversight of faults and breakdowns

Page 10: Operations Philip Edwards Head of Science Operations 28 October 2008

Tour of the Facilities

Page 11: Operations Philip Edwards Head of Science Operations 28 October 2008

First Science with the Parkes 13mm receiver

First Observation• New detection of H2O Maser.• Observation carried out by Jose-Francisco Gomez and his P616 team.

First science with the new 13mm receiver was the detection of a new post-asymptotic giant branch star, a very rare and short-lived class of object. Data provided courtesy of Jose-Francisco Gomez et al. Plot prepared by Stacey Mader.

Page 12: Operations Philip Edwards Head of Science Operations 28 October 2008

Observations of a strong Ammonia source, G316.819 showing strong (1,1) and (2,2) transitions.

Removing baseline ripple

The plot shows two observations taken one after the other, the first (upper panel) with no special 'de-rippling' measures, the lower taken in a mode where the receiver is moved cyclically up and down to 'smear out' the ripple.In the observation for the lower plot the receiver was moved up and down in time with a sawtooth pattern, with amplitude 6.3mm peak-to-peak (lambda/2) and period 60 seconds. Integrations were 4 minutes (exact multiple of 60 seconds).

Experiment carried out and data provided by John Reynolds.

Page 13: Operations Philip Edwards Head of Science Operations 28 October 2008

ATCA

• Installation of interim CABB system continuing• Shutdown March/April 2009 for full CABB installation• Upgraded seeing monitor installed• NASA tracking continuing, at lower level than nominal 10 hr/wk• ATCA calibration (esp. in mm bands) being addressed• Poor image rejection in parts of mm bands being understood• Synthesis School held 29 Sep to 03 Oct • New Systems Scientist, Jamie Stevens, to start in January

• Who do I call?• Support can be requested at time of proposal

• Support during the day from local staff

• After hours support provided by DA

Page 14: Operations Philip Edwards Head of Science Operations 28 October 2008

Synthesis Imaging School 2008

Page 15: Operations Philip Edwards Head of Science Operations 28 October 2008

Mopra

• Power problems throughout the winter season• Mm observing ends Nov 4, recommences Jan 29• Remote observing now run over VNC sessions• First 7mm observations undertaken• Testing of remote observing to Marsfield and further afield• Mopra Milky Way Survey meeting Nov 3

• Who do I call?• Support can be requested at time of proposal• Support with schedule preparation in Marsfield• Support during the day from local staff• First contact for after hours support is the DA

Page 16: Operations Philip Edwards Head of Science Operations 28 October 2008

Tidbinbilla

• Understanding between ATNF and ICTC for continued use of facilities at the CDSCC for radio astronomy

• Service observations for single-dish radio astronomy to be announced in ATNF Call for Proposals

• In last 6 months, 146 hrs of single-dish Tid time used for four proposals

• Proposals reviewed by TAC

• ATNF contact to liaise with CDSCC Radioastronomy Engineer

• Use of CDSCC facilities for VLBI to continue

Page 17: Operations Philip Edwards Head of Science Operations 28 October 2008

LBA

• Operational issues• Swinburne contract for correlation completed• New contract with Curtin from Oct 1• New contract provides enhanced support for scheduling and

calibration.• eVLBI production observations have commenced• Hartebeesthoek polar shaft bearing failure: impact on LBA

observations.• Addition of TIGO and O’Higgins in November session

• In the future• Curtin computer cluster at ATCA will augment eVLBI to 1 Gbps

from ATNF antennas. • more network data transfers for faster turn-around. Less pressure

on disks• Auckland 12m telescope officially opened Oct 2008

Page 18: Operations Philip Edwards Head of Science Operations 28 October 2008

Operations summary

• Continued discussion of Future ATNF Operations internally and within community

• Formal change of management structure July 1st

• Project plans submitted to ATNF Project Review Board

• Synergies in Operations/ASKAP software requirements

• Improving configuration management

• Planning for SOC continuing

• Increased ATNF-wide thinking