overview of edwards aquifer authority operations in nueces ... · 4/21/2010  · eaa operations in...

21
Nueces Basin and Bay Area Stakeholders Committee April 21, 2010 Overview of Edwards Aquifer Authority Operations in Nueces Basin

Upload: others

Post on 14-Aug-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Overview of Edwards Aquifer Authority Operations in Nueces ... · 4/21/2010  · EAA Operations in Nueces Basin • Regulatory programs – quantity and quality • Data collection

Nueces Basin and Bay Area Stakeholders Committee

April 21, 2010

Overview of Edwards Aquifer Authority Operations in Nueces Basin

Page 2: Overview of Edwards Aquifer Authority Operations in Nueces ... · 4/21/2010  · EAA Operations in Nueces Basin • Regulatory programs – quantity and quality • Data collection

Topics of Discussion

• EAA purpose and boundary• EAA activities in Nueces Basin• Impacts on Instream Flows in Nueces

Basin

Page 3: Overview of Edwards Aquifer Authority Operations in Nueces ... · 4/21/2010  · EAA Operations in Nueces Basin • Regulatory programs – quantity and quality • Data collection

Edwards Aquifer = San Antonio Segment of the Balcones Fault Zone Edwards Aquifer

A

B

Page 4: Overview of Edwards Aquifer Authority Operations in Nueces ... · 4/21/2010  · EAA Operations in Nueces Basin • Regulatory programs – quantity and quality • Data collection

Generalized Edwards Aquifer Cross Section

A B

Page 5: Overview of Edwards Aquifer Authority Operations in Nueces ... · 4/21/2010  · EAA Operations in Nueces Basin • Regulatory programs – quantity and quality • Data collection

EAA Operations in Nueces Basin

• Regulatory programs – quantity and quality• Data collection – quantity, quality, rainfall• Current research projects:

– Flowpath studies:• Alluvial underflow• Tracer testing in Kinney County• COE Nueces Basin Feasibility Study – HSPF• Recharge and recirculation – Phase III/IV

complete• Cloud Seeding – Uvalde, Medina, Bandera Co.

Page 6: Overview of Edwards Aquifer Authority Operations in Nueces ... · 4/21/2010  · EAA Operations in Nueces Basin • Regulatory programs – quantity and quality • Data collection

EAA Operations in Nueces Basin (contd.)

• Range management cost share• Existing recharge dams in Nueces Basin (three):

– Seco Creek– Parkers Creek– Middle Verde Creek

• Planning/oversight Groups– SCTWAC– State water planning process - Region L– Edwards Aquifer RIP – Recharge Subcommittee

Page 7: Overview of Edwards Aquifer Authority Operations in Nueces ... · 4/21/2010  · EAA Operations in Nueces Basin • Regulatory programs – quantity and quality • Data collection

Existing EAA-operated structures

• Authority operated structures:– All in Medina County

• Parkers Creek Dam – built 1974• Middle Verde Creek Dam – built 1978• San Geronimo Creek Dam – built 1979• Seco Creek Dam/Channel – built 1982

– Authority has surface water diversion permits for the four structures

– Authority also has Class V injection well permits for the Verde and Seco creek structures

Page 8: Overview of Edwards Aquifer Authority Operations in Nueces ... · 4/21/2010  · EAA Operations in Nueces Basin • Regulatory programs – quantity and quality • Data collection

San Geronimo Creek Dam

Page 9: Overview of Edwards Aquifer Authority Operations in Nueces ... · 4/21/2010  · EAA Operations in Nueces Basin • Regulatory programs – quantity and quality • Data collection

Middle Verde Creek Dam

Page 10: Overview of Edwards Aquifer Authority Operations in Nueces ... · 4/21/2010  · EAA Operations in Nueces Basin • Regulatory programs – quantity and quality • Data collection

Parkers Creek Dam

Page 11: Overview of Edwards Aquifer Authority Operations in Nueces ... · 4/21/2010  · EAA Operations in Nueces Basin • Regulatory programs – quantity and quality • Data collection

Seco Channel

Page 12: Overview of Edwards Aquifer Authority Operations in Nueces ... · 4/21/2010  · EAA Operations in Nueces Basin • Regulatory programs – quantity and quality • Data collection
Page 13: Overview of Edwards Aquifer Authority Operations in Nueces ... · 4/21/2010  · EAA Operations in Nueces Basin • Regulatory programs – quantity and quality • Data collection
Page 14: Overview of Edwards Aquifer Authority Operations in Nueces ... · 4/21/2010  · EAA Operations in Nueces Basin • Regulatory programs – quantity and quality • Data collection

South Central Texas Regional Water Planning Process – Region L

• – 1998 to present– 2001 and 2006 versions for Region L Plan

• 2001 version had more recharge scenarios than 2006 version

• 2006 version primarily contains Trans- Texas management scenario (L-18)

• Draft 2011 plan – recharge scenarios identical/very similar to 2006 plan

Page 15: Overview of Edwards Aquifer Authority Operations in Nueces ... · 4/21/2010  · EAA Operations in Nueces Basin • Regulatory programs – quantity and quality • Data collection

Definition Number 1 Types of Recharge Structures:

TYPE 2

NORTH SOUTH

Recharge Area

Hold for directinfiltration

TYPE 1Catchment Area

Hold for ReleaseEdwards

LimestoneEngineeredStructure

EngineeredStructure

Balcones Fault Zone

Glen Rose Formation

Confining Beds

Glen Rose Formation

Edwards Limestone

Page 16: Overview of Edwards Aquifer Authority Operations in Nueces ... · 4/21/2010  · EAA Operations in Nueces Basin • Regulatory programs – quantity and quality • Data collection

Commonly Analyzed Recharge Sites

SanAntonio

Hays

Comal

Bexar

MedinaUvaldeKinney

UpperBlanco

UpperVerde

UpperHondoUpper

SabinalUpperDry Frio

Montell Concan

CiboloDam No. 1

LowerVerdeLower

Hondo

Indian CreekLower

Sabinal

LowerBlanco

LowerFrio

SanGeronimo

LEGEND

Type 1 ProjectType 2 ProjectEdwards Aquifer Recharge ZoneSaline Water Line

Page 17: Overview of Edwards Aquifer Authority Operations in Nueces ... · 4/21/2010  · EAA Operations in Nueces Basin • Regulatory programs – quantity and quality • Data collection

Recharge Enhancement Studies (contd.)

• 2006 Region L Plan (contd.)– Contains recharge programs 2A, 2B, and

2C– Program 2A has the most scenarios,

includes the 2B and 2C scenarios, plus others

– Section 4C.20 of plan recommends:• Implement Program 2C by 2020• Expand to Program 2A by 2060

Page 18: Overview of Edwards Aquifer Authority Operations in Nueces ... · 4/21/2010  · EAA Operations in Nueces Basin • Regulatory programs – quantity and quality • Data collection

Recharge Enhancement Studies (contd.)

• 2006 Region L Plan (contd.)– Program 2A

• Indian Creek (with diversion to Dry Frio)• Lower Frio, Sabinal, Hondo, Verde• Lower Blanco, Cibolo #1, Dry Comal• San Geronimo (Upper San Geronimo)• Northern Bexar and northern Medina counties• Salado Creek FRS modifications

Page 19: Overview of Edwards Aquifer Authority Operations in Nueces ... · 4/21/2010  · EAA Operations in Nueces Basin • Regulatory programs – quantity and quality • Data collection

Recharge Enhancement Studies (contd.)

• 2006 Region L Plan (contd.)– Program 2A (contd.)

• Northern Bexar and Northern Medina counties (small Type 2 structures)

–Limkiln–Culebra–Deep Creek–Salado Dam No. 3–Government Canyon

Page 20: Overview of Edwards Aquifer Authority Operations in Nueces ... · 4/21/2010  · EAA Operations in Nueces Basin • Regulatory programs – quantity and quality • Data collection

Impacts on Instream Flow

• Impacts on lower Nueces Basin are minimal, pluses and minuses, qualitative estimates at this time

• Some activities enhance and some diminish flows

• Mitigation (if needed) is envisioned in all project concepts

Page 21: Overview of Edwards Aquifer Authority Operations in Nueces ... · 4/21/2010  · EAA Operations in Nueces Basin • Regulatory programs – quantity and quality • Data collection

Overview of EAA Nueces Basin Activities

END of SLIDES

John Hoyt, P.G.Edwards Aquifer Authoritywww.edwardsaquifer.org