online general permits njdep october 9, 2013 ace academy

22
ONLINE GENERAL PERMITS ONLINE GENERAL PERMITS NJDEP NJDEP October 9, 2013 October 9, 2013 ACE Academy ACE Academy

Upload: shon-lynch

Post on 12-Jan-2016

219 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: ONLINE GENERAL PERMITS NJDEP October 9, 2013 ACE Academy

ONLINE GENERAL PERMITSONLINE GENERAL PERMITS

NJDEPNJDEP

October 9, 2013October 9, 2013

ACE AcademyACE Academy

Page 2: ONLINE GENERAL PERMITS NJDEP October 9, 2013 ACE Academy

Two Permitting ProceduresTwo Permitting Procedures

Case- by-CaseCase- by-Case• PCPs – Radius Application and on-line PCPs – Radius Application and on-line

submittalsubmittal

General PermitsGeneral Permits• On-line RegistrationOn-line Registration

Page 3: ONLINE GENERAL PERMITS NJDEP October 9, 2013 ACE Academy

General Permits (GP)General Permits (GP)• N.J.A.C. 7:27-8.8 “General N.J.A.C. 7:27-8.8 “General

Permits”Permits”• GP is a pre-approved permit GP is a pre-approved permit

and certificate which applies and certificate which applies to a specific class of significant to a specific class of significant sourcessources

• Fee $410Fee $410• Valid for 5 yearsValid for 5 years

Page 4: ONLINE GENERAL PERMITS NJDEP October 9, 2013 ACE Academy

CURRENTLY AVAILABLECURRENTLY AVAILABLE

We have 22 different General Permits We have 22 different General Permits available for Minor Sources and 4 General available for Minor Sources and 4 General Operating Permits for Major facilitiesOperating Permits for Major facilities

http://www.state.nj.us/dep/aqpp/gp1list.htm

Page 5: ONLINE GENERAL PERMITS NJDEP October 9, 2013 ACE Academy

Updates in GPsUpdates in GPs New General permits available on-line:New General permits available on-line:

• GP-004A - Fuel Dispensing FacilitiesGP-004A - Fuel Dispensing Facilities

(replacing GP-004 and GP-014)(replacing GP-004 and GP-014)• GP-009A – Boiler(s) and Heater(s) each GP-009A – Boiler(s) and Heater(s) each

greater than or equal to 10 MMBTU/hr and greater than or equal to 10 MMBTU/hr and less than 50 MMBTU/hr combusting less than 50 MMBTU/hr combusting gaseous fuel (replacing GP-009)gaseous fuel (replacing GP-009)

Under Construction:Under Construction:• GP-001A – Solid Material Storage GP-001A – Solid Material Storage

(replacing GP-001) (replacing GP-001)

Page 6: ONLINE GENERAL PERMITS NJDEP October 9, 2013 ACE Academy

GP-004A GP-004A Fuel Dispensing FacilitiesFuel Dispensing Facilities

66

Page 7: ONLINE GENERAL PERMITS NJDEP October 9, 2013 ACE Academy

GP-004A GP-004A Fuel Dispensing FacilitiesFuel Dispensing Facilities

ApplicabilityApplicability FD-4A-1: FD-4A-1: Marina gasoline storage tank(s)Marina gasoline storage tank(s)

FD-4A-2: FD-4A-2: Airport gasoline storage tank(s) Airport gasoline storage tank(s)

FD-4A-3: FD-4A-3: Fuel service station gasoline storage tank(s) equipped with Fuel service station gasoline storage tank(s) equipped with Stage I (monthly facility throughput <= 10,000 gallons and Stage I (monthly facility throughput <= 10,000 gallons and commenced operation on or before 6/29/2003)commenced operation on or before 6/29/2003)

FD-4A-4: FD-4A-4: Fuel service station gasoline storage tank(s) equipped with Fuel service station gasoline storage tank(s) equipped with Stage I and Stage II having an annual facility throughput of less than Stage I and Stage II having an annual facility throughput of less than or equal to 9 MM gallons; ORor equal to 9 MM gallons; OR

FD-4A-5: FD-4A-5: Fuel service station gasoline storage tank(s) equipped with Fuel service station gasoline storage tank(s) equipped with Stage I and Stage II with an additional vapor recovery system control Stage I and Stage II with an additional vapor recovery system control having an annual facility throughput <= 15 MM gallons.having an annual facility throughput <= 15 MM gallons.

Note: E-85 storage tank(s) equipped with Stage I vapor control system Note: E-85 storage tank(s) equipped with Stage I vapor control system

Page 8: ONLINE GENERAL PERMITS NJDEP October 9, 2013 ACE Academy

GP-004A Requirements forGP-004A Requirements forFuel Dispensing FacilitiesFuel Dispensing Facilities

• State Requirements:State Requirements: Stage I and Stage II Vapor Recovery SystemStage I and Stage II Vapor Recovery System

Includes higher gasoline throughput, especially for facilities Includes higher gasoline throughput, especially for facilities that have additional control(s);that have additional control(s);

Includes the use E-85 fuel;Includes the use E-85 fuel;

Includes the option of testing the Pressure/Vacuum Valve Includes the option of testing the Pressure/Vacuum Valve annually in accordance with N.J.A.C.7:27-16.3 or replacing annually in accordance with N.J.A.C.7:27-16.3 or replacing the Pressure/Vacuum Valve every two years;the Pressure/Vacuum Valve every two years;

Includes the option to operate a Stage II system compatible Includes the option to operate a Stage II system compatible with ORVR nozzleswith ORVR nozzles

Page 9: ONLINE GENERAL PERMITS NJDEP October 9, 2013 ACE Academy

GP-004A Requirements forGP-004A Requirements forFuel Dispensing FacilitiesFuel Dispensing Facilities

Federal Requirements:Federal Requirements: MACT Federal Requirements based on the MACT Federal Requirements based on the

monthly gasoline throughput of each facility monthly gasoline throughput of each facility (see next table for requirements)(see next table for requirements)

Page 10: ONLINE GENERAL PERMITS NJDEP October 9, 2013 ACE Academy

1010

Page 11: ONLINE GENERAL PERMITS NJDEP October 9, 2013 ACE Academy

GP-009A GP-009A Boiler(s) and Heater(s) each Boiler(s) and Heater(s) each

greater than or equal to greater than or equal to 10 MMBTU/hr 10 MMBTU/hr

and less than 50 MMBTU/hr and less than 50 MMBTU/hr combusting gaseous fuelcombusting gaseous fuel

1111

Page 12: ONLINE GENERAL PERMITS NJDEP October 9, 2013 ACE Academy

GP-009A GP-009A

ApplicabilityApplicability A single boiler and/or indirect fired process heater A single boiler and/or indirect fired process heater

with a maximum gross heat input rate greater than with a maximum gross heat input rate greater than or equal to 10 MMBTU/hr and less than 50 or equal to 10 MMBTU/hr and less than 50 MMBTU/hr, or MMBTU/hr, or

Multiple boilers and/or indirect fired process Multiple boilers and/or indirect fired process heaters, each with a maximum gross heat input heaters, each with a maximum gross heat input rate greater than or equal to 10 MMBTU/hr and less rate greater than or equal to 10 MMBTU/hr and less than 50 MMBTU/hr. than 50 MMBTU/hr.

Burning the following commercial fuels Natural Gas; Burning the following commercial fuels Natural Gas; Propane and/or No. 2 Fuel Oil only during periods of Propane and/or No. 2 Fuel Oil only during periods of gas curtailmentgas curtailment

Page 13: ONLINE GENERAL PERMITS NJDEP October 9, 2013 ACE Academy

GP-009A Requirements GP-009A Requirements for Boiler(s) and Heater(s) for Boiler(s) and Heater(s)

• State Requirements:State Requirements: Revised Subchapter 19 (Revised Subchapter 19 (annual adjustment,

record keeping and reporting, requirements of the combustion processes in accordance with N.J.A.C. 7:27-19;

Revised Subchapter 9 (Sulfur limits)Revised Subchapter 9 (Sulfur limits)

Requires stack testing for boilers greater than 25 MMBTU/hr and combusting natural gas and/or propane to demonstrate compliance with SOTA limits for CO and NOx emission concentrations in lb /mmbtu

Page 14: ONLINE GENERAL PERMITS NJDEP October 9, 2013 ACE Academy

GP-009A Requirements GP-009A Requirements for Boiler(s) and Heater(s) for Boiler(s) and Heater(s)

• Federal Requirements:Federal Requirements: Revised NSPS ( Initial notification reports

required for boilers greater than 10 MMBTU/hr in accordance with to NSPS, Subpart Dc 40 CFR 60.48c(a))

Page 15: ONLINE GENERAL PERMITS NJDEP October 9, 2013 ACE Academy

GP-001A GP-001A Solid Material Storage Solid Material Storage

1515

Page 16: ONLINE GENERAL PERMITS NJDEP October 9, 2013 ACE Academy

GP-001A GP-001A Solid Material Storage Solid Material Storage

ApplicabilityApplicability• Single Solid Material Storage Equipment Single Solid Material Storage Equipment

equipped with a particulate control apparatus equipped with a particulate control apparatus having a minimum design removal efficiency of having a minimum design removal efficiency of at least 99%, orat least 99%, or

• Multiple Pieces of Solid Material Storage Multiple Pieces of Solid Material Storage Equipment equipped with a particulate control Equipment equipped with a particulate control apparatus having a minimum design removal apparatus having a minimum design removal efficiency of at least 99%.efficiency of at least 99%.

Page 17: ONLINE GENERAL PERMITS NJDEP October 9, 2013 ACE Academy

GP-001A Requirements for GP-001A Requirements for Solid Material Storage Solid Material Storage

Requirements for GP-001A:Requirements for GP-001A:• Allows multiple pieces of solid material storage Allows multiple pieces of solid material storage

equipment to be registered;equipment to be registered;

• GP-001A will have an inventory list of GP-001A will have an inventory list of equipment, emission points, control devices, equipment, emission points, control devices, and emission units; andand emission units; and

• Requires records of material stored.Requires records of material stored.

Page 18: ONLINE GENERAL PERMITS NJDEP October 9, 2013 ACE Academy

How To RegisterHow To Register Online Business Portal Online Business Portal

www.njdeponline.comwww.njdeponline.com

Paper (Not allowed as of Paper (Not allowed as of January, 2010)January, 2010)

Page 19: ONLINE GENERAL PERMITS NJDEP October 9, 2013 ACE Academy

Requirements for Requirements for Online Business PortalOnline Business Portal

Obtain Facility ID / Program Interest Obtain Facility ID / Program Interest NumberNumber

Create a MyNewJersey Portal access Create a MyNewJersey Portal access account at account at http://www.deponline.comdeponline.com

Enter facility specific informationEnter facility specific information Details on Source OperationsDetails on Source Operations Certify (Individual With Direct Knowledge & Certify (Individual With Direct Knowledge &

Responsible Official) Responsible Official) Credit card payment, bank routing number Credit card payment, bank routing number

(e-check) or Bill Me Later(e-check) or Bill Me Later

Page 20: ONLINE GENERAL PERMITS NJDEP October 9, 2013 ACE Academy

How do I obtain a How do I obtain a General Permit?General Permit?

The first step is to create a "My New The first step is to create a "My New Jersey Account" at: Jersey Account" at: http://www.njdeponline.com/

Once you have created the account, Once you have created the account, you will be able to log into NJDEP you will be able to log into NJDEP Online Portal and complete a general Online Portal and complete a general permit online. permit online.

Page 21: ONLINE GENERAL PERMITS NJDEP October 9, 2013 ACE Academy

General Permit Help LineGeneral Permit Help Line(609) 633-2829(609) 633-2829

Page 22: ONLINE GENERAL PERMITS NJDEP October 9, 2013 ACE Academy

2222