on the waterfront mapping the future - seattle magazine · 2019. 2. 26. · bell harbor ....

1
STADIUM PLAZA RAILROAD WAY ALASKAN WAY S. MAIN ST. COLUMBIA ST. S. JACKSON ST. S. KING ST. MARION ST. MADISON ST. OCCIDENTAL PARK SPRING ST. UNIVERSITY ST. UNIONST. LENORA ST. FIRSTAVE. PIKE PINE S. WASHINGTON ST. S. MAIN ST. IMPROVEMENTS S. WASHINGTON ST. IMPROVEMENTS WASHINGTON STREET BOAT LANDING COLUMBIA ST. IMPROVEMENTS MARION ST. BRIDGE IMPROVEMENTS ALASKAN WAY SEATTLE GREAT WHEEL IVAR’S ACRES OF CLAMS YE OLD CURIOSITYSHOP PIER 57 PIER 59 THE EXISTING WATERFRONT PARK SEATTLE AQUARIUM UNION ST. ELEVATOR + STAIRS OVERLOOK WALK PIKE PLACE MARKET VICTOR STEINBRUECK PARK BELL HARBOR CONFERENCECENTER MARKETFRONT COLMAN DOCK/ FERRIES CENTURYLINK FIELD BELL HARBOR MARINA PIER 62 PIER 63 LENORA ST. PEDESTRIAN BRIDGE IMPROVEMENTS BELL ST. PARK BELL ST. PARK PIKE ST. IMPROVEMENTS PINE ST. IMPROVEMENTS THE HABITAT BEACH NEAR PIONEER SQUARE WILL MAKE ELLIOTT BAY ACCESSIBLE. THE WIDE EXPANSE OF ALASKAN WAY IS IN THE FOREGROUND A PORTION OF THE PROMENADE— WHICH SPANS THE LENGTH OF THE FUTURE WATERFRONT PARK— AS SEEN FROM PIER 58 CONCERTS WILL RETURN TO PIER 62, A FLEXIBLE ACTIVITY SPACE BLUFF WALK SLIDES, PART OF THE OVERLOOK WALK BAY STEPS AT OVERLOOK WALK WHICH WILL CONNECT THE WATERFRONT AND PIKE PLACE MARKET The Waterfront Seattle plan calls for public spaces with room for activities such as soccer, ice skating and concerts; a roadway with a dedicated bike path; overlooks and other places to revel in spectacular mountain and water views; and improved corridors that connect the waterfront with the rest of the city. Some parts of the plan are well underway—the Pike Place MarketFront opened in 2017—while the entire 26-block area isn’t expected to be completed until 2023. Mapping the Future On the Waterfront A NEW TWO-WAY PROTECTED BIKE LANE WILL RUN FROM S KING STREET TO PIER 62 IMAGES/MAP BY JAMES CORNER FIELD OPERATIONS COURTESY OF THE CITY OF SEATTLE MAKING WAY Improvements to Pike and Pine streets, from First Avenue east, will make these east-west corridors more inviting to pedestrians N S W E 92 SEATTLEMAG.COM MARCH 2019

Upload: others

Post on 22-Jan-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: On the Waterfront Mapping the Future - Seattle Magazine · 2019. 2. 26. · bell harbor . conference center marketfront. colman dock/ ferries. centurylink field. bell harbor marina

M A R C H 2019 S E AT T L E M AG . CO M 93

STADIUM PLAZA

RAILROAD WAY

ALASKAN WAY

S. M

AIN S

T.

CO

LUM

BIA

ST.

S. JA

CKSO

N ST.

S. K

ING S

T.

MA

RIO

N S

T.

MA

DIS

ON

ST.

OCCIDENTAL PARK

SPRI

NG

ST.

UN

IVER

SITY

ST.

UN

ION

ST.

LENO

RA ST.

FIRST AVE.

PIKE

PIN

E

S. W

ASHIN

GTON S

T.

S. MAIN ST. IMPROVEMENTS

S. WASHINGTON ST.IMPROVEMENTS

WASHINGTON STREET BOAT

LANDING

COLUMBIA ST. IMPROVEMENTS

MARION ST. BRIDGE

IMPROVEMENTS ALASKAN WAY

SEATTLE GREAT WHEEL

IVAR’S ACRES OF CLAMS

YE OLD CURIOSITY SHOP

PIER

57

PIER

59

THE EXISTING WATERFRONT

PARKSEATTLE

AQUARIUM

UNION ST. ELEVATOR +

STAIRS

OVERLOOK WALK

PIKE PLACE MARKET

VICTOR STEINBRUECK PARK

BELL HARBOR CONFERENCE CENTER

MARKETFRONT

COLMAN DOCK/FERRIES

CENTURYLINK FIELD

BELL HARBOR MARINA

PIER 62

PIER 63

LENORA ST. PEDESTRIAN BRIDGE

IMPROVEMENTS

BELL ST. PARK

BELL ST. PARK

PIKE ST. IMPROVEMENTS

PINE ST. IMPROVEMENTS

THE HABITAT BEACH NEAR PIONEER SQUARE WILL MAKE ELLIOTT BAY ACCESSIBLE. THE WIDE

EXPANSE OF ALASKAN WAY IS IN THE FOREGROUND

A PORTION OF THE PROMENADE—WHICH SPANS THE LENGTH OF THE

FUTURE WATERFRONT PARK— AS SEEN FROM PIER 58

CONCERTS WILL RETURN TO PIER 62, A FLEXIBLE ACTIVITY SPACE

BLUFF WALK SLIDES, PART OF THE OVERLOOK WALK

BAY STEPS AT OVERLOOK WALK WHICH WILL CONNECT THE WATERFRONT

AND PIKE PLACE MARKET

The Waterfront Seattle plan calls for public spaces with room for activities such as soccer, ice skating and concerts; a roadway with a dedicated bike path; overlooks and other places to revel in spectacular

mountain and water views; and improved corridors that connect the waterfront with the rest of the city. Some parts of the plan are well underway—the Pike Place MarketFront opened in 2017—while the entire

26-block area isn’t expected to be completed until 2023.

Mapping the FutureO n t h e W a t e r f r o n t

A NEW TWO-WAY PROTECTED BIKE LANE WILL RUN FROM S KING STREET TO PIER 62

I M AG E S / M A P BY J A M E S CO R N E R F I E L D O P E R AT I O N S CO U R T E S Y O F T H E C I T Y O F S E AT T L E

MAKING WAYImprovements to Pike and Pine streets,

from First Avenue east, will make these east-west corridors more inviting to pedestrians

NS

W

E

92 S E AT T L E M AG . CO M M A R C H 2019