olorunsola samuel kayode

Upload: sam-kay-olorunsola

Post on 30-May-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/14/2019 Olorunsola Samuel Kayode

    1/6

    OLORUNSOLA SAMUEL KAYODE

    1ST ECWA ITEDO-MAKUTU, P O BOX 14, ISANLU

    TEL: - 08054626082

    EMAIL: - [email protected]

    CAREER OBJECTIVE: - To build a career where energy is delivered in a safe and organised

    manner, by promoting the organization mission and improvingprofitability by the utilization of my technological knowledge andmanagement skills.

    WORKING EXPERIENCES

    SEPT 2008 DATE DANGOTE GROUP OF COMPANIES

    OBAJANA CEMENT PLC, OBAJANA, KOGI STATE

    GAS TURBINE GENERATOR POWER PLANT

    FIELD ENGINEER

    Pre-Commissioning / Commissioning of 45MW GE LM6000 Sprint

    Aero-derivative Gas Turbine Generator sets, checking for

    alignment, cabling, valve positioning, instruments installation, co

    resistance test, continuity test and other installations and tests

    Supervised the Installation, Calibration and set up Equipments.

    Supervised Cable laying, Termination and Meggering.

    Hand on experience on GE Mark VI control and Fanuc 90/70 PLC

    Performed unit start- up of Equipments, functional and

    performance test in ensuring proper and safe operation of

    machines by evaluating running parameters.

    Managed company technical document like Packing list, Bill of

    materials and drawing.

    Conducted Inspections on Installation of Electrical Equipments/

    Facilities in order to maintain Plant design Standard for quality

    Control and reporting findings and recommendations to ensure

    compliance with company requirement and Industrial practice.

    mailto:[email protected]:[email protected]
  • 8/14/2019 Olorunsola Samuel Kayode

    2/6

    Ensured installation of all Electrical and Instruments Equipments

    are carried out safely in accordance with company Environmenta

    health and safety guidelines.

    Set up and Operate test Equipments to evaluate performance of

    Electrical Equipments and Instruments after installation for the

    purpose of detecting potential problems in sufficient time to

    permit an orderly and timely removal of equipments for

    replacement or from service in order to achieve electrical

    completion and preparing facilities for commissioning.

    Analyze and Interpret Test information to resolve design related

    problems.

    Operations and Maintenance of Aero-derivative Gas Turbine

    Generator sets, Instruments Air Compressors Auxiliary Skids and

    balances of Plant.

    Schedule, predictive, preventive and breakdown maintenance of

    GTG package and Auxiliaries.

    Installation, maintenance and calibration of Gas turbine and BOP

    instruments and control system, including pressure and differenti

    pressure transmitters, gas sensors, smoke detectors, flame

    detectors, pressure and level switches. Using calibrators such as

    hart communicator, Yokogawa Brain Test set, GE Druke, Merical

    and fluke

    Maintenance of Gas metering station instruments and control

    systems

    Maintenance of Medium / High voltage switch gear and Breakers

    and power Transformer {PROLEC} up to 64 MVA ratings.

    maintenance of Installation of fire fighting system and

    Commissioning

    Knowledge of MCC and DCP ( Motor control center and Direct

    Current Panel )

    Capable to interpret and use P and ID interconnection drawing.

  • 8/14/2019 Olorunsola Samuel Kayode

    3/6

    Familiar with FANUC 90/70, 90/30 PLC and Controls.

    Conduct/ Supervise the Installation, Calibration and set of

    Instrument.

    Conduct / Supervise loop check.

    OCT. 2007- AUG 2008 ACHIEVERS TECHNOLOGY LINK, MUSHIN, LAGOS

    SYSTEM ENGINEER

    Installation, Commissioning, Troubleshooting And

    Maintenance of VSAT

    Configuration Of Modems and Site Survey

    Hardware And Software Installation

    Computer Engineering

    Installation, maintenance and servicing of electronics

    security systems

    The test conducted on Equipments among others include:

    DC High Potential Test, Polarization Index Test, Insulation

    Resistance Test, Insulating Oil / Dielectric Test, Turn Ratio

    Test, Power Factor Test, Vector group Test, Polarity Test,

    Phase Sequence Test, Winding Resistance Test, Contact

    Resistance Test,

    SEPT. 2006 SEPT 2007 NATIONAL YOUTH SERVICE SCHEME;

    Life Line Group of Schools, Fugar, Etsako Central LGA Edo State

    TEACHING

    Teaching of physics and chemistry ( theory and practicals)

    Supervising all science laboratory activities

    DEC 2004 AUG 2006 ELECTRONICS TECHNOLOGY SYSTEM (ETS) TAIWO ROADILORIN

    TRAINEE ENGINEER

    Design Of Electronics Systems & Circuit Analysis

  • 8/14/2019 Olorunsola Samuel Kayode

    4/6

    Installation, calibration and maintenance of electronics

    instruments; such as temperature transmitters, pressure

    transmitter, level switches, speed sensors and other

    industrial control instruments

    Project Engineering And Consultancy

    Computer Maintenance, Troubleshooting Hardware And

    Software Installations

    Setting Up Of Local Area Network (LAN)

    Electronics Systems Circuit Analysis

    Installation Of Electronics and Security Devices

    DEC 2003- JULY 2004 AJAOKUTA STEEL COMPANY, AJAOKUTA

    INDUSTRIAL TRAINEE

    Power Transmission Substation Operations

    Thermal Power Plant instrumentation and control Operation

    Maintenance of Electrical Power Machines

    Power Cabling Installation

    Transformers and Circuit Breaker Testing

    EDUCATION AND QUALIFICATIONS:

    2000-2005 UNIVERSITY OF ILORINB.Eng. Electrical Engineering, (2005)

    Core courses include: Communication and Control in Power System,Advance Electronics, Electromagnetism, Principle of Communication,Power electronics, Electrical Machines, Control System, AssemblyLanguage, Electrical power system.

    Project: Design and construction of 750VA Uninterruptable Power

    supply with Voltage Regulator

    TRAINING ATTENDED

    MAR 2009 NIGERIA IRON MINING COMPANY, ITAKPE

    Basic Fire prevention and controlling in Industry training

  • 8/14/2019 Olorunsola Samuel Kayode

    5/6

    MAR 2008 EINSTEIN TECHNOLOGY, IKEJA LAGOS

    VSAT Technology, Computer Engineering and Networking,

    Hardware and Software Installation.

    Microsoft Office, Graphical Design, Matlab, Digital Editing

    RESEARCH PUBLICATIONS: Design and Construction of 750 VA Uninterruptable Power Supply

    Unit (Unpublished) 2005

    Design Of 1 KVA Purely Sinusoidal Uninterruptable Power Supply

    Unit (Unpublished) 2006

    SKILL:

    Team Playing, Self Motivating, Fast Learning, Computer Competency, Excellent

    Communication & Interpersonal Skills, analytical and numerical skills, Ability to

    interpret Electrical/ electronics system circuit

    BIODATA

    DATE OF BIRTH: 27TH NOVEMBER, 1982

    PLACE OF BIRTH: ISANLU

    NATIONALITY: NIGERIAN

    STATE OF ORIGIN: KOGI

    GENDER: MALE

    MARITAL STATUS: SINGLE

    RELIGION: CHRISTIANITY

    LANGUAGES SPOKEN: ENGLISH AND YORUBA

    REFEREES:

    MR H.K YOGEESHSNR MANAGER (ELECTRICAL)

    POWER PLANT

    OBAJANA CEMENT PLC, OBAJANA

    08033312287

    MR. RICHARD B. OLUPINLAADMISSION OFFICE

    FEDERAL COLLEGE OF EDUCATION

    (TECHNICAL), AKOKA YABA, LAGOS

    TEL: 08035992101

  • 8/14/2019 Olorunsola Samuel Kayode

    6/6

    ENGR. DAVID LAWAL

    ELECTRONICS TECHNOLOGY SYSTEM

    89 91, STADIUM SHOPPING COMPLEX

    TAIWO ROAD, ILORIN

    TEL. 08033699776