OKI FY 2017 UNIFIED PLANNING WORK PROGRAM 

  

     

                                                           

      

Page 2: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

 OKI FY 2017 

UNIFIED PLANNING WORK PROGRAM 

                         

The preparation of this document was financed cooperatively by the Federal Highway Administration and the Federal Transit Administration of the United States Department of 

 Transportation, the Ohio Department of Transportation, the Kentucky Transportation Cabinet, Indiana  Department of Transportation and local units of government within the OKI region. The opinions, findings,  

and conclusions expressed in this document are those of the author and are not necessarily those of the United States Department of Transportation. This report does not constitute a standard, specification, or regulation.                     

  

   

Ohio‐Kentucky‐Indiana Regional Council of Governments 720 East Pete Rose Way, Suite 420 

Cincinnati, Ohio 45202  

www.oki.org Phone: (513) 621‐6300 Fax: (513) 621‐9325 TTY: (513) 621‐6300 

                                                           April 14, 2016   

Page 3: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and
Page 4: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

CONTENTS 

   

 

INTRODUCTION ............................................................................................................................................. 1   

 

WORK PROGRAM 

 

600  TRANSPORTATION   

 

601  Short Range Planning .................................................................................................... 14 

602  Transportation Improvement Program ........................................................................ 15     

605  Surveillance ................................................................................................................... 17 

610  Transportation Planning ............................................................................................... 20 

611  Fiscal Impact Model ...................................................................................................... 25 

625  Transportation Services ................................................................................................ 26 

665   Special Studies .............................................................................................................. 27 

667  Rideshare Activities ....................................................................................................... 28 

674  JARC/Mass Transit Exclusive ......................................................................................... 29 

684  Ohio Exclusive ............................................................................................................... 38 

685  Indiana Exclusive ........................................................................................................... 39 

686  Kentucky Exclusive ........................................................................................................ 43 

695  Unified Planning Work Program ................................................................................... 45 

697  Transportation Program Reporting ............................................................................... 46 

 

700  ENVIRONMENTAL   

 

710  Local Water Quality Activities ....................................................................................... 47    

720  Mobile Source Emissions Planning ............................................................................... 50   

 

800  REGIONAL PLANNING ACTIVITIES ........................................................................................... 51   

 

  500  U.S. Forest Service Work Program ................................................................................ 52 

   

APPENDIX A: BUDGET    ..................................................................................................................... A‐1   

 

Rationale for Funding   ...................................................................................................................... A‐1   

Budget Table  ..................................................................................................................................... A‐2 

 

APPENDIX B: COST ALLOCATION PLAN ..................................................................................................... B‐1 

 

APPENDIX C: TITLE VI ................................................................................................................................. C‐1   

 

Page 5: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

 

Topic and Work Program Cross Reference 

 

 

Planning Activity (alphabetical order)  Work Element 

2040 Plan  610 – System Management 

3C Planning Process  610 – System Management 

Air Quality and Air Quality Conformity  720 ‐ Mobile Source Emissions Planning 

Bike/Ped  601 ‐ Short Range Planning 

Clean Air (Do your Share)  665 – Special Studies 

Congestion Management  610 – System Management 

Consultations  610 – System Management 

Corridor Studies  610 – System Management 

Demographics  605 ‐ Surveillance 

Fiscal Impact Analysis Model (FIAM)  610.5 Fiscal Impact Analysis Model 

Freight  610 – System Management 

Functional Class  610 – System Management 

Geographic Information Systems  605 ‐ Surveillance 

Homeland Security  605 ‐ Surveillance 

Indiana Planning  685.1,2 & 4 Indiana Exclusive 

ITS  610 – System Management 

JARC  674 – J/NF Coordinated Plan 

Kentucky Special Projects  686.2,3 – Kentucky Exclusive 

Ladders of Opportunity  605 ‐ Surveillance 

Livability  610.4 – Land Use 

New Freedom  674 – J/NF Coordinated Plan 

Participation Plan  625 – Transportation Services 

Public Outreach  610 – System Management 

Regional Planning  800 – Regional Planning (Local Funding) 

RideShare  667 – Commuter Assistance 

Regional (Rural) Trans Pl Orgs (RTPO)  684.4 – Ohio Exclusive 

Safety  610 – System Management 

Security  610 – System Management 

Strategic Regional Policy Plan (SRPP)  610.4 – Land Use 

Street Centerline Files  605 ‐ Surveillance 

TIP  602 ‐ Transportation Improvement Program 

Traffic Counts  605 ‐ Surveillance 

Traffic Simulation  610 – System Management 

Transit Planning  674 – Transit Agency Planning 

Transportation Summary  697 – Transportation Program Reporting 

Travel Models  605 – Surveillance 

Travel Survey  605 ‐ Surveillance 

Travel Time Data  610 – System Management 

UPWP  695 – Unified Planning Work Program 

Water Quality  710 ‐  Water Quality Program 

 

 

Page 6: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

 

 

 

 

Introduction   

 

 

 

 

 

 

Page 7: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

1

INTRODUCTION   The Fiscal Year 2017 Unified Planning Work Program (UPWP) outlines the scope of work to be undertaken by OKI for the period beginning July 1, 2016 and ending June 30, 2017. OKI serves as the Metropolitan Planning Organization  (MPO)  for the Greater Cincinnati region. This document  illustrates the relationship between adopted goals, objectives and program activities. It outlines the general nature of these program elements, which are summarized by general categories, and are  referenced  to specific projects by project number. Planning  activities,  products  and  a  budget  is  provided  for  each  program  element.  Also  included  in  this document is the agency Prospectus which provides the agency structure, committee memberships and key interagency agreements. 

Primarily a management tool for planning and coordination, the UPWP provides the basis for cataloging and integrating OKI's activities  into general categories.  It delineates  the programmatic and  fiscal relationships essential  for  internal  planning  and  programming.  The  current  federal  regulation  that  guides MPOs  in developing  an  annual  UPWP  for  the  purpose  of  programming,  scheduling,  and managing metropolitan transportation planning activities for the program year is in 23 134(a), (f) and 49 USC 5303(a), (b). The primary federal regulations are Section 1101(b) of FAST Act (P.L. 114‐357) and 49 CFR Part 26 regarding involvement of

disadvantaged business enterprises in US DOT funded planning projects 23 CFR 420.109, 23 CFR 450.308, 49 CFR 613 and 23 U.S.C. 150(c).  

PLANNING AREA The OKI region embraces an area of 2,636 square miles, with a population of 1,999,474 (2010 Census)  in Butler, Clermont, Hamilton and Warren counties in the State of Ohio; Boone, Campbell and Kenton counties in the Commonwealth of Kentucky; and Dearborn County in the State of Indiana.  

 

 

OKI Planning Area

Page 8: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

2

 

PLANNING PRIORITIES 

The FY 2017 transportation planning program emphasizes the implementation and documentation of the activities which will advance the region’s ability to meet the future travel needs of the OKI region.  

The overall  goal  for  transportation planning  is  the  implementation of balanced  and  efficient  intermodal  and multimodal transportation services for the OKI region while involving a broad spectrum of agencies and the public in all aspects of the process. More specifically it is the intent of the program to address the goals of the OKI 2040 Regional Transportation Plan which are consistent with the metropolitan planning factors outlined in the federal transportation legislation Fixing America’s Surface Transportation (FAST) Act. Within the context of these goals, and in consideration of perceived local area needs and OKI's overall role in transportation planning, efforts will be directed toward the following types of activities. OKI staff, in coordination with USDOT, ODOT, KYTC and INDOT, will  continue  the  performance‐based  planning  efforts  initiated  in  FAST  Act.  Performance  Targets  will  be established addressing performance measures in 23 U.S.C. 150(c) and coordinating on targets related to Transit Asset Management and Transit Safety.  1)  Maintain a  long range  transportation plan  to serve as a guide  for  transportation  investment and service 

decisions. 

Maintain,  refine, and amend as necessary  the OKI 2040 Regional Transportation Plan,  including  the travel  demand model,  in  conformance with  the  requirements  of  the  CAAA  and  FAST Act  and/or  it successor. Continue  and  expand  an  active performance‐based planning  component of  the planning process. 

Consideration of non‐motorized modes of travel to increase the number of trips for utilitarian purposes made by bicycling and walking, and  to  improve  the  safety and  convenience  for  these modes  in  the region. 

Improve the interaction between regional and local planning activities, and strengthen the relationship between land use planning and transportation planning at all levels. 

2)  Maintain current socioeconomic and transportation system inventories and projections. 

Maintain  up‐to‐date  estimates  and  forecasts  of  demographic  and  land  use  activity  for  input  to transportation planning activities. 

Maintain current transportation system inventory and usage data. 

3)  Evaluate local area transportation problems and develop recommended solutions. 

Assist units of local government in analyzing the impact of traffic generated by proposed developments and preparing recommendations for street access and traffic control to serve the needs of the proposed development, while preserving the capacity and safety of the public roadways. 

Assist and encourage units of local government in the development of access management policies and corridor plans, to preserve and protect the functional integrity of the roadway system. 

Inventory and evaluate traffic operations at problem intersections and formulate recommendations for improvements regarding striping, signage, channelization, signalization and other traffic controls. 

Inventory and evaluate traffic operations on key segments of existing roadways and develop traffic flow improvement recommendations. 

Provide technical assistance for the preparation of basic pedestrian, vehicular and/or bicycle circulation plans. 

Continuation  of  transportation  system management  (TSM)  and  travel  demand management  (TDM) activities,  to  improve  system  efficiency,  and  to  help  realize  reductions  in  vehicle miles  of  travel, congestion, air pollution,  fuel  consumption, and advance a  system  that enhances  sustainability and livability. 

Page 9: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

3

4)  Prioritize transportation projects to assure project funding and full utilization of federal and state funds. 

Develop and maintain a biennial Transportation Improvement Program. 

Conduct a TIP and Plan conformity analysis consistent with the State Implementation Plan for Air Quality as required. 

Investigation of innovative financing mechanisms, both public and private, to improve the ability of local governments to implement needed transportation improvements. 

5)  Assist in implementation of specific transportation projects. 

Serve as the designated recipient for FTA's Specialized Transportation Program (Section 5310). 

Evaluate local social service agency applications for vehicle purchase under 5310. 

Develop and maintain a coordinated transit plan for the region consistent with JARC/New Freedom and 5310 programs. 

Assist local communities and other agencies in establishing park‐and‐ride lots for carpooling, vanpooling, and transit. 

Assist in the development, implementation, and coordination of bicycle and pedestrian transportation facilities and programs throughout the region. 

Assist in the planning, programming, and implementation of projects funded by the STP, STBG set‐aside and CMAQ programs. 

Promote and  facilitate  the  implementation of  intelligent  transportation  system  (ITS)  to  improve  the transportation system efficiency and management. 

6)  Provide traffic engineering and transportation planning information and technical assistance in support of development and implementation programs. 

Partner with state DOT’s on regional traffic and ITS operations programs for  implementation of cross jurisdictional traffic signal timing, operation, maintenance and freeway active traffic management. 

Arrange and conduct seminars and/or develop educational materials for county, township and municipal staff and officials. Topics would include access management, participation planning, roadway financing, right‐of‐way preservation, site impact studies, traffic control and regulation, bicycle/pedestrian planning and design, and others. 

Provide transit planning assistance to urban and rural transit systems.  

Continuation of the planning and implementation requirements of the Americans with Disabilities Act (ADA). 

Provide travel demand forecasts with turning movement projections for KYTC projects. 

Provide process‐related assistance in arranging and conducting public meetings, and in promoting issue identification and understanding, goal‐setting and prioritization, and community outreach activities. 

Provide technical data and assistance to individual transportation corridor and facility studies. 

7)  Improve the efficiency by which goods are transported, transferred among modes, and distributed within and beyond the region. Continue freight planning and improvement in the efficiency of intermodal freight operations. 

8)  Involve a broad spectrum of agencies and the public, including underserved communities in all aspects of transportation planning. OKI will maintain a robust participation plan. 

RESPONSIBLE PARTY 

All work will be performed by OKI staff except as noted. Consulting firms are used to supplement staff resources as  needed  and  as  noted  in  the  individual work  elements  and  also  in  the  budget  tables. OKI’s  procurement 

Page 10: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

4

procedures are consistent with (Federal Super Circular) 2 CFR 200. Transit section 674 is the responsibility of the respective transit agencies.  

SUPPORT AND ASSISTANCE FROM THE STATES & FEDERAL AGENCIES 

The  Ohio  Department  of  Transportation,  the  Kentucky  Transportation  Cabinet,  the  Indiana  Department  of Transportation,  the  FHWA  and  FTA  support  and  assist  OKI  in many  ways,  including  provision  of  a  district representative, traffic count data, and TIP programming  information, all of which are essential to the ongoing planning process. 

 SUMMARY OF KEY AGENCY PROGRAMS AND ACTIVITIES There  are  three  key  documents  produced  by  the metropolitan  planning  process:  the Unified  Planning Work Program,  The  Regional  Transportation  Plan  and  the  Transportation  Improvement  Program.  These  and  other important activities are discussed below.  Unified Planning Work Program (UPWP) (Update Schedule: Yearly; Next Update: May 2017) This document, prepared annually by OKI in cooperation with local and state officials, transit agencies and others, documents  all  planning  activities  anticipated  during  the  fiscal  year  regardless  of  funding  sources,  while incorporating the comprehensive multi‐modal planning process. This continuous planning process is responsive to the needs of the local area and to the changes occurring in the region for which current data concerning land use, travel and transportation facilities must be continuously maintained.   OKI Regional Transportation Plan (RTP) (Update Schedule: every four years; Next Update: June 2020) The OKI Board of Directors adopted  the OKI 2040 Regional Transportation Plan on  June 9, 2016.   The Plan  is amended as necessary. The Plan meets all the requirements of the FAST Act federal planning regulations. The Plan is  required  to be updated every  four years and serves as a blueprint  for  transportation projects  in  the  region through the year 2040. At the same time,  it responds to FAST Act and Clean Air Act requirements that call for mitigating congestion, optimizing safety, and addressing air quality and other environmental, social and financial issues. 

This Plan meets federal regulations in that it is constrained fiscally and with regard to mobile source emissions (air quality). An expanded  section  related  to  community  impacts and environmental  justice  is  included. This Plan provides the framework for corridor studies and other initiatives. 

Transportation Improvement Plan (TIP) (Update Schedule: varies; Next Update: April 2017) This document  is normally developed every two years and reviewed periodically  in cooperation with state and local  officials,  regional  and  local  transit  operators  and  other  affected  transportation,  regional  planning  and implementing agencies. The TIP consists of improvements recommended from the short‐range planning process, elements  of  the  transportation  plan  and  the  transit  development  programs  of  the  various  transit  systems. Specifically, the TIP: 1) identifies transportation improvements recommended for advancement during the four year program period; 2) indicates the area's priorities; 3) groups improvements of similar urgency and anticipated staging into appropriate staging periods;  4) includes realistic estimates of total costs and revenues for the program period, including year of expenditure cost estimates; and 5) is financially constrained. The entire TIP is tested to establish its conformity with the State Implementation Plan for air quality. 

The TIP includes project‐by‐project listings which are modified periodically and contain: 1) sufficient descriptive material of work, termini and  length to  identify the project; 2) estimated total cost and the amount of federal funds proposed to be obligated during the program year; 3) proposed source of federal and non‐federal funds; and 4) identification of the recipient and state and local agencies responsible for carrying out the project.  Transportation Air Quality Conformity and Emissions Analysis In May 2012, pursuant to provisions of the Clean Air Act Amendments of 1990, the U.S. Environmental Protection Agency designated nine counties  in the Cincinnati area as a marginal nonattainment area for ozone under the 

Page 11: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

5

current ozone standard.  Nonattainment means that the area is not meeting the national air quality standard. The Cincinnati ozone nonattainment area includes Lawrenceburg Township in Dearborn County Indiana, portions of the  Kentucky  counties  of  Boone,  Campbell  and  Kenton,  and  the Ohio  counties  of  Butler,  Clermont,  Clinton, Hamilton and Warren. Clinton County is outside of the OKI region, but is part of the nonattainment area. The Ohio Department of Transportation (ODOT) is the lead planning agency for Clinton County.    In December 2014, U.S. EPA designated seven counties as nonattainment under the 2012 annual fine particulate (PM2.5) standard.  The Cincinnati PM2.5 nonattainment area includes portions of the Kentucky counties of Boone, Campbell and Kenton, and the Ohio counties of Butler, Clermont, Hamilton and a portion of Warren.  The area is in attainment for all other criteria pollutants monitored by U.S. EPA. Nonattainment and maintenance areas must make commitments to attain or maintain the standard as part of a State Implementation Plan (SIP) and perform transportation conformity.  Transportation conformity is a mechanism to ensure that federal funding and approval are given to those transportation activities that are consistent with air quality goals as contained in the SIP. 

 

 

Page 12: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

6

Corridor and Special Studies OKI has been a leader both regionally and nationally in initiating and managing corridor studies. Since 1997, 18 corridor and/or  special  studies have been  completed by OKI.    In 2011, OKI  completed  the development of a Regional  Freight  Plan.  Recommendations  from  this  study  and  previous  corridor  studies  form  a  considerable component of the Regional Transportation Plan. In 2014 the Kenton County Transportation Plan was completed and the KY‐536 Scoping Study was completed in 2016. The corridor studies permit detailed evaluation of problems and potential solutions.   Transportation System Management (TSM) The TSM element  is  included as part of  the OKI Transportation  Improvement Program. TSM activities are an integral part of the OKI planning program. TSM implies a practice of planning, programming, implementation, and operations that call for improving the efficiency and effectiveness of the transportation system by improving the operations and/or services provided.  Congestion Management Process (CMP) The OKI  region’s quality of  life and economic  competitiveness are closely  related  to  the degree  to which  the transportation system is able to provide an acceptable level of mobility. The importance of congestion is reflected in federal transportation rules requiring a Congestion Management Process (CMP) in metropolitan areas. The CMP shall provide “for  safe and effective  integrated management and operation of  the multimodal  transportation system”  and  result  in  “performance  measures  and  strategies  that  can  be  reflected  in  the  metropolitan transportation plan”.  OKI’s  CMP  identifies  appropriate  performance measures  to  assess  the  extent  of  congestion.  It  establishes  a coordinated program for data collection and system performance monitoring to define the extent and duration of  congestion.  For  the  purpose  of monitoring  system  performance, OKI  has  identified  a  regional  Congestion Management Network. The CMP network  includes about 1,525  road miles  that  carry nearly 78% of  the  total regional  traffic.  Ongoing  system  monitoring  is  accomplished  through  various  data  acquisition  techniques including: 1) data‐base management of traffic count data performed by OKI and its partners; 2) travel time surveys on the network beginning with the National Highway System (NHS) and by making use of INRIX and HERE data; 3) acquisition of transit ridership data and operational data from transit operators; 4) periodic inventory of freight operations/data in the region; 5) periodic field review of the region’s highway system attributes; 6) detailed travel data  in ongoing  transportation corridor  study areas; and 7) a  framework  for evaluating  the effects of  system improvements (performance measures).  The CMP also identifies and evaluates appropriate congestion management strategies for the improved safety of the existing and  future  transportation system. OKI produces a comprehensive CMP analysis  report every  four years, coinciding with the development of OKI’s Metropolitan Transportation Plan.  The last CMP analysis report was completed in November 2015. The 2015 report documents the procedures and findings from the fourth 4‐year  data  collection  cycle  that  was  completed  in  December  2014  and  compares  transportation  system performance to the 2011 and earlier data.     Transit Planning Assistance OKI provides ongoing  transit  planning  assistance  to  all  federally‐funded  public  transit  systems  in  the  region: Southwest  Ohio  Regional  Transit  Authority  (SORTA),  Transit  Authority  of  Northern  Kentucky  (TANK),  the Middletown Transit System  (MTS), Clermont Transportation Connection  (CTC), Warren County Transit Service (WCTS) and the Butler County Regional Transit Authority (BCRTA).  

Specialized Transportation OKI is actively involved in the review of Specialized Transportation Program applications from private, nonprofit agencies  in  Butler,  Clermont, Hamilton  and Warren  counties.  Each  year, OKI  prioritizes  funding  requests  for projects  from  applicants.  The  Job  Access  Reverse  Commute/New  Freedom  planning  coordination  efforts 

Page 13: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

7

commenced  in FY2006 and staff completed the first JARC/New Freedom “Coordinated” Plan as a product of a previous UPWP. The Plan produced a coordinated approach to transit/paratransit investments for the region. An update of the 2012 Coordinated Plan will be undertaken in FY16. Under MAP‐21 the New Freedom program has evolved into what is now the 5310 Program. OKI has been identified by the governors of each of the three states as the designated recipient to administer the 5310 transit funds for private, non‐profit entities.  Transportation Alternative Program (TA) The Transportation Alternative Program continues created under FAST Act.  States are required to sub allocate funds to MPO’s  in urban area.  OKI administers a competitive process  for the region’s counties  (by state). OKI continued  the successful Ohio TA program and had a call  for projects  in Spring 2016. Project selection will be completed  in the Fall of 2016. About $6 million  in TA funding for FY19‐FY21 will be awarded. OKI selected five projects for the three Northern Kentucky counties in spring 2013.  Technical Services OKI has for many years allocated a portion of its resources to the provision of technical assistance to units of local government in the areas of transportation planning, traffic engineering and process consultation. While this does not constitute a major element of the agency’s overall mission, it is a service which is greatly appreciated by local governments, many of which do not have either the staffing or the financial resources to have access to these types  of  services  on  their  own.  OKI  has  provided  technical  services  for  several  multi‐jurisdictional  trail development efforts in recent years.  RideShare OKI’s RideShare service has been operational for more than 30 years. RideShare is a voluntary, employer‐oriented activity  to  increase vehicle occupancy, decrease miles of  travel and  improve air quality. The OKI staff actively promotes  and  operates  RideShare,  including  providing matching  services  to  area  commuters.  The  strategies include  direct marketing  to major  employers,  their  employees,  the  general  public,  and  community  groups. Promotional  tools  include  freeway  and  arterial  signing  bearing  the  241‐RIDE  telephone  number,  bus  signs, brochures, radio and print advertising and the Guaranteed Ride Home program. 

 Participation Plan, Title VI, ADA and Section 504 In 2014,  the agency adopted an updated Participation Plan OKI  is dedicated  to ensuring a  fair and equitable planning process and business practice. The OKI Participation Plan outlines processes for consultations practices related to the Disadvantaged Business Enterprises (DBE), Title IV and Section 504 of Rehabilitation Act of 1973 requirements. OKI has dedicated staff to ensure compliance with and support of the Council’s responsibilities and practices related to these issues.  Strategic Regional Policy Plan Pursuant  to  its  charge  of maintaining  a  comprehensive,  cooperative  and  continuing  transportation  planning process, OKI adopted a  strategic  regional policy plan  (SRPP)  in 2005. The SRPP was  reviewed and updated  in 2014. In addition to addressing federal transportation planning mandates, the plan was conceived to save limited tax  dollars  through  better  coordination  of  local  land  use  planning  and  regional  transportation planning.  Specifically, the plan encourages  land use patterns that promote multimodal travel and the efficient use of land, natural resources, and public facilities. OKI staff continues to work with the Land Use Commission to develop, refine and implement the SRPP Policy Recommendations. Staff will transition all SRPP related guidance tools  for  online  interactive  use,  research materials  to maintain  relevancy  and  supplement  as  necessary  the comprehensive  plan  guidance  about  neighborhood  redevelopment,  economic  vitality  and  sustainability  best practices. 

General Coordination Efforts Between OKI, State DOTs, FHWA, FTA, RTAs OKI  has worked  closely  with  ODOT,  KYTC,  INDOT,  Federal  Highway  Administration  (FHWA),  Federal  Transit Administration  (FTA),  Environmental  Protection  Agency  (EPA),  SORTA,  TANK,  Middletown  Transit  Service, 

Page 14: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

8

Clermont Transportation Connection, Warren Co. Transit and BCRTA in developing the multimodal approach to planning for the region. OKI has also coordinated with and has been a participant in the development of many studies including each of the state‐wide transportation plans. OKI shares data with the various planning partners and agencies and provides technical assistance whenever possible.   Planning Emphasis Area Each of the FHWA Division Offices in Ohio, Kentucky and Indiana and FTA Regions IV and V issue Planning Emphasis Areas  (PEA’s)  through  their respective state DOT annually. The purpose of  the PEAs  is  to  focus our efforts on implementing the programs and reforms of the FAST Act. 

  

OKI FY17 PLANNING EMPHASIS AREAS   State/Emphasis Area 

 Status  Program Element 

 Kentucky 

   

 Implementation of the FAST Act     

a) Performance‐Based Planning.  Address in planning documents as performance measures are released. 

Ongoing  610.1 products 1, 3, 6 

b) Expand Committees or Boards.  Include public ports and private transportation providers (intercity buses, carpools, etc.) in the planning process. 

OKI Committees and Boards include such representation. Activity on‐going. 

610.2 product 2

c) Consider Climate Change in Planning Process.  Consider projects/strategies to improve resilience and reliability of transportation system to mitigate stormwater, and to enhance travel and tourism. 

Ongoing  610.1 product 9

       Regional Models of Cooperation:  Ensure a regional approach to transportation planning by promoting cooperation and coordination across transit agency, MPO, and state boundaries.  

                           610.1 product 2

a) Incorporate Joint Goals.  Incorporate goals for project delivery, congestion management, safety, freight, livability, and commerce that are common to Transit, MPO, and state into planning process. 

Ongoing  610.1 products 2, 3, 6 

b) Planning Agreements.  Update agreements to ensure that effective processes for cross‐jurisdictional communication exist. 

Complete   

c) ITS Architecture.  Update and collaborate with partners (State, MPO, etc.) to ensure compatibility. 

ITSA updated in FY16 

610.1 product 4

         Ladders of Opportunity:  Access to essential services (employment,   health care, schools/education, and recreation). 

   

a)  Identify criteria for underserved populations (low income, minorities, elderly, LEP, Disabled) and essential services (health care, schools, supermarkets, employment centers, voting/polling places, courthouses, recreational areas, motor vehicle depts.). 

Added for FY17  605.1 product 6 

b)   Map existing connectivity.  Added for FY17  605.1 product 6 

Page 15: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

9

c)   Identify gaps in connectivity and create solutions.  Develop and implement analytical methods to identify gaps in connectivity in existing and developing transportation system and potential solutions. 

Added for FY17 

605.1 product 6

d)  Participation Plans.  Evaluate the effectiveness of Participation Plans for engaging disadvantage communities in the decision‐making process. 

Ongoing  625.2 product 1, 4

e)  Coordinated Human Service Public Transportation Plan.  Update same. 

FY16 Updated  674.3 product 4

f)  Bike/Ped facilities.  Assess the safety and condition of bike/ped facilities. 

Ongoing  601.1 and 610.1 product 6 

g)  ADA Transition Plans.  Evaluate compliance with ADA, particularly around schools, concentrations of disadvantaged populations, social services, medical, and transit facilities. 

Ongoing  610.1 product 2

h)  EJ and Title VI.  Determine the funding, not just the number of projects,  spent in these areas, and list in TIPs/MTPs. 

Investment analysis if TIP and Plan as required by FAST 

602.1 product 5, 610.1 product 1 

       

  Ohio     

  Develop performance measures consistent with FAST Act     

a)  Coordinating PM's with ODOT and public transit providers  Work in process  

610.1 products 1, 3, 6 

b)  Integrating PM's into long range plan and TIP  Work in process  

610.1 products 1,3, 6 

c)  Developing a process to report PM's  Complete ‐ see OKI website 

 

  Development of SFY18‐21 TIP     

a)  MPO TIP documentation demonstrating explicit review and approval of all projects recorded in the TIP and projects' consistency with the MPO LRP.  

Ongoing  602.1 product 1

b)  MPO TIP fiscal constraint documentation for all projects and programs  recorded in the TIP 

Ongoing  602.1 product 1

  Continue and Develop Regional Models of Cooperation     

a)  Ensure a regional approach to transportation planning and promoting coordination across transit agencies, MPOs and state boundaries 

Ongoing  610.1 product 2

  Ladders of Opportunity     

  Plan for access to essential services, including multi‐modal transportation connectivity gap analyses and plan to address identified gaps 

Added for FY17 

605.1 product 6

  Integrating Freight into planning and programming  Ongoing  610.1 product 8

  Title VI and Environmental Justice     

  MPOs should clearly document specific activities they are conducting related to Title VI and EJ within their annual work programs 

Ongoing  625.2 product 1

       

Page 16: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

10

 

 FY 2017 UNIFIED PLANNING WORK PROGRAM HIGHLIGHTS 

1) 601  Short Range Planning: Assistance  to  local  jurisdictions  including pedestrian  and bike planning,  Safe Routes to School programs, and the continuation of an active Surface Transportation Block Grant Set‐aside (STBG) program. Assisting in the on‐going development of a Regional Trails Inventory. 

2) 602 Transportation Improvement Program: Staff will continue an active program oversight. Prioritization of projects  to  be  funded with OKI  STP,  CMAQ  and  STBG  set‐aside  funding.  Incorporation  of  performance measures as required by the FAST Act. 

3) 605 Surveillance: Continue to refine and enhance the trip‐based travel model.  Continued development of the  tour‐based  travel demand model  including  the collection of  traffic generator  survey data. Continued enhancement of GIS system capabilities. Plan for access to essential services and “Ladders of Opportunity,” including multi‐modal transportation connectivity gap analyses and plan to address identified gaps in service to underserved populations with an emphasis on low income and minority populations. Other underserved populations will be evaluated as feasible. 

4) 610.1 Long Range Planning‐ System Management: Continue an aggressive congestion management (CMP) program  and  use  of  INRIX  and  HERE  data.  Evaluation  of  performance‐based metrics  for  the  Regional Transportation  Plan.  Coordination  with  federal,  state,  regional,  and  local  agencies  to  advance  the 

   Indiana 

   

  Title VI Program Management     

a)  Identify LPA's without a current Title VI Plan  The OKI Application for Funding requires the applicant to document the status of their ADA and Title VI plans. 

685.1 product 8

b)  Monitor Title VI Plan implementation     

  Performance Based Planning Measures and Targets    685.1 products 1, 6

  Ladders of Opportunity     

  Identify criteria for underserved populations (low income, minorities, elderly, LEP, Disabled) and essential services (health care, schools, supermarkets, employment centers, voting/polling places, courthouses, recreational areas, motor vehicle depts.).Plan for access to essential services, including multi‐modal transportation connectivity gap analyses and plan to address identified gaps. 

  685.1 product 5

  Program HSIP funds for safety planning activities and/or identify low cost systemic use of HSIP funds 

   

  15% of HSIP funds are available for planning purposes such as road safety audits and safety data collection. 

OKI has sub‐allocated funds to a safety project led by Dearborn County Engineer 

685.1 product 2

Page 17: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

11

transportation  goals  for  the  region.  Continue  to  improve  functionality  of  the  SRPP  and  environmental consultations by migration to interactive on‐line platform for informing the transportation planning process. 

5) 610.4 Land Use: Continue implementation of the Strategic Regional Policy Plan. New partners will be invited to  use  the  fiscal  impact  analysis model.  Comprehensive  planning  tools  and model  ordinances  will  be maintained  to  assist  local  governments  identifying  environmental  best  practices,  development  and redevelopment strategies. 

6) 610.5  Fiscal  Impact  Analysis  Model  –  Technical  Development:  Ongoing  maintenance  and  technical assistance features and functionality of the model. 

7) 611.5 Fiscal  Impact Analysis Model – Web‐Based Maintenance & Startup:  Staff will oversee  consultant services  to  provide  the  web‐based  FIAM  and  related  services  including  data  upload  for  new  partner communities and backup services for existing clients. 

8) 625.2  Transportation  Services  ‐  Participation  Plan:  On‐going  support  of  area  studies,  outreach  and development  of  collateral  transportation materials will  be  conducted.  Active  social media  program  for informing citizens and businesses about transportation issues. DBE and Title VI related services. Execution of the agency’s Participation Plan. 

9) 665.4 Regional Clean Air Program: OKI’s Clean Air Program will once again strive to advance the “Do Your Share for Cleaner Air” message through a variety of media. 

10) 667.1 Commuter Assistance Services ‐ Rideshare: Continue to provide Surface Transportation Block Grant Set‐aside Program to commuters within the Tri‐State area, thereby providing energy conservation, traffic and pollution reduction and preserving the quality of life in the OKI region.  

11) 674.1/674.2  JARC/New  Freedom  Coordinated  Transportation  Plan: OKI  is  the  designated  recipient  for federal funds for Job Access and Reverse Commute (Section 5316) and the New Freedom Program (Section 5317). OKI will use the Coordinated Public Transit‐Human Services Transportation Plan to select and fund projects. 

12) 674.3 Transit Planning Activities (5310 Program) ‐ OKI will administer the 5310 transit funds for private, non‐profit entities in a cooperative arrangement with SORTA.  

13) 674.4 New Freedom Pass Through: OKI, as the designated recipient for New Freedom funds, is responsible for managing  the projects operated by  two entities  in  the  region providing services but not  identified as “designated  recipients”  under  FTA  regulations. OKI  serves  as  the  oversight  agency  to  ensure  all  federal requirements are met including reports submitted to the Federal Transit Administration’s TrAMS system. 

14) 674.5/674.6/674.7/674.8/674.9/674.10 Mass Transit Exclusive Planning Studies: Conduct transit planning and programming activities in the OKI region. Work performed by area transit agencies. 

15) 684.4 Ohio Exclusive Regional Transportation Planning Organization Pilot Program: OKI will continue  to provide assistance to OVRDC  in the development of their  long range transportation plan through funding provided by ODOT. 

16) 685.1  Indiana Exclusive: Dearborn County Transportation Planning: Work  closely with Dearborn County officials, INDOT and FHWA to conduct the metropolitan planning process. Focus on tracking and delivering projects, red flag summaries, ADA and functional class updates. 

17) 685.2  Indiana  Exclusive:  Dearborn  County  Transportation  Planning  (STP):  Staff  oversight  of  Bright  74 Scoping Study and FIAM services for Dearborn County communities. 

18) 685.4  Indiana Exclusive: Dearborn County Transportation Planning: Bright 74 Scoping Study: Consultant contract to conduct a scoping study of corridor from Bright to I‐74. Project was initiated in FY16 and will be completed in this FY. 

19) 686.3 Kentucky Exclusive: Boone County Transportation Plan Update. Staff oversight of the Boone County Transportation Plan Update. Other ongoing activities related to PIF’s and Unscheduled Needs will continue. 

20) 686.2  Kentucky  Exclusive  (PL  Discretionary):  Boone  County  Transportation  Plan  Update  (consultant contract). 

21) 695.1 Unified Planning Work Program: Develop, produce and disseminate a FY2018 UPWP that responds to metropolitan transportation planning requirements. Prepare mid‐year and year‐end performance reports. 

Page 18: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

12

22) 697.1  Transportation  Program  Reporting:  A  transportation  report  summarizing  the major  findings  and activities of the OKI transportation planning process. 

23) 710.1  Local Water Quality Activities: Provide  technical  support  for  local agencies as  time and  resources permit. 

24) 710.6 Water Quality  Program  (Ohio  EPA):  Permit  consistency  reviews,  associated  plan  amendments  as appropriate and public information products as detailed in OKI’s contract with Ohio EPA.  

25) 710.9 Water Quality Program  (Ohio General Assembly): Updated Water Quality Management Plan  and associated plan amendments.  

26) 720.1 Mobile Source Emissions Planning: Conformity analysis for the regional transportation plan and TIP amendments. Quantification of the expected air quality and energy benefits of candidate projects for STP, SNK, STBG set‐aside or CMAQ funding. 

27) 800.1 Regional Planning Activities: Analyses of national and regional land development trends, conditions, and issues; and technical assistance on issues including land use, zoning, economic development, housing, water and  sewer  infrastructure,  intergovernmental  coordination, capital budgeting, and natural  systems. Provide support for the OKI Regional Planning Forum and the OKI Planning Directors’ Network.  

28) 500.1 U.S.  Forest Service Work Program: OKI will work with NARC, VTU, and Davey  to engage decision makers, planners, and engineers in the OKI region to develop Integrating Trees Into Stormwater Management Design and Policy – A Guide for Local Decision Makers that will be promoted nationally.   

Page 19: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

13

TRANSIT AND MULTI‐MODAL PLANNING  

The OKI FY 2017  transportation planning program emphasizes  the  implementation and documentation of  the transportation planning activities which will advance the region’s ability to meet the future travel needs of the OKI region. Many of the program elements deal specifically with transit and multimodal planning. Following are project descriptions/justification of those elements: 

       

Element  Description  Product Number (#)     Page 

601  Short Range Planning  Planning assistance – (#1,3)  14 

602  TIP  Program of projects (1‐3,6,7)         15 

605  Surveillance  Collection & integration of transit data into upgraded travel model: (#1,2,3,10) 

 18 

605  Surveillance  Ladders of Opportunity (#6)  18 

610  Long Range Planning   Coordination with transit agencies (all)  21  

610  Land Use  Research and collaboration regarding the connections between transportation & land use  (#1) 

23 

625.2  Participation Plan  All  26 

667.1  RideShare  Guaranteed ride home program (#3)  28 

674.1/2  JARC/New Freedom  Program Management (all)  29 

674.3  5310 Program  All   30 

674.4  New Freedom Pass Through 

Pass Through for Taxi Services (all)  31 

674.5  Southwest Ohio Regional Transit Authority (SORTA) 

Local Transit Agency Planning (all)  32 

674.6  Transit Authority of Northern Kentucky (TANK) 

Local Transit Agency Planning (all)  33 

674.7  Middletown Transit System (MTS) 

Local Transit Agency Planning (all)  34 

674.8  Clermont Transportation Connection (CTC) 

Local Transit Agency Planning (all)  35 

674.9  Butler County Regional Transit Authority (BCRTA) 

Local Transit Agency Planning (all)         36 

674.10  Warren County Transit Authority (WCT) 

Local Transit Agency Planning (all)   37 

684.4  Ohio Exclusive – Regional Transportation Planning Organization Pilot 

Transit and multimodal needs assessment (all) 

38 

720  Mobile Source Emissions Planning 

All          50 

   

 

 

 

 

Page 20: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

    

  

 Work Program 

        

     

Page 21: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

14

601 – SHORT RANGE PLANNING 

OBJECTIVE To address short‐term problems and needs relating to transportation of persons and goods in the OKI region, and to identify actions that present a systematic approach to solving these problems.  To  coordinate with  units  of  local  government  regarding  the  development  and  adoption  of  access management plans, thoroughfare plans and other studies.   To utilize the transportation planning expertise and resources of the OKI staff in providing data, technical assistance and planning services.  To  administer  the  federal  Surface  Transportation  Block  Grant  Set‐aside  Program  for  funding  sub‐allocated to OKI from all three states.   To  provide  training  and  support  to  public  and  private  non‐profit  agencies  to  enhance  and  improve transportation capabilities and resources, through workshops, and notifications of educational and/or training opportunities. 

 METHODOLOGIES 1)   Technical Assistance‐ As appropriate, staff may provide technical assistance to local communities in 

various elements of transportation/bicycle/pedestrian planning, engineering, etc.  2)  Surface  Transportation  Block  Grant  Set‐aside  program  ‐  OKI  administers  a  competitive  Surface 

Transportation Block Grant Set‐aside program for the region. Surface Transportation Block Grant Set‐aside  Program  includes  both  infrastructure  and  the  Safe Routes  to  School  projects.  Information regarding the program will be disseminated to local governments, and technical assistance will be provided on request. OKI will continue to actively seek projects with merit, and will assist applicants through the application and implementation process.  

3)   Transit Planning Assistance ‐ OKI will continue to provide assistance to the public transit systems for planning activities. Specific efforts will be directed  toward  financial planning, privatization,  route analysis, service changes and coordination, and human services transportation coordination. Staff will  present  transit  TIP  modifications  to  the  ICC  and  amendments  to  the  OKI  Board  of Directors/Executive Committee as needed. 

PRODUCTS 1)   Documentation supporting technical assistance to local communities in various elements of 

transportation/bicycle/pedestrian planning, engineering, etc. 2)   Administration of OKI’s Surface Transportation Block Grant Set‐aside Program and Safe Routes to 

School Program.  3)  Transit planning assistance to any of the transit systems in the OKI Region consistent with identified 

needs, including Human Services Transportation Coordination, as required under MAP‐21 and FAST Act. (as appropriate) 

PROFESSIONAL DEVELOPMENT The UPWP budget includes funding for one staff member to attend the Association of Pedestrian and Bicycle Professionals professional development conference in 2016 and the Ohio Planning Conference in 2016. 

Page 22: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

15

602 ‐ TRANSPORTATION IMPROVEMENT PROGRAM 

OBJECTIVE To develop an effective, multi‐year program that identifies and prioritizes transportation improvements. Projects  are  to  be  consistent with  transportation  plans  and  studies  developed  through  the  urban transportation planning process. The program is fiscally and air quality constrained. 

METHODOLOGY 1)  The TIP is a fiscally constrained planning document that provides a complete listing of all intended 

federally funded or regionally significant transportation projects for a four‐year period. The current TIP was adopted  in April 2015  that covers  the planning horizon of  fiscal years 2016  ‐ 2019. Staff continues to monitor projects in the TIP and attends project review meetings conducted by ODOT, KYTC and INDOT. Staff works with ODOT‐District 8 to lock‐down projects for the upcoming fiscal year and INDOT‐Seymour District for Early Consultation of highway projects planned for Dearborn County (conducted under 685.1) 

2) The TIP  is a dynamic document  that requires numerous amendments and modifications during a fiscal year. Staff remains responsive to the needs of the program and prepares amendments and administrative modifications  to  the  TIP  as needed.  The OKI  Intermodal Coordinating Committee reviews TIP amendments and makes recommendations to the OKI Executive Committee or the Board of Directors. The ICC approves TIP Administrative Modifications as outlined in OKI Resolution 2014‐04 adopted by the Board of Directors on 1/9/14. 

3) Staff will continue to refine the web‐based tools that allow the public to search the OKI TIP  in an interactive manner. The online TIP (TIP on demand) has been updated since its inception to be more user‐friendly and a smart phone app has been developed and updated for the OKI TIP. 

4) OKI will prioritize projects in the OKI region seeking TRAC funds. 5) Staff continues to prepare an annual list of obligated highway, transit and planning projects federally 

funded in accordance with 23 U.S.C. § 450.332. 6) Annually the MPO is required to self‐certify that the agency is conducting the requirements of the 

3C Planning process required under Title 23. 7) MAP‐21  began  and  FAST  Act  continues  the  requirement  that MPO  Plans  and  TIP’s  incorporate 

performance management processes via national, state and regional goals. 

PRODUCTS 1) Development of the new FY 2018 – 2021 TIP (6/30/17). Staff will monitor and expedite projects in 

the region using OKI allocated federal funds through meetings with ODOT, KYTC,  INDOT and  local sponsors; work with ODOT District  8  to  lock‐down  projects  for  fiscal  years  2018  and  2019.  (as necessary) 

2) TIP Amendments and TIP Administrative Modifications. (as necessary) 3) Continued  refinement  of  the  TIP  on Demand  on  the OKI website  and  the  smart mobile  device 

applications. (as necessary) 4) Regional prioritization of TRAC applicant projects. (as necessary) 5) An annual listing of obligated highway, transit and planning projects funded with federal funds will 

be published within 90 days of the end of the state fiscal year for Ohio and Indiana projects (9/30/16) and within 90 days of the end of the federal fiscal years for Kentucky projects (12/31/16). 

6) Annual self‐certification of the metropolitan planning process (5/17) 7) The TIP will include transportation performance measures which will be tracked and evaluated over 

time. 

Page 23: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

16

PROFESSIONAL DEVELOPMENT The UPWP budget  includes  funding  for one staff member to attend the Ohio Planning Conference  in 2016. 

                                           

Page 24: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

17

605 ‐ SURVEILLANCE 

OBJECTIVE Develop and maintain, on the appropriate update cycle, the basic data and geographical  information systems  (GIS)  essential  to  transportation  planning  activities.  Such  a  database  represents  current conditions within the region and permits comparison to previous as well as forecast periods to determine the impact of changing development and travel patterns.   Develop and maintain a  travel model  capable of estimating  current  trip making behavior and  travel patterns as well as assessing the impacts of proposed changes in land uses, transportation system, travel demand management strategies, and transportation control measures.  

METHODOLOGIES 1) Maintain  and  update  transportation  system  inventory  data.  The  regional  database  includes 

transportation supply characteristics.  2) Update travel data. Trip making data was collected for a sample of the households in the region and 

traffic count data is collected throughout the spring, summer, and fall. The data included household characteristics,  trips made  and  their  characteristics  (trip  purpose, mode,  time,  etc.).  Staff  will continue to collect and analyze data and utilize it for travel demand model design and calibration. OKI will  contract with  consultants  for data  collection  activities  required  for  travel modeling  and transportation planning studies. 

3) Maintain, refine and enhance OKI travel demand, air quality models, and data processing models to represent  state‐of‐the‐practice  capabilities.  The  activities  involved  include  streamlining  model operation,  improving  data  summary  tabulation/plotting/reporting  capability,  evaluating  and improving model methodologies, updating/refining the model equations based on the trip origin‐destination  data  collected  from  surveys  and  updating model  documents.  OKI  will  continue  to participate in a review capacity of a project lead by ODOT to develop an activity‐based travel model known as the Ohio Disaggregate Modeling System (ODMS) for five large MPOs in the state. This travel demand forecasting model will be developed using the latest specifications and estimate, calibrate and  validate  the ODMS  for OKI, MVRCP, MORPC,  LCATS  and NOACA using  2010 data. Continue development of an integrated workflow between the travel demand model and OKI’s GIS. 

4) The most current state data center (Ohio Department of Development Services, Kentucky State Data Center, Indiana Business Research Center) county level population control totals will be used in air quality  conformity  determination  and  travel  demand  modeling  procedures.  Track  zonal  level residential and commercial development activity to identify areas of growth and/or change in land use. 

5) Assist U.S.  Census  Bureau  in  census work. OKI will  assist  the  Census  Bureau  in  providing  data, processing census data and reviewing census products. OKI will develop expertise in utilizing Census products  in  order  to  respond  to  census  related  data  requests  from  local  government,  business, academia and the public. 

6) Plan  for  access  to  essential  services  and  “Ladders  of  Opportunity,”  including  multi‐modal transportation  connectivity  gap  analyses  and  plan  to  address  identified  gaps  in  service  to underserved  populations  with  an  emphasis  on  low  income  and  minority  populations.  Other underserved populations will be evaluated as feasible.  

7) Maintain licensing and technical support for GIS software through an Enterprise License Agreement with ESRI.  Attend annual ESRI user conference, state GIS conferences, local GIS user group meetings, and other GIS training as needed.  Upgrade GIS hardware as required.  

Page 25: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

18

8) Continue development  and/or  refinement of GIS databases  and maps  to  support  transportation planning elements. 

9) Develop additional internet and/or intranet web mapping applications to display OKI GIS database information.   

10) OKI will continue enhancement of traffic simulation capabilities including its application to selected sub‐areas as appropriate.  Purchase additional software and hardware to incorporate technological advancements into the simulation process.  Maintain technical expertise in the latest advancements in travel modeling and traffic simulation by participating in user conferences and other training as appropriate. 

11) The OKI GIS is the primary data warehouse for many regional datasets related to transportation. As such OKI is a valuable resource within the regional community as it relates to safety and security for transportation infrastructure. OKI staff will explore ways to continue and if appropriate, expand its role as a regional data source for such critical datasets. 

12) Investigate additional opportunities for collecting crowd sourced data.   

PRODUCTS 1)   Updated transportation system characteristics data files, including updated highway network, transit 

network, and other transportation supply data files. (on‐going) 2)  Updated travel data files, including traffic counts and transit ridership figures. Contract(s) for data 

collection.  Maintain traffic counting equipment and capabilities (potentially by purchasing additional equipment). (on‐going) 

3)   An updated,  refined,  and enhanced  four‐step  travel demand,  air quality model, data processing routines.    Implementation  and  testing  of  an  activity‐based  travel  model  known  as  the  Ohio Disaggregate  Modeling  System  (ODMS)  (ODOT  contract).  Streamlined  internal  workflow  for presenting model data. (on‐going) 

4)  Revised zonal socioeconomic files for 2015, 2020, 2030, 2040 (as needed).  5)   Providing support to the U.S. Census Bureau and processing of data requests from local governments, 

citizens and others (as requested). 6)   Develop a  framework  for  “Ladders of Opportunity.” Develop  criteria  for  identifying underserved 

populations, essential services, available data sources and techniques for evaluating gaps in service. Create geodata and document program approach. (6/17) 

7)   Up‐to‐date GIS software. (6/17) 8)   Updated geographic databases. (on‐going) 9)   New online web mapping applications.  (as needed) 10)  Traffic  simulation  products  in  support  of  overall  planning  process.  Enhanced  3‐D  visualization 

presentations and techniques.  (as appropriate) 11)  Participation  in  regional  homeland  security  efforts  such  as  the  Emergency  Preparedness 

Collaborative.  Improved GIS data sharing and collaboration within the regional homeland security community including presentation to stakeholders and community leaders and funding agencies as appropriate. (on‐going) 

12)  Crowd sourced data collection applications. (as needed) 

PROFESSIONAL DEVELOPMENT 1)   Three staff members to attend the TRB Transportation Planning Applications Conference.  (5/17) 2)  One staff member to attend the Citilabs Futura User Conference (11/16) 3)  Two staff members to attend the Transportation Research Board Annual Meeting (1/17) 4)  Two staff members to attend the ESRI Developer’s Summit (3/17)  

Page 26: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

19

5)  One staff member to attend two unspecified Census‐related workshops 6)  Two staff members to attend the Ohio GIS Conference and two members to attend the Kentucky GIS 

Conference (9‐10/16) 7)  Contingency for GIS software training for staff    

                                         

Page 27: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

20

610.1 ‐ LONG RANGE PLANNING:  SYSTEM MANAGEMENT 

OBJECTIVE To invest transportation resources in improving the management and operation of the transportation system through continued cooperation, communication and coordination. 

METHODOLOGIES 1) The Regional Transportation Plan was updated in June 2016. In FY 2017 the Plan will be amended as 

necessary. As part of the Plan, Performance Measure reporting will continue in compliance with the requirements of Moving Ahead for Progress in the 21st Century Act (MAP‐21) and continued by FAST. OKI will host the federal certification review team for review of the OKI planning processes. 

2) Metropolitan  planning  organizations  like  OKI must maintain  a  focus  on managing  the  existing infrastructure. OKI will work with all levels of agencies and the public to discuss how all modes in the existing system can be managed and operated more efficiently. OKI will continue to participate  in regional, state and national forums to identify procedures for addressing federal and state planning requirements  including Americans with Disabilities Act  (ADA)  requirements. OKI will educate and assist  local  public  agencies  on  the  requirements  of  ADA.  OKI  will  pursue  regional  models  of cooperation by promoting cooperation and coordination across agency boundaries. 

3) For measuring  system performance  and providing data  for  the  congestion management process (CMP), OKI will continue to collect and exploit traffic quality information of roadways in the 1,173 mile CMP network. The traffic information includes a combination of data from OKI’s travel demand model,  intersection  turning movement  counts at  selected  key  regional  intersections,  speed data provided by FHWA National Performance Management Research Data Set (HERE), ODOT (INRIX) and KYTC,  and  travel  time  information  collected by OKI. OKI  travel  time  collection will be  limited  to locations where  FHWA,  ODOT  and  KYTC  speed  data  is  insufficient.  Following  each  4‐year  data collection cycle, a CMP Findings and Analysis Report will be completed. The next report  is due  in November  2019.  The  report  evaluates  the  CMP  network  based  on  established  performance measures  and  recommends  appropriate  strategies  to  address  deficient  locations.  The  findings contained  in  the  report will  continue  to  be  integrated  into  the  TIP  and  regional  transportation planning processes and be consistent with MAP‐21 and FAST requirements. 

4) Intelligent  Transportation  Systems  (ITS)  are  electronics,  communications,  and  information processing used singly or integrated to improve the efficiency or safety of surface transportation. An ITS  Architecture  (ITSA)  defines  how  systems  functionally  operate  and  the  interconnection  of information exchanges that must take place between these systems to accomplish transportation services. All federally‐funded ITS projects must conform to a Regional ITS Architecture that meets all requirements  of  the  federal  ITS  Architecture  and  Standards  rule. OKI  maintains  the  Regional Architecture and ITS Plan and periodically makes updates in response to changes in federal or state rules and to add or revise projects. OKI updated the ITSA and strategic plan in June 2016.  

5) OKI staff is active in transportation planning studies in the region. This element provides for start‐up activities for new corridor studies managed by OKI or studies not managed by OKI but where staff participation is appropriate. It also provides for special studies or analysis to assist communities to more  fully  evaluate  the  impacts  of  transportation  projects  and  programs.  Staff will  continue  to participate in a regional discussion group that is investigating transit opportunities. Staff will continue to participate in and support the Eastern Corridor and the Brent Spence Bridge program of projects. Staff  will  continue  to  produce  project  related  information  and  news  for  all  levels  of  public involvement. 

Page 28: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

21

6) OKI will maintain and update crash data on the transportation system to monitor existing conditions. Staff will develop safety performance measures in cooperation with the state DOT’s. Database and GIS software will be utilized to locate high crash concentrations and segments of roadway with high crash rates. Performance of a limited number of safety studies for ODOT and other agencies will be conducted  as  resources  permit.  Support  the  Highway  Safety  Improvement  Program  (HSIP)  by coordinating efforts with KYTC, ODOT and INDOT in executing their State Strategic Highway Safety Plans (SHSP).  

7) OKI will provide project level traffic forecasts, turning movements and traffic simulation as requested utilizing the regional travel model and other software as appropriate. 

8) Staff will  continue  to  engage  the multi‐modal  freight  community  and  explore  opportunities  to partner. Planning activities related to the identification of freight transportation needs and solutions. Freight  demands  offer OKI  the  opportunity  to  partner with  regional  partners who  are  active  in economic development pursuits to leverage transportation investments in a way that enhances the public good. 

9) Staff will  build  upon  previous  research  conducted  in  Fiscal  Years  2015  and  2016  to  integrate  a “Security” mechanism  (addressing  infrastructure vulnerability and  resiliency)  into  the OKI project prioritization process as a good practice measure recommended by the FAST Act. 

10) OKI will consult with appropriate state and local experts responsible for environmental protection, conservation,  natural  resources,  stormwater  management,  land  use  planning  and  historically significant sites to consider effects of the transportation plan, as required by FAST. This includes the consideration of environmental effects in its planning process through consultations that involve a comparison of the proposed transportation plan with environmental information and a discussion of potential environmental strategies that are regional  in scope. OKI will continue to support efforts that  advance  transportation  and/or  regional  planning  activities which  rely  upon  and/or  provide enhancement to the OKI environmental resource data,  including certain Green Umbrella activities and  the  region’s Taking Root  campaign. OKI will explore methods  to best  integrate  tourism and natural  disaster  risk  reduction,  as  encouraged  by  FAST,  into  the  ongoing  consultations. OKI will continue examining the relationship between transportation, climate change and livability. Staff will continue to explore the potential performance measures and data needs associated with climate change and livability. 

PRODUCTS 1) Amendments to the OKI 2040 Regional Transportation Plan (as necessary). Appropriate Performance 

Measures  reporting  will  be  conducted  and  recorded  (ongoing).  Host  the  federal  and  state transportation agencies for federal certification review (12/2016). 

2) Coordination with ODOT, KYTC, local governments, major transit agencies, public ports and private transportation providers on options for  improving the management and operation of the existing transportation system and future improvements. Participation in regional, state and national forums on transportation planning  issues,  including updates of state DOT transportation plans and other cross jurisdictional transportation cooperative planning activities. Education and assistance on ADA requirements to local public agencies (ongoing). 

3) Ongoing performance‐based Congestion Management Program. Speed data from FHWA, ODOT and KYTC will be integrated into the current OKI travel time database. OKI will collect intersection turning movement counts at key locations within Northern Kentucky.  OKI travel time collection using OKI vehicles may occur if needed (ongoing). 

4) ITS architecture and ITS Strategic Plan maintenance (as necessary). 

Page 29: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

22

5) Project development activities for future transportation corridor or special studies including but not limited to benefit/cost analysis, bus rapid transit, Eastern Corridor etc. (as appropriate). 

6) Identification of high crash concentrations locations (as needed). Performance of a limited number of safety studies for stakeholders as requested and resources permit. Cooperation with ODOT, KYTC in the review of their SHSP (as needed). Safety performance measures and targets monitoring and reporting (on‐going). 

7) Project  level traffic forecasts, turning movements and traffic simulation as requested utilizing the regional travel model and other software as appropriate. 

8) Continued outreach and coordination with private and public  freight and economic development stakeholders. Development of the freight component of the regional transportation system. Identify the OKI Critical Urban Freight Corridors in consultation with each state’s freight staff. 

9) Revised OKI Prioritization process incorporating metrics to track security (06/17). 10) Consultations with multidisciplinary agencies on  the development of  the  transportation plan and 

continued  discussion  of  potential  environmental  strategies  that  are  regional  in  scope.  Staff will explore methods  to  integrate  tourism and natural disaster risk  reduction with  the  transportation plan. Staff will identify and research potential performance measures and data needs associated with regional  environmental  resources,  climate  change,  and  livability.  Continue  to  inform  local governments of ADA Transition Plan requirements. (ongoing) 

 PROFESSIONAL DEVELOPMENT 

1) Two members to attend the Ohio Planning Conference (7/16) 2) One member to attend the Ohio Conference on Freight (8/16) 3) One staff member to attend the Ohio Traffic Engineering Conference (10/16) 4) One staff member to attend the APA National Conference (5/17) 5) One staff member to attend an unspecified freight/economic development‐related conference 6) One staff member to attend the TRB Planning Applications Conference (5/17)                     

Page 30: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

23

610.4 – LONG RANGE PLANNING: LAND USE 

OBJECTIVE To maintain and implement the Strategic Regional Policy Plan (SRPP) and strengthen the linkage between transportation  policy  and  land  use.  Provide  guidance  and  assistance  to  local  governments  as  local comprehensive planning efforts occur and as local standards and development criteria are created.    METHODOLOGIES 1) Continue education efforts about regional  land use trends on traffic congestion, air quality, travel 

times, and energy consumption. Target audiences will include local elected and appointed officials, planners, developers, and government decision‐makers. Consultation with state and local land use agencies  responsible  for  land  use  management,  natural  resources,  environmental  protection, conservation, historic preservation, and travel and tourism will occur. 

2) Continue implementation of the Strategic Regional Policy Plan by refining and continuing distribution and transition to interactive digital format of local comprehensive plan guidance, sample ordinances and collateral materials, such as surveys and research products about neighborhood redevelopment, economic vitality and best practices for  improving community  livability and sustainability. Provide technical assistance and encourage the use of these resources in order to promote land use patterns consistent with the SRPP Issues, Goals, Objectives and Policy Recommendations. 

3) Promote the use of the OKI Fiscal Impact Analysis Model to communities throughout the OKI region and other regions.   

4) Research and compile information to establish a source of reference and guidance materials for local governments  regarding  best  practices  with  emphasis  on  regionally  appropriate  environmental strategies including stormwater strategies.  

 PRODUCTS 1) Documentation of presentations and consultations about the land use/transportation relationship, 

trends and distributed materials. (ongoing) 2) Maintained www.HowDoWeGrow.org  SRPP website with  current  regional  trends  and  conditions 

related to the SRPP, transition all SRPP related guidance tools for online  interactive use, research materials  to maintain  relevancy  and  supplement  as necessary  the  comprehensive plan  guidance about neighborhood redevelopment, economic vitality and sustainability best practices.   Updated website  and  documentation  of  distribution  of  local  comprehensive  plan  guidance,  sample ordinances, and collateral materials and of technical assistance provided. (ongoing) 

3) Documentation of Fiscal Impact Analysis Model promotion. (ongoing) 4) Improved  OKI  Greenspace  Office  webpage  including  compiled  materials  and  links  to  relevant 

resources available to inform local governments on environmental best practices. (ongoing)  

PROFESSIONAL DEVELOPMENT The UPWP budget includes three staff members to attend the National American Planning Association Conference  (4/17), one staff member to attend the National Smart Growth Conference  (2/17), three staff members to attend state APA Planning Conference (9/16).     

Page 31: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

24

610.5 – FISCAL IMPACT ANALYSIS MODEL 

OBJECTIVE To  continue  to  maintain  and  refine  the  OKI  Fiscal  Impact  Analysis  Model  (FIAM).  Transportation investment  stimulates  economic  development  and  land  use  change.  The  FIAM  implements  a recommendation of OKI’s Strategic Regional Policy Plan by increasing local governments’ understanding of  the  costs  and  benefits  of  development.    The  FIAM  helps  local  governments  to  capitalize  on  the potential  land  use  changes  related  to  these  transportation  investments  by  analyzing  the  costs  and benefits  of  alternative  land  use  scenarios.  The  FIAM  uses  local  government  budgetary,  land  use, population and employment statistics to estimate costs and revenues of development using current local government budget data.   

 METHODOLOGIES 1) Continue to provide technical assistance to existing users. 2) Manage the process of incorporating additional user data into OKI’s Fiscal Impact Analysis Model.   3) Research and develop Fiscal Impact Analysis Model refinements and expanded functionality deemed 

necessary and appropriate as the FIAM continues to be used by local governments.   PRODUCTS 1) Documentation of technical assistance provided. (ongoing) 2) Additional data and analysis for new partners using the fiscal impact analysis model (as appropriate) 3)   Documentation of expanded functionality (as appropriate) 

                        

Page 32: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

25

611.5 – FISCAL IMPACT ANALYSIS MODEL – WEB‐BASED MAINTENANCE & STARTUP 

OBJECTIVE To continue to manage, maintain and improve the website operating the Fiscal Impact Analysis Model (FIAM). The web‐based version of  the FIAM enables users  to access and utilize  the FIAM online and requires continued maintenance to ensure the data used for FIAM calculations is current. The web‐based FIAM is designed to allow users to save work for future reference requiring the ongoing management of saved  information  for  individual users.  In order to ensure the maximum utilization of the web‐based interface,  improvements and upgrades are  frequently necessary. The web‐based FIAM also  requires adjustments as new partners communities join the program.  METHODOLOGIES 1) Staff will coordinate with consultant to maintain the web‐based FIAM and back‐up data on a regular 

schedule. 2) Staff will coordinate with consultant to update user data to the web‐based FIAM as necessary. 3) Staff  will  coordinate  with  consultant  to  upload  data  to  the  web‐based  FIAM  for  new  partner 

communities. 

PRODUCTS 1) A continuously functioning and accessible web‐based Fiscal Impact Analysis Model.  (ongoing) 2) A  report  citing  the users updated  and  the  type of  information  including  financial, demographic, 

and/or geographic, updated for each user, as applicable. (ongoing) 3) Creation of new data sets for each new partner community. (as appropriate) 

                        

Page 33: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

26

625.2 – TRANSPORTATION SERVICES: PARTICIPATION PLAN 

 OBJECTIVE To incorporate Title VI and Section 504 of the Rehabilitation Act of 1973 along with other environmental justice (EJ) concerns to ensure the participation of people who are traditionally underserved into OKI’s planning process. OKI will continue to implement a Participation Plan (PP) using traditional methodologies where appropriate, but will expand techniques and explore the use of other methodologies relative to the fair treatment and meaningful involvement of all people, especially the traditionally underserved, regardless of race, color, national origin, age, disability or income.  

PREVIOUS WORK OKI has developed a comprehensive Title VI based policy  relative  to EJ concerns of  the  traditionally underserved  and  established  an  Environmental  Justice  Advisory  Committee  to  assist  staff with  the implementation of its PP in all transportation planning projects. An update to the PP was adopted by the OKI Board of Directors in January 2014. OKI continues to update its DBE Certified Vendor Directory and Bid List and solicit additional DBE certified vendors.  METHODOLOGIES 1) Update, maintain and execute the PP and its strategies and plans for OKI studies and programs. The 

effectiveness of the PP will be periodically reviewed. 2) Enhance  the  participation  process;  strengthen  community‐based  partnerships,  and  provide  EJ 

populations  recognized  by  OKI with  opportunities  to  learn  about  and  improve  the  quality  and usefulness of various transportation modes. 

3) Facilitate DBE/SBE participation in OKI contracting opportunities. 4) Work with the Intermodal Coordinating Committee to develop criteria and measurement tools for 

EJ components when evaluating STP, TA and CMAQ projects to be advanced through the planning process. 

5) Coordinate and execute OKI internal and external communications activities involving transportation issues  to  the public, media, elected  representatives and government officials as well as business associations  and  industry‐related  organizations  to  enhance  and  support  OKI’s  transportation planning processes.  

 PRODUCTS 1) An  updated  PP,  Title  VI  and  customized  outreach  plans,  including  social  media  activities  as 

appropriate, for OKI studies and projects as needed. 2) Annual program compliance review will be conducted. (6/17) 3) RFPs and RFQs will be disseminated to OKI’s DBE / SBE Certified Vendor Directory and Bid List. 4) Input will be provided to the TIP and Plan project evaluation process to ensure proper consideration 

is given to underserved communities.   5) Public  outreach,  collateral  materials,  provide  and  received  industry  related  knowledge  and 

education. (6/17)  

PROFESSIONAL DEVELOPMENT 1) The UPWP budget includes one staff to attend the COMTO conference. (7/16) 2) The UPWP budget includes one staff to attend an unspecified social media conference. (4/17) 

 

Page 34: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

27

665.4 – SPECIAL STUDIES:  REGIONAL CLEAN AIR PROGRAM 

OBJECTIVE To continue the Regional Clean Air Program designed to reduce outdoor pollution levels through outreach and education in order to protect public health, the local economy and attain national ozone and particulate matter standards. 

 METHODOLOGIES 1) OKI will continue outreach and education efforts within the region. Although smog season is primarily from 

May to September, the program will work throughout the year to develop its “do your share for cleaner air” message as well as educate audiences on particulate matter  issues. Since smog reduction can be achieved through a variety of actions, several audiences will be targeted  including the  local media, government and businesses, citizens and employers. Event marketing, advertising,  social media, public  relations and other avenues of creating awareness will be utilized. 

 OKI’s Clean Air Program addresses ozone and particulate matter pollution issues.  The Greater Cincinnati area is in non‐attainment for the 8‐hour ozone and annual PM2.5 standards. This multi‐faceted campaign targets Greater Cincinnati citizens, media, local governments and businesses.  The “Air Quality Advisory” fax and email system  notifies  approximately  1,500  contacts  when  an  advisory  is  issued  due  to  either  high  ozone  or particulate matter  pollution  levels.   This  advanced  notification  system  allows  companies  to  notify  their employees as to the actions they can take to reduce air pollution production.  Many organizations have taken voluntary measures and made operations changes to reduce pollution formation.  In addition, this notification system also allows the media to report to the public that an Air Quality Advisory has been called.  It provides the  local  meteorologists  with  the  information  they  need  to  include  the  advisory  in  their  weather forecasts.  Each television station has made the air quality index a part of their forecasts.  The message is then carried forward to the general public including the voluntary measures they can take to reduce emissions such as combining trips, riding the bus, carpooling or biking. 

 The primary goal of the public outreach campaign is to improve the quality of the air in the Greater Cincinnati and Northern Kentucky area by continuing to educate the general public, businesses and the media about air pollution (ozone and particulate matter pollution), their contributions to it, and the voluntary measures they can  take  to help  reduce air pollution  formation.  Clean air continues  to be a critical  issue  for  the Greater Cincinnati area.  Concerns related to the health and well‐being of the citizens as well as economic factors drive this issue to the forefront of regional issues.  Addressing these concerns through innovative educational and informational campaigns is a priority for OKI.  

 Budget for marketing the Clean Program is $198,914.  The message is conveyed through a variety of tactics including  

Air Quality Advisory notifications when either high levels of ozone or particulate matter pollution are expected 

Informational/marketing/educational materials 

Comprehensive advertising campaign 

Event participation  PRODUCTS 1) An outreach program geared toward the reduction of pollutants in the eight county urban airshed. (ongoing)  

  

Page 35: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

28

667.1 – COMMUTER ASSISTANCE SERVICES:  RIDESHARE 

OBJECTIVE To provide Surface Transportation Block Grant Set‐aside Program to commuters within the Tristate area; thereby promoting energy conservation,  reducing  traffic and pollution,  saving money and helping  to preserve the quality of life for those who live in the OKI region. 

METHODOLOGIES 1) RideShare will maintain a current, accurate database of participants,  their origin and destination 

points, work hours  and other  key  information. Match‐lists will be provided  to  applicants by  the following business day.   

2) The OKI RideShare program promotes alternative transportation such as carpooling, vanpooling and public  transportation.  This  is  accomplished  by  providing  information  and  financial  incentives  to individuals and companies. 

3) The Guaranteed Ride Home (GRH) program provides registered carpoolers, vanpoolers and transit customers with a ride home in emergency situations at a minimal cost.     

4) The marketing of the program will be evaluated based on cost and effectiveness. Public awareness of the program will be raised through community and special events and employer presentations. 

PRODUCTS 1) A detailed  report of database activities such as additions and counts of applicants provided with 

match‐lists. (on‐going) 2) Retain existing vanpools through rider recruitment and form new vanpools. (on‐going) 3) An accurate GRH database and an efficient reimbursement program. (on‐going) 4) Execution  of  an  annual  marketing  plan  outlining  the  most  effective  approaches  to  increase 

awareness and participation in all aspects of the OKI RideShare program. (on‐going)    

               

Page 36: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

29

674.1/674.2 – JARC/NEW FREEDOM COORDINATED TRANSPORTATION PLAN 

OBJECTIVE  The objective of this program is to continue the management requirements of special  transit programs for  job access and  reverse  commute,  JARC Program  (Section 5316), and  the New Freedom Program (Section 5317) that were originally funded under SAFETEA‐LU. OKI was the designated recipient for these two federal programs. The funds will be used for management of remaining sub‐recipients as well as an update to the OKI Coordinated Public Transit‐Human Services Transportation Plan (Coordinated Plan).  

PREVIOUS WORK  OKI  was  named  the  designated  recipient  for  the  Cincinnati  urbanized  area  during  FY2007  by  the Governors of Ohio and Kentucky. OKI first developed the Coordinated Plan in 2007 with an update during FY 2012. The Coordinated Plan was  last updated during FY 2016  through  the use of public  surveys, surveys of transportation providers and a public meeting to gather input directly from participants. The latest version of the Coordinated Plan was adopted in May 2016. 

An Oversight Team provides guidance in managing the JARC and New Freedom programs, as well as the Section 5310 Program. OKI staff time for processing invoices from sub‐recipients is funded through this work element. Payments for the transportation services provided by the sub‐recipients come directly from the New Freedom pass through grants. 

METHODOLOGIES 1) Hold meetings of the Oversight Team, as needed, to provide guidance and oversight  in managing 

existing JARC, New Freedom and Section 5310 Programs in the region. Meetings with sub‐recipients, as needed, to effectively manage the New Freedom projects that OKI directly manages. 

2) Update of the existing Coordinated Plan which was last updated in fiscal year 2016. 3) Prepare quarterly progress reports for FTA describing the status of projects funded with JARC and 

New Freedom grants. Sub‐recipients prepare monthly progress reports to OKI indicating how they are complying with federal reporting requirements, which are included in the template supplied to the sub recipients. 

PRODUCTS 1) Meetings of the Oversight Team and other recipients of JARC and New Freedom federal funds. (as 

needed) 2) Updates to the Coordinated Plan. (as needed) 3) Prepare quarterly progress reports in the TrAMS system of FTA (quarterly) which include information 

from sub‐recipients. 

PROFESSIONAL DEVELOPMENT The  UPWP  includes  a  contingency  for  one  staff  to  attend  a  currently  undetermined  professional development activity related to FTA reporting requirements. 

 

    

Page 37: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

30

674.3 – SECTION 5310 PROGRAM 

OBJECTIVE  The objective of this program is to provide a means for distributing Section 5310 federal funds allocated to the Cincinnati urbanized area. These funds are used by many private, non‐profit agencies to acquire vehicles for transportation services offered to their clients.  

PREVIOUS WORK  OKI has been involved with the Ohio Section 5310 program for many years; during some of those years a sub‐allocation of Section 5310 federal funds was provided to the Cincinnati urbanized area. In more recent years, OKI has reviewed and ranked Section 5310 applications from private, non‐profit agencies located in Butler, Clermont or Hamilton counties in Ohio and Boone, Campbell and Kenton counties in Kentucky.  

OKI developed a Joint Cooperative Agreement with SORTA for the Section 5310 Program. The agreement specifies that OKI will handle the solicitation, review and awarding of Section 5310 federal funds while SORTA will handle the procurement process to purchase vehicles off the Ohio State Contract and provide continuing control of the vehicles until they reach the end of their useful life. 

METHODOLOGIES 1) Hold meetings of the Oversight Team, as needed, to provide guidance and oversight for the Section 

5310 program. The Oversight Team also reviews the JARC and New Freedom programs. 2) Update  the  application  process  for  soliciting,  reviewing  and  ranking  applications  from  eligible 

agencies  as  needed.  Projects  recommended  for  funding will  be  presented  to  the OKI  Board  of Directors/Executive Committee for approval. 

3) Staff will prepare quarterly progress  reports  in  TrAMS  for  the OKI  administrative portion of  the project. 

4) The OKI  Coordinated  Public  Transit‐Human  Services  Transportation  Plan  (Coordinated  Plan) was updated during FY 2016. This document is the basis for awarding Section 5310 federal funds. 

 PRODUCTS 1) Meetings of the Oversight Team. (as needed) 2) Update  the  Section  5310  application  packet  (as  needed)  and  hold  a  workshop  to  explain  the 

application process. (September 2016) 3) Prepare quarterly progress reports in the TrAMS system of FTA. 4) Revisions to the Coordinated Plan. (as needed)  PROFESSIONAL DEVELOPMENT The  UPWP  includes  a  contingency  for  one  staff  to  attend  a  currently  undetermined  professional development activity related to the Section 5310 program. 

 

    

Page 38: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

31

674.4 – NEW FREEDOM PASS THROUGH 

OBJECTIVE  The objective of  this program  is  to continue  the management of special  transit programs  for elderly individuals and individuals with disabilities under the New Freedom Program (Section 5317) as originally required under SAFETEA‐LU. 

PREVIOUS WORK  OKI  was  named  the  designated  recipient  for  the  Cincinnati  urbanized  area  during  FY2007  by  the Governors of Ohio and Kentucky. During FY2016, OKI updated the OKI Coordinated Public Transit‐Human Services Transportation Plan  (Coordinated Plan)  for  the OKI Region. Payments  for  the  transportation services provided by the sub‐recipients come directly from the New Freedom pass through grants. 

METHODOLOGIES 1) OKI, as the designated recipient for New Freedom funds,  is responsible for managing the projects 

operated by entities  in  the  region providing  transportation  services  for disabled persons but not identified as “designated recipients” under FTA regulations. OKI serves as the oversight agency to ensure  all  federal  requirements  are met  by  sub‐recipients  of New  Freedom  funds.  Towne  Taxi continues  to operate a  taxi  voucher program  in  the Cincinnati urbanized area  funded with New Freedom Federal Funds. During FY 2016 New Freedom grants were closed  for  two agencies  that provided  transportation  services  in  the  Cincinnati  urbanized  area—Community  Cab  and  Senior Services  of  Northern  Kentucky.  OKI  will  pass  through  funds  to  the  remaining  participating transportation provider  and  collect monthly progress  reports  for  the  taxi  voucher program.  The monthly progress reports are used by OKI staff to prepare the quarterly progress reports submitted to the Federal Transit Administration’s TrAMS system. 

PRODUCTS 1) Oversight, funding and requisite reporting for the provision of transportation services to people with 

disabilities operated by private providers. (Ongoing) 

                 

Page 39: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

32

674.5 MASS TRANSIT EXCLUSIVE: SORTA PLANNING STUDIES 

OBJECTIVE Conduct planning and programming activities to advance the scope and quality of transit service to users within the SORTA service area. 

METHODOLOGIES SORTA will conduct short term fixed‐route transit planning efforts in Hamilton County and the greater Cincinnati urbanized area. Long term transit planning efforts, particularly those involving modes other than fixed route bus, will likely be multi‐jurisdictional efforts. SORTA will also participate in key local and regional planning studies and OKI’s  Intermodal Coordinating Committee and work with other  transit systems in the region to advance transit improvement goals. 

PRODUCTS 1) Monitor  Existing  Fixed‐route  Service  –  Monitor  existing  service  to  determine  strengths  and 

weaknesses;  design  and  analyze  potential  improvements within  context  of  current  funding  and available equipment.  If additional funding is identified, SORTA will evaluate implementing elements of the Go Forward transit plan and subsequent updates to that plan. 

2) Transit Center Development – SORTA will complete design work  for  transit centers  in Northside, Oakley, and Walnut Hills.  Construction of these projects will be initiated.   

3) Rail Projects – Assist SORTA's Rail Services Manager in various safety and security, operational and other  activities  associated  with  the  Cincinnati  Modern  Streetcar  project.  Complete  grants management and reporting requirements for federal and state funds awarded to City of Cincinnati for this project.  Continue to monitor and maintain bridges, tunnels, and pedestrian facilities along the Oasis and Blue Ash  railroad  right‐of‐way.  Initiate design planning  for highest priority  repairs identified in annual bridge inspections. Work to securing funding for repairs. 

4) Corridor and Transportation Study Participation and Assistance – Continue to participate in corridor studies  and  other major  transportation  initiatives  including  the  Eastern  Corridor  Transportation Improvement  and  Oasis  Commuter  Rail  studies,  I‐75  interchange  reconstruction,  I‐71/ML  King interchange, and the Oasis and Wasson Way bike trail projects. 

5) Work with OKI to provide administrative assistance for vehicle procurement and vehicle state of good repair for the region’s 5310 program. 

6) Coordinate with partners at OKI and the federal and state levels to develop performance measures and targets consistent with the requirements of FAST. 

         

Page 40: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

33

674.6 MASS TRANSIT EXCLUSIVE: TANK PLANNING STUDIES 

OBJECTIVE Conduct planning and programming activities to increase the transit system efficiency and advance the quality of transit service to users within the TANK service area. 

METHODOLOGIES In  FY2017,  TANK  will  continue  with  the  implementation  of  the  Network  Study  recommendations, including  service  improvements and  infrastructure enhancements. As  in every year, TANK will apply performance measures  through  its  route  review processes  and participate  in  key  local  and  regional planning studies to advance transit improvement goals. 

PRODUCTS 1) Performance Analysis‐ TANK will conduct  the calendar year Substandard Route Review  (SSRR) by 

collecting  route‐level  data  and  applying  the  following  performance  measures:  Net  Cost  per Passenger Trip, Cost Recovery, Passenger Trips per Revenue Mile, and Passenger Trips per Revenue Hour. The SSRR allows TANK to  identify underperforming routes and make  informed decisions on service improvements. In addition, TANK monitors route‐level productivity (Ridership per Revenue Hour) on a monthly basis through the Planning Dashboard. 

2) Transit Service Improvements– TANK will continue the implementation of the 2013 Network study recommendations. Changes will be  implemented  in conjunction with  further public engagement, market research, and service performance analysis.   

3) Covington Transit Center Renovation‐ in FY2017 TANK will complete the revitalization of its main bus station in downtown Covington. The project, which is slated to begin in August, includes significant improvements in lighting, signage, passenger amenities, and overall aesthetic.   

4) Technology Improvements – TANK is in the final steps of data organization in order to provide real‐time information to our riders. Additionally, we are hoping to implement a reloadable “smart card” fare system in FY2017. 

5) NKU Hub Study‐ TANK will be working with Northern Kentucky University to improve the passenger amenities and to create a center for transit activity on campus.  

6) Hebron Area Flex Study – In accordance with the Network Study, TANK will study the possibilities of implementing an on‐demand circulator route in the industrial areas surrounding CVG. 

7) Bus on Shoulder – following the 2014 feasibility study, in FY2017 TANK intends to start a pilot Bus on Shoulder program on I‐471, between I‐275 and KY‐8. The program will be coordinated with KYTC, the local law enforcement authorities, SORTA, and CTC.     

8) Service  Request  Process  –  TANK will  continue  to  implement  the  Service  Request  Process.    This process addresses specific service needs that have been requested of TANK from the community in an effort to better serve the organization’s objectives.   

9) Regional collaboration ‐ TANK will participate in, and contribute to, key local and regional planning studies, as well as the OKI’s Intermodal Coordinating Committee (ICC), Northern Kentucky planning projects, and the regional Bus Rapid Transit (BRT) initiatives.   

  

 

   

Page 41: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

34

674.7 ‐ MASS TRANSIT EXCLUSIVE: MIDDLETOWN TRANSIT SYSTEM (MTS) PLANNING STUDIES  

 OBJECTIVE MTS FY2017 planning activities will focus on strengthening county and regional partnerships to improve access for City of Middletown residents and visitors to jobs, education, medical, and other opportunities.  Work will be performed in partnership with the Butler County RTA (BCRTA). 

METHODOLOGIES Planning activities to be conducted by MTS in FY 2017 include: 1) Replace current fixed route fleet and keep other transit assets in a state of good repair within limited 

budgeted constraints. 2) Continue partnership with BCRTA to strength countywide and regional connections. 3) Work Cincinnati  State Community College,  the City of Monroe  and  Liberty  Township  to  explore 

transit options  for new and developing  retail/job centers and connectivity  to between Cincinnati State Campuses. 

4) Integrate performance measures into strategies to improve service efficiency and effectiveness. 5) Participate in regional studies and coordination efforts at the Transit Alliance of Butler County and 

OKI. 

PRODUCTS 1) Fleet replacement.  2) Coordinated planning and operation efforts with BCRTA. 3) Improved  access  inside  the Butler County  I‐75  retail  corridor  and between Butler  and Hamilton 

County Cincinnati State campuses. 4) Continued  compliance  and  coordination  with  FTA,  ODOT  and  OKI  regulations  including  the 

development of performance measures and targets which will yield improved city and countywide transit connections for City of Middletown residents and visitors. 

5) Participation in regional public transportation efforts (ongoing).                    

Page 42: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

35

674.8 – MASS TRANSIT EXCLUSIVE: CLERMONT TRANSPORTATION CONNECTION 

OBJECTIVE CTC planning activities include the evaluation of existing transit services in order to maximize efficiency and increase ridership. 

 METHODOLOGIES CTC will continue participation  in  the  local and  regional  transit planning activities,  including  the OKI Intermodal Coordinating Committee.  CTC will be engaged in the regional discussion about the Bus Rapid Transit plan and multi‐modal planning activities for the Eastern Corridor and Clermont County. 

PRODUCTS 1) Ongoing analysis – Monitor the fixed route and dial‐a‐ride service operations for opportunities to 

increase productivity and reduce costs. 2) Increase coordination with local agencies, including presentations and group meetings. 3) Identify new park and ride locations along SR 125 for the Route 4X Amelia Express. 4) Purchase new buses with security camera system. 5) Increase ridership.  6) Improvements in service efficiency. 7) Conduct a survey of CTC passengers. 8) Purchase a farebox system. 9) Participation in regional planning activities with SORTA, TANK, Cincinnati USA Regional Chamber and 

OKI. 10) Coordinate with partners at OKI and the federal and state levels to develop performance measures 

and targets consistent with the requirements of FAST. 

                    

Page 43: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

36

674.9 MASS TRANSIT EXCLUSIVE: BUTLER COUNTY REGIONAL TRANSIT AUTHORITY (BCRTA) PLANNING STUDIES 

OBJECTIVE BCRTA State FY2017 planning activities will support BCRTA Board of Trustees’ and the Transit Alliance of Butler County’s mutual  efforts  to  identify  transportation  needs  and  leverage  available  resources  to effectively and efficiently meet the needs.   

METHODOLOGIES Locally funded planning activities that will be conducted by BCRTA in FY 2017 include: 1) Advocate a coordinated approach  to publicly supported  transportation services  in Butler County, 

e.g.,  continue  working  with  Middletown  Transit  and  Miami  University  to  expand  services  by leveraging current resources. 

2) Increase service availability (e.g., summer service for Oxford‐Hamilton connection) for connections among the urban centers within Butler County. 

3) Increase job‐related service availability in the Hamilton and Fairfield areas.  4) Work with Miami University to develop a real time bus tracking app. 5) Continue integration of performance measures into analysis of service efficiency and effectiveness. 6) Continue upgrade of radio system to tie in with public safety. 7) Improve community awareness and appreciation of existing and new general public transit services 

in Butler County. Continue participation in regional public transportation efforts. 8) Update practices and plans consistent with changes in FTA and ODOT regulations.  

PRODUCTS 1)  New and expanded services for target markets. 2)  Increased ridership. 3)  Improvements in safety and service efficiency. 4)  Increased coordination of publicly funded transportation services in Butler County.  5)  Continued compliance with FTA and ODOT regulations. 6) Coordinate with partners at OKI and the federal and state levels to develop performance measures 

and targets consistent with the requirements of FAST. 

               

Page 44: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

37

674.10 – MASS TRANSIT EXCLUSIVE: WARREN COUNTY TRANSIT 

OBJECTIVE Ongoing evaluation of existing transit services to maximize their efficiency. Improve everyday operations through analysis of services and how they are provided to the public. Provide service opportunities to County residents. 

PREVIOUS WORK 

In calendar 2015 WCTS replaced three buses and provided services to Warren County residents. Operating highlights include: 1) Provided 39,556 trips.  2) Of these trips 81% were for elderly or disabled citizens. 3) Total hours of service was 39,556 and total miles of service was 432,925. 4) Cost per revenue mile was $2.30. 5) Cost per passenger trip was $20.41. 

 METHODOLOGIES WCTS will continue participation in the region’s transit planning activities at OKI as a member of the ICC. WCTS will provide county‐wide service to residents with reduced  fare to senior adults and qualifying disabled persons. We continue a partnership with Cincinnati Metro for funding.  

PRODUCTS 1) Participation in regional planning activities at OKI. 2) Continued analysis of scope of service. 3) Continued compliance with FTA and ODOT regulations. 4) Coordinate with partners at OKI and the federal and state levels to develop performance measures 

and targets consistent with the requirements of FAST. 

                   

Page 45: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

38

684.4 – OHIO EXCLUSIVE: REGIONAL TRANSPORTATION PLANNING ORGANIZATION PILOT PROGRAM  

OBJECTIVE To  partner with  the  Ohio  Valley  Regional  Development  Commission  (OVRDC)  through  the  ODOT’s Regional Transportation Planning (RTPO) Pilot Program in the development of a transportation plan for the OVRDC region. 

PREVIOUS WORK Since the early 1990s, the ODOT has been informally consulting with elected officials in rural Ohio in the development of the STIP. In order to formalize these communication streams and enhance the statewide planning process, ODOT  is  initiated a Rural Transportation Planning Organization Pilot Program which will evaluate the benefits of adding transportation planning processes to existing multi‐county regional planning agencies’ planning programs. ODOT began the Pilot Program on July 1, 2013. Since then, OKI has  assisted  OVRDC  is  preparing  a  participation  plan,  goals  and  objectives,  socio‐economic  data processing techniques and geographic  information (GIS) techniques to prepare transportation data  in the  format  needed  for  transportation planning purposes.  FY16  included  assistance  in  formulating  a project based component of the OVRDC Transportation Plan. 

METHODOLOGIES OKI will continue the participation in the development of the OVRDC Regional Transportation Plan and mentor the agency in conducting transportation planning and outreach efforts to further the planning process for their region. This would include consultation with local officials and the public and developing transportation expertise within the rural planning organization. Funding is FHWA Planning and Research matched by ODOT state funds. 

PRODUCT Mentor the OVRDC. Provide ongoing discussion, collaboration, technical assistance and consultation leading to the successful development of the agency’s transportation plan for the OVRDC region. (on‐going)                   

Page 46: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

39

685.1 ‐ INDIANA EXCLUSIVE:  DEARBORN COUNTY TRANS.  PLANNING (PL) 

OBJECTIVE   The objective of this work element  is to conduct the core 3C planning process  for Dearborn County, Indiana including the UPWP, TIP and Regional Transportation Plan. 

METHODOLOGIES 1) Conduct the 3C planning process for Dearborn County, including continued active management of 

the Transportation Improvement Program (TIP), the OKI 2040 Regional Transportation Plan (Plan), special  transportation  studies,  the Unified Planning Work Program  (UPWP),  freight planning and other  obligations  including  participation  in  the  Indiana MPO  Council,  Annual  List  of  Obligated Projects,  and  quarterly  tracking  reports.  A  Red  Flag  investigation  will  be  implemented,  when appropriate, prior to projects being entered into the TIP. For FY17 the  integration of performance measures and  targets  into  the Plan  (and TIP) will  continue  in  coordination with  state DOT’s and transit providers. Appropriate reporting procedures and formats will be developed. 

2) Work with stakeholders to continue to provide a robust, flexible and useful program for investing in and providing for a safer transportation system. 

3) Provide technical assistance to Dearborn County and INDOT related to mobile source emissions. Air quality conformity determinations for are  included  in this element as needed. The nonattainment portion  of  Dearborn  County  includes  Lawrenceburg  Township,  the  cities  of  Greendale  and Lawrenceburg. 

4) Work cooperatively with INDOT and Dearborn Co. in the project development process to improve the cost estimating procedures and project schedules for federally funded projects.  

5) Work cooperatively as appropriate, with stakeholders on the furtherance of compliance with ADA requirements. Provide  technical assistance  to member governments. Plan  for access  to essential services  and  “Ladders  of  Opportunity,”  including  multi‐modal  transportation  connectivity  gap analyses and plan  to address  identified gaps  in  service  to underserved populations  (low  income, minorities, elderly, LEP, Disabled). 

6) Coordinate  with  INDOT  regarding  revised  functional  class  designation  of  roadways,  highway performance monitoring system (HPMS) and performance measures as part of the OKI Congestion Management Process (CMP). For measuring system performance and providing data for the CMP, OKI will continue to collect and exploit traffic quality  information of major roadways  in Dearborn County  as  part  of  the  regional  1,173  mile  CMP  network. The  traffic  information  includes  a combination of data  from OKI’s travel model,  intersection counts, speed data provided by FHWA National Performance Management Research Data Set, and  travel  time  information  collected by OKI.   OKI  travel  time  collection  will  be  limited  to  locations  where  FHWA  speed  data  is insufficient. Following each 4‐year data collection cycle, a CMP Findings and Analysis Report will be completed. The report evaluates the CMP network based on established performance measures and recommends appropriate strategies  to address deficient  locations.  The  findings contained  in  the report will  continue  to  be  integrated  into  the  TIP  and  the  regional  transportation  plan  and  be consistent with FAST Act requirements. 

7) Maintain the Dearborn County portion of the OKI Regional Travel Model, GIS and homeland security planning  activities.  Perform  data  collection  activities  to  support  these  efforts  including  traffic, employment and other data as necessary.  

8) The  OKI  Participation  and  Title  VI  plans will  be maintained  and  executed  in  consultation with stakeholders to provide reasonable access to the planning process and streamlined opportunities to comment on issues before the OKI Board of Directors, elected officials, INDOT and FHWA. 

Page 47: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

40

9) Provide  for  project management  of  the  implementation  and maintenance  of  the  fiscal  impact assessment model (FIAM).  

10) Coordinate with  state  and  local  agencies  to  develop  information  and  conduct  discussions  that provide  for  environmental  consultations  (i.e.  planning  and  environmental  linkages)  on  the development of the transportation plan. 

PRODUCTS 1) Incorporation of Dearborn County projects  in the OKI TIP (on‐going), amended OKI 2040 Regional 

Transportation  Plan  (as  appropriate),  special  transportation  studies,  the  FY2018  UPWP,  Annual Completion  Report  (9/30/16),  quarterly  tracking  reports  with  performance  monitoring  in cooperation with Debra Ault INDOT LPA Coordinator (on‐going), Indiana MPO Council participation, an Annual List of Obligated Projects (1/15/17), and Red Flag  Investigations consistent with  INDOT templates (as needed). Integration of performance measures into the Plan in coordination with state DOT’s and transit providers. (on‐going) 

2) Aggressive programming of HSIP funds in local safety planning programs and projects. (on‐going) 3) Perform  mobile  source  emission  estimates  and  air  quality  conformity  determinations  for 

Lawrenceburg Township, Greendale and Lawrenceburg. (as necessary) 4) Development of improved scheduling and cost estimating procedures in cooperation with state and 

local partners. (on‐going) 5) Progress towards compliance with ADA requirements, and the advancement towards “connected” 

communities and ladders of opportunity for underserved communities. Provide technical assistance to member governments. (on‐going) 

6) Updated federal roadway functional class review as necessary. Participate in HPMS efforts. Ongoing performance‐based CMP. Speed data from FHWA and ODOT will be integrated into the current OKI travel  time database. OKI will collect  intersection  turning movement counts at key  locations. OKI travel time collection using OKI vehicles may occur if needed. (6/17) 

7) Enhanced travel model and new GIS layers used to support transportation planning and Homeland Security planning efforts. (ongoing) 

8) Maintain and execute the OKI Participation and Title VI plans. (on‐going) 9) Support services associated with the fiscal impact assessment model (FIAM). (as needed) 10) Environmental consultations on the transportation plan.  (ongoing) 

 PROFESSIONAL DEVELOPMENT The budget includes 1 staff member attending the Indiana MPO Conference (9/16) 

            

Page 48: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

41

685.2 ‐ INDIANA EXCLUSIVE:  DEARBORN COUNTY TRANS.  PLANNING (STP) 

OBJECTIVE   The objective of this work element is to supplement elements of the 3C planning process for Dearborn County. This element will supplement the activities  listed  in 685.1 and  include special  (nonrecurring) activities and studies. 

METHODOLOGIES 1) The primary activity will be project management activities and administrative services associated 

with the Bright 74 Connector Study. A consultant will be retained to conduct technical services (see 685.4) 

2) Maintenance and execution services associated with the OKI Fiscal impact Model in Dearborn County (as appropriate) 

PRODUCTS 1) Competed Scoping Study for the Bright 74 Connector Corridor (12/16) 2) Support services associated with the fiscal impact assessment model (as needed)                               

Page 49: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

42

685.4 ‐ INDIANA EXCLUSIVE – DEARBORN COUNTY STP: BRIGHT 74 STUDY 

 OBJECTIVE   The objective of  this work element  is  to  investigate  the  feasibility of  implementing a  transportation improvement that would significantly  improve the transportation system between the Bright, Indiana area to the Interstate 74 corridor.  METHODOLOGIES The Dearborn County transportation system lacks a critical north/south corridor providing safe, efficient connections between the highly populated portions of Miller and Harrison townships to the Interstate 74 corridor. The 74 corridor is an underutilized east‐west asset in the northern part of county which can provide improved mobility and economic opportunity. The need is identified in the OKI 2040 Regional Transportation Plan (2012 Update) as project ID 803 and in the 2040 Plan’s 2016 Update as project ID 4450.  The Bright 74 Study will investigate the feasibility of implementing a transportation improvement that would significantly improve the transportation system in the corridor connecting the Bright, Indiana area to the Interstate 74 corridor. The corridor covers more than 18 square miles, measuring approximately 6 miles in length and 3 miles wide.  The Study is assumed to be classified as an Indiana Department of Transportation (INDOT) “Major Project” during this phase. As such, the Bright 74 Study will explore all viable modal options by following the INDOT Project Development Process (PDP) for Major Projects. Study tasks will generally follow the INDOT Project Development Manual Steps 2 through Step 5 to develop preferred alternatives, but will not include the initiation of environmental field studies, resources agency coordination or NEPA documentation.   The study will require approximately 12 months. It was initiated in FY16 and will be completed in FY17 

PRODUCTS 1) Completion and documentation of Steps 2‐5 of the INDOT project development process including a 

prioritized  list  of  recommended  projects  identified  for  future  project development  and  funding. Deliverables will include the Public Involvement Plan, INDOT Design Summary; a Red Flag Summary Report;  travel  demand model  inputs  and  outputs  suitable  for  use  with MCIBAS,  a  Conceptual Solutions Report; and a Preliminary Alternative Screening Package. (12/16)  

2) The consultant’s deliverables to OKI will include base mapping, GIS and CAD files, construction cost estimates, and other secondary data developed for the study. (12/16)  

          

Page 50: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

43

686.2 – KENTUCKY EXCL. (PL DISCRETIONARY): BOONE COUNTY TRANSPORTATION  PLAN UPDATE 

 OBJECTIVE Prepare an update of the Boone County Transportation Plan.  METHODOLOGIES OKI will prepare an update to the Boone County Transportation Plan originally developed in 1996 and updated  in  2005.  These  plans  lead  to  successful  implementation  of  several  improvements  to  the transportation network including Aero Parkway and elements of the KY 237 and KY 536 corridors. This update  is needed  to be able  to  continue  to  respond  to  the  impacts of  continued  rapid growth and development in Boone County. The goals of the study are: 

Update a transportation system plan that is compatible with existing and future land uses;  Improve the existing system through safety and operational improvements;  Identify funding shortfalls and develop strategies to address these shortfalls 

The major elements of the effort include Data Collection; Existing Conditions Analyses; Future Conditions Analyses; Evaluation of potential access improvements to I‐275 in the Graves Road area; Identification of  Environmental  Constraints;  Development  of  Recommended  Improvements;  and  a  Financial Assessment. 

 PRODUCTS 1) A short‐term Operational Improvement Plan that involves relatively low‐cost, easily‐  implemented 

safety and operational improvements; and 2) A prioritized long‐range transportation plan consisting of major projects and strategies.  FUNDING OKI will use $160,000  in PL Discretionary Funds to be matched with $40,000 from the Boone County Fiscal Court.                 

Page 51: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

44

686.3 – KENTUCKY EXCLUSIVE: TRANSPORTATION PLANNING ACTIVITIES 

OBJECTIVE This work element is intended to respond to the need for safety, operational, special studies or data collection effort focused specifically on Northern Kentucky. 

PREVIOUS WORK Previous work for Northern Kentucky has included numerous operational, mobility, efficiency and safety studies throughout Boone, Campbell and Kenton counties. In addition county‐wide transportation plans were completed for Kenton, Campbell and Boone in 2014, 2004 and 2005 respectively. In FY 2009 OKI staff developed traffic simulation for a portion of the KY‐8 corridor in Bellevue and Dayton. Also in FY 2009, the US 42 corridor in Florence was analyzed. In FY 2010, FY 2011 and FY 2012 staff developed the KY  High  Risk  Rural  Road  Program  pilot  project  for  KYTC  and  FHWA.  In  FY16  OKI  Staff  successfully conducted the KY 536 Scoping Study which resulted in a preferred alternative for the KY 17 to Campbell County line. In addition, OKI as the MPO serving the three Northern Kentucky counties participated as vital partner in KYTC’s bi‐annual updates to the Unscheduled Project List (UPL). 

METHODOLOGIES 1) Project Identification Forms (PIFs) for all Kentucky projects recommended in the 2040 OKI Regional 

Transportation Plan and other transportation‐related studies must be maintained and kept current. PIFs will be maintained and revised per guidelines established by KYTC. OKI will maintain and revise the Unscheduled Projects List (UPL), for Kentucky projects identified through OKI’s planning process. 

2) OKI staff avails  itself  to communities  in  the region  for assistance on  transportation  technical and planning matters. This will  include assistance to  local governments regarding the LPA process and the  requirements  for  administration  of  federal‐aid  projects.  Attend  statewide  planning  and professional development activities. 

3) Collection and processing of traffic and safety data used for planning purposes. 4) Contract management and participation in the Boone County Transportation Plan (completion date 

06/17). 

PRODUCTS 1) OKI will maintain current Project Identification Forms (PIFs) for all Kentucky projects recommended 

in  the OKI  Regional  Transportation  Plan  and  other  transportation‐related  studies  per  guidelines established by KYTC. OKI will maintain and revise the Unscheduled Projects List (UPL), for Kentucky projects identified through OKI’s planning process.(on‐going) 

2) Participation  in  planning  studies  and  activities  as  appropriate.  Assistance  to  local  governments regarding  the  LPA  process  and  the  requirements  for  administration  of  federal‐aid  projects. Participation in Statewide Planning meetings and other professional development activities with a focus on Kentucky transportation. (07/16 ‐ 06/17) 

3) OKI will work with KYTC and/or contractors to collect classified traffic volumes on northern Kentucky roadways as resources permit. 

4) Consultant  contract  management  and  project  oversight  and  completion  of  the  Boone  County Transportation Plan. (06/17) 

 PROFESSIONAL DEVELOPMENT 1) One staff member to attend the Kentucky Transportation Conference (01/17) 

 

Page 52: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

45

695 – UNIFIED PLANNING WORK PROGRAM 

OBJECTIVE Development of the Fiscal Year 2018 Unified Planning Work Program (UPWP). 

METHODOLOGIES The  Fiscal  Year  2018 Unified  Planning Work  Program  (UPWP) will  outline  the  scope  of work  to  be undertaken by OKI  for  the period beginning  July 1, 2017  and ending  June 30, 2018.  The document illustrates  the  relationship between adopted goals, objectives and program activities.  It outlines  the general  nature  of  these  program  elements, which  are  summarized  by  general  categories,  and  are referenced to specific projects by project number.   Primarily a management tool for planning and coordination, the UPWP provides the basis for cataloging and  integrating  OKI's  activities  into  general  categories.  It  delineates  the  programmatic  and  fiscal relationships essential  for  internal planning and programming. Activities associated with creating the program descriptions, reproduction and dissemination are provided for under this work element. Draft UPWP will be submitted in electronic format. Final program will be printed documents when requested. 

PRODUCTS 1) Draft FY2018 UPWP (3/17).  2) Updated Memorandum of Understanding  among  the  applicable entities  identifying  their mutual 

responsibilities per 23 CFR 450.314. (as necessary) 3) Monthly progress, annual completion, and expenditure reports. (ongoing) 4) FY2018 Unified Planning Work Program. (5/17) 

                       

Page 53: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

46

697.1 – TRANSPORTATION PROGRAM REPORTING 

OBJECTIVE To provide the public and funding agencies with a yearly transportation report summarizing the major activities of the transportation planning process.  

PREVIOUS WORK OKI prepared a transportation summary for the last several years as part of the agency’s annual program reporting. 

PRODUCT Transportation Annual Summary (6/17) 

                                  

Page 54: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

47

710.1 ‐ LOCAL WATER QUALITY ACTIVITIES 

OBJECTIVE To undertake water quality planning activities  in Ohio, Kentucky and  Indiana, as appropriate and as resources permit. 

METHODOLOGIES 1)  Continue to support watershed activities  in southwestern Ohio, northern Kentucky, and Dearborn 

County as requested and as resources permit. These activities may include participating in technical advisory  groups;  facilitating  meetings;  arranging  for  presentations,  tours,  and  canoe  outings; participating  in  public  involvement  efforts;  and  identifying  technical  and  fiscal  resources  to implement various improvement projects. 

2)  Continue  to  provide  support  for  the  OKI  Groundwater  Committee,  a  forum  that  helps  local governments meet state and federal mandates and promotes coordinated management of a sole source aquifer system that provides more than two‐thirds of a million people with drinking water and water for commercial, industrial, agricultural and recreational purposes. 

3)   Continue to provide support for the OKI Regional Conservation Council, including representatives of the Soil and Water Conservation Districts in the region. 

4)  Continue to refine the base  information and recommendations  in the OKI Regional Water Quality Management Plan for the Kentucky and Indiana portions of the region as resources permit. 

PRODUCTS 1)  Collateral materials  for  southwestern Ohio, northern Kentucky, and Dearborn County watershed 

management  activities,  which  may  include  education  and  outreach  materials,  fact  sheets, directories, and articles in stakeholder newsletters. (as appropriate) 

2)  Meeting notices, agendas, summaries, and related correspondence. (as appropriate) 3)  Meeting notices, agendas, summaries, and related correspondence for the OKI RCC Annual meeting 

occurring in the spring and support, as needed, for the annual tour occurring in the fall. 4)  Updated base information and recommendations for the OKI Regional Water Quality Management 

Plan. (within resource constraints)  PROFESSIONAL DEVELOPMENT The UPWP budget  includes  funding  for two staff members to attend the annual Water Management Association of Ohio (WMAO) Conference (11/16); for one staff member to participate  in one WMAO technical workshop during the year; and for one staff member to attend the annual Ohio Stormwater Conference.  Staff registration at the OKI Regional Conservation Council annual meeting and other local soil and water conservation district and conservation group events are also budgeted throughout the year.          

Page 55: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

48

710.6 ‐ WATER QUALITY PROGRAM 

OBJECTIVE To assess, manage, and protect surface water and groundwater resources in view of regional growth and development and the resultant increased demand. 

PREVIOUS WORK OKI  adopted  a major Water Quality Management  Plan Update  for  Butler,  Clermont, Hamilton,  and Warren Counties in Ohio in 2011 in accordance with federal and state requirements. The 2011 plan was the first comprehensive update to the Ohio portion of the Regional Water Quality Management Plan published by OKI in 1977. Since 2011 OKI has continued to update the Ohio portion of the Plan on an incremental basis, to provide  local governments and their consultants with data  including population and land use information, to review wastewater facility projects for consistency with the plan (which is a  state  and  federal  requirement),  to  inform  the  public  of water  quality  issues  and  to  assist  local implementation of plan recommendations.  

METHODOLOGIES 1) Monitor the Water Quality Management Plan to identify needs for amendments and/or updating. 2) Respond to requests for wastewater permit consistency reviews from Ohio EPA, local jurisdictions 

and other local constituents, and pursue associated needs for amendments to the Regional Water Quality Management Plan.  

3) Produce  a  targeted water quality  improvement project  and  supplemental WQM Plan  activity  as detailed in OKI’s contract with Ohio EPA. 

PRODUCTS 1) Water Quality Management Plan amendments. (as appropriate)  2) Permit  consistency  reviews,  associated  plan  amendments when  needed  and  public  information 

products as detailed in OKI’s contract with Ohio EPA. (as appropriate) 3) Data and analysis, summary information, maps and descriptive text generated for the targeted water 

quality improvement project as detailed in OKI’s contract with Ohio EPA. (6/17)                  

Page 56: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

49

710.9 ‐ WATER QUALITY PROGRAM (OHIO GENERAL ASSEMBLY) 

OBJECTIVE To assess, manage, and protect surface water and groundwater resources in view of regional growth and development and the resultant increased demand. 

PREVIOUS WORK OKI adopted a major Water Quality Management Plan (WQMP) Update for Butler, Clermont, Hamilton, and Warren Counties in Ohio in 2011 in accordance with federal and state requirements. The 2011 plan was the first comprehensive update to the Ohio portion of the Regional Water Quality Management Plan published by OKI in 1977. Since 2011 OKI has continued to update the Ohio portion of the Plan on an incremental basis, to provide  local governments and their consultants with data  including population and land use information, to review wastewater facility projects for consistency with the plan (which is a  state  and  federal  requirement),  to  inform  the  public  of water  quality  issues  and  to  assist  local implementation of plan recommendations. OKI has also conducted studies and analyses and has used stream and watershed evaluations with direction from Ohio EPA to support water quality management at the local, regional and state levels.   METHODOLOGIES 1)  Consult with Ohio EPA on priorities for updating portions of the Regional Water Quality Management 

Plan.  2)  Consult with watershed organizations  to  identify  local priorities  among water quality  issues  and 

planning needs.  3)  Consult with wastewater management agencies to clarify planning needs and get consensus on plan 

amendments that could affect them.   4)  Prepare and present proposed WQMP plan updates and amendments for public input.  

PRODUCTS 1) Summary of consultations with Ohio EPA on WQMP priorities.   2) Summary of consultations with watershed organizations about water quality issues and planning 

needs.  (as necessary) 3) Summary of consultations with wastewater management agencies about planning needs and plan 

amendments. 4) Updated Water Quality Management Plan and associated plan amendments. (as necessary)   

           

Page 57: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

50

720.1 – MOBILE SOURCE EMISSIONS PLANNING 

OBJECTIVE To ensure  that OKI’s Metropolitan Transportation Plan  (MTP) and Transportation  Improvement Program  (TIP) contribute to the region’s attainment and maintenance of national ambient air quality (AQ) standards. 

PREVIOUS WORK In May 2012, pursuant to provisions of the Clean Air Act Amendments of 1990, the U.S. Environmental Protection Agency (EPA) designated nine counties in the Cincinnati area as a marginal nonattainment area for ozone under the  current  ozone  standard.    The  Cincinnati  ozone  nonattainment  area  includes  Lawrenceburg  Township  in Dearborn  County  Indiana,  portions  of  the  Kentucky  counties  of  Boone,  Campbell  and  Kenton,  and  the Ohio counties of Butler, Clermont, Clinton, Hamilton and Warren.   Under  the 1997 annual  fine particulate  (PM2.5) standard, seven counties are considered a maintenance area, whereas those counties must continue compliance with the standard. The fine particulate maintenance area includes Lawrenceburg Township in Dearborn County Indiana,  the  Kentucky  counties  of Boone,  Campbell  and  Kenton,  and  the Ohio  counties  of Butler,  Clermont, Hamilton and a portion of Warren.   OKI has coordinated the process of developing local emission reduction strategies in support of revisions to the air quality State Implementation Plans (SIPs). OKI has provided the state agencies with mobile source emissions data for use in SIP revisions. OKI has performed transportation air quality conformity analysis for the region’s MTP and TIP, most  recently  for  the 2040 Regional Transportation Plan  in 2016.   OKI has developed procedures  to integrate updates to the EPA Motor Vehicle Emissions model (MOVES) into the travel modeling process. OKI has analyzed  the  air quality  and  energy benefits of  all  candidate  transportation projects  subject  to OKI’s project prioritization process, as well as the Ohio statewide urban CMAQ process.     

METHODOLOGIES 1) OKI will continue to coordinate with federal, state and  local air quality and transportation agencies on SIP 

revisions  and  air  quality  issues  including  but  not  limited  to  conformity  determinations.  OKI will  remain knowledgeable  about  current  state  and  federal  legislation  and  regulations  and  will  provide  technical information and current data as requested. OKI will perform and document conformity analyses as required under  the  Clean  Air  Act  Amendments  and  based  upon  criteria  outlined  in  the  USEPA  Transportation Conformity  Rule  (40  CFR  Part  93).  OKI’s model  will  utilize  the  latest  EPA  software  and  latest  planning assumptions. 

2) Staff will evaluate the expected air quality and energy benefits of potential CMAQ, SNK, STP and TA funded projects utilizing the OKI travel demand model, MOVES, and accepted off‐model methodologies. 

PRODUCTS 1) Ongoing coordination and consultation with OKI committees, federal, state and local agencies regarding air 

quality  issues.  Preparation  of  appropriate  documentation  of Metropolitan  Transportation  Plan  and  TIP conformity. Provision of travel and mobile source emission data to support SIP revisions prompted by changes in local emission control programs and federal standards for ozone and particulate matter.  

2) Quantification of the expected air quality and energy benefits of candidate projects for CMAQ, SNK, STP, SNK or TA funding as required. 

PROFESSIONAL DEVELOPMENT 

1) One staff member to attend in‐state training opportunities.      

Page 58: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

51

800 ‐ REGIONAL PLANNING ACTIVITIES 

 OBJECTIVE To provide support for sustainable development through planning services, data resources, and other information useful  to  the government, business, and  civic  sectors  in  the OKI  region. When deemed advantageous to the region, to provide contributed services to leverage additional funding for programs that  advance  regional  planning  objectives  of  the OKI  Strategic  Regional  Policy  Plan  or  Long  Range Transportation Plan.  METHODOLOGIES 1)  Assist local governments, businesses, citizens and other parties, by providing information about the 

region,  including maps, census data, traffic  information and OKI reports for nominal reproduction and handling fees.  

2)  Address development issues through research and technical assistance strategies, including working with  the  public,  private,  and  civic  sectors.  The  beneficiaries  of  this  effort  will  be  government agencies,  taxpayers,  and  local  businesses  as  each  improves  its  capacity  to  evaluate  and  direct sustainable growth and development. 

3)   Provide support for the OKI Regional Planning Forum, a forum for planners in the region from multiple disciplines  including  land  use,  environmental,  transportation,  health,  energy  and  education organized  to encourage  regional  cross disciplinary  collaboration  and  inform planners on  current trends and regional initiatives.   

4)   Provide support for the OKI Planning Directors’ Network, a network for planning directors at county, township  and municipal  levels  in  the  OKI  region  organized  to  enable  efficient  sharing  of  best practices,  information on departmental and professional development and  increase  likelihood for multijurisdictional collaboration. 

5)   Continue technical assistance to local communities interested in advancing products from the Solar Ready II project completed in FY 16.  

6)   Provide in‐kind staff support to advance the U.S. Forestry project initiative. In FY 17, this support will include  organizing  and  facilitating  quarterly  stakeholder working  group meetings,  assisting  the working group to develop regionally specific best management practices related to integrating trees into local storm water management design. 

 PRODUCTS 1) Provision of various products and information. (as appropriate) 2) Analyses of national and  regional  land development  trends, conditions, and  issues; and  technical 

assistance on issues including land use, zoning, economic development, housing, water and sewer infrastructure, intergovernmental coordination, capital budgeting, and natural systems. (ongoing) 

3) Support services for the Regional Planning Forum activities. (as appropriate) 4) Meeting agendas and related correspondence regarding Planning Directors’ Network activities. (as 

appropriate) 5) Meeting materials and memos summarizing any technical assistance provided. (as appropriate) 6) Meeting agendas, meeting materials and bi‐annual progress reports prepared for the US Forestry 

Project. (as appropriate) 

 

 

Page 59: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

52

500.1 – U.S. Forest Service Work Program 

 OBJECTIVE OKI,  in partnership with the National Association of Regional Councils (NARC), Davey Resource Group (Davey), and Centerline Strategies, LLC, will complete work on  the 2015 U.S. Forest Service National Urban and Community Forestry Challenge Cost‐Share Grant Award. OKI will work with NARC, Davey, and Centerline to engage decision makers, planners, and engineers in the OKI region to develop Integrating Trees Into Stormwater Management Design and Policy – A Guide for Local Decision Makers that will be promoted nationally. The product will be a resource for promoting, facilitating and increasing the use of trees for stormwater management.   In spite of the proven value of trees for reducing stormwater flows and pollutants, there is widespread lack of understanding, acceptance, and credibility of their use for managing stormwater. The OKI Guide will overcome these barriers by providing a practical tool that informs local governments of options and best practices for including trees in stormwater facility design regulations and policies. OKI and its team of national partners will develop a guide that is applicable across the nation. OKI will identify the most practical solutions based on perspectives of local government in the OKI Tri‐state region. Davey Resource Group will draw upon its vast knowledge and understanding of forests and green infrastructure to ensure that the Guide is scientifically sound and feasible. Centerline Strategies will compile a national inventory of local government policies and incentives for integrating trees into stormwater management solutions. NARC will work with OKI and its other members to ensure the Guide's applicability to other regions and to promote it through NARC's national membership."  

METHODOLOGIES 1) Conduct a literature review to ensure the best science and case study examples of the use of trees 

in stormwater design will be conducted to inform BMP development. 2) Develop best practices  for  local governments’ consideration with  input of a stakeholder working 

group. 3) Develop promotional materials advancing the BMPs developed. 

PRODUCTS 1) Bi‐Annual progress reports and quarterly financial reports. (as appropriate throughout year) 

2) Best practice recommendations. (6/17) 

3) Educational and promotional materials informing communities on the BMPs developed. (3/17) 

FUNDING Project  funding  is made available by a 2015 award of  the U.S. Forestry Service  through  the National 

Urban and Community Forestry Challenge Cost‐Share Grant Program.   

 

Page 60: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

Appendix A

Budget

Page 61: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

A-1

RATIONALE FOR FUNDING

The objective of the Unified Planning Work Program (UPWP) process is to provide a rational basis

for the development, review, approval, execution and control of a comprehensive and coordinated

transportation planning program for the OKI Region.

A number of federal, state and local organizations contribute funds to the program. Partner agencies

are also recipients of these funds and have the responsibility of completing the described program

activities. The UPWP ties the various resources, needs, interests, and responsibilities into a

coordinated annual work program.

The first phase of the process is a determination of what work elements are to be included in the

UPWP. This is based upon (1) new federal and state directions and directives, (2) continuing

requirements, and (3) local needs, interests and priorities.

Following an evaluation of which elements best serve the needs of the region, while at the same

time fulfilling the agency's objectives, a comparison of joint interest and the benefits that will be

derived is made. Based on the output of this process, a funding table is prepared for inclusion in the

UPWP. The funding agencies, in their review of the work program, make a determination of the

appropriateness of the funding level and source of funds. Comments or requests for changes are

then incorporated into a revised UPWP. Throughout the process, the basic premise of maintaining

a regional, continuing, cooperative and comprehensive planning process prevails.

The FY 2017 UPWP reflects selectivity in the allocation of funding sources to program activities. This

procedure and the subsequent matching of funding sources to program activities reflect

consideration of:

• Amount of resources available from each agency;

• Primary interest area of each funding agency;

• Potential for delays in funding by each funding agency;

• Primary interest and type of each recipient agency; and

• Desirability of maintaining a single funding arrangement for each grouping of work activities.

In summary, while it is administratively necessary and advantageous to selectively match funding

sources with work activities or groupings, the basic philosophical intent is to maintain a single

integrated comprehensive and coordinated transportation planning program that jointly serves the

needs of local, state and federal interests.

Work Performance Responsibility

All work is performed by staff except where indicated. OKI may contract with consulting firms using

OKI's procurement procedures which are consistent with 2 CFR 200 Uniform Administrative

Requirements, Cost Principles, and Audit Requirements for Federal Awards. Consultants provide

access to additional resources and expertise. Elements utilizing consultants are identified in the text

of that element. The budgeted amounts are identified within the following budget tables.

Page 62: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

OHIO KENTUCKY INDIANA REGIONAL COUNCIL OF GOVERNMENTSFY 2017 UNIFIED PLANNING WORK PROGRAM

TABLE 1 ALL ACTIVITIES BY COST OBJECTIVE AND DIRECT COST CATEGORY

Work SOURCE

Personnel Consultant Marketing Special Other Indirect & Total

Toll Credits and

Contributed Total

Element Purchase Direct Fringes Work Cost Services Project

TRANSPORTATION PLANNING

601 Short Range (PL/FTA)

601 Short Range Planning

601.1 FY 2017 CPG CPG 31,030 2,769 61,661 95,460 95,460

601.1 1 FY 2016 CPG Carryover CPG 5,910 596 11,744 18,250 18,250

602 TIP (PL/FTA)

602 Transportation Improvement Program

602.1 FY 2017 CPG CPG 39,090 1,360 77,675 118,125 118,125

602.1 1 FY 2016 CPG Carryover CPG 7,260 893 14,427 22,580 22,580

605 Continuing Planning-Surveillance (PL/FTA)

605 Continuing Planning - Surveillance

605.1 FY 2017 CPG CPG 480,664 290,000 28,782 955,127 1,754,573 1,754,573

605.1 1 FY 2016 CPG Carryover CPG 91,057 45,000 28,273 180,940 345,270 345,270

original submitted 02/29/2016 A-2

Page 63: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

OHIO KENTUCKY INDIANA REGIONAL COUNCIL OF GOVERNMENTSFY 2017 UNIFIED PLANNING WORK PROGRAM

TABLE 1 ALL ACTIVITIES BY COST OBJECTIVE AND DIRECT COST CATEGORY

Work SOURCE

Personnel Consultant Marketing Special Other Indirect & Total

Toll Credits and

Contributed Total

Element Purchase Direct Fringes Work Cost Services Project

610 Transportation Plan (PL/FTA)

610 Transportation Plan

610.1 Transportion Plan

610.1 FY 2017 CPG CPG 300,463 21,912 597,050 919,425 919,425

610.1 1 FY 2016 CPG Carryover CPG 58,051 2,395 115,354 175,800 175,800

610.4 Land Use Planning

610.4 FY 2017 STP (ODOT PID #93160) STBGP 113,482 15,553 225,500 354,535 73,134 427,669

610.5 Fiscal Impact Analysis

610.5 FY 2017 STP (ODOT PID #93164) STBGP 35,248 500 70,041 105,789 21,822 127,611

611.5 FY 2017 FIAM Maintenance and Startups local 20,000 20,000 20,000

625 Services (PL/FTA)

625 Services

625.2 FY 2017 CPG CPG 104,114 2,252 206,884 313,250 313,250

625.2 1 FY 2016 CPG Carryover CPG 19,241 2,406 38,233 59,880 59,880

665 Special Studies

665.4 Regional Clean Air Program

(FY17 ODOT PID #93167)

FY 2017 ODOT CMAQ / KY SNK CMAQ/STBGP 47,437 - 198,914 2,485 94,262 343,098 85,775 428,873

667 Rideshare Activities

667.1 Rideshare Program

(FY17 ODOT PID #93169)

FY 2017 ODOT CMAQ / KY SNK CMAQ/STBGP 36,775 137,422 10,050 73,077 257,324 11,250 268,574

original submitted 02/29/2016 A-3

Page 64: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

OHIO KENTUCKY INDIANA REGIONAL COUNCIL OF GOVERNMENTSFY 2017 UNIFIED PLANNING WORK PROGRAM

TABLE 1 ALL ACTIVITIES BY COST OBJECTIVE AND DIRECT COST CATEGORY

Work SOURCE

Personnel Consultant Marketing Special Other Indirect & Total

Toll Credits and

Contributed Total

Element Purchase Direct Fringes Work Cost Services Project

674 Transit

674.1 JARC (5316) FY2012 FTA 25,048 49,772 74,820 74,820

674.2 New Freedom (5317) FY2012 FTA 6,898 300 13,706 20,904 20,904

674.4 New Freedom (5317) FY2013 Pass-Thru FTA 57,807 57,807 57,807 115,614

674.1 JARC (5316) FY2010 & FY2011 FTA 27,519 300 54,682 82,501 82,501

674.3 Transit Planning Activities (5310) FFY13-14 FTA 42,445 121,908 84,343 248,696 248,696

684 Ohio Exclusive

684.4 Regional Transportation Planning Agency Program

(FY16 ODOT PID #99720)

FY2016-17 Mentor Pilot Program Research 14,290 28,396 42,686 42,686

685 Indiana Exclusive

685.1 Dearborn County (INDOT) FY2017 CPG CPG 9,909 1,650 19,691 31,250 31,250

685.2 Dearborn County (INDOT) FY2017 STP STBGP 20,786 411 41,303 62,500 62,500

685.4 Bright 74 Corridor Study FY2016 carryover STBGP 81,500 81,500 81,500

686 Kentucky Exclusive

686.3 Transportation Planning Activities FY2017 PL/FTA 44,636 2,499 88,696 135,831 135,831

686.2 Boone County Study PL Disc 200,000 200,000 200,000

original submitted 02/29/2016 A-4

Page 65: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

OHIO KENTUCKY INDIANA REGIONAL COUNCIL OF GOVERNMENTSFY 2017 UNIFIED PLANNING WORK PROGRAM

TABLE 1 ALL ACTIVITIES BY COST OBJECTIVE AND DIRECT COST CATEGORY

Work SOURCE

Personnel Consultant Marketing Special Other Indirect & Total

Toll Credits and

Contributed Total

Element Purchase Direct Fringes Work Cost Services Project

695 UPWP Administration (PL/FTA)

695 UPWP Administration

695.1 FY 2017 CPG CPG 7,708 225 15,317 23,250 23,250

695.1 1 FY 2016 CPG Carryover CPG 1,465 75 2,910 4,450 4,450

697 Trans Program Reporting (PL/FTA)

697 Transportation Program Reporting

697.1 FY 2017 CPG CPG 5,509 15 10,946 16,470 16,470

697.1 FY 2016 CPG Carryover CPG 1,053 5 2,092 3,150 3,150

720 Air Quality (PL/FTA)

720 Mobile Source Emissions Planning

720.1 FY 2017 CPG CPG 27,609 188 54,863 82,660 82,660

720.1 1 FY 2016 CPG Carryover CPG 5,268 63 10,469 15,800 15,800

674 Mass Transit Exclusive

Southwest Ohio Regional Transit Authority (SORTA)

Transit Authority of Northern Kentucky (TANK) See Table 6, Page A-18

Middletown Transit Service (MTS)

Clermont Transportation Connection (CTC)

Butler County Regional Transit Authority (BCRTA)

Warren County Transit Service

TRANSPORTATION PLANNING SUB TOTAL 1,609,965 816,215 336,336 125,957 3,199,161 6,087,634 249,788 6,337,422

original submitted 02/29/2016 A-5

Page 66: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

OHIO KENTUCKY INDIANA REGIONAL COUNCIL OF GOVERNMENTSFY 2017 UNIFIED PLANNING WORK PROGRAM

TABLE 1 ALL ACTIVITIES BY COST OBJECTIVE AND DIRECT COST CATEGORY

Work SOURCE

Personnel Consultant Marketing Special Other Indirect & Total

Toll Credits and

Contributed Total

Element Purchase Direct Fringes Work Cost Services Project

AGRICULTURAL PLANNING

500 US Forestry Activities

500.1 National Urban and Community Forestry USDA 37,531 52,430 14,619 74,579 179,159 52,430 231,589

ENVIRONMENTAL PLANNING

710 Water Quality

710 Ohio EPA Program

710.6 FY2017 604 (b) OEPA 19,037 2,250 37,829 59,116 59,116

710.9 FY2017 Ohio General Assembly Funds OEPA 25,108 550 49,892 75,550 75,550

710.1 FY2017 Local Funded Water Activities OKI 18,244 11,488 36,253 65,985 65,985

REGIONAL PLANNING

800 Regional Planning Activities

800.1 FY2017 Local Funded Regional Planning Activities OKI 11,295 808 22,445 34,548 34,548

NON-TRANSPORTATION PLANNING SUB TOTAL 111,215 52,430 29,715 220,998 414,358 52,430 466,788

FY 2017 Totals 1,721,180 868,645 336,336 155,672 3,420,159 6,501,992 302,218 6,804,210

1FY16 ODOT CPG carryover funds to be partnered with FY17 KYTC funds

original submitted 02/29/2016 A-6

Page 67: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

OHIO KENTUCKY INDIANA REGIONAL COUNCIL OF GOVERNMENTSFY2017 UNIFIED PLANNING WORK PROGRAM

TABLE 2 CPG (PL/FTA ) BY COST OBJECTIVE AND FUNDING SOURCE

Work Total Other Ohio Ohio Ohio Ohio Kentucky Kentucky Kentucky Kentucky Kentucky Indiana Indiana Indiana

Element Work Cost Funding Totals Federal Match Local Totals PL KYTC Match FTA 5303 Local Totals PL Local(from Table 1)

FY 2017 CPG Activities 100.0000% 82.5123% 80.0000% 10.0000% 10.0000% 17.4877% 61.4021% 3.8376% 18.5979% 16.1624%

FY 2016 Carryover CPG Activities 100.0000% 82.5123% 80.0000% 10.0000% 10.0000% 17.4877% 61.4021% 3.8376% 18.5979% 16.1624%

Kentucky Exclusive PL/FTA Activities 100.0000% 100.0000% 61.4021% 3.8376% 18.5979% 16.1624%

Kentucky Discretionary PL 100.0000% 100.0000% 80.0000% 20.0000%

Indiana Exclusive CPG Activities 100.0000% 100.0000% 80.0000% 20.0000%

JARC/New Freedom/5310 (FTA) 100.0000% 100.0000%

601 Short Range (PL/FTA)

601 Short Range Planning

601.1 FY 2017 CPG 95,460 78,766 63,013 7,877 7,877 16,694 10,250 641 3,105 2,698

601.1 1 FY 2016 CPG Carryover 18,250 15,058 12,046 1,506 1,506 3,192 1,960 122 594 516

602 TIP (PL/FTA)

602 Transportation Improvement Program

602.1 FY 2017 CPG 118,125 97,468 77,974 9,747 9,747 20,657 12,684 793 3,842 3,339

602.1 1 FY 2016 CPG Carryover 22,580 18,631 14,905 1,863 1,863 3,949 2,425 152 734 638

605 Continuing Planning-Surveillance (PL/FTA)

605 Continuing Planning - Surveillance

605.1 FY 2017 CPG 1,754,573 1,447,739 1,158,191 144,774 144,774 306,834 188,403 11,775 57,065 49,592

605.1 1 FY 2016 CPG Carryover 345,270 284,890 227,912 28,489 28,489 60,380 37,074 2,317 11,229 9,759

610 Transportation Plan (PL/FTA)

610 Transportation Plan

610.1 Transportion Plan

610.1 FY 2017 CPG 919,425 758,639 606,911 75,864 75,864 160,786 98,726 6,170 29,903 25,987

610.1 1 FY 2016 CPG Carryover 175,800 145,057 116,045 14,506 14,506 30,743 18,877 1,180 5,718 4,969

original submitted 02/29/2016 A - 7

Page 68: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

OHIO KENTUCKY INDIANA REGIONAL COUNCIL OF GOVERNMENTSFY2017 UNIFIED PLANNING WORK PROGRAM

TABLE 2 CPG (PL/FTA ) BY COST OBJECTIVE AND FUNDING SOURCE

Work Total Other Ohio Ohio Ohio Ohio Kentucky Kentucky Kentucky Kentucky Kentucky Indiana Indiana Indiana

Element Work Cost Funding Totals Federal Match Local Totals PL KYTC Match FTA 5303 Local Totals PL Local(from Table 1)

FY 2017 CPG Activities 100.0000% 82.5123% 80.0000% 10.0000% 10.0000% 17.4877% 61.4021% 3.8376% 18.5979% 16.1624%

FY 2016 Carryover CPG Activities 100.0000% 82.5123% 80.0000% 10.0000% 10.0000% 17.4877% 61.4021% 3.8376% 18.5979% 16.1624%

Kentucky Exclusive PL/FTA Activities 100.0000% 100.0000% 61.4021% 3.8376% 18.5979% 16.1624%

Kentucky Discretionary PL 100.0000% 100.0000% 80.0000% 20.0000%

Indiana Exclusive CPG Activities 100.0000% 100.0000% 80.0000% 20.0000%

JARC/New Freedom/5310 (FTA) 100.0000% 100.0000%

625 Services (PL/FTA)

625 Services

625.2 FY 2017 CPG 313,250 258,470 206,776 25,847 25,847 54,780 33,636 2,102 10,188 8,854

625.2 1 FY 2016 CPG Carryover 59,880 49,408 39,526 4,941 4,941 10,472 6,430 402 1,948 1,692

695 UPWP Administration (PL/FTA)

695 UPWP Administration

695.1 FY 2017 CPG 23,250 19,184 15,348 1,918 1,918 4,066 2,497 156 756 657

695.1 1 FY 2016 CPG Carryover 4,450 3,672 2,938 367 367 778 478 30 145 126

697 Trans Program Reporting (PL/FTA)

697 Transportation Program Reporting

697.1 FY 2017 CPG 16,470 13,590 10,872 1,359 1,359 2,880 1,768 111 536 465

697.1 1 FY 2016 CPG Carryover 3,150 2,599 2,079 260 260 551 338 21 102 89

720 Air Quality (PL/FTA)

720 Mobile Source Emissions Planning

720.1 FY 2017 CPG 82,660 68,205 54,563 6,821 6,821 14,455 8,876 555 2,688 2,336

720.1 1 FY 2016 CPG Carryover 15,800 13,037 10,430 1,304 1,304 2,763 1,697 106 514 446

686 Kentucky Exclusive

686.3 Transportation Planning Activities FY2017 135,831 135,831 83,403 5,213 25,262 21,954

Sub-Total - Regional Totals 4,104,224 3,274,412 2,619,529 327,441 327,441 829,812 509,521 31,845 154,328 134,116

original submitted 02/29/2016 A - 8

Page 69: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

OHIO KENTUCKY INDIANA REGIONAL COUNCIL OF GOVERNMENTSFY2017 UNIFIED PLANNING WORK PROGRAM

TABLE 2 CPG (PL/FTA ) BY COST OBJECTIVE AND FUNDING SOURCE

Work Total Other Ohio Ohio Ohio Ohio Kentucky Kentucky Kentucky Kentucky Kentucky Indiana Indiana Indiana

Element Work Cost Funding Totals Federal Match Local Totals PL KYTC Match FTA 5303 Local Totals PL Local(from Table 1)

FY 2017 CPG Activities 100.0000% 82.5123% 80.0000% 10.0000% 10.0000% 17.4877% 61.4021% 3.8376% 18.5979% 16.1624%

FY 2016 Carryover CPG Activities 100.0000% 82.5123% 80.0000% 10.0000% 10.0000% 17.4877% 61.4021% 3.8376% 18.5979% 16.1624%

Kentucky Exclusive PL/FTA Activities 100.0000% 100.0000% 61.4021% 3.8376% 18.5979% 16.1624%

Kentucky Discretionary PL 100.0000% 100.0000% 80.0000% 20.0000%

Indiana Exclusive CPG Activities 100.0000% 100.0000% 80.0000% 20.0000%

JARC/New Freedom/5310 (FTA) 100.0000% 100.0000%

SOURCE OF FUNDS

FY2017 CPG - ODOT 3,459,044 2,742,060 2,193,647 274,206 274,206 716,985 440,243 27,515 133,344 115,881

FY2016 CPG Carryover - ODOT 645,180 532,353 425,882 53,235 53,235 112,827 69,278 4,330 20,984 18,235

Hamilton Co. Emergency Mgmt Agency4,104,224 3,274,412 2,619,529 327,441 327,441 829,812 509,521 31,845 154,328 134,116

FY2017 Carrying into FY2018 (220,705) (176,564) (22,071) (22,071) (46,777) (28,721) (1,795) (8,700) (7,559)

FY2017 PL/FTA - KYTC 783,035 480,800 30,050 145,628 126,557

KYTC FY17 PL Funding Summary

601.1 Short Range Planning 18,560 11,396 712 3,452 3,000

602.1 Transportation Improvement Program 22,966 14,101 882 4,271 3,712

605.1 Continuing Planning - Surveillance 342,228 210,135 13,133 63,647 55,313

610.1 Transportation Plan 178,754 109,759 6,859 33,245 28,891

625.2 Services 60,903 37,396 2,337 11,327 9,843

695.1 UPWP Administration 4,520 2,776 172 841 731

697.1 Transportation Program Reporting 3,202 1,966 123 596 517

720.1 Mobile Source Emissions Planning 16,071 9,868 617 2,989 2,597

686.3 Transportation Planning Activities FY2017 135,831 83,403 5,213 25,262 21,954783,035 480,800 30,050 145,628 126,557

686 Kentucky Exclusive

686.2 Boone County Study 200,000 200,000 160,000 40,000

685 Indiana Exclusive

685.1 Dearborn County (INDOT) FY2017 CPG 31,250 31,250 25,000 6,250

1FY16 ODOT CPG carryover funds to be partnered with FY17 KYTC funds

x

original submitted 02/29/2016 A - 9

Page 70: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

OHIO KENTUCKY INDIANA REGIONAL COUNCIL OF GOVERNMENTSFY2017 UNIFIED PLANNING WORK PROGRAM

TABLE 2 CPG (PL/FTA ) BY COST OBJECTIVE AND FUNDING SOURCE

Work Total Other Ohio Ohio Ohio Ohio Kentucky Kentucky Kentucky Kentucky Kentucky Indiana Indiana Indiana

Element Work Cost Funding Totals Federal Match Local Totals PL KYTC Match FTA 5303 Local Totals PL Local(from Table 1)

FY 2017 CPG Activities 100.0000% 82.5123% 80.0000% 10.0000% 10.0000% 17.4877% 61.4021% 3.8376% 18.5979% 16.1624%

FY 2016 Carryover CPG Activities 100.0000% 82.5123% 80.0000% 10.0000% 10.0000% 17.4877% 61.4021% 3.8376% 18.5979% 16.1624%

Kentucky Exclusive PL/FTA Activities 100.0000% 100.0000% 61.4021% 3.8376% 18.5979% 16.1624%

Kentucky Discretionary PL 100.0000% 100.0000% 80.0000% 20.0000%

Indiana Exclusive CPG Activities 100.0000% 100.0000% 80.0000% 20.0000%

JARC/New Freedom/5310 (FTA) 100.0000% 100.0000%

674 Transit

674.1 JARC (5316) FY2012 74,820 74,820 74,820

674.2 New Freedom (5317) FY2012 20,904 20,904 20,904

674.4 2 New Freedom (5317) FY2013 Pass-Thru 57,807 57,807 57,807 57,807

674.1 JARC (5316) FY2010 & FY2011 82,501 82,501 82,501

674.3 Transit Planning Activities (5310) FFY13-14 248,696 248,696 248,696

TOTAL PL/FTA/STATE FUNDED 4,820,202 57,807 3,759,140 3,104,257 327,441 327,441 1,029,812 669,521 31,845 154,328 174,117 31,250 25,000 6,250

Anticipated OH FY17 funding carried to FY18 -

not funded by KYTC until FY18 (267,481) (46,776) (28,721) (1,795) (8,700) (7,560)

KYTC FY17 Funding 983,036 640,800 30,050 145,628 166,557

SOURCE OF FUNDS

FY2017 CPG - ODOT 2,742,060 2,193,648 274,206 274,206FY2016 CPG Carryover - ODOT 532,353 425,884 53,235 53,235FY15 FTA 5310 248,696 248,696FY2012 & FY2013 FTA Carryover 57,807 153,531 153,531FY2010 & FY2011 FTA Carryover 82,501 82,501FY2017 PL - KYTC 601,000 480,800 30,050 90,150FY2017 Discretionary PL 200,000 160,000 40,000FY2017 FTA 5303 - KYTC 182,035 145,628 36,407FY2017 CPG - INDOT 31,250 25,000 6,250Hamilton Co. Emergency Mgmt Agency

57,807 3,759,141 3,104,260 327,441 327,441 983,035 640,800 30,050 145,628 166,557 31,250 25,000 6,2501

FY16 ODOT CPG carryover funds to be partnered with FY17 KYTC funds 2

FTA Pass Through projects matched with recipient match or contributed services

original submitted 02/29/2016 A - 10

Page 71: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

OHIO KENTUCKY INDIANA REGIONAL COUNCIL OF GOVERNMENTSFY2017 UNIFIED PLANNING WORK PROGRAM

TABLE 3 - OTHER TRANSPORTATION BY COST OBJECTIVE AND FUNDING SOURCE

Work TotalToll Credits &

Contributed Total Ohio Ohio ODOT CarryoverOK

OD

CM

ST toll Ohio Kentucky Kentucky Carryover

OK

KY

CM

ST Cont Kentucky Indiana Indiana Carryover

OK

IND

ST Indiana

Element Work Cost Services Project Portion State match Yes NoI

OT

AQ

BGP

crs Local Portion State Yes NoI

TC

AQ

BGP

Svs Local Portion State Yes NoI

OT

P Local

P P

FY 2017 STBG Funded Projects 82.5123% 100.00% 20.00% 17.4877% 80.00% 20.00%

FY 2017 Regional Clean Air 82.5123% 100.00% 17.4877% 80.00% x 20.00%

FY 2017 Rideshare Activities 82.5123% 100.00% 17.4877% 80.00% x 20.00%

FY 2016 Research Funded Projects 100.0000% 80.00% 20.00%

Indiana STBGP Exclusive 100.0000% 80.00% 20.00%

610 Transportation Plan (PL/FTA)

610.4 Land Use Planning

610.4 1 FY 2017 STP (ODOT PID #93160) STBGP 354,535 73,134 427,669 292,535 a 292,535 73,134 X X X X 62,000 e 49,600 X X X 12,400

610.5 Fiscal Impact Analysis

610.5 1 FY 2017 STP (ODOT PID #93164) STBGP 105,789 21,822 127,611 87,289 b 87,289 21,822 X X X X 18,500 f 14,800 X X X 3,700

611.5 FY 2017 FIAM Maintenance and Startups local 20,000 20,000 16,502 X X 16,502 3,498 X X 3,498

665 Special Studies

665.4 Regional Clean Air Program (FY17 ODOT PID #93167)

1,2 FY 2017 ODOT CMAQ / KY SNK CMAQ/SNK 343,098 85,775 428,873 283,098 c 283,098 70,775 X X X X 60,000 g 60,000 X X X X 15,000

667 Rideshare Activities

667.1 Rideshare Program (FY17 ODOT PID #93169)

2 FY 2017 ODOT CMAQ / KY SNK CMAQ/STBGP 257,324 11,250 268,574 212,324 d 212,324 X X X 45,000 h 45,000 X X X X 11,250

684 Ohio Exclusive

684.4 Regional Transportation Planning Agency Program (FY16 ODOT PID #99720)

FY2016-17 Mentor Pilot Program Research 42,686 42,686 42,686 i 34,149 8,537 X X

685 Indiana Exclusive

685.2 Dearborn County (INDOT) FY2017 STP STBGP 62,500 62,500 62,500 50,000 X X X 12,500

685.4 Bright 74 Corridor Study FY2016 carryoverSTBGP 81,500 81,500 81,500 65,200 X X X 16,300

TOTALS 1,267,432 191,981 1,459,413 934,434 909,395 174,268 16,502 188,998 169,400 45,848 144,000 115,200 28,800

1 ODOT CMAQ funds provided at 100% with toll credits match.2 KYTC SNK funding matched with contributed services.

x

riginal submitted 02/29/2016 A - 11

Page 72: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

OHIO KENTUCKY INDIANA REGIONAL COUNCIL OF GOVERNMENTSFY2017 UNIFIED PLANNING WORK PROGRAM

TABLE 3 - OTHER TRANSPORTATION BY COST OBJECTIVE AND FUNDING SOURCE

Work TotalToll Credits &

Contributed Total Ohio Ohio ODOT CarryoverOK

OD

CM

ST toll Ohio Kentucky Kentucky Carryover

OK

KY

CM

ST Cont Kentucky Indiana Indiana Carryover

OK

IND

ST Indiana

Element Work Cost Services Project Portion State match Yes NoI

OT

AQ

BGP

crs Local Portion State Yes NoI

TC

AQ

BGP

Svs Local Portion State Yes NoI

OT

P Local

P P

FY 2017 STBG Funded Projects 82.5123% 100.00% 20.00% 17.4877% 80.00% 20.00%

FY 2017 Regional Clean Air 82.5123% 100.00% 17.4877% 80.00% x 20.00%

FY 2017 Rideshare Activities 82.5123% 100.00% 17.4877% 80.00% x 20.00%

FY 2016 Research Funded Projects 100.0000% 80.00% 20.00%

Indiana STBGP Exclusive 100.0000% 80.00% 20.00%

SOURCE OF FUNDS

Total OH Share ODOT OKI Local KY Share KYTC OKI Local INDOT OKI Local

FY 2017 STBGP/SNK FUNDS - Transportation ---------------- -------------------- 522,824 379,824 379,824 94,956 a,b X 80,500 64,400 e,f 16,100 62,500 50,000 12,500

FY 2016 CARRYOVER STP/SNK FUNDS - Transportation ---------------- -------------------- 81,500 81,500 65,200 16,300

FY17 FIAM Maintenance and Startups - Local ---------------- -------------------- 20,000 16,502 16,502 3,498 3,498

FY 2017 CMAQ (OH Clean Air) ---------------- -------------------- 283,098 283,098 283,098 70,775 c X

FY 2017 SNK FUNDS (KY Clean Air) ---------------- -------------------- 60,000 60,000 60,000 g 15,000

FY 2017 CMAQ - (OH Rideshare) ---------------- -------------------- 212,324 212,324 212,324 d

FY 2017 SNK FUNDS (KY Rideshare) ---------------- -------------------- 45,000 45,000 45,000 h 11,250

FY 2016 Research FUNDS (ODOT) ---------------- -------------------- 42,686 42,686 34,149 8,537 i

1,267,432 934,434 909,395 174,268 16,502 188,998 169,400 45,848 144,000 115,200 28,800

a,b FY17 STBGP - LU (PID 93160) $292,535 w/TC + FIAM (PID 93164) $87,289 w/TC e,f FY17 SNK Trans. Planning -- LU ($49,600) and FIAM ($14,800) = $64,400 - KYTC wants SNK tasks rounded to nearest $100.

c FY17 CMAQ Clean Air Program (PID 93167) $283,098 w/TC match g FY17 SNK RCAP ($60,000) w/contributed services match - KYTC wants SNK tasks rounded to nearest $100.

d FY17 CMAQ Rideshare Program (PID 93169) $212,324 h FY17 SNK RideShare ($45,000) w/contributed services match - KYTC wants SNK tasks rounded to nearest $100.

i FY16-17 RTPO matched by ODOT with State funds (PID 99720)

riginal submitted 02/29/2016 A - 12

Page 73: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

OHIO KENTUCKY INDIANA REGIONAL COUNCIL OF GOVERNMENTSFY 2017 UNIFIED PLANNING WORK PROGRAM

TABLE 4 - OTHER PLANNING ACTIVITIES BY COST OBJECTIVE AND FUNDING SOURCE

OH

KY

IN

C/O

FED Ohio

Other State OH Local DOE Contributed HHS USDA Contributed

OKI County Funds

Work Work Activity Total Contributed Total Federal Funds OKI Services Services

Element Work Cost Services Project County

604( B) Program x 100.00%

Ohio General Assembly funds x 100.00%

USDA 50.00%

APA/HHS

MARC/NARC/DOE

Local Water Quality and Regional Planning Programs 100.00%

AGRICULTURAL PLANNING

500 US Forestry Activities

500.1 National Urban and Community Forestry USDA 179,159 52,430 231,589 x 114,565 52,430 64,594

ENVIRONMENTAL PLANNING

710 Water Quality

710 Ohio EPA Program 710.6 FY2017 604 (b) OEPA 59,116 59,116 x x 56,867 2,200710.9 FY2017 Ohio General Assembly Funds OEPA 75,550 75,550 x 75,000 550

710.1 FY2017 Local Funded Water Activities OKI 65,985 65,985 65,985

REGIONAL PLANNING

800 Regional Planning Activities

800.1 FY2017 Local Funded Regional Planning Activities OKI 34,548 34,548 34,548

TOTAL NON-TRANS PLANNING ACTIVITIES 414,358 52,430 466,788 56,867 75,000 2,750 114,565 52,430 165,127

original submitted 02/29/2016 A - 13

Page 74: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

OHIO-KENTUCKY-INDIANA REGIONAL COUNCIL OF GOVERNMENTSFY 2017 UNIFIED PLANNING WORK PROGRAM

TABLE 5 - HOURS

Estimated Estimated Estimated Estimated Estimated Estimated Estimated

Work Personnel Estimated Estimated OH Trans KY Trans IN Trans FTA USDA OH Water OKI

Element Cost Hourly Personnel Personnel Personnel Personnel Personnel Personnel Personnel Personnel

(From Tbl 1) Rate Hours Hours Hours Hours Hours Hours Hours Hours

######## ######## 100.0000% 100.0000% 100.0000% 100.0000% 100.0000%

TRANSPORTATION PLANNING

601 Short Range (PL/FTA)

601 Short Range Planning

601.1 FY 2017 CPG 31,030 31 1,003 827 175

601.1 FY 2016 CPG Carryover 5,910 31 191 158 33

602 TIP (PL/FTA)

602 Transportation Improvement Program

602.1 FY 2017 CPG 39,090 40 968 799 169

602.1 FY 2016 CPG Carryover 7,260 40 180 148 31

605 Continuing Planning-Surveillance (PL/FTA)

605 Continuing Planning - Surveillance

605.1 FY 2017 CPG 480,664 29 16,480 13,598 2,882

605.1 FY 2016 CPG Carryover 91,057 29 3,122 2,576 546

610 Transportation Plan (PL/FTA)

610 Transportation Plan

610.1 Transportion Plan

610.1 FY 2017 CPG 300,463 39 7,641 6,305 1,336

610.1 FY 2016 CPG Carryover 58,051 39 1,476 1,218 258

610.4 Land Use Planning

610.4 FY 2017 STP (ODOT PID #93160) 113,482 23 4,986 4,114 872

610.5 Fiscal Impact Analysis

610.5 FY 2017 STP (ODOT PID #93164) 35,248 27 1,329 1,097 232

original submitted 02/29/2016 A - 14

Page 75: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

OHIO-KENTUCKY-INDIANA REGIONAL COUNCIL OF GOVERNMENTSFY 2017 UNIFIED PLANNING WORK PROGRAM

TABLE 5 - HOURS

Estimated Estimated Estimated Estimated Estimated Estimated Estimated

Work Personnel Estimated Estimated OH Trans KY Trans IN Trans FTA USDA OH Water OKI

Element Cost Hourly Personnel Personnel Personnel Personnel Personnel Personnel Personnel Personnel

(From Tbl 1) Rate Hours Hours Hours Hours Hours Hours Hours Hours

######## ######## 100.0000% 100.0000% 100.0000% 100.0000% 100.0000%

625 Services (PL/FTA)

625 Services

625.2 FY 2017 CPG 104,114 34 3,058 2,523 535

625.2 FY 2016 CPG Carryover 19,241 34 565 466 99

665 Special Studies

665.4 Regional Clean Air Program

(FY17 ODOT PID #93167)

FY 2017 ODOT CMAQ / KY SNK 47,437 3 14,589 12,037 2,551

667 Rideshare Activities

Rideshare Program

(FY17 ODOT PID #93169)

FY 2017 ODOT CMAQ / KY SNK 36,775 31 1,191 982 208

674 Transit

674.1 JARC (5316) FY2012 25,048 45 560 560

674.2 New Freedom (5317) FY2012 6,898 43 161 161

674.1 JARC (5316) FY2010 & FY2011 27,519 45 615 615

674.3 Transit Planning Activities (5310) FFY13-14 42,445 41 1,043 1,043

684 Ohio Exclusive

684.4 Regional Transportation Planning Agency Program

(FY16 ODOT PID #99720)

FY2016-17 Mentor Pilot Program 14,290 74 193 193

685 Indiana Exclusive

685.1 Dearborn County (INDOT) FY2017 CPG 9,909 30 328 328

685.2 Dearborn County (INDOT) FY2017 STP 20,786 40 519 519

original submitted 02/29/2016 A - 15

Page 76: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

OHIO-KENTUCKY-INDIANA REGIONAL COUNCIL OF GOVERNMENTSFY 2017 UNIFIED PLANNING WORK PROGRAM

TABLE 5 - HOURS

Estimated Estimated Estimated Estimated Estimated Estimated Estimated

Work Personnel Estimated Estimated OH Trans KY Trans IN Trans FTA USDA OH Water OKI

Element Cost Hourly Personnel Personnel Personnel Personnel Personnel Personnel Personnel Personnel

(From Tbl 1) Rate Hours Hours Hours Hours Hours Hours Hours Hours

######## ######## 100.0000% 100.0000% 100.0000% 100.0000% 100.0000%

686 Kentucky Exclusive

686.3 Transportation Planning Activities FY2017 44,636 36 1,229 1,229

695 UPWP Administration (PL/FTA)

695 UPWP Administration

695.1 FY 2017 CPG 7,708 47 163 134 28

695.1 FY 2016 CPG Carryover 1,465 47 31 25 5

697 Trans Program Reporting (PL/FTA)

697 Transportation Program Reporting

697.1 FY 2017 CPG 5,509 37 149 123 26697.1 FY 2016 CPG Carryover 1,053 37 28 23 5

720 Air Quality (PL/FTA)

720 Mobile Source Emissions Planning

720.1 FY 2017 CPG 27,609 43 636 525 111

720.1 FY 2016 CPG Carryover 5,268 43 121 100 21

674 Mass Transit Exclusive

Southwest Ohio Regional Transit Authority (SORTA)

Transit Authority of Northern Kentucky (TANK)

Middletown Transit Service (MTS)

Clermont Transportation Connection (CTC)

Butler County Regional Transit Authority (BCRTA)

Warren County Transit Service

TRANSPORTATION PLANNING SUB TOTAL 1,609,965 1,040 62,557 47,974 11,356 847 2,380

original submitted 02/29/2016 A - 16

Page 77: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

OHIO-KENTUCKY-INDIANA REGIONAL COUNCIL OF GOVERNMENTSFY 2017 UNIFIED PLANNING WORK PROGRAM

TABLE 5 - HOURS

Estimated Estimated Estimated Estimated Estimated Estimated Estimated

Work Personnel Estimated Estimated OH Trans KY Trans IN Trans FTA USDA OH Water OKI

Element Cost Hourly Personnel Personnel Personnel Personnel Personnel Personnel Personnel Personnel

(From Tbl 1) Rate Hours Hours Hours Hours Hours Hours Hours Hours

######## ######## 100.0000% 100.0000% 100.0000% 100.0000% 100.0000%

AGRICULTURAL PLANNING

500 US Forestry Activities

500.1 National Urban and Community Forestry 37,531 21 1,790 1,790

ENVIRONMENTAL PLANNING

710 Water Quality

710 Ohio EPA Program

710.6 FY2017 604 (b) 19,037 22 847 847

710.9 FY2017 Ohio General Assembly Funds 25,108 16 1,615 1,615

710.1 FY2017 Local Funded Water Activities 18,244 29 622 622

REGIONAL PLANNING

800 Regional Planning Activities

800.1 FY2017 Local Funded Regional Planning Activities 11,295 22 507 507

NON-TRANSPORTATION PLANNING SUB TOTAL 111,215 111 5,381 1,790 2,462 1,129

FY 2017 Totals 1,721,180 1,151 67,939 47,974 11,356 847 2,380 1,790 2,462 1,129

original submitted 02/29/2016 A - 17

Page 78: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

OHIO-KENTUCKY-INDIANA REGIONAL COUNCIL OF GOVERNMENTSFY 2017 UNIFIED PLANNING WORK PROGRAM

TABLE 6 - SUMMARY BUDGET

OKI Fiscal Year 2017 UPWP Funding Distribution

Work UPWP submitted 2-29-16 l OH OH OH OH OH KY KY KY KY IN IN FTA OEPA OEPA OKI OKI cash OH KY ElementElement Summary -Budget FY Hours PL State STP CMAQ Research PL State SNK FTA PL STP Federal USDA Federal State Match Local sub-total Credit Match Total

601.1 PL-Short Range Planning 16 191 12,046$ 1,506$ 1,506$ 15,058$ 15,058$

601.1 PL-Short Range Planning 17 1,003 63,013$ 7,877$ 11,396$ 712$ 3,452$ 10,876$ 97,326$ 97,326$

602.1 PL-TIP 16 180 14,905$ 1,863$ 1,506$ 18,274$ 18,274$

602.1 PL-TIP 17 968 77,974$ 9,747$ 14,101$ 882$ 4,271$ 11,588$ 118,563$ 118,563$

605.1 PL-Continuing Planning Surveillance 16 3,122 227,912$ 28,489$ 28,489$ 284,890$ 284,890$

605.1 PL-Continuing Planning Surveillance 17 16,480 1,158,191$ 144,774$ 210,135$ 13,133$ 63,647$ 200,086$ 1,789,967$ 1,789,967$

610.1 PL-Transportation Plan 16 1,476 116,045$ 14,506$ 14,506$ 145,057$ 145,057$

610.1 PL-Transportation Plan 17 7,641 606,911$ 75,864$ 109,759$ 6,859$ 33,245$ 104,755$ 937,393$ 937,393$

625.2 PL-Services 16 565 39,526$ 4,941$ 4,941$ 49,408$ 49,408$

625.2 PL-Services 17 3,058 206,776$ 25,847$ 37,396$ 2,337$ 11,327$ 35,690$ 319,373$ 319,373$

685.1 PL-Dearborn County (INDOT) 17 328 25,000$ 6,250$ 31,250$ 31,250$

686.3 PL-Transporation Planning Activities 17 1,229 83,403$ 5,213$ 25,262$ 21,954$ 135,831$ 135,831$

695.1 PL-UPWP 16 31 2,938$ 367$ 367$ 3,672$ 3,672$

695.1 PL-UPWP 17 163 15,348$ 1,918$ 2,776$ 172$ 841$ 2,649$ 23,704$ 23,704$

697.1 PL-Transportation Program 16 28 2,079$ 260$ 260$ 2,599$ 2,599$

697.1 PL-Transportation Program 17 149 10,872$ 1,359$ 1,966$ 123$ 596$ 1,876$ 16,792$ 16,792$

720.1 PL-Mobile Source Emissions 16 121 10,430$ 1,304$ 1,304$ 13,037$ 13,037$

720.1 PL-Mobile Source Emissions 17 636 54,563$ 6,821$ 9,868$ 617$ 2,989$ 9,418$ 84,275$ 84,275$

674.1 JARC 10-11 615 82,501$ -$ 82,501$ 82,501$

674.1 JARC 12 560 74,820$ -$ 74,820$ 74,820$

674.2 New Freedom 12 161 20,904$ -$ 20,904$ 20,904$

674.4 New Freedom Pass Thru 13 57,807$ -$ 57,807$ 57,807$

674.3 Transit Planning Activities (5310) 13-14 1,043 248,696$ -$ 248,696$ 248,696$

610.4 LRP-Land Use 17 4,986 292,535$ 49,600$ 12,400$ 354,535$ 73,134$ 427,669$

610.5 Fiscal Impact Analysis Model 17 1,329 87,289$ 14,800$ 3,700$ 105,789$ 21,822$ 127,611$

611.5 FIAM Maintenance and Startups 17 16,502$ 16,502$ 16,502$

685.2 Dearborn County (INDOT) 17 519 50,000$ 12,500$ 62,500$ 62,500$

685.4 Bright 74 Corridor Study 17 0 65,200$ 16,300$ 81,500$ 81,500$

665.4 Regional Clean Air Program 17 14,589 283,098$ 60,000$ -$ 343,098$ 70,775$ 15,000$ 428,873$

667.1 Rideshare Program 17 1,191 212,324$ 45,000$ -$ 257,324$ 11,250$ 268,574$

684.4 RTPO Mentor Pilot Program 16-17 193 8,537$ 34,149$ -$ 42,686$ 42,686$

500.1 National Urban Forestry 17 1,790 114,565$ 52,430$ 64,594$ 231,589$ 231,589$

710.6 OEPA 604b Program 17 847 56,867$ 2,200$ 59,067$ 59,067$

710.9 OH General Asembly Funds 17 1,615 75,000$ 550$ 75,550$ 75,550$

710.1 Local Funded Water Activities 17 622 65,985$ 65,985$ 65,985$

800.1 Local Funded Regional Planning 17 507 34,548$ 34,548$ 34,548$

Total UPWP 17 67,939 2,619,529$ 335,979$ 379,824$ 495,422$ 34,149$ 480,800$ 30,050$ 169,400$ 145,628$ 25,000$ 115,200$ 484,728$ 114,565$ 56,867$ 75,000$ 52,430$ 687,300$ 6,301,870$ 165,731$ 26,250$ 6,493,850$

original 02/29/2016 A - 18

Page 79: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

5307 FTA 5309 FTA 5339 FTA CMAQ STP

Northside Transit Center Environmental  $                  65,000   $                  65,000  4/30/2015

Northside Transit Center Design/Engineering  $               345,000   $                345,000  5/30/2016

Northside Transit Center Property Acquisition  $                 750,000   $               250,000   $            1,000,000  5/1/2016

Walnut Hills environmental   $                  10,000   $                  10,000  2/1/2016

Walnut Hills Design and Engineering  $               190,000   $                190,000  5/30/2016

Walnut Hills P&R Hub  $              960,000   $               240,000   $            1,200,000  10/30/2016

Oakley environmental  $                  10,000   $                  10,000  2/1/2016

Oakley Design/Engineering 190,000$                  $                190,000  3/1/2016

Oakley P&R Hub  $              960,000   $               240,000   $            1,200,000  9/30/2016

5307 FTA 5316 FTA 5317 FTA CMAQ STP

Covington Transit Center Renovation‐ construction $922,813 $230,703 $1,153,516 Jun‐17

Real‐Time Transit Data $129,317 $32,330 $161,647 Jun‐17

NKU Hub‐ planning $12,000 $3,000 $15,000 Jun‐17

Bus on Shoulder ‐ implementation $4,000 $1,000 $5,000 Jun‐17

5307 FTA 5316 FTA 5317 FTA CMAQ STP

Short range Planning Activities 10000 $10,000 Jun‐17

Clermont Transportation Connection (CTC)

5307 FTA 5316 FTA 5317 FTA CMAQ STP

No Planning Activities in FY2017 $0 $0 $0 Jun‐17

5307 FTA 5316 FTA 5317 FTA CMAQ STP

Advocate coordinated approach $4,000 $4,000 Jun‐17

Improve Butler Co. urban center connections $3,000 $3,000 Jun‐17

Technology improvements $6,000 $6,000 Jun‐17

Analyze allocation of resources $1,000 $1,000 Jun‐17

Participation in regional planning $3,000 $3,000 Jun‐17

Update practices and plans $2,000 $2,000 Jun‐17

5307 FTA 5316 FTA 5317 FTA CMAQ STP

No Planning Activities in FY2017 $0 $0 $0 Jun‐17

A‐19

Table 6 ‐ Transit Budget

Federal

Federal

Federal

Federal

Federal

Completion Date

Completion DatePlanning Activity

State Local Total Completion DatePlanning Activity

State Local

Completion Date

Local TotalState Completion Date

State Local Total Completion Date

State

SORTA

Planning Activity

Planning Activity

State Local Total

Local Total

Total

Planning Activity

Planning Activity

Butler County Regional Transit Authority (BCRTA)

Middletown Transit Service (MTS)

Warren County Transit Service

Transit Authority of Northern Kentucky (TANK)

Federal

Page 80: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

Appendix B

Cost Allocation

Page 81: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

Page 1 of 4

ESTIMATED ACTUAL VARIANCE ESTIMATED

FY 2015 FY 2015 (OVER BUDGET) FY 2017

UNDER BUDGET

EMPLOYEE WAGES

Indirect Labor

Acct. # Acct. Name

15(17)-02-001.0-5105.01 Salaries - Indirect Administration $238,649.00 $265,824.27 ($27,175.27) $267,261.00

15(17)-02-001.0-5105.02 Salaries - Indirect Accounting/Finance $187,842.00 $190,273.55 ($2,431.55) $199,910.00

15(17)-02-001.0-5105.03 Salaries - Indirect Clerical $36,879.00 $8,107.70 $28,771.30 $0.00

15(17)-02-001.0-5105.04 Salaries - Indirect Communications $82,055.00 $88,582.88 ($6,527.88) $89,096.00

15(17)-02-001.0-5105.05 Salaries - Indirect Human Resources $68,950.00 $68,168.76 $781.24 $74,124.00

15(17)-02-001.0-5105.06 Salaries - Indirect Administrative Support $13,847.00 $3,430.08 $10,416.92 $3,925.00

Subtotal - Indirect Labor $628,222.00 $624,387.24 $3,834.76 $634,316.00

Direct Labor

Acct. # Acct. Name

15(17)-01-000.1-5105.00 Salaries - General and Administrative $8,435.00 $14,978.87 ($6,543.87) $15,268.00

14-05-665.5-5105.00 Salaries - Solar Ready $13,704.00 $14,967.45 ($1,263.45) $0.00

14-05-665.5-5105.01 Salaries - Solar Ready OKI local $3,044.00 $2,798.70 $245.30 $0.00

15(17)-06-667.1-5105.00 Salaries - RideShare $20,727.00 $14,321.90 $6,405.10 $13,974.00

14(16)-08-601.1-5105.00 Salaries - Short Range Planning co $7,332.00 $8,980.66 ($1,648.66) $5,910.00

14(16)-08-602.1-5105.00 Salaries - Trans Imprvmnt Program co $12,978.00 $8,435.49 $4,542.51 $7,260.00

14(16)-08-605.1-5105.00 Salaries - Surveillance co $160,419.00 $152,255.88 $8,163.12 $91,057.00

14(16)-08-610.1-5105.00 Salaries - Long Range Plng - Sys Mgmt co $81,506.00 $110,586.76 ($29,080.76) $58,051.00

14(16)-08-625.2-5105.00 Salaries - Participation Plan co $28,345.00 $18,313.01 $10,031.99 $19,241.00

14(16)-08-695.1-5105.00 Salaries - UPWP Administration co $2,232.00 $2,984.18 ($752.18) $1,465.00

14(16)-08-697.1-5105.00 Salaries - Trans Program Reporting co $2,644.00 $0.00 $2,644.00 $1,053.00

14(16)-08-720.1-5105.00 Salaries - Mobile Source Emissions co $7,186.00 $14,556.04 ($7,370.04) $5,268.00

15(17)-08-601.1-5105.00 Salaries - Short Range Planning $18,443.00 $20,086.94 ($1,643.94) $28,493.00

15(17)-08-602.1-5105.00 Salaries - Trans Imprvmnt Program $36,642.00 $29,752.32 $6,889.68 $35,950.00

15(17)-08-605.1-5105.00 Salaries - Surveillance $318,088.00 $340,143.63 ($22,055.63) $432,832.00

15(17)-08-610.1-5105.00 Salaries - Long Range Plng - Sys Mgmt $226,346.00 $233,698.61 ($7,352.61) $276,008.00

15-08-610.2-5105.00 Salaries - Long Range Plng - Freight Conference $0.00 $3,677.55 ($3,677.55) $0.00

15(17)-08-625.2-5105.00 Salaries - Participation Plan $80,111.00 $51,300.73 $28,810.27 $95,788.00

15(17)-08-685.1-5105.00 Salaries - INDOT Exclusive CPG $10,033.00 $10,284.74 ($251.74) $9,909.00

15(17)-08-686.3-5105.00 Salaries - KYTC Excl - Trans Planning Activities $38,649.00 $35,564.81 $3,084.19 $27,616.00

15(17)-08-695.1-5105.00 Salaries - UPWP Administration $6,308.00 $3,827.96 $2,480.04 $7,088.00

15(17)-08-697.1-5105.00 Salaries - Trans Program Reporting $7,486.00 $1,821.31 $5,664.69 $5,070.00

15(17)-08-720.1-5105.00 Salaries - Mobile Source Emissions $20,327.00 $15,828.88 $4,498.12 $25,413.00

15(17)-15-610.4-5105.00 Salaries - Land Use Planning $140,993.00 $136,992.50 $4,000.50 $110,584.00

15(17)-15-610.5-5105.00 Salaries - Fiscal Impact Analysis Model Implementation $26,498.00 $10,609.85 $15,888.15 $21,509.00

15(17)-15-685.2-5105.00 Salaries - INDOT Exclusive STP $8,184.00 $8,191.19 ($7.19) $20,786.00

15(17)-20-665.4-5105.00 Salaries - Regional Clean Air Program $24,020.00 $5,674.34 $18,345.66 $8,925.00

10-23-674.1-5105.00 Salaries - FTA (5316) JARC Administration FY08-09 $3,220.00 $14,830.88 ($11,610.88) $0.00

12-23-674.1-5105.00 Salaries - FTA (5316) JARC Administration FY10-11 $5,860.00 $1,542.23 $4,317.77 $24,352.00

12-23-674.2-5105.00 Salaries - FTA (5317) New Freedom Administration FY10-11 $7,612.00 $16,557.88 ($8,945.88) $0.00

13-23-674.2-5105.00 Salaries - FTA (5317) New Freedom Administration FY12 $3,506.00 $2,053.04 $1,452.96 $6,898.00

15-23-674.3-5105.00 Salaries - FTA (5310) Transit $4,716.00 $0.00 $4,716.00 $6,952.00

15(17)-26-800.1-5105.00 Salaries - Regional Planning $29,086.00 $17,094.19 $11,991.81 $11,295.00

15(17)-29-710.1-5105.00 Salaries - Local Water $25,254.00 $24,180.37 $1,073.63 $18,244.00

15(17)-30-710.9-5105.00 Salaries - OH General Assembly WQ $24,789.00 $25,284.83 ($495.83) $25,108.00

15(17)-38-710.6-5105.00 Salaries - OEPA 604b Water $17,716.00 $18,319.79 ($603.79) $19,037.00

15-46-550.2-5105.00 Salaries - APA KY Plan4Health $0.00 $2,494.53 ($2,494.53) $0.00

16-47-500.1-5105.00 Salaries - National Urban and Community Forestry $18,354.00

16-47-500.1-5105.01 Salaries - Nat. Urban & Comm. Forestry - OKI Local $19,177.00

14(16)-71-684.4-5105.00 Salaries - RTPO Mento Pilot Program $8,153.00 $1,501.30 $6,651.70 $5,768.00

$0.00

$0.00

$0.00

Subtotal - Direct Labor $1,440,592.00 $1,394,493.34 $46,098.66 $1,479,703.00

TOTAL EMPLOYEE WAGES $2,068,814.00 $2,018,880.58 $49,933.42 $2,114,019.00

OHIO-KENTUCKY-INDIANA REGIONAL COUNCIL OF GOVERNMENTS

SCHEDULE OF DIRECT LABOR, FRINGE BENEFITS, AND GENERAL OVERHEAD

July 1, 2014 - June 30, 2015

OKI FY17 Overhead Schedule - provisional DL Method - submitted 2-25-16 B - 1 DATE PRINTED: 2/25/2016

Page 82: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

Page 2 of 4

ESTIMATED ACTUAL VARIANCE ESTIMATED

FY 2015 FY 2015 (OVER BUDGET) FY 2017

UNDER BUDGET

OHIO-KENTUCKY-INDIANA REGIONAL COUNCIL OF GOVERNMENTS

SCHEDULE OF DIRECT LABOR, FRINGE BENEFITS, AND GENERAL OVERHEAD

July 1, 2014 - June 30, 2015

FRINGE BENEFITS COST CENTER

Paid Leave

Acct. # Acct. Name

15-03-002.0-5108.00 Performance Contingency $0.00 $2,000.00 ($2,000.00)

15(17)-03-002.0-5110.00 Vacation Expense $166,454.00 $179,712.30 ($13,258.30) $162,736.00

15(17)-03-002.0-5115.00 Sick Leave $74,173.00 $62,008.60 $12,164.40 $67,914.00

15(17)-03-002.0-5120.00 Holiday Leave (8 fixed) $72,816.80 $71,226.29 $1,590.51 $73,819.20

15(17)-03-002.0-5120.02 Presidents' Day - Sub Holiday $9,102.10 $9,921.86 ($819.76) $9,227.40

15(17)-03-002.0-5120.03 Columbus Day - Sub Holiday $9,102.10 $8,910.87 $191.23 $9,227.40

15(17)-03-002.0-5130.00 Administrative Leave $12,136.00 $5,809.98 $6,326.02 $9,227.00

Subtotal - Paid Leave $343,784.00 $339,589.90 $4,194.10 $332,151.00

Other Fringe Benefits

Acct. # Acct. Name

15(17)-03-002.0-5205.00 FICA - Employer $175,472.00 $168,015.33 $7,456.67 $178,769.18

15(17)-03-002.0-5209.00 Retirement Plan (403b) $87,799.00 $71,193.66 $16,605.34 $88,964.19

15(17)-03-002.0-5210.00 Retirement Plan (401a) $243,109.00 $232,361.96 $10,747.04 $247,171.68

15(17)-03-002.0-5212.00 Employer 457 Plan Contribution $17,750.00 $17,679.10 $70.90 $18,250.00

15(17)-03-002.0-5215.00 Workers' Compensation $5,409.00 $464.28 $4,944.72 $5,182.50

15(17)-03-002.0-5220.00 Unemployment Insurance $1,200.00 $0.00 $1,200.00 $1,200.00

15(17)-03-002.0-5223.00 HRA Expenses - ER $12,000.00 $5,828.44 $6,171.56 $14,850.00

15(17)-03-002.0-5223.01 HSA Contribution - ER $54,000.00 $52,166.67 $1,833.33 $69,300.00

15(17)-03-002.0-5225.01 Health Insurance Premium $516,856.08 $511,866.96 $4,989.12 $518,054.87

15(17)-03-002.0-5225.02 Dental Insurance Premium $27,566.50 $24,617.48 $2,949.02 $25,619.54

15(17)-03-002.0-5225.03 Life Insurance Premium $9,448.44 $9,515.47 ($67.03) $11,065.81

15(17)-03-002.0-5225.04 LTD Insurance Premium $7,805.40 $9,056.84 ($1,251.44) $10,420.28

15(17)-03-002.0-5226.00 Employee Incentive $4,595.00 $2,267.00 $2,328.00 $1,716.00

15(17)-03-002.0-5240.30 Sick Leave Variance & Adjust $18,491.00 $17,922.14 $568.86 $1,690.88

15(17)-03-002.0-5240.32 Holiday Variance & Adjustment $1,214.00 ($852.83) $2,066.83 $174.58

15(17)-03-002.0-5240.36 Vacation Variance & Adjustment $26,922.00 $9,943.32 $16,978.68 $39,699.84

Prior Year Rate Adjustment $0.00

Subtotal - Other Fringe $1,209,637.42 $1,132,045.82 $77,591.60 $1,232,129.34

TOTAL FRINGE BENEFITS $1,553,421.42 $1,471,635.72 $81,785.70 $1,564,280.34

OKI FY17 Overhead Schedule - provisional DL Method - submitted 2-25-16 B - 2 DATE PRINTED: 2/25/2016

Page 83: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

Page 3 of 4

ESTIMATED ACTUAL VARIANCE ESTIMATED

FY 2015 FY 2015 (OVER BUDGET) FY 2017

UNDER BUDGET

OHIO-KENTUCKY-INDIANA REGIONAL COUNCIL OF GOVERNMENTS

SCHEDULE OF DIRECT LABOR, FRINGE BENEFITS, AND GENERAL OVERHEAD

July 1, 2014 - June 30, 2015

INDIRECT COST CENTER - NON-LABOR

Acct. # Acct. Name

15(17)-02-001.0-5107.00 Auto Allowance $8,700.00 $8,700.00 $0.00 $8,700.00

15(17)-02-001.0-5510.02 Meals & Incidentals - OR $44.00 $0.00 $44.00 $237.27

15(17)-02-001.0-5515.02 Lodging - OR $172.00 $0.00 $172.00 $1,214.19

15(17)-02-001.0-5520.02 Transportation - OR $347.00 $50.60 $296.40 $1,048.39

15(17)-02-001.0-5520.03 Transp OR OKI Vehicle Mileage $349.00 $454.43 ($105.43) $300.00

15(17)-02-001.0-5520.06 Transportation - IR $345.00 $252.36 $92.64 $236.04

15(17)-02-001.0-5520.07 Transp IR OKI Vehicle Mileage $63.00 $2.17 $60.83 $30.00

15(17)-02-001.0-5525.02 Misc. Travel Expenses - OR $3.00 $0.00 $3.00 $100.00

14(16)-02-001.0-5570.02 PD - Meals & Incidentals - OR $1,586.00 $1,400.70 $185.30 $2,065.72

14(16)-02-001.0-5571.02 PD - Misc. Travel Expenses - OR $652.00 $458.10 $193.90 $405.00

14(16)-02-001.0-5572.02 PD - Lodging - OR $6,899.00 $5,964.13 $934.87 $7,223.09

14(16)-02-001.0-5574.02 PD - Transportation - OR $4,357.00 $4,289.74 $67.26 $4,217.41

14(16)-02-001.0-5574.03 ProfDev OR OKI Vehicle Mileage $0.00 $171.76 ($171.76) $237.60

14(16)-02-001.0-5574.06 PD - Transportation - IR $0.00 $0.00 $0.00 $0.00

14(16)-02-001.0-5574.07 ProfDev IR OKI Vehicle Mileage $83.00 $0.00 $83.00 $0.00

14(16)-02-001.0-5575.02 Professional Development Registrations $8,711.00 $8,554.94 $156.06 $7,742.40

14(16)-02-001.0-5575.04 Professional Development Memberships $1,040.00 $1,008.15 $31.85 $1,260.00

14(16)-02-001.0-5585.00 Agency Memberships $2,894.00 $2,821.50 $72.50 $3,014.00

14(16)-02-001.0-5590.00 Professional Publicatons $1,093.00 $547.20 $545.80 $530.00

14(16)-02-001.0-6125.00 Professional Services - Other $48,000.00 $44,992.50 $3,007.50 $48,000.00

14(16)-02-001.0-6210.00 Outside Printing & Graphics $1,343.00 $882.30 $460.70 $900.00

14(16)-02-001.0-6350.00 Payroll/Data Processing Services $7,081.00 $7,005.86 $75.14 $7,672.24

14(16)-02-001.0-7110.00 Materials and Supplies $7,231.00 $7,668.71 ($437.71) $7,028.16

14(16)-02-001.0-7110.01 Supplies - Office Equipment $1,151.00 $2,136.57 ($985.57) $1,685.44

14(16)-02-001.0-7110.02 Supplies - Furniture & Fixture $1,300.00 $623.29 $676.71 $769.01

14(16)-02-001.0-7110.03 Supplies - Computers & Software $30,103.00 $15,302.91 $14,800.09 $26,150.00

14(16)-02-001.0-7110.04 Supplies - Computers & Software $0.00 $0.00 $0.00 $5,220.00

14(16)-02-001.0-7151.00 Occupancy & Storage $455,761.00 $461,297.39 ($5,536.39) $456,492.36

14(16)-02-001.0-7153.00 Telephone - Line chgs and LD $7,270.00 $7,090.75 $179.25 $7,350.34

14(16)-02-001.0-7157.00 Internet Expenses $11,773.00 $11,760.00 $13.00 $12,330.00

14(16)-02-001.0-7159.00 Website Management $0.00 $184.95 ($184.95) $475.00

14(16)-02-001.0-7210.00 Postage and Shipping $2,317.00 $1,679.00 $638.00 $1,856.41

14(16)-02-001.0-7250.00 Equip Repairs, Maint & Lease $18,737.00 $17,932.10 $804.90 $21,680.00

14(16)-02-001.0-7310.00 Legal $24,550.00 $17,067.90 $7,482.10 $22,000.00

14(16)-02-001.0-7312.00 Auditing Fees $29,210.00 $23,158.50 $6,051.50 $24,450.00

14(16)-02-001.0-7350.00 Insurance $22,956.00 $23,491.08 ($535.08) $23,802.44

14(16)-02-001.0-7410.00 Meetings and Hearings $470.00 $906.00 ($436.00) $840.00

14(16)-02-001.0-7450.00 Depreciation $19,891.00 $16,018.07 $3,872.93 $24,959.26

14(16)-02-001.0-7510.00 Legal Notices $2,120.00 $749.00 $1,371.00 $450.00

14(16)-02-001.0-7520.00 Retirement Plan Expenses $3,500.00 $2,493.62 $1,006.38 $3,950.00

14(16)-02-001.0-7525.00 Employee Benefit Plan Fees $500.00 $150.00 $350.00 $500.00

14(16)-02-001.0-7651.00 In-house Reproduction $1,144.00 $1,666.02 ($522.02) $1,605.08

14(16)-02-001.0-7653.00 Other Unclassified $2,532.00 $2,890.33 ($358.33) $2,928.02

14(16)-02-001.0-7655.00 Indirect Expense Reimbursement $0.00 $0.00 $0.00

Prior Year Rate Adjustment $0.00

TOTAL INDIRECT COSTS - NON-LABOR $736,278.00 $701,822.63 $34,455.37 $741,654.85

OKI FY17 Overhead Schedule - provisional DL Method - submitted 2-25-16 B - 3 DATE PRINTED: 2/25/2016

Page 84: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

Page 4 of 4

ESTIMATED ACTUAL VARIANCE ESTIMATED

FY 2015 FY 2015 (OVER BUDGET) FY 2017

UNDER BUDGET

OHIO-KENTUCKY-INDIANA REGIONAL COUNCIL OF GOVERNMENTS

SCHEDULE OF DIRECT LABOR, FRINGE BENEFITS, AND GENERAL OVERHEAD

July 1, 2014 - June 30, 2015

FRINGE BENEFIT COST RATE CALCULATION

TOTAL FRINGE BENEFITS A $1,553,421 $1,471,636 $1,564,280

TOTAL EMPLOYEE WAGES B $2,068,814 $2,018,881 $2,114,019

FRINGE BENEFIT COST RATE 75.09% 72.89% A ÷ B 74.00%

FRINGE BENEFIT COST RECOVERY COMPARISON

Should have recovered in fiscal year + $1,016,497 Actual DL * Actual Fringe Rate

Amount actually recovered in fiscal year - $1,047,091 Actual DL * Estimated Fringe Rate

Prior Year Net (Over) / Under Recovery + $0

Prior Year (Over) / Under Recovery Posted to Cost Center - $0

(Over) / Under Recovery of Fringe Benefits = ($30,594)

FRINGE BENEFITS COST DISTRIBUTION

INDIRECT LABOR FRINGE BENEFITS $471,716 $455,139 $469,366

DIRECT LABOR FRINGE BENEFITS $1,081,705 $1,016,497 $1,094,915

TOTAL FRINGE BENEFITS $1,553,421 $1,471,636 $1,564,280

INDIRECT COST RATE CALCULATION

INDIRECT LABOR $628,222 $624,387 $634,316

INDIRECT FRINGE BENEFITS $471,716 $455,139 $469,366

OTHER INDIRECT COSTS $736,278 $701,823 $741,655

TOTAL INDIRECT COSTS A $1,836,216 $1,781,349 $1,845,337

TOTAL DIRECT LABOR COSTS B $1,440,592 $1,394,493 $1,479,703

INDIRECT COST RATE 127.46% 127.74% A ÷ B 124.71%

INDIRECT COST RECOVERY COMPARISON

Should have recovered in fiscal year + $1,781,349 Actual DL * Actual Indirect Rate

Amount actually recovered in fiscal year - $1,777,458 Actual DL * Estimated Indirect Rate

Prior Year Net (Over) / Under Recovery + $0

Prior Year (Over) / Under Recovery Posted to Cost Center - $0

(Over) / Under Recovery of Indirect Costs = $3,891

SUMMARY

ESTIMATED ACTUAL ESTIMATED

FY 2015 FY 2015 FY 2017

FRINGE BENEFIT COST RATE 75.09% 72.89% 74.00%

INDIRECT COST RATE 127.46% 127.74% 124.71%

TOTAL OVERHEAD COST RATE 202.55% 200.64% 198.71%

FY 2015

FY 2015

OKI FY17 Overhead Schedule - provisional DL Method - submitted 2-25-16 B - 4 DATE PRINTED: 2/25/2016

Page 85: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and
Page 86: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and
Page 87: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

Ohio-Kentucky-Indiana Regional Council of Governmen tsFY2017 Unified Planning Work ProgramLabor Base for Fringe and Indirect Cost Allocation Plansby Funding Source and Cost Category

FEDERAL STATE FEDERAL FEDERAL FEDERAL LOCAL Toll Crs/OHIO OH/ODOT OHIO OHIO OHIO OHIO LOCAL

TOTAL FHWA/FTA FHWA FHWA FHWA EPA OHIOProject Project COST PROJECT OTHER OHIO CPG FTA STP CMAQ 604b Partner COUNTYCode Name CATEGORY COST FUNDS SHARE FUNDS FUNDS FUNDS FUNDS FUNDS FUNDS Match FUNDS

660110 601 (FED) % OF FUNDING 100 82.5123 80.0000 10.0000 10.0000

FY16 OH Short Range Direct Labor 5,910 4,876 3,901 488 488Carryover 74.00% Fringe Benefits 4,373 3,609 2,887 361 361FY17 KY 124.71% INDIRECT 7,371 6,082 4,865 608 608funds FY17 OTHER DIRECT 596 492 393 49 49

Rates TOTAL 18,250 15,058 12,047 1,506 1,506

FY17 Funding 95,460 78,766 63,013 7,877 7,877

760110 601 (FED) % OF FUNDING 100 82.5123 80.0000 10.0000 10.0000

FY17 Short Range Direct Labor 28,493 23,510 18,808 2,351 2,351funds 74.00% Fringe Benefits 21,084 17,397 13,917 1,740 1,740

124.71% INDIRECT 35,534 29,320 23,456 2,932 2,932FY17 OTHER DIRECT 2,769 2,285 1,828 228 228Rates TOTAL 87,879 72,511 58,009 7,251 7,251

FY17 Carrying into FY18 7.94% 7,581 6,255 5,004 626 626

660210 602 (FED) % OF FUNDING 100 82.5123 80.0000 10.0000 10.0000

FY16 OH TIP Direct Labor 7,260 5,990 4,792 599 599Carryover 74.00% Fringe Benefits 5,373 4,433 3,546 443 443FY17 KY 124.71% INDIRECT 9,054 7,471 5,977 747 747funds FY17 OTHER DIRECT 893 737 589 74 74

Rates TOTAL 22,580 18,631 14,905 1,863 1,863

FY17 Funding 118,125 97,468 77,974 9,747 9,747

760210 602 (FED) % OF FUNDING 100 82.5123 80.0000 10.0000 10.0000

FY17 TIP Direct Labor 35,950 29,663 23,731 2,966 2,966funds 74.00% Fringe Benefits 26,601 21,949 17,560 2,195 2,195

124.71% INDIRECT 44,833 36,993 29,594 3,699 3,699FY17 OTHER DIRECT 1,360 1,122 898 112 112Rates TOTAL 108,745 89,728 71,782 8,973 8,973

FY17 Carrying into FY18 7.94% 9,380 7,740 6,192 774 774

B - 7

Page 88: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

Ohio-Kentucky-Indiana Regional Council of Governmen tsFY2017 Unified Planning Work ProgramLabor Base for Fringe and Indirect Cost Allocation Plansby Funding Source and Cost Category

FEDERAL STATE FEDERAL FEDERAL FEDERAL LOCAL Toll Crs/OHIO OH/ODOT OHIO OHIO OHIO OHIO LOCAL

TOTAL FHWA/FTA FHWA FHWA FHWA EPA OHIOProject Project COST PROJECT OTHER OHIO CPG FTA STP CMAQ 604b Partner COUNTYCode Name CATEGORY COST FUNDS SHARE FUNDS FUNDS FUNDS FUNDS FUNDS FUNDS Match FUNDS

660510 605 (FED) % OF FUNDING 100 82.5123 80.0000 10.0000 10.0000

FY16 OH Surveillance Direct Labor 91,057 75,133 60,107 7,513 7,513Carryover 74.00% Fringe Benefits 67,380 55,597 44,478 5,560 5,560FY17 KY 124.71% INDIRECT 113,559 93,700 74,960 9,370 9,370funds FY17 OTHER DIRECT 73,273 60,459 48,367 6,046 6,046

Rates TOTAL 345,269 284,890 227,912 28,489 28,489

FY17 Funding 1,754,573 1,447,739 1,158,191 144,774 144,774

760510 605 (FED) % OF FUNDING 100 82.5123 80.0000 10.0000 10.0000

FY17 Surveillance Direct Labor 432,832 357,140 285,712 35,714 35,714funds 74.00% Fringe Benefits 320,276 264,268 211,414 26,427 26,427

124.71% INDIRECT 539,784 445,389 356,311 44,539 44,539FY17 OTHER DIRECT 318,782 263,034 210,427 26,303 26,303Rates TOTAL 1,611,675 1,329,830 1,063,864 132,983 132,983

FY17 Carrying into FY18 8.14% 142,898 117,908 94,327 11,791 11,791

661010 610 (FED) % OF FUNDING 100 82.5123 80.0000 10.0000 10.0000

FY15 OH Long Range Direct Labor 58,051 47,899 38,319 4,790 4,790Carryover 74.00% Fringe Benefits 42,957 35,445 28,356 3,544 3,544FY17 KY 124.71% INDIRECT 72,397 59,736 47,789 5,974 5,974funds FY17 OTHER DIRECT 2,395 1,976 1,581 198 198

Rates TOTAL 175,800 145,056 116,045 14,506 14,506

FY17 Funding 919,425 758,639 606,911 75,864 75,864

761010 610 (FED) % OF FUNDING 100 82.5123 80.0000 10.0000 10.0000

FY17 Long Range Direct Labor 276,008 227,741 182,192 22,774 22,774funds 74.00% Fringe Benefits 204,234 168,518 134,814 16,852 16,852

124.71% INDIRECT 344,209 284,015 227,212 28,402 28,402FY17 OTHER DIRECT 21,912 18,080 14,464 1,808 1,808Rates TOTAL 846,363 698,354 558,683 69,835 69,835

FY17 Carrying into FY18 7.95% 73,062 60,285 48,228 6,029 6,029

B - 8

Page 89: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

Ohio-Kentucky-Indiana Regional Council of Governmen tsFY2017 Unified Planning Work ProgramLabor Base for Fringe and Indirect Cost Allocation Plansby Funding Source and Cost Category

FEDERAL STATE FEDERAL FEDERAL FEDERAL LOCAL Toll Crs/OHIO OH/ODOT OHIO OHIO OHIO OHIO LOCAL

TOTAL FHWA/FTA FHWA FHWA FHWA EPA OHIOProject Project COST PROJECT OTHER OHIO CPG FTA STP CMAQ 604b Partner COUNTYCode Name CATEGORY COST FUNDS SHARE FUNDS FUNDS FUNDS FUNDS FUNDS FUNDS Match FUNDS

662520 625 (FED) % OF FUNDING 100 82.5123 80.0000 10.0000 10.0000

FY16 OH Participation Plan Direct Labor 19,241 15,876 12,701 1,588 1,588Carryover 74.00% Fringe Benefits 14,238 11,748 9,398 1,175 1,175FY17 KY 124.71% INDIRECT 23,995 19,799 15,839 1,980 1,980funds FY17 OTHER DIRECT 2,406 1,985 1,588 199 199

Rates TOTAL 59,880 49,408 39,527 4,941 4,941

FY17 Funding 313,250 258,470 206,776 25,847 25,847

762520 625 (FED) % OF FUNDING 100 82.5123 80.0000 10.0000 10.0000

FY17 Participation Plan Direct Labor 95,788 79,037 63,230 7,904 7,904funds 74.00% Fringe Benefits 70,879 58,484 46,787 5,848 5,848

124.71% INDIRECT 119,457 98,567 78,853 9,857 9,857FY17 OTHER DIRECT 2,252 1,858 1,487 186 186Rates TOTAL 288,376 237,946 190,357 23,795 23,795

FY17 Carrying into FY18 7.94% 24,874 20,524 16,419 2,052 2,052

FY17 Funding 135,831

768630 686 (FED) % OF FUNDING 100 0.0000

FY17 KY KY Excl Trans Plan Direct Labor 27,616 0funds 74.00% Fringe Benefits 20,435 0

124.71% INDIRECT 34,440 0FY17 OTHER DIRECT 2,499Rates TOTAL 84,990 0

FY17 Unspent Balance 37.43% 50,841 0 0 0 0

669510 695 (FED) % OF FUNDING 100 82.5123 80.0000 10.0000 10.0000

FY16 OH UPWP Admin. Direct Labor 1,465 1,209 967 121 121Carryover 74.00% Fringe Benefits 1,083 894 715 89 89FY17 KY 124.71% INDIRECT 1,827 1,507 1,206 151 151funds FY17 OTHER DIRECT 75 62 50 6 6

Rates TOTAL 4,450 3,672 2,937 367 367

B - 9

Page 90: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

Ohio-Kentucky-Indiana Regional Council of Governmen tsFY2017 Unified Planning Work ProgramLabor Base for Fringe and Indirect Cost Allocation Plansby Funding Source and Cost Category

FEDERAL STATE FEDERAL FEDERAL FEDERAL LOCAL Toll Crs/OHIO OH/ODOT OHIO OHIO OHIO OHIO LOCAL

TOTAL FHWA/FTA FHWA FHWA FHWA EPA OHIOProject Project COST PROJECT OTHER OHIO CPG FTA STP CMAQ 604b Partner COUNTYCode Name CATEGORY COST FUNDS SHARE FUNDS FUNDS FUNDS FUNDS FUNDS FUNDS Match FUNDS

FY17 Funding 23,250 19,184 15,347 1,918 1,918

769510 695 (FED) % OF FUNDING 100 82.5123 80.0000 10.0000 10.0000

FY17 UPWP Admin. Direct Labor 7,088 5,848 4,679 585 585funds 74.00% Fringe Benefits 5,245 4,328 3,462 433 433

124.71% INDIRECT 8,839 7,294 5,835 729 729FY17 OTHER DIRECT 225 186 149 19 19Rates TOTAL 21,397 17,655 14,124 1,766 1,766

FY17 Carrying into FY18 7.97% 1,853 1,529 1,223 153 153

669710 697 (FED) % OF FUNDING 100 82.5123 80.0000 10.0000 10.0000

FY16 OH Trans Prgrm Reptg Direct Labor 1,053 869 695 87 87Carryover 74.00% Fringe Benefits 779 643 514 64 64FY17 KY 124.71% INDIRECT 1,313 1,084 867 108 108funds FY17 OTHER DIRECT 5 4 3 0 0

Rates TOTAL 3,150 2,600 2,080 260 260

FY17 Funding 16,470 13,590 10,872 1,359 1,359

769710 697 (FED) % OF FUNDING 100 82.5123 80.0000 10.0000 10.0000

FY17 Trans Prgrm Reptg Direct Labor 5,070 4,183 3,347 418 418funds 74.00% Fringe Benefits 3,752 3,096 2,476 310 310

124.71% INDIRECT 6,323 5,217 4,174 522 522FY17 OTHER DIRECT 15 12 10 1 1Rates TOTAL 15,159 12,508 10,007 1,251 1,251

FY17 Carrying into FY18 7.96% 1,311 1,081 865 108 108

672010 720 (FED) % OF FUNDING 100 82.5123 80.0000 10.0000 10.0000

FY16 OH Mobile Srce Emissions Direct Labor 5,268 4,347 3,477 435 435Carryover 74.00% Fringe Benefits 3,899 3,217 2,574 322 322FY17 KY 124.71% INDIRECT 6,570 5,421 4,337 542 542funds FY17 OTHER DIRECT 63 52 42 5 5

Rates TOTAL 15,800 13,037 10,430 1,304 1,304

B - 10

Page 91: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

Ohio-Kentucky-Indiana Regional Council of Governmen tsFY2017 Unified Planning Work ProgramLabor Base for Fringe and Indirect Cost Allocation Plansby Funding Source and Cost Category

FEDERAL STATE FEDERAL FEDERAL FEDERAL LOCAL Toll Crs/OHIO OH/ODOT OHIO OHIO OHIO OHIO LOCAL

TOTAL FHWA/FTA FHWA FHWA FHWA EPA OHIOProject Project COST PROJECT OTHER OHIO CPG FTA STP CMAQ 604b Partner COUNTYCode Name CATEGORY COST FUNDS SHARE FUNDS FUNDS FUNDS FUNDS FUNDS FUNDS Match FUNDS

FY17 Funding 82,660 68,205 54,564 6,820 6,820

772010 720 (FED) % OF FUNDING 100 82.5123 80.0000 10.0000 10.0000

FY17 Mobile Srce Emissions Direct Labor 25,413 20,969 16,775 2,097 2,097funds 74.00% Fringe Benefits 18,804 15,516 12,413 1,552 1,552

124.71% INDIRECT 31,693 26,150 20,920 2,615 2,615FY17 OTHER DIRECT 188 155 124 16 16Rates TOTAL 76,098 62,790 50,232 6,279 6,279

FY17 Carrying into FY18 7.94% 6,562 5,414 4,332 541 541

FY10&11 Funds carried into FY17 82,501 82,501 82,501

267410 674 (FED) % OF FUNDING 100 100.0000 100.0000

FY12 JARC Direct Labor 24,352 24,352 24,352Carryover 74.00% Fringe Benefits 18,019 18,019 18,019

124.71% INDIRECT 30,369 30,369 30,369FY17 OTHER DIRECT 300 300 300Rates TOTAL 73,041 73,041 73,041

FY12 Carrying into FY18 11.47% 9,460 9,460 9,460

FY13 Funds carried into FY17 20,904 20,904 20,904

367420 674 (FED) % OF FUNDING 100 100.0000 100.0000

FY13 New Freedom Direct Labor 6,898 6,898 6,898Carryover 74.00% Fringe Benefits 5,104 5,104 5,104

124.71% INDIRECT 8,602 8,602 8,602FY17 OTHER DIRECT 300 300 300Rates TOTAL 20,904 20,904 20,904

FY13 Carrying into FY18 0.00% (0) (0) (0)

FY15 funds carried into FY17 248,696 248,696 248,696

567430 674 (FED) % OF FUNDING 100 100.0000 100.0000

FY15 FTA 5310 Transit Direct Labor 6,952 6,952 6,952funds 74.00% Fringe Benefits 5,144 5,144 5,144

124.71% INDIRECT 8,670 8,670 8,670FY17 OTHER DIRECT 18,000 18,000 18,000Rates TOTAL 38,766 38,766 38,766

FY17 Carrying into FY18 84.41% 209,930 209,930 209,930

B - 11

Page 92: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

Ohio-Kentucky-Indiana Regional Council of Governmen tsFY2017 Unified Planning Work ProgramLabor Base for Fringe and Indirect Cost Allocation Plansby Funding Source and Cost Category

FEDERAL STATE FEDERAL FEDERAL FEDERAL LOCAL Toll Crs/OHIO OH/ODOT OHIO OHIO OHIO OHIO LOCAL

TOTAL FHWA/FTA FHWA FHWA FHWA EPA OHIOProject Project COST PROJECT OTHER OHIO CPG FTA STP CMAQ 604b Partner COUNTYCode Name CATEGORY COST FUNDS SHARE FUNDS FUNDS FUNDS FUNDS FUNDS FUNDS Match FUNDS

FY17 Funding 31,250 0

768510 685 (FED) % OF FUNDING 100 0.0000

FY17 INDOT PL Direct Labor 9,909funds 74.00% Fringe Benefits 7,333

124.71% INDIRECT 12,358FY17 OTHER DIRECT 1,650Rates TOTAL 31,250

FY17 Unspent Balance 0.00% 0 0

Carryover Sub-Total % OF FUNDING 100 82.5123 80.0000 10.0000 10.0000

FY16 OH CPG (PL/FTA) Direct Labor 227,507 0 194,402 124,960 15,620 38,202 0 0 0 0 15,620Carryover 74.00% Fringe Benefits 168,349 0 143,852 92,468 11,558 28,268 0 0 0 0 11,558FY17 KY 124.71% INDIRECT 283,728 0 242,442 155,840 19,480 47,641 0 0 0 0 19,480funds FY17 OTHER DIRECT 98,306 0 84,367 52,614 6,577 18,600 0 0 0 0 6,577

Rates TOTAL 777,890 0 665,063 425,882 53,235 132,711 0 0 0 0 53,235

FY17 Funding Sub-Total % OF FUNDING 100 82.5123 80.0000 10.0000 10.0000

FY17 CPG (PL/FTA) Direct Labor 944,167 0 748,091 598,473 74,809 0 0 0 0 0 74,809funds 74.00% Fringe Benefits 698,642 0 553,554 442,843 55,355 0 0 0 0 0 55,355

124.71% INDIRECT 1,177,471 0 932,944 746,355 93,294 0 0 0 0 0 93,294FY17 OTHER DIRECT 351,652 0 286,733 229,386 28,673 0 0 0 0 0 28,673Rates TOTAL 3,171,932 0 2,521,322 2,017,058 252,132 0 0 0 0 0 252,132

Carrying into FY18 Sub-Total 537,752 0 440,127 176,590 22,074 219,390 0 0 0 0 22,074

Grand Total % OF FUNDING 100 84.3811 80.0000 10.0000 100.0000 10.0000

CPG (PL/FTA) Direct Labor 1,171,674 0 942,493 723,433 90,429 38,202 0 0 0 0 90,42974.00% Fringe Benefits 866,992 0 697,407 535,311 66,914 28,268 0 0 0 0 66,914

124.71% INDIRECT 1,461,199 0 1,175,386 902,196 112,774 47,641 0 0 0 0 112,774FY17 OTHER DIRECT 449,958 0 371,100 282,000 35,250 18,600 0 0 0 0 35,250Rates TOTAL 3,949,822 0 3,186,386 2,442,940 305,367 132,711 0 0 0 0 305,367

B - 12

Page 93: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

Ohio-Kentucky-Indiana Regional Council of Governmen tsFY2017 Unified Planning Work ProgramLabor Base for Fringe and Indirect Cost Allocation Plansby Funding Source and Cost Category

FEDERAL STATE FEDERAL FEDERAL FEDERAL LOCAL Toll Crs/OHIO OH/ODOT OHIO OHIO OHIO OHIO LOCAL

TOTAL FHWA/FTA FHWA FHWA FHWA EPA OHIOProject Project COST PROJECT OTHER OHIO CPG FTA STP CMAQ 604b Partner COUNTYCode Name CATEGORY COST FUNDS SHARE FUNDS FUNDS FUNDS FUNDS FUNDS FUNDS Match FUNDS

FY17 Funding 62,500

768520 685 (FED) % OF FUNDING 100

FY17 INDOT STBGP Direct Labor 20,786funds 74.00% Fringe Benefits 15,381

124.71% INDIRECT 25,922FY17 OTHER DIRECT 411Rates TOTAL 62,500

FY17 Unspent Balance 0.00% 0

FY17 Funding 354,535 292,535 292,535 73,134100.0000 Toll Credits

761040 610 (FED) % OF FUNDING 100 82.5123 80.0000 20.0000

FY17 Land Use Direct Labor 110,584 91,245 91,245funds 74.00% Fringe Benefits 81,827 67,518 67,518

124.71% INDIRECT 137,909 113,792 113,792FY17 OTHER DIRECT 15,553 12,833 12,833Rates Sub-Total 345,873 285,388 0 0 285,388 0

Toll Credits 71,347 71,347 71,347TOTAL 417,221 356,735 285,388 71,347

FY17 Unspent Balance 2.44% 8,662 7,147 7,147 1,787

FY17 Funding 105,789 87,289 87,289 21,822100.0000 Toll Credits

761050 610 (FED) % OF FUNDING 100 82.5123 80.0000 20.0000

FY17 Fiscal Impact Anlys Direct Labor 21,509 17,748 17,748funds 74.00% Fringe Benefits 15,916 13,132 13,132

124.71% INDIRECT 26,824 22,133 22,133FY17 OTHER DIRECT 500 413 413Rates TOTAL 64,749 53,426 0 0 53,426 0

Toll Credits 13,356 13,356 13,356TOTAL 78,105 66,782 53,426 13,356

FY17 Unspent Balance 38.79% 41,040 33,863 33,863 21,822

B - 13

Page 94: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

Ohio-Kentucky-Indiana Regional Council of Governmen tsFY2017 Unified Planning Work ProgramLabor Base for Fringe and Indirect Cost Allocation Plansby Funding Source and Cost Category

FEDERAL STATE FEDERAL FEDERAL FEDERAL LOCAL Toll Crs/OHIO OH/ODOT OHIO OHIO OHIO OHIO LOCAL

TOTAL FHWA/FTA FHWA FHWA FHWA EPA OHIOProject Project COST PROJECT OTHER OHIO CPG FTA STP CMAQ 604b Partner COUNTYCode Name CATEGORY COST FUNDS SHARE FUNDS FUNDS FUNDS FUNDS FUNDS FUNDS Match FUNDS

FY17 Funding Sub-Total% OF FUNDING 100 82.5123 80.0000 20.0000 20.0000

FY17 STBGP/SNK Direct Labor 152,879 108,993 0 0 0 108,993 0 0 0 0funds 74.00% Fringe Benefits 113,124 80,650 0 0 0 80,650 0 0 0 0

124.71% INDIRECT 190,655 135,925 0 0 0 135,925 0 0 0 0FY17 OTHER DIRECT 16,464 13,246 0 0 0 13,246 0 0 0 0Rates Sub-Total 473,122 338,814 0 0 0 338,814 0 0 0 0

Toll Credits 84,703 84,703 84,703TOTAL 557,825 423,517 84,703

FY17 Unspent Balance 49,702 41,010 0 0 0 41,010 0 0 0 23,609

Grand Total % OF FUNDING 100 82.5123 80.0000 20.0000 TC/20

STP/SNK Direct Labor 152,879 108,993 0 0 0 108,993 0 0 0 074.00% Fringe Benefits 113,124 80,650 0 0 0 80,650 0 0 0 0

124.71% INDIRECT 190,655 135,925 0 0 0 135,925 0 0 0 0FY17 OTHER DIRECT 16,464 13,246 0 0 0 13,246 0 0 0 0Rates Sub-Total 473,122 338,814 0 0 0 338,814 0 0 0 0

Toll Credits 84,703 84,703 84,703TOTAL 557,825 423,517 84,703

FY17 Funding 343,098 283,098 283,098 70,775100.0000 Toll Credits

766540 665 (FED) % OF FUNDING 100 82.5123 80.0000 20.0000

FY17 Ozone Direct Labor 8,925 7,364 7,364funds 74.00% Fringe Benefits 6,604 5,449 5,449

124.71% INDIRECT 11,130 9,184 9,184FY17 Contributed Svs 9,971 n/aRates OTHER DIRECT 201,399 166,179 166,179

Sub-Total 238,029 188,176 188,176Toll Credits 47,044 47,044 47,044TOTAL 285,073 235,220 188,176 47,044

FY7 Unspent Balance 33.53% 115,040 94,922 94,922 23,730

B - 14

Page 95: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

Ohio-Kentucky-Indiana Regional Council of Governmen tsFY2017 Unified Planning Work ProgramLabor Base for Fringe and Indirect Cost Allocation Plansby Funding Source and Cost Category

FEDERAL STATE FEDERAL FEDERAL FEDERAL LOCAL Toll Crs/OHIO OH/ODOT OHIO OHIO OHIO OHIO LOCAL

TOTAL FHWA/FTA FHWA FHWA FHWA EPA OHIOProject Project COST PROJECT OTHER OHIO CPG FTA STP CMAQ 604b Partner COUNTYCode Name CATEGORY COST FUNDS SHARE FUNDS FUNDS FUNDS FUNDS FUNDS FUNDS Match FUNDS

FY17 Funding 257,324 212,324 212,324

766710 667 (FED) % OF FUNDING 100 82.5123 100.0000

FY17 Rideshare Direct Labor 13,974 11,530 11,530funds 74.00% Fringe Benefits 10,340 8,532 8,532

124.71% INDIRECT 17,427 14,379 14,379FY17 Contributed Svs 8,272 n/aRates OTHER DIRECT 147,472 121,683 121,683

TOTAL 197,485 156,124 156,124

FY17 Unspent Balance 26.47% 68,111 56,200 56,200

FY16 Funds carried into FY17 42,686 42,686 42,686

668440 684 (FED) % OF FUNDING 100 100.0000 100.0000

FY16 OH OH Excl - RTPO Direct Labor 5,768 5,768 5,768carryover 74.00% Fringe Benefits 4,268 4,268 4,268

124.71% INDIRECT 7,192 7,192 7,192FY17 OTHER DIRECT 0 0 0Rates TOTAL 17,229 17,229 17,229

FY17 Carrying into FY18 59.64% 25,457 25,457 25,457

FY17 Funding 59,117 59,117 56,867 2,250

771060 710 (FED) % OF FUNDING 100 100.0000 100.0000 0.0000

FY17 604b Water Direct Labor 19,037 19,037 19,037 0funds 74.00% Fringe Benefits 14,088 14,088 14,088 0

124.71% INDIRECT 23,742 23,742 23,742 0FY17 OTHER DIRECT 2,250 2,250 2,250Rates TOTAL 59,117 59,117 56,867 2,250

FY17 Unspent Balance 0.00% 0 0 0 0

B - 15

Page 96: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

Ohio-Kentucky-Indiana Regional Council of Governmen tsFY2017 Unified Planning Work ProgramLabor Base for Fringe and Indirect Cost Allocation Plansby Funding Source and Cost Category

FEDERAL STATE FEDERAL FEDERAL FEDERAL LOCAL Toll Crs/OHIO OH/ODOT OHIO OHIO OHIO OHIO LOCAL

TOTAL FHWA/FTA FHWA FHWA FHWA EPA OHIOProject Project COST PROJECT OTHER OHIO CPG FTA STP CMAQ 604b Partner COUNTYCode Name CATEGORY COST FUNDS SHARE FUNDS FUNDS FUNDS FUNDS FUNDS FUNDS Match FUNDS

FY17 Funding 75,550 75,550 75,000 550

771090 710 (FED) % OF FUNDING 100 100.0000 100.0000 0.0000

FY17 OH Gen Asmbly Water Direct Labor 25,108 25,108 25,108 074.00% Fringe Benefits 18,579 18,579 18,579 0

124.71% INDIRECT 31,313 31,313 31,313 0FY17 Contributed Svs 0 0 0 0Rates OTHER DIRECT 550 550 550

TOTAL 75,550 75,550 75,000 550

FY17 Unspent Balance 0.00% 0 0 0 0

FY16-17 Funding 231,589

650010 500 (FED) % OF FUNDING 100

FY16-17 Nat'l Urban Forestry Direct Labor 37,5312 year 74.00% Fringe Benefits 27,773funding 124.71% INDIRECT 46,806

FY17 Contributed Svs 52,430Rates OTHER DIRECT 67,049

TOTAL 231,589

FY16 Carrying into FY18 0.00% 0

771010 710 (LOCAL) % OF FUNDING 100

FY17 Local Water Direct Labor 18,244funds 74.00% Fringe Benefits 13,500

124.71% INDIRECT 22,753FY17 OTHER DIRECT 11,488Rates TOTAL 65,985

780010 800 (LOCAL) % OF FUNDING 100

FY17 Regional Planning Direct Labor 11,295funds 74.00% Fringe Benefits 8,358

124.71% INDIRECT 14,087FY17 OTHER DIRECT 808Rates TOTAL 34,548

B - 16

Page 97: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

Ohio-Kentucky-Indiana Regional Council of Governmen tsFY2017 Unified Planning Work ProgramLabor Base for Fringe and Indirect Cost Allocation Plansby Funding Source and Cost Category

FEDERAL STATE FEDERAL FEDERAL FEDERAL LOCAL Toll Crs/OHIO OH/ODOT OHIO OHIO OHIO OHIO LOCAL

TOTAL FHWA/FTA FHWA FHWA FHWA EPA OHIOProject Project COST PROJECT OTHER OHIO CPG FTA STP CMAQ 604b Partner COUNTYCode Name CATEGORY COST FUNDS SHARE FUNDS FUNDS FUNDS FUNDS FUNDS FUNDS Match FUNDS

790001 (LOCAL) % OF FUNDING 100

FY17 General & Admin. Direct Labor 15,268funds 74.00% Fringe Benefits 11,298

124.71% INDIRECT 19,041FY17 OTHER DIRECT 82,618Rates TOTAL 128,224

% OF FUNDING 100 100.0000

FY17 GRAND TOTALS Direct Labor 1,479,703 0 1,120,294 723,433 96,197 38,202 108,993 18,894 44,145 0 90,42974.00% Dir Labor Fringe Benefits1,094,923 0 828,972 535,311 71,182 28,268 80,650 13,981 32,667 0 66,914

124.71% INDIRECT 1,845,344 0 1,397,121 902,196 119,967 47,641 135,925 23,563 55,055 0 112,774FY17 Contributed Svs 70,673 0 0 0 0 0 0 0 0 0 0Rates OTHER DIRECT 980,056 0 675,007 282,000 35,250 18,600 13,246 287,861 0 0 38,050

TOTAL 5,470,699 0 4,021,395 2,442,940 322,596 132,711 338,814 344,300 131,866 0 308,167

B - 17

Page 98: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

Ohio-Kentucky-Indiana Regional Council of Governmen tsFY2017 Unified Planning Work ProgramLabor Base for Fringe and Indirect Cost Allocation Plansby Funding Source and Cost Category

TOTALProject Project COST PROJECT OTHERCode Name CATEGORY COST FUNDS

660110 601 (FED) % OF FUNDING 100

FY16 OH Short Range Direct Labor 5,910Carryover 74.00% Fringe Benefits 4,373FY17 KY 124.71% INDIRECT 7,371funds FY17 OTHER DIRECT 596

Rates TOTAL 18,250

FY17 Funding 95,460

760110 601 (FED) % OF FUNDING 100

FY17 Short Range Direct Labor 28,493funds 74.00% Fringe Benefits 21,084

124.71% INDIRECT 35,534FY17 OTHER DIRECT 2,769Rates TOTAL 87,879

FY17 Carrying into FY18 7.94% 7,581

660210 602 (FED) % OF FUNDING 100

FY16 OH TIP Direct Labor 7,260Carryover 74.00% Fringe Benefits 5,373FY17 KY 124.71% INDIRECT 9,054funds FY17 OTHER DIRECT 893

Rates TOTAL 22,580

FY17 Funding 118,125

760210 602 (FED) % OF FUNDING 100

FY17 TIP Direct Labor 35,950funds 74.00% Fringe Benefits 26,601

124.71% INDIRECT 44,833FY17 OTHER DIRECT 1,360Rates TOTAL 108,745

FY17 Carrying into FY18 7.94% 9,380

HHS LOCAL LOCAL LOCALKYTC Amer Public KY KY

FEDERAL KYTC FTA FHWA FHWA Health ContributedKENTUCKY KY - PL KY-ST KY-Fed KY-SNK CMAQ KY APA Services Partner COUNTY

SHARE FUNDS FUNDS FUNDS FUNDS FUNDS Pass Thru Match Match FUNDS

17.4877 61.4021 3.8376 18.5979 16.1624

1,034 635 40 192 167765 470 29 142 124

1,289 791 49 240 208104 64 4 19 17

3,192 1,960 122 594 516

16,694 10,250 641 3,105 2,698

17.4877 61.4021 3.8376 18.5979 16.1624

4,983 3,060 191 927 8053,687 2,264 141 686 5966,214 3,816 238 1,156 1,004

484 297 19 90 7815,368 9,436 590 2,858 2,484

1,326 814 51 247 214

17.4877 61.4021 3.8376 18.5979 16.1624

1,270 780 49 236 205940 577 36 175 152

1,583 972 61 294 256156 96 6 29 25

3,949 2,425 152 734 638

20,657 12,684 793 3,842 3,339

17.4877 61.4021 3.8376 18.5979 16.1624

6,287 3,860 241 1,169 1,0164,652 2,856 179 865 7527,840 4,814 301 1,458 1,267

238 146 9 44 3819,017 11,677 730 3,537 3,074

1,640 1,007 63 305 265

B - 18

Page 99: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

Ohio-Kentucky-Indiana Regional Council of Governmen tsFY2017 Unified Planning Work ProgramLabor Base for Fringe and Indirect Cost Allocation Plansby Funding Source and Cost Category

TOTALProject Project COST PROJECT OTHERCode Name CATEGORY COST FUNDS

660510 605 (FED) % OF FUNDING 100

FY16 OH Surveillance Direct Labor 91,057Carryover 74.00% Fringe Benefits 67,380FY17 KY 124.71% INDIRECT 113,559funds FY17 OTHER DIRECT 73,273

Rates TOTAL 345,269

FY17 Funding 1,754,573

760510 605 (FED) % OF FUNDING 100

FY17 Surveillance Direct Labor 432,832funds 74.00% Fringe Benefits 320,276

124.71% INDIRECT 539,784FY17 OTHER DIRECT 318,782Rates TOTAL 1,611,675

FY17 Carrying into FY18 8.14% 142,898

661010 610 (FED) % OF FUNDING 100

FY15 OH Long Range Direct Labor 58,051Carryover 74.00% Fringe Benefits 42,957FY17 KY 124.71% INDIRECT 72,397funds FY17 OTHER DIRECT 2,395

Rates TOTAL 175,800

FY17 Funding 919,425

761010 610 (FED) % OF FUNDING 100

FY17 Long Range Direct Labor 276,008funds 74.00% Fringe Benefits 204,234

124.71% INDIRECT 344,209FY17 OTHER DIRECT 21,912Rates TOTAL 846,363

FY17 Carrying into FY18 7.95% 73,062

HHS LOCAL LOCAL LOCALKYTC Amer Public KY KY

FEDERAL KYTC FTA FHWA FHWA Health ContributedKENTUCKY KY - PL KY-ST KY-Fed KY-SNK CMAQ KY APA Services Partner COUNTY

SHARE FUNDS FUNDS FUNDS FUNDS FUNDS Pass Thru Match Match FUNDS

17.4877 61.4021 3.8376 18.5979 16.1624

15,924 9,778 611 2,961 2,57411,783 7,235 452 2,191 1,90419,859 12,194 762 3,693 3,21012,814 7,868 492 2,383 2,07160,380 37,074 2,317 11,229 9,759

306,834 188,403 11,775 57,065 49,592

17.4877 61.4021 3.8376 18.5979 16.1624

75,692 46,477 2,905 14,077 12,23456,009 34,391 2,149 10,416 9,05294,396 57,961 3,623 17,556 15,25755,748 34,230 2,139 10,368 9,010

281,845 173,059 10,816 52,417 45,553

24,990 15,344 959 4,648 4,039

17.4877 61.4021 3.8376 18.5979 16.1624

10,152 6,233 390 1,888 1,6417,512 4,613 288 1,397 1,214

12,661 7,774 486 2,355 2,046419 257 16 78 68

30,743 18,877 1,180 5,718 4,969

160,786 98,726 6,170 29,903 25,987

17.4877 61.4021 3.8376 18.5979 16.1624

48,267 29,637 1,852 8,977 7,80135,716 21,930 1,371 6,642 5,77360,194 36,961 2,310 11,195 9,7293,832 2,353 147 713 619

148,009 90,881 5,680 27,527 23,922

12,777 7,845 490 2,376 2,065

B - 19

Page 100: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

Ohio-Kentucky-Indiana Regional Council of Governmen tsFY2017 Unified Planning Work ProgramLabor Base for Fringe and Indirect Cost Allocation Plansby Funding Source and Cost Category

TOTALProject Project COST PROJECT OTHERCode Name CATEGORY COST FUNDS

662520 625 (FED) % OF FUNDING 100

FY16 OH Participation Plan Direct Labor 19,241Carryover 74.00% Fringe Benefits 14,238FY17 KY 124.71% INDIRECT 23,995funds FY17 OTHER DIRECT 2,406

Rates TOTAL 59,880

FY17 Funding 313,250

762520 625 (FED) % OF FUNDING 100

FY17 Participation Plan Direct Labor 95,788funds 74.00% Fringe Benefits 70,879

124.71% INDIRECT 119,457FY17 OTHER DIRECT 2,252Rates TOTAL 288,376

FY17 Carrying into FY18 7.94% 24,874

FY17 Funding 135,831

768630 686 (FED) % OF FUNDING 100

FY17 KY KY Excl Trans Plan Direct Labor 27,616funds 74.00% Fringe Benefits 20,435

124.71% INDIRECT 34,440FY17 OTHER DIRECT 2,499Rates TOTAL 84,990

FY17 Unspent Balance 37.43% 50,841

669510 695 (FED) % OF FUNDING 100

FY16 OH UPWP Admin. Direct Labor 1,465Carryover 74.00% Fringe Benefits 1,083FY17 KY 124.71% INDIRECT 1,827funds FY17 OTHER DIRECT 75

Rates TOTAL 4,450

HHS LOCAL LOCAL LOCALKYTC Amer Public KY KY

FEDERAL KYTC FTA FHWA FHWA Health ContributedKENTUCKY KY - PL KY-ST KY-Fed KY-SNK CMAQ KY APA Services Partner COUNTY

SHARE FUNDS FUNDS FUNDS FUNDS FUNDS Pass Thru Match Match FUNDS

17.4877 61.4021 3.8376 18.5979 16.1624

3,365 2,066 129 626 5442,490 1,529 96 463 4024,196 2,577 161 780 678

421 258 16 78 6810,472 6,430 402 1,948 1,692

54,780 33,636 2,102 10,188 8,854

17.4877 61.4021 3.8376 18.5979 16.1624

16,751 10,286 643 3,115 2,70712,395 7,611 476 2,305 2,00320,890 12,827 802 3,885 3,376

394 242 15 73 6450,430 30,965 1,935 9,379 8,151

4,350 2,671 167 809 703

135,831 83,403 5,213 25,262 21,954

100.0000 61.4021 3.8376 18.5979 16.1624

27,616 16,957 1,060 5,136 4,46320,435 12,547 784 3,800 3,30334,440 21,147 1,322 6,405 5,5662,499 1,534 96 465 404

84,990 52,185 3,262 15,806 13,736

50,841 31,218 1,951 9,455 8,217

17.4877 61.4021 3.8376 18.5979 16.1624

256 157 10 48 41189 116 7 35 31319 196 12 59 5213 8 1 2 2

778 478 30 145 126

B - 20

Page 101: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

Ohio-Kentucky-Indiana Regional Council of Governmen tsFY2017 Unified Planning Work ProgramLabor Base for Fringe and Indirect Cost Allocation Plansby Funding Source and Cost Category

TOTALProject Project COST PROJECT OTHERCode Name CATEGORY COST FUNDS

FY17 Funding 23,250

769510 695 (FED) % OF FUNDING 100

FY17 UPWP Admin. Direct Labor 7,088funds 74.00% Fringe Benefits 5,245

124.71% INDIRECT 8,839FY17 OTHER DIRECT 225Rates TOTAL 21,397

FY17 Carrying into FY18 7.97% 1,853

669710 697 (FED) % OF FUNDING 100

FY16 OH Trans Prgrm Reptg Direct Labor 1,053Carryover 74.00% Fringe Benefits 779FY17 KY 124.71% INDIRECT 1,313funds FY17 OTHER DIRECT 5

Rates TOTAL 3,150

FY17 Funding 16,470

769710 697 (FED) % OF FUNDING 100

FY17 Trans Prgrm Reptg Direct Labor 5,070funds 74.00% Fringe Benefits 3,752

124.71% INDIRECT 6,323FY17 OTHER DIRECT 15Rates TOTAL 15,159

FY17 Carrying into FY18 7.96% 1,311

672010 720 (FED) % OF FUNDING 100

FY16 OH Mobile Srce Emissions Direct Labor 5,268Carryover 74.00% Fringe Benefits 3,899FY17 KY 124.71% INDIRECT 6,570funds FY17 OTHER DIRECT 63

Rates TOTAL 15,800

HHS LOCAL LOCAL LOCALKYTC Amer Public KY KY

FEDERAL KYTC FTA FHWA FHWA Health ContributedKENTUCKY KY - PL KY-ST KY-Fed KY-SNK CMAQ KY APA Services Partner COUNTY

SHARE FUNDS FUNDS FUNDS FUNDS FUNDS Pass Thru Match Match FUNDS

4,066 2,497 156 756 657

17.4877 61.4021 3.8376 18.5979 16.1624

1,240 761 48 231 200917 563 35 171 148

1,546 949 59 287 25039 24 2 7 6

3,742 2,298 144 696 605

324 199 12 60 52

17.4877 61.4021 3.8376 18.5979 16.1624

184 113 7 34 30136 84 5 25 22230 141 9 43 37

1 1 0 0 0551 338 21 102 89

2,880 1,769 111 536 466

17.4877 61.4021 3.8376 18.5979 16.1624

887 544 34 165 143656 403 25 122 106

1,106 679 42 206 1793 2 0 0 0

2,651 1,628 102 493 428

229 141 9 43 37

17.4877 61.4021 3.8376 18.5979 16.1624

921 566 35 171 149682 419 26 127 110

1,149 706 44 214 18611 7 0 2 2

2,763 1,697 106 514 447

B - 21

Page 102: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

Ohio-Kentucky-Indiana Regional Council of Governmen tsFY2017 Unified Planning Work ProgramLabor Base for Fringe and Indirect Cost Allocation Plansby Funding Source and Cost Category

TOTALProject Project COST PROJECT OTHERCode Name CATEGORY COST FUNDS

FY17 Funding 82,660

772010 720 (FED) % OF FUNDING 100

FY17 Mobile Srce Emissions Direct Labor 25,413funds 74.00% Fringe Benefits 18,804

124.71% INDIRECT 31,693FY17 OTHER DIRECT 188Rates TOTAL 76,098

FY17 Carrying into FY18 7.94% 6,562

FY10&11 Funds carried into FY17 82,501

267410 674 (FED) % OF FUNDING 100

FY12 JARC Direct Labor 24,352Carryover 74.00% Fringe Benefits 18,019

124.71% INDIRECT 30,369FY17 OTHER DIRECT 300Rates TOTAL 73,041

FY12 Carrying into FY18 11.47% 9,460

FY13 Funds carried into FY17 20,904

367420 674 (FED) % OF FUNDING 100

FY13 New Freedom Direct Labor 6,898Carryover 74.00% Fringe Benefits 5,104

124.71% INDIRECT 8,602FY17 OTHER DIRECT 300Rates TOTAL 20,904

FY13 Carrying into FY18 0.00% (0)

FY15 funds carried into FY17 248,696

567430 674 (FED) % OF FUNDING 100

FY15 FTA 5310 Transit Direct Labor 6,952funds 74.00% Fringe Benefits 5,144

124.71% INDIRECT 8,670FY17 OTHER DIRECT 18,000Rates TOTAL 38,766

FY17 Carrying into FY18 84.41% 209,930

HHS LOCAL LOCAL LOCALKYTC Amer Public KY KY

FEDERAL KYTC FTA FHWA FHWA Health ContributedKENTUCKY KY - PL KY-ST KY-Fed KY-SNK CMAQ KY APA Services Partner COUNTY

SHARE FUNDS FUNDS FUNDS FUNDS FUNDS Pass Thru Match Match FUNDS

14,455 8,876 555 2,688 2,336

17.4877 61.4021 3.8376 18.5979 16.1624

4,444 2,729 171 827 7183,288 2,019 126 612 5315,542 3,403 213 1,031 896

33 20 1 6 513,308 8,171 511 2,475 2,151

1,148 705 44 213 185

0.0000

0.0000

0.0000

B - 22

Page 103: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

Ohio-Kentucky-Indiana Regional Council of Governmen tsFY2017 Unified Planning Work ProgramLabor Base for Fringe and Indirect Cost Allocation Plansby Funding Source and Cost Category

TOTALProject Project COST PROJECT OTHERCode Name CATEGORY COST FUNDS

FY17 Funding 31,250

768510 685 (FED) % OF FUNDING 100

FY17 INDOT PL Direct Labor 9,909funds 74.00% Fringe Benefits 7,333

124.71% INDIRECT 12,358FY17 OTHER DIRECT 1,650Rates TOTAL 31,250

FY17 Unspent Balance 0.00% 0

Carryover Sub-Total % OF FUNDING 100

FY16 OH CPG (PL/FTA) Direct Labor 227,507 0Carryover 74.00% Fringe Benefits 168,349 0FY17 KY 124.71% INDIRECT 283,728 0funds FY17 OTHER DIRECT 98,306 0

Rates TOTAL 777,890 0

FY17 Funding Sub-Total % OF FUNDING 100

FY17 CPG (PL/FTA) Direct Labor 944,167 0funds 74.00% Fringe Benefits 698,642 0

124.71% INDIRECT 1,177,471 0FY17 OTHER DIRECT 351,652 0Rates TOTAL 3,171,932 0

Carrying into FY18 Sub-Total 537,752 0

Grand Total % OF FUNDING 100

CPG (PL/FTA) Direct Labor 1,171,674 074.00% Fringe Benefits 866,992 0

124.71% INDIRECT 1,461,199 0FY17 OTHER DIRECT 449,958 0Rates TOTAL 3,949,822 0

HHS LOCAL LOCAL LOCALKYTC Amer Public KY KY

FEDERAL KYTC FTA FHWA FHWA Health ContributedKENTUCKY KY - PL KY-ST KY-Fed KY-SNK CMAQ KY APA Services Partner COUNTY

SHARE FUNDS FUNDS FUNDS FUNDS FUNDS Pass Thru Match Match FUNDS

0.0000

17.4877 61.4021 3.8376 18.5979 16.1624

33,105 20,327 1,270 6,157 0 0 0 0 5,35124,497 15,042 940 4,556 0 0 0 0 3,95941,286 25,351 1,584 7,678 0 0 0 0 6,67313,939 8,559 535 2,592 0 0 0 0 2,253

112,827 69,278 4,330 20,983 0 0 0 0 18,236

17.4877 61.4021 3.8376 18.5979 16.1624

186,167 114,310 7,144 34,623 0 0 0 0 30,089137,755 84,585 5,286 25,620 0 0 0 0 22,265232,169 142,556 8,910 43,178 0 0 0 0 37,52463,269 38,849 2,428 11,767 0 0 0 0 10,226

619,360 380,300 23,769 115,188 0 0 0 0 100,103

97,625 59,944 3,746 18,156 0 0 0 0 15,778

15.6189 61.4077 3.8380 18.5923 16.1620

219,272 134,638 8,415 40,780 0 0 0 0 35,440162,252 99,626 6,227 30,176 0 0 0 0 26,224273,455 167,907 10,494 50,857 0 0 0 0 44,19777,208 47,407 2,963 14,359 0 0 0 0 12,479

732,187 449,578 28,098 136,171 0 0 0 0 118,339

B - 23

Page 104: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

Ohio-Kentucky-Indiana Regional Council of Governmen tsFY2017 Unified Planning Work ProgramLabor Base for Fringe and Indirect Cost Allocation Plansby Funding Source and Cost Category

TOTALProject Project COST PROJECT OTHERCode Name CATEGORY COST FUNDS

FY17 Funding 62,500

768520 685 (FED) % OF FUNDING 100

FY17 INDOT STBGP Direct Labor 20,786funds 74.00% Fringe Benefits 15,381

124.71% INDIRECT 25,922FY17 OTHER DIRECT 411Rates TOTAL 62,500

FY17 Unspent Balance 0.00% 0

FY17 Funding 354,535

761040 610 (FED) % OF FUNDING 100

FY17 Land Use Direct Labor 110,584funds 74.00% Fringe Benefits 81,827

124.71% INDIRECT 137,909FY17 OTHER DIRECT 15,553Rates Sub-Total 345,873

Toll Credits 71,347TOTAL 417,221

FY17 Unspent Balance 2.44% 8,662

FY17 Funding 105,789

761050 610 (FED) % OF FUNDING 100

FY17 Fiscal Impact Anlys Direct Labor 21,509funds 74.00% Fringe Benefits 15,916

124.71% INDIRECT 26,824FY17 OTHER DIRECT 500Rates TOTAL 64,749

Toll Credits 13,356TOTAL 78,105

FY17 Unspent Balance 38.79% 41,040

HHS LOCAL LOCAL LOCALKYTC Amer Public KY KY

FEDERAL KYTC FTA FHWA FHWA Health ContributedKENTUCKY KY - PL KY-ST KY-Fed KY-SNK CMAQ KY APA Services Partner COUNTY

SHARE FUNDS FUNDS FUNDS FUNDS FUNDS Pass Thru Match Match FUNDS

0.0000

62,000 49,600 12,400

17.4877 80.0000 20.0000

19,339 15,471 3,86814,310 11,448 2,86224,117 19,294 4,8232,720 2,176 544

60,485 48,388 12,097

1,515 1,212 303

18,500 14,800 3,700

17.4877 80.0000 20.0000

3,761 3,009 7522,783 2,227 5574,691 3,753 938

87 70 1711,323 9,058 2,265

7,177 5,742 1,435

B - 24

Page 105: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

Ohio-Kentucky-Indiana Regional Council of Governmen tsFY2017 Unified Planning Work ProgramLabor Base for Fringe and Indirect Cost Allocation Plansby Funding Source and Cost Category

TOTALProject Project COST PROJECT OTHERCode Name CATEGORY COST FUNDS

FY17 Funding Sub-Total% OF FUNDING 100

FY17 STBGP/SNK Direct Labor 152,879funds 74.00% Fringe Benefits 113,124

124.71% INDIRECT 190,655FY17 OTHER DIRECT 16,464Rates Sub-Total 473,122

Toll Credits 84,703TOTAL 557,825

FY17 Unspent Balance 49,702

Grand Total % OF FUNDING 100

STP/SNK Direct Labor 152,87974.00% Fringe Benefits 113,124

124.71% INDIRECT 190,655FY17 OTHER DIRECT 16,464Rates Sub-Total 473,122

Toll Credits 84,703TOTAL 557,825

FY17 Funding 343,098

766540 665 (FED) % OF FUNDING 100

FY17 Ozone Direct Labor 8,925funds 74.00% Fringe Benefits 6,604

124.71% INDIRECT 11,130FY17 Contributed Svs 9,971Rates OTHER DIRECT 201,399

Sub-Total 238,029Toll Credits 47,044TOTAL 285,073

FY7 Unspent Balance 33.53% 115,040

HHS LOCAL LOCAL LOCALKYTC Amer Public KY KY

FEDERAL KYTC FTA FHWA FHWA Health ContributedKENTUCKY KY - PL KY-ST KY-Fed KY-SNK CMAQ KY APA Services Partner COUNTY

SHARE FUNDS FUNDS FUNDS FUNDS FUNDS Pass Thru Match Match FUNDS

17.4877 80.0000 20.0000 20.0000

23,100 0 0 0 18,480 0 0 752 3,86817,093 0 0 0 13,674 0 0 557 2,86228,808 0 0 0 23,046 0 0 938 4,8232,807 0 0 0 2,246 0 0 17 544

71,808 0 0 0 57,447 0 0 2,265 12,097

8,692 0 0 0 6,953 0 0 1,435 303

17.4877 80.0000 20.0000 20.0000

23,100 0 0 0 18,480 0 0 752 3,86817,093 0 0 0 13,674 0 0 557 2,86228,808 0 0 0 23,046 0 0 938 4,8232,807 0 0 0 2,246 0 0 17 544

71,808 0 0 0 57,447 0 0 2,265 12,097

60,000 60,000 15,000

17.4877 80.0000 80.0000 20.0000 0.0000

1,561 1,5611,155 1,1551,946 1,9469,971 9,971

35,220 35,22049,853 39,882 0 9,971 0

20,118 20,118 0 5,029 0

B - 25

Page 106: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

Ohio-Kentucky-Indiana Regional Council of Governmen tsFY2017 Unified Planning Work ProgramLabor Base for Fringe and Indirect Cost Allocation Plansby Funding Source and Cost Category

TOTALProject Project COST PROJECT OTHERCode Name CATEGORY COST FUNDS

FY17 Funding 257,324

766710 667 (FED) % OF FUNDING 100

FY17 Rideshare Direct Labor 13,974funds 74.00% Fringe Benefits 10,340

124.71% INDIRECT 17,427FY17 Contributed Svs 8,272Rates OTHER DIRECT 147,472

TOTAL 197,485

FY17 Unspent Balance 26.47% 68,111

FY16 Funds carried into FY17 42,686

668440 684 (FED) % OF FUNDING 100

FY16 OH OH Excl - RTPO Direct Labor 5,768carryover 74.00% Fringe Benefits 4,268

124.71% INDIRECT 7,192FY17 OTHER DIRECT 0Rates TOTAL 17,229

FY17 Carrying into FY18 59.64% 25,457

FY17 Funding 59,117

771060 710 (FED) % OF FUNDING 100

FY17 604b Water Direct Labor 19,037funds 74.00% Fringe Benefits 14,088

124.71% INDIRECT 23,742FY17 OTHER DIRECT 2,250Rates TOTAL 59,117

FY17 Unspent Balance 0.00% 0

HHS LOCAL LOCAL LOCALKYTC Amer Public KY KY

FEDERAL KYTC FTA FHWA FHWA Health ContributedKENTUCKY KY - PL KY-ST KY-Fed KY-SNK CMAQ KY APA Services Partner COUNTY

SHARE FUNDS FUNDS FUNDS FUNDS FUNDS Pass Thru Match Match FUNDS

45,000 45,000 0 11,250

17.4877 80.0000 20.0000 0.0000

2,444 2,4441,808 1,8083,048 3,0488,272 8,272

25,789 25,78941,361 33,089 0 8,272 0

11,911 11,911 0 2,978 0

0.0000

0.0000

B - 26

Page 107: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

Ohio-Kentucky-Indiana Regional Council of Governmen tsFY2017 Unified Planning Work ProgramLabor Base for Fringe and Indirect Cost Allocation Plansby Funding Source and Cost Category

TOTALProject Project COST PROJECT OTHERCode Name CATEGORY COST FUNDS

FY17 Funding 75,550

771090 710 (FED) % OF FUNDING 100

FY17 OH Gen Asmbly Water Direct Labor 25,10874.00% Fringe Benefits 18,579

124.71% INDIRECT 31,313FY17 Contributed Svs 0Rates OTHER DIRECT 550

TOTAL 75,550

FY17 Unspent Balance 0.00% 0

FY16-17 Funding 231,589

650010 500 (FED) % OF FUNDING 100

FY16-17 Nat'l Urban Forestry Direct Labor 37,5312 year 74.00% Fringe Benefits 27,773funding 124.71% INDIRECT 46,806

FY17 Contributed Svs 52,430Rates OTHER DIRECT 67,049

TOTAL 231,589

FY16 Carrying into FY18 0.00% 0

771010 710 (LOCAL) % OF FUNDING 100

FY17 Local Water Direct Labor 18,244funds 74.00% Fringe Benefits 13,500

124.71% INDIRECT 22,753FY17 OTHER DIRECT 11,488Rates TOTAL 65,985

780010 800 (LOCAL) % OF FUNDING 100

FY17 Regional Planning Direct Labor 11,295funds 74.00% Fringe Benefits 8,358

124.71% INDIRECT 14,087FY17 OTHER DIRECT 808Rates TOTAL 34,548

HHS LOCAL LOCAL LOCALKYTC Amer Public KY KY

FEDERAL KYTC FTA FHWA FHWA Health ContributedKENTUCKY KY - PL KY-ST KY-Fed KY-SNK CMAQ KY APA Services Partner COUNTY

SHARE FUNDS FUNDS FUNDS FUNDS FUNDS Pass Thru Match Match FUNDS

0.0000

0.0000

B - 27

Page 108: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

Ohio-Kentucky-Indiana Regional Council of Governmen tsFY2017 Unified Planning Work ProgramLabor Base for Fringe and Indirect Cost Allocation Plansby Funding Source and Cost Category

TOTALProject Project COST PROJECT OTHERCode Name CATEGORY COST FUNDS

790001 (LOCAL) % OF FUNDING 100

FY17 General & Admin. Direct Labor 15,268funds 74.00% Fringe Benefits 11,298

124.71% INDIRECT 19,041FY17 OTHER DIRECT 82,618Rates TOTAL 128,224

% OF FUNDING 100

FY17 GRAND TOTALS Direct Labor 1,479,703 074.00% Dir Labor Fringe Benefits1,094,923 0

124.71% INDIRECT 1,845,344 0FY17 Contributed Svs 70,673 0Rates OTHER DIRECT 980,056 0

TOTAL 5,470,699 0

HHS LOCAL LOCAL LOCALKYTC Amer Public KY KY

FEDERAL KYTC FTA FHWA FHWA Health ContributedKENTUCKY KY - PL KY-ST KY-Fed KY-SNK CMAQ KY APA Services Partner COUNTY

SHARE FUNDS FUNDS FUNDS FUNDS FUNDS Pass Thru Match Match FUNDS

0.0000

246,376 134,638 8,415 40,780 22,485 0 0 0 752 39,307182,308 99,626 6,227 30,176 16,638 0 0 0 557 29,086307,257 167,907 10,494 50,857 28,040 0 0 0 938 49,02018,243 0 0 0 0 0 0 18,243 0 0

141,025 47,407 2,963 14,359 63,255 0 0 0 17 13,023895,209 449,578 28,098 136,171 130,418 0 0 18,243 2,265 130,436

B - 28

Page 109: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

Ohio-Kentucky-Indiana Regional Council of Governmen tsFY2017 Unified Planning Work ProgramLabor Base for Fringe and Indirect Cost Allocation Plansby Funding Source and Cost Category

TOTALProject Project COST PROJECT OTHERCode Name CATEGORY COST FUNDS

660110 601 (FED) % OF FUNDING 100

FY16 OH Short Range Direct Labor 5,910Carryover 74.00% Fringe Benefits 4,373FY17 KY 124.71% INDIRECT 7,371funds FY17 OTHER DIRECT 596

Rates TOTAL 18,250

FY17 Funding 95,460

760110 601 (FED) % OF FUNDING 100

FY17 Short Range Direct Labor 28,493funds 74.00% Fringe Benefits 21,084

124.71% INDIRECT 35,534FY17 OTHER DIRECT 2,769Rates TOTAL 87,879

FY17 Carrying into FY18 7.94% 7,581

660210 602 (FED) % OF FUNDING 100

FY16 OH TIP Direct Labor 7,260Carryover 74.00% Fringe Benefits 5,373FY17 KY 124.71% INDIRECT 9,054funds FY17 OTHER DIRECT 893

Rates TOTAL 22,580

FY17 Funding 118,125

760210 602 (FED) % OF FUNDING 100

FY17 TIP Direct Labor 35,950funds 74.00% Fringe Benefits 26,601

124.71% INDIRECT 44,833FY17 OTHER DIRECT 1,360Rates TOTAL 108,745

FY17 Carrying into FY18 7.94% 9,380

FEDERAL FEDERAL LOCAL LOCAL Energy Local LOCALINDOT INDOT INDOT Agricultural DOE Partners OKI

FHWA/FTA FHWA US Forestry MARC ContributedINDIANA CPG STP Partner COUNTY SPECIAL USDA Pass Thru Services COUNTYSHARE FUNDS FUNDS Match FUNDS PROJECTS Funds Funds Match FUNDS

0.0000 0.0000

0.0000 0.0000

0.0000 0.0000

B - 29

Page 110: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

Ohio-Kentucky-Indiana Regional Council of Governmen tsFY2017 Unified Planning Work ProgramLabor Base for Fringe and Indirect Cost Allocation Plansby Funding Source and Cost Category

TOTALProject Project COST PROJECT OTHERCode Name CATEGORY COST FUNDS

660510 605 (FED) % OF FUNDING 100

FY16 OH Surveillance Direct Labor 91,057Carryover 74.00% Fringe Benefits 67,380FY17 KY 124.71% INDIRECT 113,559funds FY17 OTHER DIRECT 73,273

Rates TOTAL 345,269

FY17 Funding 1,754,573

760510 605 (FED) % OF FUNDING 100

FY17 Surveillance Direct Labor 432,832funds 74.00% Fringe Benefits 320,276

124.71% INDIRECT 539,784FY17 OTHER DIRECT 318,782Rates TOTAL 1,611,675

FY17 Carrying into FY18 8.14% 142,898

661010 610 (FED) % OF FUNDING 100

FY15 OH Long Range Direct Labor 58,051Carryover 74.00% Fringe Benefits 42,957FY17 KY 124.71% INDIRECT 72,397funds FY17 OTHER DIRECT 2,395

Rates TOTAL 175,800

FY17 Funding 919,425

761010 610 (FED) % OF FUNDING 100

FY17 Long Range Direct Labor 276,008funds 74.00% Fringe Benefits 204,234

124.71% INDIRECT 344,209FY17 OTHER DIRECT 21,912Rates TOTAL 846,363

FY17 Carrying into FY18 7.95% 73,062

FEDERAL FEDERAL LOCAL LOCAL Energy Local LOCALINDOT INDOT INDOT Agricultural DOE Partners OKI

FHWA/FTA FHWA US Forestry MARC ContributedINDIANA CPG STP Partner COUNTY SPECIAL USDA Pass Thru Services COUNTYSHARE FUNDS FUNDS Match FUNDS PROJECTS Funds Funds Match FUNDS

0.0000 0.0000

0.0000 0.0000

0.0000 0.0000

0.0000 0.0000

B - 30

Page 111: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

Ohio-Kentucky-Indiana Regional Council of Governmen tsFY2017 Unified Planning Work ProgramLabor Base for Fringe and Indirect Cost Allocation Plansby Funding Source and Cost Category

TOTALProject Project COST PROJECT OTHERCode Name CATEGORY COST FUNDS

662520 625 (FED) % OF FUNDING 100

FY16 OH Participation Plan Direct Labor 19,241Carryover 74.00% Fringe Benefits 14,238FY17 KY 124.71% INDIRECT 23,995funds FY17 OTHER DIRECT 2,406

Rates TOTAL 59,880

FY17 Funding 313,250

762520 625 (FED) % OF FUNDING 100

FY17 Participation Plan Direct Labor 95,788funds 74.00% Fringe Benefits 70,879

124.71% INDIRECT 119,457FY17 OTHER DIRECT 2,252Rates TOTAL 288,376

FY17 Carrying into FY18 7.94% 24,874

FY17 Funding 135,831

768630 686 (FED) % OF FUNDING 100

FY17 KY KY Excl Trans Plan Direct Labor 27,616funds 74.00% Fringe Benefits 20,435

124.71% INDIRECT 34,440FY17 OTHER DIRECT 2,499Rates TOTAL 84,990

FY17 Unspent Balance 37.43% 50,841

669510 695 (FED) % OF FUNDING 100

FY16 OH UPWP Admin. Direct Labor 1,465Carryover 74.00% Fringe Benefits 1,083FY17 KY 124.71% INDIRECT 1,827funds FY17 OTHER DIRECT 75

Rates TOTAL 4,450

FEDERAL FEDERAL LOCAL LOCAL Energy Local LOCALINDOT INDOT INDOT Agricultural DOE Partners OKI

FHWA/FTA FHWA US Forestry MARC ContributedINDIANA CPG STP Partner COUNTY SPECIAL USDA Pass Thru Services COUNTYSHARE FUNDS FUNDS Match FUNDS PROJECTS Funds Funds Match FUNDS

0.0000 0.0000

0.0000 0.0000

0.0000 0.0000

0.0000 0.0000

B - 31

Page 112: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

Ohio-Kentucky-Indiana Regional Council of Governmen tsFY2017 Unified Planning Work ProgramLabor Base for Fringe and Indirect Cost Allocation Plansby Funding Source and Cost Category

TOTALProject Project COST PROJECT OTHERCode Name CATEGORY COST FUNDS

FY17 Funding 23,250

769510 695 (FED) % OF FUNDING 100

FY17 UPWP Admin. Direct Labor 7,088funds 74.00% Fringe Benefits 5,245

124.71% INDIRECT 8,839FY17 OTHER DIRECT 225Rates TOTAL 21,397

FY17 Carrying into FY18 7.97% 1,853

669710 697 (FED) % OF FUNDING 100

FY16 OH Trans Prgrm Reptg Direct Labor 1,053Carryover 74.00% Fringe Benefits 779FY17 KY 124.71% INDIRECT 1,313funds FY17 OTHER DIRECT 5

Rates TOTAL 3,150

FY17 Funding 16,470

769710 697 (FED) % OF FUNDING 100

FY17 Trans Prgrm Reptg Direct Labor 5,070funds 74.00% Fringe Benefits 3,752

124.71% INDIRECT 6,323FY17 OTHER DIRECT 15Rates TOTAL 15,159

FY17 Carrying into FY18 7.96% 1,311

672010 720 (FED) % OF FUNDING 100

FY16 OH Mobile Srce Emissions Direct Labor 5,268Carryover 74.00% Fringe Benefits 3,899FY17 KY 124.71% INDIRECT 6,570funds FY17 OTHER DIRECT 63

Rates TOTAL 15,800

FEDERAL FEDERAL LOCAL LOCAL Energy Local LOCALINDOT INDOT INDOT Agricultural DOE Partners OKI

FHWA/FTA FHWA US Forestry MARC ContributedINDIANA CPG STP Partner COUNTY SPECIAL USDA Pass Thru Services COUNTYSHARE FUNDS FUNDS Match FUNDS PROJECTS Funds Funds Match FUNDS

0.0000 0.0000

0.0000 0.0000

0.0000 0.0000

0.0000 0.0000

B - 32

Page 113: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

Ohio-Kentucky-Indiana Regional Council of Governmen tsFY2017 Unified Planning Work ProgramLabor Base for Fringe and Indirect Cost Allocation Plansby Funding Source and Cost Category

TOTALProject Project COST PROJECT OTHERCode Name CATEGORY COST FUNDS

FY17 Funding 82,660

772010 720 (FED) % OF FUNDING 100

FY17 Mobile Srce Emissions Direct Labor 25,413funds 74.00% Fringe Benefits 18,804

124.71% INDIRECT 31,693FY17 OTHER DIRECT 188Rates TOTAL 76,098

FY17 Carrying into FY18 7.94% 6,562

FY10&11 Funds carried into FY17 82,501

267410 674 (FED) % OF FUNDING 100

FY12 JARC Direct Labor 24,352Carryover 74.00% Fringe Benefits 18,019

124.71% INDIRECT 30,369FY17 OTHER DIRECT 300Rates TOTAL 73,041

FY12 Carrying into FY18 11.47% 9,460

FY13 Funds carried into FY17 20,904

367420 674 (FED) % OF FUNDING 100

FY13 New Freedom Direct Labor 6,898Carryover 74.00% Fringe Benefits 5,104

124.71% INDIRECT 8,602FY17 OTHER DIRECT 300Rates TOTAL 20,904

FY13 Carrying into FY18 0.00% (0)

FY15 funds carried into FY17 248,696

567430 674 (FED) % OF FUNDING 100

FY15 FTA 5310 Transit Direct Labor 6,952funds 74.00% Fringe Benefits 5,144

124.71% INDIRECT 8,670FY17 OTHER DIRECT 18,000Rates TOTAL 38,766

FY17 Carrying into FY18 84.41% 209,930

FEDERAL FEDERAL LOCAL LOCAL Energy Local LOCALINDOT INDOT INDOT Agricultural DOE Partners OKI

FHWA/FTA FHWA US Forestry MARC ContributedINDIANA CPG STP Partner COUNTY SPECIAL USDA Pass Thru Services COUNTYSHARE FUNDS FUNDS Match FUNDS PROJECTS Funds Funds Match FUNDS

0.0000 0.0000

0.0000 0.0000

0.0000 0.0000

0.0000 0.0000

B - 33

Page 114: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

Ohio-Kentucky-Indiana Regional Council of Governmen tsFY2017 Unified Planning Work ProgramLabor Base for Fringe and Indirect Cost Allocation Plansby Funding Source and Cost Category

TOTALProject Project COST PROJECT OTHERCode Name CATEGORY COST FUNDS

FY17 Funding 31,250

768510 685 (FED) % OF FUNDING 100

FY17 INDOT PL Direct Labor 9,909funds 74.00% Fringe Benefits 7,333

124.71% INDIRECT 12,358FY17 OTHER DIRECT 1,650Rates TOTAL 31,250

FY17 Unspent Balance 0.00% 0

Carryover Sub-Total % OF FUNDING 100

FY16 OH CPG (PL/FTA) Direct Labor 227,507 0Carryover 74.00% Fringe Benefits 168,349 0FY17 KY 124.71% INDIRECT 283,728 0funds FY17 OTHER DIRECT 98,306 0

Rates TOTAL 777,890 0

FY17 Funding Sub-Total % OF FUNDING 100

FY17 CPG (PL/FTA) Direct Labor 944,167 0funds 74.00% Fringe Benefits 698,642 0

124.71% INDIRECT 1,177,471 0FY17 OTHER DIRECT 351,652 0Rates TOTAL 3,171,932 0

Carrying into FY18 Sub-Total 537,752 0

Grand Total % OF FUNDING 100

CPG (PL/FTA) Direct Labor 1,171,674 074.00% Fringe Benefits 866,992 0

124.71% INDIRECT 1,461,199 0FY17 OTHER DIRECT 449,958 0Rates TOTAL 3,949,822 0

FEDERAL FEDERAL LOCAL LOCAL Energy Local LOCALINDOT INDOT INDOT Agricultural DOE Partners OKI

FHWA/FTA FHWA US Forestry MARC ContributedINDIANA CPG STP Partner COUNTY SPECIAL USDA Pass Thru Services COUNTYSHARE FUNDS FUNDS Match FUNDS PROJECTS Funds Funds Match FUNDS

31,250 25,000 6,250

100.0000 80.0000 20.0000 100.0000

9,909 7,927 1,982 07,333 5,866 1,467 0

12,358 9,886 2,472 01,650 1,320 330 0

31,250 25,000 6,250 0

0 0 0

0.0000 0.0000

0 0 0 0 0 00 0 0 0 0 00 0 0 0 0 00 0 0 0 0 00 0 0 0 0 0

100.0000 80.0000 20.0000 0.0000

9,909 7,927 0 0 1,982 07,333 5,866 0 0 1,467 0

12,358 9,886 0 0 2,472 01,650 1,320 0 0 330 0

31,250 25,000 0 0 6,250 0

0 0 0 0 0 0

100.0000 80.0000 0.0000

9,909 7,927 0 1,982 07,333 5,866 0 1,467 0

12,358 9,886 0 2,472 01,650 1,320 0 330 0

31,250 25,000 0 6,250 0

20.0000

B - 34

Page 115: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

Ohio-Kentucky-Indiana Regional Council of Governmen tsFY2017 Unified Planning Work ProgramLabor Base for Fringe and Indirect Cost Allocation Plansby Funding Source and Cost Category

TOTALProject Project COST PROJECT OTHERCode Name CATEGORY COST FUNDS

FY17 Funding 62,500

768520 685 (FED) % OF FUNDING 100

FY17 INDOT STBGP Direct Labor 20,786funds 74.00% Fringe Benefits 15,381

124.71% INDIRECT 25,922FY17 OTHER DIRECT 411Rates TOTAL 62,500

FY17 Unspent Balance 0.00% 0

FY17 Funding 354,535

761040 610 (FED) % OF FUNDING 100

FY17 Land Use Direct Labor 110,584funds 74.00% Fringe Benefits 81,827

124.71% INDIRECT 137,909FY17 OTHER DIRECT 15,553Rates Sub-Total 345,873

Toll Credits 71,347TOTAL 417,221

FY17 Unspent Balance 2.44% 8,662

FY17 Funding 105,789

761050 610 (FED) % OF FUNDING 100

FY17 Fiscal Impact Anlys Direct Labor 21,509funds 74.00% Fringe Benefits 15,916

124.71% INDIRECT 26,824FY17 OTHER DIRECT 500Rates TOTAL 64,749

Toll Credits 13,356TOTAL 78,105

FY17 Unspent Balance 38.79% 41,040

FEDERAL FEDERAL LOCAL LOCAL Energy Local LOCALINDOT INDOT INDOT Agricultural DOE Partners OKI

FHWA/FTA FHWA US Forestry MARC ContributedINDIANA CPG STP Partner COUNTY SPECIAL USDA Pass Thru Services COUNTYSHARE FUNDS FUNDS Match FUNDS PROJECTS Funds Funds Match FUNDS

62,500 50,000 2,500 10,000*est 20%FIAM & 80% Land Use

100.0000 80.0000 20.0000 20.0000 100.0000

20,786 16,629 831 3,326 015,381 12,305 615 2,461 025,922 20,738 1,037 4,148 0

411 329 16 66 062,500 50,000 2,500 10,000 0

0 0 0 0

0.0000 0.0000

0.0000 0.0000

B - 35

Page 116: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

Ohio-Kentucky-Indiana Regional Council of Governmen tsFY2017 Unified Planning Work ProgramLabor Base for Fringe and Indirect Cost Allocation Plansby Funding Source and Cost Category

TOTALProject Project COST PROJECT OTHERCode Name CATEGORY COST FUNDS

FY17 Funding Sub-Total% OF FUNDING 100

FY17 STBGP/SNK Direct Labor 152,879funds 74.00% Fringe Benefits 113,124

124.71% INDIRECT 190,655FY17 OTHER DIRECT 16,464Rates Sub-Total 473,122

Toll Credits 84,703TOTAL 557,825

FY17 Unspent Balance 49,702

Grand Total % OF FUNDING 100

STP/SNK Direct Labor 152,87974.00% Fringe Benefits 113,124

124.71% INDIRECT 190,655FY17 OTHER DIRECT 16,464Rates Sub-Total 473,122

Toll Credits 84,703TOTAL 557,825

FY17 Funding 343,098

766540 665 (FED) % OF FUNDING 100

FY17 Ozone Direct Labor 8,925funds 74.00% Fringe Benefits 6,604

124.71% INDIRECT 11,130FY17 Contributed Svs 9,971Rates OTHER DIRECT 201,399

Sub-Total 238,029Toll Credits 47,044TOTAL 285,073

FY7 Unspent Balance 33.53% 115,040

FEDERAL FEDERAL LOCAL LOCAL Energy Local LOCALINDOT INDOT INDOT Agricultural DOE Partners OKI

FHWA/FTA FHWA US Forestry MARC ContributedINDIANA CPG STP Partner COUNTY SPECIAL USDA Pass Thru Services COUNTYSHARE FUNDS FUNDS Match FUNDS PROJECTS Funds Funds Match FUNDS

100.0000 80.0000 20.0000 20.0000 0.0000

20,786 0 16,629 831 3,326 015,381 0 12,305 615 2,461 025,922 0 20,738 1,037 4,148 0

411 0 329 16 66 062,500 0 50,000 2,500 10,000 0

0 0 0 0 0 0

100.0000 80.0000 20.0000 20.0000 0.0000

20,786 0 16,629 831 3,326 015,381 0 12,305 615 2,461 025,922 0 20,738 1,037 4,148 0

411 0 329 16 66 062,500 0 50,000 2,500 10,000 0

0.0000 0.0000

B - 36

Page 117: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

Ohio-Kentucky-Indiana Regional Council of Governmen tsFY2017 Unified Planning Work ProgramLabor Base for Fringe and Indirect Cost Allocation Plansby Funding Source and Cost Category

TOTALProject Project COST PROJECT OTHERCode Name CATEGORY COST FUNDS

FY17 Funding 257,324

766710 667 (FED) % OF FUNDING 100

FY17 Rideshare Direct Labor 13,974funds 74.00% Fringe Benefits 10,340

124.71% INDIRECT 17,427FY17 Contributed Svs 8,272Rates OTHER DIRECT 147,472

TOTAL 197,485

FY17 Unspent Balance 26.47% 68,111

FY16 Funds carried into FY17 42,686

668440 684 (FED) % OF FUNDING 100

FY16 OH OH Excl - RTPO Direct Labor 5,768carryover 74.00% Fringe Benefits 4,268

124.71% INDIRECT 7,192FY17 OTHER DIRECT 0Rates TOTAL 17,229

FY17 Carrying into FY18 59.64% 25,457

FY17 Funding 59,117

771060 710 (FED) % OF FUNDING 100

FY17 604b Water Direct Labor 19,037funds 74.00% Fringe Benefits 14,088

124.71% INDIRECT 23,742FY17 OTHER DIRECT 2,250Rates TOTAL 59,117

FY17 Unspent Balance 0.00% 0

FEDERAL FEDERAL LOCAL LOCAL Energy Local LOCALINDOT INDOT INDOT Agricultural DOE Partners OKI

FHWA/FTA FHWA US Forestry MARC ContributedINDIANA CPG STP Partner COUNTY SPECIAL USDA Pass Thru Services COUNTYSHARE FUNDS FUNDS Match FUNDS PROJECTS Funds Funds Match FUNDS

0.0000 0.0000

0.0000 0.0000

0.0000 0.0000

B - 37

Page 118: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

Ohio-Kentucky-Indiana Regional Council of Governmen tsFY2017 Unified Planning Work ProgramLabor Base for Fringe and Indirect Cost Allocation Plansby Funding Source and Cost Category

TOTALProject Project COST PROJECT OTHERCode Name CATEGORY COST FUNDS

FY17 Funding 75,550

771090 710 (FED) % OF FUNDING 100

FY17 OH Gen Asmbly Water Direct Labor 25,10874.00% Fringe Benefits 18,579

124.71% INDIRECT 31,313FY17 Contributed Svs 0Rates OTHER DIRECT 550

TOTAL 75,550

FY17 Unspent Balance 0.00% 0

FY16-17 Funding 231,589

650010 500 (FED) % OF FUNDING 100

FY16-17 Nat'l Urban Forestry Direct Labor 37,5312 year 74.00% Fringe Benefits 27,773funding 124.71% INDIRECT 46,806

FY17 Contributed Svs 52,430Rates OTHER DIRECT 67,049

TOTAL 231,589

FY16 Carrying into FY18 0.00% 0

771010 710 (LOCAL) % OF FUNDING 100

FY17 Local Water Direct Labor 18,244funds 74.00% Fringe Benefits 13,500

124.71% INDIRECT 22,753FY17 OTHER DIRECT 11,488Rates TOTAL 65,985

780010 800 (LOCAL) % OF FUNDING 100

FY17 Regional Planning Direct Labor 11,295funds 74.00% Fringe Benefits 8,358

124.71% INDIRECT 14,087FY17 OTHER DIRECT 808Rates TOTAL 34,548

FEDERAL FEDERAL LOCAL LOCAL Energy Local LOCALINDOT INDOT INDOT Agricultural DOE Partners OKI

FHWA/FTA FHWA US Forestry MARC ContributedINDIANA CPG STP Partner COUNTY SPECIAL USDA Pass Thru Services COUNTYSHARE FUNDS FUNDS Match FUNDS PROJECTS Funds Funds Match FUNDS

0.0000 0.0000

231,589 114,565 52,430 64,594

0.0000 0.0000

37,531 18,354 19,17727,773 13,582 14,19146,806 22,889 23,91752,430 52,43067,049 59,740 7,309

231,589 114,565 52,430 64,594

0 0 0 0

100.0000

18,24413,50022,75311,48865,985

100.0000

11,2958,358

14,087808

34,548

B - 38

Page 119: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

Ohio-Kentucky-Indiana Regional Council of Governmen tsFY2017 Unified Planning Work ProgramLabor Base for Fringe and Indirect Cost Allocation Plansby Funding Source and Cost Category

TOTALProject Project COST PROJECT OTHERCode Name CATEGORY COST FUNDS

790001 (LOCAL) % OF FUNDING 100

FY17 General & Admin. Direct Labor 15,268funds 74.00% Fringe Benefits 11,298

124.71% INDIRECT 19,041FY17 OTHER DIRECT 82,618Rates TOTAL 128,224

% OF FUNDING 100

FY17 GRAND TOTALS Direct Labor 1,479,703 074.00% Dir Labor Fringe Benefits1,094,923 0

124.71% INDIRECT 1,845,344 0FY17 Contributed Svs 70,673 0Rates OTHER DIRECT 980,056 0

TOTAL 5,470,699 0

FEDERAL FEDERAL LOCAL LOCAL Energy Local LOCALINDOT INDOT INDOT Agricultural DOE Partners OKI

FHWA/FTA FHWA US Forestry MARC ContributedINDIANA CPG STP Partner COUNTY SPECIAL USDA Pass Thru Services COUNTYSHARE FUNDS FUNDS Match FUNDS PROJECTS Funds Funds Match FUNDS

100.0000

15,26811,29819,04182,618

128,224

0.0000 0.0000

30,695 7,927 16,629 831 5,308 37,531 18,354 (0) 0 63,98422,713 5,866 12,305 615 3,927 27,773 13,582 0 0 47,34738,280 9,886 20,738 1,037 6,619 46,806 22,889 0 0 79,797

0 0 0 0 0 52,430 0 0 52,430 02,061 1,320 329 16 396 67,049 59,740 0 0 102,223

93,750 25,000 50,000 2,500 16,250 231,589 114,565 (0) 52,430 293,351748,204

B - 39

Page 120: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

Appendix C

Title VI

Page 121: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

Office of Equal Opportunity

Title VI Baseline Assessment Tool

1. Who is the Title VI contact person for your agency? Does this person accept complaints from the public? If not, who does? Please include title, email, and telephone number for each person listed. The individual listed below is the Title VI contact person who accepts complaints from the public on behalf of the OKI Regional Council of Governments: Florence Parker Title VI Coordinator 513-619-7686; [email protected]

2. In the past three years, has your agency been named in a discrimination complaint

or lawsuit? If so, when and what was the nature of the complaint or lawsuit? What was the outcome? Was corrective action taken? Explain. For example:

Year Type of Complaint

Finding Brief Description of Allegation

2012 Sexual Harassment

NPC

In the past three years the OKI Regional Council of Governments has not been named

in a discrimination complaint or lawsuit. 3. Does your agency have a written complaint process? If so, please provide a copy as

an attachment.

OKI does have a written complaint process and a copy is attached to this Assessment Tool.

4. Has your agency made the public aware of the right to file a complaint? If so, by

what mechanism?

OKI has a Title VI Notification to the Public posted on its website and in the Lobby of the OKI office. This notification provides information on how to file a complaint against OKI if an individual believes that he or she has been aggrieved by any unlawful discriminatory practice under Title VI.

Page 122: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

C-2

5. Has your agency provided free translation services for persons with Limited English

Proficiency (LEP)? Do you have a LEP Plan? If so, please provide a copy as an attachment.

a. What techniques or procedures are employed to address LEP?

The Hispanic population is the largest of the LEP population groups in the OKI region. Thus far OKI has not received a request for translation services from any of its LEP population groups but staff is prepared to provide such assistance free of cost through its working relationship with Affordable Language Services. This firm offers professional translation and interpretation services in more than 200 languages along with sign language interpreters. The techniques and procedures employed by OKI staff to work with all LEP population groups in the OKI region are outlined in the Limited English Proficiency (LEP) Guidance attached to this Assessment Tool.

6. Has your agency provided written Title VI Assurances to ODOT? Is the Title VI

Assurance included in the annual MPO self-certification resolution? If so, please provide a copy as an attachment.

OKI has provided written Title VI Assurances to ODOT. The Assurances are included in the annual MPO self-certification resolution and a copy of the Assurance is attached to this Assessment Tool.

7. Do you have any questions regarding this assessment of Title VI? If so, please include them here along with your email address or telephone number and an ODOT representative will respond.

OKI staff does not have any questions regarding this assessment of Title VI at this time. However, staff would like to note that it would be helpful to know about upcoming Title VI or Civil Rights trainings, workshops, etc. where costs might be incurred by the end of each calendar year. That information would enable staff to better assist the OKI Finance Department as it prepares budgets and projects future expenditures for such trainings, workshops, etc.

8. Provide the number of full-time employees of your agency. Provide a copy of your most recent EEO report.

At this time OKI has (31) full-time employees. Since this number is fewer than (50) employees OKI is not required to file an EEO report. However, OKI does employ and adhere to the following EEO and Affirmative Action Policy:

Equal Employment Opportunity and Affirmative Action Policy

Page 123: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

C-3

OKI is committed to a policy of equal employment opportunity. This is accomplished by enforcing EEO-related federal/state laws and regulations, Gubernatorial Executive Orders and state employment policies and procedures related to civil rights, affirmative action and non-discrimination. OKI will not discriminate against employees or applicants for employment based on any protected status including, but not limited to race, age, color, ancestry, religion, marital status, veteran status, sex, pregnancy, national origin, genetic information or physical or mental disability. All managers and employees must comply with this EEO policy. This policy is disseminated to all employees, various recruitment sources and is displayed at all business locations. Any employee that violates this policy will be subject to discipline, up to and including termination. Any issue related to equal employment opportunity may be discussed with the Equal Employment Opportunity (EEO) Officer, who is designated by the Executive Director. The name of the current EEO Officer is posted on the Cafeteria bulletin board. Anyone who believes he/she has experienced or witnessed a violation of this policy must immediately report it to the EEO Officer.

9. When was the last time the individual responsible for complying with Title VI responsibilities for your agency attended Title VI training? Did he/she receive a certificate of completion? If yes, please attach a copy of the certificate.

April 14-16, 2015, OKI’s Title VI Coordinator participated in a 3-day Basic Civil Rights Training hosted by KYTC (Kentucky Transportation Cabinet) and presented by the Federal Highway Administration Resource Center. The training reviewed the purpose and authorities for the Title VI Program; described the background, purpose and authorities for FHWA’s Equal Opportunity Contract Compliance Program, and described the background, purpose and authorities for the DBE Program. The training did not include a certificate of completion. November 17, 2015, OKI’s Title VI Coordinator participated in the INDOT Title VI Useful Function Training which was a refresher course on Title VI, General ADA and LEP (Limited English Proficiency) requirements for MPOs (Metropolitan Planning Organizations) and LPAs (Local Public Agencies). The refresher course did not include a certificate of completion. December 15, 2015, OKI’s Title VI Coordinator participated in an FHWA Environmental Justice Workshop that was hosted by MORPC (Mid-Ohio Regional Planning Commission) and presented by the Federal Highway Administration. This workshop did not include a certificate of completion.

10. Would your agency like Title VI training or other Civil Rights technical assistance from ODOT? If yes, please explain.

Page 124: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

C-4

OKI’s Title VI Coordinator is always eager to receive Title VI training or other Civil Rights technical assistance from ODOT. An area of particular interest centers around the challenges of implementing the OKI DBE Program, calculating and fulfilling the OKI DBE Goal.

11. Provide the name, title, and contact information of the person who completed this baseline assessment. Is this the person who should be contacted with follow-up questions? If not, please provide the contact information for that individual.

The individual who completed this baseline assessment is also the person who should be contacted with follow-up questions:

Florence Parker, Title VI Coordinator 513-619-7686; [email protected]

Disadvantaged Business Enterprise

12. Does your agency include the required DBE assurance language (49 CFR 26.13 (a) and (b)) verbatim in all financial agreements, contracts, and sub-contracts? Please provide a sample copy of such. A sample copy of the required DBE assurance language and verbatim in all financial agreements, contracts, and sub-contracts is attached to this Assessment Tool.

13. Does your agency physically include the Civil Rights Special Provisions (FHWA-1273)

in all contracts and ensure they are included in all sub-contracts, including third-tier contracts. Please provide a sample copy of such. This question is not applicable to OKI’s work program because OKI is a transportation planning agency and does not execute construction contracts.

14. The Notice of Proposed Rule Making (NPRM) for 49 CFR 26.21 (a)(1) [http://www.gpo.gov/fdsys/pkg/FR-2012-09-06/pdf/2012-21231.pdf] intends to clarify US DOT’s position regarding which entities can set DBE program goals. It is US DOT’s position that only State Transportation Agencies (STAs), such as ODOT, can set DBE program goals and that sub-recipients would need to implement the established goal. Does your agency currently follow this process or does your agency set its own DBE goals? If your agency sets its own DBE goals, you will need to discontinue doing so and adopt ODOT’s DBE goals.

OKI currently sets its own DBE Program Goal which is 2.5% for Fiscal Years 2016-2018. That goal has been calculated based on the contracting opportunities anticipated in technical consultant contracts such as Architecture and Engineering Technical Studies

Page 125: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

C-5

(A&E). It’s anticipated that DBEs will participate on these contracts as members of a project team due to the general shortage of certified DBE firms in the OKI region performing such services.

Consultant Contracts

15. Does your agency have written consultant selection procedures consistent with the provisions of 49 CFR 18.36?

The written guidelines of OKI’s Contract Management Narrative include consultant selection procedures consistent with the provisions of 49 CFR 18.36.

16. What considerations are given to minority contractors in the selection of

consultants for transportation planning work? Serious considerations are given to the participation of minority contractors in OKI’s transportation planning process. OKI’s consultant selection process includes points for DBE participation and every RFQ states OKI’s DBE Goal and the fact that DBE participation is encouraged. a. Does your agency monitor annual Title VI contracting goals? Describe your

monitoring process. OKI staff calculates its DBE Goal based on projected contracting opportunities. OKI’s DBE Liaison Officer, who is also OKI’s Title VI Coordinator, is responsible for the implementation and compliance of all aspects of its DBE Program. OKI’s Finance Department monitors the process by tracking expenditures to DBE and non-DBE contracting vendors via invoices submitted for payment.

b. Does the consultant selection process include maintenance of records of

qualified minority consultants?

The maintenance of records of qualified minority consultants is overseen by the Title VI Coordinator who is also the DBE Liaison Officer. A qualified minority consultant wishing to contract with OKI must provide a current copy of his/her DBE Certification to be held on file in the OKI office.

c. What other methods or procedures are utilized to encourage use of qualified

minority consultants?

Whenever OKI solicits an RFP or RFQ the announcement is posted on OKI’s website and a Legal Notice is published in the major area newspaper. OKI’s DBE Liaison Officer emails the announcement to the appropriate vendors listed in OKI’s DBE

Page 126: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

C-6

Vendor Directory. If there are no vendors with the appropriate NAICS codes listed in OKI’s DBE Vendor Directory the DBE Liaison Officer will research DBE directories regionally and nationally. The officer also forwards the RFP or RFQ announcement to the local African American and Hispanic Chambers of Commerce for dissemination to their respective memberships. OKI is a member of both chambers.

d. Are Title VI assurances and provisions included in consultant contracts? Provide

an example.

A sample copy of the Title VI assurances and provisions included in consultant contracts can be found in Item #34 of Appendix C, Standard Terms and Conditions attached to this Assessment Tool.

17. Have consultants made good faith efforts to employ qualified minority sub-contractors? If so, to what extent?

To the best of OKI staff knowledge consultants continue to make good faith efforts to employ qualified DBE certified minority sub-contractors. When responding to an RFP or RFQ consultants will routinely state their intention to employ qualified minority sub-contractors or they will tout the inclusion of a minority sub-contractor.

18. What are you agency’s procedures for monitoring consultant compliance with Title

VI contract provisions?

Please refer to Item #20 in Appendix C, Standard Terms and Conditions. In addition to the consultant complying with the regulations stipulated in Item #20 of Appendix C, OKI staff in the Finance Department performs interim desk audits of contract payments to DBE sub-contractors by the primary consultant to ensure that the actual amount paid to DBE contractors equals or exceeds the dollar amount stated in the schedule of DBE participation. Appendix C is referenced in Question #16d and is attached to this Assessment Tool.

Urban Transportation Planning Process

19. Does your agency maintain documentation describing its procedures for incorporation Title VI requirements into the region’s urban transportation planning program? Public participation is the single most important element of OKI’s transportation planning process. OKI’s Unified Planning Work Program (UPWP) includes a work element directing the development and maintenance of its Participation Plan. The Plan describes processes in place to successfully engage citizens, communities and

Page 127: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

C-7

business interests in OKI’s eight county region. The Participation Plan also describes formats for requesting, obtaining and recording public input or feedback including, but not limited to, question-and-answer sessions, surveys, or comment sheets. More recently the focus has been to take full advantage of the various social media platforms resulting in a major increase in the number of surveys completed online and much more activity around the posting of Tweets or sustained blogging between staff and the general public.

20. What techniques and procedures are employed to provide data relative to minority and disabled populations, age and sex distributions, neighborhoods, income levels, physical environment, travel habits, etc.? OKI’s staff Demographer and its Operations & Air Quality Manager refer to the most current data available from the U.S. Census Bureau, the American Community Survey and the Greater Cincinnati Household Travel Survey to collect data relative to minority and disabled populations, age and sex distributions, neighborhoods, income levels, physical environment, travel habits, etc.

21. Is this data used to develop a socio-demographic profile of the MPO region? If so, provide a copy of the socio-demographic profile of your agency’s region. The abundance of information available in the three aforementioned sources plus the information that is compiled to update OKI’s Regional Transportation Plan (RTP) every four years enable staff to develop various socio-demographic profiles depending on the desired end product. A chart from the RTP’s Chapter 3 on Demographics has been extracted from OKI’s 2040 Regional Transportation Plan to illustrate how the OKI region is evolving and changing. The next update of the RTP is currently underway and will be presented for Board approval in June 2016.

22. To what extent is the data considered in determining that a proposed transportation

system will be capable of responding favorably to minority group requirements? What techniques are used?

In addition to the serious consideration of available data, OKI staff hosts interactive public meetings and posts on its website the date, time, location and agendas for its Intermodal Coordinating Committee (ICC) and Board Meetings which are open to the public. These activities provide opportunities to not only share the latest findings and recommendations for proposed projects but to receive input and feedback from residents who live, work, own businesses and/or play in OKI’s eight county region. OKI’s Title VI Coordinator works closely with members of OKI’s Environmental Justice Advisory Committee (EJAC) who keep their respective constituents informed. Many of the EJAC members either represent or work on behalf of OKI’s underserved populations and are usually able to provide additional insight because they are familiar with the history and location for a proposed project. OKI’s Regional Planning

Page 128: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

C-8

Manager works closely with the Advisory Committee for OKI’s Coordinated Public Transit – Human Services Transportation Plan. This Plan identifies the transportation needs of older adults, individuals with disabilities and low income individuals; lays out strategies for meeting these needs; and prioritizes services for these target populations who are generally described as traditionally underserved population groups.

23. Do the MPO Transportation Plan and TIP include assessments of the impacts that planned transportation system investments will have on both minority (including low-income status populations) and non-minority areas? Discuss the assessment methodology and resulting documentation.

The assessment of the impact(s) that planned transportation investments will have on both minority and non-minority areas are among the responsibilities for OKI’s EJAC members. The announcement of a funding round is usually followed by OKI staff presenting a workshop that is open to the public and all interested potential applicants. This workshop highlights the details of the funding opportunity; confirms the application deadline; answers any additional questions and addresses any concerns. Upon receipt of completed applications for a funding round OKI staff will post the applications on its FTP site and OKI’s Title VI Coordinator will provide EJAC members with the user name and password to gain access to the site. EJAC members will review and score the question on all of the applications pertinent to OKI’s traditionally underserved populations. The members then meet with the Title VI Coordinator to review and discuss their scores eventually reaching a consensus. These scores are provided to the OKI Prioritization Subcommittee which ranks all of the applications and makes funding recommendations to the OKI Board. The Board makes the final decision on all project funding which becomes of record in the official OKI Board minutes.

24. Explain your agency’s public involvement process for transportation planning. How

does your agency obtain and consider input from all citizen groups, especially minority, low income, disabled, and transit dependent?

OKI’s public involvement process for its transportation planning is a formally structured Participation Plan comprised of four Elements. The first Element outlines the strategy and structure that OKI staff will use to engage the public in regional planning and agency decisions that may affect their quality of life. The focus of Element 2 highlights the process for defining Target Groups and Areas using census data to identify where traditionally underserved population groups are most concentrated. Element 3 explains the assessment process that OKI staff has developed to ensure equitable distribution of transportation planning investments or benefits thus avoiding a disproportionate burden of adverse impacts. Element 4 outlines how the Participation Plan will be implemented; lists the technical support

Page 129: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

C-9

for plan implementation and ensures commitment to an evaluation of the OKI Participation Plan every four years. OKI staff obtains input and feedback by conducting interactive public meetings and providing presentations related to transportation, land use and the environment to a variety of stakeholders. Staff also continually seeks opportunities throughout its eight county region for discussion and dialogue. Independent of these activities other methods for increasing public awareness of transportation issues or participation opportunities include, but are not limited to, postings on OKI’s website, collaboration with like agencies, coordination with the OKI Environmental Justice Advisory Committee, social media, press releases, media briefings, newspaper articles, newsletters and information displays. a. Do you have a formalized public involvement process? When was the last time

it was updated?

Yes. OKI staff has developed a formal public involvement process for transportation planning that continues to evolve, be reviewed and updated as warranted. OKI staff conducts an update at least every four years. The OKI Participation Plan was last updated and approved by the OKI Board January 2014.

25. Are Environmental Justice (EJ) populations, either individually or through their

organizations and community leaders, represented in the citizen participation effort? If so, how many and in what capacity? Environmental Justice population groups are represented in OKI’s citizen participation effort in various capacities. The OKI Board includes six members of color – (1) member represents a municipality with a population over 5,000; another member is the Director of the city of Cincinnati’s Planning Commission; 3rd member is the CEO & General Manager of the Southwest Ohio Regional Transit Authority; 4th member is a resident of northern Kentucky; 5th member is the President & CEO of the Greater Cincinnati & N KY African American Chamber of Commerce, and 6th member represents the Ohio Commission on Hispanic/Latino Affairs. OKI’s Environmental Justice Advisory Committee has (12) members representing a cross section of the OKI region and includes a local resident, a small business owner, a Freestore Foodbank vice president, city/county/township and state government officials, a council on aging representative, a social service representative, a civil rights advocate and a transit service agency representative. The Advisory Committee for OKI’s Coordinated Plan consists of (10) members of which (1) member represents senior citizens in Clermont County; (1) member is the Executive Director of the Butler County Regional Transit Authority (BCRTA); (1) member represents the Northern Kentucky Area Development District (NKADD); (2)

Page 130: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

C-10

members represent Everybody Rides METRO, a transit service agency; (1) member represents Wesley Community Services which provides essential services that promote the independence of senior citizens; (1) is a staff member with the Transit Authority of Northern Kentucky (TANK); (1) member is Director of the Clermont Transportation Connection (CTC); (1) member is an area resident; and (1) member is a small business owner

26. Are there any other affirmative actions taken by your agency to enlist the involvement and support of EJ populations in the transportation planning process? Explain.

At this time there are no affirmative action activities underway by OKI staff to enlist the involvement and support of EJ population groups but OKI’s Title VI Coordinator is a member of the SW Ohio Regional Transportation Workgroup. One of the current goals for this workgroup is to explore the feasibility of establishing a Mobility Management System which will help fill the gap of providing reliable, safe, affordable transportation for individuals, especially persons with disabilities. Individuals participating in this workgroup run the gamut from parents with a family member who is disabled to health professionals to transportation advocates to city and county officials to representatives from the social service and developmentally disabled communities to representatives from transit service agencies to representatives from area councils on aging to the veterans community. OKI’s Title VI Coordinator and members of OKI’s Environmental Justice Advisory Committee have also provided input to the team of partners collaborating with OKI staff as the result of the award of a U.S. Forestry Grant. The focus of the input centered around how best to involve low income, minority and underserved communities in the process of implementing the grant.

Page 131: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

C-11

ATTACHMENTS

Page 132: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

C-12

OKI

COMPLAINT

PROCEDURE

Page 133: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

C-13

OKI Title VI Program

Title VI Complaint Procedure

Ohio-Kentucky-Indiana Regional Council of Governments

720 East Pete Rose Way, Suite 420 Cincinnati, Ohio 45202

513-621-6300 www.oki.org

Page 134: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

C-14

TITLE VI COMPLAINT PROCEDURE

Ohio-Kentucky-Indiana (OKI) Regional Council of Governments

This document is provided by the OKI Regional Council of Governments for a contractor, subcontractor, vendor or member of the general public to seek recourse if the individual is of the opinion that he or she has been unjustly served during the course of interaction with OKI and its transportation planning process. Any person who believes he or she has been discriminated against on the basis of race, color, or national origin by the OKI Regional Council of Governments (hereinafter referred to as “the Authority”) may file a Title VI complaint by completing and submitting OKI’s Title VI Complaint Form. The Authority investigates complaints received no more than 180 days after the alleged incident. The Authority will process complaints that are complete. Once the complaint is received, the Authority will review it to determine if our office has jurisdiction. The complainant will receive an acknowledgement letter informing him or her whether the complaint will be investigated by our office. The Authority has ten business days to investigate the complaint. If more information is needed to resolve the case, the Authority may contact the complainant via a letter. The complainant has ten business days from the date of the letter to send requested information to the investigator assigned to the case. If the investigator is not contacted by the complainant or does not receive the additional information within ten business days, the Authority can administratively close the case. A case can be administratively closed also if the complainant no longer wishes to pursue his or her case. After the investigator reviews the complaint, he or she will issue one of two letters to the complainant: a closure letter or a letter of finding (LOF). A closure letter summarizes the allegations and states that there was not a Title VI violation and that the case will be closed. An LOF summarizes the allegations and the interviews regarding the alleged incident, and explains whether any disciplinary action, additional training of the staff member, or other action will occur. If the complainant wishes to appeal the decision, he or she has ten business days after the date of the letter or the LOF to do so. A person may also file a complaint directly with the Federal Transit Administration, at FTA Office of Civil Rights, 1200 New Jersey Avenue SE, Washington, DC 20590.

Page 135: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

C-15

If information is needed in another language, contact 800-750-0750 (Ohio Relay Service).

TITLE VI COMPLAINT FORM Ohio-Kentucky-Indiana (OKI)

Section I:

Name:

Address:

Telephone (Home): Telephone (Work):

Electronic Mail Address:

Accessible Format Requirements?

Large Print Audio Tape

TDD Other

Section II:

Are you filing this complaint on your own behalf?

Yes* No

*If you answered “yes” to this question, go to Section III.

If not, please supply the name and relationship of the person for whom you are complaining:

Please explain why you have filed for a third party:

Please confirm that you have obtained the permission of the aggrieved party if you are filing on behalf of a third party.

Yes No

Section III:

I believe the discrimination I experienced was based on (check all that apply): [ ] Race [ ] Color [ ] National Origin Date of Alleged Discrimination (Month, Day, Year): ________________________ Explain as clearly as possible what happened and why you believe you were discriminated against. Describe all persons who were involved. Include the name and contact information of the person(s) who discriminated against you (if known) as well as names and contact information of any witnesses. If more space is needed, please use the back of this form.

Page 136: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

C-16

Regional Council of Governments

Section IV:

Have you previously filed a Title VI complaint with this Agency?

Yes No

Section V: Have you filed this complaint with any other Federal, State, or local agency, or with any Federal or State court?

[ ] Yes [ ] No

If yes, check all that apply:

[ ] Federal Agency ___________________

[ ] Federal Court ____________________ [ ] State Agency _______________

[ ] State Court ______________________ [ ] Local Agency _______________

Please provide information about a contact person at the agency/court where the complaint was filed.

Name: _________________________________________________________________________________ Title: _________________________________________________________________________________ Agency: _________________________________________________________________________________ Address: _________________________________________________________________________________ Telephone:

Section VI Name of agency complaint is against: Contact person: Title: Telephone number:

You may attach any written materials or other information that you think is relevant to your complaint. Signature Date Please submit this form in person at the address below, or mail this form to:

Page 137: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

C-17

Florence Parker, Title VI Coordinator OKI Regional Council of Governments 720 East Pete Rose Way, Suite 420, Cincinnati, OH 45202

LIMITED

ENGLISH

PROFICIENCY

GUIDANCE

Page 138: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

C-18

OKI Title VI Program

Limited English Proficiency Guidance

Ohio-Kentucky-Indiana Regional Council of Governments

720 East Pete Rose Way, Suite 420 Cincinnati, Ohio 45202

513-621-6300 www.oki.org

Page 139: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

C-19

LIMITED ENGLISH PROFICIENCY (LEP) GUIDANCE

OHIO-KENTUCKY-INDIANA (OKI) REGIONAL COUNCIL OF GOVERNMENTS

The OKI Regional Council of Governments is a Metropolitan Planning Organization and a Council of Governments that serves an eight-county region in three states. According to the 2012 American Community Survey there are 2,146,560 individuals in the Cincinnati-Middletown, OH-KY-IN Metro Area. In order to ensure that members of a Limited English Proficiency group are afforded the opportunity to participate in OKI’s transportation planning process, every Legal Notice is published in both English and Spanish in La Jornada, the area Spanish journal. Postings are also made on La Jornada Latina, the Spanish journal’s Facebook page, and public service announcements are broadcast in Spanish by the on-air talent on WOXY-FM, the Spanish radio station. Spanish has been selected relative to LEP support because of the 2,146,560 individuals in the OH-KY-IN Metro Area, 16,490 Spanish persons or 0.80% speak English less than “very well”; 8,256 Indo-European persons or 0.40% speak English less than “very well”; 10,687 Asian and Pacific Islander persons or 0.50% speak English less than “very well” and 3,432 persons speak other languages or 0.20% speak English less than “very well”. Table 1.1 illustrates the social characteristics of individuals in the Cincinnati-Middletown, OH-KY-IN Metro Area and Table 1.2 provides demographic information for the same metro area. Should the need arise, OKI staff has established a working relationship with Affordable Language Services which offers professional translation and interpreting services in more than 200 languages.

Page 140: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

C-20

DP02: SELECTED SOCIAL CHARACTERISTICS

2012 American Community Survey 1-Year Estimates

Table 1.1 – Entire Table is found in Appendix C

Subject Cincinnati-Middletown, OH-KY-IN Metro Area

LANGUAGE SPOKEN AT HOME

Population 5 years and over 2,006,331 2,006,331

English only 1,892,443 94.30%

Language other than English 113,888 5.70%

Speak English less than "very well" 38,865 1.90%

Spanish 44,931 2.20%

Speak English less than "very well" 16,490 0.80%

Other Indo-European languages 32,589 1.60%

Speak English less than "very well" 8,256 0.40%

Asian and Pacific Islander languages 24,809 1.20%

Speak English less than "very well" 10,687 0.50%

Other languages 11,559 0.60%

Speak English less than "very well" 3,432 0.20%

DP05: ACS DEMOGRAPHIC AND HOUSING ESTIMATES 2012 American Community Survey 1-Year Estimates Table 1.2 – Entire Table is found in Appendix B

Subject Cincinnati-Middletown, OH-KY-IN Metro Area

Estimate Percent

SEX AND AGE

Total population 2,146,560 2,146,560

Male 1,048,533 48.80%

Female 1,098,027 51.20%

RACE

Total population 2,146,560 2,146,560

One race 2,106,090 98.10%

Two or more races 40,470 1.90%

One race 2,106,090 98.10%

White 1,781,225 83.00%

Black or African American 260,247 12.10%

American Indian and Alaska Native 4,612 0.20%

Asian 42,729 2.00%

HISPANIC OR LATINO AND RACE

Total population 2,146,560 2,146,560

Page 141: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

C-21

Hispanic or Latino (of any race) 58,192 2.70%

OKI Title VI Program

Title VI Policy Statement Assurances

Ohio-Kentucky-Indiana Regional Council of Governments

720 East Pete Rose Way, Suite 420 Cincinnati, Ohio 45202

513-621-6300 www.oki.org

Page 142: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

C-22

Page 143: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

C-23

Page 144: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

C-24

DBE

ASSURANCE

LANGUAGE

Page 145: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

C-25

APPENDIX C STANDARD TERMS AND CONDITIONS

Item 1. Definitions. For purposes of this Agreement, the following terms shall be defined

as set forth in this section: (a) "DOT" or "the Secretary" means the Comptroller General of the United States, the

United States Department of Transportation or as the context may require, the Secretary of Transportation, or other persons duly authorized to perform the functions to be performed under this Contract including (where applicable) the Federal Transit Administration, the Federal Highway Administration (FHWA), the Ohio Department of Transportation (ODOT), and the Kentucky Transportation Cabinet (KYTC).

(b) "Approved work program" or "work program" means the approved work program, or any revisions to the work program, approved by the Executive Director of the Council and any designated official of DOT.

(c) "Approved activities" means those activities described in the approved work program.

(d) "Program funds" consist of all amounts, including the value of services and contributions other than cash (if specifically stated in proposal and cost analysis), received by the Contractor for the approved activities.

(e) "Council" means the Ohio-Kentucky-Indiana Regional Council of Governments and its authorized representatives.

(f) "Costs" include direct labor costs, salary related expenses, general and administrative overhead, other direct costs, contractor/subcontractor costs, and fixed fee or profit of the Contractor.

Item 2. Use of Program Funds. Program funds shall be applied against only those

expenditures incurred specifically for approved activities and in conformity with the terms and conditions of this Agreement and with the budget approved by a duly authorized official of both the Council and DOT. The Contractor shall comply with the cost allocability provisions contained in 48 C.F.R. Part 31.2.

Item 3. Governing Law. This Contract shall be governed by and construed in accordance with the laws of the States of Ohio and Commonwealth of Kentucky. This agreement may also be governed by and construed in accordance with federal law wherein such a law is referenced or necessary to the interpretation of the Agreement. In the event of any proceedings regarding this Agreement, the Parties agree that the venue shall be the Ohio Court of Claims, Franklin County or state courts of Kentucky or the U.S. District Court for the Western District of Kentucky,

Page 146: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

C-26

Louisville Division. All parties expressly consent to personal jurisdiction and venue in such Court for the limited and sole purpose of proceedings relating to this Agreement or any rights or obligations arising thereunder. Service of process may be accomplished by following the procedures prescribed by law.

Item 4. Ability to Meet Obligations. Contractor affirmatively states that there are no actions, suites or proceedings of any kind pending against Contractor or, to the knowledge of the Contractor, threatened against Contractor before or by any court, governmental body or agency or other tribunal or authority which would, if adversely determined, have a materially adverse effect on the authority or ability of Contractor to perform its obligations under this Contract or which question the legality, validity or enforceability hereof or thereof.

Item 5. Data to be Furnished to Contractor. If the services to be performed are dependent upon the Council's furnishing data and information to the Contractor, all information, data, reports, records, and maps as are existing, available, and necessary for the carrying out of the work shall be furnished to the Contractor without charge by the Council, and the Council shall cooperate with the Contractor in every way possible in the carrying out of the planning work.

Item 6. Council's Obligation. Subject to the other conditions of this Agreement, the Council will honor requisitions for costs incurred and budgeted (see Appendix A) in amounts deemed by it and by DOT to be proper to ensure the carrying out of the approved work program and payment of eligible costs. In addition to the Council's right to withhold payment of those items which it or DOT does not deem either proper or consistent with the conditions of this Agreement, the Council may elect by notice in writing not to make a payment of grant funds for any of the reasons listed in Section 10 of this document relative to termination or suspension.

Item 7. Establishment and Maintenance of Accounts. The Contractor shall establish for the

approved activities, in conformity with such requirements as may be established by the Council or by DOT to facilitate project administration, separate accounts to be maintained within its existing accounting system or set up independently at the convenience of the Contractor. Such accounts are referred to in these conditions collectively as the "program account". The Contractor shall appropriately record in the program account all program funds as that term is defined in Section 1 of these cash conditions.

Item 8. Documentation of Activity Costs. All costs charged to the program account shall be supported by properly executed payrolls, time records, invoices, contracts, and vouchers evidencing in proper detail the nature and propriety of the charges. This requirement also extends to any certified DBEs or DBE subcontractors. All accounting records shall readily provide a breakdown of activity costs in accordance with the line items shown on the latest approved budget. Such records, together with supporting documents, shall be kept separately from other documents and records and shall be maintained for a period of three years after receipt of the final reimbursement to the Council of Contractors funds, by DOT.

Page 147: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

C-27

Item 9. Audits and Inspections. The Contractor will, as often as deemed necessary by DOT, the Comptroller General of the United States, the Council, or any of their duly authorized representatives to have full access to and the right to examine any directly pertinent books, documents, papers, and records of the Contractor involving transactions related to this Contract for three years from the receipt of final payment under this Contract. The Contractor shall include in all its Team subcontractor’s contracts, a provision that DOT, the Comptroller General or the Council, or any of their duly authorized representatives, will have full access to and the right to examine any directly pertinent books, documents, papers, and records of any subcontractor involving transactions related to the Contract for three years from the final payment under this Contract. The term "Contract" as used in this clause excludes purchase orders not exceeding $5,000 for materials or services directly utilized. OKI will also perform interim desk audits of contract payments to DBEs. The audit will review payments to DBE subcontractors to ensure that the actual amount paid to DBE subcontractors equals or exceeds the dollar amount stated in the schedule of DBE participation.

Item 10. Personnel. (a) The Contractor represents that he has, or will secure at his own expense, all personnel

required in performing the services under this contract. Such personnel shall not be employees of or have any contractual relationship with the Council

(b) All of the services required hereunder will be performed by the Contractor or under this supervision, and all personnel engaged in the work shall be fully qualified and shall be authorized under State and local law to perform such services.

(c) None of the work or services covered by this Contract shall be subcontracted to any other contractors without the prior written approval of the Council.

Item 11. Reports and Information. The Contractor shall, at such times and in such manner as the

Council may require, furnish the Council with periodic reports and statements pertaining to the approved activities and work program and other related matters covered hereunder.

(a) Modification. In the event that subsequent to the execution of this Agreement, the Council determines that services in addition to those set forth in Appendix A are necessary, the Council may, at its discretion, request those services from the Contractor. Any such request shall be made by the Executive Director of the Council in writing. The Contractor may then, if it chooses, offer in writing to perform the requested services. The Contractor's written offer shall clearly state the additional cost(s) of providing the additional services. If the Council decides to accept the Contractor's written offer, it shall so notify the Contractor by its written acceptance and the terms of this Agreement shall thereby be modified. Any payments made by the Council as the result of a modification to this Agreement in the manner set forth in this paragraph shall not be included in arriving at the aggregate amount to be paid under this Agreement as set forth in paragraph 2 of Appendix B. In addition, any and all such payments shall be subject to the terms and conditions of Appendix B.

Item 12. Termination or Suspension. (a) Termination for Cause: The Council may by written notice mailed not less than five days

prior to the effective date thereof, terminate or suspend this Contract in whole or in part, or, without such notice, withhold payment, in the event that it finds that the Contractor has

Page 148: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

C-28

(i) failed to comply in a timely and proper manner with applicable State and Federal law or with any of the provisions of this Contract; (ii) failed to carry out the approved work program; (iii) made unauthorized or improper use of contract funds; (iv) submitted any application, report, or other document which contains a misrepresentation of a material nature or is incorrect or incomplete in any material respect; (v) violated any of the covenants, agreements, or stipulations of this Contract; (vi) if for any reason continuation of the approved work program is rendered improbable, unfeasible, impossible, or illegal; (vii) filing of a bankruptcy petition by or against the Contractor; or (viii) actions that endanger the health, safety or welfare of the Council or citizens of the region. The Contractor shall take such action relative to termination or suspension as may be required by the Council in the notice of termination or suspension or later communication. In such case, termination or suspension shall not affect any otherwise valid and allowable obligations made in good faith prior to receipt of notice of termination or suspension.

In the event of termination, all finished or unfinished documents, data, studies, surveys, drawings, maps, models, photographs, and reports or other material prepared by the Contractor under this Agreement, shall at the option of the Council, become its property, and the Contractor shall be entitled to receive just and equitable compensation for any satisfactory work completed on such documents and other materials. The Council shall promptly compensate the Contractor for any satisfactory work completed on those documents, data, studies, surveys, drawings, maps, models, photographs, reports, or other materials that the Council decides to retain as its property.

Notwithstanding the above, the Contractor shall not be relieved of liability to the

Council for damages sustained by the Council by virtue of any breach of this Agreement by the Contractor, and the Council may withhold any payments to the contractor for the purpose of set off until such time as the exact amount of damages due the Council from the Contractor is determined.

(b) Termination for Convenience: The Council or the Contractor may terminate this Agreement

at any time by giving written notice to the other party of such termination and specifying the effective date thereof, at least 30 days before the effective date of termination. In that event, all finished or unfinished documents and other materials as described in Paragraph 10(a) above shall, at the option of the Council, become its property. If this Agreement is terminated by the Council or Contractor as provided herein, the Contractor shall be paid for all eligible expenditures properly incurred for services actually performed prior to termination and invoiced as described in 4(a) of this Agreement; provided, that such costs are approved by the Council and DOT. Payment for those goods and services shall not be unreasonably withheld. In addition, the Contractor shall be entitled to a portion of its profit or fixed fee which shall be determined by multiplying the total profit or fixed fee figure appearing in line 11 of the Cost Summary (see Appendix A) by the percentage of total work completed by the Contractor under this Agreement. For purposes of determining the percentage of total work completed under this Agreement, each item within a task shall be considered so that even if the Contractor fails to complete a task, it will be entitled to the portion of its profits attributable to the items within that task that have been completed

Page 149: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

C-29

prior to termination. If this Agreement is terminated otherwise than solely for the convenience of the Council, Paragraph 10(a) hereof relative to termination shall apply.

Item 13. Political Activity. No portion of program funds shall be used for any partisan political

activity or to further the election or defeat of any candidate for public offices. All employees of the Contractor shall observe the limitations on political activities to which they may be subject under the Hatch Act (5 U.S.C. 1501 et seq., 18 U.S.C. 595).

Item 14. Campaign Finance. If applicable, the Contractor swears under the penalty of perjury, as

provided by Ohio Revised Code section 2921.11 and KRS 523.020, that neither he/she nor the entity which he/she represents has knowingly violated any provisions of the campaign finance laws of the State of Ohio or the Commonwealth, and that the award of a contract to him/her or the entity which he/she represents will not violate any provisions of the campaign finance laws of the State of Ohio or the Commonwealth.

Item 15. Anti-Lobbying Restrictions. The Contractor is required to sign the Restrictions on Lobbying Certification (Appendix D) and if any contractor funds are used for purposes of lobbying, Contractor agrees to disclose to Council such lobbying on Standard Form LL.

Item 16. Interest of Public Officials and Employees. No officer or employee of the Council and no members of its governing body, and no public official of the locality in which the approved work program or its components will be carried out who exercises any functions or responsibilities in the review or approval of the undertaking or carrying out of such program shall (a) participate in any decision relating to any contract negotiated under this Contract which affects his personal interest or the interest of any corporation, partnership, or association in which he is, directly or indirectly, interested, or (b) have any financial interest, direct or indirect, in such contract or in the work to be performed under such contract. The Contractor agrees that neither it, its employees, or agents will make any payment, take any action or permit any person to make any payment or to take any action which may result in a violation of this Section 13.

Item 17. Interest of Certain Federal Officials. No member of or delegate to the Congress of the United State of America, and no resident commissioner, shall be admitted to any share or part hereof or to any benefit arising here from.

Item 18. Covenant Against Contingent Fees. The Contractor warrants that he has not employed or retained any company or person, other than a bona fide employee working solely for the Contractor, to solicit or secure this contract, and that he has not paid or agreed to pay any company or person, other than a bona fide employee working solely for the Contractor, any fee, commission, percentage brokerage fee, gifts, or other consideration, contingent upon or resulting from the award or making of this Contract. For breach or violation of this warranty, the Council shall have the right to annul this Agreement without liability, or at its discretion to deduct from the Agreement price or consideration, or otherwise recover, the full amount of such fee, commission, percentage, brokerage fee, gift, or contingent fee.

Item 19. Equal Employment Opportunity.

Page 150: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

C-30

(a) The Contractor will not discriminate against any employee or applicant for employment because of race, color, religion, sex, or national origin. The Contractor shall take affirmative action to ensure that applicants are employed and that employees are treated during employment, without regard to their race, color, religion, sex, or national origin. Such actions shall include, but not be limited to the following: employment, upgrading, demotions, or transfers, recruitment or recruitment advertising, layoffs or terminations, rates of pay or other forms of compensation, selection for training including apprenticeship, and participation in recreational and educational activities. The Contractor agrees to post in conspicuous places available to employees and applicants for employment notices to be provided setting forth the provisions of this non-discrimination clause. The Contractor will in all solicitation or advertisements for employees placed by or on behalf of the Contractor, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, or national origin. The Contractor will cause the foregoing provisions to be inserted in all subcontracts of the Team for any work covered by this contract so that such provisions will be binding upon each subcontractor provided that the foregoing provisions shall not apply to contracts or subcontracts for standard commercial supplies or raw materials.

(b) The Contractor shall keep such records and submit such reports concerning the racial and ethnic origin of applicants for employment and employees as DOT may require.

(c) The Contractor agrees to comply with such rules, regulations or guidelines as DOT may issue to implement these requirements.

Item 20. Compliance with Title VI of the Civil Rights Act of 1964. (a) Compliance with Regulations: The Contractor will comply with the Regulations of the KYTC,

where applicable, and the ODOT, where applicable, relative to non-discrimination in Federally-assisted programs of the Department of Transportation (Title 49, Code of Federal Regulations, Part 21, hereinafter referred to as the Regulations), which are herein incorporated by reference and made apart of this Agreement.

(b) Nondiscrimination: The Contractor, with regard to the work performed by it after award and prior to completion of the contract work, will not discriminate on the grounds of race, color, religion, sex, or national origin in the selection and retention of subcontractors, including procurement of material and leases of equipment. The Contractor will not participate either directly or indirectly in the discrimination prohibited by Section 21.5 of the Regulations, including employment practices when the Contract covers a program set forth in Appendix B of the Regulations.

(c) Solicitations for Subcontracts including procurement of materials and equipment: In all solicitations, either by competitive bidding or negotiations made by the Contractor for work to be performed under a subcontract, including procurement of materials or equipment, each potential subcontractor or supplier shall be notified by the Contractor of the Contractor's obligations under this Agreement and the Regulations relative to nondiscrimination on the grounds of race, color, religion, sex, or national origin.

(d) Information and Reports: The Contractor will provide all information and reports required by the Regulations, or orders and instructions issued pursuant thereto, and will permit access to its books, records, accounts, other sources of information, and its facilities as may be determined by DOT, to be pertinent, to ascertain compliance with such Regulations,

Page 151: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

C-31

orders and instructions. Where any information required of a Contractor is in the exclusive possession of another who fails or refuses to furnish this information, the Contractor shall so certify to DOT as appropriate, and shall set forth what efforts it has made to obtain the information.

(e) Sanctions for Noncompliance: In the event of the Contractor's noncompliance with the nondiscrimination provisions of this Contract, DOT shall impose such contract sanctions as it may determine to be appropriate, including but not limited to: (1) withholding of payments to the Contractor under the Agreement until the Contractor

complies and/or (2) cancellation, termination, or suspension of the Agreement in whole or in part.

(f) Incorporation of Provisions: The Contractor will include the provisions of Paragraph (a) through (e) in every subcontract, including procurement of materials and leases of equipment, unless exempt by the regulations, order, or instructions issued pursuant thereto. The Contractor will take such action with respect to any subcontract or procurement as the Council may direct as a means of enforcing such provisions including sanctions for noncompliance; provided, however, that in the event a Contractor becomes involved in, or is threatened with litigation with a subcontractor or supplier as a result of such direction, the Contractor may request the Council to enter into such litigation to protect the interest of the Council.

Item 21. Occupational Health and Safety: The Contractor agrees to comply with all statutes,

rules and regulations governing safe and healthful working conditions, including the Occupational Health and Safety Act of 1970, 29 U.S.C. 650 et.seq., as amended, Ohio Revised Code section 4167.06 and KRS Chapter 33. The Contractor also agrees to notify the Council in writing immediately upon detection of any unsafe and/or unhealthful working conditions at the job site. The Contractor agrees to indemnify, defend and hold COUNCIL harmless from all penalties, fines or other expenses arising out of the alleged violation of said laws.

Item 22. Bribery: By the Contractor signature on the contract, the Contractor certifies that no

employee of the Contractor, any affiliate or subcontractor, has bribed or attempted to bribe an officer or employee of the Council.

Item 23. Interest of Contractor. The Contractor covenants that he presently has no interest and shall not acquire any interest, direct or indirect, which would conflict in any manner or degree with the performance of services required to be performed under this Contract. The Contractor further covenants that in the performance of this Contract no person having any such interest shall be employed.

Item 24. Violation of and Compliance with Ohio and Kentucky Laws. The Contractor shall reveal any final determination of violation by the Contractor or subcontractor with the previous five (5) year period pursuant to Ohio Revised Code sections 5733, 5740, 5747, 4111, 4101, 4141 and 4123 and KRS Chapters 136, 139, 141, 337, 338, 341, and 342 that apply to the Contractor or subcontractor. The Contractor shall be in continuous compliance with the provisions of Ohio Revised Code sections 5733, 5740, 5747, 4111, 4101, 4141 and 4123 and KRS Chapters 136, 139, 141, 337, 338, 341, and 342 the apply to the Contractor or subcontractor for the duration of the contract.

Page 152: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

C-32

Item 25. Findings Confidential. Any reports, information, data, etc., given to or prepared or assembled by the Contractor under this Agreement, which the Council requests to be kept as confidential, shall not be made available to any individual or organization by the Contractor without prior written approval of the Council.

Item 26. Publication, Reproduction, and Use of Material. No material produced in whole or in part under this contract shall be subject to copyright in the United States or in any other country. The Council and DOT shall have unrestricted authority to publish, disclose, distribute and otherwise use, in whole or in part, any reports, data, or other materials prepared under this Agreement.

Item 27. Waivers or Revisions. To be valid, a waiver of any condition to this Agreement, or any revision to the approved work program and budget must be in writing from a duly authorized official of DOT and the Council. No failure or delay by the Council in exercising any right, remedy, power or privilege hereunder, nor any single or partial exercise thereof, nor the exercise of any other right, remedy, power or privilege shall operate as a waiver hereof or thereof. No failure or delay by the Council in exercising any right, remedy, power or privilege under or in respect of this Contract shall affect the rights, remedies, powers or privileges of COUNCIL hereunder or shall operate as a waiver thereof.

Item 28. Safeguarding Operations and Funds. The Contractor will safeguard all funds becoming

available to it for approved activities under this Agreement (including funds becoming available to it for deposit, or deposited, in the program account) by insurance or fidelity bonds or by taking such other actions as may be approved by DOT and the Council. Such insurance or fidelity bonds, if required, shall be of such types, in such amounts, and with such coverage and otherwise as shall be satisfactory to DOT and the Council and proper and adequate for the purposes of this Agreement.

Item 29. Adjustments and Amounts of the Agreement. The Council reserves the right to review the progress made by the Contractor in carrying out the approved work program and, on the basis of this review, to renegotiate with the Contractor and decrease (or increase subject to the availability of funds) accordingly the amount of the compensation provided hereunder.

Item 30. Assignment. The Contractor shall not assign, or transfer any interest in this Agreement without the prior written consent of the Council. Any purported assignment or subcontract by Contractor in violation hereof shall be void. It is expressly acknowledged that the Council shall never be required or obligated to consent to any request for assignment or subcontract; and further that such refusal to consent can be for any or no reason fully within the sole discretion of the Council. However, in the case of an assignment or transfer of a claim for money due or to become due under this Agreement to a bank, trust company or other financial institution, the Contractor need not obtain the consent of the Council if the Contractor promptly furnishes notice of any such assignment or transfer.

Item 31. Disputes. The Contractor agrees that all disputes concerning questions of fact in connection with the work, and not otherwise disposed of by the specific terms of this Agreement shall be resolved as follows:

The Contractor shall notify the Council's Executive Director, in writing, within sixty (60) days following a determination by the Council, which in the opinion of the Contractor, is in material conflict with the facts concerning the subject matter. In such notification, the Contractor shall present such

Page 153: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

C-33

evidentiary matters as may support the Contractor's position and shall request a review of the previous determination. Within a reasonable time, the Executive Director shall cause the circumstance and facts to be reappraised for the purpose of his determination.

The Contractor agrees that the Executive Director will decide all such questions which may arise including the quality and acceptability of materials furnished and work performed; the rate of progress of the work; the interpretation of the plans and specifications; the acceptable fulfillment of the Agreement on the part of the Contractor; matters concerning compensation and all other matters and disputes relating to facts in connection with this Agreement; and the services or work to be performed there-under. Item 32. Remedies. Except as otherwise provided in this Agreement, any dispute concerning a question of fact arising under this Agreement which is not disposed of by agreement shall be decided by the Council Executive Director, who shall reduce his decision to writing and mail or otherwise furnish a copy thereof to the Contractor. The decision of the Council Executive Director shall be final and conclusive unless within 30 days from the date of receipt of such a copy, the Contractor mails or otherwise furnishes to the Executive Director a written appeal addressed to the Council Executive Committee. The decision of the Executive Committee of the Council Board of Trustee’s shall be final and conclusive unless determined by a court of competent jurisdiction to have been fraudulent, capricious, arbitrary, or so grossly erroneous as necessarily to imply bad faith, or not supported by substantial evidence. In connection with any appeal proceeding under this clause, the Contractor shall be afforded an opportunity to be heard and to offer evidence in support of their appeal. Pending final decision of a dispute hereunder, the Contractor shall proceed diligently with the performance of the Agreement in accordance with the Council Executive Director's decision and such continued performance does not in any manner imply acceptance of an agreement with that decision by the contractor nor does it infringe upon the Contractor's right to appeal that decision.

This "Remedies” clause does not preclude consideration of law questions in connection with decisions provided for in the above paragraph; provided, that nothing in this Agreement shall be construed as making final the decision of any administrative official, representative, or board on a question of law.

Item 33. Responsibility for Claims and Liability. The Contractor shall indemnify and hold harmless the Council and those agencies previously defined as DOT, from and against liabilities, losses, damages, cost, expenses, and disbursements imposed on, asserted against or incurred By the Council, and DOT to the extent that such liabilities resulted from the negligent performance, or negligent acts of its agents or employees.

Item 34. Disadvantaged Business Enterprise. It is the policy of the Council that minority business enterprises, as defined in 49 CFR Part 26, shall have the maximum opportunity to participate in the performance of contracts financed in whole or in part with Federal funds under this Agreement. Consequently, the D.B.E. requirements of 49 CFR Part 26 apply to this Agreement.

The Council shall not discriminate on the basis of race, color, national origin, or sex in the award and performance of any DOT-assisted contract or in the administration of its DBE Program or the requirements of 49 CFR Part 26. The recipient shall take all necessary and reasonable steps under 49 CFR Part 26 to ensure non-discrimination in the award and administration of DOT-assisted contracts. The recipient’s DBE Program, as required by 49 CFR Part 26 and as approved by DOT, is incorporated by

Page 154: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

C-34

reference in this agreement. Implementation of this program is a legal obligation and failure to carry out its terms shall be treated as a violation of this agreement. Upon notification to COUNCIL of its failure to carry out its approved programs, the Department may impose sanctions as provided for under 49 CFR Part 26 and may, in appropriate cases, refer the matter for enforcement under 18 U.S. C. 1001 and /or the Program Fraud Civil Remedies Act of 1986 (31 U.S.C. 3801 et sq.) The Contractor agrees to ensure that minority business enterprises as defined in 49 CFR Part 26 have the maximum opportunity to participate in the performance of contracts and subcontracts financed in whole or in part with Federal funds provided under this Agreement. The target for such DBE utilization would be 5% of total contract funds. The Contractor shall take all necessary and reasonable steps in accordance with 49 CFR Part 26 to ensure that minority business enterprises have the maximum opportunity to compete for and perform contracts. The Contractor agrees to include as part of its contracts, a clause requiring disclosure of names, addresses and other information pertaining to the DOT-assisted contract. Contractors must include such a clause in sub-contracting agreements. The Recipient agrees to comply with the DBE requirements contained within 49 CFR Part 26. The Contractor, subrecipient, or subcontractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this Agreement. The contractor shall carry out applicable requirements of 49 CFR Part 26 in the award and administration of USDOT-assisted contracts. Failure by the contractor to carry out these requirements is a material breach of this Agreement, which may result in the termination of this Agreement or such other remedy as the Recipient deems appropriate. Each contract signed with a Contractor (and each subcontract the prime contractor signs with a subcontractor) must include this provision. The Council will require all DBEs to inform it, in a written affidavit, of any change to its circumstances affecting its ability to meet size, disadvantaged status, ownership or control criteria of 49 CFR Part 26, or of any material changes in the information provided with such DBE’s application for certification.

Item 35. Nondiscrimination on the Basis of Handicap. The Contractor agrees to comply with U.S. DOT regulations “Nondiscrimination on the Basis of Handicap in Programs and Activities Benefiting from Federal Financial Assistance,” 49 CFR 27.9, which implement the Rehabilitation Act of 1973, as amended, and the Americans with Disabilities Act of 1990, prohibiting discrimination against otherwise qualified persons, under this agreement.

Page 155: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

Item 36. Authority to do Business. The Contractor must be duly organized and must be

properly authorized to do business under the laws of Ohio and Kentucky. Contractor must be in good standing and have full legal capacity to provide the services specified under this Contract. The Contractor must have all necessary right and lawful authority to enter into this Contract for the full term hereof and that proper corporate or other action has been duly taken authorizing the Contractor to enter into this Contract. The Contractor will provide the Council with a copy of a corporate resolution authorizing this action and a letter from an attorney confirming that the Contractor is authorized to do business in the State of Ohio and Commonwealth of Kentucky if requested. All contracts must be signed by a duly authorized officer, agent or employee of the Contractor.

Item 37. Hold Harmless and Indemnification Clause. The Contractor agrees to indemnify,

hold harmless, and defend the Council, its elected and appointed officials, employees, agents and successors in interest from all claims, damages, losses and expenses including attorneys’ fees, arising out of or resulting, directly or indirectly, from the Contractor’s (or Contractor’s subcontractors if any) performance or breach of the contract provided that such claim, damage, loss, or expense is (1) attributable to personal injury, bodily injury, sickness, death, or to injury to or destruction of property, including the loss of use resulting therefrom, or from negligent acts, errors or omissions and (2) not caused by the negligent act or omission or willful misconduct of the Council or its elected and appointed officials and employees acting within the scope of their employment. This Hold Harmless and Indemnification Clause shall in no way be limited by any financial responsibility or insurance requirements and shall survive the termination of this Contract.

Item 38. Insurance Requirements. Prior to commencing work, Contractor shall obtain at its own cost and expense the following types of insurance through insurance companies licensed in the State of Ohio and the Commonwealth of Kentucky. Insurance written by non-admitted carriers will also be considered acceptable, in accordance with Ohio Revised Code section 3905 and Kentucky Insurance Law (KRS 304.10-040). Workers' Compensation written through qualified group self-insurance programs in accordance with Ohio Revised Code section 4123 Kentucky Revised Statutes (KRS 342.350) will also be acceptable. The Contractor shall not commence work under this Contract until all insurance required under the Contract Document has been obtained and until copies of policies or certificates thereof are submitted to and approved by the COUNCIL Finance Department. The Contractor shall not allow any subcontractor to commence work until the insurance required of such subcontractor has been obtained and copies of Certificates of Insurance retained by Contractor evidencing proof of coverages. Without limiting Contractor's indemnification requirements, it is agreed that Contractor shall maintain in force at all times during the performance of this agreement the following policy or policies of insurance covering its operations, and require subcontractors, if subcontracting is authorized, to procure and maintain these same policies. COUNCIL may require Contractor to supply proof of subcontractor’s insurance via Certificates of Insurance, or at the Council’s option, actual copies of policies.

Page 156: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

C-36

A. The following clause shall be added to the Contractor's (and approved

subcontractors) Comprehensive General Liability Policies: 1. "The Council’s (COUNCIL), its elected and appointed officials, employees,

agents and successors are added as an "Additional Insured" as respects operations of the Named Insured performed relative to the contract.”

B. The insurance to be procured and maintained and the minimum Limits of Liability shall

be as follows, unless different Limits are specified by addendum to the Contract:

1. COMMERCIAL GENERAL LIABILITY, via the Occurrence Form, with a $1,000,000 Combined Single Limit for any one occurrence and $2,000,000 aggregate for Bodily Injury, Personal Injury and Property Damage, including:

a. Premises - Operations Coverage b. Completed Operations c. Contractual Liability d. Broad Form Property Damage e. Independent Contractors Protective Liability f. Personal Injury

2. AUTOMOBILE LIABILITY insuring all Owned, Non-Owned and Hired Motor Vehicles. The minimum coverage Liability Limit is $1,000,000 Combined Single Limit for any one accident. The Limit of Liability may be subject to increase according to any applicable State or Federal Transportation Regulations.

3. Workers' Compensation insuring the employers' obligations under

Kentucky Revised Statutes Chapter 342.Employers' Liability with a $100,000 Limit of Liability for Each Accident/$500,000 Disease - Policy Limit/$100,000 Disease - Each Employee

4. PROFESSIONAL LIABILITY (Errors and Omission Liability) insurance policy,

which includes a minimum limit of liability of $1,000,000 for each Wrongful Act. In the event that the Contractor’s policy is written on a “Claims Made” form, the Contractor shall, after work has been completed, furnish evidence that the liability coverage has been maintained for at least one year after completion of work, either by submitting renewal policies with a Retroactive Date of not later than the date work commenced under this contract, or by evidence that the Contractor has purchased an Extended Reporting Period Endorsement that will apply to any and all claims arising from work performed under this contract.

C. Acceptability Insurance is to be placed with Insurance Companies with an A. M. Best Rating of no less than "B+ VI", unless proper financial information relating to the Company is submitted to and approved by COUNCIL’s Finance Department.

D. Miscellaneous

Page 157: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

C-37

1. The Contractor shall procure and maintain insurance policies as described

herein and for which the COUNCIL Finance Department shall be furnished Certificates of Insurance upon the execution of the Contract. The Certificates shall include provisions stating that the policies may not be cancelled without COUNCIL having been provided at least (30) thirty days written notice. The Certificates shall identify the Contract to which they apply and shall include the name and address of the person executing the Certificate of Insurance as well as the person's signature. If policies expire before the completion of the Contract, renewal Certificates of Insurance shall be furnished to COUNCIL’s Finance Department before the expiration date.

2. Certificates of Insurance as required above shall be furnished, as called for:

a. No later than five (5) days after the successful submitting firm is

notified of award by the Council to:

Ohio-Kentucky-Indiana Regional Council of Governments Attn: Finance Department

720 East Pete Rose Way, Suite 420 Cincinnati, Ohio 45202

3. The Contractor agrees that it will not materially alter any of the insurance

policies currently in force and relied on under this agreement. Further, the Contractor will not reduce any coverage amount below the limits required in this agreement.

4. Approval of the insurance by COUNCIL shall not in any way relieve or

decrease the liability of the Contractor hereunder. It is expressly understood that the Council does not in any way represent that the specified Limits of Liability or coverage or policy forms are sufficient or adequate to protect the interest or liabilities of the Contractor.

Item 39. Provisions to be Incorporated in Subcontracts . The prime contractor agrees to pay each subcontractor under this prime contract for satisfactory performance of its contract no later than then (10) working days from the receipt of each payment the contractor receives from OKI. The prime contractor agrees further to return retainage payments to each subcontractor within 30 days after the subcontractor’s work is satisfactorily completed. Any delay or postponement of such payment from the above referenced time frame may occur only for good cause following written approval by OKI. This clause applies to both DBE and non-DBE subcontractors. Failure to comply may result in said prime contractor being eliminated from future participation in OKI contract opportunities for a period of one year and until a written plan of remedy to avoid such occurrences in the future is submitted by the offending prime contractor for approval by OKI. The Contractor agrees to incorporate all the provisions of Appendix C, Item 1 through Item 38 and Appendix D in its entirety, in any Sub-Contracts. In addition, if additional

Page 158: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

C-38

contracts are authorized by the Council in writing, the Contractor agrees to incorporate all such Appendix C and D provisions in such contracts.

Page 159: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

C-39

SOCIO-DEMOGRAPHIC

PROFILE

Page 160: OKI FY 2017 UNIFIED PLANNING WORK PROGRAM · Promote and facilitate the implementation of intelligent transportation system (ITS) to improve the transportation system efficiency and

C-40

De

mo

gra

ph

ic P

rofi

le

Bo

on

e C

o,

KY

Bu

tle

r C

o.,

OH

Ca

mp

be

ll C

o.,

KY

Cle

rmo

nt

Co

., O

HD

ea

rbo

rn C

o.,

IN

Ha

mil

ton

Co

., O

HK

en

ton

Co

., K

YW

arr

en

Co

., O

HO

KI

Re

gio

n

Tota

l popula

tion

118,8

11

368,1

30

90,3

36

197,3

63

50,0

47

802,3

74

159,7

20

212,6

93

1,9

99,4

74

One R

ace

116,6

52

360,2

63

88,9

44

194,7

10

49,5

57

785,1

88

156,5

55

209,5

09

1,9

61,3

78

W

hite

109,0

50

316,6

67

85,2

15

189,2

50

48,7

80

552,3

30

145,3

94

192,4

31

1,6

39,1

17

B

lack o

r A

fric

an A

merican

2,9

92

26,9

72

2,2

90

2,2

84

300

205,9

52

7,3

59

6,9

40

255,0

89

A

merican India

n a

nd A

laska N

ative

228

770

126

403

87

1,6

17

294

341

3,8

66

A

sia

n2,5

34

8,8

11

753

1,9

20

189

16,1

82

1,4

47

8,2

84

40,1

20

Asia

n India

n632

2,9

66

203

692

25

5,6

12

390

4,1

42

14,6

62

Chin

ese

299

1,8

73

136

386

31

3,6

16

208

1,8

45

8,3

94

Filip

ino

187

715

123

205

50

1,3

85

229

375

3,2

69

Japanese

860

272

46

84

18

841

126

405

2,6

52

Kore

an

161

520

102

107

18

1,3

44

115

445

2,8

12

Vie

tnam

ese

193

1,3

51

33

226

33

1,1

42

107

357

3,4

42

Oth

er

Asia

n [

1]

202

1,1

14

110

220

14

2,2

42

272

715

4,8

89

N

ative

Haw

aiian a

nd O

ther

Pacific

Isla

nder

95

288

20

61

26

603

155

99

1,3

47

Native

Haw

aiian

27

46

322

687

29

23

243

Guam

ania

n o

r C

ham

orr

o24

79

93

5231

42

17

410

Sam

oan

16

10

314

635

14

199

Oth

er

Pacific

Isla

nder

[2]

28

153

522

9250

70

58

595

S

om

e O

ther

Race

1,7

53

6,7

55

540

792

175

8,5

04

1,9

06

1,4

14

21,8

39

Tw

o o

r M

ore

Races

2,1

59

7,8

67

1,3

92

2,6

53

490

17,1

86

3,1

65

3,1

84

38,0

96

W

hite;

Am

erican India

n a

nd A

laska N

ative

[3]

413

1,2

46

315

818

143

1,9

81

519

657

6,0

92

W

hite;

Asia

n [

3]

475

1,2

91

172

520

70

2,5

98

396

1,0

02

6,5

24

W

hite;

Bla

ck o

r A

fric

an A

merican [

3]

699

3,3

72

668

873

177

7,6

40

1,5

48

855

15,8

32

W

hite;

Som

e O

ther

Race [

3]

260

777

69

172

53

969

253

203

2,7

56

R

ace a

lone o

r in

com

bin

ation w

ith o

ne o

r m

ore

oth

er

races:

[4]

White

111,0

47

323,8

20

86,5

20

191,8

19

49,2

47

567,0

32

148,3

49

195,3

73

1,6

73,2

07

Bla

ck o

r A

fric

an A

merican

3,8

60

31,1

21

3,0

50

3,2

97

492

216,7

82

9,1

57

8,0

04

275,7

63

Am

erican India

n a

nd A

laska N

ative

771

2,4

96

512

1,3

43

249

5,8

06

995

1,1

51

13,3

23

Asia

n3,1

48

10,5

55

986

2,5

44

286

20,0

16

1,9

77

9,5

50

49,0

62

Native

Haw

aiian a

nd O

ther

Pacific

Isla

nder

176

503

65

138

44

1,0

75

271

220

2,4

92

Som

e O

ther

Race

2,1

16

7,9

40

666

1,0

31

238

10,4

31

2,3

50

1,7

84

26,5

56

HIS

PA

NIC

OR

LA

TIN

O

Tota

l popula

tion

118,8

11

368,1

30

90,3

36

197,3

63

50,0

47

802,3

74

159,7

20

212,6

93

1,9

99,4

74

His

panic

or

Latino (

of any r

ace)

4,2

05

14,6

70

1,4

95

2,8

96

502

20,6

07

4,2

25

4,7

84

53,3

84

M

exic

an

2,5

42

8,2

46

723

1,5

04

292

9,5

83

2,2

04

2,4

49

27,5

43

P

uert

o R

ican

435

1,3

66

150

407

49

2,1

11

427

651

5,5

96

C

uban

96

382

53

109

9682

103

210

1,6

44

O

ther

His

panic

or

Latino [

5]

1,1

32

4,6

76

569

876

152

8,2

31

1,4

91

1,4

74

18,6

01

Not

His

panic

or

Latino

114,6

06

353,4

60

88,8

41

194,4

67

49,5

45

781,7

67

155,4

95

207,9

09

1,9

46,0

90

HIS

PA

NIC

OR

LA

TIN

O A

ND

RA

CE

Tota

l popula

tion

118,8

11

368,1

30

90,3

36

197,3

63

50,0

47

802,3

74

159,7

20

212,6

93

1,9

99,4

74

His

panic

or

Latino

4,2

05

14,6

70

1,4

95

2,8

96

502

20,6

07

4,2

25

4,7

84

53,3

84

W

hite a

lone

2,0

95

6,4

84

809

1,9

19

294

10,0

57

1,9

64

3,1

26

26,7

48

B

lack o

r A

fric

an A

merican a

lone

64

509

37

50

91,2

04

92

102

2,0

67

A

merican India

n a

nd A

laska N

ative

alo

ne

36

164

27

54

8398

59

52

798

A

sia

n a

lone

20

52

33

20

2102

49

23

301

N

ative

Haw

aiian a

nd O

ther

Pacific

Isla

nder

alo

ne

19

49

53

2129

16

6229

S

om

e O

ther

Race a

lone

1,6

07

6,2

39

441

603

125

6,8

39

1,6

47

1,1

42

18,6

43

Tw

o o

r M

ore

Races

364

1,1

73

143

247

62

1,8

78

398

333

4,5

98

Not

His

panic

or

Latino

114,6

06

353,4

60

88,8

41

194,4

67

49,5

45

781,7

67

155,4

95

207,9

09

1,9

46,0

90

W

hite a

lone

106,9

55

310,1

83

84,4

06

187,3

31

48,4

86

542,2

73

143,4

30

189,3

05

1,6

12,3

69

B

lack o

r A

fric

an A

merican a

lone

2,9

28

26,4

63

2,2

53

2,2

34

291

204,7

48

7,2

67

6,8

38

253,0

22

A

merican India

n a

nd A

laska N

ative

alo

ne

192

606

99

349

79

1,2

19

235

289

3,0

68

A

sia

n a

lone

2,5

14

8,7

59

720

1,9

00

187

16,0

80

1,3

98

8,2

61

39,8

19

N

ative

Haw

aiian a

nd O

ther

Pacific

Isla

nder

alo

ne

76

239

15

58

24

474

139

93

1,1

18

S

om

e O

ther

Race a

lone

146

516

99

189

50

1,6

65

259

272

3,1

96

Tw

o o

r M

ore

Races

1,7

95

6,6

94

1,2

49

2,4

06

428

15,3

08

2,7

67

2,8

51

33,4

98

[1] O

ther

Asia

n a

lone, or

two o

r m

ore

Asia

n c

ate

gories.

[2] O

ther

Pacific

Isla

nder

alo

ne, or

two o

r m

ore

Native H

aw

aiia

n a

nd O

ther

Pacific

Isla

nder

cate

gories.

[3] O

ne o

f th

e f

our

most com

monly

report

ed m

ultip

le-r

ace c

om

bin

ations.

[4] In

com

bin

ation w

ith o

ne o

r m

ore

of

the o

ther

races lis

ted.

[5] This

cate

gory

is c

om

posed o

f people

whose o

rigin

s a

re f

rom

the D

om

icia

n R

epublic

, S

pain

and S

panis

h s

peakin

g C

entr

al or

South

Am

erican c

ountr

ies.

It a

lso inclu

des g

enera

l origin

responses s

uch a

s "

Latino"

or

"His

panic

."

Sourc

e: U

.S. C

ensus B

ure

au, 2010 C

ensus S

F1, D

P-1

Table