oki 2014 transportation funding opportunities

16
OKI 2014 Transportation Funding Opportunities

Upload: halia

Post on 25-Feb-2016

62 views

Category:

Documents


0 download

DESCRIPTION

OKI 2014 Transportation Funding Opportunities. Funding Programs . Surface Transportation Program (STP) Transportation Alternatives Program (TA) Congestion Mitigation / Air Quality (CMAQ) Highway Safety Improvement Program (HSIP). Example Eligible Projects - STP. Roadway widening - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: OKI 2014 Transportation Funding Opportunities

OKI 2014 Transportation

Funding Opportunities

Page 2: OKI 2014 Transportation Funding Opportunities

Funding Programs Surface Transportation Program (STP)Transportation Alternatives Program (TA)Congestion Mitigation / Air Quality (CMAQ)Highway Safety Improvement Program (HSIP)

Page 3: OKI 2014 Transportation Funding Opportunities

Example Eligible Projects - STP

Roadway wideningRoadway reconstruction, realignmentNew routeSignalizationAccess managementSafety improvementsTransit capitalBicycle/pedestrian transportation projects

Page 4: OKI 2014 Transportation Funding Opportunities

Example Eligible Projects - TASafe Routes for non drivers, schoolsConversion and use of abandoned railroad

corridors for trails for pedestrians and bicyclists

Turnouts, overlooks and viewing areasPreservation and rehabilitation of historic

transportation facilities

Page 5: OKI 2014 Transportation Funding Opportunities

Example Eligible Projects - CMAQ

Traffic signal coordination/optimizationAddition of intersection turn lanesTransit vehicle replacementNew transit service and transit facilitiesOzone reduction programsRideshare programAlternative fuel/diesel retrofitNote: CMAQ funds are not sub-allocated to OKI in OH & KY

Page 6: OKI 2014 Transportation Funding Opportunities

Example Eligible Projects - HSIP

An intersection safety improvement

Installation of rumble strips

Installation of a skid-resistant surface

An improvement for pedestrian or bicyclist safety or safety of the disabled

Elimination of hazards at a railway-highway crossing

Construction of a traffic calming feature

Elimination of a roadside obstacle

Improvement of highway signage and pavement markings

Installation of a priority control system for emergency vehicles at signalized intersections

Installation of a traffic control or other warning device at a location with high accident potential

Improvement in the collection and analysis of crash data

Work zone safety improvements

Installation of guardrails

Page 7: OKI 2014 Transportation Funding Opportunities

Available Ohio FundsOhio STP Ohio TA

FY 16 -- $ 4.06 MFY 17 $ 3.2 M $ 2.35 MFY 18 $ 9.9 M $ 2.35 MFY 19 $19.2 M $ 2.35 MTOTAL $32.3 M $11.11 M

Page 8: OKI 2014 Transportation Funding Opportunities

Available Indiana Funds

Indiana STP

Indiana TA

Indiana CMAQ

Indiana HSIP

FY16 $503,000 $11,650 $415,560 $153,100

Note: Total STP assumes $160k for Bright 74 Corridor

Page 9: OKI 2014 Transportation Funding Opportunities

Estimated Annual Kentucky Funds

Available Through OKI

KY STP (SNK)

KY TA KY CMAQ

$5,100,000 $433,000 $0

Call for projects anticipated in 2015 for fiscal years:2018 & 2019

Page 10: OKI 2014 Transportation Funding Opportunities

Timeline2014 February March April Ma

yJune July August Septemb

er

Ohio STPOhio TAOhio CMAQ

IndianaSTP, CMAQTA, HSIPKentuckySNK, TA

Remains open until expended

No call this year

Page 11: OKI 2014 Transportation Funding Opportunities

Ohio Surface Transportation Program

(STP)Fiscal Years 2017-2019

Maximum Amount: $6 Million Per ProjectMinimum 20% Local Match Required

Applications Available Beginning 2/12/14 Applications Due 3/28/14 ICC Prioritization Subcommittee Evaluation5/06/14 OKI Board Action 6/12/14

Page 12: OKI 2014 Transportation Funding Opportunities

Ohio Transportation Alternatives (TA)

Fiscal Years 2015-2019 Maximum Amount: $500,000 Per Project

Minimum 20% Local Match Required Applications Available Beginning 2/12/14 Applications Due 3/28/14 ICC Prioritization Subcommittee Evaluation5/06/14 OKI Board Action 6/12/14

Page 13: OKI 2014 Transportation Funding Opportunities

Ohio Congestion Management and Air Quality (CMAQ)

Fiscal Years 2018-2020Maximum Amount: Unspecified

Minimum 20% Local Match Required Applications Available Beginning 4/08/14 Applications Due 6/02/14 ICC Prioritization Subcommittee Evaluation8/12/14 OKI Board Prioritize & Submit to Statewide Committee 9/11/14

Page 14: OKI 2014 Transportation Funding Opportunities

Indiana STP, TA, CMAQ, HSIPFiscal Year 2016

Maximum Amount: UnspecifiedMinimum 20% Local Match Required

Applications Available Beginning now Applications Due ongoing

Page 15: OKI 2014 Transportation Funding Opportunities

More information and applications available on the OKI website

Page 16: OKI 2014 Transportation Funding Opportunities

Questions?Contact:

Bob Koehler, Deputy Executive Director

[email protected]

Mark Paine, TIP [email protected]

(513) 621-6300