DESCRIPTION
EERSTER RIVER MULTI PURPOSE SPORTS CENTRE • PROFESSIONAL TEAM • RFP/TENDER FOR PROFESSIONAL SERVICES TO DESIGN A MULTI PURPOSE SPORTS HALL. VMA –ARCHITECTS /PROJECT MANAGER OWS-STRUCTURAL & CIVIL L2K –QUANTITY SURVEYOR ICE GROUP –ELECTRICAL ENG. MAN –MECHANICAL ENG. A.GEACH –LAND SURVEYOR G.FARMER –HEALTH & SAFETY CONSULTANT. SUBMISSION OF COMPLETED TENDER DOCUMENTTRANSCRIPT
EERSTER RIVER MULTI PURPOSE SPORTS CENTRE
STAGE 1• RFP/TENDER FOR PROFESSIONAL SERVICESTO DESIGN A MULTI PURPOSE SPORTS HALL.
• PROFESSIONAL TEAMVMA – ARCHITECTS /PROJECT MANAGEROWS- STRUCTURAL & CIVILL2K – QUANTITY SURVEYORICE GROUP – ELECTRICAL ENG.MAN – MECHANICAL ENG.A.GEACH – LAND SURVEYORG.FARMER – HEALTH & SAFETY CONSULTANT.
SUBMISSION OF COMPLETED TENDER DOCUMENT
STAGE 2 & 3TENDER AWARD
• DESIGN CONCEPT & DESIGN DEVELOPMENT• THE BRIEFHALL 476 sqmMINOR HALL 42sqmKITCHEN 28sqmABLUTION 51sqmSEMINAR /ADMIN AREA -76sqmREFUSE ROOM - 8sqmSTORE ROOM 10sqmDISABLED TOILET 5sqmENTRANCE FOYER - 93sqmVIEWING DECK 30sqm
COORDINATION OF ALL CONSULTANTS INPUT INTO THE DESIGN.REVIEW DESIGN WITH ALL STATUTORY BODIES.
PRECEDENT STUDY
House Brebnor– Stanley Saitowitz
House Brebnor– Stanley Saitowitz
•Piazza del Campidoglio – Michelangelo Buonarroti
•Piazza del Campidoglio – Michelangelo Buonarroti
STAGE 4
• TECHNICAL DOCUMENTATION OF CONSULTING TEAM
• REVIEW THE ESTIMATED COST
• LOCAL AUTHORITY APPROVAL
• TENDER FOR CONSTRUCTION ADVERTISED
• CONTRACTOR RECOMMENDED FOR APOINTMENT
• SAFAZ (WOMAN BUILDER)
• CONTRACT ADMINISTRATION & SITE SUPERVISION
• PRACTICAL COMPLETION / WORKS COMPLETION / FINAL COMPLETION
• AS BUILT DRAWINGS –MAINTANANCE MANUAL COMPLIANCE CERTIFICATES – OCCUPATION CERTIFICATES
STAGE 5
THE END .THANK YOU