nyu expansion tour

10
Andrew Weigand - Prof. Damon Rich - Syracuse University Urban Studio NYC - Fall 2010

Upload: andrew-weigand

Post on 28-Jan-2016

235 views

Category:

Documents


0 download

DESCRIPTION

Tour of NYU's growth and explanation of current 2031 Plan and community concerns.

TRANSCRIPT

  • Andrew Weigand - Prof. Damon Rich - Syracuse University Urban Studio NYC - Fall 2010

    TRIM AREA

    BLEED AREA

    Silver Towers

    Washingto

    n Square P

    ark

    Washingon S

    quare Villag

    e

    Furman Law Building

    Washington Square Quad ?

    Bobst L

    ibrary

    Center f

    or Acad

    emic +

    Spiritua

    l Life

    University with a Plan

    Edgar Allen Poe Facade

    Kimmel Center

    Furman Law Building

    Ori

    gina

    l Loc

    atio

    n

    Providence

    Playhouse

    Wilf Hall Construction

    Broken Promises

    Whoops

    Theatre walls to be preserved

    Prov

    iden

    ce P

    layh

    ouse

    One struggle in the West Village surrounds NYU: 2031 a plan for the next 20 years of NYU. It calls for NYU to expand to compete with other universities, and includes proposals across the city. In NYUs Core, the area surrounding Washington Square park, the plan aims to develop 2 million square feet of additional space, with most of the building concentrated in the southern superblocks.

    NYU has been located in the Village since 1832 when its first academic building on Washington Square East, was finished. In 1922, Chancellor Elmer Ellsworth Brown predicted that the University would expand to surround Washington Square. Today, the fabric to the West of Washington Square is protected by zoning which limits NYUs growth; undaunted, the University continues to expand and owns many of the blocks surrounding the Park, which residents fear will lead to a loss of the character which defines the village.

    Issues with NYUs growth date to a 1947 proposal for a Law Center, followed by the 1953 Title 1 Urban renewal plans which created the superblocks to the southeast of Washington Square. This plan was met with passionate protest because one of the superblocks was designated for academic use for NYU. This block, on Washington Square

    South is home to Bobst Library, Tisch Hall, and Warren Weaver Hall. Since the 1953 project began, NYU has acquired all three superblocks and virtually all property (and have maxed out its F.A.R.) east of the Square.

    To move forward with the NYU: 2031 plan, NYU began the ULURP (Uniform Land Use Redevelopment Plan) approval process for developing the southern superblocks. Initially set on building a 4th tower on the site of the Landmarked (in 2005) Silver Towers, NYU withdrew the proposal following protest from the community and architects Pei Cobb Freid. The ULURP application is still underway, and NYU still plans to create of 2 million square feet of growth on the two southern blocks, building on the site of the current Morton Williams Supermarket and between the existing Washington Square Village residential blocks.

    This planned development is the core issue residents and preservationists have with NYUs growth; however, a series of disputes have flared regarding construction and renova-tion projects around the historic Providence Playhouse on MacDougal St. and Edgar Allen Poe House located on West 3rd St. Also contested were zoning and visual impact of the Kimmel Center for University Life and Center for Academic and Spiritual Life.

  • TRIM AREA

    BLEED AREA

    Silver Towers

    Washingto

    n Square P

    ark

    Washingon S

    quare Villag

    e

    Furman Law Building

    Washington Square Quad ?

    Bobst L

    ibrary

    Center f

    or Acad

    emic +

    Spiritua

    l Life

    University with a Plan

    Edgar Allen Poe Facade

    Kimmel Center

    Furman Law Building

    Ori

    gina

    l Loc

    atio

    n

    Providence

    Playhouse

    Wilf Hall Construction

    Broken Promises

    Whoops

    Theatre walls to be preserved

    Prov

    iden

    ce P

    layh

    ouse

    One struggle in the West Village surrounds NYU: 2031 a plan for the next 20 years of NYU. It calls for NYU to expand to compete with other universities, and includes proposals across the city. In NYUs Core, the area surrounding Washington Square park, the plan aims to develop 2 million square feet of additional space, with most of the building concentrated in the southern superblocks.

    NYU has been located in the Village since 1832 when its first academic building on Washington Square East, was finished. In 1922, Chancellor Elmer Ellsworth Brown predicted that the University would expand to surround Washington Square. Today, the fabric to the West of Washington Square is protected by zoning which limits NYUs growth; undaunted, the University continues to expand and owns many of the blocks surrounding the Park, which residents fear will lead to a loss of the character which defines the village.

    Issues with NYUs growth date to a 1947 proposal for a Law Center, followed by the 1953 Title 1 Urban renewal plans which created the superblocks to the southeast of Washington Square. This plan was met with passionate protest because one of the superblocks was designated for academic use for NYU. This block, on Washington Square

    South is home to Bobst Library, Tisch Hall, and Warren Weaver Hall. Since the 1953 project began, NYU has acquired all three superblocks and virtually all property (and have maxed out its F.A.R.) east of the Square.

    To move forward with the NYU: 2031 plan, NYU began the ULURP (Uniform Land Use Redevelopment Plan) approval process for developing the southern superblocks. Initially set on building a 4th tower on the site of the Landmarked (in 2005) Silver Towers, NYU withdrew the proposal following protest from the community and architects Pei Cobb Freid. The ULURP application is still underway, and NYU still plans to create of 2 million square feet of growth on the two southern blocks, building on the site of the current Morton Williams Supermarket and between the existing Washington Square Village residential blocks.

    This planned development is the core issue residents and preservationists have with NYUs growth; however, a series of disputes have flared regarding construction and renova-tion projects around the historic Providence Playhouse on MacDougal St. and Edgar Allen Poe House located on West 3rd St. Also contested were zoning and visual impact of the Kimmel Center for University Life and Center for Academic and Spiritual Life.

  • TRIM AREA

    BLEED AREA

    Silver Towers

    Washingto

    n Square P

    ark

    Washingon S

    quare Villag

    e

    Furman Law Building

    Washington Square Quad ?

    Bobst L

    ibrary

    Center f

    or Acad

    emic +

    Spiritua

    l Life

    University with a Plan

    Edgar Allen Poe Facade

    Kimmel Center

    Furman Law Building

    Ori

    gina

    l Loc

    atio

    n

    Providence

    Playhouse

    Wilf Hall Construction

    Broken Promises

    Whoops

    Theatre walls to be preserved

    Prov

    iden

    ce P

    layh

    ouse

    One struggle in the West Village surrounds NYU: 2031 a plan for the next 20 years of NYU. It calls for NYU to expand to compete with other universities, and includes proposals across the city. In NYUs Core, the area surrounding Washington Square park, the plan aims to develop 2 million square feet of additional space, with most of the building concentrated in the southern superblocks.

    NYU has been located in the Village since 1832 when its first academic building on Washington Square East, was finished. In 1922, Chancellor Elmer Ellsworth Brown predicted that the University would expand to surround Washington Square. Today, the fabric to the West of Washington Square is protected by zoning which limits NYUs growth; undaunted, the University continues to expand and owns many of the blocks surrounding the Park, which residents fear will lead to a loss of the character which defines the village.

    Issues with NYUs growth date to a 1947 proposal for a Law Center, followed by the 1953 Title 1 Urban renewal plans which created the superblocks to the southeast of Washington Square. This plan was met with passionate protest because one of the superblocks was designated for academic use for NYU. This block, on Washington Square

    South is home to Bobst Library, Tisch Hall, and Warren Weaver Hall. Since the 1953 project began, NYU has acquired all three superblocks and virtually all property (and have maxed out its F.A.R.) east of the Square.

    To move forward with the NYU: 2031 plan, NYU began the ULURP (Uniform Land Use Redevelopment Plan) approval process for developing the southern superblocks. Initially set on building a 4th tower on the site of the Landmarked (in 2005) Silver Towers, NYU withdrew the proposal following protest from the community and architects Pei Cobb Freid. The ULURP application is still underway, and NYU still plans to create of 2 million square feet of growth on the two southern blocks, building on the site of the current Morton Williams Supermarket and between the existing Washington Square Village residential blocks.

    This planned development is the core issue residents and preservationists have with NYUs growth; however, a series of disputes have flared regarding construction and renova-tion projects around the historic Providence Playhouse on MacDougal St. and Edgar Allen Poe House located on West 3rd St. Also contested were zoning and visual impact of the Kimmel Center for University Life and Center for Academic and Spiritual Life.

  • Brown Building (John Woosley, 1911)This building was once the Triangle Shirtwaist Co. which experienced a fire which resulted in the deaths of over 100 garment workers spawned increased workers rights, building safety standards, and the growth of the International Ladies Garment Workers Union. Once a landmark in village history, it has been subsumed by NYUs Growth, and now acts as science classrooms.

    Bobst Library (Philip Johnson, 1967-73)NYU continued to expand to the south in the 1954 Title 1 Urban Renewal. The first building to be completed on one part of the renewal plans Academic superblock, it was Designed by Philip Johnson, and at the time of its proposal in 1961, the massive volume of the library spawned protests from residents.

    Washington Square Village (S.J Kessler and Sons, 1961)These housing blocks, the first project completed after the 1955 Urban Renewal which created the 3 southern superblocks. In 1957, NY Times critic Ira Freeman lamented, The mellow old landmarks of Greenwich Village are rapidly disappearing beneath modern glass monuments... Washington Square Village was the first major project affecting the character of the West Village.

    Silver Towers / University Plaza (I.M. Pei 1963-66)Vacant from following the Urban Renewal project from 1955-1963, NYU then hired I.M. Pei to design 3, 275-foot towers for faculty housing. The towers were landmarked in 2008, and NYU, facing the landmarks committee and staunch community protest withdrew a proposal for a 4th tower as part of NYU 2031, but is still considering a building on the northwest corner, along with a zipper dorm and community building.

    Edgar Allen Poe House / Furman Law Center (KPF, 2006) This new building, the Furman Law Center, faced lawsuits and protest over the demolition of the historic Edgar Allen Poe House and a Stanford White Townhouse which existed on the site. In the end, NYU removed the Poe house, retaining its faade, which was shifted 1/2 block and built around for the new 170,000 square foot Law School expansion.

    Wilf Hall / Providence Playhouse (Morris Adjmi Assoc., 2010) This village landmark and off Broadway theatre was recently threatened by a NYU renovation/addition project, which sought to rebuild the Playhouse and surrounding NYU-owned Buildings. The facade and interior of the theatre were (mostly) preserved during the construction of the new Wilf Hall.

    Washington Square Park The park is undergoing its third overhaul, provoking residents over the centering of the fountain, tree removal, and delays. Elmer Brown predicted that NYU would one day surround the park, and his vision has been realized the question a now is how far are residents, the city, and the university willing to go to expand or fight against expansion, with the park at the center of it all.

    Center for Academic and Spiritual Life (Machado & Silvetti) The center, currently under construction, replaces the former Catholic Center that was built on the site, and required a variance for bulk modification. Other concerns surrounding the project from residents addressed the street trees and landscaping adjacent to the building, which were removed for construction but will be replaced following the projects completion.

    1

    2

    3

    4

    5

    6

    78

    W Houston St

    5th Av

    e

    Unive

    rsity P

    lace

    Broad

    way

    La G

    uardi

    aTh

    omps

    on

    Sulliv

    anMa

    cDou

    gal

    4th

    9th

    Bleecker

    3th

    Waverly Pl

    NYU Core

    STAR

    T

    FINISH

    The University will expand to surround Washington Square Park Chancellor Elmer Ellsworth Brown, 1922

    1

    2

    3

    4

    5

    6

    7

    8

  • Brown Building (John Woosley, 1911)This building was once the Triangle Shirtwaist Co. which experienced a fire which resulted in the deaths of over 100 garment workers spawned increased workers rights, building safety standards, and the growth of the International Ladies Garment Workers Union. Once a landmark in village history, it has been subsumed by NYUs Growth, and now acts as science classrooms.

    Bobst Library (Philip Johnson, 1967-73)NYU continued to expand to the south in the 1954 Title 1 Urban Renewal. The first building to be completed on one part of the renewal plans Academic superblock, it was Designed by Philip Johnson, and at the time of its proposal in 1961, the massive volume of the library spawned protests from residents.

    Washington Square Village (S.J Kessler and Sons, 1961)These housing blocks, the first project completed after the 1955 Urban Renewal which created the 3 southern superblocks. In 1957, NY Times critic Ira Freeman lamented, The mellow old landmarks of Greenwich Village are rapidly disappearing beneath modern glass monuments... Washington Square Village was the first major project affecting the character of the West Village.

    Silver Towers / University Plaza (I.M. Pei 1963-66)Vacant from following the Urban Renewal project from 1955-1963, NYU then hired I.M. Pei to design 3, 275-foot towers for faculty housing. The towers were landmarked in 2008, and NYU, facing the landmarks committee and staunch community protest withdrew a proposal for a 4th tower as part of NYU 2031, but is still considering a building on the northwest corner, along with a zipper dorm and community building.

    Edgar Allen Poe House / Furman Law Center (KPF, 2006) This new building, the Furman Law Center, faced lawsuits and protest over the demolition of the historic Edgar Allen Poe House and a Stanford White Townhouse which existed on the site. In the end, NYU removed the Poe house, retaining its faade, which was shifted 1/2 block and built around for the new 170,000 square foot Law School expansion.

    Wilf Hall / Providence Playhouse (Morris Adjmi Assoc., 2010) This village landmark and off Broadway theatre was recently threatened by a NYU renovation/addition project, which sought to rebuild the Playhouse and surrounding NYU-owned Buildings. The facade and interior of the theatre were (mostly) preserved during the construction of the new Wilf Hall.

    Washington Square Park The park is undergoing its third overhaul, provoking residents over the centering of the fountain, tree removal, and delays. Elmer Brown predicted that NYU would one day surround the park, and his vision has been realized the question a now is how far are residents, the city, and the university willing to go to expand or fight against expansion, with the park at the center of it all.

    Center for Academic and Spiritual Life (Machado & Silvetti) The center, currently under construction, replaces the former Catholic Center that was built on the site, and required a variance for bulk modification. Other concerns surrounding the project from residents addressed the street trees and landscaping adjacent to the building, which were removed for construction but will be replaced following the projects completion.

    1

    2

    3

    4

    5

    6

    78

    W Houston St

    5th Av

    e

    Unive

    rsity P

    lace

    Broad

    way

    La G

    uardi

    aTh

    omps

    on

    Sulliv

    anMa

    cDou

    gal

    4th

    9th

    Bleecker

    3th

    Waverly Pl

    NYU Core

    STAR

    T

    FINISH

    The University will expand to surround Washington Square Park Chancellor Elmer Ellsworth Brown, 1922

    1

    2

    3

    4

    5

    6

    7

    8

  • Superblocks: Urban Renewal and Discontent

    1965

    2021?

    1951 1955 1958

    19731972 1981

    La Gu

    ardia

    Woost

    er

    Greene

    Merce

    r

    Bleeker

    W 3

    rd

    W 4

    th

    A proposed 400 tower on the Silver Towers site has been withdrawn following a letter from Pei Cobb Freid Architects

    NYU recognizes the primacy of its Washington Square location. Its presence there is essential for its identity and mission ...

    A fourth tower is profoundly destructive of the landmarked entity because it closes a composition that

    was intended to be open and upsets the carefully considered balance between

    solid and void.

    The University will expand to surround Washington Square.

    Elizabeth HurleyPublic Affairs, NYU

    Charlie EisenhoodThe NYU Local, Student

    Elmer Ellsworth BrownChancellor, 1922, NYU

    John SextonPresident, NYU

    I. M. PeiArchitect, Silver Towers

    Its widely known as one of the finest modern residential

    complexes in the City

    Robert TierneyChairman, NYC Landmarks

    Aubrey LeesCommitee to Save Washington Square

    Coles Gym was the last building to be completed under the urban renewal plan. As a result of the deed restriction, no construction could begin until 2021.

    Washington Square Village was finished in 1958. NYU purchased it in 1964. It now serves as faculty and graduate student housing

    The housing development slated for the southern block fell through following financial issues, and the site remained vacant until 1963.

    The two southern superblocks were devoted to two residential developments, University Village and Washington Square Village.

    The two southern superblocks were sold to private developers with plans for two residential developments, University Village and Washington Square Village.

    Warren Weaver Hall was the first building to occupy the Academic Block.

    In 1953, Robert Moses proposed a Title 1 Urban Renewal project for these 9 Blocks to the south of Washington Square Park.

    NYU was given a parcel on Washington Square South. Following community opposition, NYU acquired the property in August of 1955.

    Title 1 Urban renewal projects designated certain areas as blighted, and allowed the city to claim that property for new development, displacing 53 residents.

    Tisch Hall, designed by Phillip Johnson and home to the School of Business, opened in 1972.

    In 1963, NYU purchased the southern superblock and hired I.M. Pei to design University Village, which opened in 1966.

    Bobst Library, also designed by Phillip Johnson, Was initially proposed in 1961 and delayed by community protests.

    NYU hopes to add 2 million sq feet in 4 buildings; 2 academic buildings on the WSV block and housing, community facilities, and a hotel on the southern superblock.

    They're transforming Washington Square and

    changing the neighborhood's character by constructing buildings that are huge...

    The rest of the residents of the Village suffer. There is no reason to walk through the block. [Washington Square Village] It feels unwelcoming. Simply put, it doesnt fit in with Greenwich Village.

    Greenwich Village is a fragile ecosystem.

    The Title 1 Urban Renewal plan carries with it a deed restriction which prohibits modifications or additional construction for 40 years after the completion of the redevelopment.

    To achieve this growth, NYU needs to go through the U.L.U.R.P. process to rezone their property from R7-2 to C6-2, and increase their F.A.R.

    The new, residential Tower-in-the-Park developments were initially met with staunch protest; they stood out in the Village fabric, consisted of 3-4 storey townhouses at the time.

    By pledging to build this elementary school, the university has done more than pay lip service to community needs, it has taken action that will make a real difference in the lives of hundreds of Greenwich Village families.

    Scott M StringerManhattan Borough President

    Community Board II is committed to do everything we can to ensure that NYU is not allowed to overwhelm

    our neighborhoods.

    Andrew BermanExecutive Director, G.V.S.H.P.

    The proposed oversized, out-of-context development

    has no place on this site.

  • Superblocks: Urban Renewal and Discontent

    1965

    2021?

    1951 1955 1958

    19731972 1981

    La Gu

    ardia

    Woost

    er

    Greene

    Merce

    r

    Bleeker

    W 3

    rd

    W 4

    th

    A proposed 400 tower on the Silver Towers site has been withdrawn following a letter from Pei Cobb Freid Architects

    NYU recognizes the primacy of its Washington Square location. Its presence there is essential for its identity and mission ...

    A fourth tower is profoundly destructive of the landmarked entity because it closes a composition that

    was intended to be open and upsets the carefully considered balance between

    solid and void.

    The University will expand to surround Washington Square.

    Elizabeth HurleyPublic Affairs, NYU

    Charlie EisenhoodThe NYU Local, Student

    Elmer Ellsworth BrownChancellor, 1922, NYU

    John SextonPresident, NYU

    I. M. PeiArchitect, Silver Towers

    Its widely known as one of the finest modern residential

    complexes in the City

    Robert TierneyChairman, NYC Landmarks

    Aubrey LeesCommitee to Save Washington Square

    Coles Gym was the last building to be completed under the urban renewal plan. As a result of the deed restriction, no construction could begin until 2021.

    Washington Square Village was finished in 1958. NYU purchased it in 1964. It now serves as faculty and graduate student housing

    The housing development slated for the southern block fell through following financial issues, and the site remained vacant until 1963.

    The two southern superblocks were devoted to two residential developments, University Village and Washington Square Village.

    The two southern superblocks were sold to private developers with plans for two residential developments, University Village and Washington Square Village.

    Warren Weaver Hall was the first building to occupy the Academic Block.

    In 1953, Robert Moses proposed a Title 1 Urban Renewal project for these 9 Blocks to the south of Washington Square Park.

    NYU was given a parcel on Washington Square South. Following community opposition, NYU acquired the property in August of 1955.

    Title 1 Urban renewal projects designated certain areas as blighted, and allowed the city to claim that property for new development, displacing 53 residents.

    Tisch Hall, designed by Phillip Johnson and home to the School of Business, opened in 1972.

    In 1963, NYU purchased the southern superblock and hired I.M. Pei to design University Village, which opened in 1966.

    Bobst Library, also designed by Phillip Johnson, Was initially proposed in 1961 and delayed by community protests.

    NYU hopes to add 2 million sq feet in 4 buildings; 2 academic buildings on the WSV block and housing, community facilities, and a hotel on the southern superblock.

    They're transforming Washington Square and

    changing the neighborhood's character by constructing buildings that are huge...

    The rest of the residents of the Village suffer. There is no reason to walk through the block. [Washington Square Village] It feels unwelcoming. Simply put, it doesnt fit in with Greenwich Village.

    Greenwich Village is a fragile ecosystem.

    The Title 1 Urban Renewal plan carries with it a deed restriction which prohibits modifications or additional construction for 40 years after the completion of the redevelopment.

    To achieve this growth, NYU needs to go through the U.L.U.R.P. process to rezone their property from R7-2 to C6-2, and increase their F.A.R.

    The new, residential Tower-in-the-Park developments were initially met with staunch protest; they stood out in the Village fabric, consisted of 3-4 storey townhouses at the time.

    By pledging to build this elementary school, the university has done more than pay lip service to community needs, it has taken action that will make a real difference in the lives of hundreds of Greenwich Village families.

    Scott M StringerManhattan Borough President

    Community Board II is committed to do everything we can to ensure that NYU is not allowed to overwhelm

    our neighborhoods.

    Andrew BermanExecutive Director, G.V.S.H.P.

    The proposed oversized, out-of-context development

    has no place on this site.

  • TRIM AREA

    BLEED AREA

    ...What do you mean the ULURP didnt get approved ?!....

    After its Uniform Land Use Redevelopment plan fell through, NYU investigated extreme means to develop the core campus.

    The bedrock-scraper is carefully calibrated for optimum solar penetration. Its depth also allows it to take advantage of passive geothermal heating and cooling.The Future?

    NYUndergroundPresident Sexton, Im calling to inform you that the planning board is not going to approve the Universitys ULURP.....

    This leaves us in a bit of a pickle. What should we do?

    Downtown is too expensive...Dubai is too far....Governors Island is too small...

    Well...begin work on plan U....In order to work within its own property, NYU investigated excavating the 2.75 Acres Underneath Washington Mews, creating a Bedrockscraper. It carefully preserves existing facades while enabling the NYU to grow in its Core area.

    Digging 22 stories beneath the historic townhouses and street, the University was able to create an additional 1.75 Million sq feet of space.

    Additional dark space is devoted to programs such as theatres, gyms, and nightclubs.

    ...How about downtown?...

    ...Dahbi?

    ...Governors Island?

    160

    240NYU has 160 sq ft of space per student,and a population of 40,000

    students NYU 2031 calls for an increase to 240 sq ft per student.

    2031

    2010

  • TRIM AREA

    BLEED AREA

    ...What do you mean the ULURP didnt get approved ?!....

    After its Uniform Land Use Redevelopment plan fell through, NYU investigated extreme means to develop the core campus.

    The bedrock-scraper is carefully calibrated for optimum solar penetration. Its depth also allows it to take advantage of passive geothermal heating and cooling.The Future?

    NYUndergroundPresident Sexton, Im calling to inform you that the planning board is not going to approve the Universitys ULURP.....

    This leaves us in a bit of a pickle. What should we do?

    Downtown is too expensive...Dubai is too far....Governors Island is too small...

    Well...begin work on plan U....In order to work within its own property, NYU investigated excavating the 2.75 Acres Underneath Washington Mews, creating a Bedrockscraper. It carefully preserves existing facades while enabling the NYU to grow in its Core area.

    Digging 22 stories beneath the historic townhouses and street, the University was able to create an additional 1.75 Million sq feet of space.

    Additional dark space is devoted to programs such as theatres, gyms, and nightclubs.

    ...How about downtown?...

    ...Dahbi?

    ...Governors Island?

    160

    240NYU has 160 sq ft of space per student,and a population of 40,000

    students NYU 2031 calls for an increase to 240 sq ft per student.

    2031

    2010