_____________Documents Required for Inspection_____________ Ref No. NS1-MCS (ARV)-EVN-S(DRI)-0804 Date: 18 October 2012 To: Vietnam Electricity Group Thermal Power Project Management Board No.2 Attn to: Mr. Nguyen Xo Viet, Director of PMB2 Tel : +84-38-3-240-051 Mr. Nguyen Tien Khoa, Vice Director of PMB2 Fax: +84-38-3-523-299 CC: J-Power/AF-Consult Switzerland Consortium Mr. Kiichiro Onoyama From: Marubeni Corporation Nghi Son 1 Site Office Tel : +84-37-8711501/502 Fax: +84-37-8711500 __________________________________________________________ Page(s): 1 + 21 Project: Nghi Son 1 Thermal Power Plant Construction Project Subject: Documents Required for Inspection at site (MC Invoice No. 2PN07638)Steel Conduit Accessories Dear Sirs, As the delivery inspection for following items are planned on: 20 October 2012, we are pleased to submit the documents required for inspection as attached. No. Transmittal No. (Date) Project Control No. Drawing No. 1 Hence, we would like to request to dispatch your examining staffs to attend the Inspection. Your attention would be highly appreciated. c.c. Fuji Electric Marubeni Tokyo (B715) Marubeni HAN (HAMPOWR) Marubeni HCM (HCMPOWR) Marubeni NS1 Site Nghi Son 1 TPP Construction Project (on behalf of Mr. Yasushi Matsumura, Project Manager) Attachment: i) Summary of Packing List, ii) Certificate of Arrival (Draft) Please find as attached.

Upload: tung-nguyen

Post on 04-Aug-2015

37 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NS1-MCS(ARV)-EVN-S(DRI)-0804(121018) Document Required for Inspection at Site (MC Reference No.2PN07638)Steel Conduit Accessories (1)-1

_____________Documents Required for Inspection_____________ Ref No. NS1-MCS (ARV)-EVN-S(DRI)-0804

Date: 18 October 2012 To: Vietnam Electricity Group Thermal Power Project Management Board No.2 Attn to: Mr. Nguyen Xo Viet, Director of PMB2 Tel : +84-38-3-240-051 Mr. Nguyen Tien Khoa, Vice Director of PMB2 Fax: +84-38-3-523-299 CC: J-Power/AF-Consult Switzerland Consortium Mr. Kiichiro Onoyama From: Marubeni Corporation Nghi Son 1 Site Office Tel : +84-37-8711501/502 Fax: +84-37-8711500 __________________________________________________________

Page(s): 1 + 21 Project: Nghi Son 1 Thermal Power Plant Construction Project

Subject: Documents Required for Inspection at site (MC Invoice No. 2PN07638)Steel Conduit Accessories

Dear Sirs,

As the delivery inspection for following items are planned on: 20 October 2012, we are

pleased to submit the documents required for inspection as attached.

No. Transmittal No. (Date) Project Control No. Drawing No.

1

Hence, we would like to request to dispatch your examining staffs to attend the Inspection.

Your attention would be highly appreciated.

c.c. Fuji Electric

Marubeni – Tokyo (B715)

Marubeni – HAN (HAMPOWR)

Marubeni – HCM (HCMPOWR)

Marubeni – NS1 Site

Nghi Son 1 TPP Construction Project

(on behalf of Mr. Yasushi Matsumura, Project Manager)

Attachment: i) Summary of Packing List, ii) Certificate of Arrival (Draft)

Please find as attached.

Page 2: NS1-MCS(ARV)-EVN-S(DRI)-0804(121018) Document Required for Inspection at Site (MC Reference No.2PN07638)Steel Conduit Accessories (1)-1

NGHI SON 1 THERMAL POWER PLANT CONSTRUCTION PROJECT, VIETNAM Issue Status Return Status

CONTRACT NO.: 010610/NS1-EVN-MC A: For Approval A: Approved

I: For Information AC: Approved with Correction Indicated

DRAWING / DOCUMENT LIST - Station Electrical AB: As Built Drawing I: Information Only

C: Internal Design X: Returned for Correction

Project Control No.

(NS1-…)Rev

Contractor Drawing

No.Rev Drawing Title Due Date

Rev. Target Date

(Forecast

Submission to

EVN)

Issue Letter No

(NS1-MCP(ARV)-)Issue Date

Issue

Status

Return Letter

No

Return

Date

Return

StatusCaRs

18B-E-ARV-5021 0NS1-AR-3346PX093-

50210

PVC Conduit and Accessories Specification for

Communication SystemEVN-D-2953 04 Jul 12 A MC-5535 27 Jul 12 AC 3457

Printed: 10/18/2012 ARV 1 of 1 7597 Drawing List-ELE-ARV

Page 3: NS1-MCS(ARV)-EVN-S(DRI)-0804(121018) Document Required for Inspection at Site (MC Reference No.2PN07638)Steel Conduit Accessories (1)-1
Page 4: NS1-MCS(ARV)-EVN-S(DRI)-0804(121018) Document Required for Inspection at Site (MC Reference No.2PN07638)Steel Conduit Accessories (1)-1
Page 5: NS1-MCS(ARV)-EVN-S(DRI)-0804(121018) Document Required for Inspection at Site (MC Reference No.2PN07638)Steel Conduit Accessories (1)-1
Page 6: NS1-MCS(ARV)-EVN-S(DRI)-0804(121018) Document Required for Inspection at Site (MC Reference No.2PN07638)Steel Conduit Accessories (1)-1
Page 7: NS1-MCS(ARV)-EVN-S(DRI)-0804(121018) Document Required for Inspection at Site (MC Reference No.2PN07638)Steel Conduit Accessories (1)-1
Page 8: NS1-MCS(ARV)-EVN-S(DRI)-0804(121018) Document Required for Inspection at Site (MC Reference No.2PN07638)Steel Conduit Accessories (1)-1
Page 9: NS1-MCS(ARV)-EVN-S(DRI)-0804(121018) Document Required for Inspection at Site (MC Reference No.2PN07638)Steel Conduit Accessories (1)-1
Page 10: NS1-MCS(ARV)-EVN-S(DRI)-0804(121018) Document Required for Inspection at Site (MC Reference No.2PN07638)Steel Conduit Accessories (1)-1
Page 11: NS1-MCS(ARV)-EVN-S(DRI)-0804(121018) Document Required for Inspection at Site (MC Reference No.2PN07638)Steel Conduit Accessories (1)-1
Page 12: NS1-MCS(ARV)-EVN-S(DRI)-0804(121018) Document Required for Inspection at Site (MC Reference No.2PN07638)Steel Conduit Accessories (1)-1
Page 13: NS1-MCS(ARV)-EVN-S(DRI)-0804(121018) Document Required for Inspection at Site (MC Reference No.2PN07638)Steel Conduit Accessories (1)-1
Page 14: NS1-MCS(ARV)-EVN-S(DRI)-0804(121018) Document Required for Inspection at Site (MC Reference No.2PN07638)Steel Conduit Accessories (1)-1
Page 15: NS1-MCS(ARV)-EVN-S(DRI)-0804(121018) Document Required for Inspection at Site (MC Reference No.2PN07638)Steel Conduit Accessories (1)-1
Page 16: NS1-MCS(ARV)-EVN-S(DRI)-0804(121018) Document Required for Inspection at Site (MC Reference No.2PN07638)Steel Conduit Accessories (1)-1
Page 17: NS1-MCS(ARV)-EVN-S(DRI)-0804(121018) Document Required for Inspection at Site (MC Reference No.2PN07638)Steel Conduit Accessories (1)-1
Page 18: NS1-MCS(ARV)-EVN-S(DRI)-0804(121018) Document Required for Inspection at Site (MC Reference No.2PN07638)Steel Conduit Accessories (1)-1
Page 19: NS1-MCS(ARV)-EVN-S(DRI)-0804(121018) Document Required for Inspection at Site (MC Reference No.2PN07638)Steel Conduit Accessories (1)-1

ORIGINAL

Ref. No. : NS1-MCS(ARV)-EVN-S(DRI)-0804 Date : 30- October -2012 To : Marubeni Corporation Attn : Mr. Yasushi Matsumura, Project Manager

Certificate of Arrival NGHI SON 1 THERMAL POWER PLANT CONSTRUCTION PROJECT

THE DELIVERIES AT SITE IN JULY 2012

Name of Project : Nghi Son Thermal Power Plant Construction Project (I) Contractor : Marubeni Corporation Invoice No. : Contract No. : 010610/NS1-EVN-MC Dated : June 01, 2010 In accordance with conditions of the Contract, we, the undersigned, on behalf of EVN hereby certify the oversea manufactured equipment, and material has been delivered at site on July 2012 and confirmed with the relevant conditions of the Contract. The details of the delivered cargoes are described in the Attachment “CONFIRMATION OF EQUIPMENT/ MATERIAL DELIVERED AT SITE” This Certificate is used only for the purpose of calculating, invoicing, making payment under L/C in accordance with the payment terms stipulated in the above Contract. Best Regards,

Thermal Power Project Management Board No. 2

_______________________

Nguyen Xo Viet Director

VIETNAM ELECTRICITY

THERMAL POWER PROJECT MANAGEMENT BOARD NO. 2

Address: No.2 Duy Tan Street, Hung Phuc Ward, Vinh City,

Nghe An Province, Vietnam; Tel: +84 38 2 240 051; Fax: +84 38 3 523 299;

Page 20: NS1-MCS(ARV)-EVN-S(DRI)-0804(121018) Document Required for Inspection at Site (MC Reference No.2PN07638)Steel Conduit Accessories (1)-1

Ref No. : NS1-MCS(ARV)-EVN-S(DRI)- 0804 Name of Project : Nghi Son Thermal Power Plant Construction Project (I) Contractor : Marubeni Corp oration

Attachment

CONFIRMATION OF EQUIPMENT/ MATERIAL DELIVERED AT SITE

This is to confirm the completion of delivery to the NS1 Site of the cargo/material/equipment

as per below:

No. Description Equipment No/ Part

No:

Package No

Unit Quantity

[packages] Weight

[kg] Dimension L x W x H

Date of Delivered

at the Site

1

2

3

Comment/ Conclusion (if any): Confirmed by :

Attachment : 1. Comment sheet

2. Inspection Attendees Sheet

VIETNAM ELECTRICITY

THERMAL POWER PROJECT MANAGEMENT BOARD NO. 2

Address: No.2 Duy Tan Street, Hung Phuc Ward, Vinh City,

Nghe An Province, Vietnam; Tel: +84 38 2 240 051; Fax: +84 38 3 523 299;

Contractor: Marubeni Corporation

Consultant: JPOWER/ AF Consult Switzerland (Consortium)

Owner: EVN/ Thermal Power Project Management Board No.2

Name: Name Name

Date: Date: Date:

Name: Name Name

Date: Date: Date:

Refer to Attached

Page 21: NS1-MCS(ARV)-EVN-S(DRI)-0804(121018) Document Required for Inspection at Site (MC Reference No.2PN07638)Steel Conduit Accessories (1)-1

NGHI SON 1 THERMAL POWER PLANT CONSTRUCTION PROJECT

Attachment 1

COMMENT SHEET ON EQUIPMENT/ MATERIAL INSPECTION

Equipment/Material

Description

Invoice No.

Confirmation on

Delivery to Site Ref.

No.

Letter No.

No. Consultant / TPMB2

Comment MC Reply / Explanation Conclusion

Contractor: Marubeni Corporation

Consultant: JPOWER/ AF Consult Switzerland (Consortium)

Owner: EVN/ Thermal Power Project Management Board No.2

Name: Name Name

Date: Date: Date:

Page 22: NS1-MCS(ARV)-EVN-S(DRI)-0804(121018) Document Required for Inspection at Site (MC Reference No.2PN07638)Steel Conduit Accessories (1)-1

MARUBENI CORPORATION Marubeni Corporation Site Office

Nghi Son 1 Thermal Power Plant Construction Project Attachment 2 Inspection Attendees Sheet INSPECTION ATTENDEES: INVOICE No: ………………………………………………………………….. Date: …………………………………………………………………..

No

NAME COMPANY

1

2

3

……